Loading...
R2000-010 01-24-00RESOLUTION NO. R2000-10 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AUTHORIZING THE CITY MANAGER OR HIS DESIGNEE TO EXECUTE A CHANGE ORDER WITH LEM CONSTRUCTION COMPANY, INC. FOR CONSTRUCTION OF EMERGENCY POWER WIRING AT THE ALICE STREET WATER PLANT, LIBERTY DRIVE WATER PLANT, WALNUT STREET WASTEWATER LIFT STATION, AND TWIN CREEKS WOOD WASTEWATER LIFT STATION. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain change order by and between the City of Pearland and LEM Construction Company, Inc., a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest the original of the attached change order with LEM Construction Company, Inc., for and on behalf of the City of Pearland, for construction of emergency power wiring at the Alice Street Water Plant, Liberty Drive Water Plant, Walnut Street Wastewater Lift Station, and Twin Creeks Wood Wastewater Lift Station. Section 3. That the costs associated with said change order will be paid from City of Pearland Account No. 042-6800-578.28-00. PASSED, APPROVED, AND ADOPTED this 24th day of January A.D., 2000. TOM REID MAYOR ATTEST: ORDINANCE NO. 2000-10 APPROVED AS TO FORM: DARRIN M. COKER GITY ATTORNEY 2 SECTION 00300 BID PROPOSAL Date 11/03/99 Bid of LEM Construction Co., Inc. ,, an individual proprietorship/a corporation organized and existing under the laws of the State of Texas/a partnership consisting of ., for the construction of: BARRY ROSE WASTEWATER TREATMENT PLANT EXPANSION (2.25 MGD TO 3.1 MGD) B99-001 (Submit in Duplicate) To: The Honorable Mayor and City of Council of Peadand City of Pearland 3519 Liberty Drive Peadand, Texas 77581 Pursuant to the published Invitation to Bid, the undersigned bidder hereby proposes to do all the work and furnish all necessary superintendence, labor, machinery, equipment, tools and materials, and whatever else may be necessary to complete all the work included under the General Contract for the construction of the Barry Rose Wastewater Treatment Plant Expansion as shown on the plans with all related appurtenances, complete, tested and operational, in accordance with the plans, and specifications prepared by the Engineer, Klotz Associates, Inc., Houston, Texas, under the City of Pearland's inspection for the unit prices set forth on the attached bid sheet which bears our signature for identification. It is understood that, in the event any changes are ordered made in any part of the work, the unit prices bid shall apply as additions to or deductions from the total prices for the parts of the work so changed. The bidder binds himself upon acceptance of his proposal to execute a contract and furnish performance bond and payment bond each in the amount of one hundred percent (100%) of the total contract pdce, according to the specified forms, for performing and completing the said work within the time stated, and furnishing a satisfactory maintenance bond indemnifying the Owner against defective workmanship and material for a period of one (1) year. The undersigned bidder agrees to commence work within ten (10) days after the date of a written notice to commence work. It is understood and agreed that the Contractor shall complete the work within 210 calendar days. Time for completion shall begin on the date established by the notice to commence work. Section 00300 Addendum No. 1 Page 1 of 4 It is agreed that the contract price may be increased or decreased to cover work added or deleted by order of the Engineer, in accordance with the provisions of the General Conditions of Agreement. The undersigned agrees that the amounts bid in this proposal will not be withdrawn or modified for sixty (60)days following date of bid opening. It is understood that in the event the successful bidder falls to enter into the Contract within ten (10) days and to furnish a Performance Bond and Payment Bond in the amount of 100 percent of the Contract for all parts of the work, the successful bidder will forfeit the Bid Security as provided in the Specifications submitted with his bid proposal. The undersigned proposes, if awarded the Contract, to begin work promptly after written notice to commence work is given by the Engineer, and to substantially complete the work in accordance with the completion schedule stipulated in the Special Conditions and the number of calendar days specified in this bid proposal. The following Addenda have been received. The modifications to the Bid documents noted therein have been considered and all costs thereto are included in the Bid price. Addendum No. ] , Dated 10/28/99 Addendum No. Dated Addendum No. Dated Addendum No. Dated Addendum No. Dated Addendum No. Dated. This bid proposal shall be considered part of the Contract. We the undersigned hereby offer to enter into a Contract for the construction of the Barry Rose Wastewater Treatment Plant Expansion, as specified here-in for the following prices: Item Quantity Unit Item Description and Unit No. Total Written Unit Price Price Amount 1 400 LF 2 1 LS 3 1 LS Trench Safety ~or -~ ~,-- co Dollars and .4/o cents per Allowance for Modifications to the Proposed Aeration Basin Baffle for Ten Thousand Dollars and No Cents per Lump Sum Barry Rose Wastewater Treatment Plant Expansion for and .,~/O cents per ~ ,.5 $10,000.00 $10,000.0q Section 00300 Addendum No. 1 Page 2 of 4 Total base bid lump sum price for Items 1 through 3 of (Pdnt or type in words and figures, Bidder's Total Bid Price ): (written) (figures) ). ALTERNATES - Include the following alternates as described in Section 01230: Alternate 1 - Add For. Alice Street Water Plant Improvements, Complete, Operational, and in Place Add (wri~en) Dollars ($ /~¢0¢ ). (figures) Alternate 2 - Add For: Liberty Street Water Plant Improvements, Complete, Operational, and in Place (written) e" Dollars ($ I'/,~'° ). (figures) Alternate 3 - Add For: Walnut Street Lift Station Improvements, Complete, Operational, and in Place Add (written) Dollars ($ (figures) Alternate 4 - Add For: Twin Creek Woods Lift Station Improvements, Complete, Operational, and in Place Add ~'~'¢."f .f ~.~.¢~...,.> ,Oo/_c..../4~j~5 ..'u'co ~-e~-~t~ (written) Dollars ($ VO/ooO. oo..). (figures) Section 00300 Page 3 of 4 Addendum No. 1 Very truly yours, BY: 'Herman Myers--V~ce President ADDRESS: LEM Construction Co., Inc. 10612 Rockley Road Houston, Texas 77099 A'I-f'EST~j~_ ~ Teresa Squiers--Assist~ht Secretary Seal, if bidder is Corporation END OF SECTION Section 00300 Addendum No. I Page 4 of 4