R99-101 11-22-99 RESOLUTION NO. R99-'101 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AUTHORIZING THE CITY MANAGER OR HIS DESIGNEE TO EXECUTE A CHANGE ORDER WITH CHAMPAGNE-WEBBER, INC. FOR MATERIALS AND LABOR ASSOCIATED WITH THE McHARD ROAD OVERPASS. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section '1. That certain change order by and between the City of Pearland and Champagne-Webber, Inc., a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest the original of the attached change order with Champagne-Webber, Inc., for and on behalf of the City of Peadand, for materials and labor associated with the McHard Road overpass. Section 3. That the costs associated with said change order will be paid from City of Pearland Account No. 059-9500-565.03-00. PASSED, APPROVED, AND ADOPTED this 22nd day of November A.D., 1999. ATTEST: C(_~q'Y SE~RETARY g/ / APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY TOM REID MAYOR WALSH ENGINEERING, INC. P.O. Box 700 PEARLAND, TEXAST/588-0760 WEI Project No. 96-72 ENGINEER'S MONTHLY ESTIMATE OF WORK AND MATERIALS NO. 17 FOR WORK COMPLETED THROUGH OCTOBER 12, 1999. CONTRACT: MoHARD ROAD FROM MYKAWA ROAD TO MAIN GTREET(SH 35) OWNER: City of PearMnd 85t9 Library Peml~nd, Texas 77581 CONTRACTOR: Champagne- Webbe~, Inc. 14333 Chfisman Road Houston, Texts 77039 CALENDAR DAYS RAIN DAYS Total Days 599 (550 + 6* + 43**) 8ahmca at Last Estimate 76 To Date 499 (Final days) This Month Days Rern~dning 100 (Bonus Days) TotaITo Date 76 SECTION 'A' - PAVEMENT * C. O. # I ** C. O. # $ NO. ITEM DESCRIPTION UNIT QUANTIT~ PERIOD TO DATE PRICE AMOUNT I Mobilization LS 1.0( 0,10 1.00 $400,000.00 $400,000.0g 2 Right-of-wayPrepsration AG 15.601 15.60 $3,740.00 $136,344.00 a Rem. Stab. Base &/or Asph. Pay. (~I 2) (0") SY 050.0( 40.00 ~4.00 8190.00 4 ~stv., Haul & 8toelq)il® Reel. Asph. (3") SY 8D0.0( $a.O0 5 Excavation CY 32,460,0C 31,308.00 83.25 8101,751.00 6 Embankment (D~lS. Cont.) CY 70,000,0( 78,124.00 $4.25 6310,777.00 7 Furnish & Place Top Soil (CI 2)(4") SY 8,1~8.0( 8,138.00 $0.75 86,102.50 $ Bleak Sodding 8Y 8,138.0( 8,138.00 $1.86 $15,106.62 9 Cell. Fibe~ Seed AC 9.1C 2.00 11.10 $390.00 $7,659.00 10 FerUlizet TN 12.4C 12.40 $395.00 $3,658.00 11 VegM~tive Waterln g MG 487.0C 467.00 818.00 $3,408.00 12 Flex. Base, Complete in Place (Ty A) (Gr 2)(CI 5)(t2") SY 2,010.0C 892.00 $11.00 $4,312.00 10 Lime Treatment Subgr.(Dens. Cont.)(1 ? SY 17,130.001 14,704.00 $1.45 $21,320.30 14 Lime (Ty A) TN 478.0( 370.25 $95.0~ $35,173.75 15 CemefltTteated Base(gbength-L) t'~ DIM D2)(Gr 6)(0") SY 700.0( 736.00 87.0~ 16 CementTreat~d Bas®(~,trength-L) i(Ty O1 o~ O2)(Gr 6)(12") SY 700.00, 757.00 812.0(3 17 Hat-Mix Asphaltic Concrete (Ty D) TN 322.0( 107.00 $00.5~ 18 Ooncratepavsment(Jo}ntadRstnf.)(9') SY 12,143.00 10,957.50 $36.0~ $284,895.0~ I O.~IN~ II B,D II THIS uRr ITEM DESCRIPTION I tQUANT' PRICE PERIOD TO DATE 19 Mono, Curb (6") LF 7,094,00 7,094,00 $1.50 $10,641.00 20 Cone, for Wide Flanged Anchorage CY 54.00 54.00 $175.00 $9,450.00 21 Reinf. fOr Wide Flanged Aneho~ga LBS $,g00.00 5,D00.00 $0.40 $2,360.00 22 ExcavMion for Wide Flanged Anchorage CY 290.00 220.00 23 Cement Stabilized B~=kflll (Bridge) CY 140,00 185,00 $50,00 $2,250.00 24 Retaining We. il (MBE)(Exp Agg;) SF 4,735,00 5,741,50 $27.00 $155,020.60 25 Riprap (Conc)(CI B) CY 1,300.00 357,50 $150.00 $64,850.00 26 Rlprap (8tone)(Oommo~)(Dry) CY 240,00 $70.00 $0.00 27 Rail (Ty C4) I.F 448.00 448,00 ~50.00 $22,400.00 28 Btruc. ~tL -HYC(WF Terming] Anchor.) LBS 8,400.00 8,400,00 $1,00 $2,400.00 2{) Remove Exist. Structure (Pipe) LF 27.00 $2.00 $0.00 30 Concrete Sidewalk (4") BY 220.00 225.00 $120.00 $27,000.00 31 Struck. Approach Slab CY 70,00 70.00 $200.00 $14,000.00 32 Me~l, Bm, Grd, Fne.(12 Ga), 'f'imbe; Post LF 200.00 000.00 $22.00 $6,600.00 33 MBGF Term, Anch, Section(12 Ga) EA 4.00 4.00! $225,00 34 Chain Link Fence (4') LF 250.00 250.0~ $9.00 $2,250.00 ~5; Wire Fence (Ty A) LF 1,925.00 1,923,00! $2.33 $4,480.59 351 Barricades, Signs, & Traffic Handling MO 15.00 0.5C 16.5¢ $5?0,00 $9,405,00 9UDTOTAL SECTION 'A' $1,702,882.42 SECTION 'B' - SIGNALIZATION, SIGNAGE, & PAVEMENT MARKING BID QUANT. UNn' iTE I UNiT QUANTiTYI THIS , N~.I~ ITEM DESCRIPTION . PERIOD, TO DATE I I AMOUNT , , PRICE ~ignatizetio~t Gystem at SH 35, Complate in Place per Plans L$ 1.00 1.0¢ $55,170.00 $55,170.00 E $ignaliz~'do~t System et Mykawa Rd. Complete in Placa per Plans LS 1.00 $25,450.00 $0,00 ;~ ,mall Rdsd. sign Assembly (Ty A) EA 12.00 14.0~ 20.0¢ $210.00 $4,200.00 5metl Rdsd, sign Assembly (Ty B) EA 1.00 1.0¢ ' $375.00 $375,00 5 Small Rdsd. sign Assembly (1¥ D-l) EA 5.00 1.0{~ 4.0( $200.00 ~] Reft, Pay, M;k. "l~ I(W)(4')(BId) LF 3,428.00 0.0~ $0.30 $0.00 7 Reft. P&v. Mrk. 'l~ I(W)(4')(Bkn) LF 5,330.00 1,920,0~ $0.30 $R70.00 Ref. Pay. Mrk. Ty I(W)(8')(SId) LF 215.00 300.oc $O.40 $120.00 g Refl, Pay. Mrk. Ty I(W)(24*)(SId) LF 156.00 48.0~ $3.00 10 Reft, Pay. Mrk, Ty I(Y)(4")(SId) LF 4,523.00 750.0( $0.30 $225.00 QUANT. UNIT UNIT IIQUANTITY~ PERIOD ~ TO DATE ~ PRICE I AMOUNT 111 Reft. Pay, Mrk. Ty I(Y)($-)(aid) LF 590,00 754,0~ $0,4~ $301.6~ 12 R~I. Pay. Mr k. Ty I(Y)(24-) (SId) LP 795.00 864.00 $3,03 $1,$02.~ 13 Reft. Pay, Mrk. Ty 1(~)(6. in Curb)(Sl~ LF 1,180.00 0.00 $1.80 14 Reft. Pay. Mrk. Ty II(W)(4-)(SId) LF 2,483.00 0,00 $0.12 $0.00 lft Reft. Pay, Mrk. Ty II(W) (4-) (Bkn) LF 5,330,00 1,920.00 $0.12 $230,40 10 Reft. Pay. Mrk. Ty II(W)(8-)(SId) LP 85.00 300,00 $0.25 $75.00 17 R ~. Pay. Mrk. Ty fl(W)(24')(Sld) LF 81.00 48.00 $1.00 $48.00 18 Reft. Pay, Mrk. Ty II(Y)(4-)(SId) LF 3,013.00 750.00 $0.12 $90.00 19 ~efl. Pay. Mrk. Ty ll(Y)(8-)(SId) LF 590.00 754.00 $0.21 $158.34 20 ~efl. Pay. Mrk, Ty 1100(24-)(SId) LF 705.0( 864.00 $0.75 $423.00 21 IRef. Pay. Mrk. Ty II(Y)(6* in Curb)(SId) LF 1,180,0C 844.0l $0.00 $422.00 22 Prefab. Pe, v. Mrk. (Ty A)(W)(Word) EA 10.0~ 8.00 $200,00 $1,800.00 23 Prefab. Pay. Mrk. (Ty A)(W)(A~row) EA 10.0~ 8.00 $215.00 $1.720,00 24 Eliminate Exist. Pav. Mrk. & Mrkr.(4-) LP 480.0~ 0.00 $0.52 $0.00 25 Pay. Surf. Prep. for Mrks. (4') LF 2,485,0~ 242.00 242.00 $0.01 $2.42 26 Pay. Surf. Prep. for Mrks. (8') LF 380.00 0.OO $0.02 $0,O0 27 Pev. Surf. Prep. fo~ Mrks. (24) LF 283.00 0.00 $0.03 $0.00 28 Pay. Surf. Prep. for Mrks. (Word) EA 2.0~ O.00 $5.00 $0.00 29 Pay. Surf. Prep, for Mrks. (Arrow) EA 2,00 0.00 $5.00 $0.00 30 Per, Surf. Prep, fo~ Mrks. (Blast Cle~n) (4') LF 10,775,00 2.070.00 $0.10 $267.00 31 Pay. Surf. Prep. for Mrks,(Blast Clean) (6* in Curb) LF 1,180.00 O.00 $0.10 $O.00 (Blast Clean) (8-) LF 690.0~ 1,054.0( $0,20 $210.80 3~ Pay. Surf. Pi'ep. for Mrks. (Dlast Clean)(2~t') LF 605.00 612.00; $0.40 $244.80 34 Pay, Surf. Prep. for Mrks,(Blast Clean) (Wo~d) EA 8.00 8,0( $5.00 $40.00 36 Pay. Surf. Prep. for Mrks.(Rlast Clea~n) ~'row) EA 8.00 8.0( $5.00 $40.00 SECTION 'C' - DRAINAGE I N%.I~ BID THIS UNIT , A.OUN? I Sewe~ Exm~vaUon CY 4,502.00 3,966.00 $6.00 $23,796.00 2 C em ent Stabilized Backfill CY 1,281.00 1,260.00, $25.00 $31,500.00 3 'l~ench Ex~v~fon Prote,=t~on LF 3,601.00 3,296.00; $1.00 $2,296.00 4 Reinf. Cone. Pipe(C1111)(18~) LF 740.00 660.0( $27.00 $17,820.00 5 Relnf. Cone. Pipe(C1111)(24") LF 2,414.00 2,529.0( $34.00 6 Reinf. Cone. Plpe(CI 1il)(30~) LF 568.00 620.0( $4~.00 $28,796.0; ? Reinf. Cone, Pipe(C1111)(06") LF 36.00 120.0( $64.00 $?,080.0( S Reinf, Cone. Pipe(CI i11)(60") LF 295.00 280.0( $133.00; $27,240.0( 9 Re~nf, Conc. Box Cuivert(6'x 6~ LF 318.00 $184.0( $2.0( 10 Inle~ (compl)(Ty C) EA 24.00 24.0( $1,720.0~ 11 Inlet E~tension(Ty C) EA 20.00 20.0~ 6385.0; 12; InlM (corn pi) ('i'y A) EA 6.00 6.0; $1,245.0( 1; Inlet (compl)(Ty B) EA 3.00 4.0~ $1,455.0( $$,820.0( 14 Manhole (compl)(Ty B) EA 3.00 $.0~ $7,435.0( $22,;05.0( 18 Manhole (compl)(J~t Box) {Ty M) EA 17.00 15.0~ $1,9~6.0~ $29,475.0( 18 ~fety End T~eatment (Ty 11)(18'~(6:1) EA 10.00 10.0~ ~100.0( $4,000,0( t 7 Safety End Treatment (Ty 11)(24')(6:1) EA 3.00 5.0G $495.0( $2,478.0~ 18 9afety End Treatment (Ty 11)(30'}(6:1) EA 2.00 ~675.0~ $2.0~ 19 9e~N~ty End Treatment (Ty 11)(36')(6:1) EA 1.00 2.00 $1,475.0G $2,950.0~ 20 9ilt Fen~.e LF 2,220.00 480.00 $2.5(] $1,200.0~ 21 Consfzuction Exit Type 1 SY 225.00 84.0~ $16.37 $1,375.08 22 18' PVC Pipe Re~ri~tor Irt 24' Pipe LF 10.00 $44.00 $0.~{~ SUBTOTAL SECTION 'C' $262,164.08 SECTION 'D' - BRIDGE ITEo.b~ BID PERIOD I QUANT. UNIT TO DATE , PRICE I AMOUNT I Drilted Sha~t (18') LF 183.00 153.00 $82.00 $4,896.00 2 Ozilled ShaR (air) LF 1,254.00 1,254.00 $75.00 $94,050,00 $ Dr~ledShalt(60') LF 3,182.00 3,148.65 $165,00 $519,198.g0 4 Class 'C" Concrete Abutment CY 87.80 87.80 $350.00 $30,730.00 5 Claas'C'ConereteSent CY 398.50 401.75 $~50.00 $140,612.50 8 Rein[ Cone. Slab SF 54,258.00 54,258.00 $7.50 7 Chain Link Fence Attached to Bridge(6') LF 400.00 400.00 $18.00 $7,200.00 8 Prestressed Concrete Beam (Ty IV) LF 8,099.00 8,099.00 $59.90 $485,180.10 9 CencreteSurfaceTreetment SY 4,661.00 4,661.00 $4.00 $18,644.00 10 R~il (Ty C4) LF 1,828.00 1,828,00 $50.00 $91,400.00 11 Seeted Expe, n~on Joint (4") LF 154.20 154.20 $52,00 $8,018.40 12 Perm. Coral Traffic Banier {Typ 1) (Mod: LF 874.0~ 874.00 $24.00 $20,978.00 SUBTOTAL SECTION 'O' $1,827,790.90 SECTION 'E' - EXTRA WORK ITEM DESCRIPTION UNIT ~ QUANTITYII PERIOD TO DATE PRICE AMOUNT Extra Labor (unsk~lad) Man H~ 200.00 $16.50 $0.00 Extra Labor (skilled) Man HI 200.00 $22.60 $0.00 !xtra E xeavaflon (machine) CY 200.00 $5,00 $0.00 Extra Coner eM, eil Classes with all Form work. Complete in Place CY 100.00 $125,00 $0.00 Extra Reinforcing Steel, all sizes, Complete in Place LES 1,000.00 $0.30 Extra Cement Stabilized Sand Bac~# CY 100.00 $24,00 $0.00 SUBTOTAL SECTION 'E' 5/0 PAYMENTSUMMARY SECTION "A' - Pavement SECTION ~' - Signalization, $1gnage, & Pavement Marking SECTION "C' - Drainage SECTION 'D" - Bridge SECTION "E" - Extra Work CHANGE ORDERS NO. 1 & 2 ($64,528 + $58,965.58), C, O. # 3 $277,102.50, C. 0. # 4 $480.72, C, O. # 5 $10~,881.59 TOTAL CONSTRUCTION MATERIALS ON SITE TOTAL CONSTRUCTION & MATER[AI..~ LESS 5% RETAINAGE DIFFERENCE AMOUNT PREVIOUSLY PAID $1,703,882.42 $69,175.36 $362,164.08 $1,827,790.90 $504,955.39 $4,467,971,15 $0.~0 $4,467,971.15 $223,398.56 $5,244,572.59 $4,048,855.01 AMOUNT NOW DUE CONTRACT SUMMARY ORIGINAL CONTRACT ADDITJDELET. PER C. O.'s CONTRACT TO DATE $4,374,474.88 Approved for Engineer: WALSH ENGINEERING, [NC. By: Approve ow..iSL CiTY OF ARIAN By: ~,/J ,h-/ · .[-- :-,-,-- ~,/r,-- The foregoing e~tlmate of work complMed is true and correct to the hem of my knowledge and beli~ CC: Cit~ of Pearland Champagne-Webber, Inc. Oetober 20, 1099 WEI Project No. 06-72 CITY OF PEARLAND McHARD ROAD FROM MYKAWA RD. TO MAIN STREET Champagne-Webber, Inc. 14~33 Chrisman Road H~sfon, Tex~s 77039 CHANGE ORDER NO. 5 The following change order for materials and lab<x has been approved: ~NO.k~ ITEM DESCRIPTION I UNIT I QUANTITYI UNIT PRICE I AMOUNT Charge for Purchase of Signal Equipment fo~ ~he Myl~wa Rd. Intersection (See Atb~chment) L$ 1.00 $43,020.33 $43,620.33 2 Charge for Restocking 6'x6' RC Box LF 318.00 $18.64 $5,g27.52 3 Charge for Restooking 36" RCP LF 33.00 $5.$1 $175.23 4 Charge for Restocking 30' RCP LF 33.00 $3.47 $114,51 5 Chargefor Handling of Non-restock~ble unction Box LS 1.00; $4,044.00 $4,044.00 0 Early-Completion Bonus pe~ Conkact DAY 100.0( $500.~0 $50,000.00: TOTAL CHANGE ORDER NO. 5 $103,881.591 TOTAL AMOUNT DEI. ETED PROM CoI~rRACT DUE TO CHANGE IN QUANTITIES ($411.462.12)* Extra 10 calendar days added to Conkact Time for Change Order No. 2 Extra 60 calendar days added to Contract Time for Change Order No. 3 Net Exb'a Calendm' days added = 43 Approved for Engineer: WA~SH ENGINEERING, INC. Approved for Contraotor: Approved for Owne~: Approved for Owner: CITY OF PEARl. AND By: * This amount is roflec~ed in Contm~t Summary, reducing net Additions to Conbact due to Change Orders to $93,496,27. pc: C;ty of Peadand Champagne-Webber, Inc. TRAFFIC CONTROL DEVICES, INC. P.O. BOX 890028 HOUSTON. TEXAS 77289-O028 Phone (2~ 992-3030 · Fax ~:~) 992-3~]3 May 13, 1999 Mr. Frank Jones Champagne Webber, Inc. Texas 14333 Chrisman Rd. Houston, TX 77039 REFERENCE: City of Pearland Mykawa Road/McHard Road Project No. 898-05 Dear Mr. Jones: Please find listed below the ~terial that can be restocked in our warehouse and the material that can not be restocked. A twenty percent fee has been added to material that can be restocked and a twenty five percent has been added to material that can not be restocked, plus a delivery charge for that material to be delivered to a location in Pearland. UNIT MATERIAL PRICE 2 - 2 2 2O 5 - 1 - 1 - 1 - 1 - 3 - 3 - 3 - 1 - 4 - 1 - TOTAL Controller Cabinet Fully Actuated $ 6,490.00 EA $ 6,490.00 Single Mast Arm Signal Poles 2,915.00 EA 5,830.00 Signle Mast Arm with Lum/Arm Sgnl Poles 3,292.00 EA 6,584.00 250W Cobra Head Luminaires 177.00 EA 344.00 12" Signal Sections 70.00 EA 1,400.00 3-Section Backplates 30.00 EA 150.00 5-Section Backplate 45.00 EA 45.00 LS ERMS Opticom Equipment Complete 4,685.00 EA 4,685.00 Fluorescent Baselight 105.00 EA 105.00 18" x 36" Left Turn Signal Sign 38.25 EA 38.25 Various Street Name Signs 59.50 EA 178.50 Sign Brackets 65.00 EA 195.00 Type "F" Posts 195.00 EA 585.00 Stainless Steel Type "D" Service 544.60 EA 544.60 Sets Reinf. Steel Cages for 36" ~ x 15'Shft 158.51 EA 634.04 4 1/2" ~ Ped Pole With Cap & Base 350.00 ea 350.00 TOTAL MATERIAL: $28,158.39 NON RESTOCK - 25%: 7,039.60 SUBTOTAL: $35,197.99 DELIVERY CHARGE: 800.00.- TOTAL: $35,997.99~ ',Mr. 'F~nk Jones P~e 2 May 13, 1999 UNIT Q~ MATERIAL PRICE TOTAL. 1 - P.E. Control with Recept. 11.60 EA $ 11.60 900'- 2C/#12 IMSA 20-1 Str Cu Wire 162.00 M 145.80 500'- 4C/#12 ISMA 20-1 Str Cu Wire 260.00 M 130.00 1,100'- 7C/#12 IMSA 20-1 Str Cu Wire 458.00 M 503.80 1,000'- 2C/#14 IMSA 50-2 Shielded Cable 147.00 M 147.00 3 - Signal Ahead Signs 225.00 EA 675.00 8 - Type I Grnd Box With Lid 145.00 EA 1,160.00 3 - 5/8" x 8' Cu Clad Grnd Rod 9.00 EA 27.00 100'- #4 XHHW Str Cu Wire Black 271.00 M 27.10 290'- 1" RMC 82.00 C 237.80 12 - 1" Grnd Bush With #4 Lug 225.00 EA 27.00 12 - 1" Plastic Bushing .12 EA 1.44 650'- 2" RMC 167.00 C 1,085.50 12 - 2" RMC 90's 5,30 EA 63.60 12 - 2" Grnd Bush wi~h #4 Lug 3.80 EA 45.60 6 - 2" RMC Couplings 1.35 EA 8.10 ' 250'- 3" RMC 360.00 C 900.00 10 - 3" RMC 90's 14.50 EA 145.00 10 - 3" Grnd Bush with #4 Lug 7.40 EA 74.00 10 - 3" RMC Coupling 4.00 EA 40.00 160 - 4" RMC 525.00 EA 840.00 4 - 4" RMC 90's 26.00 EA 104.00 4 - 4" Grnd Bush with #4 Lug 11.50 EA 46.00 4 - 4" RMC Coupling 5.30 EA 21.20 2,200 - 1C/#14 Loop Duct Cable 89.00 M 195.80 8 - Pails Loop Sealant 120.00 EA 960.00 TOTAL MATERIAL: RESTOCK 20%: TOTAL: $7,622.34 1,524.47~ $9,146.81~ If..you have any questions, please contact me at 281/992-3030. Sincerely, FLORIDATRAFFIC CONTROL DEVICES,INC. WM/hm Attachment cc: Mike Bennish File Wyndell McDaniels Contract Manager September 27. 1999 WEI Project No. 96-72 CI1~( OF PEARLAND McHARD ROAD FROM MYKAWA RD. TO MAIN STREET CHANGE ORDER NO. 4 Charnpagne-Webbe~, Inc. t4333 Chrisman Roed Houston, Texas 77039 The following change order for matmials end labor has been approved: IINoT~. ITEM DESCRIPTION I UNIT I QUANTITYll UNIT PRICE II AMOUNT I IExtra 1 1/4" x 27' DE Rod wi Nut & Washer 24.00 $20.O3 $480.7 TOTAL CHANGE ORDER NO. ,~ $480.72 Approved for Engineer: WALSH ENGINEERING. INC. D,io: Ip -Ir - ~/ Approved for Conbactor: Approved for Owner: D.t.: Approved for Owner: City ot pearland Champagne-Webber, Inc. C.O. 4 - 1/1 October 29, 1999 WEI P~oject No. 96-72 CITY OF PEARl. AND McHARD ROAD FROM MYKAWA RD. TO MAIN STREET Champagne-Wabbe~, In~ 14333 Chrisman Road Houston, Texas 77039 CHANGE ORDER NO, $ (FINAL) The following change order for materials and labor has been approvab: IINoTE~. ITEM DESCRIPTION I UNIT I.UANTITYII UNIT PRICE II AMOUNT Clear & Grub AC 8.30 $8,740.0C $72,542.00 Excavation of Pond CY 27,750.01~ $3.25 $90,187.50 Embankment CY 27,750.0~ $3.5(~ $97,125.00i 36' RCP LF 112.0~ $64.0{~ $7,168.00i ~ewe~ Excavation CY 80.00 $6.0(~ $180.0(~ Concrete Riprap (CL B) CY 55.(]0 $180,0~ $9,900,0~ TOTAL CHANGE ORDER NO. S (FINAL) $277,102.5a pc: City of Pearlend Champagne-Webber, Inc. C.O. 3 - 1/1 May 26, 1999 WEI Project No. 96-72 CITY OF PEARLAND McHARD ROAD FROM MYKAWA RD. TO MAIN STREET CHANGE ORDER NO.$ Champagne-Webber, Inc. 14333 Ch~lsman Road Houston. Texas 77039 The following change order for materials and labor has been approved: INToE~. [ ITEM DESCRIPTION I UNIT I QUANTITYII UNIT PRICE II AMOUNT Clear & Grub AC 10.00 $8,740.00 $87,400.00 Excavation of Pond CY 27,750.00 $3.25 $90.187.5~ Embankment CY 27,750.00 $3.50 $97,125.0~ 36" RCP LF 112.00 $64.00 $7,168.0~ Sower Excavation CY 30.00 $6.00 $180.0~ Concrete Riprap (CL B) CY 55.00 $180.00 $9,g00.00 TOTAl. CHANGE ORDER NO. $ $291,960.50 Approved for Engineer: WALSH ENGINEERING, INC. o,te: Approved for Contractor: Approved for Owner: CITY OF PEARl_AND By: Date: Approved for Owner: CITY OF PEARl. AND pc: City of Peerland Champagne-Webber, Inc. C.O. 3 - 1/1 Me~y 26, 1999 WE] F'mJe~t No. CITY OF PEARLAND McHAR~ ROAD FROM MYKAWA RD. TO MAIN STREET CHANGE ORDER NO. 2 ~ fellow~g change md~ k~' mated~l, and labor has been approved: ~ FINAL ~ UNIT I 2" 8ch. 80 PYC Conduit. In Place LF 1,771,00 $18.68 $29.504.86 2 ~" 8ch. 80 PVC Conduit In Unce. sed B~xe LF 70.i~ ~78.81 $5.481.70 8 ~' 8c~. ~0 PVC C~mdult In Cone. Medbm 8 Mcdh'y CTB per D~ to Place Fox.dar;on ~ Ught 8td.(Anci~ TOTAL CHANGE ORDER NO. ~ $2~,965,58 · ~ppmq~d Ira' Engineer: WALSH ENGINEERING, INC. CI1Y OF PEARLAND CC: City ~f Pmufand Champagne-Wdaber. Inc. C.O. 2 - 1/I CITY OF PEAflLANO iiMMRD ROAD fROM MYKAV/A RD. TO MAIN CHAli6E O~OBI NO. I IbMtan, TaMs 770~ TOTAl. CiiMiGE OAOEII NO. I ~ GC: Ciy M Pee~,4~d