Loading...
R2003-0073 05-19-03 RESOLUTION NO. R2003-73 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AUTHORIZING THE CITY MANAGER OR HIS DESIGNEE TO ENTER INTO AN ENGINEERING CONTRACT WITH OTHON, INC. FOR ENGINEERING DESIGN AND SURVEYING SERVICES ASSOCIATED WITH THE HICKORY CREEK WATER AND SEWER PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain contract by and between the City of Pearland and Othon, Inc., a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a contract with Othon, Inc. for engineering design and surveying services associated with the Hickory Creek Water and Sewer Project. PASSED, APPROVED and ADOPTED this the 19th day of Hay , A.D., 2003. ATTEST: ITY S~F;,,CRETARY ¢/ APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY 15,1~AI~ D 'I~ETENS MAYOR PRO-TEM Exhibit "A" Resolution No. R2003-73 CITY OF PEARLAND STANDARD AMENDMENT TO · CONSULTANT SERVICES AGREEMENT This Amendment (hereinafter "Amendment") is made between the City of Pearland, Texas (hereinafter "City"), and Othon, Inc. (hereinafter "Consultant") to amend that Engineering serVices contract (the "Coptract") between the City and the Engineer executed on December 10, 2001 for Engineering SerVices associated with the Hickory Creek Water and Sanitary Sewer. 1. Amended Terms. The City and the Consultant hereby agree that the Contract is amended as follows: A. Increase Maximum Contract Amount by $45,412.00; changing the total contract amount from 205,836 to 251,248 B. See Attachment for additional serVices. 2. Contract to Remain in Force. Other than the provisions of the Contract expressly amended herein, the Contract shall remain in full force and its enforceability shall be unaffected by this Amendment. EXECUTED and EFFECTIVE as of the 19th day of May ,2003 CITY OF PEARLAND Signature · ~/~ ~?~.,._..~ Name/Title: Bill Eisen, City Manager CONSULTANT Signature: Name/Title: OTHON OTHON, INC. 11111 Wilcrest Green, Suite 128 Houston, Texas 77042 713 975 8555 TEL 713 975 9068 FAX othoncorp@othon.com E-MAIL www. othon.com WEBSITE CONSULTING ENGINEERS Civil, Transportation, Environmental, Construction Management March 18, 2003 Mr. Al Hague Project Manager City of Pearland 3519 Liberty Drive Pearland, Texas 77581 RE: Revised Fee Adjustment for Change in Scope for the Hickory Creek Water and Sewer Project City of Pearland Purchase Order No. 020936 Othon Job Numbers 02187300 Dear Mr. Hague: In response to comments received by Othon on September 26, 2002 and on November 13, 2002, Othon is please to submit this revised proposal for a fee adjustment. Background Information: During the development of the Preliminary Engineering Report (PER) and the 30% Review Construction Drawings, several unexpected situations arose that warranted the inclusion of several items in the project that were outside of the scope of the original agreement. These items are described in more detail below and basically fall into two categories. The first category contains items that increased the scope of the project by adding additional service area to the project, and the second category contains items that require updating previously completed design work in order to comply with the recently completed Wastewater Collection System Master Plan. For these, Othon is requesting a fee adjustment for the incorporation of these items into the above referenced projects. Additional Scope: Below is a detailed list of the items that were added to the scope of the projects. Most of the additions were the inclusion of service areas adjacent to the subdivisions to provide water and sewer service to currently unserved areas. This increase in service area caused an increase in the total length of water and sanitary sewer for the project as well as an increase in pipe size for March 18, 2003 Mr. Hague Page 2 some of the most downstream sewers, and ultimately contributed to an increase in the anticipated construction cost. Hickory Creek Water and Sanitary Sewer: · Additional sanitary sewer and water on Steven Drive to serve an area to the south of the Hickory Creek Subdivision, · Additional sanitary sewer and water on Carroll Drive to serve an area to the north of the Hickory Creek Subdivision, · Additional sanitary sewer on Garden Road to serve an area to the north of the Hickory Creek Subdivision, · Additional area served by the sanitary sewer on Garden Road to the west and south of the Hickory Creek Subdivision, Update of Design: On August 29, 2002, Othon met with members of the City staff, and their consultant, MWH, to discuss items related to the Wastewater Collection System Master Plan as they relate to current design project. At this meeting it was decided, that changes needed to be made to both the Hickory Creek Subdivision sanitary sewer in order to incorporate elements of the master plan into this project. On the Hickory Creek Subdivision project, the decision was made to reroute the flow of the proposed wastewater collection system to connect to a new 24-inch trunk sewer on O'Day. Up to this point, the Preliminary Engineering Report (PER) and the 30% construction drawings have been developed with a wastewater collection system designed to convey the wastewater flow to a connection point on Garden Road. Therefore, the PER and 30% construction drawings need to be updated to reflect this new design concept. Please note that the design of the 24-inch trunk sewer is not included in this request, and it is included in a separate proposal submitted to the city. Fee Adjustment: For these items, Othon proposes to use a lump sum fee adjustment. Attached to this letter are spreadsheets showing the justification for the fee adjustment broken down by task and the effort required to complete each task. The fee for additional surveying is contained on the attached proposals from the Wilson Surveying Group. Othon will perform all items described above for a lump sum contract adjustment of $45,412.00 (FORTY FIVE THOUSAND FOUR HUNDRED TWELVE DOLLARS). The detailed calculation of this fee adjustment is contained on the attached worksheets and summarized below. This adjustment includes a 10% mark-up on subconsultant contracts for additional services. March 18, 2003 Mr. Hague Page 3 Fee Adjustment Summary: Hickory Creek Water and Sanitary Sewer: Additional Services - Change in Scope Additional Surveying Additional Services - Update of Design Total Fee Adjustment $20,684.00 $5,225.00 $19,503.00 $45,412.00 It is important to note that a portion of the above amount represents work that has already been performed by Othon. Specifically, the portion of each item that represents the preliminary design was completed during the development of the PER. Also, a portion of the final design has been completed up to a 30% design level. Contract Time: In addition to an adjustment to the contract amount, Othon is requesting an extension to the contract schedule as well. Othon is requesting 30 calendar days following the approval of this request for the update of the PER and the 30% construction drawings. Following resubmittal of the PER and the 30% construction drawings, the City will have time for their review, and the project will proceed as noted on the attached revised schedule. Upon acceptance of this proposal, Othon will add these items to the project scope and include related information in the final bid package. Also, this fee adjustment will be represented on the next invoice following acceptance of this proposal. Thank you in advance for your consideration of this request. Othon is available to answer questions regarding this request, and we are available to meet in person at your convenience. We look forward to seeing these and future projects to a successful and timely conclusion. Sincerely, Vincent R. Obregdd, P.E. Vice President In agreement CITY OF PEARLAND DATE FEE RECALCULATION AND SUPPORTING DOCUMENTATION · Level of Effort Calculation for Change in Scope · Level of Effort Calculation for Updating PER and 30% Construction Drawings (Hickory Creek) · Hickory Creek Subdivision - Preliminary Opinion of Probable Construction Cost (Current Design) · Proposal from the Wilson Surveying Group for Additional Surveying · Updated Schedule for Hickory Creek Subdivision Water and Sewer o m~::::::::::::::::::::::::::::::: o o o o o o o o o o o o o o o o o o o o o _- ~ ~ ~:~:.:~: : ~ ~ g ::::::::::::::::::::::: ~-~ 0 oO 0 0 0~ ~ 0 0 0 ~' CY ~ 0 0 0 ~ ~ 0 0 0 ~ ~ ~ :::::::::::::::::::: t::: o o o o ~ o o ~ ~ ~ ~ o o ~ ~ ~ o o ~ ~ ~ ::::::: :2::>:2::2:::::: ::: ~ ~ ~ o o o o o ~ o o o o om oooom · . ...... :: :: :::::.::. :::: .... :.  ::::::: :'~.'~ ~.~.~' ~.~:. - .~ - :........... ~ ~~'~ ~ ~~ ~o.~8~& _ ......... · ::.:..::~.: a 8 ~.~ ~ "* = ~ - ~ ~ ~~ :::~::?~:~/~: ~::~::::~::~:~:~ :::~ ~ ~g ~ ~ o .~ ~ ~ ~ o ~ o =~o .~ ~ ~ ~ .~ ~ ~ o ~ o :~;~;~ ::~:: :::~::~ ............ ~::~ ~ 8 ~ ~ooo oo~ooo~ ~::.: ~ ~ ~ o o o o o o o o o o o ::: ~ ~ ~ ::: ...... ::: ~ oooo oooo~o ~.u. .. ~ :::: ~. .~jj: ~:~ ::~:~::Z~:~ ::~.' ~ :~::.::: :(: (::..:':.:':. :)..' ~ ::: ~ ......... :::......... ~.. · ~ ~ :: :.: . ~ ~ ::: ::: :C~I i'i.ii 0 0 0 ~0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  oooooooooooooooooooooo ~ ~ ~:. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ~ 0 ~ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ~ :~:::2: :::: :2'.' · ...:.. 8888~~ ~ + + + ========================= o ~'- ~oo~ ooom~o 0 0 0 0 0 ~ = ~ ~ ~ :::: ::::::::::::::::::::::: ::::: z ~ :::::::: ::: :.::.::~ :::::: ~ :::3:: ::::-: :::::.:::.~ :::: CITY OF PEARLAND HICKORY CREEK SUBDIVISION PRELIMINARY OPINION OF PROBABLE CONSTRUCTION COST ITEM DESCRIPTION A. Site Work 1 2 3 4 5 6 Mobilization (7%) LS Traffic Control (4%) LS Surface Restoration SF Stormwater Pollution Prevention (3%) LS Remove & Replace A.C. Paving SY Remove & Replace Driveways EA B. Sanitary_ Sewer 1 2 3 4 5 6 7 8 9 Std. Sanitary Sewer Manhole Trench Safety 6" Sanitary Short Side Leads 6" Sanitary Long Side Leads 8" Sanitary Sewer (all depths) 10" Sanitary Sewer (all depths) 12" Sanitary Sewer (all depths) Auger 8" Sanitary Swr. (in casing) Connection to Existing Manhole C. Water Distribution 1 4" PVC, Water Main 2 6" PVC, Water Main 3 8" PVC, Water Main 4 Trench Safety 5 Fire Hydrant Assembly 6 TS&V (12"x6") 7 TS&V (16"x6") 8 TS&V (16"x8") 9 Wet Connections 10 Short Side Service w/meter 11 Long Side Service w/meter 12 2" Blowoff Valve UNIT QUANTITY UNIT COST EA LF EA EA LF LF LF LF LS LF LF LF LF EA EA EA EA EA EA EA EA TOTAL COST 1 $109,300.00 $109,300.00 1 $62,400.00 $62,400.00 95,440 $1.25 $119,300.00 1 $46,800.00 $46,800.00 350 $55.00 $19,250.00 130 $325.00 $42,250.00 Site Work Subtotal: $399,300.00 55 $1,800.00 $99,000.00 14,760 $1.30 $19,188.00 100 $743.00 $74,300.00 100 $1,400.00 $140,000.00 12,550 $18.00 $225,900.00 480 $22.00 $10,560.00 1,490 $25.00 $37,250.00 240 $200.00 $48,000.00 3 $1,200.00 $3,600.00 Sanitary Sewer Subtotal: $657,798.00 245 $20.00 $4,900.00 245 $22.00 $5,390.00 8,850 $28.00 $247,800.00 9,340 $1.30 $12,142.00 17 $1,500.00 $25,500.00 2 $3,250.00 $6,500.00 3 $3,800.00 $11,400.00 2 $4,000.00 $8,000.00 4 $1,800.00 $7,200.00 100 $650.00 $65,000.00 100 $1,100.00 $110,000.00 1 $800.00 $800.00 Water Subtotal: $504,632.00 Subtotal Construction $1,561,730.00 20% Contingency $312,346.00 Total $1,874,076.00 TOTAL OPINION OF PROBABLE CONSTRUCTION COSTS $1,875,000.00 1 Page 1 of 1 Aug-O~-02 03:~8P WILSON SURVEY GROUP (281) 485-3~8 P.O1 T/ HE WILSON SURVEY INC. ',.OFeSS ONA'..LA SU V YO ,S GROUP, August 8, 2002 Mr. Richard Davis, P.E, Othon, Inc. 1t 111 Wilcmst Green Dr., S.128 Houston, Texas 77042 Re: Additional Services on the City of Paariand Hickory Creek Project Dear Mr. Davis, This letter is our proposal to provide suNeying and mapping services in c~nnection with the above referenced design project. Based on your request letter dated July 19, 2002 (attached) we can provide the requested services for the various locations for an approxlmaf, e cost as follows: 1. Steven Drive: $1,250.00 2. Carroll Drive: $1,250.00 3, Garden Road to ~e north: $2,250.00 The' infoiTnation will be added to the existing drawing files and can be provided within one (1) week following the receipt ol~ all underground utility information; ~.'~ ;~ ~ri'~ ~Ud ~'~r ~. ad~;;J~dd~ $2, . - sign, date and return one (1) c~py of this proposal to serve as our authorization to proceed. Mr. Davis, we appreciate ~e oppo(tunity to submit this proposal. Please feel free to c~ntact me at (281) 485-3991 if you have any questions or if we can be of further service. YA~urs truly, ., ~chael D, Wilson, R.P.L.S. President ACCEPTED: BY: ....... DATE:,, TITLE: --:... 20~ ~,, Bro~lw~y · Suite 1o:~ · P~lm~l. Te=~ 77~81 FEE CALCULATION (FROM AGREEMENT) · Fee Calculation (as contained in Agreement for Engineering Services) · Curve for Engineering Compensation · Fee Calculation for Hickory Creek (fee separated per project as requested for billing purposes) · Hickory Creek Subdivision Preliminary Construction Cost Estimate CURVE FOR ENGINEERING'COMPENSATION ,,~" ~! FOR ROADS, BRIDGES, AND RELATED SERVlCE8, t ENGINEERING FEES - HICKORY CREEK SUBDIVISION Estk~ted Coral:ruction Cost: 8.10% ~AsIC SERVICES: Tol~l Desig~ Fe,' · 116,6~4 35% 55% 10% 100% Total B~sk Se~ces: $ ADDITIONAL SERVICES: 1~20~ (2) 22,~s (2) 4,011 8,1.85 2,04~ To~ Adclition~l Services: 87,7o8 P:L~g: Total. Relmbu~sabl= Expem~s: $ 1,4.94 ENGINEERING FEE: , CITY OF PEARLAND HICKORY CREEK SUBDMSION PRELIMIN~Y CONSTRUCTION COST ESTIMATE A, S,ite Work ,I 2 3 4 Mobilization Tr~io Control (4%) Surface Restoration Remove & Replace A.C. Paving B. Sanitary Sewer 1 2 2 3 4 Std. Sanitary Sewer Manhole 6" Sanitary Short Side Leads 6" Sanitm'y Long Side Leads. g" Sanitary Sewer (.all depths) I0" Sanitary Sewer (all clepths) 12" Sanitary Sewer (all depths) Water blstr~utio .r~ 1 4" ?¥~, Water Main 2 6" ?VC, Water Maln 3 8" PVG, Water Main 4 12" ?VC, Water Main 5 Auger 6" Water Main Auger 8" Water Mmin 7 Auger 12" Water Main Trench Safety 9 Fim. H¥&~t A~sembl¥ 10 TS&V 11 Wet Conn~ct~on~ 12 Short Side SeMpe w/meter Long Side Service w/meter 14 2" BlowoffV~lve UINqT OUANTITY .U15q. ? COST .T. OTAL COST LS LS SY EA LF EA EA LF LF LF LF LF LF LF LF LF LF EA EA EA EA EA EA t $1oo,ooo.oo $1o6,ooo.oo 1 $$5,000.00 $~5,000.00 13,665 $5.38 $73,517,70 100 $55.00 , $51,500.0,0' Site Work Su~totd: $234,017.70 42 $1,800,00 ' $75,600,00 13,665 $1.30 $17,764.50 75 $743,00 $55,725,00 75 $1,400.00 $105,000.00 9,724 $18.00 $175,032,00 2,062 $22,00 $45,364,00 1,879 $25.00 . $46,975,00 .Smi~m7 Se~er Subtotal: $521,46'0.50 250 $18.00 $4,500,00 990 $22,00 $1t1,780.00 6,97 ! $24'.00 $167,304.00 3,374 $28,00 $94,472.00 110 $60.00 $~,~00.00 825 $90.00 $74,250,00 165 $150.00 $24550.00 11,335 $1.30 $14,735,50 23 $1,500.00 $34,500,00 lO $%500,00 $25,000.0.0 .2 $1,800.00 $3,600.00 75 $650,00 $48,750.00 75 $1,tO0,O0 $82,500.00 2 $400.00 _ SS .0.0.0.0 .. Water Subtotal: $603,54130 10% Contlngendes ~ $135,901.97 ~ TOTAL $1,494,921.67