Loading...
R2003-0063 04-28-03 RESOLUTION NO. R2003-63 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, APPROVING WORK AUTHORIZATION #10 SUPPLEMENT #3 FOR ENGINEERING AND SURVEYING SERVICES ASSOCIATED WITH THE PEARLAND MOBILITY AND DRAINAGE BOND PROGRAM (YOST ROAD PROJECT). BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain contract by and between the City of Pearland and Turner, Collie and Braden, Inc., ("T C & B) for Program Management of the Pearland Mobility and Drainage Bond Program was authorized by the City Council on December 10, 2001. Section 2. That T C & B has developed work authorization #10 Supplement #3, which is attached hereto as Exhibit "A". Section 3. That work authorization #10 Supplement #3 for engineering and surveying services associated with the Yost Road Project is hereby approved. PASSED, APPROVED and ADOPTED this the 28th day of Apri 1 , A.D., 2003. ATTEST: APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY TOM REID MAYOR ATTACHMENT Exhibit "A" Resolution No. R2003-63 WORK AUTHORIZATION NO. 10 SUPPLEMENT NO. 3 This Work Authorization is made pursuant to the terms and conditions of the Pearland Mobility & Drainage Bond Program, hereinafter identified as the "Contract," entered into by and between the City of Pearland ("City"), and Turner Collie & Braden Inc. ("Engineer). PART 1. Work Authorization No. 10 is related to the improvement of Yost Boulevard from Broadway (FM 518) to Clear Creek. The Engineer will perform Engineering design services, Topographic Survey, ROW Survey and Hydrologic and Hydraulic studies under this Authorization. PART 2. The maximum amount payable for services under this Work Authorization, Supplement No. 3 is $32,227.00. This amount is based on the attached fee proposals submitted by: J.F. Thompson, Inc., dated March 26, 2003 in the amount of $32,227.00. PART 3. Payment to the Engineer for the services established under this Work Authorization shall be "Lump Sum." PART 4. This Work Authorization shall become effective on April 29, 2003 and shall terminate on November 12, 2005, unless extended by a supplemental work authorization. PART 5. This Work Authorization does not waive the parties' responsibilities and obligations provided under the contract. PART 6. This Work Authorization is hereby accepted and acknowledged below. ENGINEER CITY OF PEARLAND Larry F. Janak, P.E. Bill £isen Typed or Printed Name Typed or Printed Name Senior Vice President Title 5/2/03 Date LIST OF EXHIBITS Exhibit A - Fee Schedule Exhibit B - WOrk Schedule City Manager Title ' ~ Turner C~llie Braden Inc. 4~7~2003 EXHIBIT A FEE SCHEDULE Pearland Mobility & Drainage Bond Program Work Authorization No. 10 Supplement No. 3 Summary Proiect Yost Boulevard Engineering Services Hydrologic & Hydraulic Thompson Environmental Compliance Berg Oliver Topographic Survey Thompson FM 518 Intersection Thompson Sleepy Hollow Park Site Thompson Geotech Terra-Mar ROW Maps & Documents Thom 3son FM 518 Intersection Thom ~son Sleepy Hollow CuI-Du-Sac Thompson Abstracting Thom ~son PS & E Thom ~son Traffic Control Thom ~son SWPPP Thom Traffic Signals & Landscape Thom Reimbursable Expenses Thom FM 518 Intersection Thom Sleepy Hollow CuI-Du~Sac Thom Sleepy Hollow Park Site ROW Acquisition Assistance Materials Testing 3son 3son 3son 3son ~son Thom ~son Contract Land Stasff Subtotal Total to Date Previous Authorization $ 54,057.00 $ 28,000.00 $ 39,400.00 $ 4,275.00 $ 52,800.00 $ 216,710.00 $ 44,503.00 $ 11,790.00 $ 28,123.00 $ 7,617.00 $ 118,000.00 $ - $ 605,275.00 Current Authorization 5,155.00 4,315.00 2,040.00 2,175.00 2,296.00 7,251.00 3,814.00 5,181.00 $ 32,227.00 $637,502.00 Page 1 of 1 ...... HOMP$ON March 26, 2003 Mr. James W. Keller, PE Senior Project Manager Turner, Collie & Braden, Inc. PO Box 130089 Houston, Texas 77219-0089 Re: City of Pearland- Yost Boulevard Amendment One Fee Proposal Dear Mr. Keller: As discussed in our meeting on March 18, 2003, J.F. Thompson, Inc. (Thompson) respectfully submits the requested Fee Proposal for the following items: · Engineering and right-of-way services required for the realignment of Yost Boulevard. · Engineering, surveying, and fight-of-way services required to design a cul-de-sac along Sleepy Hollow Drive and associated drainage ditch along the northwest side of Yost Boulevard. · Engineering and surveying services required for the grading plan and associated Storm Water Pollution Prevention Plan (SWPPP) at the FEMA Sleepy Hollow 8 lot buyout tract. · Additional title abstracting needed for utility easement on the southeast portion of the project as discussed within the fax dated March 3, 2003. Upon notification of acceptance of this fee proposal, Thompson will proceed with a quality design in a timely manner. It has been a pleasure working with you and the Turner, Collie & Braden staff on this important project, and we look forward to the successful completion in the near future. Please feel free to contact Bill Odle or David Kubala, PE for clarification on any of the above items. Sincerely, Stephen Berckenhoff, PE Vice President SGB:jr Enclosure pc: David Kubala Bill Odle D:\PROJECTS[982[O l [DOClamendtnentl.doc J.F. Thompson, Inc. · 6110ClarksonLane · Houston, Texas77055 · 713.956.4100 · 713.956.4121 tax. www. jfthompson.com 1. Realignment of Roadway Engineering Right-Of-Way (Survey Task 4) $7,251.0C $2,040.0C Total $9,291.00 2. Cul-De-Sac and Associated Drainage Ditch Engineering Survey (Survey Tasks 1 & 2) Right-Of-Way (Survey Task 5) $3,814.0C $5,155.0C $2,175.0C Total $11,144.0{3 3. Future Park Site at Sleepy Hollow 8 FEMA Buyout Lots Engineering $5,181.0C Surveying (Survey Task 3) $4,315.0C Total $9,496.0(3 4. Additional Title Abstractin~l ~ Total $2,296.00 I I.- Z LU z~ LU W Z 0 Z W z Z Z Z Z 133 Z Z 0 Z Z Z Z Z Z Z t~ Z Z Z Z Z Eo~- d March 26, 2003 SUPPLEMENTAL AMENDMENT No. 1 SURVEY SCOPE OF SERVICES PROJECT: PROJECT LIMITS: PROJECT SCOPE: Yost Boulevard From FM 518 to Clear Creek, Brazoria County, Texas Provide land surveying and mapping services as noted below in order to provide foundation for the civil design. UNDERSTANDING OF PROJECT: · It is our understanding that the requested land surveying and mapping services to be performed by J.F. Thompson, Inc. (Thompson) will be utilized for the development of engineering construction plans for reconstruction of Sleepy Hollow Drive, perform topographic survey of the FEMA Buyout Program tracts and to revise right of way parcel No. 1 and include 2 new ROW parcel acquisition documents. All survey work tasks shall be performed and prepared in strict compliance with City of Pearland guidelines, Texas Board of Professional Land Surveying and the Texas Society of Professional Surveying Manual of Practice, Category lB, Condition 2, Standard Land Survey or a Category 6, Condition 2, Topographic Survey specifications. SURVEY PHASE SERVICES TASK 1 -TOPOGRAPHIC SURVEY: Additional topo.qraphic surveyin.q alon.q Sleepy Hollow situated east and west of Yost Boulevard. The project limits will extend 10 feet beyond the street right of way lines. · The horizontal & vertical control shall be based on the same control utilized for the previous survey. · Horizontal and vertical control shall be established along project centerline at no greater than 1,000 feet intervals. · Stakeout the design construction baseline and right of way at all PI'S, PC's, PT's, and every 1000 feet along the baseline. · The major points along the baseline shall be marked with "PK" nails with shiner on points in existing asphalt pavement, 5/8-inch iron rods with plastic caps in earthen areas or chiseled "X" in concrete areas. · Contact Texas One Stop System and or Digtess in order to have all the known utilities tone located and marked on the ground. · Obtain right of way cross-sections at 50 feet intervals and identifiable vertical points of intersection on roadway pavement and ditches. · Obtain locations, pipe sizes, and pipe material on all culverts, storm sewers, sanitary sewers, irrigation line, water lines, pipelines, etc. · If necessary, obtain building finish floor elevation and detail dimensions, building material, and specifics of building floor levels, overhangs, etc. D:\PROJECTS~982\OO\DOCSSurvey Proposal~Survey SA No. l\SA-1.R4.SurveyScope.doc March 26, 2003 TASK 2 - FEMA BUYOUT TRACT TOPOGRAPHIC SURVEY: The FEMA Buyout tracts are located near the southwest corner of Yost Boulevard & Sleepy Hollow Drive. Topographic surveying shall include locating existing improvements and trees within 100 feet of the existing west line of Yost Boulevard on the first two lots located south of Sleepy Hollow Drive. TASK 3 - FEMA SLEEPY HOLLOW (8) LOT BUYOUT TRACT TOPOGRAPHIC SURVEY: The 8 FEMA Buyout tracts are located along Sleepy Hollow southeast of Yost Boulevard. The topo of these lots will include the following: · Location, trunk size and specimen of trees larger than 4 -inch diameter trunk. · Natural ground elevation based on a 50 feet interval grid beginning at the centerline of Sleepy Hollow and extending to the top of bank of Clear Creek. · Locate the utilities and improvements on the buyout tracts. TASK 4 - REVISE ROW PARCEL No. 1 & PREPARE NEW ROW DOCUMENTS ON 2 ADDITIONAL TRACTS: At the requesi of T.C. & B and the city of Pearland, the surveyor shall revise ROW acquisition document Parcel No. 1 (John Yost Tract) and prepare a new acquisition document for the Roger Hendricks tract in order to reflect the revised street and right of way geometrics at the FM 518 intersection. The previously set right of way point shall be removed and reset on the latest alignment. TASK 5 - PREPARE NEW ROW ACQUISITION DOCUMENT FOR THE FEMA BUYOUT TRACT.: At the request of T.C. & B and the city of Pearland, the surveyor shall prepare a ROW acquisition document for a proposed right of way street cul-de-sac on the FEMA buyout lot located at the southwest corner of Yost Boulevard and Sleepy Hollow. D:\PROJECTS~982\OOXDOCSSurvey Proposa~Survey SA No. 1 \SA-1.R4.SurveyScope.doc TurnerCollie __ Braden Inc. Engineers · Planners · Project Managers P.O. Box 130089 Houston, Texas 77219~0089 5757 Woodway 77057-1599 Tel: (713) 780-4100 Fax: (713) 780-0838 April 7,2003 Re: Pearland Mobility and Drainage Program TC&B Job No. 052.511256.0010 Mr. Joe Wertz, Jr. Projects Director City of Pearland 3519 Liberty Drive Pearland, Texas 77581 Dear Mr. Wertz: In accordance with the Program Management Contract approved by the Pearland City Council on December 10, 2001, Turner Collie & Braden is requesting the following Contract Supplement for the ongoing Program Work as described below: This work is a result of the decision to realign the intersection at FM 518, Cul-Du~Sac at Sleepy Hollow and providing for flood plain storage, and mitigation for the future Sleepy Hollow park site. Work Authorization No. 10, Supplement No. 3 Yost Boulevard Improvements Topographic Survey ROW Survey Engineering Design J.F.Thompson, Inc. J.F.Thompson, Inc. J.F.Thompson, Inc. $9,470.00 $6,511.00 $16,246.00 The total amount of the Contract Supplement is $32,227.00. Copies of the Work Authorization and the Proposal for the work are attached. Please return one executed copy of each of the attached Work Authorizations. ncerely, rn~e ~ ~~e~~P!E~ Senior Project Manager Attachments Established in 1946 Engineering Excellence for Over AN A E C O M COMPANY One-Half Century