Loading...
R2002-0171 10-28-02 RESOLUTION NO. R2002-171 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, APPROVING WORK AUTHORIZATION #1 SUPPLEMENT #5 FOR ENGINEERING SERVICES ASSOCIATED WITH THE PEARLAND MOBILITY AND DRAINAGE BOND PROGRAM (CORRIGAN DITCH PROJECT EVALUATION). BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain contract by and between the City of Pearland and Turner, Collie and Braden, Inc., ("T C & B) for Program Management of the Pearland Mobility and Drainage Bond Program was authorized by the City Council on December 10, 2001. Section 2. That T C & B has developed work authorization #1 Supplement #5, which is attached hereto as Exhibit "A." Section 3. That work authorization #1 Supplement #5 for engineering services associated with the Pearland Mobility and Drainage Bond Program is hereby approved. PASSED, APPROVED and ADOPTED this the 28th day of October ., A.D., 2002. ATTEST: ~_.~Y SE~ETARY APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY TOM REID MAYOR ATTACHMENT D WORK AUTHORIZATION NO. 1 SUPPLEMENT NO. 5 Exhibit "A" R2002-171 This Work Authorization is made pursuant to the terms and conditions of the Pearland Mobility & Drainage Bond Program, hereinafter identified as the "Contract," entered into by and between the City of Pearland ("City"), and Turner Collie & Braden Inc. ("Engineer). PART 1. Under Work Authorization No. 1, Supplement No. 5 the Engineer will perform Program Administration and Preliminary Engineering, as defined by Attachment A of the Contract, for the f611owing: Alternative Analysis for the proposed Corrigan By-Pass Ditch. PART 2. The maxi'mum amount payable for services under this Work Authorization No. 1, Supplement No. 5 is $20,974.00. This amount is based on the following: PART 3. Payment to the Engineer for the services established under this Work Authorization Supplement No. 5 shall be "Reimbursabl.e." PART 4. This Wo~'k Authorizatibn No. 1, Supplement'No. 4 shall become effective on October 8, 2002 and shall terminate'on November 12, 2~05, unless extended by a supplemental w. ork authorization. .- PART 5. This Work Authorization No. 1 Supplement No. 5 does not waive the parties' responsibilities 'and obligations provided under the contract. PART 6. This Work Authorization No. 1 Supplement No. 5 is hereby accepted,and acknowledged below. ENGINEER CITY OF PEARLAND By: ,_~c"-~ By: Larry F. Janak, P.E. Bill Eisen Typed or Printed Name Typed or Printed Name Senior Vice President City Manager Title Title t/~J'/o,~ October 29, 2002 Date Date LIST OF EXHIBITS Exhibit A - Fee Schedule Exhibit B - Work Schedule Yumer Co~lie Braden Inc. 10/3/2002 EXHIBIT A FEE SCHEDULE Pearland Mobility & Drainage Bond Program Work Authorization No. l Supplement No. 5 Summary Project Corrigan Area Drainage Altemate Analysis TC&B Pro.qram Mana,qement Program Administration Preliminary Engineering Final Design SerVices Construction Administration SerVices Direct Costs Subtotal Total to Date Previous Authorization $573,183.00 $1,065,819.00 $880,154.00 $19,458.00 $194,210.00 $2,732,824.00 Current Authorization $20,974.00 $20,974.00 $2,753,798.00 Page I of I IAI E 0000~ ~00~ 0 TurnerCollieBraden Inc. Engineers • Planners • Project Managers P.O. Box 130089 Houston, Texas 77219-0089 5757 Woodway 77057-1599 Tel: (713) 780-4100 Fax: (713) 780-0838 September 26, 2002 TC&B Project No. 052.511256.0001 Mr. Bill Eisen City Manager City of Pearland • 3519 Liberty Drive Pearland, TX 77581 Re: Pearland Mobility and Drainage Bond Program Corrigan Area Drainage Alternative Analysis Dear Mr. Eisen: As requested by,City Council and in response to the comments from the meeting with the residents along Hatfield Road on Thursday September 19, 2002, Turner Collie & Braden is submitting this Proposal to evaluate alternatives to the planned Corrigan By -Pass Ditch. These alternatives and various permutations were considered as the project progressed, but were not pursued in detail because of the obvious cost of neighborhood impact issues. TC&B will perform an Alternative Analysis including alternatives identified by the Hatfield residents and those previously identified by TC&B (14 Alternates). Under this Proposal, TC&B will complete the following tasks: • Define Alternatives: including conceptual layout of each Alternative. • Evaluate Alternatives: including concept level sizing of the various elements required to complete the project (this does not include detailed hydraulic calculations for each Alternative), identifying conflicts with existing and proposed facilities and developing a concept drainage plan for impacted areas. • Cost Estimates: Preliminary Cost Estimates will be prepared for each Alternative including: Construction Cost, Engineering and Administrative Costs and Right -of -Way Acquisition Costs. • Property Impact: the findings of the Alternative Analysis will be presented to City Staff, City Council, Hatfield residents and Corrigan residents. Established in 1946 Engineering Excellence for Over One -Half Century AN A E C O M COMPANY Turner Collie0Braden Inc. September 26, 2002 Mr. Bill Eisen City of Pearland Page 2 The deliverable for this project will be a matrix showing the cost of each Alternative, number of households requiring relocation and the number of parcels to be acquired. The•above project tasks will be completed on a reimbursable basis for a fee of $20,974.00. Sincere Craig L Hester, P E Principal CH:JWK:lf cc: Rod McCrary Tim Keller P:\13-I1256r\Con•igan Drainage\Proposal WAI-5 092602.doc • • • ATTACHMENT D WORK AUTHORIZATION NO. 1 SUPPLEMENT NO. 5 This Work Authorization is made pursuant to the terms and conditions of the Pearland Mobility & Drainage Bond Program, hereinafter identified as the "Contract," entered into by and between the City of Pearland ( `City"), and Turner Collie & Braden Inc. ("Engineer). PART 1. Under Work Authorization No. 1, Supplement No. 5 the Engineer will perform Program Administration and Preliminary Engineering, as defined by Attachment A of the Contract, for the following: Alternative Analysis for the proposed Corrigan By -Pass Ditch. PART 2. The maximum amount payable for services under this Work Authorization No.1, Supplement No. 5 is $20,974.00. This amount is based on the following: PART 3. Payment to the Engineer for the services established under this Work Authorization Supplement No. 5 shall be "Reimbursable." PART 4. This Work Authorization No. 1, Supplement No. 4 shall become effective on October 8, 2002 and shall terminate on November 12, 2005, unless extended by a supplemental work authorization. PART 5. This Work Authorization No.1 Supplement No. 5 does not waive the parties' responsibilities and obligations provided under the contract. PART 6. This Work Authorization No.1 Supplement No. 5 is hereby accepted and acknowledged below. ENGINEER CITY OF PEARLAND By: By: Typed or Printed Name Typed or Printed Name Title Title Date Date LIST OF EXHIBITS Exhibit A — Fee Schedule Exhibit B — Work Schedule Turner Collie Braden Inc. 10/3/2002 EXHIBIT A FEE SCHEDULE Pearland Mobility & Drainage Bond Program Work Authorization No. 1 Supplement No. 5 Summary Project Corrigan Area Drainage Alternate Analysis TC&B Program Management Program Administration Preliminary Engineering Final Design Services Construction Administration Services Direct Costs Subtotal Total to Date Previous Authorization $573,183.00 $1,065, 819.00 $880,154.00 $19,458.00 $194,210.00 • $2,732,824.00 • Current Authorization • • $20,974.00 $20,974.00 $2,753,798.00 • Page 1 of 1 J <0 m <.i I V) X LLJ LLI LL! Li. Turner Collie & Braden Inc E f0 O co a`1- C>,� C• CO Y Z o f17)0OZ i+ 45 to N N to *ad o E `o E oti m w GI 7 a CM Q a U) O • 01 to a I: a. ry to to (0 c Q a) .a c a) c E a) 2 a E 0) 0) (a N 0 a) N Q c U t9 a) 0 0. 0 _ co 1 O C r V- i U 0) 0 1- • 6 O • 69 Q (o 0 •• O N U (`n ct In 1 0 N M 0 69 U c a o N t L 49 c • IO- c WVi N w 0 U m co W N •0 m fie C.9 O M W co (fl ch c N- in 03 vs• cr rn‘r. • N of 0 m O 0. rn 5 N dc c O 0 .-0.) U � O co (O CO r- N00r vim0O -69r N (O to 49 69 V! re N to r- 0) toN'41U)t0 N '- N N t- 00000 O O to Q) 00000 00000 CO Co CO N O 0 NCoNooNamo . N N N N N N 0) N to > cn co Tai c (() C E a) Q Q t6 > • Q N 0) W 470 G) N > O o W 0 < r N M Q 4. Public Meetings A. Subtotal t- c0 O O co O O 0 h CO N 0 Preliminary Engineering Subtotal 0 tD O 0 0 O) 0 0 0 O 0 0 Tr CO N 0 J 0 Subtotal Raw Labor • • Overhead + Fee (1.96) • • • CO 69 Subtotal Labor 0 a) 0) 000 0 t00O 40 fA05 L O 0 — 01 0 0 0 0 eR 05 0 6.10 O 00 N U y •E •� > m E 0 0 C) Tr t, to O 41, GRAND TOTAL