R2008-062 2008-04-21RESOLUTION NO. R2008-62 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, APPROVING CHANGE ORDER NO. 19 ASSOCIATED WITH THE MAGNOLIA ROAD EXPANSION PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That Change Order No.19 associated with the Magnolia Road Expansion Project, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest Change Order No. 19 associated with the Magnolia Road Expansion Project. PASSED, APPROVED and ADOPTED this the 21st day of , A.D., 2008. ATTEST: APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY TOM REID MAYOR R2008-062 08-0118 T70041 Change Order #19McLean Rd. Bridge Revisions (W.W.Webber) W.W.Webber Magnolia Road Expansion Change Order #19 — McLean Rd. Bridge Revisions City of Pearland Projects Department CHANGE ORDER MAGNOLIA ROAD EXPANSION PEARLAND, TEXAS Date of Issuance: April 21, 2008 Change Order No: 19 Contractor: W.W. Webber CoP Project No: T70041 Engineer: Othon, Inc. PO No: 072062 Title of Change: McLean Rd. Bridge Revisions Explanation: In the original design plans for the McLean Rd. bridge area (specifically Sheet No. 41), the ditches at the southeast and northeast corners of the bridge were shown to flow under the approaches and abutments. This is unacceptable due to possible slope degradation and scour around the concrete bridge piles. In addition, the 36" storm sewer at the northwest corner and the dual 24" storm sewers at the northeast corner were not shown to be removed. Upon review of the aforementioned issues, Othon chose to revise the storm sewer system in this area by rerouting all corner ditches into outfall pipes draining into Mary's Creek. Two new outfalls will be placed, one next to the previously placed 54" outfall at the southeast corner and one at the northeast corner of the bridge. Both of these outfalls are set at angles downstream to satisfy the Brazoria Drainage District #4 (BDD#4) design criteria. In the original design plans for the McLean Rd. bridge, "rip rap slope protection" was called to be placed on the slopes under the bridge over Mary's Creek. Upon further plan inspection a discrepancy was discovered by PBS&J that Section 02371 "Rip Rap" of the specifications calls for the rip rap slope protection to "consist of broken concrete or stone blocks." This type of rip rap, however, is not allowed by the BDD#4. Instead, BDD#4 requires that either concrete slope paving or interlocking blocks be placed in these areas. Therefore, Othon revised the design to call for interlocking blocks on both the north and south slopes, thus satisfying slope requirements. This change order increases the previously created Change Order #13 item for interlocking blocks to be paid by the square yard. It also deducts half of Item #102 "Rip -Rap Slope Protection" since it is no longer applicable to this area (with the other half having been deducted in Change Order #13 addressing this issue at the Harkey Rd. bridge). 'tn — '( 'II/1 u.'+-___ W.W.Webber Magnolia Road Expansion Change Order #19 — McLean Rd. Bridge Revisions The McLean Rd. bridge original plans call for proposed railing along both sides of the bridge running north -south which contain blunt ends on all four corners of the bridge. A metal beam guard fencing (MBGF) system was omitted from the plans and serves two purposes: 1) to protect traffic from the blunt ends of the bridge railing and 2) to allow the side slopes into the ditches to exceed standard grades. This change order increases previously created Change Order #13 items to account for the placement of the MBGF system at all four corners of the bridge. The revised McLean plans also call for a new 10' wide concrete bike trail to be constructed under McLean bridge along with an adjacent handrail. This trail will become a part of the future trail along Mary's Creek, a future phase of the Trail Connectivity project. These new items are created in this change order. Also, Othon revised the attachment of the water line and sanitary force main pipe materials (utilities) and bridge bents to provide for the necessary replacement with pipe thicknesses, re -attachment of the water line and sanitary force main to the bridge, and construction of these items. In addition, the typical asphalt transition detail for both the McLean Rd. and Harkey Rd. bridges are called to have 8" crushed concrete flex base. The possibility of using 8" limestone base was explored, but unfortunately there is only a bid item for 6" limestone base and there is not enough extra quantity in this item to use it. The bid quantity for this 6" limestone base item was expended on two placements of temporary asphalt between McLean and Veterans, on temporary asphalt median crossovers along Magnolia Rd. as work progressed, and on temporary asphalt at the McLean Rd. and Magnolia Rd. intersection. The quantity was therefore not nearly sufficient to complete the Harkey Rd. intersection and bridge asphalt transitions (3,662 SY) and the McLean bridge asphalt transitions (1,877 SY). The original 6" limestone base quantity did not include additional quantity for shoulder widths and only included quantity for temporary asphalt transitions, not permanent asphalt transitions, both of which created a shortage in the quantity needed. After pricing both 8" limestone base ($17.50 per SY) and 8" crushed concrete base ($13.89 per SY), the latter was the cheaper alternative. This change order therefore creates a bid item for 8" crushed concrete base to be used at both the McLean Rd. bridge and Harkey Rd. intersection and bridge asphalt transitions. The following is a breakdown of the items accounted for in this change order. Fifteen days are also added to the contract for delivery and placement of the interlocking blocks and slope pavement, additional embankment placement, storm sewer materials fabrication and placement, and the placement of the bike trail under the bridge. The total price for this change order includes all labor, equipment, materials, supervision and traffic control required to complete the aforementioned work. Continued on next page - - W.W.Webber Magnolia Road Expansion Change Order #19 — McLean Rd. Bridge Revisions Item Quantity Adjustment Paving 10 — Remove exist asphalt pvmt. 1,400 SY at McLean Bridge 10 — Remove exist asphalt pvmt 1,324 SY over run from previous work NEW — 8" crushed concrete base 5,539 SY for asphalt incl. Harkey transitions 22 — Unused 6" Limestone Base (1,332.05 SY) NEW — 5" thick conc. bike trail 1,410 SF Paving Subtotal Storm Sewer NEW — 18" RCP Storm Sewer 39 - 24" RCP Storm Sewer 39 — 24 " RCP Storm Sewer over run from previous work 41 — 36" RCP Storm Sewer 44 — 54" RCP Storm Sewer 48 — 54"CMP Storm Sewer NEW — Overrun 54" CMP NEW — Overrun SET 6:1, 36" NEW — SET 6:1, 54" culvert 54 — Type E inlet 55 — Storm Manhole Type "C" over run from previous work NEW — Storm Manhole Type "C" Storm Sewer Subtotal 8 LF 16 LF 641 LF 86 LF 338 LF 80.5 19.5 LF 1 EA 1 EA 2 EA 5 EA 4 EA Water Line NEW — WL to Sch. 80 steel 1 LS NEW — Add'l steel for abutment widening due to WL connection NEW — 2" Air valve for WL Water Line Subtotal 1 LS 1 EA Sanitary Line NEW — Sanitary to Sch. 80 steel 1 LS NEW — Attachment for force main 1 LS Sanitary Line Subtotal Unit Price $6.00 $6.00 $13.89 $7.00 $10.78 $237.77 $75.00 $75.00 $110.00 $175.00 $115.00 $195.90 $3,038.71 $10,407.90 $2,500.00 $2,500.00 $4,511.83 $14,306.78 $1,916.36 $2,472.72 $2,485.86 $4,136.62 Total Cost $8,400.00 $7,944.36 $76,936.71 ($9,324.35) $15,199.80 $99,156.52 $1,902.14 $1,200.00 $48,075.00 $9,460.00 $59,150.00 $6,957.00 $3,820.02 $3,038.71 $10,407.90 $5,000.00 $12,500.00 $18,047.32 $179,558.09 $14,306.78 $1,916.36 $2,472.72 $18,695.86 $2,485.86 $4,136.62 $6,622.48 W.W.Webber Magnolia Road Expansion Change Order #19 — McLean Rd. Bridge Items 102 — Rip -rap slope protection 219 — Interlocking blocks slope NEW — Outfall "C" Expansion Bridge Revisions CO13 — MBGF Transition (TL2) C013 — Single Guard Term. (TY1) C013 — Term -Anchor Section C013 — MBGF (12 GA) (Tim post) Bridge Items (664 SY) 1,190 SY 1 LS 4 EA 2 EA 2 EA 288 LF TOTAL CHANGE ORDERAMOUNT $40.00 $80.00 $8,389.26 ($47.00/SY) $1,724.79 $3,072.87 $1,282.62 $61.68 ($26,560.00) $95,200.00 $8,389.26 $6,899.16 $6,145.74 $2,565.24 $17,733.00 $110,372.40 $414,405.35 Back-up documentation attached • RFI #18 from W.W. Webber dated 6/20/07 • RFI #18 Response from Othon Consulting Engineers dated 04/02/08 • W.W.Webber pricing proposal and backup dated April 16, 2008. • Revised Sheet Nos. 40, 41 41A, 56F, 58G, 60, 81, 84, 85 from Othon dated 03/24/08 and 03/25/08. Contract Amount: Original Contract Price: Previous Change Order(s): Contract price prior to this change order: Net increase (decrease) from this change order: Contract price with all change orders to date (including this change order): $7,824,595.59 $ 232,028.41 $8,056,624.00 $ 414,405.35 $8,471,029.35 Contract Time: Authorized contract time change: Fifteen (15) days in this change order. Substantial Completion Date: August 25, 2008 Finance Approval. NCLD ▪ • RECOMMENDED: DAvto E RODRIl.7UEZ,P.e. By: Da C Engineer Date: 4 /zi /08 ACCEPTED: RECOMMENDED: bp" fn c VI PfA P.E Contra or Construction Manager te: 1-1/21 /o8 Date: Date: <1. A 3 op RECOMMENDED: By:i /7/L-, Project Manager Date: 9/21 /08 W.W.Webber Magnolia Road Expansion Change Order #19 — McLean Rd. Bridge Revisions *The Contractor further agrees that for the consideration in this change, the City will not pay for any additional charges for time, expense, overhead and profit or loss due to this change. APPROVED: By: Date: 041'):4 �ot3 City of Pearland Request For Information Projects Department City of Pearland Project No: T 70041 RFI Number: 18 Project Name: MAGNOLIA EXPANSION: HARKEY RD TO VETERANS DRIVE Contractor: WW WEBBER LLC Specification Number: 2330 Drawing Number: 41 PLAN SHEETS Response Code: X Critical o Routine Date Response Required: ASAP Information Required: Webber is requesting a typical cross-section profile for the McLean Roadway for the following stations: 1. STA 15+00 to 16+12 and 2. STA 17+82 to 18+50 The plan and profile drawing indicates that the existing road will only be widen 10 feet as stations 16+12 and 17+82 (32 feet) while the bridge width is (58 feet). There is no indication how to slope the side slopes of the roadway to accommodate the widening of the bridge. For example, the outfall on the southeast side is to be removed however the existing south-east ditch is suppose to remain as is flowing underneath the approach and the abutment. There is also no indication that the outfall on the north-east side is to be removed not the north-east ditch to be rerouted to accommodate the bridge widening on this side. Once again the ditch flows underneath the abutment and the approach slab. Finally, there is no barrier placed on the bridge other than the 12" white stripe shown on Sheet 72. We feel the designer might want to include a longer approach of embankment on both sides of the approaches and include portable CTBs or reflectors in this area. PAS DO .L, w►v wEddcg. PLo✓6t.r En+6,2 6- 20- 07 Title Date Response: The approaches to the McLean bridge have been modified; see Revised Sheets 40 and 41 sealed 03/24/08. hi addition, the storm sewer around the bridge has been revised; see Revised Sheets 40, 41 and 41A sealed 03/24/08. Cross sections of the approaches have been provided for your use. See Sheets 56F and 56G sealed 03/24/08. ��l c o4Ioz/o8' OTHON, INC. Consulting 1 gineers, Project Manager Signature Date If the Contractor believes Me response given requires an adjustment in contract time or contract price, the contractor shall submit a timely proposal so as not to delay contractor's work in accordance with the general conditions. Article 7 -- Changes in the work. PNA07.0.0A07l51a \ 70•InI \co\dwV70/ 10 1.111A1SVA la -..el Sa. Raft w..ao Aide\Dw1TwaLx 11020 STA 0+00 001 4. t 00 00 0 N A ;O 00 O N TO sw15+00-10w2.4•01001fM1 0000 00010+20 02 00015+20 4.0 t.. ]20. - 1004101 (SEE SHEET 39) MATCH UNE STA. 10+00 $17 snow x•.ro snow -la /077 77.1.71 1000 MI c�t— 7i i z .ii iii RYAN ACRES n i Inew if 411 A•121 00.00)5,0 00 MA A NM LEES 0000 Ill LINE STA. 15+00 MATCH LINE STA. 15+00 (SEE SHEET 41) Ira -- ! �IYM[w[� ama-a-_ SM. 170111 • MAT `1170.1• '•MAIM zo, ,o, 0, 20 4a• `��V SCUP: 1•'10' l i101111 Is YON ur d INN alru MIN rlwu r"'Y'--� _ mru r� x:sitmi• VW 1 IMIN1 1•• PDX - II•11 01 PONE 111111•111• .1�......=.74; Zar=0•11 1111111111101 SY s KWIC n • 0 T i%. '' 1111. 111111 -71:2: .- I ,, .a.u® ax v « i w.o.. 1SOL : ir:1011 L d' rtt `•\`ii'.. ji w wMIMI '�Iwri w1l n. v , 'i g t frt 1 , !'kr'1�' WIEN& 17 ,Ar ryg i iT?'^ MEM a'S 1 \ S.la1, ty • wsm w �1 E 1__o { dd ._.(-2 tvv • A••no m •• lostAS"eTiP• eL rT � • t" �� \•y Yl S I. ttY Y4 7 \1 * . — ... _-_-._� ._ - DRIVE :LI; z� _ 41APIRTIIae1■sai _' ••• NRdFitd 1 1 �.dse l '.iU ., 1 +.. •`I �"� g1 --.•,-.A.-.- T, — — ddrd dd t• td I 11 -.UMB 1 1. - m' 7 111;451Altrillail .-moi '-- �• ro • TIMM El PM 417111.1T EIMII MEM — .. _ —a _' o 1 I` k �• ; t„' : ' SOL Nw • Mani n wl rf MMR Ala �.a.l Fd SSS} rwara a RI70111 rlrR =KT low 1 PIELS • r o-1 ���� ••. .. • • PST MI ��! a:nw K r:.. w.r.1 0r ui�'i. TM Y r .•„•. .•• �� ' •!IN 3 { 1•/g �� 1R MN - MOW y4 y,,:�, yrr 1� 1 ' wI11R r1. �r0 I IIIIII 0017 %iiiiR..w • i• ,YYY• .. II�II ?� .f CALLED ”.1.12 r;r �w1w r, '7 JOSEPH w unvw5 MI w., ar•.. or 1 am 0 Iw[ CI1Y or l'CMGMD 1. • P1111�w.a, r111t1�A 0 rel c I*. PL. Rsls rr er:r ' or ■ • �� } ” t�MYI'+'t'.i '♦ ; i •r"` E - !. 2,-798.1 cordo RIm f r t^fn^MY'.'1'r.. 111•. PG _Sr /KM SMow MUT �wl0t`IrMas�••• Pm MOMS MMILEND wa MN n STk 16.0.9_ • SHEET 41A •' E , Phipmani. EV Mita • M.N. --• s,�1 102r:d1.1 R FOR, OUTFALL. C am S'0 . te.nHIM 7T STA: 17.M.m . LOP PT kik � .rig m - TIN ""-n 117/ .._. „1 PLAN rw 6E - S1,M PM 51141114111.110 I ... . --: _... IRt pir.Sl.}3A !D. VT 6M. 6 M 4, gni 19 �lSR�1„ I A1'1 Gp .. _ .. ea.AI1 __ m0. , -..+r.r'�sr`nt'c�i'°ilo nrro �4O 50 O --o +7 rola'. - iiivii vuuu- wr w •f1Y 18011 „i/. --�•f 011•111 O. N mr-n-S"u U///�i//ys/ry... /�///O//�JJI/J�//////si/JJJi flair fumy1 , a I. Sr. n•Rs fl n.1w.11 Y��`.. •inolEM 48 z —_� mw. 6 1 -- aim . ,. ' z { f I 46 t � w Z,r w ll� ._ / dla� WITTOm �' 46 it PIMP wr reel ( 44 ii F - .�'� ',I� I. 1 ®� ®j �� it-._'- 'w 44 CITY i 45 ._rte - I .., ,.,` . �rp® ``i I n.► 1 _ ��w_ '^ _ yf •, r `:J OF 42 I,rsr �'r ' ata ,..s,-/--, _ I ��1.1 /O/iJi/S:SO,a , r., ' — —T tan 11���® �-r 'r PHARLAND ... "Ma ' .-�.. 4 TO IMO DIANOOE, COMM SEM:1M 111. WITS, F00 1 , iIE CI Y ar 64,f 1� _ �7 suxpnu m. rauAil ITOASMCLEAN ter•' e wit A wr40 . 38K J yi 10 N _40 — 1 _ 180 38 PROJECT or W .. INR •� I 701011 - ---i 36 W- Ot11 r ... Y 1 .4180 i Milt w rrj r — , . {_ � I • 36 >1,�/T>eQ +2001•m' 1QT" . Y n: OCR. n wn m. 11 roman n.m lYrl$ 11' WO( !TELL 111P 180[ INm mw0 1' i1�e'r u DANS 1r MR 1 52 50 48 46_ _ 44 42 40 38 36 PIMP SIX I - w A� flan A 4 nowArerm mat mini. •e• VIM 1111111•1111111 ale= =u. SIMOrMel 10 Mir pW o N9 1N8i . SHAM 9��1 O�'p9 1, H�R 110 SINAI IOW JOSEPH W. A41NAW IHE L'!rY OF PF"Vf1ANo (VOL. (80)84, PC. 960 0609) ;2-27-1984 *PIMA O1 11•6120•1 1•1OMH MAR 00.1 11-1H1 01- 11-1 L. M-- Ow -I•• 4Y O. 001-. Bawd. AAA, t MA PA. Ans. nom O• M Proms • MN= -A a-wWO NM MP OW MO GIN_ M OF MOM MINIM 20' 10' 0' 20' 40' SCALE: 1'.20' I C,; —tasr n iNV _- I - t ,_ _50 48 46 44 42 _40 38 36 MOM= s00iOM 1 •0 191 YMAW OW IN NNW MS WNW MI 111{IMMO, COM 1K MEMO. AS IA.NIL IFie 7®od LA OTHON _.0 AMC PI10105ED IYWIOL9 MAW FADS NAWLY TO MMES. 11111 011AEIWE. S911ANY SLIM MID MIWOM YIOVEENIE, FOE ME CRY OF PWIANO 90i10E9 CO. TEXAS STORM SEVI R OUTFALL S^RIEM—c a e1PiND. Iloa[:1• 1• - as Ate' YFIIT.: 2• w, C.L [WAS H MI •1 Jr S e111 41/61479601 ✓ o110: W. W. WEBBER, LLC CONTRACTORS April 16, 2008 City of Pearland 3519 Liberty Drive Houston, Texas 77581 Attn: Andrea Brinkley Re: REQUEST FOR CHANGE - PROPOSAL #P -EXTRA WORK FOR MCLEAN BRIDGE Mclean Bridge (Scope of Work) WWW PROJECT #27519 Project: City of Pearland (City) Magnolia Expansion: Harkey Drive to Veterans Road T 70041 Ms Brinkley: Per your request, enclosed contains Webber's preliminary prices for the additional work at the Mclean Bridge. We our including with this cover letter Attachment A (Summary of Prices) and sheets 1 through 13 of 13 which are our break -down prices for specific items. Information is being forward before your meeting schedule on 17 April 2008 as requested. Although Webber is sending its prices it is at this time reserving its rights to ask for additional time and overhead costs which will be associated with this change in scope at this location. Should you have any additional questions, please contact us at 281-484-2121. Sin - rely, n Do Project Engineer 0 (fo cc: Ivan Svec Benny Grimmer 14333 Chrisman Road • Houston,Texas 77039-1597 27519 -Mclean Bridge revised d @83ff@re7risFfA 0 i c)cing blocks, WL supports etc Equal Opportunity Employer W.W. WEBBER LLC REQUEST FOR CHANGE ON Magnolia Expansion: Harkey Drive to Veterans Road T 70041 BIKE TRAIL 10 - 6" 26.11 cyds 10 ft wide with 2" bank sand WWW PROJECT, 27519 LABOR LABOR ADDITIONAL WWW LABOR ITEMS: CREW HOURS UNIT COST GRADING/FORMING/POURING TRUCK, PICK UP, FLATBED, CHEVY, 4500 1,410.00 SF $ 507.60 REBAR + SUPPORTS FOREMAN 1.00 1,410.00 20.00 $ 30.00 $ 1,917.60 $ 600.00 OPERATOR 2.00 27.50 10.00 $ 17.50 $ 2,741.20 $ 350.00 UTILITY WORKERS 6.00 1,410.00 20.00 $ 15.00 $ 366.60 $ 1,800.00 LABORS 3.00 1.00 30.00 $ 12.50 HAND HELD PLATE COMP. $ 1,125.00 $ 5,533.00 MATERIAL rs 15% MARK-UP: $ 829.95 TOTAL WWW MATERIAL: $ 6,362.95 $ 71.80 SUBTOTAL WWW EQUIPMENT: $ 1,517.30 EQUIPMENT @ 15% MARK-UP: $ 227.60 TOTAL WWW EQUIP: $ 1,744.90 SUBTOTAL VWWV LABOR: BURDEN @ 55%: 15% OF LABOR TOTAL WWW LABOR: $ 3,875.00 $ 2,131.25 $ 900.94 $ 6,907.19 MATERIAL MATERIAL MATERIAL ADDITIONAL WWW MATERIAL ITEMS: COST UNIT COST FORM MATERIALS $ 0.36 TRUCK, PICK UP, FLATBED, CHEVY, 4500 1,410.00 SF $ 507.60 REBAR + SUPPORTS $ 1.36 $ 234.60 1,410.00 SF 7.41 $ 1,917.60 CONCRETE +CURE $ 99.68 27.50 cyds $ $ 2,741.20 MISC $ 0.26 1.00 1,410.00 SF AIR COMPRESSOR $ 366.60 15.49 10.00 1.00 $ 154.90 HAND HELD PLATE COMP. SUBTOTAL VWVW MATERIAL: $ 5,533.00 MATERIAL rs 15% MARK-UP: $ 829.95 TOTAL WWW MATERIAL: $ 6,362.95 ADDITIONAL WWW EQUIPMENT ITEMS: EQUIPMENT EQUIPMENT EQUIPMENT EQUIPMENT COST UNIT QTY COST TRUCK, PICK UP, FLATBED, CHEVY, 4500 $ 11.73 20.00 1.00 $ 234.60 TRUCK, PICK UP, 4X2, GAS, CHEVY, 2500 $ 7.41 30.00 2.00 $ 444.60 BACKHOE, RUBBER TIRE 4168 $ 20.38 30.00 1.00 $ 611.40 AIR COMPRESSOR $ 15.49 10.00 1.00 $ 154.90 HAND HELD PLATE COMP. 1 $ 3.59 10.00 2.00 $ 71.80 SUBTOTAL WWW EQUIPMENT: $ 1,517.30 EQUIPMENT @ 15% MARK-UP: $ 227.60 TOTAL WWW EQUIP: $ 1,744.90 ADDITIONAL SUBCONTRACTOR ITEMS: QUANTITIES UNIT PRICE BID TOTALS TOTAL SUBCONTRACTOR ITEMS: EXISTING LINE ITEMS TO OVER -RUN QUANTITIES UNIT PRICE BID TOTALS TOTAL OP EXISTING UNE I7EMS TO OVER -RUN TOTAL ADOITWNAL DAYS TO PERFORM WORK: UNKNOWN $ SUMMARY TOTAL WWW ITEMS: TOTAL SUBCONTRACTOR ITEMS: 15% OVERHEAD ON SUB ITEMS: ADDITIONAL WORK SUBTOTAL: 1.0% BOND (Additional Work Only, Excluding Existing Line Items to Over -nm) TOTAL FOR ADDITIONAL WORK: 1410 SF $ 15,015.03 $ 15,016.03 $ 150.15 ($ 15,165.18 LS I $10.76 SF W.W. WEBBER LLC REQUEST FOR CHANGE City of Pearland (City) Magnolia Expansion: Harkey rive to Veterans Road 184NCH TIEIN TO 54 RCP TRUCK,FLATBED,CHEVY, 3500 WNW PROAECTs2s61a ADDITIONAL WWW LABOR ITEMS: CREW LABOR HOURS UNIT LABOR COST TRUCK, PICK UP, 4X2, GAS, CHEVY, 2500 $ 7.41 2.00 S FOREMAN $ 14.82 1.00 2.00 $ 30.00 $ 60.00 OPERATOR 1.00 1.00 4.00 $ 17.50 $ 70.00 PIPE FITTERS 3.00 2.00 $ 15.00 $ 90.00 UTILITY WORKERS AIR COMPRESSOR, 185 CFM, DSL, INGERSOL RAND 2.00 4.00 $ 12.00 $ 96.00 1.00 $ 61.96 30 LB BREAKERS $ 2.57 2.00 2.00 $ 10.28 CONCRETE SAWS SUBTOTAL W W W LABOR: BURDEN lip 55%: 15% OF LABOR TOTAL WWW LABOR: $ 316.00 $ 173.80 $ 73.47 $ 563.28 ADDITIONAL WWW MATERIAL ITEMS: MATERIAL COST MATERIAL UNIT MATERIAL COST S SUBTOTAL WWW MATERIAL: MATERIAL Q 15% MARK-UP: TOTAL WNW MATERULL: $ $ $ ADDITIONAL WWW MATERIAL ITEMS: MATERIAL MATERIAL COST UNIT MATERIAL COST 18 -INCH RCP+STAB SAND $ 71.75 8.00 LF $ 574.00 MISC s 281 1.00 EA $ 281.00 SUBTOTAL WWW MATERIAL: MATERIAL (415% MARK-UP TOTAL WWWMATERIAL• S 855.00 S 128.25 S 983.25 EQUIPMENT EQUIPMENT EQUIPMENT EQUIPMENT ADDITIONAL WWW EQUIPMENT ITEMS: COST UNIT OTT COST TRUCK,FLATBED,CHEVY, 3500 $ 11.73 2.00 1.00 $ 23.46 TRUCK, PICK UP, 4X2, GAS, CHEVY, 2500 $ 7.41 2.00 1.00 TOTAL OF OOST911G LINE ITEMS TO OVERRUN >1 $ 14.82 BACKHOE, CAT, RUBBER TIRE, 416B,DSL $ 20.38 4.00 1.00 $ 81.52 LOADER, WHEEL, ARTIC'D, DSL, KOMATSU, WA 380 $ 43.28 2.00 1.00 $ 86.56 AIR COMPRESSOR, 185 CFM, DSL, INGERSOL RAND $ 15.49 4.00 1.00 $ 61.96 30 LB BREAKERS $ 2.57 2.00 2.00 $ 10.28 CONCRETE SAWS $ 4.75 3.00 1.00 $ 14.25 SUBTOTAL WWW EQUIPMENT: EQUIPMENT Q 15% MARK-UP: TOTAL W W W EQUIP: $ 292.85 $ 43.93 $ 336.78 ADDITIONAL SUBCONTRACTOR ITEMS: QUANTITIES UNIT PRICE BID TOTALS TOTAL SUBCONTRACTOR ITEMS: EXISTING LINE ITEMS TO OVER -RUN QUANTITIES UNIT PRICE BID TOTALS TOTAL OF OOST911G LINE ITEMS TO OVERRUN >1 TOTAL ADDITIONAL DAYS TO PERFORM WORK: SUMMARY TOTAL WWW ITEMS: TOTAL SUBCONTRACTOR ITEMS: 15% OVERHEAD ON SUB ITEMS: ADDITIONAL WORK SUBTOTAL: 1.0% BOND (Additional Work Only. Excluding Existing Line Items to Over -run) TOTAL FOR ADDITIONAL WORK: $ 1,883.31 $ $ $ 1,8!3.31 S 18.83 $ 1,902.14 LS $ 3,820.02 LS' W.W. WEBBER LLC. REQUEST FOR CHANGE City of Pearland (City) Magnolia Expansion: Harkey Drive to Veterans Road 54-11' q- op- ‘5- 54 -INCH ALUMINIZED STEEL PIPE 54 -INCH RCP (MATERIAL +LABOR +EQUIPMENT) $ 168.66 /LF WNW PROJECTW 27519 - PROPOSAL# LF ADDITIONAL WWW LABOR ITEMS: 1 $ 3,288.87 CREW HOURS LABOR UNIT LABOR COST 1 SUBTOTAL WWW EQUIPMENT: EQUIPMENT © 15% MARK-UP: TOTAL WWW EQUIP: $ - S _ 1 1$ - 1 1 1 1 1 S SUBTOTAL WWW MATERIAL.: MATERIAL c 15% MARK-UP: TOTAL WWW MATERIAL: $ 3,288.87 $ 493.33 $ 3,782.20 SUBTOTAL WWW LABOR: BURDEN @ 55%: 15% OF LABOR TOTAL WWW LABOR: $ - $- MATERIAL MATERIAL MATERIAL ADDITIONAL WWW MATERIAL ITEMS: COST UNIT COST 54 -INCH RCP (MATERIAL +LABOR +EQUIPMENT) $ 168.66 /LF 19.50 LF BID TOTALS 1 $ 3,288.87 1 SUBTOTAL WWW EQUIPMENT: EQUIPMENT © 15% MARK-UP: TOTAL WWW EQUIP: $ - S _ 1 1$ - 1 TOTAL OF EXISTING UNE ITEMS TO OVER -RUN S SUBTOTAL WWW MATERIAL.: MATERIAL c 15% MARK-UP: TOTAL WWW MATERIAL: $ 3,288.87 $ 493.33 $ 3,782.20 EQUIPMENT EQUIPMENT EQUIPMENT EQUIPMENT ADDITIONAL WWW EQUIPMENT ITEMS: COST HOURS QTY COST QUANTITIES UNIT PRICE BID TOTALS 1 SUBTOTAL WWW EQUIPMENT: EQUIPMENT © 15% MARK-UP: TOTAL WWW EQUIP: $ - S _ ADDITIONAL SUBCONTRACTOR ITEMS: QUANTITIES UNIT PRICE BID TOTALS TOTAL SUBCONTRACTOR ITEMS: EXISTING UNE ITEMS TO OVER -RUN QUANTITIES UNIT PRICE BID TOTALS 1 - 1 1$ - 11 1 1$ - 1 TOTAL OF EXISTING UNE ITEMS TO OVER -RUN S TOTAL ADDITIONAL DAYS TO PERFORM WORK: (SUMMARY TOTAL WWW ITEMS: TOTAL SUBCONTRACTOR ITEMS: 15% OVERHEAD ON SUB ITEMS: ADDITIONAL WORK SUBTOTAL: 1% BOND (Additional Wont 3 Existing Items to Over -run) TOTAL FOR ADDITIONAL WORK: COST PER LINEAR FEET: $ 3,782.20 $ 320 $ 37.82 City of Pearland (City) Magnolia Expansion: Harkey Drive to Veterans Road W.W. WEBBER LLC. REQUEST FOR CHANGE 1.00 EA \ I DI? 5,41- Fumish and Install 36 -inch SETs MCLEAN BRIDGE wwW PROJECT! 27518 - PROPOSALS LABOR LABOR ADDITIONAL WWW LABOR ITEMS: CREW HOURS UNIT COST MATERIAL COST FOREMAN 1.00 EA 1.00 $ 30.00 /EA $ 30.00 OPERATOR 1.00 EA 1.00 f 17.50 /EA $ 17.50 PIPEFITTER 4.00 EA 1.00 $ 15.00 /EA S 60.00 UTILITY WORKERS 3.00 EA 1.00 $ 15.00 /EA $ 45.00 SUBTOTAL WWW MATERIAL: MATERIAL C 15% MARK-UP: TOTAL WWW MATERIAL: SUBTOTAL WWW EQUIPMENT: EQUIPMENT © 15% MARK-UP: TOTAL WWW EQUIP: $ 192.87 $ 28.93 $ 2,186.95 $ 328.04 $ 2,514.99 SUBTOTAL WWW LABOR: BURDEN r.. 55%: 15% OF LABOR TOTAL WWW LABOR: $ 152.50 $ 83.88 $ 35.46 $ 271.83 ADDITIONAL WWW MATERIAL ITEMS: LOADER, WHEEL ARTIC'D DSL, KOMATSU, WA 380 8 43.28 /HR 1.00 1.00 EA $ 43.28 MATERIAL COST f 7.41 MATERIAL UNIT MATERIAL COST 36 -INCH SETS 6:1 W/ PIPE RUNNERS EA $ 1,970.00 / 1.00 f 1,970.00 MISC MATERIAL (SAND. GROUT) EA $ 216.95 / 1.00 $ 216.95 1.00 EA $ 120.45 HAND-HELD COMPACTORS $ 5.00 /HR 1.00 2.00 EA $ 10.00 SUBTOTAL WWW MATERIAL: MATERIAL C 15% MARK-UP: TOTAL WWW MATERIAL: SUBTOTAL WWW EQUIPMENT: EQUIPMENT © 15% MARK-UP: TOTAL WWW EQUIP: $ 192.87 $ 28.93 $ 2,186.95 $ 328.04 $ 2,514.99 EQUIPMENT EQUIPMENT EQUIPMENT EQUIPMENT ADDITIONAL WWW EQUIPMENT ITEMS: COST HOURS QTY COST LOADER, WHEEL ARTIC'D DSL, KOMATSU, WA 380 8 43.28 /HR 1.00 1.00 EA $ 43.28 TRUCK PICK UP, 4X2, GAS, CHEW, 2500 f 7.41 /HR 1.00 1.00 EA $ 7.41 TRUCK FLATBED, CHEW, 4500 $ 11.73 /HR 1.00 1.00 EA S 11.73 EXCAVATOR, KOMATSU PC 400 LC, DSL $ 120.45 /HR 1.00 1.00 EA $ 120.45 HAND-HELD COMPACTORS $ 5.00 /HR 1.00 2.00 EA $ 10.00 SUBTOTAL WWW EQUIPMENT: EQUIPMENT © 15% MARK-UP: TOTAL WWW EQUIP: $ 192.87 $ 28.93 $ 221.80 ADDITIONAL SUBCONTRACTOR ITEMS: QUANTITIES UNIT PRICE BID TOTALS TOTAL SUBCONTRACTOR ITEMS: EXISTING UNE ITEMS TO OVER -RUN QUANTITIES UNIT PRICE BID TOTALS TOTAL OF EXISTING LINE ITEMS TO OVER -RUN TOTAL ADOIIIONAL DAYS TO PERFORM WORK: UNK SUMMARY TOTAL WWW ITEMS: TOTAL SUBCONTRACTOR ITEMS: 15% OVERHEAD ON SUB ITEMS: ADDITIONAL WORK SUBTOTAL: 1% BOND (Additional Work & Existing Items to Over -run) TOTAL FOR ADDITIONAL WORK: COST PER EACH: 3,008.62 $ 3,008.62 $ 30.09 $ 3,038.71 Ls $ 3,038.71 /EA $ 10,407.90 LS I $ 10,407.90 /EA I W.W. WEBBER LLC. REQUEST FOR CHANGE City of Pearland (City) Magnolia Expansion: Harkey Drive to Veterans Road Furnish and Install 54 -inch SETs MCLEAN BRIDGE www PROJECT# 27519- PROPOSAL# LABOR LABOR ADDITIONAL WWW LABOR ITEMS: CREW HOURS UNIT COST MISC MATERIAL $ 580.00 EA EA 1.00 1.00 FOREMAN $ 580.00 1.00 1.00 [ 3.00 3.00 $ $ 30.00 21.50 /EA /EA $ 9000 $ 64.50 OPERATOR/ CRANE EXCAVATOR, KOMATSU PC 400 LC, DSL OPERATOR $ 7,080.00 $ 1,062.00 2.00 EA 3.00 $ 17.50 /EA $ 105.00 PIPEFITTER 1.00 3.00 EA 3.00 $ 15.00 /EA $ 135.00 EA $ 30.00 SUBTOTAL WWW EQUFMENT: EQUIPMENT @ 15% MARK-UP: TOTAL WWW EQUIP: $ 803.61 $ 120.54 $ 924.15 SUBTOTAL WWW LABOR: BURDEN ft 55%: 15% OF LABOR TOTAL WWW LABOR: $ 394.50 $ 216.98 $ 91.72 $ 703.20 MATERIAL MATERIAL MATERIAL ADDITIONAL WWW MATERIAL ITEMS: COST UNIT COST 54 -INCH SETS 6:1 W/ PIPE RUNNERS $ 6,500.00 / 1.00 $ 6,500.00 MISC MATERIAL $ 580.00 / 1.00 1.00 EA $ 580.00 TRUCK, FLATBED, CHEVY, 4500 $ 11.73 MR 3.00 1.00 EA E - EXCAVATOR, KOMATSU PC 400 LC, DSL SUBTOTAL WWW MATERIAL: MATERIA'.. @ 15% MARK-UP: TOTAL WWW MATERIAL: $ 7,080.00 $ 1,062.00 $ 8,142.00 EQUIPMENT EQUIPMENT EQUIPMENT EQUIPMENT ADDITIONAL WWW EQUIPMENT ITEMS: COST HOURS QTY COST LOADER, WHEEL, ARTIC'D DSL, KOMATSU, WA 380 $ 43.28 /HR 3.00 1.00 EA $ 129.84 TRUCK PICK UP, 4X2, GAS, CHEVY, 2500 $ 7.41 MR 3.00 1.00 EA $ 22.23 TRUCK, FLATBED, CHEVY, 4500 $ 11.73 MR 3.00 1.00 EA $ 35.19 EXCAVATOR, KOMATSU PC 400 LC, DSL $ 120.45 MR 3.00 1.00 EA $ 361.35 35 TON CRANE $ 75.00 MR 3.00 1.00 EA $ 225.00 HAND-HELD COMPACTORS $ 5.00 /HR 3.00 2.00 EA $ 30.00 SUBTOTAL WWW EQUFMENT: EQUIPMENT @ 15% MARK-UP: TOTAL WWW EQUIP: $ 803.61 $ 120.54 $ 924.15 ADDITIONAL SUBCONTRACTOR ITEMS: QUANTITIES UNIT PRICE BID TOTALS TANDEM 4.00 j $ I $ 40.00 175.00 / / $ 160.00 DELIVERY + PICK-UP I 200 1 I $ 350.00 TOTAL SUBCONTRACTOR ITEMS: $ 510.00 EXISTING LINE ITEMS TO OVER -RUN QUANTITIES UNIT PRICE BID TOTALS L TOTAL OF EXISTING UNE ITEMS TO OVER -RUN TOTAL ADDITIONAL DAYS TO PERFORM WORK: UNK 'SUMMARY TOTAL WWW ITEMS: TOTAL SUBCONTRACTOR ITEMS: 15% OVERHEAD ON SUB ITEMS: ADDITIONAL WORK SUBTOTAL: 1% BOND (Additional Work & Existing Items to Over -run) TOTAL FOR ADDITIONAL WORK: COST PER EACH: $ 9,769.35 $ 510.00 $ 25.50 $ 10,304.85 $ 103.05 04/09/20087:03 PM ATTACHMENT A MCLEAN BRIDGE.XLS Page 1 W.W. WEBBER LLC. REQUEST FOR CHANGE City of Pearland (City) Magnolia Expansion: Harkey Drive to Veterans Road TYPE 'C' MANHOLE MATERIAL COST MATERIAL UNIT MATERIAL COST ww VPROJECTS 27519 - PROPOSAL, $ ADDITIONAL WWW LABOR ITEMS: 4.00 EA CREW MISC MATERIAL HOURS _ 110.00 /EA LABOR UNIT LABOR COST EA $ 1,445.40 LOADER, WHEEL, ARTIC'D DSL, KOMATSU, WA 380 $ 43.28 /HR 12.00 1.00 EA FOREMAN - 1.00 EA 12.00 $ 30.00 /EA $ 360.00 OPERATOR SUBTOTAL WWW EQUIPMENT: EQUIPMENT @ 15% MARK-UP: TOTAL WWW EQUIP: 1.00 EA 12.00 $ 17.50 /EA _ $ 210.00 OPERATOR 1.00 EA 12.00 $ 17.50 /EA $ 210.00 PIPEFITTER 3.00 EA 12.00 $ 15.00 /EA $ 540.00 UTILITY WORKERS 3.00 EA 12.00 $ 12.50 /EA $ 450.00 SUBTOTAL WWW LABOR: BURDEN C 55%: 15% OF LABOR TOTAL WWW LABOR: $ 1,770.00 $ 973.50 $ 411.53 $ 3,155.03 ADDITIONAL WWW MATERIAL ITEMS: MATERIAL COST MATERIAL UNIT MATERIAL COST TYPE C MANHOLE + SAND $ 2,510.00 /EA 4.00 EA $ 10,040.00 MISC MATERIAL $ 120.45 _ 110.00 /EA 4.00 EA $ 440.00 EA $ 1,445.40 LOADER, WHEEL, ARTIC'D DSL, KOMATSU, WA 380 $ 43.28 /HR 12.00 1.00 EA $ 519.36 HAND-HELD COMPACTORS $ 5.00 SUBTOTAL WWW MATERIAL: MATERIAL 15% MARK-UP: TOTAL WWW MATERIAL: 12.00 2.00 $ 10,480.00 $ 1,572.00 S 12,05200 EQUIPMENT EQUIPMENT EQUIPMENT EQUIPMENT ADDITIONAL WWW EQUIPMENT ITEMS: COST HOURS QTY COST TRUCK, PICK UP, 4X2 GAS, CHEVY, 2500 $ 7.41 /HR 12.00 1.00 EA $ 88.92 TRUCK, FLATBED, CHEVY, 4500 $ 11.73 /HR 12.00 1.00 EA $ 140.76 EXCAVATOR, KOMATSU PC 400 LC, DSL $ 120.45 /HR 1200 1.00 EA $ 1,445.40 LOADER, WHEEL, ARTIC'D DSL, KOMATSU, WA 380 $ 43.28 /HR 12.00 1.00 EA $ 519.36 HAND-HELD COMPACTORS $ 5.00 /HR 12.00 2.00 EA $ 120.00 SUBTOTAL WWW EQUIPMENT: EQUIPMENT @ 15% MARK-UP: TOTAL WWW EQUIP: $ 2,314.44 $ 347.17 $ 2,661.61 ADDITIONAL SUBCONTRACTOR ITEMS: QUANTITIES UNIT PRICE BID TOTALS TOTAL. SUBCONTRACTOR ITEMS: S EXISTING UNE ITEMS TO OVER -RUN QUANTITIES UNIT PRICE BID TOTALS TOTAL OF EXISTING LINE ITEMS TO OVER -RUN $ TOTAL ADDITIONAL DAYS TO PERFORM WORK: UNK (SUMMARY TOTAL WWW ITEMS: TOTAL SUBCONTRACTOR ITEMS: 15% OVERHEAD ON SUB ITEMS: ADDITIONAL WORK SUBTOTAL: 1% BOND (Additional Work A. Existing Items to Over -run) TOTAL FOR ADDITIONAL WORK: COST PER EACH: $ 17,868.63 $ $ $ 17,868.63 $ 178.69 $ 18,047.32 Ls $ 4,511.83 /EA W.W. WEBBER LLC. REQUEST FOR CHANGE City of Pearland (City) Magnolia Expansion: Harkey Drive to Veterans Road 230.00 EA INSTALL SCH.80 STEEL WL IN LIEU OF SCH. 40 STEEL PAM PROJECTS 2780 - PROPOSALS LABOR LABOR ADDITIONAL WWW LABOR ITEMS: CREW HOURS UNIT COST MATERIAL UNIT MATERIAL COST Waterline at Mclean Midge Schedule 80 S 49.27 1 230.00 $ 11.332.10 (21788.72 - 11331.90) / 230 SUBTOTAL WWW MATERIAL: MATERIAL @ 15% MARK-UP: TOTAL WWW MATERIAL: $ 11,332.10 $ 2,833.03 $ 14,165.13 SUBTOTAL WWW EQUIPMENT: EQUIPMENT @ 15% MARK-UP: TOTAL. WWW EQUIP: $ - $ - $ - SUBTOTAL WWW LABOR: BURDEN @ 55%: 15% OF LABOR TOTAL WWW LABOR: $ - $ - $ - S - ADDRIONAL WWW MATERIAL ITEMS: MATERIAL COST MATERIAL UNIT MATERIAL COST Waterline at Mclean Midge Schedule 80 S 49.27 1 230.00 $ 11.332.10 (21788.72 - 11331.90) / 230 SUBTOTAL WWW MATERIAL: MATERIAL @ 15% MARK-UP: TOTAL WWW MATERIAL: $ 11,332.10 $ 2,833.03 $ 14,165.13 EQUIPMENT EQUIPMENT EQUIPMENT EQUIPMENT ADDITIONAL WWW EQUIPMENT ITEMS: COST HOURS QTY COST SUBTOTAL WWW EQUIPMENT: EQUIPMENT @ 15% MARK-UP: TOTAL. WWW EQUIP: $ - $ - $ - ADDITIONAL SUBCONTRACTOR ITEMS: QUANTITIES UNIT PRICE BID TOTALS TOTAL SUBCONTRACTOR ITEMS: EXISTING LINE ITEMS TO OVER -RUN QUANTITIES UNIT PRICE BID TOTALS TOTAL OF EXISTING UNE ITEMS TO OVER-RIAV TOTAL ADDITIONAL DAYS TO PERFORM WORK: SUMMARY TOTAL WWW ITEMS: TOTAL SUBCONTRACTOR ITEMS: 15% OVERHEAD ON SUB ITEMS: ADDITIONAL WORK SUBTOTAL: 1% BOND (Additional Work & Existing Items to Over -run) TOTAL FOR ADDITIONAL WORK: COST PER LINEAR FEET: 3 14,165.13 $ $ 14,165.13 $ 141.65 $ 14,306.78 LS $ 62.20 LF i3. W.W. WEBBER LLC. REQUEST FOR CHANGE City of Pearland (City) Magnolia Expansion: Harkey Drive to Veterans Road iNr WASTED STEEL FOR WL SUPPORT LABOR LABOR ADDITIONAL WWW LABOR ITEMS: CREW HOURS UNIT COST $ 0.38 LBS 96.00 LBS $ 36.48 REBAR-ABUTMENTS AND BENTS (WASTE) $ 0.38 1,500.00 LBS $ $ 570.00 ADDITIONAL STEEL FABRICATED (ABUTMENTS AND BENTS) SUBTOTAL WWW LABOR: BURDEN @ 55%: 15% OF LABOR TOTAL WWW LABOR: $ - $ - $ - $ MATERIAL MATERIAL MATERIAL ADDITIONAL WWW MATERIAL ITEMS: COST UNIT COST REBAR - WATERLINE SUPPORT (WASTE) $ 0.38 LBS 96.00 LBS $ 36.48 REBAR-ABUTMENTS AND BENTS (WASTE) $ 0.38 1,500.00 LBS $ $ 570.00 ADDITIONAL STEEL FABRICATED (ABUTMENTS AND BENTS) $ 0.38 2100.00 LBS $ 798.00 SUBTOTAL WWW MATERIAL: MATERIAL @ 15% MARK-UP: TOTAL WWW MATERIAL: $ 1,404.48 $ 210.67 $ 1,615.15 EQUIPMENT EQUIPMENT EQUIPMENT EQUIPMENT ADDITIONAL WWW EQUIPMENT ITEMS: COST HOURS QTY COST TIE ADDITIONAL STEEL ABUTMENTS AND BENTS 2100.00 LBS $0.128 $ 268.80 SUBTOTAL WWW EQUIPMENT: EQUIPMENT @ 15% MARK-UP: TOTAL WWW EQUIP: $ - $ $ ADDITIONAL SUBCONTRACTOR ITEMS: QUANTITIES UNIT PRICE BID TOTALS TIE ADDITIONAL STEEL ABUTMENTS AND BENTS 2100.00 LBS $0.128 $ 268.80 TOTAL SUBCONTRACTOR ITEMS: $ 268.80 EXISTING LINE ITEMS TO OVER -RUN QUANTITIES UNIT PRICE BID TOTALS TOTAL OF EXISTING UNE ITEMS TO OVER -RUN TOTAL ADDITIONAL DAYS TO PERFORM WORK: 0 1. SUMMARY TOTAL WWW ITEMS: TOTAL SUBCONTRACTOR ITEMS: 15% OVERHEAD ON SUB ITEMS: ADDITIONAL WORK SUBTOTAL: 1% BOND (Additional Work & Existing Items to Over -run) TOTAL FOR ADDITIONAL WORK: $ 1,615.15 $ 268.80 $ 13.44 $ 1,897.39 18.97 $ 1,916.36 LS W.W. WEBBER LLC. REQUEST FOR CHANGE City of Pearland (City) Magnolia Expansion: Harkey Drive to Veterans Road 2" Air Combination Valve for Water Aerial Crossing wwwPROJECT>T 27519 - PROPOSAL* $ 376.83 ADDITIONAL WWW LABOR ITEMS: CREW HOURS LABOR UNIT LABOR COST EA $ 376.83 MISC PARTS AND SUPPLIES $ 50.00 r 1.00 EA $ 37.05 $ 50.00 $ 11.73 MR FOREMAN 1.00 1.00 EA 5.00 $ 30.00 /EA $ 150.00 OPERATOR $ 490.85 1.00 EA 5.00 $ 17.50 /EA $ 87.50 PIPEFITTER 3.00 EA 7.00 $ 15.00 /EA $ 315.00 SUBTOTAL WWW LABOR: BURDEN © 55%: 15% OF LABOR TOTAL WWW LABOR: $ $ $ 552.50 303.88 128.46 $ 984.83 MATERIAL MATERIAL MATERIAL ADDITIONAL WWW MATERIAL ITEMS: COST UNIT COST 2" AIR COMBINATION VALVE $ 376.83 $ 13.93 MR 1.00 1.00 EA $ 376.83 MISC PARTS AND SUPPLIES $ 50.00 r 1.00 EA $ 37.05 $ 50.00 $ 11.73 MR 5.00 1.00 EA $ 58.65 f SUBTOTAL WWW MATERIAL: MATERIAL @ 15% MARK-UP: TOTAL WWW MATERIAL_ $ 426.83 $ 64.02 $ 490.85 EQUIPMENT ADDITIONAL WWW EQUIPMENT ITEMS: COST EQUIPMENT EQUIPMENT EQUIPMENT HOURS QTY COST BACKHOE, CAT, RUBBER TIRE, 416B,DSL $ 13.93 MR 5.00 1.00 EA $ 69.65 TRUCK, PICK UP, 4X2, GAS, CHEVY, 2500 $ 7.41 MR 5.00 1.00 EA $ 37.05 TRUCK, FLATBED, CHEVY, 4500 $ 11.73 MR 5.00 1.00 EA $ 58.65 f SUBTOTAL WWW EQUIPMENT: EQUIPMENT © 15% MARK-UP: TOTAL WWW EQUIP: $ 95.70 $ 14.36 $ 110.06 ADDITIONAL SUBCONTRACTOR ITEMS: QUANTITIES UNIT PRICE BID TOTALS WELDER AND HELPER 10.00 575.00 5750.00 TOTAL SUBCONTRACTOR ITEMS: $ 750.00 EXISTING UNE ITEMS TO OVER -RUN TOTAL OF EXISTING UNE ITEMS TO OVER -RUN QUANTITIES UNIT PRICE BID TOTALS TOTAL ADDITIONAL DAYS TO PERFORM WORK: unk 'SUMMARY TOTAL WWW ITEMS: TOTAL SUBCONTRACTOR ITEMS: 15% OVERHEAD ON SUB ITEMS: ADDITIONAL WORK SUBTOTAL: 1% BOND (Additional Wont & Existing Items to Over -run) TOTAL FOR ADDITIONAL WORK: $ 1,585.74 $ 750.00 $ 112.50 $ 2,448.24 24.48 $ 2,472.72 LS Or I3 City of Pearland (City) Magnolia Expansion: Harkey Drive to Veterans Road W.W. WEBBER LLC. REQUEST FOR CHANGE 230.00 INSTALL SCH.80 STEEL 4 -inch FORCE MAIN IN LIEU OF SCH. 40 STEEL WWW PROJECTS 2751* - PROPOSALS LABOR LABOR ADDMONAL WWW LABOR ITEMS: CREW HOURS UNIT COST $ 095 / 220.00 $1, 96900 (21706.72 - 11331.90) / 230 SUBTOTAL WWW MATERIAL: MATERIAL © 15% MARK-UP: TOTAL WWW MATERIAL: $ 1,969.00 $ 492.25 $ 2,461.25 SUBTOTAL WWW EQUIPMENT: EQUIPMENT @ 15% MARK-UP: TOTAL WWW EQUIP: $ $ - - $ - SUBTOTAL WWW LABOR: BURDEN @ 55%: 15% OF LABOR TOTAL WWW LABOR: $ - $ $ _ $ _ MATERIAL MATERIAL MATERIAL ADDITIONAL WWW MATERIAL ITEMS: COST UNIT COST FORCE MAIN at Mclean Bridge Schedule 80 $ 095 / 220.00 $1, 96900 (21706.72 - 11331.90) / 230 SUBTOTAL WWW MATERIAL: MATERIAL © 15% MARK-UP: TOTAL WWW MATERIAL: $ 1,969.00 $ 492.25 $ 2,461.25 EQUIPMENT EQUIPMENT EQUIPMENT ADDITIONAL WWW EQUIPMENT ITEMS: COST HOURS QTY EQUIPMENT COST SUBTOTAL WWW EQUIPMENT: EQUIPMENT @ 15% MARK-UP: TOTAL WWW EQUIP: $ $ - - $ - ADDITIONAL SUBCONTRACTOR ITEMS: QUANTITIES UNIT PRICE BID TOTALS TOTAL SUBCONTRACTOR ITEMS: EXISTING UNE ITEMS TO OVER -RUN QUANTITIES UNfT PRICE BID TOTALS TOTAL OF EXISTING UNE ITEMS TO OVER -RUN TOTAL ADDITIONAL DAYS TO PERFORM WORK: SUMMARY TOTAL WWW ITEMS: TOTAL SUBCONTRACTOR ITEMS: 15% OVERHEAD ON SUB ITEMS: ADDITIONAL WORK SUBTOTAL: 1% BOND (Addeorw Wolk & Existing Items to Over -Tun) TOTAL FOR ADDITIONAL WORK: COST PER LINEAR FEET: $ 2,461.25 $ 2,461.25 24.61 I $ 2,485.86 LS I 10.81 LF W.W. WEBBER LLC REQUEST FOR CHANGE City of Pearland (City) Magnolia Expansion: Harkey Drive to Veterans Road ATTACHMENT FOR FORCE MAIN UNES PAW PROJECT' 27519 LABOR LABOR ADDITIONAL WWW LABOR ITEMS: CREW HOURS UNIT COST GRADING/FORMING/POURING LS 1.00 1.00 $ 1,500.00 TRUCK, PICK UP, 4X2, GAS, CHEW, 2500 FOREMAN 1.00 10.00 10.00 $ 30.00 $ - $ 300.00 OPERATOR 1.00 10.00 10.00 $ 17.50 $ $ 175.00 PIPEFITTER 2.00 10.00 $ 15.00 $ $ 300.00 UTILITY WORKERS 2.00 10.00 $ 15.00 $ 300.00 $ 1500.00 $ 225.00 $ 1,725.00 SUBTOTAL WWW EQUIPMENT: EQUIPMENT @I 15% MARK-UP: TOTAL WWW EQUIP: $ 395.20 $ 59.28 $ 454.48 SUBTOTAL WWW LABOR: BURDEN (41 55%: 15% OF LABOR TOTAL WWW LABOR: $ 1575.00 $ 591.25 $ 249.94 $ 1,916.19 MATERIAL MATERIAL MATERIAL ADDITIONAL WWW MATERIAL ITEMS: COST UNIT COST ATTACHMENTS FOR WL AND FORCE MAIN $ 1,500.00 LS 1.00 1.00 $ 1,500.00 TRUCK, PICK UP, 4X2, GAS, CHEW, 2500 $ 7.41 10.00 1.00 $ - BACKHOE, RUBBER TIRE 416B $ 20.38 10.00 1.00 $ $ SUBTOTAL WVVW MATERIAL: MATERIAL @ 15% MARK-UP: TOTAL WWW MATERIAL: $ 1500.00 $ 225.00 $ 1,725.00 EQUIPMENT EQUIPMENT EQUIPMENT EQUIPMENT ADDITIONAL WWW EQUIPMENT ITEMS: COST UNIT QTY COST TRUCK, PICK UP, FLATBED, CHEVY, 4500 $ 11.73 10.00 1.00 $ 117.30 TRUCK, PICK UP, 4X2, GAS, CHEW, 2500 $ 7.41 10.00 1.00 $ 74.10 BACKHOE, RUBBER TIRE 416B $ 20.38 10.00 1.00 $ 203.80 SUBTOTAL WWW EQUIPMENT: EQUIPMENT @I 15% MARK-UP: TOTAL WWW EQUIP: $ 395.20 $ 59.28 $ 454.48 ADDITIONAL SUBCONTRACTOR ITEMS: QUANTITIES UNIT PRICE BID TOTALS 12 4,c 17,; TOTAL SUBCONTRACTOR ITEMS: EXISTING UNE ITEMS TO OVER -RUN QUANTITIES UNIT PRICE BID TOTALS TOTAL OF EXISTING UNE ITEMS TO OVER -RUN $ TOTAL ADDITIONAL DAYS TO PERFORM WORK: UNKNOWN SUMMARY TOTAL WVVW ITEMS: TOTAL SUBCONTRACTOR ITEMS: 15% OVERHEAD ON SUB ITEMS: ADDITIONAL WORK SUBTOTAL: 1.0% BOND (Additional Work Only, Exduding Existing Line Items to Over -run) TOTAL FOR ADDITIONAL WORK: $ $ 4,095.67 $ 4,095.67 $ 40.96 $ 4,136.62 LS $ 8,389.26 LS I 1 W.W. WEBBER LLC. REQUEST FOR CHANGE City of Pearland (City) Magnolia Expansion: Harkey Detre to Veterans Road 1.00 EA lev/ SttT 15- op OUTFALL 'C" WWW PROJECTS 27519 - PROPOSALS LABOR LABOR ADDITIONAL WWW LABOR ITEMS: CREW HOURS UNIT COST 1 00 i 7,222.78 / $ 7,222 78 TOTAL SUBCONTRACTOR ITEMS: $ 7,222.78 I SUBTOTAL WVVW MATERIAL: MATERIAL © 15% MARK-UP: TOTAL WWW MATERIAL: $- $ $ SUBTOTAL WWW EQUIPMENT: EQUIPMENT © 15% MARK-UP: TOTAL WWW EQUIP: $ - $ - $ SUBTOTAL WWW LABOR: BURDEN @ 55%: 15% OF LABOR TOTAL WWW LABOR: $ - $ - $ - $ - MATERIAL MATERIAL MATERIAL ADDITIONAL WWW MATERIAL ITEMS: COST UNIT COST OUTFALL .C. EXPANSION - CHANGE IN BID PRICE (17874.58 - 10651.80) 1 00 i 7,222.78 / $ 7,222 78 TOTAL SUBCONTRACTOR ITEMS: $ 7,222.78 I SUBTOTAL WVVW MATERIAL: MATERIAL © 15% MARK-UP: TOTAL WWW MATERIAL: $- $ $ EQUIPMENT EQUIPMENT EQUIPMENT EQUIPMENT ADDITIONAL WWW EQUIPMENT ITEMS: COST HOURS QTY COST OUTFALL .C. EXPANSION - CHANGE IN BID PRICE (17874.58 - 10651.80) 1 00 i 7,222.78 / $ 7,222 78 TOTAL SUBCONTRACTOR ITEMS: $ 7,222.78 I SUBTOTAL WWW EQUIPMENT: EQUIPMENT © 15% MARK-UP: TOTAL WWW EQUIP: $ - $ - $ ADDITIONAL SUBCONTRACTOR ITEMS: QUANTITIES UNIT PRICE BID TOTALS OUTFALL .C. EXPANSION - CHANGE IN BID PRICE (17874.58 - 10651.80) 1 00 i 7,222.78 / $ 7,222 78 TOTAL SUBCONTRACTOR ITEMS: $ 7,222.78 I EXISTING LINE ITEMS TO OVER -RUN QUANTITIES UNIT PRICE BID TOTALS TOTAL OF EXISTING LINE ITEMS TO OVER -RUN TOTAL ADDITIONAL DAYS TO PERFORM WORK: unk ISUMMARY TOTAL WWW ITEMS: TOTAL SUBCONTRACTOR ITEMS: 15% OVERHEAD ON SUB ITEMS: ADDITIONAL WORK SUBTOTAL: 1% BOND (Additional Work & Existing Items to Over -run) TOTAL FOR ADDITIONAL WORK: $ 7,222.78 1,083.42 8,306.20 83.06 Concrete Pipe Division Sealy Plant Phone Quote Date: 04/02/2008 Salesman: Bill Schaefer 2735 Hwy 36 N Sealy, Texas Ph: (979)885-7403 Fax: (979)885-7001 Customer: W.W. Webber Sob Name : Magnolia Road E inlet, C Manhole P.O.#: Taxable/Exempt: Exdudes Tax Delivery/Physical Location: FOB Jobsite Attention: Mr. Dan Doll/Chris Phone#: 832-473-0926 Fax: 281-484-7127 Quantity 4ea. Type C Manhole with 32" ring and cover Price each 2100.00 SPECIAL INSTRUCTIONS/REASON FOR CHANGE: Prices already discounted--- Mclean Bridge Manholes: Total # of manholes 4 Average depth 12 ft to 8.45 Calculation for CMS at Manhole: CEMENT STAB SAND VOLUME / SIDE = (10FT X 8FT X 1FT) = 80CFT 4 SIDES = TOTAL VOLUME = 4 X 80 = 320CFT / 27 = 11.85CY X 2.0TONS = 23.7 TONS 2 EACH SIDE = 3 LOADS X 19.48 = 58.44 TNS X 2 = 116.88 TNS X $14.00 PER TN = $ 1640.00 PER EA = $410.00 EA PRICE OF MANHOLES RINKER QOUTE = $2100.00 EA PER MATERIAL = $2510.00 EA Miscellaneous and Permanent Material: Date 04/05/2008 Schedule 80 vs Schedule 40 Job: 27519: Magnolia Expansion Permanent Materials: Description Quantity Cost Freight Total Steel carrier pipe 242 LF 25.88 6262.96 coating c218 242 LF 6.9 1669.8 coating c210 242 LF 6.29 1522.18 45 bend 4 ea 134.31 537.24 r/f slip on flang 2 ea 58.49 116.98 10 -inch flg adp imp 2 ea 118.17 236.34 10 -inch insulating kit 2 ea 55.74 111.48 Total 10456.98 per foot 45.46513 Schedule 80 Description Quantity Cost Freight Total 1 Bare Steel carrier pipe 242 LF 72.5 17545 2 coating c218 coh-blue 242 LF 9 2178 3 coating c210 242 LF 4.25 1028.5 4 std weld 45 ell imp 4 ea 65 260 5 45 bend 4 ea 60 240 6 r/f slip on flang 2 ea 58.49 116.98 7 10 -inch flg adp imp 2 ea 89.6 179.2 8 one-Iok restraint kit 2 ea 61.76 123.52 9 10" bolt/nut/gasket kit i 4 ea 14.38 57.52 10 10 -inch insulating kit 2 ea 30 60 Total 21788.72 per foot 94.733565 difference 21788.72 -10456.98 = 11331.94 per foot = 230 If = +49.27 2008/API/04/F1I 23:03 P.002 mum' SOFFIT COMPANY- 05 04/04/2608 s s s» FORNAL 0007/7201 s s ss aspiration Sats 05/03/08 Soots 4 40638810 Phone 113.84? 5690 Saleepaeon. 5136 quoted 04/03/08 Quoted by 203O ' matmR. a+e nets nt M10a customer limber 07WWWCOI Job Nambes Cuutomar! Job: W W WZRBBR LLC CONTRACTORS MAGNOLIA ROAD 14333 CHRIMAN ROAD MAGNOLIA ROAD CITY OF PHARLAND ON TXTf039 HARVRY ROAD TO VBII DR HOUSTON )( )<PL+ARLAND TX 77881 Coalsonts LI SIT PART N0. VENDOR P/N DESCRIPTION 11/5 8517 PRICE TOTAL PRICE 1. 10 473 XX 10" mu S. CARRIES .694W (SCR 50) EA 72.6000 19792.60 20 273 22 10" ID luta C-210 El 4.2600 1160.25 30 273 XX 10" OD AWA C-218 'CON -BLUE" R1 9.0000 2467.00 50 8 210947 190947 10" STD 151.0 46 ELL 111P M 65.0000 620.00 60 8 12 10" ID AUWA C210 FOR 46 BEND EA 60.0000 480.00 61 2 /11889 111889 10" CLASS 150 11/7 81.17-01 FLO De EA 66.4889 116.96 '62 2 0103060 57A10 10 113 1 FLO ADP 115+ EA 89.6000 179.20 63 2 0108280 SLCP10 10 053-105 SLOP RESIEAINT ACC KIT/C900 I EI 61.7600 123.62 84 2 0220360 FGP08-10 10" BOLT/E0i/2rT III 21(7 EA 14.3780 28.76 ..._86 2 Ii 10• T175 "E" 1509 INSOLATION FLO KIT EA 30.0000 60.00 1 -1758028 - 402-1/40114-31S11.10-I1.40/11P-TAPSADDLE' --. -... . - EA- • -4276176-- - - • • 42:&I -- 80 1 1703280 68-200 68 2" KITZ IPS BRZ FP E7 0004WG EA 28.7294 28.73 90 2 0I53300 250086 2 1 6 OILY BIP 11(7011 RA 1.7811 8.56 100 2 011090 ZRGL9008 2 GALT NI 90 ELL EA 2.2062 • 30 1 TA 2" APCO 1144.1 A1R/Y4COR YALY3 11 300.0000. 300..... • 120 240 21 4" BARR STEIL 717E .337 (SCR 80) RA 14.5000 3480.00 130 240 21 4" ID LVW 0-210 El 2.0000 480.00 140 240 A 4" OD A3W1 C-218 "CON-RLUE" El 3.8000 912.00 • • rs MEW. 9007471/15 s* . Dan Doli From: Roach, Fred [FRoach@cemexusa.comj Sent Tule dna ay, April 08, 2008 2:23 PM To: Subject: FW: S.E.T. Quote - Magnolia Road Expansion > Original Message > From: Roach, Fred > Sent: Thursday, March 13, 2008 1:59 PM > To: ban Doll (E-mail) > Cc: Killion, Coy; Grote, Don > Subject: S.E.T. Quote - Magnolia Road Expansion > Dan > We are pleased to quote you prices for our one-piece precast 54" SAFETY END TREATMENT SECTIONS with tongue or groove joint for the above referenced project. Our price is for a 6:1 slopes as specified. The section meets the requirements and specifications as outlined under the Texas Department of Transportation> '> s Item 467. When sections with SAFETY PIPE RUNNERS are required, the sections are delivered to the jobsite with the SAFETY PIPE RUNNERS cut, drilled, galvanized and installed with galvanized bolts in seated inserts, which have been cast, into the product during manufacture. > 1.0 Each - SAFE END TRT(TY II)(54")(6:1)(PD-SPR) = $6500.00 > -SPR INDICATES SAFETY PIPE RUNNERS INCLUDED. > Allow 4-6 Weeks for production. Prices are for delivery in ONE truckload to site accessible by our truck under it's own power. Customer to unload. S.E.T. is 25'-6" Long and with a shipping weight of 24000Lbs. TERMS: NET 30 DAYS. > Respectfully Submitted > Fred Roach > Baytown / Sealy Plants > Hydro Conduit of Texas, LP > dba Rinker Materials - Concrete Pipe Division > Off.: (281) 427 -1779 -(Baytown) > Fax: (281) 427 -1770 -(Baytown) > Off.: (281) 375 -6121 -(Sealy -Metro) > Fax.: (979) 885 -3428 -(Sealy) > Cell: (281) 684-3996 CONFIDENTIALITY: The information contained in this transmission may contain privileged and confidential information. It is intended only for the use of the person(s) named above. If you are not the intended recipient, you are hereby notified that any review, dissemination, distribution or duplication of this communication, and the information contained in it, is strictly prohibited. If you are not the intended recipient, please contact the sender and immediately destroy all copies of the original message. 1 04/04/2008 02:37 44v Harr? Anker Date: .m06 2812862133 EROSION PREVENTION PAGE 01/01 EROSION PREVENTION PRODUCTS ivm QUO on b+bb0e no -(281)307-7769 Topan Doll W.W. Webber Phufl4 261 84,2121 A: Iti Project Magnolia Rd. ouL N C Location: Psarland Tx. Tema: Due Apon Radept F. B. Job Lu -Li; -1 1112712_, 3621 al Channel Lock 400 41/2 " blocks, goate d% Ind nstahgon. gheasounsferimmar 4,262 3.F Channel Lock 400 4112" thick, open cell blocks geotextle 4,262 8.F lnstallallon of Blocks, cables and Gsokxh8e Terardov rrs 1,406 $,F Channel Lock 400 41/2" thick, open cel blocks end geotextbe 1,400 S.F kKblNakon of Blocks, and Geobadle 82.114 :10,66.80 82.39 80.76 8239 80.76 110,186.18 83,263.36 $3,361.44 81,073.61 rnssQuorarlen Is veldt( 45 days. Vice Based upon materials paid for by 12/3 Taxes not Included, N applicable. Estimated installation time 2 days. Certified payroll, it required. Labor for placement of bloats and granting of al!UCtures. Labor for placement of top soil on blocks. Delivery of block and geotl kWe. 1- MbbNIXSOon by EPP. Concrete for pouting blocks to structures. Sand for leveling blocks. sr "Epp to PRP/kW " Conbacior to Provide: Subcontract (*purchase order Payment for sales taxes, or exemption acsVrtcais. Job sloe InAmnasion sheet completed. Full Payment for all materials Delivered and installed. Dry working conditions, any end al derraterhg. E eavaifen end beekMofAhnadbculserea Recommended Twnderms. Exeavatfon a/fopes le grade for Mock phaement Limits of blocks slaked out. Seeding or hydromulchkig if required. Top soil for beddlll of blocks. Immediate access lo work site for equipment and had bucks. 25% restocidrg charge for ail returned materials. Plus Freight 3.16 _ $17474.68 83736 Per a% yard of bud 880,8. P.O. Box 891586 • Hautnn. Texas 77289-1586 Tot: (281) 286.2120 • Fax: (281) 286-2133 • 13-mai1: eppchannollockQaol.com 20' 10' 01 20' 40' 1 ,- PReP tf• LA - IC MP GAMOW • MIMI . 111. --...._ SCALE: 1'..20' AsLL.L. , sLLs, rovs, 1 1 I RYAN ACRES DRIVE , LI , lk -.: OOP III 14.4.3 1131121111111 ms. ORM COEIMIL lirAi M.= L.t...ar ...'' .....: ..... Y. MINA MIN PM ea, Wm otr.,co.m1 m1 MIA IC '' ' I i I A-11' __, it „r., - i mum 1•46 INIVIR MU LOU= . 11( SOLIM•Mt COMA Or IV MM.. OF boo.. Em. •• ...L. Am.. E. ...or ._ 1 "''''''- '':•/:' .....hi s _ -°- -- EXIST. ASPHALT al ..;.... g..slerMeMAOO 3if1i,.Al•. 1EW•1•m. •o•Ek 00 1M-4---.--- N11S1E0%,1N-91AM1l1318 31 -T („.;.1) 1a l •sMOePmNOMaM C0zOgt fMlIwtRM aRLMOr - VO v.•rOo0•.N1EMcaM /RMceoMlO= c 1 — . POMP( IsJ A ... QOM =ORM MN it IOW A • R. =OEM zurroaralra..^N-9--z..."" _____. --„ 100 PANA --.'-'1"-,T191. -0, 1,3 ....., NAM MAMA* MM. AI =MAW A• •0116 - --- 7,.... - _ __---/ __i_ ---L ___ ____,___ ,_.,, _ _ r, _- .._ , ,_ __. ' . ' -------7-- .1111. Ira •••••• ANL 0111. Ix loam OIMEMOEL =MN • 113 DI. • .1,••••••• i• . • , ' -IF C...) '-... WREN Or 010•3 MOM REM =UMW= '41 •C 2 MOP new — 94 NOP • 9.043 ANIMENDINIMIIIMMIIMimmi ---.----,_ - --.. • PoP s• MM. MI OW LOCRAN Lom•A man ommoms ••••• Ma MIA M., M L . 10.910 4• r0p9.49 J .-!..11,"ri'n's‘o•°+7.;) 11011 • SAM i ' EXIST kare. - - - ____ _._ , . _ i AtIMINIS NAM MUM OEM IV IOVALIAA le MeRS WWI MA AVM INK il•••0116 MOM VralledlINIALINE ?Mr AL* =aue.....nroff 11.724•0.0. Av. — _ --------__, - -- • , o_ , A 12.10 - MASIST....79...074.7....m.rm PM• MI C-1 - •-- - - I Law ' '.'1."Tircr. ".93. ' 'War: ,sA`VVA'AV.O,7Y7fun-r("' I • IWO OR OA NAM •Lt ••••• NM =MC AMES X 10 10I-17, 10 ME ••••••1110 ROAM NU OIL WM 01.•_21,1-.1AO OEM al....10-00 • Mr • MR MOE '416":11 mal.'"Ire tie: ATTI4S11 am MO OM= XMAS Mt ON WM M MOM .........., 1 MCLEAN ROAD 5 , . i 0 i 1 . I1 LINE STA. 10+00 ;TA. 15+00 52 5JO V0F0.1E11P:11.93 00 9 ., 52 me. el IMO 50 , . COIVNEcr ro EXIST a OF POAD ' S. 1.31,70, 47. . , mow AS MIAMI APLAS1 mu AA MA DEAD O1/11/03 PVT. PLIDLIVED 700-TEAP PUBLISHED I00-1EAR . XIST. CL oiam ' 50 ,,E,,,, —7-1-A ,-,---- 1.7.1 l../THON 48 _11— 7' - - — — -- 48 MM. AC_ =Mums mom. 0•111••••••••••••••••114 -Or-- I CA1 11111 •1••••••••••••• •• I WM FAST OITC ns•••••1•. M.MINNOMA 46 , Hp I/ ... _ ,, ,,,,,, • se RCP COMM /--- - . • was . 46 N411.• SA—T—rrY WV ------ - W 1111-.• - - ----T 111301011T _ _ 1i.,. 44 / - MI 42 ----_ g4•l•.•iC- cOrrFy ';2'\ 11-ew• Lea . • 1 CNN AZ1 _ _42 t• i(N;.,..•-- ; . _ 40 :_ • 7— MOT Mo. 40 PROPOSED IIAGNOLJA ROADWAY FROM 0044(0I D. WATER ZANE ' ' ,- - 1,...... TO VETERANS, WITS DRAINAGE, 54.411440Y SEWER AND VIAIERMIN IMPROV0IIE/415, FOR ..- , / .... ---...,,,,, 38 THE crry Of 0(881.00038 BRAZOR1A 00. TEXAS 14MO - Kum NW MX - Mt .C. WI MCLEAN ROAD STA.10+00 TO STA.15+00 361 1 - - - 1 - 1116-11N- le 11.113.11 (3) - 36 , ,, se NMIAAIT Mt) ,, E•1/1150, ''' 34 I i 1 &32 : , • . a, SCALEZT: .. . , • 2 rT (Am Y,'.1; INEL-3 Ho. 49 cries., 10,00 11 DO 00 13,00 1+000 1 00 PAM AUG 3005 SURVEY SY: CL DANS 01,0 80, 20' 10' 0' 20' 40' 1!!!‘ SCALE 1..20' TM 1114 . 110 MICE WARM STA 15+573 ts...osto --MN OW MOWN =IOW MULL TOM. MOTOR MST MO AMOR PIM TOM Or MIT RI11.111t MIME 00.11151001 170. ST. /0411 12.1r2I LIS 1••• IMMO/ MIMI =TIN . 200 01•11 2802 WM I) I 502- 2441047 I-JEW< A .. NA 1114iii,-• MACE, - IN 0-1 TIM .2. Ill rgirOd*' ,152F,L 30011011. I WOO olt" 52 50 48 46 44 IPRoP Ci ROAM oox,Alt•Mt- DURO A, ILL 10444 MUM MN VW MON 11=0k MALL TONNA 02002 TOOT MO 021002 50/1. 17411$ slant OICI S MOM • ,jkal t,y, I. WW1= Ir LIME ;, CI, Or ArAy,,,Aryp TO= WM TO , Pryor) COMM TO MIMI 11111011( 00 OTT. 1 AI SW TO 00 or 04410.0e 01541004 110.4 Sta• L 0.00 Dan 40021 00 71, 1104.4 0910 0.100. PS 11•11410, 90.1131.11 ME .0 OPP OPP /LAP OILY MOM 14 ahlE *Moo. r COMINVC1191 146 0.4900.0 POPO. SVO DPORE0 IIE-oppoomi. "Owe o 060110411 0 'i0* •r;000 :21;3.0 04 if' . PM STA 1SV4.20 0:43.32 ' LVC,70.00 6 SEE SHEET 41A .1.DX FOR OUTFALL 0POI STA ..24 PLAN 004 falv 51.88 HICH PT STA 17484 80 1.0. PI ti-tm 01 38 PM SU' 11111 ELEV51.28 , 27.92 LVC 70.00 2002 RONDE 000 -YEAR EL000 RAIN WWI. W -2E-2000 EireLANED 000 -YEAR now RAW (02-22-7999) LOW T STA: 20+00.00 1.001 PT UT 470 PN SU:1918100 PM 1.1010 4.00 1,4,70.90 coma lo owls a. we VA *NO. 47.40 52 50 1011111,10X oak wieco. mom ime me waft W. MI. WOO W. 4 .11 44 • 011 OF 141.41 MEP V V. NM WO N.. NO In) 009 .B. ••••.0 9 ME 0,00..3 Low. co Iv* "*.r.orol'Jo' goo 15.01.T. 4.1 grata/ felnellt161111 POP. • MA OM trOK 1040 0. - PPM OE 94 7.1 1101141 OF OM AM OP .011.1106.11INAT W Y Oa It 011110001111,X114 • 9.1114 00*048940.0302.20.00200 4111. M. MOM. 1.1•• 4,04111.1 .114{ N.101. MA DE .1019/ 2•1 OPLIV•111.: ?WI 71.3 Ess417 41 1..4. WW1 P•11110 01.9•4 fr. .10.114 1.1.1111 EMI LOOM MOP .4140 IMP MO MO 10 OP Mill PM AM M. WOOF IS M. I> .11 U.. NOM MI 4.1•1310 Rall• VARPINIPATIVIPMFor WEL Oir 111144.111 MN PIM lona= NI MOM. WM L. MN .1.11 • P. 0/44 Min.411 V.I. VW MK 1004. Ot PM Cr 1.111 111. no M. .1111.1•LI 1. Or 0/10.1/ 411.1 MO Mt WI . ▪ 9.10110 LO. 19 09. AP WS /0 • MEP NO OP .11. Oil MOM. W. Y. MAE 741-71/110 0.120 14 OVIVI-4404301'”if rria‘PS .M1 1.0 1.910/ Or MI., 9. PE MP Pm Al ...a PM. 00•1.111110111111114 M. or no IWO PM .111.116 .111•1113 TO qr. OMB ir• M. NM. rat . 0.s or MOM 01•4 MO 16 UM 0400 10 WORD WW1 9411 0 ‘..JTHON 01.41414. 401.110. MOM. �tIIS31tS.000W1040 11140.9.1.1.141 F13,'"ITOP•1474.1••••02 48 222 2 2 WM 00 - MOP 1411 u402 46 4 1 .,-0107 114. 021 • 0.11•IT 42 40 CITY OF PEARLAND 38 36 PROPOSED MAGMOUA ROADWAY FROM HARKEY TO VETERANS, WITH DRAINAGE, SANITARY SEWER AND WATERNAMI IMPROVEMENTS, FOR THE CITY CV PEARIAVID (RAZOR* CO. TEXAS MCLEAN ROAD STA.1 5+00 TO END OF PROJECT 10400 20400 0,007:1' 2 7031:1 . 2 1,707TIT EB:) , 47 (84.00 10. 41 Or 07 VMS '4111114.111,21°.! 00001 0025 30: JELSIELL,t1 VILtd. - ALLtI . s N ✓0SC.'H W MANNA0 i(1 tl i[ f.,T ' NNAHANO (VOL. ((14)8,1, C. 951 oCar) 12-.27 11,84 AOI ILININ7111/IOL FIR • 0.MOM 11011. ae a n,a wceon A.d \V0i81/ s'o 52 50 48 46 WrS7 POW 42 40 E 38 36 '�— ea, 204.. f4Wp2ED 8! 682040., OPoWNCC 0151/aC1 I*1.4 +.I,. I. Snorer, n.b.w db Bowl_ o.. I..,, swam .WRM L Labe IE. al.L1 dee FM.. bob MOM .0 M qua nIke Ole Pe Wee MI ow ea We ocomplunewi Noe NOT tenoneOec eMale. Wee, It-MMoMwlwowm i wLOBIOM 20' 10' 0' 20' 40' SCALE: 1•.20' IMMIX We MIA ORM Oat 110 Won NAM aa s"- hellses Mien nal Tean Ipe/e. el twape sear w Palm POLL 10uTAI daM Wale. VOW Pao usu. Bela elev. - ets, 9irebill 1:400* =man OOP. owl. Ida4Cau erne NW wefts ME *Oa 1141. av�Rewai i�i%o Om %rILORM �soeor MINNOMR LoSONO. s time ea Nana VIFIValrare 1.21 eflerMII Men NW NM Oa MAO ea am Be aillearai Mu own le Wm olailialm Mew Wawa le amia•t Moe 10011we ne yea teem e a7152ix aa MetenenMame. On.110osav 6•PonipirdpgregleZ ZS AV lir WI Mau Lae NW an. Mae ex UN /ft M. XL Ma Wert alec alma • me MOB al MO wor Lae ^AKieeEeeaNM vaa•IfeO UMW two NNW Are Ilean Ora WOO.. w tamale Mew RE NOWL w Maliweeela Mon N6 a R Ife-aa fit let ai_ii. Mar olieePle sou WU PR Ilk Mk Crow M belrima rt",ao+% ama ma mos ftasos Foam an wee re weal 52 50_ 48 46 44 42 40 38 36 WI. STET414 LEW Rev NO ceawnoa Lei OTHON MOIL NC. CONetall•B•1011111aa ow mama. arosoliwereN ma* Nano 416 CITY OF PEARLAND PR020SE0 YAg10LU ROADWAY TROY NARNEY TO VETERANS, WITH DRAINAGE, SANITARY SEWER AND WATERMIN III4ROVEYENTS, FOR THE CITY OF MARIANO BRAZORIA CO. 145*0 STORM SEWER OUTFALL SYSTEM — C ,rnwT,m VERT.: 1• . 2' OAR •OG 8005 SINWEY Y: CL CANS OE4CN0.0 91: co; .11 WWI RT. IT SICU NO. INF It]9RETS DWG 111 cre,p(11113,\EiCINI SCWER OUTPAll. PAIAJn.c1/4.1V71,/100 Dravehq. \ REV TO FtFi • • ./FALSIF-LT4414 nUftilYtml4LED• el-At/ PP#4044 Of 4'2I O4u4Ct ..T.,' .O. 20 10' 0' 20' 40' _ , :05,-Pri 0, MANNA, PO Y."- ' ' , NT O. !'. SCALE. l''•20' . 2,, t \ \ ',. NC, (.)..4, •,-• 7 Oc,,,,,,O '" ' ' lE110111ARIS '2,:i j - ,,,,77 , Ofto N.M. MM.) MOM isma yr re. OM .1f MP OF MOW MOM CO Me OPPOMPM AO MPIZOOLD VI ME AP.E 9.0.125 too Mi. P. Om TM OM, Mpg MO MX Spet • OboriNUCTI. . POM COMM= OIYOM MO Al.16.1. •1311 'Er MON. OW, MOM MU 1.0..3 . ME SEMMItsi COM. OF ME MIMMILCMX OF omMIOLY. VOW MO IM.EM ROM, UM . OM , POOP WI II ••• IKT• \ I /LIMN= Wm . PPE • 0.00O. \ \ \ ; TO:1•7:41.f1WCIleiehal. -c• OM nnotaaame &ALUM . MP OD If 114. PUIPOOZED STIO1 , \ . MCI= 11•001, KM TO WOW 10101 PITALION NW . , 11WRII6M.ps IMMO M 101M NM MME M,AAnr.OR - VW .1 OAS 10 eil VIM PIPE • 0.01114 MOLD 010 \ l, , PA 17441 . IN•WRT \ Few. waft emu OUTITAxx ..c. LIMAIOVO Mo MM.. 14.111% Oh N.M. ME MOMS ... rmorkm., az) ,042..MO PIM 01111140301 001TOTEM, •., ,4. NOM. OMR TO NMI SWIM 4...61 MM.. . unnom Pogo Roil ON OW w• \ ,4,.., '''A'r ' , tt , .! 4 UMMOMM VOW tOr MOMS MI MOM OM MA <4;71110e NOT= Al • 0010430, COMA% 10 MO 11.110 OW 4' MIO 10.M. OE 011.0.0 YOM MM. I.E LOM MOM MOO MO MOM TOE t11•410410 male Mr.".1411111eZETAR 7:EOT :Mr War..1. MOM WM DM Mal TO MOMS MY it r1.041..1OrafrOM VOWnli......r4"Ilr Ir At MOM. NM ROM MIP MO MM. 11t.1.1.1 .11MMIAME No OMM TOW MEWL ea 01.1..W lt, AM' nor TO OE 1„... ak 011,110ZNIIIIIIROCJIM OEM MOM. KM 001 IM, a' (7....111-OW OR .1 M4-MOMMOM m WM . MP. ME OMMOMMO SW_ IE MOO PIO M OM MOM ..1110 M. 01.1114%. MOW P PE MOM 0,M ...rae Proampa sto PK AVM, woos OMM NO MM. IMMOM id MI EWA OR kV. 9.1.1.4 Ileal Ms NM .. OfP 52 rr 52 r.„.,/.40 ayuct sar MA 001 VAT. 50 r 7 0_1.4 OTHoN 50 a... •L,CEOPPOPoo •10•10PS 0................. ,— AFCPC. NG PTA 'WI . MOM ADOVC PROP 54. 7*7*.1111 - TYR '.C. MN , „„,............. nay.sorra. PAIMMMOU 46 -SP ---c— / :: ---____ 48 46 .:.. .OP9..G ..M....,.O..,. OA. ... r \, 41 - "C r,ory -•//0 , /....., 44 :''' CITY 42 SS, ...' . ,•, vilt, - se PO, / OF PEARLAND 40 M•-E-A MCU UOL L- D SAM, 1/4 / VLC ',I , allallat c , PM • / WINCII • 0.0.• , / 40 R—ROW PEA OOSDMGNOUROADWAY FOM RKEY/ RYPOP TO VTRANS, WITH DRAINAE, SANTA SEWER 40 WATERIAN IMPROVEMENTS, FO THE CITY OT PLARLAND BRAZORIA CO. TEXAS , \ (2-5A14•.ii , STORM SEWER OUTFAI_L. 38 Ramo .m.......mw..r.s. ..................tmar ArAllif 38 SYSTEM — c 36 ...- 36 s_1.111.MOONED 1.1COU-1.. 20 ,..., eV Mk JT do. Kr. , .ov 20 41/0r11119t173 Zaenir'n 02475 On 40' 15+50 RWW 16+ 00 52 52 PROP. 11616F. (TIP.) PROP. 9' GONG. APPROACH SLAB TRAFFIC RAIL (TYR.) 16+09.22 16+35 ROW -- 62 PROP. — ANHOLE -60 -AO 52 PROP. se RCP. -20 0 20 - CUT- 00.00 5F 8111- 317,67 5F CUT= 00.00 SF FILL.407.63 SF 14+00 20 6:1 SHO 3:1 SIDE SLOPE NEARSIDE (TYP.) -B0 O 20 CUT- 0.00 SF FILL -356.37 5F W CUT- 0.00 5F FILL -259.76 SF 15+00 20 CUMULATIVE 143.77 CY 1059,35 CY CUT- FILL - 010051.01.100i ern ▪ 4• 1. NM or =Mr Mel OF Oro V. *NW loolons MY MEP M, LMmptl Illar.114/4.003 s. ROW Au OR NAL or OUR - mp ION e[ a sten Wm MUM= WM IC JO It RI. IRMIOIRKI Awn morn/p mit MO.00T OF Nei tmss CRs 0.mom1 i mioI♦ Ma Mal It MOWS Sal NMet awl= OE as ma WRJOIPANICIVIDZIMT =MOM 10,a ArIZARI ME MO. MIMI Or 001.0•04114 MN. Y.00 IR Roar 0001•111 VTR ler =NU NO OW MIR roA colts eoF NM Or Ma OIL ann. Oar WM 113 .201-7771 le MC ore MOW.= • 50/ !Mr rno �[mw Mr; reti.'"WM0 Mar MMV1: INS 0=10111 alias is cot Orris m MOO MUM Rao irt wOR CUT AREA FILL AREA VON *ELT AAPS 48 46 /44 3:1 SIDE SLOPE NEARSIDE (TYPO CUT- 21.64 5F FILL- 15.35 SF PROP. 54' RCP. -20 0 20 CUT- 34.56 SF FILL. 16.76 SF CUT. 35,64 5F FILL. 46.74 SF CUT. 7.64 5F FILL- 167.33 5F 60 CITY OF PEARLAND PROPOSED MGNOUA ROADWAY FRON NARREY TO VETERANS. WRN DRAINAGE, SANRARY SEWER AND WATERMAIN IMPROVEMENTS, FOR THE CITY OF PEARL/ND 6RAZORN CO. TEXAS MCLEAN RD CROSS SECTIONS SHEET 3 OF 4 56ENTRP: 1t0R12.:1- - 20' 2' OATS AU6.. 2005 21.0•fY BV: .L DANS OEACNE 1 BY: PER, JY PIt0W1 SY: 45 9W.fl N0. 50FCF117 AIMS MC N0: n9e\C.fl,\e.a\RC/ TO 18+50 WIDTH v4RI6 (IVP.) 2:1 640E SLOPE NEARSIDE 1.5:1 SIDE SLOPE FARSIDE PROP. e- D -40 r355 �RCP 20 0 CUT, 34.42 5F FILL. 96.04 SF 20 52 52 40 19+00 2.5.1 SIDE SLOPE NEARSIDE 2:1 SIDE: SLOPE FAR510E fP CUT= 0,28 SF FILL= 165.19 SF OUT. 11.86 SF FILL= 52.50 5F 52 20 FILL. 12.24 SF -e0 20+00 6:1 6140U '.3:1 SIDE SLOPE' REARM (TYR. FOR RIR T SIDE) 0:1 SIDE SLOPE] FARSIDE 114. FOR Rio P SIDE) 18+00 CUT= 2.42 SF FILL- 5.42 SF 1.4:1 900 SLOPE NEARSIDE 1.4:1 SIDE SLOPE FAR0DE CUT- 1.97 SF FlLL= 166.98 5E CUT. 1.84 5F PILO. 141.88 SF CUMULATIVE CUT= 112.02 CY 01114 724.73 CY 10114E MI.nc 2742! CY ▪ 101 30001 OF WILI LIMN altalreglami uoatas i /M. oat IMO WC 710 MOOS MOMS ME OMNI AV MOONS ti mrnet� n CM. •001MOM 020111 C000•Mg Fµ013 _t�e�IMN R[,,411=011.01=6....11,111111,10 NOM PIM 10 =MOW • NW WY NI MinMD MI6 Of 011411l .011.=0. OW IMOWIONITS MI NOM 00000 Of ill :A 10 MU Vilf. mu, NO IMO MO( MI Mal TO MOM Ner 03�__ ▪ ��yypp�� 030,01001011.3 la 01031•010.10 WY OM taw MIK4 wU'OM mu� 4pnaat0i[LINOLVr 1,1! Ili LLMO. NO QM dlo 4 C01014 014Iu Mat WDM Mall • OWL Mar 10 14•11 Rfl MI w[ Hann w[2 Data rt 01 EIPV eek m MOON MOatrti 0 111,101. Of 11•3 .i NMuwe10.=10110Rd NI MC 000404' CUi AREA FILL AREA m 61 tv NG GEswR6t .wR00 wrt 4 OTHON WOn w61 DOR CPT OF PEARLAND PROPOSED MAGNOLIA ROADWAY FROM HARKEY TO VETERANS. MR DRAINAGE, S4NRARY SEWER AND WATERMAIN IMPROVEMENTS, FOR TOE 8112 OF PEARIANO 66420844 CO. TERAS MCLEAN RD CROSS SECTIONS SHEET 4 OF 4 9RNITICD: NOPo2:1-. WE MOT.: I 0010 4404. 2005 91R�Ev B�: C.L. CANS 0690N40 88: DER, 41 DRAW BY'. 41 9161 NO. 5606149609 DWG 90: 32 2:1 SIDE SLOPE NEARSIDE 1.5:1 SIDE SLOPE 18+50 68011.1 VARIES CTTR.) - 00 EAFYSIOE PROP. 36 - EX'S 3e• RCP -20 0 20 CIJT= 34.42 SF FILL= 98.04 SF - 52 32 19+00 2.5:1 SIOE O. 45 SLOPE NEARSIDE 2:1 E SID " "s,. P445100 eo -60 -40 CUT= 1166 SF FILL= 52.50 SF 20 52 52 4,9 19+50 6:1 3:1 010E SLOP St4HEAOU!R ts......4 3:1 SIDE SLOPE FARSIDE 00 -so CUT= 11.03 SF FILL= 12.24 SF PROP. 9' CONC APPROACH SLAB CUT= 0.28 SF FILL= 165.19 SF CUT= 1.97 SF F111=156.98 SF 52 18+00 -20 20 CUT= 2.42 SF FILL- 5.42 SI - 32 1.4:1 SIDE SLOPE NEARSIDE 1 4:1 SIDE SLOPE FARSICE PROP. .200900. -20 0 20 CUT= 1.84 SF FILL= 141.88 SF PROP. 500 RCP„ ULATIVE CUT= 112.02 CY FILL=724.73 CV TOTN. Nall CY frw.ai CY MUNI& 46/1 WOW Mal WS OW WPM 146400. 161106 LOOM VW. TV WM MP 4f OW Or WNW 6110t • WO V. 1161166 WOWS OM ao. Mex. No ea) .GMEEON ifaWillemee Reno we mom NM zzarmy - 00,441040CM CAE WSW 1.6 WOW Or 60 =MS •mm MIM grzo 6.5....war. rt. eallmeseriow "1“` MITIZIVATS= UWEL MOW 1••••••• MOW 6 0.000111 NO /WNW OnrOrtrOOVILTINTIF 17:7 go. 1.06.061.0 115 ,7=0. • WM /0▪ 6 • 01•116000110 10. 110 2140. WO WOW. W 01100•1111111MAZ AWN =Int 106106 •1 el RAW 70 WM WOE Ira WNW WM WOW.. NAM WM< MN 0111 cot 11, mew 10 NU imr MEI NW W WM, MEL WI MR ME NW 10 WWW1 0Q1 .00 ow ion 4,4742. •••• WI 0 WE MM. 4W1 WWIE MO 11•66 MOLLY FOE 0.01 IMMO W00 WS MO If II WM MEW O• al WWI M Arr., Eir W. OW 00001. WM 66116 MAPS M 107-7•7 ID 66 1•01110•1 MO. ME ea, W 01. 715-467 10r =,-101.110-0.4 • LOY • WW WOE Olt 06.1.96 OW WU WE 16 LIM 101016 MOM WM 064610.6 61011. 111E WWI Or 06 11.162 AO • 10M•6 MI6 MIMS • NW TIE WO .0 BMW WNW. WU MR COW • MKS .L1116 MO 16 WM 1050140. CUT AREA 1111111 FILL AREA Rs 101 WIT 01:11 064 40 060.161014 004 DONE rai 1.7.1%.)7110N COM NC. =MOM MIMI. • 1•40•1•06 6.* swami pow Ohm 1•10 16 VIVirrit/6 Me WE CITY OF PEARLAND PROPOSED MAGNOLIA ROADWAY FROM NARKEY TO VETERANS, MTN DRAINAGE, SANETARY SEWER AND WATERMAIN IMPROVEMENTS, FOR THE CITY OF PEARLAND BRAIORIA. CO. TEXAS MCLEAN RD CROSS SECTIONS SHEET 4 Of 4 svawnmo, NORI2:1- • 20' VENT.; I. • 2. 161062426,20e. OEsONED BY: DER, Jr MON 0, WEI NO. 3600F1873NELT5 090260: MUELLER SUPER CENTURION - MODEL 200 AMERICAN DARLING - MODEL B -84-B OR APPROVED EQUAL ORIENT FRONT OF FIRE HYDRANT PER PLANS SEE NOTES FOR THREAD SITE AND QUICk� CONNECT SEE VALVE BO DETAIL THIS SHEET NATURAL GROUN /—CUNCRETE INVALLVS IS TO MORE SALT y MAWS TCn S DAMS ME COLOR CODE SCA GOAL RR HYDRANT BODY TO BE DELIVERED FROM MANUFACTURER PANTED SAFETY BLUE (225A120). COLOR CODE (BDNNETSI NIIN ie. MO P7 AN DELOR YELLEN CON 73. MAIM 27 MS LF 377TY CDC 7,L 675A1P1 L ▪ 117331,16 ,ELT R ME 671131 ».- Ar 173 PSI Ta MMPRRa o . LE,ML P. VIRE IMR•Plr TOUR TM 7.75. CDO.1701 7•36 SIS3.4.717. 3. MOVIDE .171-rLAXLV CO APPROVER COM PIT Perna. INS GAMS Mall. ON MID 1716331,7 IPE 73.706 PIG;TIO INCE fsET RTmm RNA s MM. MIST MS 34 FM TR f SIX N. W Vwn OX ac (EEMRIM tEw 1EV ADZE NE TIE Mks • w 1St NTIMAT �APm uOW m fr mmn rz rlan TimncGvwi r i' WRY TA. CENCRETE RD. 1161.17 NA= r r w I star PLAew =curt /WM SD.. TO MAE 7. ALL STRC NVORMTS MO VALVE VD. ME TO Re ULT. TO MIMI DV. OlL4 PAVD10 13. CLIOLETE 3. ALL PBC WARW. Id TO TE MIMEO VITH PASRA-3771 COI., 1737•M 73TEM II/ • 7 RTrpED VIM uIMO 7111.1 KAU 'iiUS STEEL CAI MAW R. M MUT a LK IRE 171MT CM Y rs 9. CONTRYLTOR WITS, CM OGINCI. LOJI6 WOW START C7 77171LICTOAL ELSON CLAMP W/ STAINLESS STEEL ROD OFIRE HYDRANT N).S NEDR FINER MRROSION RESISTANT SCREEN CONNECDON ON 2' PK PIPE 2' COHBINATTTI AR VALVE BMW.) POI. RIALS DEStle^MW DER DATE 01/]OTHoN aEDCI. BK. COMMONS INGNAMPA CAC femmAdMA 41.11MONAMIAL OA CITY OF PEARLAND PROPOSED MAONOUA ROADWAY FROM HARNEY TO VETERANS, WITH DRAINAGE, SANITARY SEWER AND WATERMAIN IMPROVEMENTS, FOR THE CITY OF PEARLANO BRAZORM CO. TEXAS WATER UNE DETAILS SHEET 2 OF 2 SUBMITTED: SCALE NKBT.: DATE AUG. 2005 wRKr Br: aL. onus OESIp1ED BY DER JT MAW BY dr SHEET Ml 60 WO REEK DWG NO 401 sit SPAVO 2.11,e141 unsu1nu'a roc: lf al WOO MOH _ _ 3\a. 1 .,. _I ..r Yroo cw muwnc ---- -_-— -1 __�._.-----. _-------�.._ NO ;� 1f101 )133V0 S. W4 IV CVOS MI310N1 SO Y Prod oonl .mr - (wr:i W a wy wRI i�i °1w r SO 0 O VIVOZ1101 WWII n ua 7NL y0J 'aN3W011�IN MYIIY31Mi an Y3M7S SZ I _._ .r Lv�-___....x....,.......21 .._.1 n n .n if g WOWS '30Y1 N1M1 VI/MU Ol uonN hog arm K,oiewN ----.--I' awM �r� p aaaow 6Y— r sv do � r \ F I 0,.a /a, q .,.q A.113i`Y S9 r , a . / ,wy+ W:n•uw. `"vYl Maw 10 S9 r wpm ru•yu ATM - w,m. w,m nftnn r ivy mai- I .. --- 59.. rl/ M31A Nvld ....... '\u b74r�9.1 Ore L 10110.1• MN NNt MOO. r a•111•311 'I 310.1 it\ ` • l{ :, w•a aw .01 ..l :]1VJf INS IN rr•w MONw, � a �iw NOLL03S Ti IdA1 rwone ,uo•.+. — ,,� w.+r— .wa1. aa�i••0/ •r " IMMIowri>INIVIC"'" - yv mw._-� w wy y Ilgo, ..,w (iJ ,au we Mt amy�aiW 0� ,Mv ani �•l�llmasY lisialk Matattliv I�yy��p�{��.W lSi;' a . L �. . 1 { • .. . Z ,1LM'.� a ran' �Ww�W���ww'r11�� Q 4 a, II ,olio b111.1.10L901.110111ML \\\ ?:araIii 1au1'w VAAL) mi N•3.• �F I♦ SFUNIV - .. \�c�.-‘�V\, Y L\ 1\ i �. Iii• .11 - an •RAlx !t °iiiiY: _�i�"'' llATEA w 11 s ..0-.15 wnr 3 _.11 �.Ti a..., k., LL LL n. yw.ae,, ll X 1l L\ 1 n \L ii ti w« �iWflrl ILMINVj SI va rn .o-1 "�"' \ \\ • 1` . 'r�cr Avm _L \� n. m, wO•wwlil wwwlwe -.{'7"""" ,%27: A1w Srmrammi MAIMS „ wok. 01030•1 =arsiWi w MOWS _'.8 - \'' \ `.8= = INNIS MOM A NINNY mo MOO w wrr 1010 T•11 ' `` t` 1 $'WY r—,:�hw NM= ,OZ.*.I 3710^a .01 ,0Z .0 .00 ,0L CAP END DETA, a vnr�a� Tr s SECO9N A -A (ON on TABLE OF ESTIMATED QUANTITIES 9 P,E BENT 1/ • L --- •mumate-Y . O' dummies wW Max K rot at We OAT. 2R' WOW .,reef rem 010A 000 90 190 LAW WO TO DOW 116. WACO NA At 0 DOW TO OOW /0.00.0..1 M 0, WIMPMOT PM. 000 2 VeSWAG GENERAL NOTES: 1,10000 Di WOWS 11111. 202,00TO COW Tr TOWN ro 3.000 • TECE 100111 .2•40.10 202 1210. DWI ,910.201 19140 WOW e. 000 ae,to /aweODAS ,. lag . T TANg. T y�_y p� %AUI10N NDA 0•01 1016 OW TOY 00 POL - POD O. WS 1,9 Ott 99101 1190-29010 TM Of • tRt%OppePe ae10IDOW WM WOW LOW 0, WOO DO 1,01•3 OS OW cor wow Now.) ...No 1,0 do. 0100 WI WI 1099100 Of MO DOT no um •da NEMO. •' mem MO. WO MT bO Uq 412 WO OW IF WWI Mt 0110 It OW MOW. WM /13 21100 ‘11 P-01•0000 AAA Of e FA LOW l O�1.eWSN�� WW2 OM If OW WO FM OW 10 MD WO TO WI DM L10 SA A St ART 115•10,9111 9011 MI OW 10 WO MT 090010 4111. WO Mt WM • IOW CM 0,011000 01•001NO 0•01 IN WY 10111 911 911 0. LK WOO W F�OI WOW On 0•91 10 INV .01 10 WOO ORO OM 10 WW1 IMP MEM NOWT >9 20/-71/1 SA 111001.11.9 Tnet rove 0-01mu. OW 00 A LEP•lam No -den WO 0.009 .11. 1iod mnwcYDWI 00196 0111. 10 $00OW OW WM Al DA 01 WS PRIVATE UTTEITY ONES SHOWN en.mGNT SEW ,cent rearrcs 9 e�- 19C As.01M M•xv...ena0111. 0, 9000 Dett me row 09119•000 EMMY 00 10.91 A 011 REV I. xs00PTIO. CITY OF PEARLAND GATE PROPOSED MAGNOLIA ROADWAY FROM HARNCY TO VETERANS, WITH DRAINAGE, SANITARY SEWER AND WATERMAIN IMPROVEMENTS, FOR THE CITY OF PEARLAND 9RAZORM CO. TEXAS MCLEAN ROAD DENT DETNLS NJOIAITIEO: SCALE. NORIZ:: S SHOWN VERT.." SURVEV90 2WC1 DANS DEVOID WT: DER, JT *909 91: JT WET NO WS OF 1679RCTS DWG NO: