Loading...
R2008-059 2008-04-14RESOLUTION NO. R2008-59 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AMENDING A CONTRACT FOR ENGINEERING SERVICES ASSOCIATED WITH THE ORANGE STREET IMPROVEMENTS. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain amended contract for engineering services associated with the Orange Street Improvements, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest an amended contract for engineering services associated with the Orange Street Improvements. PASSED, APPROVED and ADOPTED this the 14t" day of A il, A.D., 2008. ID MAYOR ATTEST: Y NG I M Y S ETARY '~4c~ V Y~"` A- . C(i ~'~ sX ~~ : x" <.?;, to APPROVED AS TO FORM: ` /~' ~_ DAR IN M. COKER CITY ATTORNEY Exhibit "A" Resolution No. R2008-09 08-0120 T70051 PROJECTS DEPARTMENT 3519 Liberty Drive Pearland, Tezas 77581 CHANGE ORDER Orange Street Improvements Date of Issuance: Contractor: Engineer: April 14,2008 N/A GC Engineering Ezulanation• This change order encompases the following: Description of Work 1 Addition of Water line design 2 Changes to drainage design 3 4 5 Please attach back uu documentation Cost & Time Change Summa, Original Contract: Previous Change Order(s): Amendments 1 & 2 Contract prior to this change order: Net increase (decrease)from this change orde Revised Contract: Change Order No.: CoP Project No.: P.O. No.. 3 T70051 61535 Cost Time $ 35,273.00 Days $ 18,974.00 Days $ - Days $ - Days $ - Days Cost Time $ 366,270.00 Days $ 152,604.00 Days $ 518,874.00 Days $ 54,247.00 0 Days $ 573,121.00 0 Days Finance Approval: ~ ~,~}~,; RECOMMENDED: RECOMMENDED: By: Q' `'~ Date: oq- 17/0 8 resign F,ngmeer ACCEPTED*: By: N j i- Date: contractor Date: y•d/•U~ By: ~{,l,a- Date: ilron Manager APPROVED: By: Date ~3 D/Og~ owner •Conirailor agrees to perform change(s) included in this Change Order for the price and time indicated. The prices for changes included all costs associated with this Chance Order. No work is to be done until this change order is executed. No payment to the Contractor (or Consultant) shall be made for work included in the change order until the Contractor's pay estimate is updated Revise the project plans and specifications as referenced and insofar as the original project drawings and specifications are inconsistent, this Change Order governs. Upon execution by all parties, the following changes identified for the contrail value andlor contrail time shown, are made part of the contrac4. Page 1 54. Revised 7/27/07 EXHIBIT "A" AMENDMENT TO SCOPE OF SERVICES Additional Services for Waterline and Alternative Drainage System Design Orange Street Widening from State Highway 35 to Hatfield Road INTRODUCTION The City of Pearland (OWNER) requests that GC Engineering, Inc. (GCE) amend professional engineering services to include the design of a waterline from State Highway 35 to Woody Avenue as well as providing alternative drainage designs for the Orange Street Widening Project. The project objectives are as follows: To improve and provide for continuity in the existing water supply network in the area of Orange Street Widening Project, and To modify the originally proposed drainage system and to evaluate various options as requested by the OWNER. The options considered include: a. A single drainage outfall to a proposed detention facility at BNSF railroad and then discharging to the existing Town Ditch. Consideration of this option was necessary at the time due to unknown timing of the proposed town ditch outfall at Mykawa Road. b. Two drainage outfalls, one at the proposed Town Ditch Extension at the intersection of Mykawa Road and Orange Street and the other at BNSF railroad crossing. This scheme resulted in cost savings as approximately 2,000 feet of 60-inch diameter sewer could be eliminated from the project. This design also resulted in revisions to the roadway vertical profile from Hatfield Road to Mykawa Road as the flood flows for extreme storm events were enable to be directed to the Proposed Town Ditch. The work described in this Addendum would be performed as part of the Orange Street Widening Project. The design elements resulting from this scope will be incorporated in the contract documents for Orange Street Widening Project. ARTICLE I BASIC SERVICES: GCE shall render the following preliminary design services to the OWNER in connection with the Project. A. Waterline Design Attend up to two meetings with the City and other interested parties to discuss waterline alignment and design requirements. In addition, GCE will obtain from the OWNER the configuration, pressure data, type and size of the existing network that will be tied to the proposed waterline. Design a new 12" diameter waterline from SH 35 to Woody Avenue. The design will include the following: a) Perform an analysis to determine the pressure distribution along the proposed line based on the available network information from the City. b) Design connections to the new waterline to tie i. the future 16" waterline at Orange Street and SH-35 intersection. ii. the existing 10" waterline at Mykawa Road intersection. iii. the existing 10" waterline along Woody Avenue. In addition, replace the existing 10" waterline along Woody Avenue within the proposed Orange Street Widening with a new 10" waterline. c) Terminate the new waterline at Woody Avenue intersection by connecting the new line to the existing 8" waterline along Orange Street west of Woody Avenue. Orange Street Widening from Hatfield Road to SH 35 -Addendum 2 Page 1 of 3 G ; A~ ~~ d) At all intersecting roads except those indicated above, provide stubs, 6-inch minimum diameter, or connect to the existing waterline where present. e) Provide fire hydrants along Orange Street within the limits of the new waterline. 3 Incorporate waterline plans, specifications and engineers construction cost estimate in the construction documents for the Orange Street Widening Project. 4 Prepare and application for waterline crossing at BNSF railroad. Coordinate permit approval process with BNSF. A BNSF Permit application fee of up to $600 was assumed and included in this scope of services. B. Modifications to the Drainage Systems 1. The original drainage design considered directing run-off from the entire project length to outfall at the existing Town Ditch at BNSF railroad. The design will be modified to incorporate an additional outfall at proposed Town Ditch at Mykawa Road. Work will include the analysis of the modified system, design of storm sewers to convey the peak flows for the design flood recurrence interval, and modifications to the existing drainage system to minimize or eliminate the need for new storm sewers between Mykawa Road and BNSF railroad. 2. Make appropriate adjustments to the vertical profile of the roadway and the proposed right-of--way for each alternative. 3. Prepare 30% design plans. ARTICLE II TIME OF COMPLETION: The Basic services portion of the work of this engineering study will be completed within 90 days of notice to proceed. If Additional services are required, those services will be provided outside of the basic services schedule. If GCE's services are delayed or suspended in whole or in part by OWNER, or if GCE's services are extended by the Contractor's actions or in actions for more than 90 days through no fault of GCE, GCE may be entitled to equitable adjustment of rates and amounts of compensation. Orange Street Widening from Hatfield Road to SH 35 -Addendum 2 Page 2 of 3 EXHIBIT "B" COMPENSATION Additional Services for Waterline and Alternative Drainage System Design Orange Street Widening from State Highway 35 to Hatfield Road LUMP SUM WITH ADDITIONAL SERVICES BASED ON HOURLY RATES For and in consideration of the services to be rendered by GCE, OWNER shall pay the fees hereinafter set forth. A. COMPENSATION: Exhibit "B" Compensation 1. Compensation to GCE for the Design Phase services as defined in Article IA of Exhibit "A" shall be a Lump Sum of $35,273.00. If GCE sees the Scope of Services changing so that additional services are needed, GCE will notify OWNER for OWNER's approval before proceeding. 2. For services as defined in Article IB of Exhibit "A", a total budget of $18,974.00 is proposed. Therefore, the total additional fee for this scope amendment shall be $54,247.00 and the agreement between the OWNER and GCE shall be amended to an overall amount of $573,121.00. Details concerning the amended fees are included in this Exhibit "B". B COMPENSATION TERMS: 1. "Sub-Consultant Expense" is defined as the expense that is incurred by GCE in employment of others in outside firms for services in the nature of foundation borings, testing, surveying, process design and similar services that are not included in the Basic Services. 2. "Direct Non-Labor Expense" is defined as that expense for any assignment incurred by GCE for supplies, transportation and equipment, travel, communications, subsistence and lodging away from home and similar incidentals in connection with that assignment. C. BASIC SERVICES: 1. Upon authorization from the OWNER, GCE shall proceed with the services outlined in Article IA & B of Exhibit "A". For the purposes of preparing monthly statements for the preliminary and design phase of the Project, GCE shall submit to the OWNER payment requests in proportion to that part of the service which has been accomplished as evidenced by monthly statements. Final payment for Preliminary Design phase shall be due upon the completion of service, whether the work be constructed or not. G:\Projects\C - 0616 -Orange Street Widening\Scope, Budget, and Schedule\.4ddendum 2\Revised Addendum 2\080226 Addendum 2.doc Orange Street Widening from Hatfield Road to SH 35 -Addendum 2 Page 3 of 3 N~~++ Gi W W 7 W U W W W F W rW V ~-~ O L'". ^~ ^~ eet A O O M x ri .~ 6) 6~ L 6~ ~, 0 C/} ~ ~ N h V'i N M o M a: ~D: O E M h i M r M 00 : M : e ~: ~Di ~ ~ r C_, -T y N? Oi "~i ~E [~ gyp? N i o0? ~? d' P N O ~ ~: 64 : api Y3 i Vji 64 : ~ 69 : vjE 69 : ..i: 69 : ~; M ~, ~' N •~ 69 • 69 : 00 .-~ 7 O d A ~+ 6R i a F"i .a ~ d h O : u 'n ~p ~= ~ L d 69 : Ef] C a W a ~ CY N lei ~e Ni Mc O M O~ ~ Oi M lei M r Mi 00i Mi i ~i ~i 7i "t r ~; ^t n y d W O N : O : •--i : 7 c •-• - VO ~ ~:. 00 ~O ~ O~ L: rn oo v, va ,E v , rt vE N: ai A Q Z a O\i tom; N 00 Oi v'1 00 v1 ^ CY Ni N N lOi \O O N O '[Y N l~ ~ E'~ d ~ M ~ ~ O ~ ~ .7 N VJ ~: N: \O: ~: N ~' ~ J N i ~ _ ~ o0 A ,~ ,,; ., d C +t N M U ~ v a, E.., v; U~ L ~ O ~i' i C' N 00 N (~ a i [\ Ni 00 ~ N 6 7 , N ~ ~ v w, c W ~1 f ' 7 7 i N l0: 'd'E N OE N' 7i N oo O N E ~: NE ~E N N.- -+ C Y tv C~ .~ ~ ~!i ~r~ r N V 7 .-i , r G ~pA N ~ ~ 'y p f o~+ C4 W y, ~ ~ M N e i o0 N 00 N ~ ~ ~ W W i '~ O ,,,~ ~ r y CJ v `7 _ N o0 00 T. ,n ~ ~ M. ~ [~ r N ', a ~ ~ ~ ~ y N? Mp NE Ni Nc O ~ i N$ NE NE ~ '>0. . ~ tf bD . urn u .~ U ~ W, ~ ~,; ~i ~> L ~ C4 .~ bri y, r ~ R _ ~ x x ~ ~" ~ ~" ~ o ~ r .~ ~ ~ _ ^ Y ~ ~ • ~ U ~ ~ ~ ~ ~ : = , r ~ d F ~ T O ~ ~ ~ ~ L' O ~ Q of ~ ~ ~ ~' Q C ~ ~ -- J H ~- _ i _ .~ ~ O. ~ ~ ,~ O 'r ~ d ~ ~ ~ _ _ ~ V1 Q U ~ GL. T7 ~ • ~ i. N Q i Q o LL ~ L Q+ ~.+ e ~ ~ N N : CC cC [ o ~ o ~ O~ z_ N i ~ ~ a i r .> i ~> i 3 3~ °~ ~~ °€ ~€ ¢€~ z€ m~ d€ ~ 01 ~ .ti M ~ ~ .~ O ~ !t r-I ~ ~ ~ ~ C ~ G ~ ~ o u d d '~ ~ ~p w d O O .~ O a d v ~ F 0 d a F