R2003-0043 03-10-03 RESOLUTION NO. R2003-43
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND,
TEXAS, APPROVING WORK AUTHORIZATION #5 SUPPLEMENT//4 FOR
ENGINEERING SERVICES ASSOCIATED WITH THE PEARLAND
MOBILITY AND DRAINAGE BOND PROGRAM (CULLEN BOULEVARD
PROJECT).
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS:
Section 1. That certain contract by and between the City of Pearland and Turner,
Collie and Braden, Inc., ("T C & B) for Program Management of the Pearland Mobility and
Drainage Bond Program was authorized by the City Council on December 10, 2001.
Section 2. That T C & B has developed work authorization #5 Supplement fl4,
which is attached hereto as Exhibit "A".
Section 3. That work authorization #5 Supplement #4 for engineering services
associated with the Cullen Boulevard Project is hereby approved.
PASSED, APPROVED and ADOPTED this the 10th day of March ,
A.D., 2003.
ATTEST:
APPROVED AS TO FORM:
DARRIN M. COKER
CITY ATTORNEY
TOM REID
MAYOR
ATTACHMENT D
WORK AUTHORIZATION NO. 5
SUPPLEMENT NO. 4
Exhibit "A"
Resolution No. R2003-43
This Work Authorization is made pursuant to the terms and conditions of the Pearland
Mobility & Drainage Bond Program, hereinafter idemified as the "Contract", entered into
by and between the City of Pearland ("City"), and Turner Collie & Braden Inc.
("Engineer).
PART 1. Work Authorization No. 5, is related to The Cullen Road Extension Project.
The Engineer will perform Design Services..
PART 2. The maximum amoum payable for services under this Work Authorization
No.5 Supplement No. 4 is $199,426.74. This amount is based on the attached fee
proposal submitted by Freese and Nichols, Inc. for Engineering Design Services, dated
February 20, 2003.
PART 3. Paymem to the Engineer for the services established under this Work
Authorization shall be "Lump Sum Basis".
PART 4. This Work Authorization shall become effective on March 4, 2003 and shall
terminate on November 12, 2005, unless extended by a supplemental work authorization.
PART 5. This Work Authorization does not waive the parties' responsibilities and
obligations provided under the contract.
PART 6. This Work Authorization is hereby accepted and acknowledged below.
ENGINEER CITF DF PEAt~ANI~
By: "--~,,q.~,~~ By: ~11/} ~/f/~ ~ ~~
/
Typed or Printed Name
Alan Hue11er
Typed or Primed Name
Title
Date
LIST OF EXHIBITS
Exhibit A - Fee Schedule
Exhibit B - Work Schedule
Deputy City Manager
Title
Tumer Collie Braden Inc. 2/28/2003
EXHIBIT A
FEE SCHEDULE
Pearland Mobility & Drainage Bond Program
Work Authorization No. 5
Supplement No. 4
Summary
Project
Cullen Road Extension
En~lineerin.q Services
Hydrologic & Hydraulic
Environmental Compliance
Topographic Survey
Geotech
ROW Maps & Documents
PS&E
Basic Services
Traffic Control
SWPPP
Construction Phase Ser
Direct Cost
ROW Acquisition Assistance
Materials Testing
Subtotal
Total toData
Previous
Authorization
Walsh/Freese & Nichols $29,126.00
Quadrant Consultants $ 18,330.00
Wilson Survey $35,200.00
Terra-Mar $4,250.00
Wilson Survey $12,000.00
$
Freese & Nichols $
Freese & Nichols $
Fmese & Nichols $
Freese & Nichols
Freese & Nichols $ -
Crossland Acquisition, Inc. $51,300.00
$ -
$150,206.00
Current
Authorization
$ -
$ -
$ -
$ -
$ 160,872.52
$ 22,5O7.46
$ 6,O5O.0O
$ 5,777.80
$ 4,219.OO
$
$ -
$199,426.78
$349,632.78
Page 1 of 1
ATTACHMENT A
SCOPE OF SERVICES BY PROJECT ENGINEER
BASIC SERVICES: Freese and Nichols, Inc. (herein called Project Engineer) shall render the
following professional services to the City of Pearland/Program Manager (herein called
OWNER) in connection with the development of Cullen Boulevard Extension From Broadway
(FM 518) to Northfork Drive, herein called the Project:
I. General
In general, and except as may be modified herein or directed by City of Pearland,
engineering design, plans and specifications and construction procedures will follow the
usual practices of the City of Pearland, and will be in conformance with City of Pearland
Program Procedures and Design Criteria Manual and will conform to approved schematic
layouts and profiles. The Project Engineer will perform all requisite engineering design
services for the project, including engineering analysis, preparation of construction plans,
specification and estimates of prob~tble construction costs.
Design Services
The engineering services to be performed by the Project Engineer are those services
which are necessary for the preparation of design construction plans, specifications, and
other items of work related thereto, all of which are hereinafter referred to as the "Design
Phase Services." Design Phase Services will include but are not limited to the general
type and classifications listed in the fOllowing:
A. Roadway Design Controls
1. Prepare existing and proposed typical sections of all roadway elements.
Prepare roadway plan and profile sheets showing horizontal and vertical
geometric design including the necessary refining of the horizontal and
vertical alignment shown on the preliminary layout. The plan and profile
sheets shall have 1 inch = 20 feet horizontal scale and 1 inch = 2 feet
vertical scale. Roadway design will be for four-lane divided concrete
street with 6" curb and 6' wide sidewalk on both sides.
Drainage Design
Prepare overall and detailed drainage area maps and calculations
necessary to perform the design of the storm sewer system, roadside
ditches, roadside swales, culvert crossing, outfall pipe and outfall
structure. All calculations, drainage areas, and outfall system will be in
conformance with the Drainage Study.
Ce
o
Prepare Drainage Plan and Profile sheets which will include plan and
profile information on storm sewers, roadside ditches, roadside swales,
outfall piping outfall structures, existing utilities, and cross culverts.
Storm sewer design shall be shown on roadway plan and profile sheets.
Prepare plan and profile drawings shOwing each culvert crossing.
4. Prepare the necessary drainage detail sheets.
Signal Modifications Design
Perform the design of modifications to the existing Cullen Blvd.
Broadway (FM 518) signal including necessary loop detectors and related
pavement marking modifications.
2. PrePare the necessary details and standards for the signal modification.
Miscellaneous Roadway Design
Compute and tabulate construction quantities and prepare construction
cost estimate. In addition to individual quantity summary sheets, checked
quantities for each pay item of work included in the proposal form for the
construction contract shall be tabulated on a general summary sheet. The
general summary sheet or sheets shall conform to standards furnished by
the Program Manager.
2. Prepare estimates and submit, with each review submittal.
Prepare roadway details sheets and modify construction standards as
required.
Prepare Title Sheet and Index Sheet. The Title Sheet will be in the format
established by the Program Manager. The Index Sheet will include a
listing of the required construction standards approved by the City of
Pearland.
o
Prepare project layout sheets and general construction notes, and provide
construction standards approved by the City of Pearland/Program
Manager.
6. Prepare signing, pavement marking, and illumination conduit plans.
7. Submit 30%, 60%, 90% and Final Plans for review.
to
Ge
Utility and Layouts and Agreements
Prepare layouts and profile of existing utility crossings showing conflict of
utilities with proposed improvements. These.utility plans will show the
location, alignment, and grade of each utility crossing, including both
aerial and underground lines, giving the project station, skew, elevations,
owner, the type of line crossed, and all other pertinent data visible in the
field or obtainable from local residents records. The utility plans will be
submitted on or before the 30% plan submittal date so that all utility
company relocations may be approved prior to awarding of the general
construction contracts.
Prepare the exhibits, text correspondence and meeting attendance records
to ensure the completion of all necessary utility agreements.
o
In counsel with the Program Manager, coordinate with utility companies
to expose potential conflicts and field ties to uncover utilities in potential
conflict areas.
Include the utility companies' construction plans and specifications for the
utility relocations, to be made by the construction contractor, in the plans
and specifications issued by Program Manager for construction of the
Project in logical numbered sequence. Tabulate utility quantities in the
quantity summary and bidding documents.
Design of new and/or relocation of City owned water, gravity seWer,
forcemain, and service lines not included in this project. However design
of spot adjustments/relocation for conflict resolution with proposed
pavement and storm sewer will be performed and included in appropriate
roadway/storm sewer plan and profile sheets.
Earthwork Cross Sections
Sections showing existing and proposed sections will be prepared every 100 feet
on tangent sections and every 50 feet on curves for all roadways showing cut and
fill quantities. These cross-section sheets will be plotted to a scale of 1" = 10'
both horizontally and vertically on cross-section sheets of the same size as the
plans. Quantities will be tested for accuracy and reliability prior to including in
the plans.
Design Computations
Design computations will be neatly recorded on 8-1/2 inch by 11 inch
computation sheets or standard computer printout, fully titled, numbered dated,
signed and sealed by the maker, checked and indexed. A copy of these
computations, fully checked, will be submitted with the completed tracings.
Computations will be available at all times for review by City of Pearland and
Program Manager. Check prints of drawings will be maintained at all times and
be available for review by City of Pearland.
III.
Ho
Agencies Coordination
The Project Engineer shall provide the necessary coordinations with Brazoria
Drainage District No. 4, and TxDOT and assist the City of Pearland in acquiring
approvals and/or construction permits.
Project Specifications
Prepare Project specifications using the City of Pearland Standard Specifications
and general notes for construction bidding, based on Program Manager provided
General Notes library and project specifications.
Preparation of Supplementary Specifications, Special'Provisions, and
Contract Documents ·
Fumish drafts of supplemental specifications and special provisions of the
construction contract, modifying, augmenting, or deleting the provisions of the
Standard Specifications. The Project Engineer will also furnish estimates,
proposal quantities, and all other information and data reftuired to complete the
construction contract documents..
For all construction contracts, the contract documents will be printed and
published by, bids will be received by, and the award of the contract or the
rejection of bids will be made by City of Pearland with the assistance of the
Program Manager.
K. Assistance During Advertising and Award of Construction Contract
Assist city of Pearland during the bidding process by, responding to questions
raised by potential bidders and clarify plans and specifications as required to
provide clarification and assistance in evaluation of proposals as required.
Design Services During Construction
A. Shop Drawings
Shop detail and construction drawings submitted by the construction contractors
will be reviewed and checked in accordance with accepted standards of
professional practice. These will include reinforcement details, form details, and
details of all other items required to review and evaluate for compliance of the
IV.
construction to the standards required. The review shall be sufficient detail to
assure that the materials furnished are of proper size and strength and conform to
the construction plans and specifications.
Clarification
Assist the City of Pearland and the Program Manager in providing responses to
the Contractor's "Requests for Information" and to provide clarification to the
plans and specifications as required.
Additional Services
A. Stormwater Pollution Prevention Plan
Prepare stormwater pollution prevention plan (SWPPP) and layout sheets
showing temporary control measure during each phase of construction. Also,
prepare permanent sediment filtration ponds as required by Texas Commission
Environmental Quality.
B. Traffic Control Plan-
1. Prepare construction traffic control plans which will include the following:
bo
The seqUence of construction and method of handling traffic
during each phase.
The existing and proposed traffic control devices that will be used
to handle traffic during each construction sequence, including
signals, regulatory sign, warning signs, construction warning sign,
guide signs, route markers, construction pavement markings,
channeling devices, portable changeable message signs, flashing
arrow boards, barricades, barriers, etc.
Co ,
The proposed traffic control devices (stop signs, flag person, etc.)
at grade intersections during each construction sequence.
Where detours or temporary widening are provided, typical cross
sections will be shown.
Road construction work hours will be developed based on traffic
conditions.
Vo
Time of Completion
The Project Engineer is authorized to commence work on the Project upon execution of
this AGREEMENT and agrees to complete the Design Phase Services so as to deliver the
Vii
VII.
complete plans, specifications, and quantities to the OWNER within 180 days. Review
periods by Brazoria Drainage District No. 4 and TxDOT to acquire approvals and permits
have not been accounted for.
If Project Engineer's services are delayed or suspended in whole or in part by OWNER
or if Project Engineer's services are extended by'the Contractor's actions or inactions for
more than 90 days through no fault of Project Engineer, the Project Engineer may be
entitled to equitable adjustment of rates and amounts of compensation.
Responsibilities of the OWNER
The OWNER shall perform the following in a timely manner so as not to delay the
services of the Project Engineer.
Ao
Designate a person to act as OWNER's representative with respect to the services
to be rendered under this Agreement. Such person shall have contract authority to
transmit instructions, receive information, interpret and define OWNER's policies
and decisions with re,qpect to the Project Engineer's services for the project.
Bo
Provide all criteria and full information as to OWNER's requirements for the
Project, including design objectives and constraints, space, capacity and
performance requirements.
Assist the Project Engineer by placing at Project Engineer's disposal all available
information pertinent to the Project including previous, reports and any other data
relative to the project.
Do
Provide complete topographical information including 100-ft cross-sections along
Fite Road and along the proposed preliminary roadway alignment. Above
information shall be provided in AUTOCAD Release 2000 electronic format with
a hard copy.
E. Provide As-built Plans of the section roadway completed at Broadway (FM 518).
F. Provide prOposed roadway alignment to be used for the Project.
Go
Arrange for access to and make all provisions for the Project Engineer to enter
upon public and private property as required for the Project Engineer.
Compensation
Compensation to the Project Engineer for the services defined in this Attachment for the
Cullen Boulevard Extension between Broadway (FM 518) and Northfork Drive shall be a
lump sum of $199,427.00. If the Project Engineer sees the Scope of Services changing
so that additional services are needed, the Project Engineer will notify OWNER for
OWNER'S approval before proceeding with any additional services. Additional
Services, if authorized, shall be invoiced per Schedule of Charges attached.
Upon authorization from the OWNER, the Project Engineer shall proceed with services
outlined in this Attachment. Monthly payment reqUests shall be submitted to the
OWNER-for the portion of service which has been accomplished as evidenced by'
monthly statements. Final payment for the services shall be due upon the completion of
service.
T:OFF03041PROOTCIq I .Scope of Service~
Freese
'"':' Nichots,
Engineers Environmentat Scientists Architects
2010 East Broadway Pear[and, TX 77581-5502 281/485-2404 28.1/485-4322 fax : www. freese.com
SCHEDULE OF CHARGES
POSITION MIN MAX
PRINCIPAL OF FIRM
OFFICE MANAGER
SENIOR PROJECT MANAGER
PROFESSIONAL ENGINEER/PROJECT MANAGER
DESIGN ENGINEER
SR. CADD DESIGNER
CADD OPERATOR
RESIDENT CONSTRUCTION INSPECTOR
CONTRACT/OPERATIONS ANALYST
WORD PROCESSING/SECRETARIAL
The ranges and individual salaries will be adjusted annually.
140 215
135 145
125 140
90 100
70 85
45' 55
40 45
65 75
65 70
50 60
EXPENSES
Plotting Printing
Bond $ 2.00 per plot Bluelines/Blacklines
Color $ 3.50 per plot Offset and Xerox Copies
Vellum $ 4.00 per plot Binding
Mylar $10.00 per plot Tape Binding
$0.08 per square foot
$0.07 per side copy
$2.00 per book
$1.75 per book
Computer and Cadd
PC Cad Stations $10.00 per hour
PC Stations $ 8.00 per hour
OTHER DIRECT EXPENSES
Other direct expenses are reimbursed at actual cost times multiplier of 1.10. They include outside printing and
reproduction expense, communication expense, travel, transportation and subsistence away from Pearland and other
rrfiscellaneous expenses directly related to the work, including costs of laboratory analysis, tests, and other work
required to be done by independent persons other than staff members.
T- OFF9999hrN2003 Scheduleo fCharges doc
Summary of Fee Schedule for Cullen Boulevard Extension
Design Phase Services
Additional Services
Construction Phase Services
Expenses
ITotal Cost for Cullen Boulevard Extension
$160,872.52
$28,557.46
$5,777.80
$4,219.00
$199,426.78
Page 1 of 4
ITEMIZED FEE COMPUTATION AND EXPENSES
Pearland Mobility and Drainage Program
Cullen Boulevard Extension: FM 518 lo Nor~hfork Road
Project Project Design Senior
Description Principal Manager: Engineer Engineer Designer CADD Clerical Total
Hours Hours Hours Hours Hours Hours Hours Hours
Design Phase Services
A. Roadway Design Con~'ols
1. Typical Sections 2 6 16 24
2. Roadway Finn/profile sheets 2 36 190 80 40 200 548
B. Dfiange Design
1. Detailed Drainage Area Maps & Celt's. I 4 40 24 12 81
2. Drainage Plan/Profile sheets I 20 t40 40 20 200 421
3. Prepare Plan/Profile for Culvert Crsngs. 3 20 8 16 47
C. Signal Modofications Design
I. Design & Prepare Modifications Plans I 8 10 18 18 2 57
2. Prepare Necessary Details & Standards 2 2 3 4 11
D. Miscellaneous Roadway Design
1. Comput~ and Tabulate Quantities 6 16 18 8 48
2. Prepare .Estimates for each Submittal 2 4 12 4 6 28
3. Prepare Rdwy. Details and Modify Std's 2 8 10 4 24 48
4. Prepai'e Tile Sheet & Index Sheet 2 4 . 4 10
5. Provide Layout sheets, Gen. No,es, Std's 2 6 4 10 22
6. Prepare Signing, Pav't Mkg. Plans I 4 · 20 16 4 24 69
7. Prep. & Submit 30, 60, 90%, Final Plans 3 12 24 16 12 40 4 111
E. Utility Layouts and Agreements
1. Prepare Exist. Utilities Conflict Pl~n/prfl 6 16 24 8 40 94
2. Prepare exhibits, correspondence, records 4 8 16 10 8 46
3. Coordinate to Expose Potential Confficls 2 6 6 2 16
4. Include Utilities reloc. Plans in Plan Set 4 4 8 2 8 26
F. Ea'thwork Cross Sections · 3 16 12 6 16 53
5. Design Computations 2 8 16 16 8 50
H. Agencies Coordinations 8' 8 6 4 26
L Project Specifications 1 6 8 6 21
J. Prepaxe Supplemental Spec's, Special Prov. I 8 8 20 37
K. Provide Assistance Du~.ng Bid & Award 10 8 6 24
Subtotal - Design Phase Services 15 166 580 345 96 644 72 1918
Project Project Design Senior
Description Principal Manager Engineer Engineer Designer CADD Clerical Total
Hours Hours Hours Hours Hours Hours Hours
Design Phase Services Total Hours 15 166 580 345 96 644 72 1918
]ubtotal Hours 15 166 580 345 96 644 72 1918
Rate $50.00 $46.00 $35.00 $28.00 $25.00 $19.00 $19.00
Rate + Overhead 164.28% $132.14 $121.57 $92.50 $74.00 $66.07 $50.21 $50.21
Rate+ Ovrhd 164.28%) x Fix Fee 12% $148.00 $136.16 $103.60 $82.88 $74.00 $56.24 $56.24
Total Direct Labor Cost $2,220 $22T602 $60~087 $28~593 $7TI04 $36~218 $4~049 $1607872.$2
Design Phase Services Indirect Labor Cost
Description Unit Qty. Cost Total
Travel Mile 400 $0.365' S146.00
Printing/Reproduction L.S. I $3,000.00 $3,000.00
Deliveries L.S. 1 $300.00 $300.00
Total Indirect Labor Cost
Design Phase Services Total Cost
164,318.52
Page 2 of 4
ITEMIZED FEE COMPUTATION AND EXPENSES
Pearland Mobility and Drainage Program
Cullen Boulevard Extension: FM 518 to Northfork Road
Project Project Design Senior
Description PrinciPal Manager Engineer Engineer. Designer CADD Clerical Total
Hours Hours Hours Hours Hours Hours Hours Hours
3additional Services
A. Stormwater Pollution Prey. Plans 4 24 12 36 76
B. Traffic Control Plans 2 24 60 48 24 120 4 282
Subtotal - Additional Services 2 28 84 60 24 156 4 358
Project Project Design Senior
Description Principal Manager Engineer Engineer Designer CADD Clerical Total
Hours Hours Hours Hours Hours Hours Hours
Additional Services Total Hours 2 28 84 60 24 156 4 358
gubtotal Hours 2 · 28 84 60 24 156 4 358
Rate $50.00 $46.00 $35.00 $28.00 $25.00 $19.00 $19.00
Rate + Overhead 164.28% $132.14 $121.57 $92.50 $74.00 $66.07 $50.21 $50.21
(Rate + Ovrhd 164.28%) x Fix Fee 12% $148.00 $136.16 · $103.60 $82.88 $74.00 $56.24 $56.24 I
Total Direct Labor Cost $296 $3,812 $8~702 $4,973 $1,776 $8,773 $225 $28,557.46
Additional Services Indirect Labor Cost
Description Unit Qty. Cost Total '
Travel Mile 0 $0.000 $0.00 ·
Printing/Reproduction L.S. 0 $0.00 $0.00
Deliveries L.S. 0 $0.00 $0.00
Total Indlreet Labor Cost $0.00
Additional Services Total Cost
[$
28,557.45[
Page 3 of 4
ITEMIZED FEE COMPUTATION AND EXPENSES
Pearland Mobility and Drainage Program
Cullen Boulevard Extension: FM 518 to Northfork Road
. Project Project Design Senior .
Description Principal Manager Engineer Engineer Designer CADD Clerical Total
Hours Hours Hours Hours Hours Hours Hours Hours
~Construcfion Phase Services
A. Shop Dra~dng Reviews 6 10 4 20
B. Clarifications 2 8 18 6 2 36
Subtotal - Construction Phase Services 2 14 28 0 0 6 6 56
Project Project Design Senior
Description Principal M~na~er Engineer Engineer Designer CADD Clerical Total
Hours Hours Hours Hours Hours Hours Hours
Construction Phase Services Total Hours 2 14 28 0 0 6 6 56
Subtotal Hours 2 14 ' 28 0 0 6 ~6 56
Rate $50.00 $46.00 $35.00 $28.00 $25.00 $19.00 $19.00
~,ate + Overhead 164,28% $132.14 $121.57 $92.50 $74.00 $66.07 $50.21 $50.21
(Rate + Ovrhd 164.28%) x Fix Fee 12% $148.00 $136.16 $103.60 $82.88 $74.00 $56.24 $56.24
Total Direct Labor Cost $296 $1,906 $2,901 $0 $0 $337 $337 $5,777.80
Construction Phase Services Indirect Labor Cost
· Unit ' Qty. Cost Total
Description
Fravel Mile 200 $0.365 $73.00
L.S. I $500.00 $500.00
Printing/Reproduction L.S. I $200.00 $200.00
Deliveries
$773.00
Total Indlreet Labor Cost
[ $ 6,550.80I
IConstruction Phase Services Total Cost
Page 4 of 4
PRELIMINARY CONSTRUCTION COST ESTIMATE
CULLEN BLVI): FM 518 TO NORTHFORK DR,
1 PREPARE RIGHT-OF-WAY AC 8.5 $7,000.00 $59,500.00
2 ROADWAY EXCAVATION CY 3,000 $4.25 $12,750.00
3 REMOVE EXISTING PAVEMENT SY 4,000 $10.00 $40,000.00
4~ EMBANK (DENS CONT)(TY A)(CL 3) CY 3,000 $4.50 $13,500.00
5, iFURN AND PLAC TPSL (CL 2) (4 IN) SY 4,000 $0.80 $3,200.00
6 BLOCK SOD SY 4,000 $2.00 $8,000.00
7 :BRDCST SEED AC 2.5 $1,200.00 $3,000.00
8 LIME TREAT SUBGR ~DENS CONT)(12 IN) SY 29,000 $2.00 $58,000.00
9 LIME cry A) TN 1,000 $100.00 $100,000.00
10 CONC PAV (CONT REINF)(9 IN) SY 23,000 $29.00 $667,000.00
11 2" ASPHALT PAVEMENT-TYPE D TN 480 $60.00 $28,800.00
12 FLEXIBLE BASE (12" CEMENT STABI~ .rZg. D CRUSHED LIMESTONE) SY 4,700 $12.00 $56,400.00
13 MONO CURB (6 IN) LF 15,200 $2.00 $30,400.00
14 SIDEWALK SF 41,250 $4.00 $165,000.00
15 CEM STAB BKFL. CY 4,000 $30.00 $120,000.00
16 TRENCHEXCAV PROTECTION (EST.) LF 4,900 $3.00 $14,700.00
17 RC PIPE (CL Ill)( 24 IN) LF 540 $45.00 $24,300.00
18 RC PIPE (CL III)( 30 IN) LF 890; $55.00 $48,950.00
19 RC PIPE (CL ~I)(36 IN) LF 670 $60.00 $40,200.00
20 RC PIPE (CL 111)(42 IN) LF 725 $80.00 $58,000.00
21 RC PIPE (CL m)(78 IN) LF 1,750 $160.00 $280,000.00
22 CONC BOX CULV (5 ~ X 3 FT) LF 200 $200.00 $40.000.00
23 CONC BOX CULV (5 I~T X 5 F'D LF 295 $250.00 $73,750.00
24 TYPE "C" INLET EA 20 ' $2,000.00 $40,000.00
25 TYPE "A" INLET ON 78" RCP ALONG FITE EA 7 $1,500.00 $10,500.00
EA 12 $850.'00 , ' $10,200.00
26 INLET EXT (TYPE "C") .-
27 JUNCTION BOX EA 8 $2,500.00 $20,000.00
28 JUNCTION BOX W/GRATE INLET TOP EA $3,500.00 $3,500.00
29 MANHOLE EA 8 $2,250.00 $18,000.00
30 REMOVE EXIST. DRAINAGE STRUCTURES LS $10,000.00 $10,000.00
30 OUTFALL STRUCTURE @ TRANQUILITY LAKE LS I $15,000.00 $15,000.00
31~ I-tEADWALLS EA 2 $8,000.00 $16,000.00
32 SIGNAL SYSTEM MODIFICATION (SPAN WIRE) LS I $50,000.00 $50,000.00
33 MOBILIZATION LS I $260,000.00 $260,000.00
34 TRAFFIC CONTROL & DETOURING (BUDGET) LS 1 $100,000.00 $100,000.00
35 ROADWAY SIGNAGE LS I $4,000.00 $4,000.00
36 PAVEMENT MARKING LS I $7,000.00 $7,000.00
37 POLLUTION PREVENTION LS 1 $9,000.00 $9,000.00
38 BUDGET FOR CITY-OWNED UTILITY SPOT CONFLICT RESOLUTION LS 1 $25,000.00 $25,000.00
39 2" l::.l.EC. CONDUIT(BUDGET) LF 7,400 $5.50 $40,700.00
SUBTOTAL $2,584,350.00
CONTINGENCIES @ 15% $387,652.50
TOTAL 2,972,002.50
ATTACHMENT
Exhibit "A"
Resolution No. R2003-44
WORK AUTHORIZATION NO. 12
Supplement No.2
This Work Authorization is made pursuant to the terms and conditions of the Pearland
Mobility & Drainage Bond Program, hereinafter identified as the "Contract," entered into
by and between the City of Pearland ("City"), and Turner Collie & Braden Inc.
("Engineer).
PART 1. Work Authorization No. 12 is related to the improvement of Walnut Street
improvements, Veterans to Houston. The Engineer will perform Right-of-Way
Acquisition Services under this Authorization.
PART 2. The maximum amount payable for services under this Work Authorization is
$40,500.00. This amount is based on the following: See attached fee proposals submitted
by: Lockwood Andrews & Newnam, Inc. in the amount of $40,500.00 dated February 6,
2003.
PART 3. Payment to the Engineer for the services established under this Work
Authorization shall be "Reimbursable on a per Parcel Basis".
PART 4. This Work Authorization shall become effective on March 4, 2003 and shall
terminate on November 12, 2005, unless extended by a supplemental work authorization.
PART 5. This Work Authorization does not waive the parties' responsibilities and
obligations provided under the contract.
PART 6. This Work Authorization is hereby accepted and acknowledged below.
ENGINEER
By: ~-~ ~~_~-r~ By:
Typed or Printed Name
A1 an Muel 1 er
Typed or Printed Name
Title
Date
Deputy City Manaqer
Title
~/D~te
LIST OF EXHIBITS
Exhibit A - Fee Schedule
Exhibit B - Work Schedule
Turner Collie Braden Inc. 2/28/2003
EXHIBIT A
FEE SCHEDULE
Pearland Mobility & Drainage Bond Program
Work Authorization No. 12
Supplement No. 2
. Summary
Proiect
Walnut - Veterans to Houston
En.qineerin.q Services
Hydrologic & Hydraulic
Environmental Compliance
Topographic Survey
Geotech
ROW Maps & Documents
PS&E
Traffic Signal Design
Traffic Control Plans
Stormwater PPP
Services During Construction
Reimbursable Expenses
ROW Acquisition Assistance
Materials Testing
Subtotal
Previous
Authorization
$ 18,400.00
Berg Oliver $ 18,300.00
Andrew Lonnie Sikes $ 17,000.00
QC Labs $ 2,365.00
Andrew Lonnie Sikes $ 6,000.00
LAN $ 98,700.00
LAN $ 11,200.00
LAN $ 13,300.00
LAN $ 5,2OO.OO
LAN $ 5,3OO.0O
LAN $ 3,000.00
LAN $
$ -
Total to Date
$ 198,765.00
Current
Authorization
-
-
-
-
-
4O,5OO.OO
$ 40,500.00
$ 239,265.00
Page 1 of I
02/06/2003 09:05
FAX 7132663723
OO3
C~X'~ OF
MOBILITY AND DRAi~AGE BONb PROGRAM
I~GHT-O~F-WAY ACQUISITION
Title Servlcea
Conduct a 25-yeax title i~ve~tigati~n to detevmlna fee Owner.
Secure preliminary title commitmeaX and title ~a~,e for all parcel takings
appraised ax greater than $25,000, insuring acceptable title to thc Cixy of'Pearland.
· Aa~Iyze appnfi~al repoa, and confirm value ~or ~o ~ o~r for ~ ~
* Revj~ fight~f-way ~, field n~s, ~d p~l ~ for u~ ~ndifions
~ch ~ ~nt~ati~ undated gor~e t~, ~e.
Pr~o~e i~ offer l~, in~ms of~~, ~ ~er d~~
~qu~ by T~B on append
~ off~ ~d app~l r~on.
e M~I~ foHow-~ ~t~s ~d ~re ~ fl~~ i~eats ~on
a~~ of~ off~ f~ ~e dos~g
- ~p~e a s~e neg~ator r~a f~ ~.
K~e o~ ~ ~~, ~ ~e d~d ~ oth~ n~e~ items ~ deliv~ for
M~ ~a~ ~e for de~ve~ to T~B.
mpp~ do~en~fio~ ~d pr~ide a reco~~on wi~ ~g~d ~
P~m follow-up ~ ~ p~pc~ o~ c~i~g ~ l~ ~-
e ~ ~e ~~ o~ d~s ~ ~ ~ off~ 1~, ~ ~ ~ file ~r
~nd~on ~ s~ to
ao~g Strvic~
Coord'ma~e with t]xe Title Compmay to ~ ~ ~ ~e ~em ~o~
w~ ~ fo~ n~~ when r~ng ~ paym~.
~d closi~ and p~de ~g ~s
Re.rd ~ o~ in~~ ~i~ely ~ dosing at t~ C~ CI~'s
Office.
A-3
Turner ollieBraden Inc.
Engineers • Planners • Project Managers
February 24, 2003
Mr. Joe Wertz, Jr.
Projects Director
City of Pearland
3519 Liberty Drive
Pearland, Texas 77581
Dear Mr. Wertz:
Re:
P.O.Box130089
Houston, Texas 77219-0089
5757 Woodway 77057-1599
Tel: (713) 780 4100
Fax: (713) 780-0838
Pearland Mobility and Drainage Program
Cullen Road Improvements
TC&B Job No. 511256-005
In accordance with the Program Management Contract approved by the Pearland City Council
on December 10, 2001, Turner Collie & Braden is requesting the following Contract
Supplement for the ongoing Program Work as described below:
Work Authorization No. 5, Supplement No.4
Cullen Road Extension
Basic Design Services
Traffic Control Plan
SWPPP
Construction Phase Services
Expenses
Freese and Nichols, Inc.
Freese and Nichols, Inc
Freese and Nichols, Inc
Freese and Nichols, Inc
Freese and Nichols, Inc
$160,872.52
22,507.47
6,050.00
5,777.80
4,219.00
The total amount of the Contract Supplement is $199,426.79 Copies of the Proposal for the
work are attached.
Please return one executed copy of the attached Work Authorization.
Sincerely,
N
Janes W. Keller, P E
Senior Project Manager