Loading...
R2007-167 2007-10-22 RESOLUTION NO. R2007-167 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AUTHORIZING THE CITY MANAGER OR HIS DESIGNEE TO PARTICIPATE IN AN INTERLOCAL COOPERATIVE PRICING ARRANGEMENT WITH THE HOUSTON-GALVESTON AREA COUNCIL (HGAC) FOR THE PURCHASE OF A WHEEL LOADER AND AN EXCAVATOR. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That contract pricing has been obtained through interlocal cooperative partner HGAC for the purchase of a wheel loader and an excavator. Section 2. That the City Manager or his designee is hereby authorized to participate in an interlocal cooperative pricing arrangement with the Houston-Galveston Area Council (HGAC) for the purchase of a wheel loader and an excavator in the amount of $307,552.10. ,""~"~RL~'~.;" {i<~i) (~(, ~)~ A "f;;P=Si~ .......' l~tlii.BI";.\\.\ PASSED, APPROVED and ADOPTED this the 22nd day of October, A.D., 2007. c~~ 10M REID MAYOR ~ ~ "" UN N , TgtC ~ETARY APPROVED AS TO FORM: 0~. IL. ~ DARRIN M. COKER CITY ATTORNEY CONTRACT PRICING WORKSHEET Contract Date For Standard Equipment Purchases No.: EM06-07 Prepared: 9/4/2007 This Farm must be prepared by Contractor,an,'d provided to End`User,tb attach to Purchase Order,with copy`to H GAC;; Tire H GAC administrative fee shall,be calculated and shown as a separate ate line-item.-Please typeor print legibly.�" : Buying cy Cityof Pearland Contractor: Equipment Services, (FEI) FEI)Agency: qPment Support PP Agency Bob Pearce Contractor Jim Rose Contact Contact Phone: 281-652-1600 Phone: 817-283-2844/817-602-8322 Fax: Fax: 817-355-3194/817-656-2577 Email: Email: iroset esscorp.net/iroseqovsales(a.sbeglobal.net Product A013 Description: Case CX240B Excavator,173 Horsepower Code: A;Product Item Base`Unit Price Per Contractor's H-GAC Contract -. $181,830.00 B'Publisl ed Options-Itemize below Attach additional sheet(s).if necessary Include;Option Code to description if applicable.'; (Note Published Options are,options which were submitted and priced in Contractor's bid) Description Cost Description Cost 11'6"Arm $990.00 24"Excavating Bucket $4,869.00 Auxiliary Hydraulic Double Acting $4,783.00 Control Pattern Selector $894.00 Additional Work Lights $650.00 Subtotal From Additional Sheet(s): Subtotal B: $12,186.00 � e Un ublishedo tions are items which werea notubadditionul sheets)tf necessary � � P P (Note: p pnutted.and priced in Contractor's bid) Description Cost Description Cost 36"Excavating Bucket in lieu of 30" $500.00 72"Wide Ditch Cleaning Bucket w/bolt on edge $4,421.00 Aux.Hyd.Piping to end of stick for Power Tilt use $1,810.00 He-lac Power-Tilt Model PT-11 $12,900.00 Subtotal From Additional Sheet(s): Subtotal C: $19,631.00 Check:Total cost of Unpublished Options(C)cannot exceed 25%of the total of the Base Uniti Price plus Published Options(A+B). For this transaction the percentage is: 10% D:Other.Cost Items NotItemized Above e:�:Installation Frei Deli •Above( ;g � &tit, very,Etc:) : � .-. . _ Description Cost Description Cost Subtotal D: $0.00 E,Total Cost Before Any-Applicable Trade-In I Other Allowances/Discounts(A+B+C+D) '$213,647.00 Quantity Ordered:, 1 X Subtotal of A+B+C+D: $213,647.00 == Subtotal E: $213,647.00 F.H-GAC Fee Calculation (1,5%of Equipment Cost Cost) Subtotal F: $3,204.71 G.-Trade=Ins!"Other Allowances!Special Discounts , Description Cost Description Cost Cat 322 Excavator trade-in deduct €<23,750> Subtotal G: <$23,750.> Delivery Date 30-90 days H.Total Purchase-Price,(E+F+G) $193,101.71 CONTRACT PRICING WORKSHEET Contract EM06-07 Date 9/4/2007 For Standard Equipment Purchases No.: Prepared: This Form must be prepared=by•Contractor,and provided to End!'User to:attach to Purchase'Order,with copyto H-GfC r eHGACadministratiye ee"shall be calculated and shown i' _as a separate hne;ttem..Pleas type"or print legibly "� E Buying City of Pearland contractor: Equipment Support Services,Inc. (FEI)Agency: Agency Bob Pearce Contractor Jim Rose Contact Contact Phone: 281-652-1600 Phone: 817-283-2844/817-602-8322 Fax: Fax 817-355-3194/817-656-2577 Email: Email: irose(aiesscorp.net/iroseciovsales(a.sbcglobal.net coaect D017 Description: Case 621D Wheel Loader,136 HP,2.75 cu.yd.Bucket A Product_Item Base Unit Pnce Per Contractor's H`GAC"Contract E ;, $94,232.00 B Published Options Itemize below Attach additional sheets)if necessary IncludOpti e on Code in description tf applicable (Note Published Options are options which were submitted and riced,in Contractor's bid Description Cost Description Cost Cooling System Reversible Fan $380.00 Construction Forks with Coupler $7,094.00 XT Loader Version $10,243.00 3 Function Loader Valve $810.00 Subtotal From Additional Sheet(s): $18,527.00 Subtotal B: $18,527.00 C 1 Unpublished Options `Itemize below/attach(additional sheets)if necessary .e.. {Note Unpublished o trans are items which were not submitted and paced in Contractor's bid:), p. Description Cost Description Cost Subtotal From Additional Sheet(s): r Subtotal C: Check:Total cost of Unpublished Options(C)cannot exceed 25%of the total of the Base Unit{ For this transaction the percentage is: 0% Price plus Published Options(A+B). D Other Cost Items Not temized;Above(e,g.`Instaliation,Freight,Delivery,Etc:) ,, Description Cost Description Cost Subtotal D: $0.00 E Total Cost Before Any Applicable Trade-In/Othe :Allowa`nces/Discounts"(A+B+C+D) $112 75900 Quantity Ordered: 1 X Subtotal of A+B+C+D: $112,759.00 == Subtotal E: $112,759.00 F:H GAC Fee Calculation (1 5%of Equipment"Cost Cost} s Subtotal F: $1,691.39 Gr Trade Ins/Other Allowances/Spec►al Discounts Description Cost Description Cost t Subtotal G: $0.00 ', ,- Dehvery;Date. 30 to 90 days .: H.Total Purchase P 1ce(E+F+G);.,'; $114,450.39