Loading...
R2003-0047 03-10-03RESOLUTION NO. R2003-47 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, APPROVING THE PROPOSED DESIGN AND PROJECT SCHEDULE FOR THE RECYCLING CENTER. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That the proposed design and project schedule for the Recycling Center is hereby approved. PASSED, APPROVED and ADOPTED this the 101;h dayof I~arch A.D.,2003. TOM REID MAYOR ATTEST: (~NsG IL~~, ~MC/ E(~,,J~ETARY ¢" APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY Construct a freestanding building of approximately 8,000 square feet. The building will include the following spaces: Office 300 sf Unisex Restroom 50 sf Receiving, Sorting, Process Area 6,200 sf Covered Exterior Storage/Work Area 1,000 sf Interior/Exterior Walls Allowance 450 sf Total Gross Building Area 8,000 sf The building will be a drive-in facility with overhead doors at two sides of the structure. The slab for the building will be designed to support vehicular traffic in accordance with recommendations from the geo-technical report. The building will include HVAC systems at the office and restroom only. A vertical bailer will be installed at the process area. The project's design will be developed in relation to the City of Pearland's overall concept/desired appearance for the Southwest Environmental Center (SWEC) site. Construct concrete paved drives, parking, staging, and dumpster storage areas to allow for staging entrance/exit, on-site circulation, on-site parking, and trade access to loading areas. Lighting, bollards, and fencing will be provided. Extension of utilities/services from existing wastewater plant to recycling center site (or other location as required). Construct asphalt extension of Magnolia Road (2 lanes) from existing wastewater plant entrance drive to recycling center entrance drive. Landscaping of Recycling Center site and adjacent areas. No detention will be required. Z LJJ ~b-C,~iOiV ~2 Z LI.I 0 n PEARLAND RECYCLING CENTER 0Z-078~)0 (ONNECT TO EXISTING MAGNOLIA ROAD FUTUR~ MAGNOLIA BOULEVARD EXTENSION FUTURE ENVIRONMENt EDUCA~ON PA~UONS  W^TER AR(HqI[(I~ EN6~NEER$ SURVEYORS SITE PLAN PEARLAND RECYCLING CENTER II II II ii !1 il ii II ii ii I i ! ! PEARLAND RECYCLING CENTER I I I I ! ! ! ! ! ! ! ! ! ! ! ! ! ! l NORTH ELEVATION WEST ELEVATION EAST ELEVATION '© © WEST ELEVATION tLR PEARLAND RECYCLING CENTER 0Z-078-00 FEB. 19, ZOO3 1. Design Development Approval 2. Production to 50% Const. Documents 3. City of Pearland Code review 4. City of Pearland approves 50% CD 5. Production to 100% CD 6. City of Pearland approves 100% CD 7. Submit for Permitting 8. Release for Proposals 9. Receive Proposals and Evaluate 10. Council Approval of Contract 11. Contractor Insurance and Notice to proceed 12. Construction Period 13. Substantial Completion 14. Final Completion February 24, 2003 March 18, 2003 March 19, 2003 March 20, 2003 April 15, 2003 April 16, 2003 April 17, 2003 April 21, 2003 May 13, 2003 May 19, 2003 May 30, 2003 June 1, 2003-January 31, 2004 February 1, 2004 March 1, 2004 1. Site / Building Construction Costs 2. Magnolia road connection and culverts 3. Landscape Allowance 4. Contingency Allowance 5. Professional Fees 6. Topographic Survey Costs 7. Geotechnical Costs 8. Estimated Advertising, Printing, etc. 9. Estimated Material Testing Costs 10. Estimated Furnishings / Loose Equipment 11. Soft Costs Contingency Estimated Total $1,035,000 $75.000 $20,000 $60,000 $98,400 $1o,ooo $22,000 $1o,ooo $35,000 $58,625 $25,000 $1,449,025 ¥