Loading...
R99-012 02-22-99RESOLUTION NO. R99-12 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AUTHORIZING THE CITY MANAGER OR HIS DESIGNEE TO EXECUTE A CHANGE ORDER WITH BEYER CONSTRUCTION, INC. FOR PAVING AND DRAINAGE IMPROVEMENTS ALONG PEARLAND PARKWAY FROM OILER DRIVE THROUGH MARY'S CREEK. WHEREAS, the City of Pearland constructed paving and drainage improvements along Pearland Parkway from Oiler Drive through Mary's Creek to improve traffic and drainage flows within the City; and WHEREAS, construction of the paving and drainage improvements along Pearland Parkway resulted in a change order estimated to be $81,977.30; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. The City Manager or his designee is authorized to execute a change order with Beyer Construction, Inc. for paving and drainage improvements along Pearland Parkway from Oiler Drive through Mary's Creek. Section 2. That the costs associated with said change order will be paid from the City's 1997 Certificates of Obligation. PASSED, APPROVED, AND ADOPTED this~'~h day of F~(~JP rl~,._(~' , A.D., 1999. TOM REID MAYOR 1 RESOLUTION NO. R99-12 ATTEST: APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY 2 February 11, 1999 CITY OF PEARLAND PAVING & DRAINAGE IMPROVEMENTS' PEARLAND PARKWAY FROM OILER DRIVE THROUGH MARY'S CREEK COP PN: B98-04 SEI PN: 98-011 CHANGE ORDER NO. 4 Beyer Construeion, Inc. 12200 Duncan Road Houston, Texas 77066 The following change order for material has been approved: Item Description QUANTITY OVERAGE ITEMS: 7 8" Concrete Pavement 8 12" Lime Stabilized Subgrade CHANGE ORDER NO. 4 Unit of Unit Measure Quantity Price SY 2,530.51 28.50 SY 3,399.23 2.90 TOTAL: Amount 72,119.54 9,857.77 I$ 81,977.30 Approved f Owner: · ~IY700it~Enginee Approved for Contractor: BEYER CONS RUCT!.ON, IN Approved for Owner: CITY OF PEARLAND City Manager Date: ,2 ,- ~,, ,~- Approved for Engineer: SNOWDEN ENGINEERING, INC. By: Jame~ D. Snowden, P.E., R.P.L.S. Date: MEMO February 15, 1999 F E B ], 5 1999 CiTY TO: Darrin Coker and Alan Mueller FROM: John Hargrove SUBJECT: Approval of Change Order No. 4 to Paving and Drainage Improvements, Pearland Parkway, from Oiler Drive through Mary's Creek; Byer Construction, Inc. Darrin, I need the following on Council agenda ASAP: CONSIDERATION AND POSSIBLE ACTION - Increase construction contract with Byer Construction, Inc. by $81,977.30 to compensate for under-measured materials in contract bid schedule of quantities (transition areas into existing pavements built under an earlier contract were left out, and the width of subgrade was mis-calculated 2 feet short of actual width for entire length of project.) This Change Order No. 4 uses contract unit prices. This project was completed in December, 1998. Darrin: Including this change order, all change orders add up to 26.71% of the original contract amount. The need for this change order was not discovered until the final closeout pay quantities were being worked up. Until this change order, change orders were at 15.26% of the original contract, which even included the addition of a needed crossover at the 9-10 High School east driveway. The wording of the requested minute action is written as it is in an attempt to get into the record the fact that this change order was not at all anticipated, and in fact the work was already constructed long before the materials quantity shortages errors in the contract bid schedule were discovered. This project is 058-9727-565, out of #97 C.O.'s. Contract Amount: $716,248.40 CO No. 1 51,056.15 CO No. 2 55,210.00 CO No. 3 3,075.00 (CO No. 4 81,997.40) TOTAL $907,566.95