R2003-0029 02-24-03 RESOLUTION NO. R2003-29
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND,
TEXAS, AUTHORIZING THE CITY MANAGER OR HIS DESIGNEE TO
ENTER INTO AN ENGINEERING CONTRACT WITH GEOTEST
ENGINEERING, INC. FOR MATERIALS TESTING SERVICES
ASSOCIATED WITH THE FM 518 SEWER PROJECT.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS:
Section 1. That certain contract by and between the City of Pearland and
Geotest Engineering, Inc., a copy of which is attached hereto as Exhibit "A" and made a
part hereof for all purposes, is hereby authorized and approved.
Section 2. That the City Manager or his designee is hereby authorized to execute
and the City Secretary to attest a contract with Geotest Engineering Inc. for materials
testing services associated with the FM 518 Sewer Project.
PASSED, APPROVED and ADOPTED this the 24th daY of Fehruary ,
A.D., 2003.
ATTEST:
Y SE~ETARY
APPROVED AS TO FORM:
DARRIN M. COKER
CITY ATTORNEY
TOM REID
MAYOR
Exhibit "A"
R2003-29
CITY OF PEARLAND
STANDARD AGREEMENT
FOR ENGINEERING SERVICES
This Contract (Contract) is made between the City of Pearland, Texas
(hereinafter "City"), and Geotest Engineering, Inc. (hereinafter "Engineer") as follows:
1. Summary of Contract Terms. The following information and referenced documents
shall be a part of this Contract:
Description of Project: Provide materials testing services for the FM 518 Sewer
Project.
EngineedSubconsultant(s) Fee Basis of Compensation
Geotest Engineering $63,222.00 Cost Plus
Maximum Contract Amount $63,222.00 Cost Plus
* All financial obligations created by this agreement are between the City and
Engineer, and shall not be construed to be between City and any subconsultant.
Delivery of plans, specifications and estimates: Sixty (60) days from completion of
Illumination Design.
Attachments: Scope of Services - Exhibit
Fee Schedule
2. Services and Payment.
Engineer shall perform services within the Standard of Care of the Engineering
profession as follows:
A. Engineer will furnish services to the City in accordance with the terms and
conditions specified in this Contract. Payment for the services of Engineer shall be due
and payable upon submission and approval of a statement for services to City.
Statements for services shall not be submitted more frequently than monthly.
After consultation with the City, the Engineer shall specify the basis of
compensation in the scope of work for the project. The Engineer shall provide adequate
detail of the basis of compensation so that the City can determine the reasonableness
of the fees and have the ability to make reasonable progress payments to the Engineer
based upon work completed at the payment intervals. The Engineer shall subcontract
for all subconsultants, subject to City approval, necessary to complete the scope of
work. The subconsultant's fees and administrative mark-up, if any, shall be included in
the scope of work. Unless othenNise agreed upon, the method of compensation shall
be one of the following methods:
1. Salary Cost Times Multiplier Plus Direct Nonsalary Expense ("Salary")
Compensation shall be based on 1) the direct salaries (including benefits)
of the Engineer's employees whose time is directly chargeable to the
project; 2) an agreed upon multiplier to compensate the Engineer for
overhead and profit; and 3) reimbursement for direct nonsalary
expenditures and subconsultant contracts as defined in the scope of work
for the project. The Engineer shall provide a proposal that includes the
t~)tal fees for the project, which shall not be exceeded without prior City
approval.
2. Per Diem ("Per Diem")
Compensation shall be based upon 1) an agreed upon lump sum per day
for specific services; and 2) reimbursement for direct nonsalary
expenditures and subconsultant contracts as defined in the scope of work
for the project. This method is best suited to expert witness work or other
short-term engagements involving intermittent services.
3. Cost Plus Fixed Fee ("Cost Plus")
Compensation shall be based upon 1) reimbursement of the actual costs
of all services and supplies related to the project and 2) an agreed upon
fixed fee (profit). The Engineer shall provide an estimate of the costs to
be reimbursed, but actual compensation shall be based upon invoices and
supporting documentation provided by the Engineer.
4. Lump Sum ("Lump")
Compensation shall be based upon an agreed lump sum payment for
completing the entire scope of work. This method is best suited to
investigations or studies and for basic services with limited scope and
complexity.
5. Percent of Construction ("Percent")
Compensation shall be based upon 1) the "Harris County Curve for
Engineering Compensation" for basic and construction phase services;
and 2) reimbursement for direct nonsalary expenditures and subconsultant
contracts as defined in the scope of work for the project. The Engineer
shall provide a proposal that includes the estimated construction cost of
the project and the total fees for the project. If the actual Iow bid for
construction is 20% above or below the estimate, the engineering fees are
subject to equitable adjustment by mutual agreement of the Engineer and
city.
If City fails to make any payment due Engineer for services and expenses within
thirty (30) days after receipt and approval of Engineer's statement for services therefore,
the amounts due Engineer will be increased at the rate of one percent (1%) per month
from said thirtieth (30th) day, and, in addition, Engineer may, after giving seven (7) days'
written notice to City, suspend services under this Contract until Engineer has been paid
in full, all amounts due for services, expenses, and charges.
B. All the Engineer's working drawings, plans, and specifications, if required under
this Contract, ~hall be sufficiently accurate, detailed, and complete so that competitive
bids for the work can be obtained and the improvements constructed.
C. Approval of the Engineer's work by the City shall not release the Engineer, its
employees, agents, or consultants, from the responsibility and liability for the accuracy
and competency of their designs, working drawings, and specifications, or other
documents and services.
D. Subject to Article 8 herein or as otherwise agreed, the Engineer shall promptly
correct errors in the Engineer's work, including errors discovered after final payment,
without receiving additional compensation.
E. Prior to execution of this agreement, the Engineer shall have prepared a project
schedule identified as an attachment to this agreement. The Project Schedule shall be
submitted in digital and paper form, in the Microsoft Project for Windows format. The
Project Schedule shall contain a complete schedule so that the Engineer's scope of
services under this contract can be accomplished within the specified time and contract
cost. The Project Schedule will provide specific work sequence and definite review
times by the City and the Engineer of the work performed. If the review time should
take longer than shown on the project schedule, through no fault of the Engineer,
additional contract time may be authorized by the City through a supplemental
agreement, if requested by a timely written request from the Engineer and approved by
the City.
3. Term and Termination. This Contract term will begin upon execution and end sixty
days after issuance of the certification of completion of construction by the Engineer.
The City may terminate this Contract at any time during its term by giving written notice
to Engineer. The City shall pay the Engineer for all services rendered to the date of
termination.
4. Modifications. City without invalidating the Contract, may order changes within the
general scope of the work required by the Contract by altering, adding to and/or
deducting from the work to be performed. If any change under this clause causes an
increase or decrease in Engineer's cost of, or the time required for, the performance of
any part of the Services under the Contract, an equitable adjustment will be made by
mutual agreement and the Contract modified in writing accordingly.
5. Subcontracts. If, for any reason, at any time during the progress of providing
services, City determines that any subcontractor for Engineer is incompetent or
undesirable, City will notify Engineer accordingly and Engineer shall take immediate
corrective action, which may include cancellation of such subcontract. Subletting by
subcontractors shall be subject to the same regulations. Nothing contained in the
Contract shall create any contractual relation between any subcontractor and City.
6. Ownership of Documents. All drawings, report data, and other project information
developed in the execution of the services provided under this Contract shall be the
property of the City upon payment of Engineer's fees for services. Engineer may retain
copies for record purposes. Owner agrees such documents are not intended or
represented to be suitable for reuse by City or others. Any reuse by City or by those
who obtained said documents from City without written verification or adaptation by
Engineer will be at City's sole risk and without liability or legal exposure to Engineer, or
to Engineer's independent associates or consultants, and City shall indemnify and hold
harmless Engineer and Engineer's independent associates and consultants from all
claims, damages, losses, and expenses including attorneys' fees arising out of or
resulting therefrom. Any such verification or adaptation will entitle Engineer to further
reasonable compensation. Engineer may reuse all drawings, report data, and other
project information in the execution of the services provided under this Contract in
Engineer's other activities. Any reuse by Engineer will be at Engineer's sole risk and
without liability or legal exposure to City, and Engineer shall indemnify and hold
harmless City from all claims, damages, losses, and expenses including attorneys' fees
arising out of or resulting therefrom.
7. Insurance.
A. The Engineer shall procure and maintain for the duration of this Agreement,
insurance against claims for injuries to persons, damages to property, or any errors and
omissions relating to the performance of any work by the Engineer, its agents,
employees or subcontractors under this Agreement, as follows:
(1) Workers' Compensation as required by law.
(2) Professional Liability Insurance in an amount not less than $1,000,000 in
the aggregate.
(3)
Comprehensive General Liability and Property Damage Insurance with
minimum limits of $1,000,000 for injury or death of any one person,
$1,000,000 for each occurrence, and $1,000,000 for each occurrence of
damage to or destruction of property.
(4)
Comprehensive Automobile and Truck Liability Insurance covering owned,
hired, and non-owned vehicles, with minimum limits of $1,000,000 for
injury or death of any one person, $1,000,000 for each occurrence, and
$1,000,000 for property damage.
B. The Engineer shall include the City as an additional insured under the policies,
with the exception of the Professional Liability Insurance and Workers' Compensation.
Certificates of--Insurance and endorsements shall be furnished to the City before work
commences. Each insurance policy shall be endorsed to state that coverage shall not
be suspended, voided, canceled, reduced in coverage or in limits except after thirty (30)
days prior written notice by certified mail, return receipt requested, has been given to
the City. Upon request, certified copies of all insurance policies shall be furnished to the
city.
8. Indemnity. Engineer shall indemnify and hold the City, its officers, agents, and
employees, harmless from any claim, loss, damage, suit, and liability of every kind for
which Engineer is legally liable, including all expenses of litigation, court costs, and
attorney's fees, for injury to or death of any person, for damage to any property, or
errors in design, any of which are caused by the negligent act or omission of the
Engineer, his officers, employees, agents, or subcontractors under this Contract.
9. Assignment. Engineer shall not assign this Contract without the prior written
consent of the City.
10. Law Governinq and Venue. This Contract shall be governed by the law of the State
of Texas and no lawsuit shall be prosecuted on this Contract except in a court of
competent jurisdiction located in Brazoria County, Texas.
11. Entire Contract. This Contract represents the entire Contract between the City and
the Engineer and supersedes all prior negotiations, representations, or contracts, either
written or oral. This Contract may be amended only by written instrument signed by
both parties. Purchase orders issued under this Agreement shall contain a statement
nullifying additional terms and conditions on the reverse side of the purchase order and
referencing this Agreement.
12. Conflicts in Contract Documents. The above provisions shall govern over any
conflicting provision contained in any referenced contract document specified above.
13. Dispute Resolution Procedures. The Engineer and City desire an expeditious
means to resolve any disputes that may arise between them regarding this Contract. To
accomplish this, the parties agree to mediation as follows: If a dispute arises out of or
relates to this Contract, or the breach thereof, and if the dispute cannot be settled
through negotiation, then the parties agree first to try in good faith, and before bringing
any legal action, to settle the dispute by mediation of a third party who will be selected
by agreement of the parties.
EXECUTED and EFFECTIVE as of the -~%ay of ]~'-~'da(-V ,20 O"'&J.
/
CITY OF PEARLAND
Printed Name: Bil I Eisen
Title: City Manager
ENGINEER
By: /
Printed Name: Mark D, WeZ'ls ~ P,E.
Title: Vice President
STATE OF TEXAS §
COUNTY OF '~Z'~ Z · r'/~-- §
BEFORE ME, the undersigned Notary Public, on this day personally appeared
~'~;7/ ,~,,'..,5',~,,~ , known to me to be the person whose name is subscribed to the
foregoing instrument and acknowledged to me that he/she executed the same for the purposes
and consideration therein expressed.
GIVEN UNDER MY HAND AND
~-/3 f~-~*~ , A.D., 20 O,~
/
STATE OF TE~S
COUN~ OF Harris
SEAL OF OFFICE THIS 0?7 DAY OF
NOTARY PUBLIC IN AND FOR THE
STATE OF TEXAS
Printed Name: r~& t~//~
My Commission Expires: ~'~rT/
BEFORE ME, the undersigned Notary Public, on this day personally appeared
Mark D. Wetls~ P.E. , known to me to be the person whose name is subscribed to
the foregoing instrument and acknowledged to me that he/she executed the same for the
purposes and consideration therein expressed.
GIVEN UNDER MY HAND AND SEAL OF OFFICE THIS 3rd DAY OF
March
~'~"~,~.~, ~ckiLO~er ~ NOTARY PUBLIC IN AN~ FOR THE
,~..,~, ~Commissi~ Expir.. STATE OF TE~S
II
~,O7_ 2~4 ...~
Printed Name: Vicki L. Grvder
My Commission Expires:Deceit)er 7, 2004
GEOTEST ENGINEERING, INC.
Geotechnical Engineers & Materials Testing
5600 Bintliff Drive Houston, Texas 77036
Telephone: (713) 266-0588
Fax: (713) 266-2977
Januaw 6,2003
City of Pearland
cio Carter & Burgess, Inc.
55 Waugh Drive, Suite 800
Houston, Texas 77007
Attn: Mr, Vernon Webb
Re:
Materials Testing Services for
FM 518 West Sewer and Lift Stations
Project No, B2003-031
Dear Mr. Webb:
Proposal No.: 03PM142
Geotest Engineering, Inc. appreciates the opportunity to submit our proposed scope or services
and budget estimate to provide materials testing services on the above referenced project. Based on the
proposed scope of services, we estimate a budget of $63,222.00. Any additional services requested
and not part of this estimate will be charged in accordance with our attached standard fee schedule.
We look forward to working with you. If the enclosed estimate is agreeable, please
indicate your formal acceptance by signing below and returning one (1) copy to Geotest. If you have
any questions or require additional information, please contact me at your convenience.
Very truly yours,
GEOTEST ENGINEERING, INC.
Mark D. Wells, P.E.
Vice President
Copies Submitted:
Enclosures:
2
Cost Estimate (03PM142)
Fee Schedule (CMT800)
MOW/ep
pc26/fee15/03pm142
Accepted by:
Printed Name:
Title:
Date:
GEOTEST ENGINEERING, INC. _
5600 Bintliff Drive Houston, Texas 77036 Tel (713) 266-0588 Fax (713) 266-2977 ,"'.
CONSTRUCTION MATERIALS TESTING COST BREAKDOWN
Materials Testing Services for
FM 518 West Sewer and Lift Station
Project No. B2002-031
(03PM141)
PERSONNEL ..
06 Technician
06.5 Technician eT
08 Welding Inspector (C.W.I.)
12 Vehicle Charge
MA TERIALS TESTING
200 Concrete Mix Design Inspection and Testing:
201 Mix Design Review (Statistical Analysis)
203 Cylinder Test (ASTM C-39)
204 Beam Test (ASTM C-78, C-293)
205 Concrete Coring (4" Dia., up to 6" Thickness)
211 MortadGrout Comp. Strength Cubes (ASTM C-109) set of 6
Quantity Unit Rate
800 x $43.00
120 x $64.50
30 x $67.00
950 x $5.50
3
120
8
6
6
1
3
3
3
4
3
1
4
8
7
1
4
2
1
6OO
8
x $115.00 lEa
x $13.00 / Ea
x $20.00 / Ea
x $72.00 / Ea
x $127.00 / Set
Amount
/ Hr $34,400.00
/ Hr $7,740.00
/ Hr $2,010.00
/ Hr $5,225,00
$345.00
$1.560.00
$160.00
$432.00
$762.00
$220.00
$450.00
$210.00
$135.00
$140.00
$141.00
$275.00
$268.00
$360.00
$1,050.00
$160.00
$660.00
$64.00
$215.00
$4,800.00
$1,440.00
$63,222.00
800 Asphalt Concrete Mix Design & Inspection:
801
8O4
8O6
8O7
807.5
8O8
812.5
815
Mix Design Review
Extraction & Gradation Test (TEX 210F)
HVEEM Stability (TEX 208F)
Bulk Density - Lab Molded (TEX-207F)
Bulk Density - Core (TEX-207F)
Molding Specimens (3 per set) (TEX 206F)
Asphalt Coring Minimum Charge
Maximum Theoretical Specific Gravity (TEX 277)
1000 Soils Tests:
1001 Liquid and Plastic Limits (ASTM D-4318)
1006 OMD Standard Compaction (ASTM D-698)
t007 OMD Modified Compaction (ASTM D-1557)
1008 OMD Lime or Cement Stabilized Soil (ASTM D-698 or D-1557)
1010 Percent Solids - Lime Slurry
1011 Lime Series - 4 Point
1013 Nuclear Density Equipment Rental (up to 8 hrs/day)
1014 Cement Sand Compressive Strength (ASTM D-1633)
x $220.00 / Ea
x $150.00 /Ea
x $70.00 / Set
x $45.00 / Set
x $35.00 / Ea
x $47.00 / Set
x $275.00 / LS
x $67.00 / Ea
x $45.00 Ea
x $150.00 Ea
x $160.00 Ea
x $165.00 Ea
x $32.00 Ea
x $215.00 Ea
x $8.00 / Hr
x $180.00 /Set
TOTAL
Remarks
Overtime rate of 1.5 times the hourly rate is appficable or any hours worked before 6:00 a.m. or after 6:00
p.m. Monday through Friday, and any hours worked on Saturday, Sunday or holiday or over 8 hours per day.
A minimum of 4 hours will be charged at the applicable rate for all technician/inspector services.
GEOTEST ENGINEERING, INC.
5600 Bintliff Drive Houston, Texas 77036 Tel (713) 266-0588
CONSTRUCTION MATERIALS
TESTING FEE SCHEDULE
CMT 800
PERSONNEL
04 Technician NICET IV
05 Technician NICET III, HMA-IA or HMA-II
06 Technician NICET II, HMA-IB, ACI-I
06.5 Technician OT
07 Technician Non-NICET
08 Welding Inspector (C.W.I.)
09 Welding Inspector (Associate C.W.I.)
10 NDT Inspector (ASNT Level II)
10.1 NDT Inspector (ASNT Level III)
10.2 NDT Inspector Level II w/Asst. (2 man crew)
11 Support Personnel (Drafting or Word Processing)
12 Vehicle Charge
MA TERIALS TESTING
100 Concrete Aggregates:
101 Screen or Sieve Analysis (ASTM C-136)
102 Specific Gravity (ASTM C-127 or C-128)
103 Unit Weight (ASTM C-29)
104 Absorption (ASTM C-127 or C-128)
105 Finer than 200 mesh (ASTM Col 17)
106 Organic Impurities (ASTM C-40)
107 Scratch Hardness (ASTM C-851)
108 L.A. Abrasion Tests (ASTM C-131 or C-535)
109 Clay Lumps (ASTM C-142)
110 Light Weight Pieces (ASTM C-123)
111 Sand Equivalent (ASTM C-2419)
112 Sodium Sulfate Soundness - 5 cycles (ASTM C-88)
113 Sodium Sulfate Soundness - additional Cycles
200 Concrete Mix Design Inspection and Testing:
201
2O2
2O3
2O4
2O5
2O6
2O7
207.5
208
2O9
210
211
212
213
214
215
Mix Design Review (Statistical Analysis)
Trial Batch Tests (Incl. Test Costs ASTM C-192)
Cylinder Test (ASTM C-39)
Beam Test (ASTM C-78, C-293)
Concrete Coring (4" Dia., up to 6" Thickness)
Additional Thickness (6" to 12")
Additional Thickness (over 12")
Concrete Coring, Minimum Charge
Preparation of Core, Capping and Test (ASTM C-42)
Cement Compressive Strength, one age (ASTM C-109)
Cement Compressive Strength, two ages (ASTM C-109)
MortadGrout Comp. Strength Cubes (ASTM C-109) set of 6
MortadGrout Comp. Strength Cubes 3" x 6" (ASTM C-495)
MortadGrout Comp. Strength (ASTM C-1019)
Structural Coring
Windsor Probes (ASTM C-803)
Fax (713) 266-2977 ,"' -.
Page 1 of 3
$53.00 / Hr
$48.00 / Hr
$43.00 / Hr
$64.50 / Hr
$36.00 / Hr
$67.00 Hr
$48.00 Hr
$48.00 Hr
$52.00 Hr
$86.00 Hr
$31.00 Hr
$5.50 Hr
$39.00 Ea
$45.00 Ea
$28.00 Ea
$42.00 Ea
$38.00 Ea.
$33.00 / Ea
$28.00 / Ea
$150.00 lEa
$37.00 / Ea
$46.00 / Ea
$48.00 / Ea
$250.00 / Ea
$150.00 lEa
$115.00 lEa
$275.00 / Ea
$13.00 / Ea
$20.00 / Ea
$72.00 / Ea
$6.75 / In
$12.00 / In
$275.00 / LS
$57.00 / Ea
$104.00 / Set
$127.00 /Set
$127.00 / Set
$17.00 / Ea
$127.00 / Set
By Quotation
$85.00 / Set
GEOTEST ENGINEERING, INC. _
5600 Bintliff Drive Houston, Texas 77036 Tel (713) 266-0588 Fax (713) 266-2977~ ....
CONSTRUCTION MATERIALS
TESTING FEE SCHEDULE
CMT 800
300 Brick:
301 Compressive Strength (ASTM C-67)
302 Absorption - five hour boiling (ASTM C-67)
303 Absorption - 24 hour boiling (ASTM C-67)
$23.00
$47.OO
$47.OO
Page 2 of 3
Ea
Ea
Ea
400 Reinforcing Steel:
401 Tension Tests (size #11 and under)
402 Tension Tests (sizes over #11)
403 Bend Tests (size #6 and under)
404 Bend Tests (sizes over #6)
405 Deformation Examination
406 Bolt Tensile '[:est (ASTM A-325)
500 Welded Specimens:
501 Welded Coupons (ASTM A-370)
600 Tension Tests (ASTM A-370):
601 Without use of Extensometer
602 With use of Extensometer (with Curves)
603 Steel Strand Cable
700 Nondestructive Testing (Steel):
701 Radiographic Films (ASTM E-142)
702 Radiographic Source, Iridium (ASTM E-1114)
703 Radiographic Source, Cobalt 60
704 Ultrasonic Equipment (AWS D1.1)
800 Asphalt Concrete Mix Design & Inspection:
801
802
803
804
805
806
807
807.5
808
809
810
811
812
812.5
813
814
815
816
817
818
Mix Design Review
Trial Batch Test (up to 5 points)
Additional Curve Points for Trial Batch Test, per point
Extraction & Gradation Test (TEX 210F)
Specific Gravity (ASTM C-2041 or TEX 201F)
HVEEM Stability (TEX 208F)
Bulk Density - Lab Molded (TEX-207F)
Bulk Density - Core (TEX-207F)
Molding Specimens (3 per set) (TEX 206F)
Penetration (ASTM D-5)
Ductility (ASTM D-113)
Viscosity (ASTM D-2170)
Asphalt Coring (4" Dia., up to 6" Thickness)
Asphalt Coring Minimum Charge
Additional thickness greater than 6"
Abson Recovery (TEX 211 F)
Maximum Theoretical Specific Gravity (TEX 277)
Hot Mixed In-Place Asphalt Design
Asphalt Content - Nuclear Method (ASTM D-4125)
Apparent Specific Gravity (TEX-202F)
$35.00 Ea
$43.00 Ea
$26.00 Ea
$30.00 Ea
$17.00 Ea
$38.00 Ea
Cost +10%
$34.00 /Ea
$60.00 / Ea
$83.00 / Ea
Cost+ 10%
$79.00 / Day
$90.00 / Day
$59.00 Day
$220.00 Ea
$1,200.00 Ea
$175.00 Ea
$150.00 Ea
$53.00 Ea
$70.00 /Set
$45.00 /Set
$35.00 / Ea
$47.00 /Set
$67.00 / Ea
$85.00 / Ea
$72.00 lea
$68.00 / Ea
$275.00 ILS
$6.00 /In
$225.00 / Ea
$67.00 / Ea
$2,000.00 / Ea
$60.00 /Ea
$42.00 lEa
5600 Bintliff Drive
GEOTEST ENGINEERING, INC.
Houston, Texas 77036 Tel (713) 266-0588
CONSTRUCTION MATERIALS
TESTING FEE SCHEDULE
CMT 800
900 Build-up Roof and Roof Fill:
901 Cutting Out Roofing Sample Evaluation/Analysis (ASTM D-2928)
902 , Dry Density Test and 28 day Compressive Tests (ASTM)
903 Laboratory Preparation
1000 Soils Tests:
Fax (713) 266-2977 ~-"-.
$230.00 / Ea
$50.00 / Ea
$35.00 / Hr
1001 Liquid and Plastic Limits (ASTM D-4318) $45.00 / Ea
1002 Moisture Content Only (ASTM D-2216) $7.00 / Ea
1003 Sieve Analysis (ASTM D-422) $42.00 / Ea
1004 Percent Passing #200 Sieve (ASTM D-1120) $45.00 / Ea
1005 Specific Gravity (ASTM D-854 and D-204) $44.00 / Ea
1006 OMD Standard Compaction (ASTM D-698) $150.00 / Ea
1007 OMD Modified Compaction (ASTM D-1557) $160.00 / Ea
1008 OMD Lime or Cement Stabilized Soil (ASTM D-698 or D-1557) $165.00 / Ea
1009 California Bearing Ratio (ASTM D-1883) $158.00 / Ea
1010 Percent Solids- Lime Slurry $32.00 / Ea
1011 Lime Sedes - 4 Point $215.00 / Ea
1012 Cement Content (ASTM D-806) $250.00 / Ea
1013 Nuclear Density Equipment Rental (up to 8 hrs) $8.00 / Hr
1014 Cement Sand Compressive Strength (ASTM D-1633) $180.00 / Set
1015 Maximum and Minimum Density (Sand) (ASTM D-4254) $136.00 / Ea
1016 Density and Moisture of Soil Sample (ASTM D-2216, ASTM D-2937) $16.00 / Ea.
1017 Unconfined Compressive (ASTM D-2166) $29.00 / Ea
1018 Unconsolidated Undrained (ASTM D-2850) $47.00 / Ea
1019 Consolidation-increment (ASTM D-2435) $275.00 / Ea
1019.5 Consolidation- additional increment $32.00 / Ea
1020 pH of Soil (ASTM D-4972) $13.50 / Ea
1021 Optimum Lime Content pH Method $150.00 / Ea
1022 Sieve Analysis - Base Material (ASTM C-136) $44.00 / Ea
1023 Compressive Strength- Base Material (TEX-120E) $250.00 / Ea
1024 Soil Shrinkage Factor (ASTM D-427) $42.00 / Ea
1025 One Dimensional Swell Cohesive Soils (ASTM D-4943) $190.00 /Ea
1026 TriaxialTesting By Quotation
1027 Permeability Constant Head (ASTM D-2434) $150.00 / Ea
1028 Pinhole Test (ASTM D-4647) $190.00 lEa
1029 Crumb Test $25.00 / Ea
1030 Double Hydrometer (ASTM D-4221) $100.00 / Ea
1031 Free Swell (FHA) $45.00 / Ea
1032 Soil Suction- Filter Paper Method $35.00 / Ea
Page 3 of 3
Remarks
Overtime rate of 1.5 times the hourly rate is applicable or any hours worked before 6:00 a.m. or after 6:00
p.m. Monday through Friday, and any hours worked on Saturday, Sunday or holiday or over 8 hours per
day.
A minimum of 4 hours will be charged at the applicable rate for all technician/inspector services.
pc29/feeschedule/cmtSOOd rft
GEOTEST ENGINEERING, INC.
Geotechnical Engineers & Materials Testing
5600 Bintliff Drive
January 6, 2003
City of Pearland
c/o Carter & Burgess, Inc.
55 Waugh Drive, Suite 800
Houston, Texas 77007
Attn: Mr. Vernon Webb
Re: Materials Testing Services for
FM 518 West Sewer and Lift Stations
Project No. B2003-031
Dear Mr. Webb:
Houston, Texas 77036 Telephone: (713) 266-0588
Fax: (713) 266-2977
Proposal No.: 03PM142
Geotest Engineering, Inc. appreciates the opportunity to submit our proposed scope of services
and budget estimate to provide materials testing services on the above referenced project. Based on the
proposed scope of services, we estimate a budget of $63,222 00. Any additional services requested
and not part of this estimate will be charged in accordance with our attached standard fee schedule.
We look forward to working with you. If the enclosed estimate is agreeable, please
indicate your formal acceptance by signing below and returning one (1) copy to Geotest. If you have
any questions or require additional information, please contact me at your convenience.
Very truly yours,
GEOTEST ENGINEERING, INC.
>1712 -41 -L.
Mark D Wells, P.E.
Vice President
Copies Submitted:
Enclosures:
MDW/ep
pc26/fee15/03pm142
Accepted by:
Printed Name:
Title:
Date:
2
Cost Estimate (03PM142)
Fee Schedule (CMT800)
GEOTEST ENGINEERING, INC.
5600 Bintliff Drive Houston, Texas 77036 Tel (713) 266-0588 Fax (713) 266-2977
CONSTRUCTION MATERIALS TESTING COST BREAKDOWN
Materials Testing Services for
FM 518 West Sewer and Lift Station
Project No. B2002 031
(03PM141)
PERSONNEL
06 Technician
06.5 Technician OT
08 Welding Inspector (C.W.I.)
12 Vehicle Charge
MATERIALS TESTING
200 Concrete Mix Design Inspection and Testing:
201 Mix Design Review (Statistical Analysis)
203 Cylinder Test (ASTM C-39)
204 Beam Test (ASTM C-78, C-293)
205 Concrete Coring (4" Dia., up to 6' Thickness)
211 Mortar/Grout Comp. Strength Cubes (ASTM C-109) set of 6
800 Asphalt Concrete Mix Design & Inspection:
801 Mix Design Review
804 Extraction & Gradation Test (TEX 210F)
806 HVEEM Stability (TEX 208F)
807 Bulk Density - Lab Molded (TEX-207F)
807.5 Bulk Density - Core (TEX-207F)
808 Molding Specimens (3 per set) (TEX 206F)
812 5 Asphalt Coring Minimum Charge
815 Maximum Theoretical Specific Gravity (TEX 277)
1000 Soils Tests:
1001 Liquid and Plastic Limits (ASTM D-4318)
1006 OMD Standard Compaction (ASTM D-698)
1007 OMD Modified Compaction (ASTM D-1557)
1008 OMD Lime or Cement Stabilized Soil (ASTM D-698 or D-1557)
1010 Percent Solids - Lime Slurry
1011 Lime Series - 4 Point
1013 Nuclear Density Equipment Rental (up to 8 hrs/ day)
1014 Cement Sand Compressive Strength (ASTM D-1633)
Remarks
Quantity Unit Rate
800
120
30
950
3
120
8
6
6
1
3
3
3
4
3
1
4
8
7
1
4
2
1
600
8
$43.00 / Hr
$64.50 / Hr
$67.00 / Hr
$5.50 / Hr
$115.00 / Ea
$13.00 / Ea
$20.00 / Ea
$72.00 / Ea
$127.00 / Set
$220.00 / Ea
$150.00 / Ea
$70.00 / Set
$45.00 / Set
$35.00 / Ea
$47.00 / Set
$275.00 / LS
$67.00 / Ea
$45.00
$150.00
$160.00
$165.00
$32 00
$215.00
$8.00
$180.00
TOTAL
/ Ea
/ Ea
/ Ea
/ Ea
/ Ea
/ Ea
/ Hr
/ Set
Overtime rate of 1.5 times the hourly rate is applicable or any hours worked before 6:00 a.m. or after 6:00
p.m. Monday through Friday, and any hours worked on Saturday, Sunday or holiday or over 8 hours per day.
A minimum of 4 hours will be charged at the applicable rate for all technician/inspector services.
Amount
$34,400.00
$7 740.00
$2 010.00
$5 225.00
$345.00
$1, 560.00
$160.00
$432.00
$762.00
$220.00
$450.00
$210.00
$135.00
$140.00
$141.00
$275.00
$268.00
$360.00
$1,050.00
$160.00
$660.00
$64.00
$215.00
$4,800.00
$1,440.00
$63,222.00
GEOTEST ENGINEERING, INC.
5600 Bintliff Drive Houston Texas 77036 Tel (713) 266-0588
Fax (713) 266-2977
CONSTRUCTION MATERIALS
TESTING FEE SCHEDULE
CMT 800
PERSONNEL
04 Technician NICET IV
05 Technician NICET III, HMA-IA or HMA-II
06 Technician NICET II HMA-IB, ACI-I
06.5 Technician OT
07 Technician Non-NICET
08 Welding Inspector (C.W.I.)
09 Welding Inspector (Associate C.W.I.)
10 NDT Inspector (ASNT Level II)
10 1 NDT Inspector (ASNT Level III)
10 2 NDT Inspector Level II w/ Asst. (2 man crew)
11 Support Personnel (Drafting or Word Processing)
12 Vehicle Charge
MATERIALS TESTING
100 Concrete Aggregates:
101 Screen or Sieve Analysis (ASTM C-136)
102 Specific Gravity (ASTM C-127 or C-128)
103 Unit Weight (ASTM C-29)
104 Absorption (ASTM C-127 or C-128)
105 Finer than 200 mesh (ASTM C-117)
106 Organic Impurities (ASTM C-40)
107 Scratch Hardness (ASTM C-851)
108 L.A. Abrasion Tests (ASTM C-131 or C-535)
109 Clay Lumps (ASTM C-142)
110 Light Weight Pieces (ASTM C-123)
111 Sand Equivalent (ASTM C-2419)
112 Sodium Sulfate Soundness - 5 cycles (ASTM C-88)
113 Sodium Sulfate Soundness - additional Cycles
200 Concrete Mix Design Inspection and Testing:
201 Mix Design Review (Statistical Analysis)
202 Trial Batch Tests (Incl. Test Costs ASTM C-192)
203 Cylinder Test (ASTM C-39)
204 Beam Test (ASTM C-78, C-293)
205 Concrete Coring (4" Dia., up to 6" Thickness)
206 Additional Thickness (6" to 12")
207 Additional Thickness (over 12")
207.5 Concrete Coring, Minimum Charge
208 Preparation of Core, Capping and Test (ASTM C-42)
209 Cement Compressive Strength, one age (ASTM C-109)
210 Cement Compressive Strength, two ages (ASTM C-109)
211 Mortar/Grout Comp. Strength Cubes (ASTM C-109) set of 6
212 Mortar/Grout Comp. Strength Cubes 3" x 6" (ASTM C-495)
213 Mortar/Grout Comp. Strength (ASTM C-1019)
214 Structural Coring
215 Windsor Probes (ASTM C-803)
$53.00
$48.00
$43.00
$64.50
$36.00
$67.00
$48.00
$48.00
$52.00
$86.00
$31.00
$5.50
$39.00
$45.00
$28.00
$42.00
$38.00
$33.00
$28.00
$150.00
$37.00
$46.00
$48.00
$250.00
$150.00
Page 1 of 3
/ Hr
/ Hr
/ Hr
/ Hr
/ Hr
/ Hr
/ Hr
/ Hr
/ Hr
/Hr
/ Hr
/ Hr
/ Ea
/ Ea
/Ea
/ Ea
/ Ea
/ Ea
/ Ea
/ Ea
/ Ea
/ Ea
/ Ea
/ Ea
/ Ea
$115.00 / Ea
$275.00 / Ea
$13.00 / Ea
$20.00 / Ea
$72.00 / Ea
$6.75 / In
$12.00 / In
$275.00 / LS
$57.00 / Ea
$104.00 / Set
$127.00 / Set
$127.00 /Set
$17.00 / Ea
$127.00 / Set
By Quotation
$85.00 / Set
GEOTEST ENGINEERING, INC.
5600 Bintliff Drive Houston Texas 77036 Tel (713) 266-0588
Fax (713) 266-2977
CONSTRUCTION MATERIALS
TESTING FEE SCHEDULE
CMT 800
300 Brick:
301 Compressive Strength (ASTM C-67)
302 Absorption - five hour boiling (ASTM C-67)
303 Absorption - 24 hour boiling (ASTM C-67)
400 Reinforcing Steel:
401 Tension Tests (size #11 and under)
402 Tension Tests (sizes over #11)
403 Bend Tests (size #6 and under)
404 Bend Tests (sizes over #6)
405 Deformation Examination
406 Bolt Tensile Test (ASTM A-325)
500 Welded Specimens:
501 Welded Coupons (ASTM A-370)
600 Tension Tests (ASTM A-370):
601 Without use of Extensometer
602 With use of Extensometer (with Curves)
603 Steel Strand Cable
700 Nondestructive Testing (Steel):
701 Radiographic Films (ASTM E-142)
702 Radiographic Source, Iridium (ASTM E-1114)
703 Radiographic Source, Cobalt 60
704 Ultrasonic Equipment (AWS D1.1)
800 Asphalt Concrete Mix Design & Inspection:
801 Mix Design Review
802 Trial Batch Test (up to 5 points)
803 Additional Curve Points for Trial Batch Test, per point
804 Extraction & Gradation Test (TEX 210F)
805 Specific Gravity (ASTM C-2041 or TEX 201 F)
806 HVEEM Stability (TEX 208F)
807 Bulk Density - Lab Molded (TEX-207F)
807.5 Bulk Density - Core (TEX-207F)
808 Molding Specimens (3 per set) (TEX 206F)
809 Penetration (ASTM D-5)
810 Ductility (ASTM D-113)
811 Viscosity (ASTM D-2170)
812 Asphalt Coring (4' Dia., up to 6" Thickness)
812 5 Asphalt Coring Minimum Charge
813 Additional thickness greater than 6"
814 Abson Recovery (TEX 211 F)
815 Maximum Theoretical Specific Gravity (TEX 277)
816 Hot Mixed In -Place Asphalt Design
817 Asphalt Content - Nuclear Method (ASTM D-4125)
818 Apparent Specific Gravity (TEX-202F)
Page 2 of 3
$23.00 / Ea
$47.00 / Ea
$47.00 / Ea
$35.00
$43.00
$26.00
$30.00
$17.00
$38.00
Cost +10%
/ Ea
/ Ea
/ Ea
/ Ea
/ Ea
/ Ea
$34.00 / Ea
$60.00 / Ea
$83.00 / Ea
Cost + 10%
$79.00 / Day
$90.00 / Day
$59.00 / Day
$220.00 / Ea
$1,200.00 / Ea
$175.00 / Ea
$150.00 / Ea
$53.00 / Ea
$70.00 / Set
$45.00 / Set
$35.00 / Ea
$47.00 / Set
$67.00 / Ea
$85.00 / Ea
$72.00 / Ea
$68.00 / Ea
$275.00 / LS
$6.00 / In
$225.00 / Ea
$67.00 / Ea
$2,000.00 / Ea
$60.00 / Ea
$42.00 / Ea
GEOTEST ENGINEERING, INC.
5600 Bintliff Drive Houston Texas 77036 Tel (713) 266-0588
Fax (713) 266-2977
CONSTRUCTION MATERIALS
TESTING FEE SCHEDULE
CMT 800
900 Build-up Roof and Roof Fill:
901 Cutting Out Roofing Sample Evaluation/ Analysis (ASTM D-2928)
902 Dry Density Test and 28 day Compressive Tests (ASTM)
903 Laboratory Preparation
1000 Soils Tests:
1001 Liquid and Plastic Limits (ASTM D-4318)
1002 Moisture Content Only (ASTM D-2216)
1003 Sieve Analysis (ASTM D-422)
1004 Percent Passing #200 Sieve (ASTM D-1120)
1005 Specific Gravity (ASTM D-854 and D-204)
1006 OMD Standard Compaction (ASTM D-698)
1007 OMD Modified Compaction (ASTM D-1557)
1008 OMD Lime or Cement Stabilized Soil (ASTM D-698 or D-1557)
1009 California Bearing Ratio (ASTM D-1883)
1010 Percent Solids - Lime Slurry
1011 Lime Series - 4 Point
1012 Cement Content (ASTM D-806)
1013 Nuclear Density Equipment Rental (up to 8 hrs)
1014 Cement Sand Compressive Strength (ASTM D-1633)
1015 Maximum and Minimum Density (Sand) (ASTM D-4254)
1016 Density and Moisture of Soil Sample (ASTM D-2216, ASTM
1017 Unconfined Compressive (ASTM D-2166)
1018 Unconsolidated Undrained (ASTM D-2850)
1019 Consolidation - increment (ASTM D-2435)
1019.5 Consolidation - additional increment
1020 pH of Soil (ASTM D-4972)
1021 Optimum Lime Content pH Method
1022 Sieve Analysis - Base Material (ASTM C-136)
1023 Compressive Strength - Base Material (TEX-120E)
1024 Soil Shrinkage Factor (ASTM D-427)
1025 One Dimensional Swell Cohesive Soils (ASTM D-4943)
1026 Triaxial Testing
1027 Permeability Constant Head (ASTM D-2434)
1028 Pinhole Test (ASTM D-4647)
1029 Crumb Test
1030 Double Hydrometer (ASTM D-4221)
1031 Free Swell (FHA)
1032 Soil Suction - Filter Paper Method
Remarks
D-2937)
Page 3 of 3
$230.00 / Ea
$50.00 / Ea
$35.00 / Hr
$45.00
$7.00
$42 00
$45.00
$44.00
$150.00
$160.00
$165.00
$158.00
$32.00
$215.00
$250.00
$8.00
$180.00
$136.00
$16.00
$29.00
$47.00
$275.00
$32.00
$13.50
$150.00
/ Ea
/ Ea
/ Ea
/ Ea
/ Ea
/ Ea
/ Ea
/ Ea
/ Ea
/ Ea
/ Ea
/ Ea
/ Hr
/ Set
/ Ea
/ Ea
/ Ea
/ Ea
/ Ea
/ Ea
/ Ea
/ Ea
$44.00 / Ea
$250.00 / Ea
$42.00 / Ea
$190.00 / Ea
By Quotation
$150.00 / Ea
$190.00 / Ea
$25.00 / Ea
$100.00 / Ea
$45.00 / Ea
$35.00 / Ea
Overtime rate of 1.5 times the hourly rate is applicable or any hours worked before 6:00 a.m. or after 6:00
p.m. Monday through Friday, and any hours worked on Saturday, Sunday or holiday or over 8 hours per
day.
A minimum of 4 hours will be charged at the applicable rate for all technician/inspector services.
pc29/feesch edul a/cm t800d rft
DOCUMENT FILING REQUEST
RP-131
Description:
Geotest Engineering, Inc.
Engineering Agreement
Resolution:
Bill Eisen
City Manager
Type:
Materials Testing Services
Search String Parameters:
FM518 Sewer
Requested By:
Robin Pitcock
Project Management