Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
R2003-0028 02-10-03
RESOLUTION NO. R2003-28 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AWARDING A BID FOR CONSTRUCTION OF THE INDEPENDENCE PARK PAVILION. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section '1. That the City opened bids for construction of the Pearland Parkway water line, and such bids have been reviewed and tabulated. Section 2. That the City Council hereby awards the bid to Frost Constructors, Inc. in the amount of $274,058.88. Section 3. The City Manager or his designee is hereby authorized to execute a contract for construction of the Independence Park Pavilion. PASSED, APPROVED and ADOPTED this the 10th day of February , A.D., 2003. ATTEST: fy' SEQ~ETARY APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY TOM REID MAYOR FEES 05 13 30 FR SU INFRASTRUCTURE 71 993 '.j301 TO 2816521679 t;igInmrJIt 49 manautmen 69 !cririn10411 Mr. Darrin Coker City Attorney City of Pearland 3519 Liberty Drive Pearland, Texas 77581 5416 February 5, 2003 S&B Letter No.: U021".00G S&B Project No.: UO2.7 City of Pearland Bid No.: 2003-036 Re.: independence Pavilion Replacement at Independence Park Recommendation of Award Letter bear Mr. Coker:. S&B Infrastructure, Ltd. (S&B) is pleased to present this Reconunendation of Awa td Letter for the referenced project. After review of the three bid proposals sibmitted, +&B iecommtnds awarding the project to Frost Constructors, Inc. for the amount of $2741)58.88. A t..opy of the stlnunary bid tabulation is attached, The bid amount from Frost Constructors, Inc. and Piedmont Contractors, Inc, did contain multiplication and addition errors. The correct totals were deter:nined using ,Section 15.1 of the Instructions to Bidders. As per our discussion yesterday, it was decider that Hull & N.ill, Inc.'s bid proposal would be disqualified since none of the unit prices or bid amounts on the bid form were filled out. We appreciate the opportunity to present this letter to thw City of Pearland and Took forward to assisting the City during the construction phase. If you have any questions or need more information, please call me at* 713-8454318. Sincerely, David C. Dyhala, Engineering -In Tra`ning attch. cc: Mr. Greg Moore Mr. Gordon Island - CuP Mr. Eddie Kirst - S&B DCD $:\prolcet\ta0217-Pirad, fid _Pavllion\Admin\LettersvXl6-letter of award-01415.03.doc 3535 Sage Road • Houston, Texas 77056-7011 • (713) 845-5401 • Fax (7150) 993-93©1 FEB 05 '03 13'30 FR S&B INFRASTRUCTURE 713 993 9301 TO :251 521979 P.03 SUMMARY BID TABULATION INDEPENDENCE PAVILION REPLACEMENT AT INDEPENDENCE PARK BID DATE: FEBRUARY 4, 2003 CONTRACTOR l . FROST CONSTRUCTORS, INC. 2 . PIEDMONT CONTRACTORS, INC. 3 . HULL & HULL, INC. GRAND TOTAL $ 274,058,F>8 $ 456,682.03 DISQUALIFIED ** TOTAL PAGE.03 ** FEB 07 '03 08: 4'7 FR S&B INFRASTRUCTURE 713 993 9301 TO 2816521703 Engineering #' Management ;,t lechnologt! Mr. Bill Eisen City Manager City ufPearland 3519 Liberty Drive Fearland,'lexas •l7581 February 6, 2003 S&B Letter No.: S&B Project No.: City of PCarland Did No.: Re.: independence Pavilion Replacement at Independence Park Value Engineering Recommendations for Construction Cost Reduction r:tear Mr. Fisen P.02 v0Z17 U0217.007 00217 2003-036 Per our conversation with you and Mr. Greg Moore, Interim Director of Parks and ILe.creatiori, yesterday, S&.R infrastructure, Ltd (S&B) has performed a value engineering analysis and developed a plan of action for reducing the construction cost of the wart -nevi d project to bring the estimated total project coot below the $300,000 budget, As you may recall, the bid items were set up as a menu so if the bids came in too high, portions of the work could be deleted to reduce the cost without detracting from the over-all (unutiunality of the facility. Frost Constructors, Inc. submitted the lowest bid of $274,058 88, making the current projected total cost $310,477.88 including $36,419 for engineering. After reviewing the bids and conferring with Mr. Moore, S&B suggests that the Sodding, proposed in Bid Item No. 22, and two of the four water fountains proposed in Bid Item No. 26, be eliminated from the contract, This would reduce the construction contract amount by $20,752 to $289,725.88 leaving a budget surplus of $10,274.12. Further, and with concurrence from Mr Moore, SCR sugeests that approximately$5,000 of this surplus be allocated for Parks and Rea to provide the sodding which would leave a net budget surplus of a little onyx $5 000 The Contractor has indicated they would be amenable to these changes and, we have discussed this with the City Attorney, Mr. Dann Coker, and understand that under State law, the proposed bid item modifications can only be made after the contract is awarder] fui tlir full ai lount 'I'heretore S&B respectfully proposes the construction contract in the amount of $274,058.88 from frost Constructors, Inc_ he submitted to the Pearland City Council for approval, Monday, February 10, 2003. Subsequently, S&B will assist the City in final value engineering coordination with the Contractor_ We appreciate the opportunity to work with the City of Pearland and are looking forward to the successful completion of this project. If you have any questions of need more information, please call me at 713-845-4802. Sincerely, o cexiJ Eddie Kirst, P.E Deputy Director Municipal Engineering cc: Mr, Greg Moore — CoP Mr. Gordon Island — C'oP LEK/lek 3535 Sage Road • Houston, Texas 77056-7011 • (713) 845-5401 • Fax (713) 993-9301 ** TOTAL PRGE.02 ** FEB 05 '03 13:34 FR S«B INFRRSTRUCTURE 713 993 9301 TO 2816521 38 P.02 Engineerlgs :9 Mansnowth a 4.4 rccrao(2?i; Mr. Darren Coker City Attorney City of Pearland 3519 Liberty Drive Pearland, Texas 77581-5416 February 5, 2003 S&B Letter No.: U0217.006 S&B Project No. U0217 City of Pearland Bid No.: 2003-036 Re.: Independence Pavilion Replacement at Independence Park Recommendation of Award Letter Dear Mr. Coker. S&B Infrastructure. Ltd (S&B) is pleased to present this Recommendation of Award Letter for the referenced project. After review of the three bid proposals submitted, S&B recommends awarding the project to Frost Constructors, Inc. for the amount of S274,058.88. A copy of the summary hid tabulation is attached. The bid amount from Frost Constructors, Inc. and Piedmont Contractors, Inc did contain multiplication and addition errors. The correct totals were determined using Section 15.1 of the Instructions to Bidders. As per our discussion yesterday, it was decided that Hull & Hull, 1nc.'s bid proposal would be disqualified since none of the unit prices or bid amounts on the hid Corm were filled out. We appreciate the opportunity to present this letter to the City of Pearland and look forward to assisting the City during the construction phase. If you have any questions or need more information, please call me at 713-845-5318. Sincerely, ale David C. Dybala, I Engineering -In -Training attch. cc: Mr. Greg Moore - CoP Mr. Gordon Island - CoP Mr. Eddie Kirst - S&B DCD C:\project\u0217-PIndindp_Pavilion1Admin\Lertcrst006-Ictter of award-01-05.03,doc 3535 Sage Road • Houston, Texas 77056-7011 • (713) 845-5401 • Fax (713) 993-9301 FEB 05 '03 13:34 FR S&B INFRASTRUCTURE 713 993 9301 TO 2816521738 P.03 SUMMARY BID TABULATION INDEPENDENCE PAVILION REPLACEMENT AT INDEPENDENCE PARK BID DATE• FEBRtUARY 4, 2003 CONTRACTOR 1 . FROST CONSTRUCTORS, INC. 2 . PIEDMONT CONTRACTORS, INC. 3 . HULL & HULL, INC. GRAND TOTAL $ 274,058.88 $ 356,682.03 DISQUALIFIED .; TOTAL PAGE 03 ,.