Loading...
R2002-0137 09-09-02 RESOLUTION NO. R2002-137 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AUTHORIZING THE CITY MANAGER OR HIS DESIGNEE TO EXECUTE A CHANGE ORDER FOR INFLOW AND INFILTRATION WORK ASSOCIATED WITH THE DIXIE HOLLOW SERVICE AREA. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain change order for inflow and infiltration work associated with the Dixie Hollow service area, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest the Change Order for inflow and infiltration work associated with the Dixie Hollow service area. PASSED, APPROVED and ADOPTED this the ~ , A.D., 2002. ATTEST: APPROVED ASTO FORM: DARRIN M. COKER CITY ATTORNEY 9 day of September MAYOR Exhibit "A" R2002-13-7 CHANGE ORDER FOR INFLOW/INFILTRATION REDUCTION: SLEEPY HOLLOW AND LONGWOOD SERVICE AREAS PEARLAND, TEXAS Date of Issuance: August 1, 2002 Owner: City of Pearland Contractor: Garver Construction, Ltd Engineer: Carter & Burqess, Inc. Change Order Number: Owner's Project Number: Contractor's Project Number: Engineer's Project Number: B2001-045 30147.010 Explanation of this Change Order: This change order is being issued to authorize the following modifications to the contract. These modifications include the removal of bid quantities that are not required and the addition of the rehabilitation of the sanitary sewer system in the Dixie Hollow subdivision. In addition, the Contractor was substantially complete with the work in the contract 76 days pdor to the required completion date. The Contractor is therefore eligible for the $22,500 early completion bonus. Bid Item 7: Delete 106.19 SY of Remove & Replace 1%, asphalt @ $44.00 per SY = Bid Item 18: Delete 400 LF of Remove & Replace 6" to 8" by open cut @ $44.00 per LF = Bid Item 19: Add 81 service connections @ $425.00 each= Bid Item 27: Delete 200 LF of extra length of 6" to 10" point repairs 0 to 8 feet deep @ $35.00 per LF = Bid Item 29: Delete 22 6" to 10" point repairs to allow pipe bursting @ $350.00 each = Bid Item 34: Delete 60 replacement of manhole cover in street ROW @ $330.00 each = Bid Item 35: Delete 20 stainless steel manhole inserts @ $180.00 each = Bid Item 36: Delete 20 PVC manhole inserts @ $40.00 each = Bid Item 40: Delete 9,000 LF of cleaning 6" to 12" sanitary sewer @ $1.50 per LF = Bid Item 41: Delete 3,600 LF of extra payment for mechanical Cleaning @ $2.00 per LF = Bid Item 46: Add 3885 LF of pipe bursting from 8" to 8" @ $29.00 per LF= Add 568 LFof pipe bursting along Elm Hollow from 10" to 10" @ $41.00 per LF = Add 1 early completion bonus @ $22,500 = ($4,672.36) ($17,600.00) $34,425.00 ($7,000.00) ($7,700.00) ($19,800.00) ($3,600.00) ($SO0.O0) ($13,500.00) ($7,200.00) $112,665.00 $23,288.00 $22,5OO.OO The remaining quantities for Manhole Replacement (Bid Item 13) & Manhole Rehabilitation (Bid Item 30) are approved for use within the Dixie Hollow service area. The remaining 961 Lf of 8" to 8" pipe bursting (Bid Item 46) is also approved for use within the Dixie Hollow service area. The Contractor shall not invoice for work preformed under bid items 40 and 41. The work required in the contract for these items has been completed and the Contractor has agreed not to request payment for these items. Contract Amount: Original Contract Price: Previous Change Order(s): Contract price prior to this change order $860,135.00 $ 98,505.00 $958,640.00 Net increase (decrease) from this change order $111,005.64 Contract price with all change orders to date (including this change order): $1,069,645.64 Contract Time: The Contractor shall have 30 days from receipt of fully executed change order to complete these items. The completion of these items is not required for the contractor to receive the early completion bonus; however, if the time required for the completion of these items extends beyond 30 days, liquidated damages will apply. RECOMMENDED: By: ~~--~ -By: Engineer Date: ~//~~ Date: ACCEPTED: APPROVED: ~' O~N~er Date: Carter::Burgess August 6, 2002 Mr. Cecil Bowery City of Pearland 3501 East Orange Street Pearland, Texas 77581 RE: I/1 Change Order #3 Dear Mr. Bowery: 55 Waugh Drive Suite 800 Houston, Texas 77007-5833 P.O. Box 131487 Houston, Texas 77219-1487 Phone: 713.869.7900 Fax: 713.869.5502 WWW.c-b.Corn I have attached five (5) copies of the signed change order number 3 for the TWDB funded I/1 project. Per your request this change order is adding the Dixie Hollow subdivision to the scope of work. This subdivision was not part of the original project; however, the installation of flow meters indicated a significant amount of I/1 within the neighborhood. The area has been submitted to the TWDB and has received preliminary approval to be included within this project. This change order is also authorizing payment for the early completion. This results in an $111,005.64 increase in the project budget to $1,069,645.64. This is 24.4% over the original contract amount of $860,135. It is anticipated that one additional change order for the final quantity adjustments will be required and that this should be a deductive change order. If you have any questions, please let me know. Sincerely, CARTER & BURGESS Vernon Webb, P.E. Project Manager VW/adw L:\0301\030147.010\Publ\Const Admtn\bowery-L04.doc cc: Correspondence Proj. Mngr. — VW City of Pearland — Mr. Gene Simeon Mike Cook, TWDB Carter & Burgess, Inc. Carter & Burgess Consultants, Inc. Nixon & Laird Architects/Engineers, P.C. Nixon & Laird Architects/Engineers, Inc. C&B Nevada, Inc.