Loading...
R2007-065 2007-04-23 RESOLUTION NO. R2007-65 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AMENDING A CONTRACT FOR ENGINEERING SERVICES ASSOCIATED WITH THE SH 288 FRONTAGE ROADS. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain amended contract for engineering services associated with the SH 288 frontage Roads, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest an amended contract for engineering services associated with the SH 288 Frontage Roads. PASSED, APPROVED and ADOPTED this the 23rd day of April, A.D., 2007. < )~~ TOM REID MAYOR ATTEST: ~Cffi.ui ~(). g S NIA BLAIR DEPUTY CITY SECRETARY APPROVED AS TO FORM: ~fc.M- DARRIN M. COKER CITY ATTORNEY Exhibit "A" Resolution 2007-65 CITY OF PEARLAND STANDARD AMENDMENT TO CONSULTANT SERVICES AGREEMENT This Amendment (hereinafter "Amendment") is made between the City of Pearland, Texas (hereinafter "City"), and Othon Inc. (hereinafter "Consultant") to amend that engineering services contract (the "Contract") between the City and the Consultant executed on August 28, 2006 for State Hwy. 288 Frontage Roads from FM 2234 to FM 518. (PO # 062944, Project #T20005) 1. Amended Terms. The City and the Consultant hereby agree that the Contract is amended as follows: A. Increase Maximum Contract Amount From $911,201.21 to 984,503.43; an increase of $73,302.22. B. See Attachment for additional services. 2. Contract to Remain in Force. Other than the provisions of the Contract expressly amended herein, the Contract shall remain in full force and its enforceability shall be unaffected by this Amendment. EXECUTED and EFFECTIVE as of the ~ day of:ll\"~' , 20 tl. CITY OF PEARLAND Finance Approval: 4~ ' Signature: - Name/Title: Bi 11 Ei sen. Ci tv Manaqer, 4-23-07 CONSULTANT Signature: Name/Title: F. / President ~~ ~e~ OTHON OTHON, INC. 11111 Wilcrest Green, Suite 128 Houston, Texas 77042 CONSULTING ENGINEERS Civil, Transportation, Environmental, Construction Management 7139758555 TEL 7139759068 FAX othoncorp@othon.com E.MAIL www.othon.com WEBSITE April 12, 2007 Mr. Mickiel G. Hodge Assistant City Manager City of Pearland 3519 Liberty Drive Pearland, Texas 77581 Subject: SH 288 Frontage Roads from FM 2234 to FM 518 Dear Mr. Hodge: Othon, Inc. (Othon) is resubmitting a request for an increase in the fee for developing the preliminary engineering and final construction plans (PS&E) for the subject project. This request is based on additional effort required to implement changes to the original scope of work. This request includes revisions requested by the City of Pearland for changes to the alignment along the frontage roads and the addition of the portion of Hughes Ranch Road between the frontage roads and CR94. A revised construction cost estimate has been prepared that includes improvements to Hughes Ranch Road. Hughes Ranch Road will be widened to a four lane divided facility from SH 288 to CR 94. The design will match Brazoria County design standards being used on the design of the widening of Hughes Ranch Road east of CR 94. Attached are spreadsheets with the proposed fee increases resulting from revisions to the schematic and roadway design requested by Pearland. The increases reflect additional labor to make adjustments to the alignment and typical section of the frontage road and ramps and develop the storm sewer system. One set of spreadsheets provides the increased fee for the revisions initiated by TxDOT and one set reflects the fee increase and construction cost estimate with the addition of improvements to Hughes Ranch Road. The estimated construction cost for improvements to Hughes Ranch Road is $424,233.34. Mr. Mickiel G. Hodge Assistant City Manager April 12, 2007 Page 2 The increase in fee for the changes to the scope of work in the preliminary engineering phase of the project is $53,765.65. The increase in fee for the PS&E phase ofthe project is, $19,536.57. The total additional cost for the revisions to the scope of work for the project is $73,302.22. Your consideration in this matter is appreciated. James G. Darden P.E. Chief Engineer, Transportation Enclosures cc: Skipper Jones, Project Manager