R2007-107 2007-07-09 RESOLUTION NO. R2007 -107 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AMENDING A CONTRACT FOR ENGINEERING SERVICES ASSOCIATED SEGMENT 1 of the JOHN L1ZERI MAGNOLIA ROAD PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain amended contract for engineering services associated with Segment 1 of the John Lizer/ Magnolia Road Project, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest an amended contract for engineering services associated with Segment 1 of the John Lizer/ Magnolia Road Project. PASSED, APPROVED and ADOPTED this the:th day of Jr~.D.' 2007. '--;)~ ~ TOM REID MAYOR ATTEST: APPROVED AS TO FORM: cU~ - . Cst- DARRIN M. COKER CITY ATTORNEY CITY OF PEARLAND STANDARD AMENDMENT TO ENGINEERING SERVICES AGREEMENT Exhibit "A" Resolution 2007-107 07 -0047 This Amendment (hereinafter "Amendment") is made between the City of Pearland, Texas (hereinafter "City"), and Kirst Kosmoski, Inc. (hereinafter "Consultant") to amend that consultant services contract (the "Contract") between the City and the Consultant executed on February 28, 2005 (Resolution 2005-44) for additional design engineering services to complete additional scope of work required by the John Lizerl Old Alvin intersection and drainage modifications, John Lizer Rd. drainage, outfall and geometries modifications, and additional street light and sidewalk design. Project Number T70041; PO Number 051552. 1. Amended Terms. The City and the Consultant hereby agree that the Contract is amended as follows: A. Increase Maximum Contract Amount From $193,254.00 to $223,254.00; an increase of $30,000.00. B. See Attachment for additional services. 2. Contract to Remain in Force. Other than the provisions of the Contract expressly amended herein, the Contract shall remain in full force and its enforceability shall be unaffected by this Amendment. EXECUTED and EFFECTIVE as of the ~ day of July ,2007. CITY OF PEARLAND . Finance Approval: Signature: ~~." ~L Namerritle: . P J' ('~ : '5\\ 'It'-( t-I\'f 1 ~; /);;;u>Ul Departmental Approval: ~ ' Signature: ~ _ Namerritle: Bi 1 1 n, Ci ty Manager 7-9-07 CONSULTANT ~ Signature: ~ - Namerritle: Eddie Kirst. P:E. I President r; 7 15 () if "? - ------ Exhibit„A„------------ Resolution 2007-107 CITY OF PEARLAND. 07-0047 STANDARD AMENDMENT TO ENGINEERING SERVICES AGREEMENT This Amendment (hereinafter "Amendment") is made between the City of Pearland, Texas (hereinafter"City"), and Kirst Kosmoski, Inc. (hereinafter "Consultant") to amend that consultant services contract (the "Contract") between the City and the Consultant executed on February 28, 2005 (Resolution 2005-44) for additional design engineering services to complete additional scope of work required by the John Lizer/ Old Alvin intersection and drainage modifications, John Lizer Rd. drainage, outfall and geometrics modifications, and additional street light and sidewalk design. Project Number T70041; PO Number 051552. 1. Amended Terms. The City and the Consultant hereby agree that the Contract is amended as follows: A. Increase Maximum Contract Amount From $193,254.00 to $223,254.00; an increase of$30,000.00. B. See Attachment for additional services. 2. Contract to Remain in Force. Other than the provisions of the Contract expressly amended herein, the Contract shall remain in full force and its enforceability shall be unaffected by this Amendment. EXECUTED and EFFECTIVE as of the i'9th day of July , 2007. CITY OF PEARLAND Finance Approval: Signature: Name/Title: Th12►s Mct,r,k)r,i, bweel-,sr ri Departmental Approva Signature: Name/Title: Bi 1 Eisen. Ci ty Manager 7-9-07 CONSULTANT s c &Coat, r..-- Signature: Name/Title: Eddie Kirst -.E. / President 1 Krz KIRST KosMosKi,INC. ir Civil/Consulting Engineers 2630 Fountainview,Ste.318;Hou.,Tx.77057 June 21,2007 City of Pearland KKI Project No.: m0001-017 Projects Department KKI Proposal No.: m0001-017-002 3519 Liberty Drive,3rd Fl. CoP Project No.: T70041 Pearland,Tx. 77581 Attn.: Ms.Andrea Brinkley Project Manager Re.: John Lizer Road—Widening Request for Contract Supplement to Address Changes in Scope Gentlemen, Kirst Kosmoski,Inc. (KKI)is pleased to present this supplemental proposal for providing Professional Engineering Services to the City of Pearland(City)for the referenced project. KKI proposes to provide engineering design services for the preparation of additional construction drawings and/or modification of existing designs and drawings due to substantive changes in project requirements as follows: 1. Old Alvin Rd.: a. Evaluation of drainage requirements along Old Alvin through the Alexander tract, b. Coordination with Pearland Independent School District's traffic engineer and incorporation of forthcoming Traffic Impact Analysis(TIA)results, c. Preparation of Plan&Profile drawing(s)for approximately 600-ft of Old Alvin north of Lizer, and d. Revisions to project and drainage area layouts, 2. John Lizer Rd.: a. Re-evaluation/re-design of Lizer drainage and geometries(horizontal&vertical)from SH 35 to the outfall at the Independence pond in light of items 1.a. &b. above, b. Associated revisions to project and drainage area layouts,plan&profiles,and outfall detail drawings,and c. Update existing topographic and Right-of-Way(ROW)information based on forthcoming survey from C.L.Davis&Company, 3. Street Lighting: a. Preparation of modified overall project layout highlighting the proposed ROW for use by CenterPoint Energy, b. Coordination as required with CenterPoint Energy, c. Addition of street lights to John Lizer plan&profile drawings at locations specified by CenterPoint Energy,and d. Addition of one power conduit to John Lizer plan&profile drawings(one conduit,and incorporation of connection details provided for under original agreement as traffic signal conduit), 4. Wheelchair Ramps&Sidewalks: a. Revise/modify ROW and or easement limits to accommodate revisions to existing wheelchair ramp configurations as directed the City,and b. Revise/modify R-0 W and or easement limits to accommodate completion of sidewalks on both sides of John Lizer from SH 35 to Pearland Parkway as directed the City. June 21,2007 City of Pearland John Lizer Road—Widening Supplement Request Page2of2 KKI proposes to provide the services listed above for the Lump Sum amount of$30,000. We appreciate the • opportunity to present this proposal to the City and look forward to finalizing the agreement and beginning work. If you have any questions or need more information,please call me at 832-242-7200 or 832-465-0784. Sincerely, Eddie Kirst,P.E. Principal cc:Mr. Trent Epperson—Projects Director LEK/lek P:\m0001-CoA017-john liter-pvng\proposal\004cop•brinkley_supp-rgst.doc • KT7 KIRST KOSMOSHI,INC. JA. Civil/Consulting Engineers 12630 Fountainview,Ste.318;Hou.,Tx.77057 June 21,2007 City of Pearland KKI Project No.: m0001-017 Projects Department KKI Proposal No.: m0001-017-002 3519 Liberty Drive,3rd Fl. CoP Project No.: T70041 Pearland,Tx. 77581 Attn.: Ms. Andrea Brinkley Project Manager Re.: John Lizer Road—Widening Request for Contract Supplement to Address Changes in Scope Gentlemen, Kirst Kosmoski,Inc. (KKI)is pleased to present this supplemental proposal for providing Professional Engineering Services to the City of Pearland(City)for the referenced project. KKI proposes to provide engineering design services for the preparation of additional construction drawings and/or modification of existing designs and drawings due to substantive changes in project requirements as follows: 1. Old Alvin Rd.: a. Evaluation of drainage requirements along Old Alvin through the Alexander tract, b. Coordination with Pearland Independent School District's traffic engineer and incorporation of forthcoming Traffic Impact Analysis(TIA)results, c. Preparation of Plan&Profile drawing(s)for approximately 600-ft of Old Alvin north of Lizer, and d. Revisions to project and drainage area layouts, 2. John Lizer Rd.: a. Re-evaluation/re-design of Lizer drainage and geometries(horizontal&vertical)from SH 35 to the outfall at the Independence pond in light of items 1. a. &b. above, b. Associated revisions to project and drainage area layouts,plan&profiles,and outfall detail drawings,and c. Update existing topographic and Right-of-Way(ROW)information based on forthcoming survey from C.L.Davis&Company, 3. Street Lighting: a. Preparation of modified overall project layout highlighting the proposed ROW for use by CenterPoint Energy, b. Coordination as required with CenterPoint Energy, c. Addition of street lights to John Lizer plan&profile drawings at locations specified by CenterPoint Energy,and d. Addition of one power conduit to John Lizer plan&profile drawings(one conduit,and incorporation of connection details provided for under original agreement as traffic signal conduit), 4. Wheelchair Ramps&Sidewalks: a. Revise/modify ROW and or easement limits to accommodate revisions to existing wheelchair ramp configurations as directed the City,and b. Revise/modify R-o-W and or easement limits to accommodate completion of sidewalks on both sides of John Lizer from SH 35 to Pearland Parkway as directed the City. • June 21,2007 City of Pearland John Lizer Road—Widening Supplement Request Page 2 of 2 KKI proposes to provide the services listed above for the Lump Sum amount of$30,000. We appreciate the opportunity to present this proposal to the City and look forward to finalizing the agreement and beginning work. If you have any questions or need more information,please call me at 832-242-7200 or 832-465-0784. Sincerely, Eddie Kirst,P.E. Principal cc:Mr. Trent Epperson—Projects Director LEK/lek P:\m0001-CoA017 john lizer-pvng\proposal\004-cop•brinkley_supp-rqstdoc