R2007-115 2007-07-23
RESOLUTION NO. R2007 -115
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND,
TEXAS, APPROVING CHANGE ORDER NO.1 ASSOCIATED WITH THE
EXPANSION OF THE KNAPP SENIOR CENTER.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS:
Section 1. That Change Order NO.1 associated with the expansion of the Knapp
Senior Center, a copy of which is attached hereto as Exhibit "A" and made a part hereof for
all purposes, is hereby authorized and approved.
Section 2. That the City Manager or his designee is hereby authorized to execute
and the City Secretary to attest Change Order NO.1 associated with the expansion of the
Knapp Senior Center.
PASSED, APPROVED and ADOPTED this the23rd day of July, A.D., 2007.
1 n.
r- ~~ 1 W
TOM REID
MAYOR
ATTEST:
APPROVED AS TO FORM:
0~~ 17.01-
DARRIN M. COKER
CITY ATTORNEY
City of Pearland
Exhibit "A"
Resolution 2007-115
07 -0050
Proj ects Department
CHANGE ORDER
For Melvin Knapp Senior Center Additions and Renovations
PEARLAND, TEXAS
Date of Issuance:
July 17,2007
Change Order No:
CoP Project No: F50071
Contractor: DYCOR, INC.
Architect:
Brown Reynolds Watford Architects, Inc.
Explanation:
This change order encompasses the following:
Description Cost (Deduct) or Addition
Substitute galvanized aluminum roof deck in lieu of ($49,600.00)
standing seam metal roof
Substitute Hardi-Plank siding with 3 ft. masonry ($135,000.00)
wainscoat in lieu of full masonry
Substitute MechanicallE lectricallPlumbing - lighting, ($22,300.00)
wiring, plumbing supply lines, and other various items.
Modify Porte Cochere by deleting stone work and ($23,000.00)
ornamental beams, substitute with a straight
configuration.
Delete job site trailer, conduct project construction ($22,000.00)
meetings at Dycor Office
Delete contingency to project ($50,000.00)
Delete Fire Sprinkler system; meet city code with fire ($34,200.00)
alarm system
Add full commercial kitchen $51,000.00
Substitute Davis Bacon wage rates in lieu of Texas $0
Prevailing Wage rates (new wage rates attached)
Subtotal of Changes ($285,100.00)
Please see attached Contractor's proposal letter and Architect's recommendation letter,
and Davis Bacon Wage rates.
Contract Amount:
Original Contract Price:
Previous Change Order(s):
Contract price prior to this change order:
Net il'lerease (decrease) from this change order:
$ 1,806,545.00
$ 0.00
$ 1,806,545.00
$ (285,100.00)
Page 1 of2
Contract price with all change orders to date
(including this change order):
Contract Time:
Authorized contract time change:
NA
Finance Approval: ~_ f(b.n:r ~~nL
RECOMMENDED:
Thomas W. Parker
ACCEPTED:
Clayton Dykes
BYdl.-,~ BY~
Architect tracto
Date:
Date: 7 -2O"'D 7
$ 1,521,445.00
Date:
rJ d]' fY)
APPROVED:
Bill Eisen
~
By:
City Manager
Date: July 23. 2007
Page 2 of2
DYCOR, INC.
3205 Main
Pearland, Tx. 77581
281-485-1415
281-485-2340 Fax
July 12, 2007
Mr. Tom Parker
Brown Reynolds Watford Architects, Inc.
2700 Earl Rudder Fwy. S. Suite#'l000
College Station, Tx. 77845
Re: Knapp Senior Center
Dear Mr. Parker:
As per your request, Dycor is submitting the following for your review:
1) Substitute 26ga R panel (galvalume) roof deck in lieu of standing seam (ALT.1)
Deduct ($49,600.00)
2) Delete contingency
Deduct ($50,000.00)
3) Substitute hardi siding with 2'8—3'0 masonry wainscoat in lieu of full masonry
Deduct ($135,000.00)
4) Delete Job Site trailer
Deduct ($22,000.00)
5) MEP items—substitute Cooper lighting package in lieu of specified fixtures, use
Plenum rated alarm wiring, re-use existing MDP and associated panel where
applicable,re-use lighting contactor, re-use existing conduit &wiring where
acceptable, modify plumbing supply lines where acceptable
Deduct ($22,300.00)
6) Modify Porte Cochere—delete all stone work, delete arched ornamental beams
Deduct ($23,000.00)
7) Add full commercial kitchen •
Add $51,000.00
8) Deduct the fire sprinkler system
Deduct ($34,200.00)
9) Substitute Davis-Bacon wage rate in lieu of wage rate schedule included in Bid
Documents
No Price Change
Total Change Deduct $ 285,100.00 •
Original Contract $ 1,806,545.00
Revised Contract $ 1,521,445.00
Total square footing under roof including Porte Cochere 11,886sf
Original price per sf $ 155.64
Revised price per sf $ 128.00
Sincerely,
4/4ic Off/e,—
Clayton Dykes
DYCOR, INC.
3205 Main
Pearland, Tx. 77581
281-485-1415
281-485-2340 Fax
July 17, 2007
Mr. Tom Parker
Brown Reynolds Watford Architects, Inc.
2700 Earl Rudder Fwy. S. Suite#4000
College Station, Tx. 77845
Re: Knapp Senior Center
Dear Mr. Parker:
As per your request, Dycor is submitting the following for your review:
1) Substitute 26ga R panel (galvalume)roof deck in lieu of standing seam (ALT.1)
Deduct ($49,600.00)
2) Delete contingency
Deduct($50,000.00)
3) Substitute hardi siding with 2'8—3'0 masonry wainscoat in lieu of full masonry
Deduct($135,000.00)
4) Delete Job Site trailer
Deduct($22,000.00)
5) MEP items—substitute Cooper lighting package in lieu of specified fixtures,use
Plenum rated alarm wiring, re-use existing MDP and associated panel where
applicable,re-use lighting contactor, re-use existing conduit &wiring where
acceptable, modify plumbing supply lines where acceptable
Deduct($22,300.00)
6) Modify Porte Cochere—delete all stone work, delete arched ornamental beams
Deduct($23,000.00)
7) Add full commercial kitchen
Add $51,000.00
8) Deduct the fire sprinkler system
Deduct ($34,200.00)
Total Change Deduct $285,100.00
Original Contract $1,806,545.00
Revised Contract $ 1,521,445.00
Total square footing under roof including Porte Cochere 11,886sf
Original price per sf $ 155.64
Revised price per sf $ 128.00
Sincerely,
Clayton Dykes
• Page 2 of 6
Acoustical Ceiling Work) $ 19 . 50 5 . 93
ELEV0031- 001 01/01/2005
Rates Fringes
Elevator Mechanic $ 28 . 40 12 . 115+a
FOOTNOTES : a . —Employer contributes 80 of basic hourly rat
for over 5 years ' service and 60 of basic hourly rate for
months to 5 years ' service as Vacation Pay Credit . Paid
Holidays : New Year ' s Day; Memorial Day; Independence Day;
Labor Day; Thanksgiving Day; Friday after Thanksgiving Day
Christmas Day
PLAS0681- 002 04/01/2005
Rates Fringes
Plasterer
Galveston County $ 20 . 15 3 . 20
PLUM0068-005 04/01/2007
Rates Fringes
Plumbers (Excluding HVAC Pipe) $ 2570 . 00 8 . 69
* PLUM0211-003 05/09/2007
i .
Rates Fringes
Pipefitter including HVAC pipe $ 25 . 47 9 . 66
Pipefitters (HVAC Pipe Only) $ 25 . 47 9 . 66
SFTX0669-001 01/01/2005
Rates Fringes
Sprinkler Fitter, Fire $ 22 . 62 10 . 50
SHEE0054-009 04/01/2007
http://www.wdol.gov/wdol/scafiles/davisbacon/TX55.dvb 7/17/2007
Page of
Rates Fringes
Sheet Metal (including HVAC
Duct, System Installation) $ 23 . 13 8 . 88
SUTX2005-013 04/28/2005
Rates Fringes
Asbestos Abatement Worker
(Ceilings , Floors , & Walls) .$ 14 . 00 0 . 00
Bricklayer $ 18 . 00 0 . 00
Cement Mason $ 12 . 76 0 . 00
Drywall Finisher $ 12 . 21 0 . 92
Drywall Hanger (Including
Metal Stud Install) $ 12 . 49 1 . 38
Electrician (Including
Pulling Wire and Low Voltage
Wiring and Installation of
Fire Alarms , Security
Systems., Telephone and
Computers) $ 17 . 55 2 . 91
Formbuilder/Formsetter $ 11 . 66 0 . 00
Glazier $ 14 . 55 2 . 46
Insulator (Batt and Foam) $ 11 . 00 0 . 00
Ironworker, Reinforcing $ 12 . 02 0 . 00
Ironworker, Structural $ 13 . 75 0 . 00
Laborers :
Common $ 10 . 26 0 . 00
Mason Tender (Brick) $ 10 . 27 0 . 00
Mason Tender (Cement) $ 9 . 88 0 . 00
Pipelayer $ 12 . 00 0 . 00
http://www.wdol.gov/wdol/scafiles/davisbacon/TX55.dvb 7/17/2007
•
Page 4 of 6
Plasterer Tender $ 12 . 90 2 . 51
Lather $ 16 . 90 3 . 61
Painter - Brush, Roller &
Spray $ 11 . 14
0 . 00
Power Equipment Operator :
Asphalt Paver $ 13 . 50 0 . 25
Backhoe $ 12 . 50 0 . 00
Crane $ 19 . 00 0 . 00
Forklift $ 14 . 53 0 . 00
Slab & Wall Saw $ 15 . 54 3 . 83
Roofer $ 11 . 38 0 . 00
Tile Finisher $ 11 . 86 0 . 53
Tile Setter $ 15 . 71 1 . 01
Truck Driver $ 10 . 75 1 . 47
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental . •
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract claus
(29CFR 5 . 5 (a) (1) (ii) ) .
In the listing above, the "SU" designation means that rates
listed under the identifier do not reflect collectively
bargained wage and fringe benefit rates . Other designations
indicate .unions whose rates have been determined to be
prevailing .
WAGE DETERMINATION APPEALS PROCESS
http://www.wdol.gov/wdol/scafiles/davisbacon/TX55.dvb 7/17/2007
•
Page5of6
1 . ) Has there been an initial decision in the matter? This c
be :
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position
a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters , initial contact , including reques
for summaries of surveys , should be with the Wage and Hour
Regional Office for the area in which the survey was conduct
because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initia
contact is not satisfactory, . then the process described in 2
and 3 . ) should be followed.
With regard to any other matter not yet ripe for the formal
process described here, initial contact should be with the
Branch of Construction Wage Determinations . Write to :
Branch. of Construction Wage Determinations
Wage and Hour Division
U. S . Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2 . ) If .the answer to the question in 1 . ) is yes , then an
interested party (those affected by the action) can request
review and reconsideration from the Wage and Hour Administra
(See 29 CFR Part 1 . 8 and 29 CFR Part 7) . Write to :
Wage and Hour Administrator
U. S . Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party' s position and by any information (wage
payment data, project description, area practice material ,
etc . ) that the requestor considers relevant to the issue .
•
http://www.wdol.gov/wdol/scafiles/davisbacon/TX55.dvb 7/17/2007
Page 6 of 6
•
3 . ) If the decision of the Administrator is not favorable, a
interested party may appeal directly to the Administrative
Review. Board (formerly the Wage Appeals Board) . Write to :
Administrative Review. Board
U. S . Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4 . ) All decisions by the Administrative Review Board are fin
END OF GENERAL DECISION
•
http://www.wdol.gov/wdol/scafiles/davisbacon/TN55.dvb 7/17/2007
Exhibit"A"
Prevailing Wage Rate Schedule
• City of Pearland,Texas
Building Construction Crafts
Classification
Hourly Rate
Air Conditioning Mechanic 10.60
Bricklayer 11.15
Carpenter 11.60
Ceiling System Installer 9.50
Cement Finisher 10.50
Drywall Hanger 9.20
Electrician 12.10
Electrical Installer 9.20
Equipment Operators
Heavy 10.55
Light 7.60
Truck Driver 7.40
Mechanic 7.75
Floor Layer
Hard 7.40
Soft 8.70
Glazier 11.40
Insulator 11.60
Iron Workers
Structural 11.00
Reinforcing Bar 9.40
Lather 12.50
Labor General 7.40
Painter 9.35
Plasterer 12.45
Plumber-Pipefitter 12.10
Roofer 7.90
Sheetmetal Worker(Interior) 11.05
Tile&Marble Setters 12.05
NOTE: The above stipulated wages are for Journeyman. All apprentices and helpers will be
paid a minimum of 50% of the Journeyman wages.
Page 55
•
Comparison Chart
Classification Davis Bacon Wage Texas Wage
Carpenter $19.50 $11.60
Plumber- Pipefitter $25.70 $12.10
Sheetmetal Worker(Interior) $23.18 $11.05
Bricklayer $18.00 $11.15
Drywall Finisher $12.21
Drywall Hanger $12.49 $9.20
Elecrician $17.55 $12.10
Formbuilder/Formsetter $11.66
Glazier $14.55 $11.40
Insulator $11.00 $11.60
Iron Worker(Structural) $13.75 $11.00
Iron Worker(Reinforcing Bar) $12.02 $9.40
(Common) Labor General $10.26 $7.40
Mason Tender(Brick) $10.27
Mason Tender(Cement) $9.88
Pipelayer $12.00 •
Plasterer Tenderer $12.90 $12.45
Painter $11.14 $9.35
Power Equipment(Heavy) $19.00 $10.55
Power Equipment(Light) $12.50 $7.60
Asphalt Paver $13.50
Backhoe $12.50
Crane $19.00
Forklift $14.53
Slab and Wall Saw $15.54
Roofer $11.38 $7.90
Tile (and Marble)Settler $15.71 $12.05
Tile(and Marble) Finisher $1.1.86
Truck Driver $10.75 $7.40
. HVAC Mechanic $23.13 $10.60
Ceiling System Installer $19.50 $9.50
Cement Finisher $10.50
Electrical Installer $17.55 $9.20
Floor Layer(Hard) $17.50 $7.40
Floor Layer(Soft) $8.70
Lather $12.50
note:the wages above are based on an hourly rate.
note:the above stipulated wages(for the texas wages)are for journeymen.All apprentices and helpers will be paid a minimum of
$l ik KID
Knapp Senior Center Renovation
Deductive Change Order
July 23, 2007
Knapp Senior Center Renovation
• Scope of Work
1. Renovate Existing 6,000 SF Building
2. 4,500 SF Building Addition
3. Porte Cochere&25,000 SF Parking Lot(46
Spaces) .
4. 11,886 SF under new roof with Porte Cochere
5. New HVAC for entire building
1
I`
';D Knapp Senior Center Renovation
• Building Program
Upgraded Kitchen Quilting Room
Games/Card Room Living Room
Exercise Room Exercise Equip. Room
ADA Restrooms Crafts &Painting Room
Storage Computer Room
2 Offices Reception Area
Lobby Activity Room
vittnuKnapp Senior Center Renovation
Original Bid:
Item Bid -
Base Bid Construction $1,800,000
Base Bid Contingency $50,000
Total Base Bid $1,850,000
Alt 1 - Composition Roof $(49,600)
Alt 2 — Commercial Kitchen • . $51,000
Alt 3 — Emergency Phone $400
Alt 4 — Vinyl Fence • $700
Alt 5 — Synthetic Masonry $3,200
Alt 6 — Delete Landscaping $(44,555)
2
hj:ZIti. Knapp Senior Center Renovation
As Awarded:
Item Bid
_ Base Bid Construction $1,800,000
Base Bid Contingency $50,000
• Total Base Bid $1,850,000
Alt 3 Emergency Phone $400
Alt 4— Vinyl Fence $700
Alt 6 - Delete Landscaping - $(44,555)
Total°Awarded Contract $1,806,545
1 Knapp Senior Center Renovation
Deductive Change Order:
Item Amount
Sub Galv. Al R-Panel Roof $(49,600)
Hardi-siding w/ 3' masonry $(135,000)
Misc. MEP revisions/metal studs $(22,300)
Modified Porte Cochere $(23,000)
Delete Job Site Trailer $(22,000)
Delete Base Bid Contingency $(50,000)
Delete Fire Sprinkler System $(34,200)
Add Commercial Kitchen, $51,000
- Change Order Total ; • $(285,100) .
•
3
d
E,ILEmaygKna Senior.Center'Renovation
PP
• Original Brick Facade . V
s, wr S ir* �.s ▪•
-
x �
1
"t!v �▪ ,- ,e� z -
ssr"` e`,, x .fit''"`° .. r-m^.z;:• .u.,r•,,.t�....r,r zs _. _
°s .4„ r 'f S+'" ' �.to- L«e'ac,1y k ;t
t 3 Y '1 "" sin _
l // aA
'F'r gp
a 1 Affi
�'
T •
•
Knapp Senior Center Renovation
Revised Façade with 3' Brick
Wainscots and Hardi-Siding
z x r r 'ems s
•
'4 F
kb, 6i .
•
r:kAPE
tA, -- .: -
.yuw ..
8 3
4
•
•
•
•
•
•
•
•
L'i
. € Knapp Senior Center Renovation
••
Revised Façade w•
ith 3' Brick
•
. Wainscots 'and :Nardi-Siding
•
-, '41- s 3 �? ' fir- t1T. C-W
d ps max 4. `5'C` t' k. % 41- `a i s4 S'^' •
•
3 'f PPm ':,L d
�� 1 : �^ gyp' .e�'pn�.
_.., ,.e.. T..b.'yt^x;° k+ `.at:"�' ... C7f7'f 'C.`'."t,.9 - -
l
,,� $y� r e1 .
ri A.,r � —� YY
„ , .
•
•
•
Knapp Senior Center Renovation
•
•
•
Revised Façade with 3' Brick ,
Wainscots -and Hardi-Siding
•
d. 3 , r- .;. 3 ti y - 1 fi` k d''I
°�,� r ,� r - � :v, �'a fit ,� F y� F ;q 'A Ih� {
•
x•'
1
•
5
Knapp Senior Center Renovation
Revised Contract Amount:
Original Contract $1,806,545
Change Order #1 - $(285,100)
New Contract Amount $1,521,445
• Original Cost per SF: $152 (includes parking lot cost)
• Revised Cost per SF: $128 (includes parking lot cost)
• Actual Building Cost after removing estimated $140K for parking
results in:
• $140/SF Original Cost
• $116/SF,Revised Cost
6
BRW
BROWN-REYNOLDS.WATFORD --- ARCHITECTS, INC.
2700 Earl Rudder Freeway South
SUITE 4000
COLLEGE STATION,TX 77845
979-694-1791
FAX 979-694-8293
W W W.BRWARCH.COM
07-18-07
To: Andrea DeKam Brinkley
Project Manager
Projects Department
City of Pearland
From: Thomas W. Parker, AIA
Ref: Knapp Senior Center
After evaluation of the proposed Change Order No. 1 we have determined that the amount
for the deductions is fair and equitable for the City. Based upon the evaluation BRW has
issued a Change Order to reflect the changes in the scope of work and the contract price.