R2002-0172 11-11-02RESOLUTION NO. R2002-172 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AUTHORIZING THE CITY MANAGER OR HIS DESIGNEE TO ENTER INTO A CONTRACT WITH S & B ENGINEERING COMPANY FOR ENGINEERING SERVICES ASSOCIATED WITH THE McHARD ROAD SANITARY SEWER PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain contract by and between the City of Pearland and S & B Engineering Company, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a contract with S & B Engineering Company, for engineering services associated with the McHard Road Sanitary Sewer Project. PASSED, APPROVED and ADOPTED this the :ti. th dayof #ovember TOM REID MAYOR A.D., 2002. ATTEST: Y,~JlJNG L/~R~G/-/7] "' ~,/ ~..}/Y SE~tETARY 6/ APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY Exhibit "A" R2002-'172 CITY OF PEARLAND STANDARD AGREEMENT FOR ENGINEERING SERVICES This Contract (Contract) is made between the City of Pearland, Texas (hereinafter "City"), and S&B Infrastructure, LTD. (hereinafter "Engineer") as follows: 1. Summary of Contract Terms. The following information and referenced dOcuments shall be a part of this Contract: Description of Project: Provide professional Engineering services for McHard Rd. Sanitary Sewer Project. Engineer/Subconsultant(s) Fee Basis of Compensation S&B Infrastructure, LTD. $154,853.00 Lump Sum Maximum Contract Amount $154,853.00 Lump Sum * All financial obligations created by this agreement are between the City and Engineer, and shall not be construed to be between City and any subconsultant. Delivery of plans, specifications and estimates: Sixty (60) days from completion of Illumination Design. Attachments: Scope of Services - Exhibit 2. Services and Payment. Engineer shall perform services within the Standard of Care of the Engineering profession as follows: A. Engineer will furnish services to the City in accordance with the terms and conditions specified in this Contract. Payment for the services of Engineer shall be due and "payable upon submission and approval of a statement for servic,e~ to. City. Statements for services shall not be submitted more frequently than monthlY. After consultation with the City, the Engineer shall specify the baSis of compensation in the scope of work for the project. The Engineer shall provide adequate deta, i[ of the basis of compensation so that the City can determine the reasonableneSs ',of t, be fees and have the ability to make reasonable progress payments to the Engineer ,:~..,d. upon work completed at the payment intervals. The Engineer shall subcontract fOr"'~i[,subconsultants, subject to City approval, necessary to complete the scope of 'wo~i'i. The subconsultant's fees and administrative mark-up, if any, shall be included in the scope of work. Unless otherwise agreed upon, the method of compensation shall be one of the following methods: 1. Salary Cost Times Multiplier Plus Direct Nonsalary Expense ("Salary") Compensation shall be based on 1) the direct salaries (including benefits) of the Engineer's employees whose time is directly chargeable to the project; 2) an agreed upon multiplier, to compensate the Engineer for overhead and profit; and 3) reimbursement for direct nonsalary expenditures and subconsultant contracts as defined in the scope of work for the project. The Engineer shall provide a proposal that includes the total fees for the project, which shall not be exceeded without prior City approval. 2. Per Diem ("Per Diem") Compensation shall be based upon 1) an agreed upon lump sum per day for specific services; and 2) reimbursement for direct nonsalary expenditures and subconsultant contracts as defined in the scope of work for the project. This method is best suited to expert witness work or other short-term engagements involving intermittent services. 3. Cost Plus Fixed Fee ("Cost Plus") Compensation shall be based upon 1) reimbursement of the actual costs of all services and supplies related to the project and 2) an agreed upon fixed fee (profit). The Engineer shall provide an estimate of the costs to be reimbursed, but actual compensation shall be based upon invoices and supporting documentation provided by the Engineer. 4. Lump Sum ("Lump") Compensation shall be based upon an agreed lump sum payment for completing the entire scope of work. This method is best suited to investigations or studies and for basic services with limited scope and complexity. 5. Percent of Construction ("Percent") Compensation shall be based upon 1) the "Harris County Curve for Engineering Compensation" for basic and construction phase services; and 2) reimbursement for direct nonsalary expenditures and subconsultant contracts as defined in the scope of work for the project. The Engineer shall provide a proposal that includes the estimated construction cost of the project and the total fees for the project. If the actual Iow bid for construction is 20% above or below the estimate, the engineering fees are subject to equitable adjustment by mutual agreement of the Engineer and City. If City fails to make any payment due Engineer for services and expenses within thirty (30) days after receipt and approval of Engineer's statement for services therefore, the amounts due Engineer will be increased at the rate of one percent (1%) per month from said thirtieth (30th) day, and, in addition, Engineer may, after giving seven (7) days' written notice to City, suspend services under this Contract until Engineer has been paid in full, all amounts due for services, expenses, and charges. B. All the Engineer's working drawings, plans, and specifications, if required under this Contract, shall be sufficiently accurate, detailed, and complete so that competitive bids for the work can be obtained and the improvements constructed. C. Approval of the Engineer's work by the City shall not release the Engineer, its employees, agents, or consultants, from the responsibility and liability for the accuracy and competency of their designs, working drawings, and specifications, or other documents and services. D. Subject to Article 8 herein or as otherwise agreed, the Engineer shall promptly correct errors in the Engineer's work, including errors discovered after final payment, without receiving additional compensation. E. Prior to execution of this agreement, the Engineer shall have prepared a project schedule identified as an attachment to this agreement. The Project Schedule shall be submitted in digital and paper form, in the Microsoft Project for Windows format. The Project Schedule shall contain a complete schedUle so that the Engineer's scope of services under this contract can be accomplished within the specified time and contract cost. The Project Schedule will provide specific work sequence and definite review times by the City and the Engineer of the work performed. If the review time should take longer than shown on the. project schedule, through no fault of 'the Engineer, additional contract time may be authorized by the City through a supplemental agreement, if requested by a timely written request from the Engineer and approved by the City. 3. Term and Termination. This Contract term will begin upon execution and end sixty days after issuance of the certification of completion of construction by the Engineer. The City may terminate this Contract at any time during its term by giving written notice to Engineer. The City shall pay the Engineer for all services rendered to the date of termination. 4. Modifications. City without invalidating the Contract, may order changes within the general scope of the work required by the Contract by altering, adding to and/or deducting from the work to be performed. If any change under this clause causes an increase or decrease in Engineer's cost of, or the time required for, the performance of any part Of the Services under the Contract, an equitable adjustment will be made by mutual agreement and the Contract modified in writing accordingly. 5. Subcontracts. If, for any reason, at any time during the progress of providing services, City determines that any subcontractor for' Engineer is incompetent or undesirable, City will notify Engineer accordingly and Engineer shall take immediate corrective action, which may include cancellation of such subcontract. Subletting by subcontractors shall be subject to the same regulations. Nothing contained in the Contract shall create any contractual relation between any subcontractor and City. 6. Ownership of Documents. All drawings, report data, and other project information developed in the execution of the services provided under this Contract shall be the property of the City upon payment of Engineer's fees for services. Engineer may retain copies for record purposes. Owner agrees such documents are not intended or represented to be suitable for reuse by City or others. Any reuse by City or by those who obtained said documents from City without written verification or adaptation by Engineer will be at City's sole risk and without liability or legal exposure to Engineer, or to Engineer's independent associates or consultants, and City shall indemnify and hold harmless Engineer and Engineer's independent associates and consultants from all claims, damages, losses, and expenses including attorneys' fees arising out of or resulting therefrom. Any such verification or adaptation will entitle Engineer to further reasonable compensation. Engineer may reuse all drawings, report data, and other project information in the execution of the services provided under this Contract in Engineer's other activities. Any reuse by Engineer will be at Engineer's sole risk and without liability or legal exposure to City, and Engineer shall indemnify and hold harmless City from all claims, damages, losses, and expenses including attorneys' fees · arising out of or resulting therefrom. 7. Insurance. A. The Engineer shall procure and maintain for the duration of this Agreement, insurance against claims for injuries to persons, damages to property, or any errors and omissions relating to the performance of any work by the Engineer, its agents, employees or subcontractors under this Agreement, as follows: (1) Workers' Compensation as required by law. (2) Professional Liability Insurance in an amount not less than $1,000,000 in the aggregate. (3) Comprehensive General Liability and Property Damage Insurance with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for each occurrence of damage to or destruction of property. 4 (4) Comprehensive Automobile and Truck Liability Insurance covering owned, hired, and non-owned vehicles, with minimum limits of $1,000,000 for injury or death of any one. person, $1,000,000 for each occurrence, and $1,000,000 for property damage. B. The Engineer shall include the City as an additional insured under the policies, with the exception of the Professional Liability Insurance and Workers' Compensation. Certificates of Insurance and endorsements shall be furnished to the City before work commences. Each insurance policy shall be endorsed to state that coverage shall not be suspended, voided, canceled, reduced in coverage or in limits except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. Upon request, certified copies of all insurance policies shall be furnished to the City. 8. Indemnity. Engineer shall indemnify and hold the City, its officers, agents, and employees, harmless from any claim, loss, damage, suit, and liability of every kind for which Engineer is legally liable, including all expenses of litigation, attorney's fees, for injury to or death of any person, for damage to errors in design, any of which are caused by the negligent act or Engineer, his officers, employees, agents, or subcontractors under this court costs, and any property, or omission of the Contract. 9. Assignment. Engineer shall not assign this Contract without the prior written consent of the City. 10. Law Governing and Venue. This Contract shall be governed by the law of the State of Texas and no lawsuit shall be prosecuted on this Contract except in a court of competent jurisdiction located in Brazoria County, Texas. 11. Entire Contract. This Contract represents the entire Contract between the City and the Engineer and supersedes all prior negotiations, representations, or contracts, either written or oral. This Contract may be amended only by written instrument signed by both parties. Purchase orders issued under this Agreement shall contain a statement nullifying additional terms and conditions on the reverse side of the purchase order and referencing this Agreement. 12. Conflicts in Contract Documents. The above provisions shall govern over any conflicting provision contained in any referenced contract document specified above. 13. Dispute Resolution Procedures. The Engineer and City desire an expeditious means to resolve any disputes that may arise between them regarding this Contract. To accomplish this, the parties agree to mediation as follows: If a dispute arises out of or relates to this Contract, or the breach thereof, and if the dispute cannot be settled through negotiation, then the parties agree first to try in good faith, and before bringing any legal action, to settle the dispute by mediation of a third party who will be selected by agreement of the parties. EXECUTED and EFFECTIVE as of the 12th day of November ,2002 CITY OF PEARLAND Printed ~lame: Bi 11 Ei sen Title: City Manager STATE OF TEXAS § COUNTY Of ~/-,,.- "z., ,~,~..- § ~.~ BEFORE ME, the undersigned Notary Public, on this day personally appeared ,'// c-~.~--,,,. , known to me to be the person whose name is subscribed to the foregoing instrument and acknowledged to me that he/she executed the same for the purposes and consideration therein expressed. GIVEN UNDER MY HAND AND ~,//,~ cz.~.r- , A.D., 20 ~,P.. ~ ,.~?, ~, PERLA U. LEHMAN ~ SEAL OF OFFICE THIS /3 DAY NOTARY PUBLIC IN AND FOR THE STATE OF TEXAS § cou. ,o OF STATE OF TEXAS Pdnted Name: ~,--/~.- My Commission Expires: 7 BEFORE ME, the undersigned Notary Public. on this day personally appeared .~,". tT~).,.~/~./..f , known to me to be the person whose name is subscribed to the foregoing instrument and acknowledged to me that he/she executed the same for the purposes and consideration therein expressed. /~.~ GIVEN UNDER MY HAND AND ¢¢~'>1~7~_,4,/ ,A.D.,20 ~,~,~'. ~ "~~ion ~xpires 04.25,0 SEAL OF OFFICE THIS c~,-~'' DAY OF STATE OF TEXAS Pdnted Name: ~/5 ~/'~--- My Commission ~pires: Mr. Joe Wertz City of Pearland 3519 Liberty Drive, 3rd Floor Pearland, Texas 77581 November 1, 2002 S&B Letter No.' S&B Project No.: U-0215.001 U-0215 Re. ~ McHard Road Sanitary Sewer: Hickory Slough to Pearland Parkway Proposal for Engineering Services Dear Mr. Wertz: S&B Infrastructure, Ltd. (S&B) is pleased to present this proposal for providing Professional Engineering Services for the referenced project. S&B proposes to provide "Basic" engineering services as described in the attached scope of services for the cost plus amount of $101,400. S&B further proposes to provide "Additional" engineering and associated services as described in the attached scope of services for the cost plus amount of $53,453. Included with this proposal is the City's standard agreement for engineering services, a narrative scope of services, copies of proposals from subconsultants, a detailed opinion of engineering cost, and a preliminary project schedule. We appreciate the opportunity to present this proposal to the City of Pearland and look forward to finalizing the agreement and beginning work. If you have any questions or need more information, please call me at 713-845-4802. Sincerely, Eddie Kirst, P.E. Deputy Director Municipal Engineering attch. cc: Mr. J.R. Reddish, P.E. - S&B Mr. Keith Neshyba, P.E. - S&B LEK/dcd \\sage3\sbproj_sage3\project\pu0215-Plnd_ McHard\Admin\Letters\001-cop-prop- 10-30-02.doc 3535 Sage Road · Houston, Texas 77056-7011 · (713) 845-5401 · Fax (713) 993-9301 ATTACHMENT "A' SCOPE OF SERVICES Sanitary Sewer along McHard Road from Hickory Slough to Pearland Parkway, Pearland, Brazoria County, Texas GENERAL: The work to be furnished by S&B Infrastructure, Ltd. (Engineer) under this contract shall consist of Engineering services required for preparing construction 151ans, specifications, and estimates (PS&E) for design of a Sanitary Sewer. This utility project is an integral part of the City's master sanitary sewer plan. These services shall be in accordance with City of Pearland (City) design standards and in English units. The Engineer shall furnish all equipment, materials, supplies, and incidentals as needed to perform the services required. The Engineer will perform all work efforts and prepare all deliverables in accordance with the applicable/current requirements of the City's specifications, standards, and manualS. ~Whenever possible, the City's standard drawings, standard specifications or previously approved special provisions and/or special specifications will be used. If a special provision and/or special specification must be developed for this project, it shall be prepared in City format and, to the extent possible, incorporate references to approved City test procedures. The Engineer will provide traffic control in accordance with the Texas MUTCD when performing any field activities associated with development of the PS&E package for this contract. The Engineer will develop and submit a work schedule with milestone activities and/or deliverables identified Microsoft Project for Windows. BASIC SERVICES: Design Phase: The Engineer shall produce PS&E deliverables for the sanitary sewer. The Engineer shall meet with the City engineering and maintenance staff at the beginning of the project to determine the design concepts for the sanitary sewer. The Engineer shall incorporate all applicable data obtained from the geotechnical and survey subconsultants into the PS&E package. The Engineer shall provide standards for sanitary sewer construction and provide details for the repair of appurtenances as a result of construction activities. The Engineer will provide review sets to the City at 30% and 90% complete stages to gather and incorporate comments, and 100%, or "Bid Ready" documents. The Engineer shall assist the City with obtaining any outside construction permits. The Engineer shall coordinate and obtain final signatures and approvals for the final set of construction plans. Page 1 of 4 ATTACHMENT "A' The following is a list of drawings anticipated to be provided under basic services: Cover Page and Index of Drawings (1 Sheet) General Notes (1 Sheet) Sheet Layout / Core Boring Plan I Survey Baseline Monumentation and Control (2 Sheets) Plan and Profile - McHard Road Sanitary Sewer (8 Sheets) Demolition Plan - Alice Road Lift Station (1 Sheet) Plan and Profile - Alice Road Sanitary Sewer (2 Sheets) Standard Details (4 Sheets) SWPPP Plan and Details (5 Sheets) Bid Phase: The 'Engineer shall assist the City with pre-bid preparation and provide the following Bid Phase Services: Provide Provide Provide Updated Cost Estimate on Final Bid Form Mylar Sepias of "As-Bid" Drawings "TIFF" Files of "As-Bid" Drawings Provide Reproducibles of Project Specifications Prepare "Bid Advertisement" & "Notice to Bidders" Conduct Pre-Bid Meeting at City of Pearland Offices Prepare Addenda (if needed) Provide Mylars & "TIFF" Files of Modified Sheets Assist the Owner with Obtaining Bids Review Bids and Submitted Documents Provide "Summary" and "Detailed" Bid Tabulations Provide "Recommendation of Award" Letter Construction Phase: The Engineer shall assist the City with pre-construction preparation and provide the following Construction Phase Services: Conduct Pre-Construction Meeting & Issue Minutes Make Periodic Site Visits (at least bi-weekly) Maintain Communication with City Field Inspector Provide Written Reports of Site Visits Consult & Advise Owner As Needed Prepare, Sign, & Issue Change Orders for Owner's Approval Review Shop Drawings, Lab Reports, & Mill Tests Review Contractor's Pay Estimates Conduct Pre-final Walk Through Inspection Prepare & Issue Final Punchlist Issue Certificate of Substantial Completion Conduct a Final walkthrough inspection Issue a Certificate of Completion Page 2 of 4 A'R'ACHMENT "A' ADDITIONAL SERVICES: The Engineer shall provide additional engineering services as described below in connection with Traffic Control PS&E deliverables, Reimbursable Expenses, and Subconsultant Services and Administration. Engineering: Traffic Control Plans: The Engineer shall develop traffic control plans and standards in accordance with the Texas Manual on Uniform Traffic Control Devices (TxMUTCD) as follows: · Phase Layouts & Notes (1 Sheet) Assist the City with obtaining TxDoT Permits Traffic Control & Detour Plan (1 Sheet) Traffic Control Standard for Lane Closure ('1 Sheet) Barricade Standards (1 Sheet) Reimbursable Expenses: The Engineer shall provide courier services, travel for Engineer's personnel to and from offiCial meetings and the construction site and internal reproductions of plans and specifications. The total amount for all reimbursable expenses shall not exceed $4,089 without prior authorization from the City. Subconsultants: The Engineer shall execute separate Subcontract Agreements with the Subconsultant(s). Subconsultant invoice amounts plus 10% shall be included in the Engineer's invoice the City. The City will not be billed directly by the Subconsultant(s). Geotechnical Services: The Geotechnical Subconsultant, Aviles Engineering Corp. (AEC), shall provide geotechnical information and soil analysis to the Consultant for the design of the sanitary sewer. See Attachment "B" for a copy of AEC's proposal. The Engineer shall manage and coordinate the activities of AEC and assist in determining the boring locations. Surveying Services: The-Surveying Subconsultant, C.L. Davis & Company (CLD), shall provide "verification" topographic field surveying services for the design of the sanitary sewer as instructed by the Engineer. See Attachment "C" for a copy of CLD's proposal. Page 3 of 4 Al-FAC H F,1 E NT "A' The Engineer will manage and coordinate the activities of CLD to limit the amount of surveying to those areas where conflicts appear likely or where a visual site inspection with the surveyor indicates existing conditions deviate significantly from the preliminary plans. The Engineer will process the field surveying data and verify that the survey information meets design requirements. Outside Reproduction ServiceS: The Engineer shall coordinate and provide for reproduction services by an outside enterprise for mylar sepias and "TIFF" files of "As-Bid" & "Record" drawings. Page 4 of 4 OPINION OF ENGINEERING COST FOR McHard Road Sanitary Sewer City of Pearland S&B Project No. u0215 Revised: Nov. 1,2002 I I [ TOTAL I TOTAL 'BASIC SERVICES: Preliminary Phase, Area 100 (LS): Project Scope Development and Coordination Meeting 12 12 12 4 40 $ 4,512 Subtotal Preliminary Phase, Area 100 (LS): ] a2 I 12 I I 12 I I 4 II mo I s 4,m Design Phase, Area 200 (LS): Coordination with TxDOT for Permit Acquisition 1 I 4 10 I 17 $ 1,452 Coordination with KIotzAssociates~ Inc. I 1 1 2 5 $ 507 Cover Page and Index of Drawings (1) 1 2 4 8 1 16 ! $ 1,428 GeneraI Notes (l) 4 8 8 8 1 29 $ 2,973 Sheet Layout / Core Boring Plan / Survey Baseline 6 12 12 16 2 48 $ 4,788 Monumentation and Control (2) Plan & Profile Sheets - McHard Road Sanitary Sewer (8) 20 80 120 260 20 500 $ 44,940 Demolition Plan - Alice Lift Station (1) 2 5 9 18 1 35 $ 3,171 Plan & Profile Sheet - Alice Road Lift Station (2) 3 10 18 36 2 69 $ 6,207 Standard Details(4) 2 4 8 16 2 32 $ 2,856 SWPPP Plan & Details (5) 8 12 24 48 6 98 $ 8,838 Subtotal Design Phase, Area 200 (LS): I 48 ] 135 I I 208 ] 422 I 36 II 849 ] S 77,160 Bid Phase, Area 300 (LS): 4, 8 14 26 4 56 i $ 5,070 Provide Updated Cost Est. on Final Bid Form Provide Mylar Sepias of "As-Bid" Drawings Provide "TIFF" Files of "As-Bid" Drawings Provide Reproducibles of Proiect Specs. Prepare "Bid Advertisement" & "Notice to Bidders" Conduct Pre-Bid Meeting at City of Pearland Offices Prepare Addenda (if needed) Provide Mylars & "TIFF" Files of Modified Sheets Assist the Owner with Obtaining Bids Review Bids and Submitted Documents Provide "Summa~" and "Detailed" Bid Tabulations Provide Recommendation of Award Letter Subtotal Bid Phase, Area 300 (LS): I 4 ] 8 [ [ 14 [ 26 I 4 11 56 I S 5,070 Construction Phase, Area 400 (LS): 12 22 42 74 12 162 $ 14,658 Conduct Pre-Construction Meeting & Issue Minutes Make Periodic Site Visits (Min. Bi-weekly) Maintain Communication with City Field Inspector Provide Written Reports of Site Visits Consult & Advise Owner As Needed Prepare~ Sign~ & Issue C.O.'s for Owner Appv. Review Shop Dwgs, Lab Rpts, & Mill Tests Review Contractors Pay Estimates Conduct Pre-final Walk Through Inspection Prepare Final Punchlist Issue Certificate of Substantial Completion Conduct a Final Walkthrough Inspection Issue a Certificate of Completion Subtotal Construction Phase, Area 400 (LS): I 121 221 I 421 741 1211 16215 14,658 TOTAL BASIC SERVICES: 76 177 276 522 56 1,107 $ 101,400 Originated: 10103/2002 Sage35project, u0215-Plnd_McHard_SS\Cost Estimates~Eng\00 lrr-engr-mp-cost- 11-01-02 Form: 9125102 Page 1 of 2 Pdnted: 1111/2002 OPINION OF ENGINEERING COST FOR McHard Road Sanitary Sewer City of Pearland S&B Project No. u0215 Revised: Nov. 1, 2002 TOTAL [ TOTAL ADDITIONAL SERVICES: Engineering: Traffic Control Plans and Details (11) 6 12 26 44 6 94 $ 8,280 Drawing Revisions Requested by Owner 2 2 2 10 45 61 $ 5,079... Subtotal Engineering: I 8 I 2 I 14 I 36 i 89 I 6 [I 155 [ $ 13,359 Reimbursable Expenses: Courier +/-20 Deliveries ~ $15/ea. $ 300 Mileage/Travel +/-20 Trips ~ 52 mi/trip ~ $0.345/mi $ 359 Internal Reproduction - Bluelines 35 Blue Line Sets of 32 Drawings Per Set $ 1,680 Internal Reproduction - Xerox Copies 35 Xerox Sets of 200 Pages $ 1,750 Subtotal Reimbursable Expenses: ~ I s 4,089 Subconsultants: Aviles Engineering Corp. Geotechnical Testing (Core Boring Every 500 Feet) $ 21,004 C.L. Davis & Co. Verification Topo Survey, Boring Location, & Construction Control Staking $ 10,800 Outside Reproduction (Ridgewa¥'s) - Mylar Sepias Mylar Sepias of"As-Bid" & "Record" Drawings (3-Sets Total) i $ 480 Outside Reproduction (Ridgeway's) - "TIFF" Files "IIFF" Files of"As-Bid" & "Record" Drawings (2-Sets Total) $ 448 Subconsultant Administrative Fee I 10% ~ $ 3,273 $ 36,005 Subtotal Subconsuttants: TOTAL ADDITIONAL SERVICES: 8 I 2 14 ] 36 I 89 I 6 155 $ 53,453 TOTAL COST: 84 [ I~7?~AD' 14[ 312[ 611I 62 H 1,262 $ 154,853 ............. ~ ~ e, rT, axrn ~a~;cw,xv Wll I RI: PROVIDED BY THeE CITY OF PEARLAN'D NOTE - SURVEY INFORMATION ALONG FUTURE MCHARD ROAD FROM SH 35 TO FU Originated: 1010312002 Sage3:~proiecfiu0215-Plnd_McHard_SS\Cost Estirnates~ng\O01rr-engr-mp-cost-11-01'O2 Page 2 of 2 P~nted: 1 Form: 9125102 8=. [] ~CT 30 2002 October 30,...gQ02 $ & B L~.asguc~l'e: LTD 3535 Sage 'Road Houston; Teff~ 77056:?011 C-eoteeltnical'lnvestigatioa: P/0posal/A~eement P~oposi:d tS-loch Sauitary Sewer Met-Iard ,Road - I. Iic. kory Slough to FUtura Pearlan~ Parkway R6u~labout Peir. tand,~ Texas . ABC'Proposal No. G2002-10-09 In response.tq your request f0~ proposal (~), Av~tsE~eri~ Co,or.on (~C) Is p~ to sub~t ~s proposM for a'~c~cal i~c~a~on*fo~ ~e pmpm~ ~y s~er project for ~e C[~ o~ Pcarland, in McHard Road~ ~m.Hickory Slm~gh to thc Fu~r~ Re,laM P~ay R~ndabo~. Thc sa~7 sewer a~gn~nt Lq about 7;5ffi f~ l~gg. T~ m~wam ~ m~m,m}~ d~' of ~ ~ s~z ~ ~11 be 17 ~d 9.M~, rmp'ec~ely. As nord ~ ~c R~, ~e proje~w~ be conmc~ us~ op~mout.with:boring and j~k~.a[ r0adway ~e~0n~; n0 mel~ will. b, roquimd for.~ proj~t~ We as~m~ ~t ~er~ ~ n° e~fing'b~Mge~ or ov,~pa~ses ~i~ .~e pr~sed ~ewer Hne ~~. ~ inmc~e~ ~ ~ RFP ~ 3ho~ o~ ~* project a~m ~aw~ pro~d to m, ~ field e~loraaon coast: of ~[lj~ and s~pling 16 bor~s ~.~ aggr~am dep~ oF297 F~t ~q'fol[~s: ' 1..boring tx> a depth of 14 ft.; ' ' 'I boring, to a depth of 15 ft.; 2 borings to a depth of-16 fl.'; '2 boring~ to a depth.of 17 ft.; 2 bvring~ to a depth of 18'ft. 2..borings.to'a depttt*o~ 19 ft.; .. 2 }~0.rta~$ to a &pth 0f20 ft.; . l .b'aring.to a depth o~ 2.1 ft.; '. · 2 boring' to a. depth'cfi 22 ft.; and '. I b'oring to a.depth of 2~ ft. STg0.Wln dfe'mi:.Houeton .Text..e.77041 .- (?.1 ~!) egr,..7646 .. F:.x. (7'18} i1~.?~43 .,.- ' ,,'-,,-.7~'.: .,'; '..- ::...,.:-* '. ". .... . *. ...... .. '°' ,[' ..".' ' ....~ ..' ..... -'-':T::.' ' ' d::.-;-'. ', ' - '.' '. ' . . . · ' ' · '-'~'.~ ..... ...'.. · : ' '.-.. ' - '7. ",~' . . "' :,.. ., ~ .* .'....'. :. ,?..',?',.:...:~. ,,.;' ,..'. ,,'. .... , ', ,. ,, ......*. .. , .. . .. .. ,' ' ','..',. ., :. "' ', , : ""..' ..... . ,. "-, ~,,, ~'."' _~._~--?'__'=__~ .... L--*--'_:--~_.: ,._..:*-~.,.~...? .~ ,.......~ ...,......... ,.-,.-~..?:,...:: ..:.. ....... . . , ....,,.............(~,...,. un,~ :'.:C.":.'-'":::"!~'.:...~t~.:!':.' .":' ..' ;., .,:.,, ...:,.... ::,.' .'.'..:....:: ....'.::=~ ..::': '.:?'?-:T' ",~T,. ?' . -.v .=. ........ ~a-ger~efit'Pa{~i~'g (~.~U..~:e:d 5:l~ca. tion~1. :'.:..', ', :': ' ..',.:;, ..'.:5' ' :.i '. 'ea;, ',:. ,.'..'~,'.,.... .:-,': "$'3..'5.00:.: : $175,'0.0.. ... ~:. ,.. ' ..:". "'; ..'- !....: ,..... .:,...::...!..;:..,::,.,,;::..:. · . ,. · .. '.: .: ..... .. :..-.... ...... :.:..- :.;':!: . ..;..:.- . ?.,-::,~ . .- , ,. ........ .; '..'; . ..,' , '.5: ..,i ':, -'"". ' ' ':'"'" ........~'" ' :"'::;'"'"?'~""'-""'""";'"":' ................. '"' ' :"' '"' ' ":¥:: ~. s~,~/''"'" "'" :'".:::':'! .... ...."" ..... '.... ':?'."..:.:':.'::.:,.s..,u~e.~.~ !':..'.~'~.'0:'.~'~!:~.~0: · ~; ~o(rECa.'~.~.:~0~.o~¥.' -. :..' ~ ":'.~;' ':'",':.'. '.'"" ~.'"'.'.i'."'.. :.'.' "' '""' ' ,' '.' '.' .' ".'".._i'_',:;::::"_'..i: .!:.,'.'i'.:i,:~:_:':_ % :.~. ',:' :;.' '":":.";.' ........ ,..: :'." . ":.'::~":.'".'., !: "....."-5 ':: i,..,.,"....; , ,, ....,, ..'..... :. :._, '.,. "'.." ...;.. -'.'?.'::'!~:':':'?.~.?:'.~.:':;:'i:¥';~-':.' '..:'". ::'".-,.... ::' i-?":(-..:.': % :". . ,. '.. · ..I .. ~. :,:.....:., ..'~' ;'".i r...,... :.,.,: ': i ... '" .:.:~ '. :.. .' ' ,,., '.,..~:: ', ,'., "'...:-~.;d.--..-~.~_;_,.~.¥..,,:.,..,.' ~_~,.,L~,..--f~:-. =' .............. - .:"- ,'.':.";.:"," ' "'-"':"'. .... ." ."' .":' ':':':'.'.'.' '":.,."' '".:','!".";SU'B:IL~TAL''. :' :'";$.4': .... .;., :....... ::....,...:,,,,..: .: ..,. .. .. : .: , , .. :.--r.~..:/ !...:::. · ~:.: , - ,..~ :..:..,......,::... %:, .::...:,.:..:.;,.....;.. ..... · .... ... :~i,~r:~9 ~,eet.',:.i:..:': ::.:. ?:"...:.:..~ ':. ":'"...':. :' '::'.': ?.::" ...-:. :'::'. ~:':::: i': '!'50~ .':'~:.:.. i:. :. ~..:.'::.:: .?! !..~..?...:...~..,.~.-,. ~ss;. ~0-'~ :.,~ '6~,~,~".'.." ;..'...~ :::::..!...:,,'..:.'..:.: '.::'~':'.;.::. ..... :.:: :..':'.':.: -. '.: 2o '.:..." ~. :.hr~.;.., :.,: "~..',' :- .'./'.:, ~s.oo..: .":. s~6.,'oo i ~,~.-~:~;~t.:::¥.::..;;..'., :...i.:.~"':~; ,:..- .' :."-::.' ..... ..".:.: "::.-. ':.~o..: ', .~_~-,..:..:.. ...,,':;~ .:':: .:....;.'..~2..'o0,., '.':., '."'.~:~-o- ,:~. :y., , ....... . , ,:,..,.,...:...,,.;-,,,,, ~-, ....... ,;~;,;,,, ..'....., SO'd TT£CL~T;. O.L TO£G EGG El;. NISNOD 3 gN=1 83S ;~4 TS:LT E~O, 0£ J. DO C.L. DAVIS & COMPANY LAND SURVEYING 1500 WINDING WAY FRIENDSWOOD, TEXAS 77546 (281) 482-9490 FAX (281) 482~1294 E-MAIL: cldavisc@gte.net November 4, 2002 EXHIBIT "C" Mr. Eddie Kirst, P.E. Department Director Municipal Engineering S&B Infrastructure, Ltd. 7825 Park Place Blvd. Houston, Texas 77087 Re: McHard Road Sanitary Sewer; from Hickory Slough to Pearland Parkway Proposal Number: 2002-135 Dear Mr. Kirst: Our proposal for land surveying services for the above referenced project is as follows: Topographic survey on IqcHard Road from State Highway Number 35 to Hickory Slough (North side only) .......................... 2. Up-date topographic survey on HcHard Road from State Highway Number 35 to Pearland Parkway .................................. $2,500.00 3. Stake control base line at point of beginning, point curvature, point tangency and SOO'stations ............................... 4, Stake core bores .......................................................................... $:l,800.00 Total Amount of Proposal .............................................................. $~0,800.00 The following items will be invoiced at cost: · Reproductions · Submittal fee(s) to governmental agencies . Delivery service · Electronic Mail · Abstracting 2002-135 mchard ss from Hickory Slough to Peadand pkwy.doc Page ! of 2 Mr. Eddie Kirst, P.E. Department Director Munidpal Engineering S&B Infrastructure, Ltd. Page - 2 EXHIBIT "C" Payment of all invoices is due thirty days from receipt. Any changes or revisions in the scope of the project after authorization to proceed will be billed on an hourly basis as described below: · Principal · Registered Professional Land Surveyor (RPLS) · Technical/Cadd · Three-man field crew · Data Collector · Clerical $125.00 $85.OO $75.00 $110.00 $30.00 $45.00 All surveying services are under the jurisdiction of the Texas Board of Land Surveying: 7701 North Lamar, Suite 400; Austin, Texas 78752; phone number: 512-452-9427. Any complaints about surveying services should be sent to the above address to the attention of Complaints Officer of the Board. Thank you for the opportunity to submit this proposal and we look forward to working with you. Sincerely, Approved & Accepted, C.L. Davis, R.P.L.S. Mr. Eddie Kirst, P.E. Department Director Municipal Engineering S&B Infrastructure, Ltd. 2002-135 mchard ss from Hickory Slough to Peadand pkwy. doc Page 2 of 2