Loading...
R2002-0160 10-14-02 RESOLUTION NO. R2002-160 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, APPROVING WORK AUTHORIZATION #6 SUPPLEMENT/t4 FOR ENGINEERING SERVICES ASSOCIATED WITH THE PEARLAND MOBILITY AND DRAINAGE BOND PROGRAM. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain contract by and between the City of Pearland and Turner, Collie and Braden, Inc., ("T C & B) for Program Management of the Pearland Mobility and Drainage Bond Program was authorized by the City Council on December 10, 2001. Section 2. That T C & B has developed work authorization #6 Supplement #4, which is attached hereto as Exhibit "A." Section 3. That work authorization #6 Supplement #4 for engineering services associated with the Pearland Mobility and Drainage Bond Program is hereby approved. PASSED, APPROVED and ADOPTED this the 14 dayof 0¢l:obe~' , A.D., 2002. ATTEST: APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY TOM REID MAYOR ATTACHMENT D WORK AUTHORIZATION NO. 6 SUPPLEMENT NO. 4 Exhibit "A" R2002-'160 This Work Authorization is made pursuant to the terms and conditions of the Pearland Mobility 8,: Drainage Bond Program, hereinafter identified as the "Contract", entered into by and between the City of Pearland ("City"), and Turner Collie & Braden Inc. ("Engineer). PART 1. Work Authorization No. 6 Supplement No. 4 is related to Baily/Oiler Road from SH 288 to SH 35. The Engineer will perform ROW Acquisition services. PART 2. The maximum amount payable for services under this Work Authorization No. 6, Supplement No.4 is $513,000.00. This amount is based on the following attached fee proposals submitted by Cobb Fendley & Associates, dated September 13, 2002 in the / amount of $256,500.00; and Contract Land Staff, Inc. dated September 23, 2002 in the amount of $256,500.00. PART 3. Payment to the Engineer for the services established under this Work Authorization shall be "Reimbursable" on a per parcel basis. PART 4. This Work Authorization shall become effective on October 7, 2002 and shall terminate on November 12, 2005, unless extended by a supplemental work authorization. PART 5. This Work Authorization does not waive the parties' responsibilities and obligations provided under the contract. PART 6. This Work Authorizatiort is hereby accepted and acknowledged below. ENGINEER By: ~f' ~ By: CITY OF PEARLAND Typed or Printed Name Typed or Printed Name Title Date LIST OF EXHIBITS Exhibit A - Fee Schedule Exhibit B - Work Schedule "J Title /5- Date T~Jrn~r Collie Braden Inc. 9/30/2002 EXHIBIT A FEE SCHEDULE Pearland Mobility & Drainage Bond Program Work Authorization No. 6 Supplement No. 4 Summary Project Bailey/Oiler Road Improvements Engineerin.q Services Hydrologic & Hydraulic Environmental Compliance 404Permit Topographic Survey Geotech ROW Maps & Documents PS&E ROW Acquisition Assistance Materials Testing Subtotal Klotz Associates, Inc. Harding ESE C. L. Davis & Company HVJ Associates, Inc Cobb Fendley Contract Land Staff Total to Date Previous Authorization $ 117,500.00 $ 110,012.00 $ $ 308,400.0O $ 131,560.00 $ $ $ $ $ $ 667,472.00 Current Authorization - - - - - - - $ 256,500.00 $ 256,500.00 $ - $ 513,000.00 $ 1,180,472.00 Page I of I September 13, 2002 ,Cobb Mr. Jim Keller, P.E. Turner Collie & Braden Inc. 5757 Woodway Houston, Texas 77057-1599 Re: Bailey/Oiler Road from FM 1128 to SH 288 Dear Mr. Keller: Cobb, Fendley & Associates, Inc. (CFA) is pleased to provide you with this proposal for Right-of-Way acquisition services. The proposed Scope of Services, Basis of Compensation and Schedule of Work are outlined on the following pages. SCOPE OF SERVICES · Secure a copy of the current property ownership deed. · Meet with property owner to negotiate the acquisition. Prepare all documentation necessary for acquisition including correspondence I.etters, contact reports, etc. as required by the City of Pearland. · Meet with propeKy owners to execute instrument. · Prepare Limited Title Certificate for properties with a value less than $25,000.OO. · Record documents in public records and/or attend closings at title company. · Furnish closed file to Turner Collie & Braden. · There is no relocation or appraisal services included in this scope. BASIS OF COMPENSATION The work outlined in the Scope of Services can be provided on an hourly basis at the following rates: Acquisition $75.00 per hour not to exceed $2,700.00 per parcel, for an estimated 95 parcels, without the written approval of the Turner Collie & Braden for exceptions. 5300 Hollister, Suite 400 I Houston, Texas 77040-6138 ]Voice 713.462.3242 ]Fax 713.462.3262 I www.cobfen.com Mr. Jim Keller September 13, 2002 Page 2 · The Bailey/Oiler Road project from FM 1128 to SH 288 consists of an estimated 95 parcels therefore, the not to exceed total will be $256,500.00. Easement fee paid to landowner by CFA on behalf of the City of Pearland is reimbursable at cost. (Fee Schedule to be provided by the City). SCHEDULE OF WORK Cobb, Fendley & Associates, Inc. can begin work upon receiving written authorization to proceed. Nine to Eighteen months will be required to complete the acquisition process. Should unusual circumstances create a delay in the process, Turner Collie & Braden will be notified and provide CFA with specific instructions on a parcel-by-parcel basis. We appreciate the opportunity to provide acquisition services to you and we look forward to being a part of your team. Respectfully yours, COBB, F~N~)LEY & ASSOCIATES, INC. Right of Way Project Manager %CO VTR CT September 23, 2002 Mr. James W. Keller Turner Collie & Braden Inc. (TCB) 5757 Wood~vay Houston, TX 77219 Re: Baily Road Project, City of Pearland Dear Mr. Keller: Attached please find our proposal to perform Right of Way acquisition and related services on the above referenced project. As can be seen from the proposal, we have agreed to a "not to exceed" cost of $2,700.00 per parcel, unless we receive permission from TCB to exceed that amount. It is our understanding that the project consists of 95 parcels making the total "not to exceed" cost $256,500.00. If the terms of this proposal are acceptable to TCB, please sign where indicated below and initial each page of the proposal and return to us. We are prepared to begin work on this project as soon as we receive a notification to proceed from TCB. Thank you for the opportunity to submit this proposal. Very Truly Yours, 'Brent Lef(w~h~ CEO Contract Land Staff, Inc AGREED AND ACCEPTED TURNER, COLLIE & BRADEN (TCB) By: Title: Date: (281) 240-3370 Corporate Office (800) 874-4519 (281) 240-5009 fax Baily Road FM 1128 to Highway 35 Right of Way Acquisition SCOPE OF SERVICES Contract Land Staff, Inc. (CONSULTANT) will perform land acquisition, perform title searches, title curative, relocation assistance (if required), damage settlement and closing for TCB (CLIENT) on behalf of the City of Pearland (CITY) as necessary for the construction of the Yost Blvd. project. These Services will be provided in compliance with the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (The Uniform Act). These services are expected to include, but are not necessarily limited to, the following activities: Phase L Pro[ect Planning and Administration Meet, at the beginning of the project, with the Right-of-Way/Engineering Project Manager of the CLIENT to review land acquisition service requirements for the project. At that meeting, the Project Manager shall provide accurate land descriptions (including parcel plats and field notes), available information about the project; a copy of the CITY's approved resolution determining need, and any other applicable information. The CITY's process and policies for land acquisition services will be discussed along with specific parameters fro: the negotiation with the property owner(s). All of the above information, as well as complete appraisal information, shall be supplied to the CONSULTANT prior to CONSULTANT beginning land acquisition. Any changes to any parcel including but not limited to plan changes, splits of the parcel, re- appraisal, plat changes, survey changes, or other changes beyond the control of CONSULTANT, may result in additional hours being charged to CLIENT. This may result in the total fees charged by CONSULTANT to be in excess of the $2,700.00 per parcel benchmark. Any activities or meetings with CLIENT, CITY, Property owners, Public Meetings, etc., required of CONSULTANT during any phase of this project, shall be billed at the hourly rates attached hereto. CITY of Pearland - Baily Road Page 1 of 6 Phase IL Title Search~ Land Acquisition & Curative · To obtain current ownership and other pertinent title information for a particular parcel on the project, CONSULTANT shall either: Prepare a Limited Title Certificate indicating apparent fee owners and encumbrances to the property that are recorded in the Real Property records of the county in which the subject property is situated. Those encumbrances that may be of record but not recorded within the time scope of the title search will not be identified. CONSULTANT shall also prepare a 25-year chain of title for each property to be acquired by CITY. CONSULTANT shall not provide title insurance, as it is not licensed to do so. Title search shall not begin on a property until such time as CONSULTANT has all final information from the Right-of Way/Engineering Project Manager as described in Phase t above. Time spent in preparing the 25-year title search and the Limited Title Certificate shall be billed at the hourly rates as shown under "CONSULTANT's RATES" attached hereto. Or, In the event that delays in the progess of work are caused by CONSULTANT's inability to ascertain current correct title information, CONSULTANT will notify CLIENT in writing of said delays as soon as is reasonably possible. Upon notification, CONSULTANT and CLIENT will collaborate to determine how to best properly.address delays and proceed accordingly. in the event CITY requests Title Insurance, Open title with a Title Insurance company to obtain a title commitment for a subject parcel. Costs for Title Insurance and other title services, including but not limited to abstract fees, closing services, escrow fees, filing fees, attorney fees, delivery fees, etc., will be borne by CITY. In the event CONSULTANT prepares a 25-year chain of title and Limited Title Certificate, and either during or after the preparation of the 25-year chain and Limited Title Certificate CLIENT or CITY desires to proceed with obtaining Title Insurance through a Title Company, CONSULTANT will bill CLIENT and will be paid for the time spent performing the above tasks at the hourly rates as shown under "CONSULTANT's RATES" attached hereto. CITY of Pearland - Baily Road Page 2 of 6 CONSULTANT will make an initial written offer to the property owner, ~vhich will include the amount of the determination of compensation, a description of the location of the real property to be acquired, the appraisal and receipt for the appraisal, and plats and field notes. After the initial offer, CONSULTANT will continue to contact and negotiate with each owner in an attempt to purchase the subject parcel at the appraised amount or at an amount agreeable to CITY. In the event the offer is accepted by property owner and approved by CITY, CONSULTANT shall close the purchase by either (In the event no Title Insurance is being purchased) Obtaining the signatures of the owner(s) of the subject parcel on an instrument conveying the Right-of Way to the CITY of Pearland and paying the owner(s) by check issued either by CONSULTANT or CITY, Or, (In the event Title Insurance is being purchased) By attending a closing at the Title Company where the Title Insurance is being purchased. Title services, title insurance commitments, policies, closing and escrow services, and updated title commitments will be provided by a Title Company selected by the CITY. Agents will assist the Title Company in obta!ning all documents necessary to transfer clear title to the CITY. In either event, CONSULTANT shall deliver or cause to be delivered fully executed, properly recorded documents to CITY. In the event CONSULTANT determines that acquisition of the property from the property owner will not be possible, CONSULTANT shall notify CLIENT that an agreement cannot be reache, d with the Property Owner. CLIENT will obtain permission from CITY for CONSULTANT to issue a Final Offer Letter to the property owner. The form of the Final Offer Letter shall be approved by the City Attorney of the CITY of Pearland. At the end of the time period for response to the Final Offer Letter, CONSULTANT shall either, Set up closing for the parcel if the property owner agrees to the Final Offer, Or, · Turn the file for the subject parcel over to the CITY for Condemnation. CITY of Pearland - Baily Road Page 3 of 6 CITY assumes as its obligation, the responsibility of responding to CONSULTANT concerning inquiries from property owners in a prompt and timely manner. CONSULTANT shall respond to property owner inquiries in a timely manner. Under the direction of, and after the notification by, the Right-of Way /Engineering Project Manager, CONSULTANT shall notify property owners in a written form prior to construction of the project. This notification shall be sent to the current property owner as determined by an updated title review immediately prior to the time the written notification is sent. · CONSULTANT shall settle damages with property owners after construction, utilizing a settlement form supplied by the CITY. CONSULTANT may, if requested by CLIENT, provide the following additional services to CLIENT at the hourly rates as shown under "CONSULTANT's RATES" attached hereto. Phase IIL Condemnation Support · Assist the CITY's Attorney as requested. Phase III. Utilitl, Relocation · Coordinate Utility Relocation as requested, Phase I/, Additional Consulting Services · Any additional consulting services under this contract shall not be undertaken without attthorization by CLIENT. ALL TIME SPENT ON TASKS DELINEATED WITHIN THIS SCOPE OF SERVICES WILL BE BILLED TO CLIENT AND PAID TO CONSULTANT AT THE HOURLY RATES AS DETAILED UNDER "CONSULTANT FEES". EXPENSES SHALL BE REIMBURSED AS DETAILED UNDER "PROJECT RELATED EXPENSES". CITY of Pearland - Baily Road Page 4 of 6 CONSULTANT FEES CONSULTANT shall be paid at the hourly rates shown below. CLIENT will also reimburse the CONSULTANT for actual, project-related expenses at the rates set forth below. CONSULTANT shall submit monthly invoices for services provided under this scope of services to CLIENT, accompanied by an explanation of charges, professional fees, services, and expenses. CONSULTANT's correct invoices submitted to CLIENT prior to the 5th day of any month will be billed to CITY by CLIENT along with CLIENT's nom~al billing for that month. Terms are DUE UPON RECEIPT~ and CLIENT shall make every effort to pay CONSULTANT within two (2) weeks of the receipt of payment from CITY by CLIENT. In no event shall invoice payment exceed thirty (30) days after the date of receipt of payment of CONSULTANT's invoice by CLIENT. In the event CONSULTANT's invoices are not paid within thirty (30) days of receipt of payment by CITY to CLIENT, a 1.5% finance charge shall be added monthly until the invoice is paid in full. The maximum fee to be paid to CONSULTANT under this scope of services shall be $2,700.00 for any individual parcel. In the event that all services anticipated under this scope of services for a parcel cannot be finalized for that amount, permission to exceed the. $2,700.00 maximum per parcel shall be requested by CONSULTANT of CLIENT and CITY. Permission to exceed that amount shall not be unreasonably denied and in no event shall CONSULTANT be required to continue to provide services beyond the $2,700.00 maximum for any parcel without additional compensation at the hourly fees as set forth below. If permission to proceed past the $2,700.00 benchmark is denied, CONSULTANT shall immediately turn over the subject parcel file to CLIENT and CONSULTANT shall have no further obligation to provide the services listed in the "Scope of SerGces" for the subject parcel. A final invoice for the services provided will be submitted by CONSULTANT to CLIENT and said invoice shall be paid as per the procedures for payment outline herein. CONSULTANT HOURLY FEES TITLE HOURLY FEES Condemnation Support .................................................................................................... $75.00 / hr Project Manager ............................................................................................................... $75.00 / hr Acquisition Specialist ...................................................................................................... $75.00 / hr Relocation Specialist ........................................................................................................ $75.00 / hr Title Coordinator / Reviewer ........................................................................................... $75.00 / hr Senior Right of Way Agent .............................................................................................. $75.00 / hr Senior Title Examiner ...................................................................................................... $75.00 / hr Documents Specialist ....................................................................................................... $75.00 / hr CITY of Pearland - Baily Road Page 5 of 6 PROJECT RELATED EXPENSES AUTOMOBILE EXPENSES Automobile expenses for miles driven on the Project in conjunction with services billed hourly shall be reimbursed to CONSULTANT at the rate of $.365, or applicable IRS allowable rate per mile. Mileage charges shall be the lesser of: distance from CONSULTANT'S office to worksite and return or distance from employee's home to worksite and return to home or office. TRAVEL EXPENSES (If authorized in writing by CLIENT) CLIENT will reimburse CONSULTANT for lodging, meals and incidental expenses (Per Diem Expenses) when CONSULTANT's personnel are required by the CLIENT to be away from their primary residence and overnight stay is required. Per Diem Expenses shall be billable as · follows, at the CONSULTANT's option: a) b) c) Actual cost of lodging (not to exceed $75.00 per night excluding tax) plus $25.00 per day for meals and incidental expenses. Lodging that exceeds $75.00 per night shall require approval in advance by CLIENT. Lodging, meals and incidental expenses at the rate of $95.00 per calendar day. Expenses for out of town or out of state travel to be approved by CLIENT prior to expenses being incurred. MISCELLANEOUS PROJECT RELATED EXPENSES a) b) c) d) e) f) g) h) Notary fees Long distance telephone charges Miscellaneous office supplies Postage Copies, reproduction, duplicating and blueprinting service Recording fees Auto parking, bridge, tunnel and road tolls Other expenses authorized by CLIENT in the performance Services of the Scope of All Project Related expenses will be billed at cost plus ten percent (10%). CITY of Pearland - Baily Road Page 6 of 6 · 1o/7 Turner Collie _ Braden Inc. ENGINEERS.PLANNERS.PROJECT MANAGERS PO Box 130089 Houston, Texas 77219 5757 Woodway 713-780-4100 Fax 713-780-0838 TRANSMITTAL Date: To: Re: Job No.: Transmitted Via: October 21, 2002 Mr. Bill Eisen City Manager City of Pearland 3519 Liberty Drive Pearland, TX 77581 City of Pearland Bailey/Oiler Road Work Authorization No. 6 - Supplement No. 4 052511256.0001.00006.6401/13-11256-006 Courier We are sending you the following: Copies Description 1 Fully executed original Work Authorization No. 6, Supplement No. 4, Attachment D to the above referenced project. Remarks: We have retained one original for our use. Copies To: File Craig L:~t_ e~st~r, P.E. Project Manager CLH/mmc Attachment CITY OF PE,ARLAND MOBILITY & DRAINAGE PROGRAM BAILY ROAD ID 1 0 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 Task Name Bally Road Preliminary Engineering Services Data Collection Field Reconnaissance Authorization -Survey Prep of Contracts Survey ROW Mapping Authorization-Geotech & ESA Prep of Contracts Authorization - Drainage Studies Prep of Contracts Geotech Studies Drainage Studies Phase I ESA Authorization ROW Acqusition Prep of Contracts ROW quisition Preliminary Design Review City of Pearland Final Design E Authorization CC • Prep of Contracts Design 30% Review 30% Design Design 60% Review 60% Design 90% Review 90% Complete Bid Documents Advertize,Bid & Award Advertize Bid Pre Bid Con(rence Receive Bids Recommend Award Award Construction Contract Construction Phase Notice to Proceed Construction Duration 1691 days 625 days 22 days 21 days O days 15 days 84 days 84 days 0 days 22 days O days 15 days 84 days 84 days 84 days 0 days 15 days 365 days 84 days 10 days 414 days O days 21 days 84 days 14 days 84 days 14 days 84 days 14 days 120 days 40 days 0 days o days 0 days 0 days Odaysl 900 days 0 days 900 days Start Mon 2/4/02 Mon 2/4/02 Mon 2/4/02 Fri 2/8/02 Mon 2/11/02 Mon 2/11/02 Tue 4/16/02 Fri 4/26/02 Mon 6/10/02 Tue 6/18/02 Mon 8/5/02 Mon 8/5/02 Wed 7/10/02 Finish Thu 9/21/06 Predecessors Tue 10/21/03 Mon 2/25/02 Thu 2/28/02 3SS Mon 2/11/02 Mon 2/25/02 5 Mon 7/8/02 Thu 7/18/02 Mon 6/10/02 5FS+50 days Tue 7/9/02 9 Mon 8/5/02 Mon 8/19/02 11 Tue 10/1/02 10 Tue 8/20/02 Mon 11/11/02 12 Wed 7/10/02 Mon 10/7/02 Mon 10/7/02 Tue 10/1/02 10 Mon 10/7/02 Mon 10/21/02 16 Tue 10/22/02 Tue 10/21/03 17 Tue 9/10/02 Tue 12/3/02' Mon 12/30/02 Mon 12/30/02 Tue 12/31/021 Tue 12/31/02' Tue 3/25/03Mon 4/7/03 24 Tue 4/8/03 Mon 6/30/03 25 Tue 7/1/03 Mon 7/14/03 26 Tue 7/15/03 Mon 10/6/03 27 Tue 10/7/03 Mon 10/20/03 28 Tue 10/21/03 Tue 2/17/04 Tue 2117/04 Tue 3/9/04 Mon 3/15/04 Mon 3/22/04 Sun 3/28/04 Sun 4/4104 Sun 4/4/04 Mon 12/2/02 7,13FF+21 days,1' Thu 12/12/02 19 Tue 2/17/04 Mon 12/30/02 20FS+18 days Mon 1/20/03 22 Mon 3/24/03 22 Tue 2/17/04 29 Sun 3/26/04 Tue 2/17/04 30 Tue 3/9/04 32FS+21 days Mon 3/15/04 32FS+27 days Mon 3/22/04 34FS+7 days Sun 3/28/04 35FS+6 days Thu 9/21/06 Sun 4/4/04 36FS+7 days Mon 4/5/04 Thu 9/21/06 38 Dec 2002 Jan Feb Mar Apr Oct Nov Apr ®® Aug Sep Oct Nov 2004 Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov 2005 Dec Jan Feb Mar Apr Ma Jul Aug Sep I:5:i 5:_:.- 2003 Dec Jan Feb I:® 12/30 Jul Aug Sep Oct Nov 2006 Dec Jan Apr May Jun Jul Aug S p • Turner Collie & Braden Inc Project: 13-11256 Date: Mon 9/30/02 Task Split Progress Milestone • Summary Rolled Up Task Rolled Up Split Rolled Up Milestone Rolled Up Progress External Tasks Project Summary Page 1