R2007-054 2007-04-09
RESOILUTION NO. R2007 -54
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND,
TEXAS, APPROVING CHANlGE ORDER NO.5 ASSOCIATED WITH THE
WEST MARY'S CREEK DETENTION FACILITY AND SWEC OUTFALL
MODIFICATIONS.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS:
Section 1. That Change Order No. 5 associated with the West Mary's Creek
Detention Facility and SWEC Outfall Modifications, a copy of which is attached hereto as
Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved.
Section 2. That the City Manager or his designee is hereby authorized to execute
and the City Secretary to attest Change Order NO.5 associated with the West Mary's
Creek Detention Facility and SWEC Outfall Modifications.
PASSED, APPROVED and ADOPTED this the gthday of April, A.D., 2007.
~unJf20
TOM REID
MAYOR
ATTEST:
\c~o ~(l.~
SONIA BLAIR
DEPUTY CITY SECRETARY
APPROVED AS TO FORM:
()~ r1L-
DARRI1\J M. COKER
CITY ATTORNEY
R2007 -54
File No. 07-0024
City of Pearl and
Projects Department
CH.ANGE ORDER
For West Mary's Creek Detention Facility
PEARLAND, TEXAS
Date of Issuance: April 9. 2007
Contractor: M. Hanna Construction
Change Order No:
CoP Project No:
5
071012
Engineer:
Dannenbaum Engineering Corp.
Explanation:
This change order encompasses the following:
1. Contract Price Reconciliation
2. Interim Quantity Adjustment
3. OH&P and Re-stocking Fee due to SWEC Deletion
4. Wet Well Modification to includ,e the addition of a 24" RCP Influent Line
5. Modifications to outfall at weir
Please attach back-up documentation
Contract Amount:
Original Contract Price:
Previous Change Order(s):
Contract price prior to this change order:
Net increase (decrease) from this change order:
$8.777.176.32
$ 536.441.31
$9.313.617.63
$ 236.392.78
Contract price with all change orders to date
(including this change order):
$ 9.550.010.40
Contract Time:
Authorized contract time change:
-30 days
:CZ:~
./ Engineer - ~
Date: '1/;2-/0 7
ACCEPTED:
By:/~$'L ( - ;:h.
D~te: OO?~7
APPROVED:
r Orl I If} f'nQJLt~JLj
Finance Dept.
APPROVED:
By: t&JJf--
Owncr
By:
Date: )J . II ill
Date: 4 ~(1 ~ Of
--
~
Change Order #1 and #2 Calculation Correction
BID
ITEM
DESCRIPTION
1 MOBILIZATION
2 PROJECT IDENTIFICATION SIGN
3 TRAFFIC CONTROL PLAN
4 CLEARING & GRUBBING
5 REMOVE & DISPOSE OF EXISTING PIPES (ALL
6 WEST DETENTION POND EXCAVATION
7 EAST DETENTION POND EXCAVATION
8 CHANNEL EXCAVATION
9 EXCAVATION PLACE & COMPACT BRINE SOIL
10 WEST DETENTION POND EMBANKMENT, COM
11 EAST DETENTION POND EMBANKMENT, COM
12 STRIP TOPSOIL, STOCKPILE SPREAD & GRAD
13 HAUL & DISPOSE OF SURPLUS EXCAVATED M
14 LOAD EXCAVATED MATERIALS INTO 3RD PAR
15 HAUL & DISPOSE OF SURPLUS EXCAVATED M
16 BACK SLOPE SWALE
17 MODIFIED TYPE "B" BERM INLET
18 24" ACMP OUTFALL
19 18" RCP STORM SEWER
20 24" RCP STORM SEWER
21 36" RCP STORM SEWER
22 54" RCP STORM SEWER
23 60" RCP STORM SEWER
24 66" RCP STORM SEWER
25 72" RCP STORM SEWER
26 5' x 5' RCB STORM SEWER
27 7' x 3' RCB STORM SEWER
28 8' x 8' RCB STORM SEWER
29 5' x 2' CAST -IN -PLACE BOX STORM SEWER
30 TYPE "C" MANHOLE FOR 48" & LARGER STOR
31 JUNCTION BOX @ DIVERSION WEIR
32 JUNCTION BOX @ PUMP STATION
33 TYPE 'E" INLET
34 18' RCP - 6 1 SET
35 54' RCP - 6 1 SET
36 60' RCP - 6.1 SET
37 66' RCP - 6:1 SET
38 72' RCP - 6:1 SET
39 5'x5'RCB-6:1 SET
40 7'x3'RCB -6:1 SET
41 7' x 3' HEADWALL
42 8'x8'SET 6:1
43A WEST MARYS WEIR STRUCTURE COMPLETE
44 48' DUCK BILL CHECK VALVE FLANGED MOUN
45 4 1/2" CONCRETE CELLULAR MATTRESS
46 18" RIP RAP GRADATION NO. 1
47 4" CRUSHED CONCRETE
48 CONCRETE BLOCK REMOVAL
49 5' CONCRETE SLOPE PAVING
50 PUMP STATION - STRUCTURAL
51 PUMP STATION - PUMPS
52 PUMP STATION - PIPING
53 PUMP STATION - ELECTRICAL
54 36' DIP FORCE MAIN
1
F
QUANTITY
UNIT
1 LS
1 EA
1 LS
90 AC
40 LF
900000 CY
246000 CY
29000 CY
266000 CY
370 CY
7100 CY
160000 SY
175000 CY
100000 CY
900000 CY
12400 LF
15 EA
800 LF
55 LF
300 LF
20 LF
135 LF
180 LF
1640 LF
730 LF
450 LF
55 LF
220 LF
20 LF
8 EA
1 EA
1 EA
1 EA
2 EA
1 EA
2 EA
1 EA
4 EA
2 EA
1 EA
1 EA
1 EA
1 LS
1 EA
4325 SY
269 SY
210 SY
90 SY
280 SY
1 LS
3 EA
1 LS
1 LS
95 LF
Original
UNIT
PRICE
$311,373.50
$550.00
$32,703.00
$2,672.70
$16.50
$0.90
$0.90
$0.90
$1.70
$1.60
$1.60
$0.90
$3.40
$1.10
$3.40
$3.70
$1,580.30
$47.90
$46.20
$63.40
$98.10
$162.40
$179.70
$203.40
$245.10
$244.70
$320.10
$494.90
$794.20
$3,936.50
$66,000.00
$36,300.00
$1,991.70
$710.30
$3,451.10
$4,061.10
$4,729.70
$5,745.10
$5,674.20
$10,622.20
$5,060.00
$13,952.10
$121,000.00
$49,500.00
$38.20
$33.10
$10.90
$4.80
$42.10
$262,471.00
$48,950.00
$154,000.00
$112,200.00
$220.00
TOTAL
$311,373.50
$550.00
$32,703.00
$240,543.00
$660.00
$810,000.00
$221,400.00
$26,100.00
$452,200 00
$592.00
$11,360.00
$144,000.00
$595,000.00
$110,000.00
$3,060,000.00
$45,880.00
$23,704.50
$38,320.00
$2,541.00
$19,020.00
$1,962.00
$21,924.00
$32,346.00
$333,576.00
$178,923.00
$110,115.00
$17,605.50
$108,878.00
$15,884.00
$31,492.00
$66,000.00
$36,300.00
$1,991.70
$1,420.60
$3,451.10
$8,122.20
$4,729.70
$22,980.40
$11,348.40
$10,622.20
$5,060.00
$13,952.10
$121,000.00
$49,500.00
$165,215.00
$8,903.90
$2,289 00
$432.00
$11,788.00
$262,471.00
$146,850.00
$154,000.00
$112,200 00
$20,900.00
CO #1
BID
PRICE
$321,002.00
$550.00
$32,703.00
$2,698.38
$17.52
$1.03
$0.93
$0.92
$1.86
$1.76
$1.67
$1.00
$3.47
$1.10
BID
TOTAL
$321,002.00
$550.00
$32,703.00
$242,854.20
$700.80
$927,000.00
$228,780.00
$26,680.00
$494,760.00
$651 20
$11,857.00
$160,000.00
$607,250 00
$110,000.00
$3.49 $3,141,000.00
$4.37
$1,660.64
$49.90
$51.73
$71.06
$111.35
$183.23
$205.33
$232.87
$278.50
$307.17
$402.67
$614.77
$847.47
$4,016.12
$68,124.55
$38,870.68
$2,071.32
$750.11
$3,689.96
$4,339.77
$5,048.18
$6,143.20
$5,992.68
$11,020.30
$5,060.00
$14,429.82
$128,289 02
$49,500.00
$40.18
$34.59
$11.77
$5.30
$42.10
$265,851.45
$54,438.15
$166,835.92
$125,349.75
$229.09
$54,188.00
$24,909.60
$39,920.00
$2,845.15
$21,318.00
$2,227.00
$24,736.05
$36,959.40
$381,906.80
$203,305.00
$138,226.50
$22,146.85
$135,249.40
$16,949.40
$32,128.96
$68,124.55
$38,870.68
$2,071.32
$1,500.22
$3,689.96
$8,679.54
$5,048.18
$24,572.80
$11,985.36
$11,020.30
$5,060.00
$14,429.82
$128,289.02
$49,500.00
$173,778.50
$9,304.71
$2,471.70
$477.00
$11, 788.00
$265,851.45
$163,314.45
$166,835.92
$125,349.75
$21,763.55
ITEM TOTAL
FOR CO #1
$9,628.50
$2,311.12
$40.82
$118,393 24
$7,432 24
$599.83
$42,429.42
$59.02
$511.36
$15,284.16
$12,712.11
$81,502.73
$8,296.38
$1,205 15
$1,603.25
$304.07
$2,297.95
$265.02
$2,812.65
$4,613.12
$48,327.88
$24,380.30
$28,113.70
$4,541.10
$26,371.84
$1,065.37
$636.96
$2,124.55
$2,570.68
$79.62
$79.62
$238.86
$557.34
$318.48
$1,592.40
$636.96
$398.10
$477.72
$7,289 02
$8,555.69
$401.60
$182.79
$44.79
$3,380.45
$16,464.46
$12,835.92
$13,149.75
$863.69
BID
PRICE
CO #2
BID
TOTAL
BID
PRICE
CO #3
BID
TOTAL
BID
PRICE
CO #4
BID
TOTAL
BID
PRICE
CO #5
BID
TOTAL
Change Order #1 and #2 Calculation Correction
55 8" CONCRETE PAVEMENT, INCLUDING LIME 0
56 20' GRAVEL ACCESS ROAD
57 6' CHAIN LINK FENCE
58 16' DOUBLE SWING GATE
59 BARBED WIRE FENCE
60 TRENCH SAFETY SYSTEM
61 POND BOTTOM GRADING
62 HYDROMULCH SEEDING
63 FILTER FABRIC FENCE
64 DEMOLITION OF EXISTING SWEC WEIR
65A SWEC WEIR STRUCTURE COMPLETE (FIBERG
66 ROCK FILTER DAM
67 STABILIZED CONSTRUCTION ENTRANCE
68 SAND PIKERUSH
69 CREEPING PIKERUSH
70 HALBRED-LEAF ROSEMALLOW
71 SPYDER-LILY
72 CARDINAL FLOWER
73 MARSH SEEDBOX
74 MAIDEN -CANE
75 FOUR -SQUARE SPIKERUSH
76 YELLOW FLAG IRIS/SOUTHERN BLUE
77 SOFT RUSH
78 PICKERELWEED
79 ARROWHEAD
80 THREE -SQUARE (OLNEY'S) BULRUSH
81 THALIA
82 GIANT BULRUSH
83 AMERICAN BULRUSH
84 SOFTSTEM BULRUSH
85 FANWORT
86 COONTAIL
87 DUCKWEED
88 AMERICAN WATERLOTUS
89 SPATTERDOCK
90 WATERLILY
91 COMMON BUTTONBUSH
92 WATER HICKORY
93 WINTERBERRY
94 LAURAL OAK
95 OVERCUP OAK
96 SWAMP CHESNUT OAK
97 WATER OAK
98 NUTFALL OAK
99 WILLOW OAK
100 BALD CYPRESS
101 AMERICAN BEAUTYBERRY
102 ROUGHLEAF DOGWOOD
103 WAX MYRTLE
105 ROSEMALLOW
106 BLUE FLAG IRIS
107 ZONE A SEEDING
108 ZONE B SEEDING
109 SEED MIX 2861
110 SEED MIX 1807
ADJUSTMENT FOR CO#1
111 FURNISH AND INSTALL PLASTIC BARRICADE
112 MAINTAIN AND REMOVE PLASTIC BARRICADE
525
1700
280
1
2800
3900
22.42
65
16111
1
1
160
1
415
415
500
500
400
800
1000
415
1000
1350
4300
4300
1000
1000
1000
1000
5055
28
28
28
336
336
336
168
31
75
30
57
14
14
38
12
151
108
108
108
96
3130
11.15
4.73
0.39
0.39
3357
1
SY
SY
LF
EA
LF
LF
AC
AC
LF
LS
LS
LF
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
AC
AC
AC
AC
LF
LS
$47.50
$13.20
$14.10
$704.00
$2.80
$1.70
$794.50
$880.00
$1.50
$27,500.00
$143,000.00
$14.50
$1,730.10
$3.80
$3.80
$10.60
$3.00
$10.60
$3.00
$2.10
$2.10
$2.10
$2.10
$2.10
$2.10
$2.30
$2.30
$2.30
$2.10
$2.30
$5.10
$5.10
$5.10
$4.90
$3.80
$3.30
$38.20
$162.80
$38.20
$162.80
$162.80
$162.80
$162.80
$162.80
$162.80
$148.60
$38.20
$38.20
$32.60
$38.20
$2.10
$2,668.40
$2,668.40
$1 ,698.40
$1,132 20
$24,937.50
$22,440.00
$3,948.00
$704.00
$7,840.00
$6,630.00
$17,812.69
$57,200 00
$24,166.50
$27,500.00
$143,000.00
$2,320.00
$1,730.10
$1 ,577.00
$1 ,577.00
$5,300.00
$1 ,500.00
$4,240 00
$2,400.00
$2,100.00
$871.50
$2,100.00
$2,835.00
$9,030.00
$9,030.00
$2,300.00
$2,300.00
$2,300.00
$2,100.00
$11,626.50
$142.80
$142.80
$142.80
$1,646.40
$1 ,276.80
$1,108.80
$6,417.60
$5,046.80
$2,865.00
$4,884.00
$9,279 60
$2,279 20
$2,279 20
$6,186.40
$1 ,953.60
$22,438.60
$4,125.60
$4,125.60
$3,520.80
$3,667.20
$6,573.00
$29,752.66
$12,621.53
$662.38
$441.56
$52.53
$13.64
$14.10
$704.00
$2.80
$1.70
$963.62
$880.00
$1.52
$27,500.00
$143,000.00
$14.50
$1 ,789.80
$4.01
$4.01
$11.17
$3.16
$11.17
$3.16
$2.21
$2.21
$2.21
$2.21
$2.21
$2.21
$2.42
$2.42
$2.42
$2.21
$2.42
$5.38
$5.38
$5.38
$5.17
$4.01
$3.48
$40.27
$171.63
$40.27
$171.63
$171.63
$171.63
$171.63
$171.63
$171.63
$156.66
$40.27
$40.27
$34.37
$40.27
$2.21
$2,813.12
$2,813.12
$1,851.92
$1,132.20
$27,578.25
$23,188.00
$3,948.00
$704.00
$7,840.00
$6,630.00
$21,604.36
$57,200.00
$24,488.72
$27,500.00
$143,000.00
$2,320.00
$1,789.80
$1,664.15
$1,664.15
$5,585.00
$1 ,580.00
$4,468.00
$2,528.00
$2,210.00
$917.15
$2,210.00
$2,983.50
$9,503.00
$9,503.00
$2,420.00
$2,420.00
$2,420.00
$2,210.00
$12,233.10
$150.64
$150.64
$150.64
$1,737.12
$1 ,347.36
$1,169.28
$6,765.36
$5,320.53
$3,020.25
$5,148.90
$9,782.91
$2,402.82
$2,402.82
$6,521.94
$2,059.56
$23,655.66
$4,349.16
$4,349.16
$3,711.96
$3,865.92
$6,917.30
$31 ,366 29
$13,306.06
$722.25
$441.56
$2,638.96
$739.85
$3,791.68
$386.14
$59.70
$85.53
$85.53
$287.44
$81.35
$229.95
$130.16
$113.89
$47 26
$113.89
$153.75
$489.73
$489.73
$124.74
$124.74
$124.74
$113.89
$630.55
$7.74
$7.74
$7.74
$89.29
$69.25
$60.13
$348.05
$273 71
$155.38
$264.88
$503.27
$123.61
$123.61
$335.51
$105.95
$1,216 93
$223.75
$223.75
$190.95
$198.89
$356.48
$1,613.60
$684.51
$59.87
$0.02
$1.44
$534.03
$4,834.08
$534.03
Change Order #1 and #2 Calculation Correction
113
114
115
116
117
DELETE PAINT INSIDE WET WELL
STOP LOG REVISION
INTERIM QUANTITY ADJUSTMENT
ADDIITIONAL 24" INFLUENT LINE
RESTOCKING CHARGES SWEC DELETION
REWORK OF BASE UNDER STOP CELL MATRE
1 LS
1 LS
1 LS
1 LS
1 LS
1 LS
($6,200.00)
($6,200.0(
$1,012.00
$1,012 00
$170,122.94
$25,000.00
$30,000.00
$13,000.00
$170,122 94
$25,000.00
$30,000.00
$13,000.00
TOTAL
$8,777,176.32
$9,311,707.35
CO #1
$536,269.59
Correct CO #2
$5,368.11
Correct CO #3
($6,200.0(1
Correct CO #4
$1,012.00
Correct CO #5
$238,122 94
Current Contract Price
Correct Contract Price
$8,777,176.32
$8,777,176.32
Correct CO #1
$534,531.04
$9,313,445.91
$9,311,707.35
Difference
($1,738.55)
CO #2
$5,359.72
Difference
$8.39
$9,318,805.63
$9,317,075.46
CO #3
($6,200.00)
Difference
$0.00
$9,312,605.63
$9,310,875.46
CO #4
$1,012.00
Difference
$0.00
$9,313,617.63
$9,311,887.46
CO #5
$238,122.94
Difference
$0.00
$9,551,740.57
$9,550,010.40
($1,730.16)
co #5 $236,392.78
Dannenbaum $25,000.00
$211,392.78
Interim Quantity Adjustment
Item
Bid
Description
Bid
Qty
Unit
Price
Actual
Qty
Underrun
Overrun/
Bid
Qty
to
Contract
Amount
Owed
from
Amount
to/due
Hanna
Underrun
Contract
Overrun/
Price
to
4
CLEARING
&
GRUBBING
90.00
$2,698.38
64.00
(26.00)
$242,854.20
$172,696.32
($70,157.88)
($350.40)
$17
52
20.00
(20
00)
$700.80
$350.40
5
REMOVE
&
DISPOSE
OF
EXISTING
PIPES
(ALL
TYPES)
40.00
6
WEST
DETENTION
POND
EXCAVATION
900000.00
$1.03
1003900.00
103900
00
$927,000.00
$1,034,017
00
$107,017.00
7
EAST
DETENTION
POND
EXCAVATION
246000
00
$0.93
238698.00
(7302.00)
$228,780.00
$221,989.14
($6,790.86)
8
CHANNEL
EXCAVATION
29000.00
$0.92
10357.00
(18643.00)
$26,680.00
$9,528.44
($17,151.56)
9
EXCAVATION,
PLACE
&
COMPACT
BRINE
SOIL
266000
00
$1.86
278736.00
12736
00
$494,760.00
$518,448.96
$23,688.96
10
WEST
DETENTION
POND
EMBANKMENT,
COMPACTION
&
GRADING
370
00
$1.76
389.00
19.00
$651.20
$684.64
$33.44
11
EAST
DETENTION
POND
EMBANKMENT,
COMPACTION
&
GRADING
7100.00
$1.67
6533.00
(567.00)
$11,857
00
$10
910.11
($946.89)
$3.47
249055.00
74055.00
$607,250.00
$864,220.85
$256,970.85
13
HAUL
&
DISPOSE
OF
SURPLUS
EXCAVATED
MATERIALS
LOADED
BY
BDD#4
175000.00
$1.10
0.00
(100000.00)
$110
000.00
$0.00
($1
10.000.00)
14
LOAD
EXCAVATED
MATERIALS
INTO
3RD
PARTY
TRUCK
100000.00
$3.49
1003900
00
103900.00
$3,141,000.00
$3,503,611.00
$362,611.00
15
HAUL
&
DISPOSE
OF
SURPLUS
EXCAVATED
MATERIALS
900000
00
16
BACK
SLOPE
SWALE
12400.00
$4
37
12200.00
(200.00)
$54,188.00
$53,314.00
($874.00)
18
24"
ACMP
OUTFALL
800
00
$49.90
0.00
(800
00)
$39,920.00
$0.00
($39,920.00)
$51.73
50.00
(5.00)
$2,845.15
$2,586.50
($258.65)
19
18"
RCP
STORM
SEWER
55.00
$71.06
800.00
500.00
$21,318.00
$56,848.00
$35,530.00
20
24"
RCP
STORM
SEWER
300.00
$111.35
22.00
2.00
$2,227.00
$2,449.70
$222.70
21
36"
RCP
STORM
SEWER
20.00
$402.67
39.00
(16
00)
$22,146.85
$15,704.13
($6,442.72)
27
7'
x
3'
RCB
STORM
SEWER
55.00
$614.77
0.00
(220.00)
$135,249.40
$0.00
($135,249.40)
($16,949.40)
($8,032.24)
($5,060.00)
28
8'
x
8'
RCB
STORM
SEWER
220.00
$847.47
0.00
(20
00)
$16,949.40
$0.00
29
5'
x
2'
CAST
-IN
-PLACE
BOX
STORM
SEWER
20.00
$4,016.12
6.00
(2.00)
$32,128.96
$24,096.72
"C"
30
TYPE
MANHOLE
FOR
48"
&
LARGER
STORM
SEWER
8.00
$5,060.00
0.00
(1.00)
$5,060.00
$0.00
41
7'
x
3'
HEADWALL
1.00
42
8'
x
8'
SET
6:1
1.00
$14,429.82
0.00
(1.00)
$14,429.82
$0.00
($14,429.82)
45
4
1/2"
CONCRETE
CELLULAR
MATTRESS
4325.00
$40.18
4388.00
63.00
$173,778.50
$176,309.84
$2,531.34
$5.30
0.00
(90.00)
$477.00
$0.00
($11,282.80)
($477.00)
48
CONCRETE
BLOCK
REMOVAL
90.00
$42.10
12
00
(268.00)
$11,788.00
$505.20
49
5"
CONCRETE
SLOPE
PAVING
280.00
$229.09_
130.00
35.00
$21,763.55
$29,781.70
$8,018.15
_ 54
36"
DIP
FORCE
MAIN
95.00
55
8"CONCRETE
PAVEMENT,
INCLUDING
LIME
OR
CEMENT
STABILIZED
SUBGRADI
525.00
$52.53
491.00
(34.00)
$27,578.25
$25,792.23
($1,786.02
)
56
20'
GRAVEL
ACCESS
ROAD
1700.00
$13.64
2882.00
1182
00
$23,188.00
$39,310.48
$16,122
48
$1.70
3369.00
(531.00)
$6,630
00
$5,727.30
($902.70)
60
TRENCH
SAFETY
SYSTEM
3900
00
$880.00
46.52
(18.48)
$57,200.00
$40,937.60
($16,262.40)
($6,478
24)
62
HYDROMULCH
SEEDING
65.00
$1.52
11849.00
(4262
00)
$24,488.72
$18,010.48
63
FILTER
FABRIC
FENCE
16111.00
$27,500.00
0.00
(1.00)
$27,500
00
$0.00
($27,500
00)
64
DEMOLITION
OF
EXISTING
SWEC
WEIR
1.00
$143,000.00
0.00
(1
00)
$143,000.00
$0.00
($143,000
00)
65A
SWEC
WEIR
STRUCTURE
COMPLETE
(FIBERGLASS
STOP
PLANKS)
1
00
66
ROCK
FILTER
DAM
160.00
$14.50
0.00
(160.00)
$2,320.00
$0.00
($2,320.00)
$170,122.94
_
URE inne
pA I' _ A' p
TEX AS
January 31, 2007 �s r• t$9
�
Lee Souder
M. Hanna Construction Company, Inc.
P.O. Box 296
Sulphur Springs, TX 75482
Re: Final Payment Settlement Offer for Excavation Quantities
West Mary's Creek Detention Pond, Project#D71012
Mr. Souder,
Based on the calculations performed by Dannenbaum Engineering using M. Hanna
Constructions' survey information and discussions held during our meeting on January
23, 2007, the City of Pearland has determined that the final quantities for excavation of
the West and East Detention Ponds at West Mary's creek and haul-off of spoil materials
from the site will be paid as follows.
Item Description Proposed
Quantity (cy)
6 West Detention Pond Excavation 1,003,900
7 East Detention Pond Excavation 238,698
13 Haul &Dispose of Surplus Excavated Materials Loaded By BDD#4 249,055
15 Haul &Dispose of Surplus Excavated Materials 1,003,900
If M. Hanna Construction is in agreement with the City of Pearland on the proposed final
excavation and haul off quantities, please adjust the necessary items in the next pay
application accordingly. If you have any questions please feel free to give me a call at
281-652-1642.
Sincerely,
Cara Nesby
Project Manager
Cc: Trent Epperson, City of Pearland
Shri Reddy, Washington Group International, Inc.
3519 LIBERTY DRIVE •PEARLAND,TEXAS 77581-5416 • 281-652-1600 •www.ci.pearland.tx.us
*Pnnted on Recycled Paper
Pond Bid Qty Qty Used Actual Qty Overrun/Underrun Unit Amount Quantity Quantity Total Owed
(cy) to Date (cy) to Bid Qty (cy) Price Owed to/due over on Overpaid to to/due from
(cy) ($) from Hanna Estimate Date($) Hanna($)
($) to Date
(cy)
Excavation
West 900000.00 900000.00 1003900.00 103900.00 $1.03 $107,017.00 0.00 $0.00 $107,017.00
East 246000.00 253882.00 238698.00 (7302.00) $0.93 ($6,790.86) 7882.00 $7,330.26 ($14,121.12)
Haul-off
East 175000.00 264239.00 238698.00 63698.00 $3.47 $221,032.06 89239.00 $309,659.33 ($88,627.27)
West 900000.00 900000.00 1003900.00 103900.00 $3.49 $362,611.00 0.00 $0.00 $362,611.00
Total $366,879.61
*at '
k k
or-
1 r
February 7,2005
K.V. Cluff
M.Hanna Construction Co.,Inc.
P.O. Box 296
Sulphur Springs,TX 75483
Dear Mr. Cluff:
In order to minimize any problems connected with material deliveries,please assure that
procurement proceeds concurrently with the wetlands permitting process, with particular
emphasis on potential long-lead items such as the motor control center,pumps and weir stop
logs,based on your knowledge of needs and delivery times.
Also.evaluate shorter delivery items that may be needed earlier in construction and provide
recommendations, considering the logistics of storage, alternate storage locations,double
handling, etc.,of these items that may provide a net advantage to the project.
The City of Pearland will provide payment for materials on-hand, in accordance with the terms
of the contiact,regardless of whether a Notice to Proceed (NTP)has been issued, and time
charges will not begin prior to the NTP.
Pleace respond via the Construction Manager. within fourteen(14) days, as to planned actions
and recommendations.
Sincerely,
6-31
Peggy Jo Betzer
City of Pearland
Washington Group International REQUEST FOR PROPOSAL
Integrated Erg:neer^g.Construcuo-,and Management SoluLens
DATE: 03/13/06 RFP NUMBER: 03
PROJECT: W.Mary's Creek Detention Facility 8 SWEC Outfall Modifications
PROJECT No: D71012 ACC'T No: 071-0000-03 P.O. No: 050963
CONTRACTOR: M. Hanna Construction, Inc.
ATTENTION: Mr. Scott Yocham
Please examine the following listed documents and/or description and submit in writing any
changes to the contract price and schedule.
Delete all SWEC area work from the scope of the contract. The quantities for the following bid items
are revised as shown:
BID UNITS T CONTRACT REVISED
ITEM No DESCRIPTION QTY QTY
28 8'x 8' RCB Storm Sewer LF 220 0 -
42 8'x 8' S.E.T. LS 1 0
64 Demolition of Existing SWEC Weir LS 1 0
65A SWEC Weir Construction LS 1 0
This is an inquiry and not an authorization for the contractor to proceed with any change in the
existing contract scope.
By: ` ---. ��- - , ., 1-Contractor
Tony Pacifico . 1- C.O.P.
Constructio nager 1- Inspector
1-File
10550 Richmond Ave.,Suite 300,Houston,TX 77042 • www.wgint.com • Phone:(281)529-3100 • Fax:(281)529-3134
Washington Group International Letter L138
Integrated Engineering, Construction, and Management Solutions
April 21, 2006
Mr. Cecil Boone
Project Manager
City of Pearland
3519 Liberty Drive
Pearland, TX 77581
Reference: W. Mary's Creek Detention Facility & SWEC Outfall Modifications
City of Pearland Project No. D71012
Subject: Quotation for Deletion of SWEC Area Work (dated April 13, 2006)
Dear Cecil
Following are my recommendations regarding the M.Hanna Construction quotation for deletion
of the SWEC area work. The quotation, dated April 13, 2006 (attached) includes a request for
compensation in the amount of $73,956.00, consisting of the elements listed below.
Re-stocking fees of $25,928.70 for the deleted 8' x 8' box culvert and 8' x 8' sloped end
treatment.
Overhead and profit recovery of $48,026.88, computed as 15% of the value of the deleted
items. The actual overhead and profit allocated to this work in the contract price is not
known.
The value of the deleted work, which is comprised of bid items 28, 42, 64. and 64A, is correctly
stated in the quotation as $320,179,22, and the net credit offered is $246,224.00.
Following are my recommendations:
Re-stocking Fee — These products have not been delivered, and it is my understanding that
they were never cast because they were also to have been deleted by the proposed SWEC re-
design which was never incorporated into the contract, and the contractor was alerted to the
deletion when the revised drawings were issued for quotation on August 1. 2005 under RFP #1.
Also, there was no re-stocking charge requested in the resulting quotation dated December 5,
2005. Based on the above, there is further justification needed for these charges.
(Documentation for this cost has been requested, via an email to Mr. Scott Yocham on April 13,
2006.)
Overhead and profit recovery - There are several factors that should offset the proposed cost,
as indicated below. Discussions should begin with disclosure of the actual OH&P allocated to
these bid items in M.Hanna's contract price, rather than using the somewhat arbitrary fee
percentage, and then the following credits applied:
10550 Richmond Avenue•Suite 300•Houston,TX USA 77042•Phone:(281)529-3100•Fax:(281)529-3138
Letter L138
Page 2 of 2
Site Overheads — Since, according to the specifications, the SWEC work cannot begin until
the ponds, pump station, and outfall structure are substantially complete, there could be no
other construction taking place during this phase, with the possible exception of punch-list
work, and there is therefore a savings to the contractor consisting of the site overheads
(supervision, etc.) which would have been incurred during the approximately (12) weeks
(February 20 - May 16, 2006) scheduled for this work.
Offsetting Contract Increase - In the negotiations for the delay costs which led to Change
Order#1, M.Hanna Construction took the position that the increased costs should be treated
as extra work and the corresponding markup stipulated in the contract applied. The
contractor was compensated for OH&P in the amount of $37,080.00, based on a negotiated
percentage applied to direct costs of $494,406.00. These extra costs included in Change
Order#1 should be applied to offset any lost OH&P connected with deleted work scope, in
keeping with the intent of paragraph 7.06.3.2 of section 00800, the Supplementary
Conditions of the Contract.
Liquidated Damages — The remaining work in the contract, which would have preceded the
SWEC work, will be completed approximately one month late, based on current forecasts.
Therefore, the contractor would be subject to liquidated damages during the entire SWEC
construction period. This savings also should be considered in the evaluation of this cost
proposal.
It is my belief that once the above factors have been considered, the requested amount will be
fully offset, and in the absence of any further information, the proposed cost should be declined.
Please contact me at (281) 529-3114 to discuss any questions or concerns.
Best Regards,
Tony Pacifico, P.E.
Construction Manager
ATTACHMENTS:
M.Hanna Construction letter dated April 13, 2006
cc: Scott Yocham, M.Hanna
Shri Reddy, P.E., WGI
File 3.2.1
Tus4(
RECEIVED
APR 1 3 ZOOb
f""' v,•{ iNT6"*'t WASHINGTON GROUP IIV'I"L
'�0 Mf1�11
M. HANNA CONSTRUCTION COMPANY, INC.
2610 Spring Cypress Rd.*Spring,Texas 77388-4629*Tel 281-907-0900•Fax 281-907-0901
April 13, 2006
Tony Pacifico •
Washington Group International
10550 Richmond Ave., Suite 300
Houston, TX 77062
RE: West Mary's Detention Facility and SWEC Outfall Modifications
RFP No. 3 - Deletion of SWEC Weir Work
Dear Tony.
We are pleased to offer you the following credit to the contract for the deletion of the
work defined in RFP No. 3. The scope of RFP No. 3 is for complete deletion of all Bid
Items and work associated with the demolition and construction/modifications of the
SWEC Weir, Bid Items 28, 42, 64 and 65A; the sum of these hid items is $320,179.22.
We are pleased to quote you a credit of$246,224 for deletion of this work. The $73,956
withheld from the credit is compensation for items such as supplier re-stocking fees, and
unabsorbed overhead and profit.
I have attached a breakdown of the pricing listed above for your review.
Should you have any questions, please do not hesitate to contact me.
Regards,
Sc tt Yocham
Project Manager
Attachments: (1
cc: File
(''Documents and Senmgs`Scott 5'ocham.f)csktop4'tty of Pearland-West Marys Creek'('hange t)rdcrs:SWF('Weir Muds`RFP
M. HANNA CONSTRUCTION COMPANY, INC.
CITY OF PEARLAND
WEST MARY'S CREEK
Project No.: D71012 RFP NUMBER 3
Acct.No.: 071-0000-03 DATE 41612006
P.O.No.: 050963 •
BID ORIGINAL REVISED OVERRUN!
ITEM DESCRIPTION UNIT UNIT PRICE QUANTITY I ITEM COST QUANTITY I ITEM COST UNDERRUN
28 8'X 8'RCB STORM SEWER LF $ 614.77 220 $ 135,249.40 0 $ - $ (135,249.40)
42 8'X 8' SET EA $ 14,429.82 1 $ 14,429.82 0 $ - _ $ (14,429.84
64 DEMOLITION OF EXISTING SWEC WEIR LS $ 27,500.00 1 _ $ 27,500.00 0 $ (27,500.00)
65A SWEC WEIR CONSTRUCTION LS $ 143,000.00 1 $ 143,000.00 0 $ (143,000.00)
113 8'X 8'RCB RE-STOCKING FEE LF $ 107.33 0 220 $ 23,611 50 $• 23,611.50
8'X 8'RCB SET RE-STOCKING FEE EA $ 2,317.20 0 1 $ 2.317.20 $ 2,317.20
114 OH&P FOR DELETED ITEMS LS 15% $ 48,026.88 $ 48,026.88
TOTALS $ 320,179.22 [[4��::� �' ' -' "° �i $ 73,956 I $ (246,224)
CONROE PIPE, INC.
An American Owned Company
Wednesday, April 19, 2006
M. Hanna Construction Company, Inc.
P.O. Box 296
Sulphur Springs, TX 75483
Attention: Scott Yocham
Reference: West Mary's Creek detention facility — Pearland, Texas
Dear Mr. Scott Yocham:
This letter is to address the deletion of the 8' wide x 8' high Pre-cast Box Culvert for
above referenced project. The following is the original price Conroe Pipe, Inc. booked
this project at:
Product with Material description and specification
Size
8X8 R.C. Box ASTM C1433 +2' Fill with Joint Sealant
C789
Since the bid date in September of 2004 and the first delivery of product to the job
site in August 2005, Conroe Pipe, Inc. in the 4th quarter of 2005; built a total of 124
linear feet (LF) (19 standards @ 6' length & 2 — 5' long x Exposed steel specials) of
the 196 LF required to meet the bid quantities for this project.
It has been brought to my attention that this bid item may be deleted. If this is in fact
the case, the owners of Conroe Pipe, Inc. will require a 30% restock fee. for the
product produced. This is due to the fact that Box Culverts are made on a job specific
basis.
If you have any further questions, please feel free to call,
Ed Jackson
Conroe Pipe, Inc.
5150 Jefferson Chemical Road/Conroe, Texas 77301
P.O. Box 3007, Conroe, TX. 77305
(936) 760-2259/Fax:(936) 760-2269/Metro:(936) 441-2277
CITY OF PEARLAND WEST MARY'S CREEK DETENTION FACILITY
AND SWEC OUTFALL MODIFICATIONS
ARTICLE 7 EXTRA WORK AND CLAIMS
SC-7 Add the following paragraphs:
7.05. Amending and Supplementing Contract Documents
7.05.1. The Contract Documents maybe amended to provide for additions, deletions, and revisions
in the Work or to modify the terms and conditions thereof in one or more of the following ways:
7.05.1.1. a formal written Amendment,
7.05.1.2. a Change Order(pursuant to Paragraph 7.01), or
•
7.05.1.3. a Work Change Directive.
7.05.2. In addition,the requirements of the Contract Documents maybe supplemented, and minor
variations and deviations in the Work may be authorized,in one or more of the following ways:
7.05.2.1. a Field Order(pursuant to Paragraph 3.09),
7.05.2.2. ENGINEER's written interpretation or clarification(pursuant to Paragraph 3.10).
7.06. Unit Price Work
7.06.1. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work,
initially the Contract Price will be deemed to include, for all Unit Price Work, an amount equal to the
sum of the established unit price for each separately identified item of Unit Price Work times the
estimated quantity of each item as indicated in the Agreement. The estimated quantities of items of
Unit Price Work are not guaranteed and are solely for the purpose of comparison of bids and
determining an initial Contract Price. Determinations of the actual quantities and classifications of
Unit Price Work performed by CONTRACTOR will be made by ENGINEER in accordance with
Paragraph 3.1. CONTRACTOR represents that its profits are not based upon the estimated quantities
of Unit Price Work and agrees that neither ENGINEER nor OWNER shall be liable to
CONTRACTOR if the actual amount of Unit Price Work differs from the estimated quantities of
Unit Price Work, even if OWNER or CONTRACTOR was negligent in making such estimates.
7.06.2. Each unit price will be deemed to include an amount considered by CONTRACTOR to be
adequate to cover CONTRACTOR's overhead and profit for each separately identified item.
7.06.3. OWNER or CONTRACTOR may make a claim for an adjustment in the Contract Price in
accordance with Article 7 if:
7.06.3.1. The quantity of any item of Unit Price Work performed by CONTRACTOR differs
by more than twenty-five(25)percent(over or under) from the estimated quantity of such
item indicated in the Agreement; and
7.06.3.2. There is no corresponding adjustment with respect to any other item of Work; and
7.06.3.3. If CONTRACTOR believes that CONTRACTOR is entitled to an increase in
Contract Price as a result of having incurred additional expense or OWNER believes that
Project No.052511256.0003 00800—Page 22 of 24 SUPPLEMENTARY CONDfl1ONS
AR
CONROE PIPE, INC.
An American Owned Company
Wednesday, November 15, 2006
M. Hanna Construction Company, Inc.
P.O. Box 296
Sulphur Springs, TX 75483
Attention: Scott Yocham
Reference: West Mary's Creek detention facility— Pearland, Texas
Dear Mr. Scott Yocham:
I was mistaken and apologize for my earlier letter; this is to clarify the production of
the 8' x 8' box culverts for the above mentioned project and when they were
produced in the 1st quarter of 2005, not the 4th quarter as stated in the April 14th
letter. Attach is the production report showing when the 19 pieces were run on the
21st of February.
If you have any further questions, please feel free to call,
E ycGcJ4Akst-rnJ
Ed Jackson
Conroe Pipe, Inc.
5150 Jefferson Chemical Road/Conroe, Texas 77301
P.O. Box 3007, Conroe, TX. 77305
(936) 760-2259/Fax: (936) 760-2269/Metro: (936)441-2277
Conroe Pipe Inc.
Actual Daily Production Costs
February 21, 2005
Pipe Produced for the Day
-
Shift Size Produced
24"X8'RG 157
PH-
DAY
42"X8'RG 51
PH-
NIGHT
5'X3'X8'C789 14
DAY 8'X 8'X 6'C789 8
5'X3'X8'C789 9
Dc- 8'X8'X6'C789 11
NIGHT
Shift Size Tons Produced Production Times Hours
24"X 8'RG 205.67 6:45AM-1:45PM 6.5
PH-
DAY
42"X 8'RG 183.09 4:15PM-9:15PM 4.5
PH-
NIGHT
5'X 3'X 8'C789 79.80 6:15AM-3:15PM 8.5
DAY 8'X 8'X 6'C789 86.40 6AM-3PM 8.5
5'X 3'X 8'C789 45.60 3:30PM-12 AM 8.5
DC- 8'X 8'X 6'C789 108.00 3:30PM-12:15AM 7.25
NIGHT
Total for day 708.56
:4
ti
�+r S
SKILL 44, .t{ INTIOSIT7
M. HANNA CONSTRUCTION COMPANY, INC.
-Corporate Office -
P.O. Box 296 • Sulphur Springs, TX 75482• (903) 885-6772 • Fax (903) 885-3099
December 5, 2006
Cara Nesby
Project Manager
City of Pearland
3519 Liberty Dr.
Pearland, TX 77581
RE: City of Pearland- West Mary's Creek Detention Facility
Subject: RFP 3—Deletion of SWEC Weir Modifications
Dear Cara,
Please accept our revised credit in the amount of$256,527.00 for deletion of the SWEC
Weir Modifications from the West Mary's Creek Detention Pond Project. This revised
price includes a restocking fee for only the 124 linear feet of 8X8 RCB produced by
Conroe Pipe. A breakdown of the proposed pricing is attached.
Should you need any additional information, do not hesitate to contact me.
Regards,
Scott Yocham
Project Manager
Attachment: RFP 3 Pricing Breakdown
cc: S. Reddy (WGI)
File
C:\Documents and Settings\Scott Yocham\Desktop\City of Pearland-West Mary's Creek\Change Orders\SWEC Weir Mods\RFP 03-
SWEC DELETION REVISED.doc
M. HANNA CONSTRUCTION COMPANY, INC.
CITY OF PEARLAND
WEST MARY'S CREEK
Project No.: D71012 RFP NUMBER 3REV
Acct.No.: 071-0000-03 DATE 11/30/2006
P.O.No.: 050963
BID ORIGINAL REVISED OVERRUN/
ITEM DESCRIPTION UNIT UNIT PRICE QUANTITY ITEM COST QUANTITY ITEM COST UNDERRUN
28 8'X 8'RCB STORM SEWER LF $ 614.77 220 $ 135,249.40 0 $ - $ (135,249.40)
42 8'X 8'SET EA $ 14,429.82 1 $ 14,429.82 0 $ - $ (14,429.82)
64 DEMOLITION OF EXISTING SWEC WEIR LS $ 27,500.00 1 $ 27,500.00 0 $ (27,500.00)
65A SWEC WEIR CONSTRUCTION LS $ 143,000.00 1 $ 143,000.00 0 $ (143,000.00)
113 8'X 8'RCB RE-STOCKING FEE LF $ 107.33 0 124 $ 13,308.30 $ 13,308.30
114 8'X 8'RCB SET RE-STOCKING FEE EA $ 2,317.20 0 1 $ 2,317.20 $ 2,317.20
115 OH&P FOR DELETED ITEMS LS 15% $ 48,026.88 $ 48,026.88
TOTALS ' $ 320,179.22 $ 63,652 I $ (256,527)
ol„,CEMf,P,��44c
b ,..,
H ...
olt n
AME11A
SKILL
>
♦ { INTIORITrS
Fs'ONSISO'‘
M. HANNA CONSTRUCTION COMPANY, INC.
- Corporate Office -
P.O. Box 296 • Sulphur Springs, TX 75482 • (903) 885-6772 • Fax (903) 885-3099
September 5, 2006
Mr. Shri Reddy, P.E.
Washington Group International
10550 Richmond Ave., Suite 300
Houston, TX 77062
RE: City of Pearland - West Mary's Creek Detention Facility
Subject: Change Request—Addition of 24"RCP Influent Line
Dear Shri,
Please issue a change order in the amount of$25,000 for additional 24" RCP influent line
which was added to the project. Attached you will find correspondence between M.
Hanna Construction and Dannenbaum Engineering, detailing the pricing for this work. ,
Also included is the letter from Dannenbaum Engineering which settles the pricing for
the work at $25,000, and Dannenbaum's intentions to reimburse the City of Pearland for
this change order.
Should you have any questions, or need any additional information, please do not hesitate
to contact me.
Sincerely,
Scott Yocham
Project Manager
jsy
C:\Documents and Settings\Scott Yocham\Desktop\City of Pearland-West Mary's Creek\Change Orders\CR-24 inch influent line.doc
DANNENBAUM ENGINEERING CORPORATION•
3100 WEST ALA9AMA HOUSTON.TEXAS 77099 P.O.BOX 2229? HOUSTON.TEXAS T7227 (719)52a9570 ; ; .
May 5, 2006
Mr. Scott Yocham
Project Manager
M. Hanna Construction. Co., Inc.
2610 Spring Cypress Road
Spring, Texas 77388 •
RE: West Mary's Creek Detention Pond
24-Inch RCP Additional influent Line
Dear Mr. Yocham:
We appreciate you meeting with us on April 24, 2006 to discuss the additional 24" RCP influent
line from. West Mary's Creek to the wet well. As per our meeting, due to the construction and
design issues, the detention system is not performing as intended. In order to keep the detention.
emptying time to 3 days and to meet the design water pool elevation at 36.5 ft. after the pumping
stops, an additional 24-inch RCP line is required. As per our agreement, Hanna Construction
and Dannenbaum Engineering Corporation will split the cost of this additional work. The scope
of work is presented in your letter dated April 22, 2006. it is understood that Dannenbaum
Engineering will contribute a total of $25,000 towards the construction cost of the additional
line. Any unexpected conditions found during construction such as dewatering, casing for bore
or any other issues that may affect the construction cost shall be borne solely by Hanna
Construction, since Dannenbaum Engineering comrnitment is not to exceed $25,000. Please
proceed immediately once coordinated with the City of Pearland as usual.
Dannenbaum Engineering Corporation is working with the City to find an administrative way to
pay our portion to you. It is our preference to pay the City and have the City pay you by change
order. We will work this out while construction is proceeding.
We appreciate you working with us in this issue, since we both want to have the City of Pearland
satisfied. Please sign in the space provided below to complete our. agreement.
If you have any questions or concerns, please do not hesitate to call me at 713.527-6365.
Sincerely yours,
Alejdro C. Flores, P.E.
Senior Project Manager C���
7 Agreed to: Sco ocham
XC: Mr. Wayne Ahrens M. Hanna Construction. Co., Inc.
Mr. Brian Whitney
Mr. Juan McLane
cAt t 10\HHENG\3659-02-Prarfand\atiminri tr—T•ivnnn Construction,doc
MAY-09-2006 13:41 7135276452 96% P.002
fr.,
Ks b llt/41v
�y
9�
t .,
y o
r\of S
• ` SKILL ,, AME�`C�.
4 { INTEGRITY
ESPONSI. .
M. HANNA CONSTRUCTION COMPANY, INC.
- Houston Office -
2610 Spring Cypress Rd • Spring, TX 77388 • (281) 907-0900 • Fax (281) 907-0901
April 22, 2006
Mr. Al Flores, P.E.
Mr. Brian Whitney, P.E.
Dannenbaum Engineering Corp., Inc.
3100 West Alabama
Houston, TX 77098
RE: West Mary's Creek Detention Pond
Subject: 24" Influent Line Pricing
Gentlemen,
After extensive review of the facts of the situation surrounding the lift station design and
construction errors, it is our conclusion that while the elevation of the well floor has
indeed created a problem with the lift station, the overall design flaws are not a result of
this construction error. M. Hanna Construction is responsible for, and will absorb all
costs associated with adjusting the various pieces of the well, such as the pump tubes,
ladder and concrete, to accommodate the depth of the well being fourteen inches less than
originally designed, but we are not financially responsible for the additional influent line.
Keeping with this conclusion, I offer the following pricing for the installation of the
additionally required 24" influent line.
ITEM QTY UNIT $/UNIT TOTAL COST
24 IN CL V RCP T&G 129 LF $ 109.79 $ 14,163.50
MANHOLE 1 LS $ 7,690.44 $ 7,690.44
JACK & BORE 24 IN 20 LF ' $ 265.46 $ 5,309.30
24" CORE 1 LS $ 8,377.48 $ 8,377.48
TOTAL $ 35,540.71
In addition to the work items listed above, the following are supplemental items that have
been priced separately, as they may or may not be required to complete the work.
C:\Documents and Settings\Customer\Local Settings\Temporary Internet Files\Content.IE5\W9U305MJ\24 inch influent line pricing[I].doc
4/24/2006
SUPPLEMENTAL ITEMS
ITEM QTY UNIT $/UNIT TOTAL COST
DEWATERING 129 LF $ 29.56 $ 3,813.56
CASING FOR BORE I 20 Ir LF S 85.00 $ 1,700.00
Upon receipt of written acceptance of the above pricing, and notice to proceed, we will
order the required material and begin preparation to perform the work.
Should you have any questions, or need any additional pricing or information, please do
not hesitate to contact me.
Regards,
Scott YochanY
Project Manager
•
C:\Documentsand Settings\Customer\Local Settings\Temporary Internet Files\Content.IE5\W9U305MJ\24 inch influent line pricing[1j.doc
4/242006
M. HANNA CONSTRUCTION, INC.
Home Office-P.O.Box 296,Sulphur Springs,Tx 75483
903-885-6772 Fax 903-885-3099
TIME AND MATERIALS WORKSHEET
PROJECT: CITY OF PEARLAND WEST MARY'S CREEK BEGIN DATE 11/20/2006
END DATE 12/9/2006
DESCRIPTION:Place 30"crushed concrete beneath articulating blocks at weir wall. Work included building path over in place
blocks,excavation subgrade,purchase and placement of crushed concrete,spread excavated material,and
clean up of bridge to work area.
Labor Breakdown Column A Column B Column C Column 0 A'C+8`D
Cost Code Employee Reg.Hrs. O.T.Hrs. Hr.ratew/brdn O.T.rate w/brdn Total
1700 Supt. 24.00 $42.50 $1,020.00
2539 5 Man Crew 77.00 $22.72 $1,749.44
Total Labor $2,769.44
Equipment Breakdown Column A Column B Column C Column D A"D
Cost Code Equipment*description #Hours Hourly Rate Fuel Total Hr.rate Total
2530 Cat D5 Dozer 24.00 $61.00 included $61.00 $1,464.00
2530 Cat 330 Excavator 16.00 $115.00 included $115.00 $1,840,00
2530 Skid Steer Loader 8.00 $40.00 included $40.00 $320.00
2530 JD Loader W.00 $56.00 included $56.00 $896.00
2530 Cat 48"Compactor 16.00 $48.00 included $48.00 $768.00
Total Equipment $5,288.00
Material Breakdown Column A Column B Column C Column D C+D
Cost Code Description of Material Quantity Unit Price Subtotal Alit S.Tax C"Tx rt. Total Material
2530 Crushed Concrete Base 273.31 $14.00 $3,826.34
Total Material $3,826.34
Subcontract Breakdown Column A Column B Column C Column D C+D
Cost Code Subcontract Description Quantity Unit Price Subtotal A'B S.Tax C'Tx rt. Total Subcont
Total Subcontract $0.00
Hanna Supervisor: Total Cost Labor+Equipment+Material+SC $11,883.78
Field O.H.Markup% 0 $0.00
Owner Representative: Subtotal $11,883.78
Home Office O.H.Mark up% 0 $0.00
Subtotal $11,883.78
Signed: Profit mark up % 10 $1,188.38
Grand Total Extra Work $13,072.16
Date: Bond Fee% 0 $0.00
Total Price $13,072.16
12/03/2006 10:19 2819970797 tsts I wt t tray rtr Hrvu ..-,
Daily Time Sheet JOB#: 24852
Date: /Z. - /-a 4 JOB NAME: West Marys
EMP# EMP NAME &ID;TEM ° Mira== Total
COST CODE 1111111.M11111- .]C. 3 Ci (Tis:'W 4 4,/i- '4 NMI /
ri Aii_411
NM Ecier La•unas IMIP c7
4103 11111.1111111
�.�
���-7 � �m inJ�•%l��IlfmemL'i�•a .�
r
•
q GQ C, 'fir--�wEi./ .7.'' -- -MIMI
(fir le " / 111111111 .
PIRE a . 7 ,- / all
ME - '---a___77• Ite MI
pwri
;''' ii . -F f u r D,its-" ' T MEINM�--
' • ' =MI '
Will i- ° ni um" 5,-- .
MeR-raavzormareffiNr" HMO
MI0 C- ,, C... ' A .--e, IMO r
IL e 2 -----. M
III
. 7 - I,_ , . 2 .4r,¢.J4-? �■MWM MEI
60
pc_ (2- f,' ,. - _.' 77a tr- 111.111M111111r r
,,, .,,i., m �� ; =ME
-
.111111111111
-- III 1
M. HANNA CONSTRUCTION PROJECT NAME West Maly's Creek
PROJECT # 24-O852
FIELD DAILY REPORT -TRIER _ e.":"r Tr . _-._
DATE /2- if k
SUPT SIGNATURE
WORK PERFORMED _' C
"'— DESCRIPTION LOCATION HOURS i-COMPLETE NOTES
I 1 �-".1 .-cNAGP -5e IrIi -t 4--
I El iii ;, VIIMINIIIIIIIIIIIII11111111111111111111ErAgroraill
C-
CR - 1
MATERIAL RECEIVED/DISPOSED
--
COST CODE MTL CODE DESC QTY RCV U OTY COMPLETE 28315 1.5 SACk SANQ[TONS}
Cansi e73 , 4-sz- - ? 3 r 3 I 7 ',i'S /'&4/7e, JO i4L -
t
- - 4
9
ri
N
•
m f #OIV101
H
m SAFETY •
ID
m -
cn
ea
N
. .--4
COMMENTSJREMARKS
12/03/2006 10:19 2819970797 BESTWLSIEKN HLAKLAVL r►vL u,
41- r5
Daily Time Sheet / -` �! I JOB#: . 24852
Date: /2 '^ 2 "'9 C JOB NAME: West Marys
EMP# EMP NAME BID ITEM 33 `T) Total
• COST CODE
113_i 1. l o-c-- 4-/l r/4 5-.
9.3e; i Eder Lagunes
4103 Nehemiah Williams
fr 'thy
miff r rv't-iAi t
•
i( l /cif
X E/'o1 .33OG Fx , t7 ri
4 13 YJ
• ry -(Peel: TO q 4341
f,7''6-42l6 y 'rr-j 4;1.T 'GGC/
,P -i-c7 i . 4 i( -)l
K2,2-9f 5 !/f6, Paz 47
- j
! i
i � `
M. NANNA CONSTRUCTION PROJECT NAME Wes,Mary's Creek _�_
PROJECT tI 24-0852
FIELD DAILY REPORT AT HER fiER
DATE /2 _2 b
SUPT SIGNATURE
WORK PERFORMED -
DESCRIPTION 1 • LOCATION HOURS STY-COMPLETE NOTES
1
5 5� 1'A�u---- U-, ‘le-it-iv & c / � _�
r
j 1 -J
A
MATERIAL RECEIVED/DISPOSED
!COST CODE MTL CODE DESC QTY RCV CI QTY COMPLETE 213315 1.5 SACK SAND(TONS)
N
m
m
r
cn
m
1
CA
-Qti I #DIVl01
-
m SAFETY
to
(53 •
m
CV -_
w
COMMENTS/REMARKS
• •
• . • •,
.. :•,••••;:i..i••• ••••::•:•-•'••7-:•••••i:••••• •:::•:'•:••:•;••-•••:•: •'•• •- • ••• ( 14i:.•-•2•;•••••:
.018100....„.00stri14141Sattarid.,..r.60:7METE..71$4_ _
" • • ; :
, .
1713 4064990 • •
Fax Mal:43646913
• .
. •
BILL TO: * •
NI, lans Is ,
• • • •
• .
..:$41-fthur ipiintis.TX 75413
. •
• '
•
Stihigtt. 11: TERMS : REF , SHIP• VA •
Marys C'reek:1- . Net 30 12',1 12006- 1-toirrtes Rd.
QUANTITY ITEM CODE . DESCRIPTION PRICE EACH AMOUNT
1
2 14.00 1.3.31 !Crushed Concrete •Crushed Conacte 3.826.341
458600,458602.458(4)4.4511605.458606.458607.458608.
458610.458612,458613.458614.458615.458617.458628.
458644.458646,458653.458654
1 W.Mary's Creek/FM 1128
P.O.If 24-0852-2670
0.( 0.00 E.xenvtion Certificaie cm 111e /0%
RECEIVEr),CEC 8- E6
FS)-
jOB
NPPROVAL ,411!,: •
f
klity lkr appi-Cttalc:
S3.826 34
TOTAL
C6 USE o E.,A
APOLLO PAPER CA (713)329-5678 piiNTED
34V W,.IYJA
•
CONTRACT FOR PROFESSIONAL SERVICES
THIS CONTRACT is entered into on , 2007 by and between the
City of Pearland("CITY")and PBS&J,Inc. ("CONSULTANT").
The CITY engages the CONSULTANT to perform Construction Management and Inspection
services for the construction of the Magnolia Road Expansion from Harkey Road to Veterans Dr.
(Project#T70041)
SECTION I-SERVICES OF THE CONSULTANT
The CONSULTANT shall perform the following professional services to CITY standards and in
accordance with the degree.of care and skill that a professional in Texas would exercise under
the same or similar circumstances:
A. The CONSULTANT shall provide Construction Management Services and
Construction Inspection Services. See Exhibit A, attached, for a detailed SCOPE
OF WORK and PROJECT schedule.
B. The CONSULTANT shall prepare and submit a detailed opinion of estimated cost
of the PROJECT change orders and construction pay estimates for overall
construction costs.
C. The CONSULTANT acknowledges that the CITY (through its employee
handbook) considers the following to be misconduct that is grounds for
termination of a CITY employee: Any fraud, forgery, misappropriation of funds,
receiving payment for services not performed or for hours not worked,
mishandling or untruthful reporting of money transactions, destruction of assets,
embezzlement, accepting materials of value from vendors, or consultants, and/or
collecting reimbursement of expenses made for the benefit of the CITY. The
CONSULTANT agrees that it will not, directly or indirectly; encourage a CITY
employee to engage in such misconduct.
D. The CONSULTANT shall review the contractor red line drawings to ensure they
are complete, and submit them in hard copy to the design engineer for
preparation of final Record Drawings. All other documents shall be Microsoft
Office compatible. The software version used shall be compatible to current
CITY standards. Other support documents submitted for change orders, for
example, structural calculations, drainage reports and geotechnical reports, shall
be submitted in hard copy only.
E. The CONSULTANT recognizes that all drawings, special provisions,field survey
notes, reports, estimates and any and all other documents or work product
generated by the CONSULTANT under the CONTRACT shall be delivered to the
CITY upon request,shall become subject to the Open Records Laws of this State.
F. The CONSULTANT Shall procure and maintain for the duration of this
Agreement. insurance against claims for injuries to persons, damages to property,
or any errors and omissions relating to the performance of any work by the
CONSULTANT, its agents, employees or subcontractors under this Agreement,
as follows:
(1) Workers' Compensation as required by law.
(2) Professional Liability Insurance in an amount not less than $1,000.000 in
the aggregate.
(3) Comprehensive General Liability and Property Damage Insurance with
minimum limits of $1,000,000 for injury or death of any one person,
$1,000,000 for each occurrence, and $1,000,000 for each occurrence of
damage to or destruction of property.
(4) Comprehensive Automobile and Truck Liability Insurance covering
owned, hired, and non-owned vehicles, with minimum limits of
$1,000,000 for injury or death of any one person, $1,000,000 for each
occurrence,and$1,000,000 for property damage.
The CONSULTANT shall include the CITY as an additional insured under the
policies, with the exception of the Professional Liability Insurance and Workers'
Compensation. Certificates of Insurance and endorsements shall be furnished to
the CITY before work commences. Each insurance policy shall be endorsed to
state that coverage shall not be suspended, voided, canceled, and/or reduced in
coverage or in limits("Change in Coverage")except with prior written consent of
the CITY and only after the CITY has been provided with written notice of such
Change in Coverage,such notice to be sent to the CITY either by hand delivery to
the City Manager or by certified mail, return receipt requested, and received by
the City no fewer than thirty (30)days prior to the effective date of such Change
in Coverage. Prior to commencing services under this CONTRACT,
CONSULTANT shall furnish CITY with Certificates of Insurance, or formal
endorsements as required by this CONTRACT, issued by CONSULTANT'S
insurer(s), as evidence that policies providing the required coverage, conditions,
and limits required by this CONTRACT are in full force and effect.
G. The CONSULTANT shall indemnify and hold the CITY,its officers,agents, and
employees, harmless from any claim, loss, damage, suit, and liability of every
kind for which CONSULTANT is legally liable, including all expenses of
Iitigation, court costs, and attorney's fees, for injury to or death of any person, for
damage to any property, or errors in design, any of which are caused by the
negligent act or omission of the CONSULTANT, his officers, employees, agents,
or subcontractors under this CONTRACT.
-2-
H. All parties intend that the CONSULTANT, in performing services pursuant to this
CONTRACT, shall act as an independent contractor and shall have control of its
own work and the manner in which it is performed. The CONSULTANT is not to
be considered an agent or employee of the CITY.
SECTION II-PERIOD OF SERVICE
This CONTRACT will be binding upon execution and end upon completion of project.
SECTION III-CONSULTANT'S COMPENSATION
A. The method of payment for this CONTRACT is a time and materials not to
exceed rate. Total compensation for the services performed shall be the sum of
$417,603.00.
B. The CITY shall pay the CONSULTANT in installments based upon monthly
progress reports and detailed invoices submitted by the CONSULTANT
C. The CITY shall make payments to the CONSULTANT within thirty (30) days
after receipt and approval of a detailed invoice. Invoices shall be submitted on a
monthly basis.
SECTION IV-THE CITY'S RESPONSIBILITIES
A. The CITY shall designate a project manager during the term of this CONTRACT.
The project manager has the authority to administer this CONTRACT and shall
monitor compliance with all terms and conditions stated herein. All requests for
information from or a decision by the CITY on any aspect of the work shall be
directed to the project manager.
B. The CITY shall review submittals by the CONSULTANT and provide prompt
response to questions and rendering of decisions pertaining thereto, to minimize
delay in the progress of the CONSULTANT'S work. The CITY will keep the
CONSULTANT advised concerning the progress of the CITY'S review of the
work. The CONSULTANT agrees that the CITY'S inspection, review,
acceptance or approval of CONSULTANT'S work shall not relieve
CONSULTANT'S responsibility for errors or omissions of the CONSULTANT or
its sub-consultant(s) or in any way affect the CONSULTANT's status as an
independent contractor of the CITY.
-3-
SECTION V-TERMINATION
A. The CITY,at its sole discretion,may terminate this CONTRACT for any reason-
- with or without cause -- by delivering written notice to CONSULTANT
personally or by certified mail at 1250 Wood Branch Park Drive, Suite 300,
Houston, Texas 77079. Immediately after receiving such written notice, the
CONSULTANT shall discontinue providing the services under this CONTRACT.
B. If this CONTRACT is terminated, CONSULTANT shall deliver to the CITY all
drawings, special provisions, field survey notes,reports,estimates and any and all
other documents or work product generated by the CONSULTANT under the
CONTRACT, entirely or partially completed, together with all unused materials
supplied by the CITY on or before the 15th day following termination of the
CONTRACT.
C. In the event of such termination, the CONSULTANT shall be paid for services
performed prior to receipt of the written notice of termination. The CITY shall
make final payment within sixty(60)days after the CONSULTANT has delivered
to the CITY a detailed invoice for services rendered and the documents or work
product generated by the CONSULTANT under the CONTRACT.
D. If the remuneration scheduled under this contract is based upon a fixed fee or
definitely ascertainable sum, the portion of such sum payable shall be
proportionate to the percentage of services completed by the CONSULTANT
based upon the scope of work.
E. In the event this CONTRACT is terminated, the CITY shall have the option of
completing the work, or entering into a CONTRACT with another party for the
completion of the work.
F. If the CITY terminates this CONTRACT for cause and/or if the CONTRACTOR
breaches any provision of this CONTRACT, then the CITY shall have all rights
and remedies in law and/or equity against CONSULTANT. Venue for any action
or dispute arising out of or relating to this CONTRACT shall be in Brazoria
County, Texas. The laws of the State of Texas shall govern the terms of this
CONTRACT. The prevailing party in the action shall be entitled to recover its
actual damages with interest, attomey's fees, costs and expenses incurred in
connection with the dispute and/or action. CONSULTANT and CITY desire an
expeditious means to resolve any disputes that may arise between under this
CONTRACT. To accomplish this,the parties agree to mediation as follows: If a
dispute arises out of or relates to this CONTRACT, or the breach thereof, and if
the dispute cannot be settled through negotiation,then the parties agree first to try
in good faith, and before pursuing any legal remedies, to settle the dispute by
mediation of a third party who will be selected by agreement of the parties.
-4-
SECTION VI—ENTIRE AGREEMENT
This CONTRACT represents the entire agreement between the CITY and the CONSULTANT
and supersedes all prior negotiations, representations, or contracts, either written or oral. This
CONTRACT may be amended only by written instrument signed by both parties.
SECTION VII—COVENANT AGAINST CONTINGENT FEES
The CONSULTANT affirms that he has not employed or retained any company or person, other
than a bona fide employee working for the CONSULTANT to solicit or secure this
CONTRACT, and that he has not paid or agreed to pay any company or person, other than a
bona fide employee, any fee, commission, percentage brokerage fee, gift, or any other
consideration, contingent upon or resulting from the award or making of the CONTRACT. For
breach or violation of this clause, the CITY may terminate this CONTRACT without liability,
and in its discretion, may deduct from the CONTRACT price or consideration, or otherwise
recover, the full amount of such fee, commission, percentage brokerage fee, gift, or contingent
fee that has been paid.
SECTION VIII-SUCCESSORS AND ASSIGNS
This CONTRACT shall not be assignable except upon the written consent of the parties hereto.
The parties have executed this CONTRACT this day of ,2006.
CITY OF PEARLAND,TEXAS
CONSULT
-5-
MSI
An employee-owned company
April 11,2007
City of Pearland
Attention: Andrea Brinkley
3519 Liberty Drive
Pearland, Texas 7781-5416
Subject: CM Services for Expansion of Magnolia Road, from Harkey Rd to Veterans
Drive
Dear Ms. Brinkley,
I have modified the proposed scope as we discussed yesterday. Attached are three
originals of the document on PBS&J letterhead.
We continue to look forward to working with you and the City of Pearland to deliver the
City's new signature thorou.hfare.
Sincerely,
PBS&J
rj-
Gary L. Hodges,P.E.
Vice President,Division Manager
1250 Wood Branch Park Drive•Suite 300•Houston.TX 77079•Telephone 281.493.5100•Fax 281.493.1047•www.pbsj.com
City of Pearland
Magnolia Road Expansion,Harkey Rd to Veteran's Dr.
Scope of Construction Management Services
A. General
The City of Pearland plans to expand Magnolia road from Harkey Road to Veterans
Drive. The project is projected to commence construction on May 1, 2007 with a total
construction contract duration of 400 Calendar Days,with a contract completion date of
June 3, 2008. Major work will include demolition of existing pavement and base,new
base and pavement placement,bridge work, drainage,storm sewer, sanitary sewer,water
line and fire main, SWPPP implementation, traffic signal installation, sign installation,
traffic control and permanent striping. PBS&J shall have no duty or obligation to
supervise the contractor's work. The City will provide office facilities for the PBS&J
field personnel.
In general,and except as may be modified in writing or directed by the City of Pearland,
the services to be provided by PBS&J under this agreement are: 1)Construction
Administration&Management/Observation and Inspection Services, and 2)Consultant
Testing Services Coordination. PBS&J anticipates working 6 days a week for first
three months in order to assure Milestone 1 and 5 days a week for the remainder of the
project. The rates projected for the various work classifications is based on direct rate
times a multiplier of 2.8224 for office based personnel and 2.36 for field based personnel.
B. Construction Administration and Management Services
Act as the City of Pearland representative and provide overall project oversight.
Analyze construction project requirements in terms of personnel required for observation
/inspection of workmanship,materials onsite and elsewhere, and construction progress to
determine conformity of the work to the plans and specifications. Assign field personnel
to associated project, once awarded,and obtain approval of assignment from the City of
Pearland.
Provide lab coordination, assignment of testing/inspection personnel,review invoices to
ensure accuracy and coordinate shop drawing/submittal reviews and approvals. Review
testing lab report results for compliance with the contract and take appropriate action to
include City notification of failures.
Perform construction management and supervise field inspection services as well as field
inspection coordination and testing lab coordination services.
Ensure contractor compliance associated with project requirements as they pertain to
project supervision,project scheduling requirements and NTP requirements. This
activity will include,but not be limited to, CPM scheduling specification compliance,
NPDES permitting compliance and review of material testing requirements with
contractor and laboratory testing personnel.
1 PESSI
Prepare, distribute, log and file project correspondence.
Review the contractor's CPM schedule monthly and ensure compliance with the
specifications associated with the project.
Based upon information supplied by the construction contractor, review and coordinate
red-lined, as built, drawings per the specifications throughout the duration of the contract.
The format shall be as required by the City of Pearland. Produce an independent estimate
in order to review and recommend contractor's monthly,pre-final and final pay estimates
for construction of the project.
Review and certify the contractor's monthly pay estimates of work performed associated
with the project.
Prepare monthly summary report of construction activities with outstanding issues
outlined for review. Monthly progress information associated with the project will be
submitted to the City of Pearland for review and approval.
Review contractor's request for additional compensation for extra work and submit
findings and recommendations to the City of Pearland.
Review contractor's request for time extensions and submit findings and
recommendations to the City of Pearland.
Assist in the preparation and issuance of construction change orders and supplemental
agreements. Additionally, recommendations associated with time and costs associated
with the change notices will be forwarded to the City of Pearland for approval prior to
implementation.
Preparation of plans and specifications associated with above change orders and
supplemental agreements are not included in the Scope of Services for this agreement.
Review, make recommendations and coordinate the response to contractor Requests for
Information (RFI) and submittals.
Provide oversight on review of contractor's claims for additional compensation for extra
work and submit findings and recommendations to City, for hearings or litigation as
required. Assist the City of Pearland in preparation and documentation of factual
evidence.
Maintain logs for correspondence, change orders, submittals, and RFI's.
Assist the City of Pearland with public outreach efforts to include attending necessary
public meetings and coordinating with stakeholders and other entities during
construction.
Coordinate and host a CPM baseline schedule development meeting with the Contractor
and the City.
2 Py9
Attend utility coordination meetings with the contractor, City and utility owners.
Coordinate and host the pre-construction meeting to ensure proper lines of
communication are outlined and pre-construction requirements associated with the
project are documented and communicated to the construction contractor.
Coordinate and host weekly construction meetings to address the current status of
contractor's work schedule, outstanding issues, submittals, shop drawings,and change
orders.
Coordinate and host month ending construction meeting as part of weekly progress
meeting to determine schedule changes and facility adjustments required to maintain
contractor's schedule for project completing.
Prepare and distribute meeting minutes from all hosted meetings.
Prepare substantial completion certificate.
Review project for final acceptance and coordinate final review with City of Pearland
personnel. Coordinate any and all outstanding issues with City of Pearland personnel to
ensure resolutions prior to final acceptance.
Coordinate final documentation processing,in accordance with City of Pearland
standards,and submit to staff upon completion of the project. and make monthly report to
the City
Provide a monthly status report to the City during the warranty period indicating
corrections identified and completed.
C. Field Observation/Inspection
Maintain project diary documenting daily construction activities, weather conditions,
time charges and contractor's resources as well as any project specific information
associated with the project. This diary will also incorporate any contract items of
observation and decisions associated with the construction of the project.
Observe and monitor contractor's operation and determine, in general, compliance with
the construction plans and specifications on each item of work underway and ensure
acceptable material is incorporated into the work. (Test results will be evaluated and
approved prior to material being accepted for payment.)
Verify contractor has obtained necessary permits.
Review contractor's daily quantities of work completed.
Complete daily construction activity reports.
Notify the City and Resident Engineer immediately in the event of an on-site accident.
3 y
Independent testing laboratories have been engaged by the City of Pearland to perform
the usual onsite and offsite lab testing services for construction materials and plant
inspections. These services are not included in the Scope of Services for this agreement.
Provide a monthly update of project significant activities and vital statistics to include
time expended, $work in place, anticipated completion date and other information as
requested by the City.
The format and documentation requirement will be electronic in format with a web based
portal for City access(one license will be provided to the City at no cost)or as otherwise
established by the City of Pearland personnel.
Coordinate utility adjustment activities, utility installation verification, monitoring,
record management,reporting,and as-built drawings.
Monitor utility owner's relocation construction for compliance with City permits.
Monitor contractor's traffic control plan for compliance with plans and specifications.
Coordinate material testing needs with contractor's schedule and schedule required tests
with assigned laboratory coordinator. Ensure test frequencies adhere to sampling
frequencies as outlined by assigned lab coordinator.
Review test reports for accuracy and maintain filing system for test reports and material
compliance as required.
Prepare photographic project documentation to include individual activities and overall
progress as well as impacts to the public.
Review and validate contractor videos and photographs taken in accordance with the
construction contract.
Attend all construction,utility coordination and scheduling meetings.
Monitor and document construction rain days,make monthly reports to the City, and
make recommendations for time extensions as appropriate.
Conduct substantial completion inspection,prepare the project punch list of discrepancies
for the various construction items and monitor the completion and acceptance of the
items as required by the specifications.
Provide warranty period inspection and work verification.
4
CONTRACT FOR PROFESSIONAL SERVICES
THIS CONTRACT is entered into on , 2007 by and between the
City of Pearland("CITY")and PBS&J,Inc. ("CONSULTANT").
The CITY engages the CONSULTANT to perform Construction Management and Inspection
services for the construction of the Magnolia Road Expansion from Harkey Road to Veterans Dr.
(Project#T70041)
SECTION I-SERVICES OF THE CONSULTANT
The CONSULTANT shall perform the following professional services to CITY standards and in
accordance with the degree.of care and skill that a professional in Texas would exercise under
the same or similar circumstances:
A. The CONSULTANT shall provide Construction Management Services and
Construction Inspection Services. See Exhibit A, attached, for a detailed SCOPE
OF WORK and PROJECT schedule.
B. The CONSULTANT shall prepare and submit a detailed opinion of estimated cost
of the PROJECT change orders and construction pay estimates for overall
construction costs.
C. The CONSULTANT acknowledges that the CITY (through its employee
handbook) considers the following to be misconduct that is grounds for
termination of a CITY employee: Any fraud, forgery, misappropriation of funds,
receiving payment for services not performed or for hours not worked,
mishandling or untruthful reporting of money transactions, destruction of assets,
embezzlement, accepting materials of value from vendors, or consultants, and/or
collecting reimbursement of expenses made for the benefit of the CITY. The
CONSULTANT agrees that it will not, directly or indirectly; encourage a CITY
employee to engage in such misconduct.
D. The CONSULTANT shall review the contractor red line drawings to ensure they
are complete, and submit them in hard copy to the design engineer for
preparation of final Record Drawings. All other documents shall be Microsoft
Office compatible. The software version used shall be compatible to current
CITY standards. Other support documents submitted for change orders, for
example, structural calculations, drainage reports and geotechnical reports, shall
be submitted in hard copy only.
E. The CONSULTANT recognizes that all drawings, special provisions,field survey
notes, reports, estimates and any and all other documents or work product
generated by the CONSULTANT under the CONTRACT shall be delivered to the
CITY upon request,shall become subject to the Open Records Laws of this State.
F. The CONSULTANT shall procure and maintain for the duration of this
Agreement. insurance against claims for injuries to persons, damages to property,
or any errors and omissions relating to the performance of any work by the
CONSULTANT, its agents, employees or subcontractors under this Agreement,
as follows:
(1) Workers' Compensation as required by law.
(2) Professional Liability Insurance in an amount not less than $1,000,000 in
the aggregate.
(3) Comprehensive General Liability and Property Damage Insurance with
minimum limits of $1,000,000 for injury or death of any one person,
$1,000,000 for each occurrence, and $1,000,000 for each occurrence of
damage to or destruction of property.
(4) Comprehensive Automobile and Truck Liability Insurance covering
owned, hired, and non-owned vehicles, with minimum limits of
$1,000,000 for injury or death of any one person, $1,000,000 for each
occurrence,and$1,000,000 for property damage.
The CONSULTANT shall include the CITY as an additional insured under the
policies, with the exception of the Professional Liability Insurance and Workers'
Compensation. Certificates of Insurance and endorsements shall be furnished to
the CITY before work commences. Each insurance policy shall be endorsed to
state that coverage shall not be suspended, voided, canceled, and/or reduced in
coverage or in limits("Change in Coverage")except with prior written consent of
the CITY and only after the CITY has been provided with written notice of such
Change in Coverage,such notice to be sent to the CITY either by hand delivery to
the City Manager or by certified mail, return receipt requested, and received by
the City no fewer than thirty (30) days prior to the effective date of such Change
in Coverage. Prior to commencing services under this CONTRACT,
CONSULTANT shall furnish CITY with Certificates of Insurance, or formal
endorsements as required by this CONTRACT, issued by CONSULTANT'S
insurer(s), as evidence that policies providing the required coverage, conditions,
and limits required by this CONTRACT are in full force and effect.
G. The CONSULTANT shall indemnify and hold the CITY,its officers,agents, and
employees, harmless from any claim, loss, damage, suit, and liability of every
kind for which CONSULTANT is legally liable, including all expenses of
litigation,court costs, and attorney's fees, for injury to or death of any person, for
damage to any property, or errors in design, any of which are caused by the
negligent act or omission of the CONSULTANT, his officers, employees, agents,
or subcontractors under this CONTRACT.
-2-
H. All parties intend that the CONSULTANT,in performing services pursuant to this
CONTRACT, shall act as an independent contractor and shall have control of its
own work and the manner in which it is performed. The CONSULTANT is not to
be considered an agent or employee of the CITY.
SECTION II-PERIOD OF SERVICE
This CONTRACT will be binding upon execution and end upon completion of project.
SECTION III-CONSULTANT'S COMPENSATION
A. The method of payment for this CONTRACT is a time and materials not to
exceed rate. Total compensation for the services performed shall be the sum of
$417,603.00.
B. The CITY shall pay the CONSULTANT in installments based upon monthly
progress reports and detailed invoices submitted by the CONSULTANT
C. The CITY shall make payments to the CONSULTANT within thirty (30) days
after receipt and approval of a detailed invoice. Invoices shall be submitted on a
monthly basis.
SECTION IV-THE CITY'S RESPONSIBILITIES
A. The CITY shall designate a project manager during the term of this CONTRACT.
The project manager has the authority to administer this CONTRACT and shall
monitor compliance with all terms and conditions stated herein. All requests for
information from or a decision by the CITY on any aspect of the work:shall be
directed to the project manager.
B. The CITY shall review submittals by the CONSULTANT and provide prompt
response to questions and rendering of decisions pertaining thereto, to minimize
delay in the progress of the CONSULTANT'S work. The CITY will keep the
CONSULTANT advised concerning the progress of the CITY'S review of the
work. The CONSULTANT agrees that the CITY'S inspection, review,
acceptance or approval of CONSULTANT'S work shall not relieve
CONSULTANT'S responsibility for errors or omissions of the CONSULTANT or
its sub-consultant(s) or in any way affect the CONSULTANT's status as an
independent contractor of the CITY.
-3-
SECTION V-TERMINATION
A. The CITY,at its sole discretion,may terminate this CONTRACT for any reason-
- with or without cause -- by delivering written notice to CONSULTANT
personally or by certified mail at 1250 Wood Branch Park Drive, Suite 300,
Houston, Texas 77079. Immediately after receiving such written notice, the
CONSULTANT shall discontinue providing the services under this CONTRACT.
B. If this CONTRACT is terminated, CONSULTANT shall deliver to the CITY all
drawings, special provisions, field survey notes,reports,estimates and any and all
other documents or work product generated by the CONSULTANT under the
CONTRACT, entirely or partially completed, together with all unused materials
supplied by the CITY on or before the 15th day following termination of the
CONTRACT.
C. In the event of such termination, the CONSULTANT shall be paid for services
performed prior to receipt of the written notice of termination. The CITY shall
make final payment within sixty(60)days after the CONSULTANT has delivered
to the CITY a detailed invoice for services rendered and the documents or work
product generated by the CONSULTANT under the CONTRACT.
D. If the remuneration scheduled under this contract is based upon a fixed fee or
definitely ascertainable sum, the portion of such sum payable shall be
proportionate to the percentage of services completed by the CONSULTANT
based upon the scope of work.
E. In the event this CONTRACT is terminated, the CITY shall have the option of
completing the work, or entering into a CONTRACT with another party for the
completion of the work.
F. If the CITY terminates this CONTRACT for cause and/or if the CONTRACTOR
breaches any provision of this CONTRACT, then the CITY shall have all rights
and remedies in law and/or equity against CONSULTANT. Venue for any action
or dispute arising out of or relating to this CONTRACT shall be in Brazoria
County, Texas. The laws of the State of Texas shall govern the terms of this
CONTRACT. The prevailing party in the action shall be entitled to recover its
actual damages with interest, attorney's fees, costs and expenses incurred in
connection with the dispute and/or action. CONSULTANT and CITY desire an
expeditious means to resolve any disputes that may arise between under this
CONTRACT. To accomplish this,the parties agree to mediation as follows: If a
dispute arises out of or relates to this CONTRACT, or the breach thereof, and if
the dispute cannot be settled through negotiation,then the parties agree first to try
in good faith, and before pursuing any legal remedies, to settle the dispute by
mediation of a third party who will be selected by agreement of the parties.
-4-
SECTION VI—ENTIRE AGREEMENT
This CONTRACT represents the entire agreement between the CITY and the CONSULTANT
and supersedes all prior negotiations, representations, or contracts, either written or oral. This
CONTRACT may be amended only by written instrument signed by both parties.
SECTION VII—COVENANT AGAINST CONTINGENT FEES
The CONSULTANT affirms that he has not employed or retained any company or person, other
than a bona fide employee working for the CONSULTANT to solicit or secure this
CONTRACT, and that he has not paid or agreed to pay any company or person, other than a
bona fide employee, any fee, commission, percentage brokerage fee, gift, or any other
consideration, contingent upon or resulting from the award or making of the CONTRACT. For
breach or violation of this clause, the CITY may terminate this CONTRACT without liability,
and in its discretion, may deduct from the CONTRACT price or consideration, or otherwise
recover, the full amount of such fee, commission, percentage brokerage fee, gift, or contingent
fee that has been paid.
SECTION VIII.SUCCESSORS AND ASSIGNS
This CONTRACT shall not be assignable except upon the written consent of the parties hereto.
The parties have executed this CONTRACT this day of ,2006.
CITY OF PEARLAND,TEXAS
CONSULT
-5-