HomeMy WebLinkAboutR2026-204 20261116RESOLUTION NO. R2026-204
A Resolution of the City Council of the City of Pearland, Texas, approving a
professional services agreement in an amount not to exceed $186,660.00 with
Ninyo & Moore for construction materials testing associated with the
Shadycrest and Creekview Subdivision Drainage Improvement (DR2401);
Creekview and Shadycrest Transite Pipe Water Line Replacement (WA2405);
and Shadycrest and Creekview Subdivision Sanitary Sewer Rehabilitation
(WW2405) projects.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS:
Section 1. That a contract for professional services in an amount not to exceed
$186,660.00 with Ninyo & Moore for construction materials testing associated with the Shadycrest
and Creekview Subdivision Drainage Improvement (DR2401); Creekview and Shadycrest Transite
Pipe Water Line Replacement (WA2405); and Shadycrest and Creekview Subdivision Sanitary
Sewer Rehabilitation (WW2405) projects, is hereby authorized and approved.
Section 2. That the City Manager or his designee is hereby authorized to execute and
the City Secretary to attest a contract for professional services.
PASSED, APPROVED and ADOPTED this on the 16th day of November, A.D., 2026.
________________________________
QUENTIN WILTZ
MAYOR
ATTEST:
________________________________
FRANCES AGUILAR, TRMC, MMC
CITY SECRETARY
APPROVED AS TO FORM:
________________________________
LAWRENCE G. PROVINS
CITY ATTORNEY
Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287
Professional Services Contract 1 of 5 4/2019
CONTRACT FOR PROFESSIONAL SERVICES
THIS CONTRACT is entered into upon final execution by and between the City of Pearland
("CITY") and Ninyo & Moore ("CONSULTANT").
The CITY engages the CONSULTANT to perform professional services for a project known and
described as Shadycrest and Creekview Subdivision Improvements ("PROJECT"). (Project
#DR2401, WA2405, WW2405), Contract # P123-26.
SECTION I - SERVICES OF THE CONSULTANT
The CONSULTANT shall perform the following professional services to CITY standards and in
accordance with the degree of care and skill that a professional in Texas would exercise under
the same or similar circumstances:
A.The CONSULTANT shall provide professional services. See Exhibit A, attached,
for a detailed SCOPE OF WORK and PROJECT schedule. The PROJECT
schedule shall be submitted in digital and hard copy form in the Microsoft Project
for Windows format.
B.The CONSULTANT shall prepare and submit a detailed opinion of estimated cost
of the PROJECT.
C.The CONSULTANT acknowledges that the CITY (through its employee
handbook) considers the following to be misconduct that is grounds for
termination of a CITY employee: Any fraud, forgery, misappropriation of funds,
receiving payment for services not performed or for hours not worked,
mishandling or untruthful reporting of money transactions, destruction of assets,
embezzlement, accepting materials of value from vendors, or consultants, and/or
collecting reimbursement of expenses made for the benefit of the CITY. The
CONSULTANT agrees that it will not, directly or indirectly; encourage a CITY
employee to engage in such misconduct.
D.The CONSULTANT shall submit all final construction documents in both hard
copy and electronic format. Plans shall be AutoCAD compatible and all other
documents shall be Microsoft Office compatible. The software version used shall
be compatible to current CITY standards. Other support documents, for example,
structural calculations, drainage reports and geotechnical reports, shall be
submitted in hard copy only. All Record Drawings electronic files shall be
submitted to the CITY in TIF format.
E.The CONSULTANT recognizes that all drawings, special provisions, field survey
notes, reports, estimates and any and all other documents or work product
generated by the CONSULTANT under the CONTRACT shall be delivered to the
CITY upon request, shall become subject to the Open Records Laws of this State.
EXHIBIT A Resolution No. R2026-204Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287
Professional Services Contract 2 of 5 4/2019
F. The CONSULTANT shall procure and maintain for the duration of this
Agreement, insurance against claims for injuries to persons, damages to property,
or any errors and omissions relating to the performance of any work by the
CONSULTANT, its agents, employees or subcontractors under this Agreement,
as follows:
(1) Workers’ Compensation as required by law.
(2) Professional Liability Insurance in an amount not less than $1,000,000 in
the aggregate.
(3) Comprehensive General Liability and Property Damage Insurance with
minimum limits of $1,000,000 for injury or death of any one person,
$1,000,000 for each occurrence, and $1,000,000 for each occurrence of
damage to or destruction of property.
(4) Comprehensive Automobile and Truck Liability Insurance covering
owned, hired, and non-owned vehicles, with minimum limits of
$1,000,000 for injury or death of any one person, $1,000,000 for each
occurrence, and $1,000,000 for property damage.
The CONSULTANT shall include the CITY as an additional insured under the
policies, with the exception of the Professional Liability Insurance and Workers’
Compensation. Certificates of Insurance and endorsements shall be furnished to
the CITY before work commences. Each insurance policy shall be endorsed to
state that coverage shall not be suspended, voided, canceled, and/or reduced in
coverage or in limits (“Change in Coverage”) except with prior written consent of
the CITY and only after the CITY has been provided with written notice of such
Change in Coverage, such notice to be sent to the CITY either by hand delivery to
the City Manager or by certified mail, return receipt requested, and received by
the City no fewer than thirty (30) days prior to the effective date of such Change
in Coverage. Prior to commencing services under this CONTRACT,
CONSULTANT shall furnish CITY with Certificates of Insurance, or formal
endorsements as required by this CONTRACT, issued by CONSULTANT’S
insurer(s), as evidence that policies providing the required coverage, conditions,
and limits required by this CONTRACT are in full force and effect.
G. The CONSULTANT shall indemnify and hold the CITY, its officers, agents, and
employees, harmless from any claim, loss, damage, suit, and liability of every
kind for which CONSULTANT is legally liable, including all expenses of
litigation, court costs, and attorney's fees, for injury to or death of any person, for
damage to any property, or errors in design, any of which are caused by the
Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287
Professional Services Contract 3 of 5 4/2019
negligent act or omission of the CONSULTANT, his officers, employees, agents,
or subcontractors under this CONTRACT.
H. All parties intend that the CONSULTANT, in performing services pursuant to this
CONTRACT, shall act as an independent contractor and shall have control of its
own work and the manner in which it is performed. The CONSULTANT is not to
be considered an agent or employee of the CITY.
SECTION II - PERIOD OF SERVICE
This CONTRACT will be binding upon execution and end March 1, 2029.
SECTION III - CONSULTANT'S COMPENSATION
A. The total compensation for the services performed shall not exceed the total noted
in Section B.
B. The CITY shall pay the CONSULTANT in installments based upon monthly
progress reports and detailed invoices submitted by the CONSULTANT based
upon the following:
1. Basic Services (Lump Sum)
2. Additional Services shall require independent and specific authorization
and shall be billed as (Lump Sum):
3. Bid Phase Services (Hourly Not to Exceed)
4. Construction Phase Services (Hourly Not to Exceed) $186,660.00
5. Reimbursable Expenses (Not to Exceed)
6. Total: $186,660.00
C. The CITY shall make payments to the CONSULTANT within thirty (30) days
after receipt and approval of a detailed invoice. Invoices shall be submitted on a
monthly basis.
SECTION IV - THE CITY'S RESPONSIBILITIES
A. The CITY shall designate a project manager during the term of this CONTRACT.
The project manager has the authority to administer this CONTRACT and shall
monitor compliance with all terms and conditions stated herein. All requests for
information from or a decision by the CITY on any aspect of the work shall be
directed to the project manager.
B. The CITY shall review submittals by the CONSULTANT and provide prompt
response to questions and rendering of decisions pertaining thereto, to minimize
Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287
Professional Services Contract 4 of 5 4/2019
delay in the progress of the CONSULTANT'S work. The CITY will keep the
CONSULTANT advised concerning the progress of the CITY'S review of the
work. The CONSULTANT agrees that the CITY'S inspection, review,
acceptance or approval of CONSULTANT'S work shall not relieve
CONSULTANT'S responsibility for errors or omissions of the CONSULTANT or
its sub-consultant(s) or in any way affect the CONSULTANT’S status as an
independent contractor of the CITY.
SECTION V - TERMINATION
A. The CITY, at its sole discretion, may terminate this CONTRACT for any reason -
- with or without cause -- by delivering written notice to CONSULTANT
personally or by certified mail at 2313 West Sam Houston Parkway North, Suite
119 Houston, TX. 77043. Immediately after receiving such written notice, the
CONSULTANT shall discontinue providing the services under this CONTRACT.
B. If this CONTRACT is terminated, CONSULTANT shall deliver to the CITY all
drawings, special provisions, field survey notes, reports, estimates and any and all
other documents or work product generated by the CONSULTANT under the
CONTRACT, entirely or partially completed, together with all unused materials
supplied by the CITY on or before the 15th day following termination of the
CONTRACT.
C. In the event of such termination, the CONSULTANT shall be paid for services
performed prior to receipt of the written notice of termination. The CITY shall
make final payment within sixty (60) days after the CONSULTANT has delivered
to the CITY a detailed invoice for services rendered and the documents or work
product generated by the CONSULTANT under the CONTRACT.
D. If the remuneration scheduled under this contract is based upon a fixed fee or
definitely ascertainable sum, the portion of such sum payable shall be
proportionate to the percentage of services completed by the CONSULTANT
based upon the scope of work.
E. In the event this CONTRACT is terminated, the CITY shall have the option of
completing the work, or entering into a CONTRACT with another party for the
completion of the work.
F. If the CITY terminates this CONTRACT for cause and/or if the CONSULTANT
breaches any provision of this CONTRACT, then the CITY shall have all rights
and remedies in law and/or equity against CONSULTANT. Venue for any action
or dispute arising out of or relating to this CONTRACT shall be in Brazoria
County, Texas. The laws of the State of Texas shall govern the terms of this
CONTRACT. The prevailing party in the action shall be entitled to recover its
actual damages with interest, attorney’s fees, costs and expenses incurred in
connection with the dispute and/or action. CONSULTANT and CITY desire an
expeditious means to resolve any disputes that may arise between under this
Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287
Professional Services Contract 5 of 5 4/2019
CONTRACT. To accomplish this, the parties agree to mediation as follows: If a
dispute arises out of or relates to this CONTRACT, or the breach thereof, and if
the dispute cannot be settled through negotiation, then the parties agree first to try
in good faith, and before pursuing any legal remedies, to settle the dispute by
mediation of a third party who will be selected by agreement of the parties.
SECTION VI – ENTIRE AGREEMENT
This CONTRACT represents the entire agreement between the CITY and the CONSULTANT
and supersedes all prior negotiations, representations, or contracts, either written or oral. This
CONTRACT may be amended only by written instrument signed by both parties.
SECTION VII – COVENANT AGAINST CONTINGENT FEES
The CONSULTANT affirms that he has not employed or retained any company or person, other
than a bona fide employee working for the CONSULTANT to solicit or secure this
CONTRACT, and that he has not paid or agreed to pay any company or person, other than a
bona fide employee, any fee, commission, percentage brokerage fee, gift, or any other
consideration, contingent upon or resulting from the award or making of the CONTRACT. For
breach or violation of this clause, the CITY may terminate this CONTRACT without liability,
and in its discretion, may deduct from the CONTRACT price or consideration, or otherwise
recover, the full amount of such fee, commission, percentage brokerage fee, gift, or contingent
fee that has been paid.
SECTION VIII- SUCCESSORS AND ASSIGNS
This CONTRACT shall not be assignable except upon the written consent of the parties hereto.
________________________________
ASSISTANT FINANCE DIRECTOR DATE
CITY OF PEARLAND, TEXAS
________________________________
CITY MANAGER/DIRECTOR
CITY OF PEARLAND, TEXAS DATE
________________________________
CONSULTANT DATE
Ninyo & Moore Geotechnical & EnvironmentalSciences Consultants
9/18/2026
Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287
11/17/2026 | 3:14 PM CST
11/17/2026 | 3:34 PM CST
ATTEST:
________________________________
FRANCES AGUILAR, TRMC, MMC
CITY SECRETARY
Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287
NINYO & MOORE, A SOCOTEC COMPANY
2313 West Sam Houston Parkway North, Suite 119, Houston, Texas 77043 | 713.973.8400
August 10, 2026
Project No. 701915001
Mr. Michael Langley
City of Pearland
2016 Old Alvin Road
Pearland, Texas 77581
Subject: Construction Materials Testing and Observation Services
Shadycrest and Creekview Subdivision Drainage Improvement (DR 2401)
Shadycrest Drive between Pearland Parkway and FM 518
Pearland, Texas
Dear Mr. Langley:
We are pleased to present this revised proposal to provide materials testing services at the subject
site. In preparation of this proposal, we have reviewed the provided plans and specifications. The
project will consist of the installation of RCP and RCB storm sewers, inlets, and junction boxes,
removal and replacement of driveway aprons, installation of sidewalks, and reconstruction of
asphalt roads (DR 2401). This proposal was prepared without the benefit of a construction
schedule and is based on our assumptions as to the needed materials testing.
Ninyo & Moore’s Houston laboratory is supervised by registered civil engineers and meets the
requirements of the ASTM E329, ASTM C1077, and ASTM D3740. Ninyo & Moore’s testing
equipment is calibrated annually by representatives utilizing equipment traceable to the National
Institute of Standards and Technology, and regularly participates in Cement and Concrete
Reference Laboratory (CCRL) and AASHTO’s Material Reference Laboratory (AMRL) reference
testing. In addition, we are accredited by the American Association for Laboratory Accreditation
(A2LA) Certificate No. 3204.01 for Construction Materials and No. 3204.02 for Geotechnical. A
complete list of the tests on our scope of accreditation can be found at the A2LA website
(www.a2la.org).
SCOPE OF SERVICES
• Attend preconstruction and site meetings, as requested.
• Perform field observation and in-place density testing for utility trench backfill, pavement
subgrade, and cement treated base.
Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287
NINYO & MOORE, A SOCOTEC COMPANY
Shadycrest and Creekview Subdivision Drainage Improvement (DR 2401), Pearland, Texas | 701915001 | August 10, 2026
• Perform concrete sampling/testing for inlets, manholes, concrete driveways, and sidewalks.
• Perform in-place density testing and sampling for asphalt pavement.
• Perform laboratory testing of soil materials such as Moisture-Density Relationships (Proctor),
Atterberg Limits (PI), and 200 Wash.
• Perform laboratory testing to evaluate the compressive strength of cement treated sand,
cement treated base, and concrete samples.
• Consultation and project management.
ESTIMATED FEE
We propose to provide our services on a time-and-materials basis accrued in accordance with
the attached cost estimate. We estimate the fee for our time and materials not to exceed
$168,925. Our estimated fee does not include weekend work, stand-by time or costs associated
with retesting, or re-inspecting materials that were found not to be in compliance with the project
plans or specifications. Any additional services requested and not part of the cost estimate will be
charged in accordance with our attached Schedule of Fees. A breakdown of our fee is presented
in the attached Table 1.
To authorize our services, provide a Professional Services Agreement. We look forward to working
with you.
Respectfully submitted,
NINYO & MOORE
Jonathan Howson, PE
Senior Project Engineer
Managing Principal Engineer
JNH/JTS/ls
Attachments: Table 1 – Breakdown of Estimated Fee
Schedule of Fees
Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287
Engineering Technician
Utilities / Paving Subgrade 112.5 days @ 8 hours/day @ 60.00$ /hour 54,000.00$
Sample Pick-up 4 days @ 2 hours/day @ 105.00$ /hour 840.00$
Vehicle Usage Charge 908 hours @ 15.00$ /hour 13,620.00$
Nuclear Density Gauge 900 hours @ 15.00$ /hour 13,500.00$
Laboratory Testing
Standard Proctor Density, D 698 5 samples @ 230.00$ /sample 1,150.00$
Standard Proctor Density Treated Soils, D 698 2 samples @ 255.00$ /sample 510.00$
Modified Proctor Density Treated Soils, D 1557 4 samples @ 270.00$ /sample 1,080.00$
200 Wash 5 samples @ 60.00$ /sample 300.00$
Atterberg Limits 5 samples @ 70.00$ /sample 350.00$
CSS Compressives 30 samples @ 80.00$ /sample 2,400.00$
100 samples @ 281.00$ /sample 28,100.00$
115,850.00$
Engineering Technician 30 days @ 4 hours/day @ 60.00$ /hour 7,200.00$
onsite for other services)10 days @ 4 hours/day @ 60.00$ /hour 2,400.00$
Vehicle Usage Charge 160 hours @ 15.00$ /hour 2,400.00$
Compression Tests of Cylinders 30 sets @ 4 samples/set @ 80.00$ /set 2,400.00$
14,400.00$
Engineering Technician 15 days @ 8 hours/day @ 60.00$ /hour 7,200.00$
Engineering Technician (OT)15 days @ 2 hours/day @ 90.00$ /hour 2,700.00$
Vehicle Usage Charge 150 hours @ 15.00$ /hour 2,250.00$
Nuclear Density Gauge 150 hours @ 15.00$ /hour 2,250.00$
Maximum Theoretical Specific Gravity 15 tests @ 105.00$ /test 1,575.00$
Molding Specimens 15 sets of 3 @ 75.00$ /set 1,125.00$
Bulk Density of Lab Molded Specimen 15 sets of 3 @ 65.00$ /set 975.00$
Stability: Hveem 15 sets of 3 @ 110.00$ /set 1,650.00$
Extraction & Gradation Test 15 tests @ 230.00$ /test 3,450.00$
Subtotal 23,175.00$
Principal Engineer 10 hours @ 180.00$ /hour 1,800.00$
Project Manager 120 hours @ 105.00$ /hour 12,600.00$
Data Processor 20 hours @ 55.00$ /hour 1,100.00$
Subtotal 15,500.00$
168,925.00$
Engineering Review, Consultation, and Data Processing
Table 1 - Breakdown of Estimated Fee
Earthwork
TOTAL ESTIMATED FEE
Concrete
Asphalt Pavement
Shadycrest and Creekview Subdivision Drainage Improvement (DR 2401), Pearland, Texas | 701915001 | August 10, 2026 1
Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287
NINYO & MOORE, A SOCOTEC COMPANY
Shadycrest and Creekview Subdivision Drainage Improvement (DR 2401), Pearland, Texas | 701915001 | August 10, 2026 TX4
Schedule of Fees
Hourly Charges for Personnel
Principal Engineer/Geologist/Environmental Scientist/Certified Industrial Hygienist .............................................. $ 180
Senior Engineer/Geologist/Environmental Scientist ............................................................................................... $ 150
Senior Project Engineer/Geologist/Environmental Scientist ................................................................................... $ 140
Project Engineer/Geologist/Environmental Scientist ............................................................................................... $ 130
Senior Staff Engineer/Geologist/Environmental Scientist ....................................................................................... $ 115
Staff Engineer/Geologist/Environmental Scientist................................................................................................... $ 110
GIS Analyst .............................................................................................................................................................. $ 85
Technical Illustrator/CAD Operator.......................................................................................................................... $ 55
Special Inspector (Concrete, Masonry, Structural Steel, Welding, and Fireproofing) ............................................ $ 140
Nondestructive Examination Technician (UT, MT, LP) ........................................................................................... $ 120
Certified Asbestos/Lead Technician ........................................................................................................................ $ 120
Field Operations Manager ....................................................................................................................................... $ 105
Supervisory Technician ........................................................................................................................................... $ 75
Senior Technician .................................................................................................................................................... $ 65
Technician ................................................................................................................................................................ $ 60
Geotechnical/Environmental/Laboratory Assistant ................................................................................................. $ 55
Information Specialist .............................................................................................................................................. $ 55
Data Processor ........................................................................................................................................................ $ 55
Other Charges
Concrete Coring Equipment (includes technician) ............................................................................................... $ 190/hr
Anchor Load Test Equipment (includes technician) ............................................................................................. $ 190/hr
GPR Equipment .................................................................................................................................................... $ 180/hr
Inclinometer ........................................................................................................................................................... $ 100/hr
Hand Auger Equipment ........................................................................................................................................ $ 80/hr
Rebar Locator (Pachometer) ................................................................................................................................ $ 50/hr
Vapor Emission Kit ................................................................................................................................................ $ 75/kit
Equipment Charge ................................................................................................................................................ $ 15/hr
X-Ray Fluorescence ............................................................................................................................................. $ 70/hr
PID/FID.................................................................................................................................................................. $ 50/hr
Air Sampling Pump ............................................................................................................................................... $ 25/hr
Field Vehicle .......................................................................................................................................................... $ 15/hr
Expert Witness Testimony .................................................................................................................................... $ 400/hr
Direct Expenses ...................................................................................................................................... Cost plus 15%
Special equipment charges will be provided upon request.
Notes
work performed in excess of 8 hours in one day Monday through Friday, evening hours, and all day on Saturday, Sunday,
and holidays.
Field technician and special inspection hours are charged at a 2-hour minimum.
30 days.
Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287
NINYO & MOORE, A SOCOTEC COMPANY
2026 TX Laboratory Testing TX4
Schedule of Fees for Laboratory Testing
SOILS CONCRETE
Atterberg Limits, D 4318 .....................................................................$ 70 Compression Strength, C 39 ............................................................... $ 20
California Bearing Ratio (CBR), D 1883, per point ............................$ 240 Flexural Test, C 78 or C 293 ............................................................... $ 30
One Dimensional Consolidation, D 2435 ...........................................$ 450 Splitting Tensile Strength, C 496 ........................................................ $ 125
Consolidation Additional Increments, D 2435....................................$ 60 Time of Setting of Cement by Vicat Needle, C 191 ........................... $ 250
Hydrometer Analysis, D 422 ...............................................................$ 145 Concrete Laboratory Mix Verification, Excluding cylinders .............. $ 500
Double Hydrometer Analysis, D 4221 ................................................$ 250 Concrete Coring, Measurement, and Compressive Strength .......... $ 250
Moisture Content, D 2216 ...................................................................$ 10 Concrete Core Compressive Strength, Includes Prep, C 42 ........... $ 90
Moisture and Density, D 2937 ............................................................$ 55 Concrete Core Measurement, C 174 ................................................. $ 30
Permeability, D 2434 ...........................................................................$ 300 Concrete Coring Minimum Charge ..................................................... $ 600
Specific Gravity, D 854 .......................................................................$ 65 Concrete Coring – 4” Diameter to 6-inch depth ................................. $ 120
Standard Proctor Density, D 698........................................................$ 230 Concrete Coring Additional Thickness 6” to 12” depth ...................... $ 11/in
Modified Proctor Density, D 1557 ......................................................$ 250 Concrete Coring Additional Thickness over 12” depth ...................... $ 15/in
(Rock corrections add $70) Compressive Strength Lt. Wt. Insulating Concrete, C 495 ................ $ 30
Sieve Analysis, D 422 .........................................................................$ 65 Unit Weight of Lt. Wt. Insulating Concrete, C 495 ............................. $ 25
Sieve Analysis, 200 Wash, D 1140 ....................................................$ 60
Swell Test, D 4546 ..............................................................................$ 350 FIREPROOFING
Triaxial Shear, U.U., D 2850 per point ...............................................$ 75 Density of SFRM, E 605 ...................................................................... $ 45
Unconfined Compression, D 2166 .....................................................$ 50 Cohesion/Adhesion of SFRM, E 736 .................................................. $ 35
Pinhole Dispersion Test, D 4647 ........................................................$ 320
Crumb Test Dispersion Test, D 4647 .................................................$ 45 ASPHALT
Lime Determination, PI Method ..........................................................$ 275 Asphalt Mix Design Review, Job Spec ........................................... $ 500
Lime Determination, pH Method, D 62765 ........................................$ 265 Asphalt Mix Design, 5 points .......................................................... $ 2500
Compressive Strength Cement Stabilized Sand, D 1633 .................$ 80 Extraction, % Asphalt, including Gradation, Tex 210F ................... $ 230
Standard Proctor Density Treated Soils, D 698 ................................$ 255 Hveem Stability, Tex 208F ............................................................. $ 110/set
Modified Proctor Density Treated Soils, D 1557 ...............................$ 270 Bulk Density Lab Molded Samples, Tex 207F ............................... $ 65/set
Bulk Density Core, Tex 207F.......................................................... $ 60
Molding Specimens, Tex 206F ....................................................... $ 75/set MASONRY Measurement of Asphalt Cores ...................................................... $ 25
Brick Absorption, 24-hour submersion, C 67 .....................................$ 85 Asphalt Coring Minimum Charge.................................................... $ 600
Brick Absorption, 5-hour boiling, C 67 ...............................................$ 85 Asphalt Coring – 4” Diameter to 6-inch depth ................................ $ 105
Brick Absorption, 7-day, C 67 .............................................................$ 85 Concrete Coring Additional Thickness over 6” depth ..................... $ 10/in
Brick Compression Test, C 67 ............................................................$ 50 Maximum Theoretical Unit Weight, Tex 227F ................................ $ 105
Brick Moisture as received, C 67........................................................$ 50
Brick Measurement, C 67 ...................................................................$ 65 AGGREGATES
CMU Block Compression Test, 8x8x16, C 140 .................................$ 150 Clay Lumps and Friable Particles, C 142 ....................................... $ 65
CMU Block Unit Weight and Absorption, C 140 ................................$ 100 Los Angeles Abrasion, C 131 or C 535 .......................................... $ 240
CMU Block Moisture Content, C 140 .................................................$ 95 Organic Impurities, C 40 ................................................................. $ 55
CMU Block Measurement, C 140 ......................................................$ 35 Sieve Analysis, Coarse Aggregate, C 136 ..................................... $ 75
Compressive Strength, Grout prism, C 1019, each ..........................$ 55 Sieve Analysis, Fine Aggregate, C 136 .......................................... $ 75
Compressive Strength, Mortar Cube, C 109, each ...........................$ 30 Decantation, C 117 ......................................................................... $ 55 Specific Gravity, Coarse, C 127 ..................................................... $ 120
Specific Gravity, Fine, C 128 .......................................................... $ 135
Special preparation of standard test specimens will be charged at the technician’s hourly rate.
Ninyo & Moore is accredited to perform the AASHTO equivalent of many ASTM test procedures.
Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287
NINYO & MOORE, A SOCOTEC COMPANY
2313 West Sam Houston Parkway North, Suite 119, Houston, Texas 77043 | 713.973.8400
September 17, 2026
Project No. 701915002
Mr. Michael Langley
City of Pearland
2016 Old Alvin Road
Pearland, Texas 77581
Subject: Construction Materials Testing and Observation Services
Creekview and Shadycrest Transite Pipe Water Line Replacement (WA2405)
Shadycrest Drive between Pearland Parkway and FM 518
Pearland, Texas
Dear Mr. Langley:
We are pleased to present this revised proposal to provide materials testing services at the subject
site. In preparation of this proposal, we have reviewed the provided plans and specifications. The
project will consist of the installation of approximately 22,500 linear feet of new water line and
service connections, with the majority of the project using trenchless construction (WA 2405). This
proposal was prepared without the benefit of a construction schedule and is based on our
assumptions as to the needed materials testing.
Ninyo & Moore’s Houston laboratory is supervised by registered civil engineers and meets the
requirements of the ASTM E329, ASTM C1077, and ASTM D3740. Ninyo & Moore’s testing
equipment is calibrated annually by representatives utilizing equipment traceable to the National
Institute of Standards and Technology, and regularly participates in Cement and Concrete
Reference Laboratory (CCRL) and AASHTO’s Material Reference Laboratory (AMRL) reference
testing. In addition, we are accredited by the American Association for Laboratory Accreditation
(A2LA) Certificate No. 3204.01 for Construction Materials and No. 3204.02 for Geotechnical. A
complete list of the tests on our scope of accreditation can be found at the A2LA website
(www.a2la.org).
SCOPE OF SERVICES
• Attend preconstruction and site meetings, as requested.
• Perform field observation and in-place density testing for bore pit backfill.
Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287
NINYO & MOORE, A SOCOTEC COMPANY
Creekview and Shadycrest Transite Pipe Water Line Replacement (WA2405), Pearland, Texas | 701915002 | September 17, 2026
• Perform laboratory testing of soil materials such as Moisture-Density Relationships (Proctor),
Atterberg Limits (PI), and 200 Wash.
• Perform laboratory testing to evaluate the compressive strength of cement treated sand.
• Consultation and project management.
ESTIMATED FEE
We propose to provide our services on a time-and-materials basis accrued in accordance with
the attached cost estimate. We estimate the fee for our time and materials not to exceed $4,050.
Our estimated fee does not include weekend work, overtime, stand-by time or costs associated
with retesting, or re-inspecting materials that were found not to be in compliance with the project
plans or specifications. Any additional services requested and not part of the cost estimate will be
charged in accordance with our attached Schedule of Fees. A breakdown of our fee is presented
in the attached Table 1.
To authorize our services, provide a Professional Services Agreement. We look forward to working
with you.
Respectfully submitted,
NINYO & MOORE
Jonathan Howson, PE
Senior Project Engineer
Managing Principal Engineer
JNH/JTS/ls
Attachments: Table 1 – Breakdown of Estimated Fee
Schedule of Fees
Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287
Engineering Technician
Utilities 2 days @ 8 hours/day @ 60.00$ /hour 960.00$
Sample Pick-up 2 days @ 2 hours/day @ 60.00$ /hour 240.00$
Vehicle Usage Charge 20 hours @ 15.00$ /hour 300.00$
Nuclear Density Gauge 16 hours @ 15.00$ /hour 240.00$
Laboratory Testing
Standard Proctor Density, D 698 4 samples @ 230.00$ /sample 920.00$
200 Wash 4 samples @ 60.00$ /sample 240.00$
Atterberg Limits 4 samples @ 70.00$ /sample 280.00$
CSS Compressives 4 samples @ 80.00$ /sample 320.00$
3,500.00$
Principal Engineer 1 hour @ 180.00$ /hour 180.00$
Project Manager 3 hours @ 105.00$ /hour 315.00$
Data Processor 1 hour @ 55.00$ /hour 55.00$
Subtotal 550.00$
4,050.00$
Engineering Review, Consultation, and Data Processing
Table 1 - Breakdown of Estimated Fee
Earthwork
TOTAL ESTIMATED FEE
Creekview and Shadycrest Transite Pipe Water Line Replacement (WA2405), Pearland, Texas | 701915002 | September 17, 2026 1
Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287
NINYO & MOORE, A SOCOTEC COMPANY
Creekview and Shadycrest Transite Pipe Water Line Replacement (WA2405), Pearland, Texas | 701915002 | September 17, 2026 TX4
Schedule of Fees
Hourly Charges for Personnel
Principal Engineer/Geologist/Environmental Scientist/Certified Industrial Hygienist .............................................. $ 180
Senior Engineer/Geologist/Environmental Scientist ............................................................................................... $ 150
Senior Project Engineer/Geologist/Environmental Scientist ................................................................................... $ 140
Project Engineer/Geologist/Environmental Scientist ............................................................................................... $ 130
Senior Staff Engineer/Geologist/Environmental Scientist ....................................................................................... $ 115
Staff Engineer/Geologist/Environmental Scientist................................................................................................... $ 110
GIS Analyst .............................................................................................................................................................. $ 85
Technical Illustrator/CAD Operator.......................................................................................................................... $ 55
Special Inspector (Concrete, Masonry, Structural Steel, Welding, and Fireproofing) ............................................ $ 140
Nondestructive Examination Technician (UT, MT, LP) ........................................................................................... $ 120
Certified Asbestos/Lead Technician ........................................................................................................................ $ 120
Field Operations Manager ....................................................................................................................................... $ 105
Supervisory Technician ........................................................................................................................................... $ 75
Senior Technician .................................................................................................................................................... $ 65
Technician ................................................................................................................................................................ $ 60
Geotechnical/Environmental/Laboratory Assistant ................................................................................................. $ 55
Information Specialist .............................................................................................................................................. $ 55
Data Processor ........................................................................................................................................................ $ 55
Other Charges
Concrete Coring Equipment (includes technician) ............................................................................................... $ 190/hr
Anchor Load Test Equipment (includes technician) ............................................................................................. $ 190/hr
GPR Equipment .................................................................................................................................................... $ 180/hr
Inclinometer ........................................................................................................................................................... $ 100/hr
Hand Auger Equipment ........................................................................................................................................ $ 80/hr
Rebar Locator (Pachometer) ................................................................................................................................ $ 50/hr
Vapor Emission Kit ................................................................................................................................................ $ 75/kit
Equipment Charge ................................................................................................................................................ $ 15/hr
X-Ray Fluorescence ............................................................................................................................................. $ 70/hr
PID/FID.................................................................................................................................................................. $ 50/hr
Air Sampling Pump ............................................................................................................................................... $ 25/hr
Field Vehicle .......................................................................................................................................................... $ 15/hr
Expert Witness Testimony .................................................................................................................................... $ 400/hr
Direct Expenses ...................................................................................................................................... Cost plus 15%
Special equipment charges will be provided upon request.
Notes
For field and laboratory technicians and special inspectors, overtime rates at 1.5 times the regular rates will be charged for
work performed in excess of 8 hours in one day Monday through Friday, evening hours, and all day on Saturday, Sunday,
and holidays.
Field technician and special inspection hours are charged at a 2-hour minimum.
30 days.
Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287
NINYO & MOORE, A SOCOTEC COMPANY
2026 TX Laboratory Testing TX4
Schedule of Fees for Laboratory Testing
SOILS CONCRETE
Atterberg Limits, D 4318 .....................................................................$ 70 Compression Strength, C 39 ............................................................... $ 20
California Bearing Ratio (CBR), D 1883, per point ............................$ 240 Flexural Test, C 78 or C 293 ............................................................... $ 30
One Dimensional Consolidation, D 2435 ...........................................$ 450 Splitting Tensile Strength, C 496 ........................................................ $ 125
Consolidation Additional Increments, D 2435....................................$ 60 Time of Setting of Cement by Vicat Needle, C 191 ........................... $ 250
Hydrometer Analysis, D 422 ...............................................................$ 145 Concrete Laboratory Mix Verification, Excluding cylinders .............. $ 500
Double Hydrometer Analysis, D 4221 ................................................$ 250 Concrete Coring, Measurement, and Compressive Strength .......... $ 250
Moisture Content, D 2216 ...................................................................$ 10 Concrete Core Compressive Strength, Includes Prep, C 42 ........... $ 90
Moisture and Density, D 2937 ............................................................$ 55 Concrete Core Measurement, C 174 ................................................. $ 30
Permeability, D 2434 ...........................................................................$ 300 Concrete Coring Minimum Charge ..................................................... $ 600
Specific Gravity, D 854 .......................................................................$ 65 Concrete Coring – 4” Diameter to 6-inch depth ................................. $ 120
Standard Proctor Density, D 698........................................................$ 230 Concrete Coring Additional Thickness 6” to 12” depth ...................... $ 11/in
Modified Proctor Density, D 1557 ......................................................$ 250 Concrete Coring Additional Thickness over 12” depth ...................... $ 15/in
(Rock corrections add $70) Compressive Strength Lt. Wt. Insulating Concrete, C 495 ................ $ 30
Sieve Analysis, D 422 .........................................................................$ 65 Unit Weight of Lt. Wt. Insulating Concrete, C 495 ............................. $ 25
Sieve Analysis, 200 Wash, D 1140 ....................................................$ 60
Swell Test, D 4546 ..............................................................................$ 350 FIREPROOFING
Triaxial Shear, U.U., D 2850 per point ...............................................$ 75 Density of SFRM, E 605 ...................................................................... $ 45
Unconfined Compression, D 2166 .....................................................$ 50 Cohesion/Adhesion of SFRM, E 736 .................................................. $ 35
Pinhole Dispersion Test, D 4647 ........................................................$ 320
Crumb Test Dispersion Test, D 4647 .................................................$ 45 ASPHALT
Lime Determination, PI Method ..........................................................$ 275 Asphalt Mix Design Review, Job Spec ........................................... $ 500
Lime Determination, pH Method, D 62765 ........................................$ 265 Asphalt Mix Design, 5 points .......................................................... $ 2500
Compressive Strength Cement Stabilized Sand, D 1633 .................$ 80 Extraction, % Asphalt, including Gradation, Tex 210F ................... $ 230
Standard Proctor Density Treated Soils, D 698 ................................$ 255 Hveem Stability, Tex 208F ............................................................. $ 110/set
Modified Proctor Density Treated Soils, D 1557 ...............................$ 270 Bulk Density Lab Molded Samples, Tex 207F ............................... $ 65/set
Bulk Density Core, Tex 207F.......................................................... $ 60
Molding Specimens, Tex 206F ....................................................... $ 75/set MASONRY Measurement of Asphalt Cores ...................................................... $ 25
Brick Absorption, 24-hour submersion, C 67 .....................................$ 85 Asphalt Coring Minimum Charge.................................................... $ 600
Brick Absorption, 5-hour boiling, C 67 ...............................................$ 85 Asphalt Coring – 4” Diameter to 6-inch depth ................................ $ 105
Brick Absorption, 7-day, C 67 .............................................................$ 85 Concrete Coring Additional Thickness over 6” depth ..................... $ 10/in
Brick Compression Test, C 67 ............................................................$ 50 Maximum Theoretical Unit Weight, Tex 227F ................................ $ 105
Brick Moisture as received, C 67........................................................$ 50
Brick Measurement, C 67 ...................................................................$ 65 AGGREGATES
CMU Block Compression Test, 8x8x16, C 140 .................................$ 150 Clay Lumps and Friable Particles, C 142 ....................................... $ 65
CMU Block Unit Weight and Absorption, C 140 ................................$ 100 Los Angeles Abrasion, C 131 or C 535 .......................................... $ 240
CMU Block Moisture Content, C 140 .................................................$ 95 Organic Impurities, C 40 ................................................................. $ 55
CMU Block Measurement, C 140 ......................................................$ 35 Sieve Analysis, Coarse Aggregate, C 136 ..................................... $ 75
Compressive Strength, Grout prism, C 1019, each ..........................$ 55 Sieve Analysis, Fine Aggregate, C 136 .......................................... $ 75
Compressive Strength, Mortar Cube, C 109, each ...........................$ 30 Decantation, C 117 ......................................................................... $ 55
Specific Gravity, Coarse, C 127 ..................................................... $ 120
Specific Gravity, Fine, C 128 .......................................................... $ 135
Special preparation of standard test specimens will be charged at the technician’s hourly rate.
Ninyo & Moore is accredited to perform the AASHTO equivalent of many ASTM test procedures.
Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287
NINYO & MOORE, A SOCOTEC COMPANY
2313 West Sam Houston Parkway North, Suite 119, Houston, Texas 77043 | 713.973.8400
August 10, 2026
Project No. 701915003
Mr. Michael Langley
City of Pearland
2016 Old Alvin Road
Pearland, Texas 77581
Subject: Construction Materials Testing and Observation Services
Shadycrest and Creekview Subdivision Sanitary Sewer Rehabilitation (WW2405)
Shadycrest Drive between Pearland Parkway and FM 518
Pearland, Texas
Dear Mr. Langley:
We are pleased to present this proposal to provide materials testing services at the subject site.
In preparation of this proposal, we have reviewed the provided plans and specifications. We
understand the project will consist of approximately 2,455 linear feet of 8-inch sanitary sewer by
open cut method (WW 2405). This proposal was prepared without the benefit of a construction
schedule and is based on our assumptions as to the needed materials testing.
Ninyo & Moore’s Houston laboratory is supervised by registered civil engineers and meets the
requirements of the ASTM E329, ASTM C1077, and ASTM D3740. Ninyo & Moore’s testing
equipment is calibrated annually by representatives utilizing equipment traceable to the National
Institute of Standards and Technology, and regularly participates in Cement and Concrete
Reference Laboratory (CCRL) and AASHTO’s Material Reference Laboratory (AMRL) reference
testing. In addition, we are accredited by the American Association for Laboratory Accreditation
(A2LA) Certificate No. 3204.01 for Construction Materials and No. 3204.02 for Geotechnical. A
complete list of the tests on our scope of accreditation can be found at the A2LA website
(www.a2la.org).
SCOPE OF SERVICES
• Attend preconstruction and site meetings, as requested.
• Perform field observation and in-place density testing for utility trench backfill.
• Perform laboratory testing of soil materials such as Moisture-Density Relationships (Proctor),
Atterberg Limits (PI), and 200 Wash.
Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287
NINYO & MOORE, A SOCOTEC COMPANY
Shadycrest and Creekview Subdivision Sanitary Sewer Rehabilitation (WW2405), Pearland, Texas | 701915003 | August 10, 2026
• Perform laboratory testing to evaluate the compressive strength of cement treated sand.
• Consultation and project management.
ESTIMATED FEE
We propose to provide our services on a time-and-materials basis accrued in accordance with
the attached cost estimate. We estimate the fee for our time and materials not to exceed $13,685.
Our estimated fee does not include weekend work, stand-by time or costs associated with
retesting, or re-inspecting materials that were found not to be in compliance with the project plans
or specifications. Any additional services requested and not part of the cost estimate will be
charged in accordance with our attached Schedule of Fees. A breakdown of our fee is presented
in the attached Table 1.
To authorize our services, provide a Professional Services Agreement. We look forward to working
with you.
Respectfully submitted,
NINYO & MOORE
Jonathan Howson, PE
Senior Project Engineer
Managing Principal Engineer
JNH/JTS/ls
Attachments: Table 1 – Breakdown of Estimated Fee
Schedule of Fees
Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287
Engineering Technician
Utilities 13.75 days @ 8 hours/day @ 60.00$ /hour 6,600.00$
Sample Pick-up 1 day @ 4 hours/day @ 60.00$ /hour 240.00$
Vehicle Usage Charge 114 hours @ 15.00$ /hour 1,710.00$
Nuclear Density Gauge 110 hours @ 15.00$ /hour 1,650.00$
Laboratory Testing
Standard Proctor Density, D 698 2 samples @ 230.00$ /sample 460.00$
2 samples @ 255.00$ /sample 510.00$
200 Wash 2 samples @ 60.00$ /sample 120.00$
Atterberg Limits 2 samples @ 70.00$ /sample 140.00$
CSS Compressives 12 samples @ 80.00$ /sample 960.00$
12,390.00$
Principal Engineer 1 hour @ 180.00$ /hour 180.00$
Project Manager 8 hours @ 105.00$ /hour 840.00$
Data Processor 5 hours @ 55.00$ /hour 275.00$
Subtotal 1,295.00$
13,685.00$
Table 1 - Breakdown of Estimated Fee
Earthwork
TOTAL ESTIMATED FEE
Subtotal
Engineering Review, Consultation, and Data Processing
Shadycrest and Creekview Subdivision Sanitary Sewer Rehabilitation (WW2405), Pearland, Texas | 701915003 | August 10, 2026 1
Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287
NINYO & MOORE, A SOCOTEC COMPANY
Shadycrest and Creekview Subdivision Sanitary Sewer Rehabilitation (WW2405), Pearland, Texas | 701915003 | August 10, 2026 TX4
Schedule of Fees
Hourly Charges for Personnel
Principal Engineer/Geologist/Environmental Scientist/Certified Industrial Hygienist .............................................. $ 180
Senior Engineer/Geologist/Environmental Scientist ............................................................................................... $ 150
Senior Project Engineer/Geologist/Environmental Scientist ................................................................................... $ 140
Project Engineer/Geologist/Environmental Scientist ............................................................................................... $ 130
Senior Staff Engineer/Geologist/Environmental Scientist ....................................................................................... $ 115
Staff Engineer/Geologist/Environmental Scientist................................................................................................... $ 110
GIS Analyst .............................................................................................................................................................. $ 85
Technical Illustrator/CAD Operator.......................................................................................................................... $ 55
Special Inspector (Concrete, Masonry, Structural Steel, Welding, and Fireproofing) ............................................ $ 140
Nondestructive Examination Technician (UT, MT, LP) ........................................................................................... $ 120
Certified Asbestos/Lead Technician ........................................................................................................................ $ 120
Field Operations Manager ....................................................................................................................................... $ 105
Supervisory Technician ........................................................................................................................................... $ 75
Senior Technician .................................................................................................................................................... $ 65
Technician ................................................................................................................................................................ $ 60
Geotechnical/Environmental/Laboratory Assistant ................................................................................................. $ 55
Information Specialist .............................................................................................................................................. $ 55
Data Processor ........................................................................................................................................................ $ 55
Other Charges
Concrete Coring Equipment (includes technician) ............................................................................................... $ 190/hr
Anchor Load Test Equipment (includes technician) ............................................................................................. $ 190/hr
GPR Equipment .................................................................................................................................................... $ 180/hr
Inclinometer ........................................................................................................................................................... $ 100/hr
Hand Auger Equipment ........................................................................................................................................ $ 80/hr
Rebar Locator (Pachometer) ................................................................................................................................ $ 50/hr
Vapor Emission Kit ................................................................................................................................................ $ 75/kit
Equipment Charge ................................................................................................................................................ $ 15/hr
X-Ray Fluorescence ............................................................................................................................................. $ 70/hr
PID/FID.................................................................................................................................................................. $ 50/hr
Air Sampling Pump ............................................................................................................................................... $ 25/hr
Field Vehicle .......................................................................................................................................................... $ 15/hr
Expert Witness Testimony .................................................................................................................................... $ 400/hr
Direct Expenses ...................................................................................................................................... Cost plus 15%
Special equipment charges will be provided upon request.
Notes
work performed in excess of 8 hours in one day Monday through Friday, evening hours, and all day on Saturday, Sunday,
and holidays.
Field technician and special inspection hours are charged at a 2-hour minimum.
30 days.
Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287
NINYO & MOORE, A SOCOTEC COMPANY
2026 TX Laboratory Testing TX4
Schedule of Fees for Laboratory Testing
SOILS CONCRETE
Atterberg Limits, D 4318 .....................................................................$ 70 Compression Strength, C 39 ............................................................... $ 20
California Bearing Ratio (CBR), D 1883, per point ............................$ 240 Flexural Test, C 78 or C 293 ............................................................... $ 30
One Dimensional Consolidation, D 2435 ...........................................$ 450 Splitting Tensile Strength, C 496 ........................................................ $ 125
Consolidation Additional Increments, D 2435....................................$ 60 Time of Setting of Cement by Vicat Needle, C 191 ........................... $ 250
Hydrometer Analysis, D 422 ...............................................................$ 145 Concrete Laboratory Mix Verification, Excluding cylinders .............. $ 500
Double Hydrometer Analysis, D 4221 ................................................$ 250 Concrete Coring, Measurement, and Compressive Strength .......... $ 250
Moisture Content, D 2216 ...................................................................$ 10 Concrete Core Compressive Strength, Includes Prep, C 42 ........... $ 90
Moisture and Density, D 2937 ............................................................$ 55 Concrete Core Measurement, C 174 ................................................. $ 30
Permeability, D 2434 ...........................................................................$ 300 Concrete Coring Minimum Charge ..................................................... $ 600
Specific Gravity, D 854 .......................................................................$ 65 Concrete Coring – 4” Diameter to 6-inch depth ................................. $ 120
Standard Proctor Density, D 698........................................................$ 230 Concrete Coring Additional Thickness 6” to 12” depth ...................... $ 11/in
Modified Proctor Density, D 1557 ......................................................$ 250 Concrete Coring Additional Thickness over 12” depth ...................... $ 15/in
(Rock corrections add $70) Compressive Strength Lt. Wt. Insulating Concrete, C 495 ................ $ 30
Sieve Analysis, D 422 .........................................................................$ 65 Unit Weight of Lt. Wt. Insulating Concrete, C 495 ............................. $ 25
Sieve Analysis, 200 Wash, D 1140 ....................................................$ 60
Swell Test, D 4546 ..............................................................................$ 350 FIREPROOFING
Triaxial Shear, U.U., D 2850 per point ...............................................$ 75 Density of SFRM, E 605 ...................................................................... $ 45
Unconfined Compression, D 2166 .....................................................$ 50 Cohesion/Adhesion of SFRM, E 736 .................................................. $ 35
Pinhole Dispersion Test, D 4647 ........................................................$ 320
Crumb Test Dispersion Test, D 4647 .................................................$ 45 ASPHALT
Lime Determination, PI Method ..........................................................$ 275 Asphalt Mix Design Review, Job Spec ........................................... $ 500
Lime Determination, pH Method, D 62765 ........................................$ 265 Asphalt Mix Design, 5 points .......................................................... $ 2500
Compressive Strength Cement Stabilized Sand, D 1633 .................$ 80 Extraction, % Asphalt, including Gradation, Tex 210F ................... $ 230
Standard Proctor Density Treated Soils, D 698 ................................$ 255 Hveem Stability, Tex 208F ............................................................. $ 110/set
Modified Proctor Density Treated Soils, D 1557 ...............................$ 270 Bulk Density Lab Molded Samples, Tex 207F ............................... $ 65/set
Bulk Density Core, Tex 207F.......................................................... $ 60
Molding Specimens, Tex 206F ....................................................... $ 75/set MASONRY Measurement of Asphalt Cores ...................................................... $ 25
Brick Absorption, 24-hour submersion, C 67 .....................................$ 85 Asphalt Coring Minimum Charge.................................................... $ 600
Brick Absorption, 5-hour boiling, C 67 ...............................................$ 85 Asphalt Coring – 4” Diameter to 6-inch depth ................................ $ 105
Brick Absorption, 7-day, C 67 .............................................................$ 85 Concrete Coring Additional Thickness over 6” depth ..................... $ 10/in
Brick Compression Test, C 67 ............................................................$ 50 Maximum Theoretical Unit Weight, Tex 227F ................................ $ 105
Brick Moisture as received, C 67........................................................$ 50
Brick Measurement, C 67 ...................................................................$ 65 AGGREGATES
CMU Block Compression Test, 8x8x16, C 140 .................................$ 150 Clay Lumps and Friable Particles, C 142 ....................................... $ 65
CMU Block Unit Weight and Absorption, C 140 ................................$ 100 Los Angeles Abrasion, C 131 or C 535 .......................................... $ 240
CMU Block Moisture Content, C 140 .................................................$ 95 Organic Impurities, C 40 ................................................................. $ 55
CMU Block Measurement, C 140 ......................................................$ 35 Sieve Analysis, Coarse Aggregate, C 136 ..................................... $ 75
Compressive Strength, Grout prism, C 1019, each ..........................$ 55 Sieve Analysis, Fine Aggregate, C 136 .......................................... $ 75
Compressive Strength, Mortar Cube, C 109, each ...........................$ 30 Decantation, C 117 ......................................................................... $ 55 Specific Gravity, Coarse, C 127 ..................................................... $ 120
Specific Gravity, Fine, C 128 .......................................................... $ 135
Special preparation of standard test specimens will be charged at the technician’s hourly rate.
Ninyo & Moore is accredited to perform the AASHTO equivalent of many ASTM test procedures.