Loading...
HomeMy WebLinkAboutR2026-204 20261116RESOLUTION NO. R2026-204 A Resolution of the City Council of the City of Pearland, Texas, approving a professional services agreement in an amount not to exceed $186,660.00 with Ninyo & Moore for construction materials testing associated with the Shadycrest and Creekview Subdivision Drainage Improvement (DR2401); Creekview and Shadycrest Transite Pipe Water Line Replacement (WA2405); and Shadycrest and Creekview Subdivision Sanitary Sewer Rehabilitation (WW2405) projects. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That a contract for professional services in an amount not to exceed $186,660.00 with Ninyo & Moore for construction materials testing associated with the Shadycrest and Creekview Subdivision Drainage Improvement (DR2401); Creekview and Shadycrest Transite Pipe Water Line Replacement (WA2405); and Shadycrest and Creekview Subdivision Sanitary Sewer Rehabilitation (WW2405) projects, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a contract for professional services. PASSED, APPROVED and ADOPTED this on the 16th day of November, A.D., 2026. ________________________________ QUENTIN WILTZ MAYOR ATTEST: ________________________________ FRANCES AGUILAR, TRMC, MMC CITY SECRETARY APPROVED AS TO FORM: ________________________________ LAWRENCE G. PROVINS CITY ATTORNEY Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287 Professional Services Contract 1 of 5 4/2019 CONTRACT FOR PROFESSIONAL SERVICES THIS CONTRACT is entered into upon final execution by and between the City of Pearland ("CITY") and Ninyo & Moore ("CONSULTANT"). The CITY engages the CONSULTANT to perform professional services for a project known and described as Shadycrest and Creekview Subdivision Improvements ("PROJECT"). (Project #DR2401, WA2405, WW2405), Contract # P123-26. SECTION I - SERVICES OF THE CONSULTANT The CONSULTANT shall perform the following professional services to CITY standards and in accordance with the degree of care and skill that a professional in Texas would exercise under the same or similar circumstances: A.The CONSULTANT shall provide professional services. See Exhibit A, attached, for a detailed SCOPE OF WORK and PROJECT schedule. The PROJECT schedule shall be submitted in digital and hard copy form in the Microsoft Project for Windows format. B.The CONSULTANT shall prepare and submit a detailed opinion of estimated cost of the PROJECT. C.The CONSULTANT acknowledges that the CITY (through its employee handbook) considers the following to be misconduct that is grounds for termination of a CITY employee: Any fraud, forgery, misappropriation of funds, receiving payment for services not performed or for hours not worked, mishandling or untruthful reporting of money transactions, destruction of assets, embezzlement, accepting materials of value from vendors, or consultants, and/or collecting reimbursement of expenses made for the benefit of the CITY. The CONSULTANT agrees that it will not, directly or indirectly; encourage a CITY employee to engage in such misconduct. D.The CONSULTANT shall submit all final construction documents in both hard copy and electronic format. Plans shall be AutoCAD compatible and all other documents shall be Microsoft Office compatible. The software version used shall be compatible to current CITY standards. Other support documents, for example, structural calculations, drainage reports and geotechnical reports, shall be submitted in hard copy only. All Record Drawings electronic files shall be submitted to the CITY in TIF format. E.The CONSULTANT recognizes that all drawings, special provisions, field survey notes, reports, estimates and any and all other documents or work product generated by the CONSULTANT under the CONTRACT shall be delivered to the CITY upon request, shall become subject to the Open Records Laws of this State. EXHIBIT A Resolution No. R2026-204Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287 Professional Services Contract 2 of 5 4/2019 F. The CONSULTANT shall procure and maintain for the duration of this Agreement, insurance against claims for injuries to persons, damages to property, or any errors and omissions relating to the performance of any work by the CONSULTANT, its agents, employees or subcontractors under this Agreement, as follows: (1) Workers’ Compensation as required by law. (2) Professional Liability Insurance in an amount not less than $1,000,000 in the aggregate. (3) Comprehensive General Liability and Property Damage Insurance with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for each occurrence of damage to or destruction of property. (4) Comprehensive Automobile and Truck Liability Insurance covering owned, hired, and non-owned vehicles, with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for property damage. The CONSULTANT shall include the CITY as an additional insured under the policies, with the exception of the Professional Liability Insurance and Workers’ Compensation. Certificates of Insurance and endorsements shall be furnished to the CITY before work commences. Each insurance policy shall be endorsed to state that coverage shall not be suspended, voided, canceled, and/or reduced in coverage or in limits (“Change in Coverage”) except with prior written consent of the CITY and only after the CITY has been provided with written notice of such Change in Coverage, such notice to be sent to the CITY either by hand delivery to the City Manager or by certified mail, return receipt requested, and received by the City no fewer than thirty (30) days prior to the effective date of such Change in Coverage. Prior to commencing services under this CONTRACT, CONSULTANT shall furnish CITY with Certificates of Insurance, or formal endorsements as required by this CONTRACT, issued by CONSULTANT’S insurer(s), as evidence that policies providing the required coverage, conditions, and limits required by this CONTRACT are in full force and effect. G. The CONSULTANT shall indemnify and hold the CITY, its officers, agents, and employees, harmless from any claim, loss, damage, suit, and liability of every kind for which CONSULTANT is legally liable, including all expenses of litigation, court costs, and attorney's fees, for injury to or death of any person, for damage to any property, or errors in design, any of which are caused by the Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287 Professional Services Contract 3 of 5 4/2019 negligent act or omission of the CONSULTANT, his officers, employees, agents, or subcontractors under this CONTRACT. H. All parties intend that the CONSULTANT, in performing services pursuant to this CONTRACT, shall act as an independent contractor and shall have control of its own work and the manner in which it is performed. The CONSULTANT is not to be considered an agent or employee of the CITY. SECTION II - PERIOD OF SERVICE This CONTRACT will be binding upon execution and end March 1, 2029. SECTION III - CONSULTANT'S COMPENSATION A. The total compensation for the services performed shall not exceed the total noted in Section B. B. The CITY shall pay the CONSULTANT in installments based upon monthly progress reports and detailed invoices submitted by the CONSULTANT based upon the following: 1. Basic Services (Lump Sum) 2. Additional Services shall require independent and specific authorization and shall be billed as (Lump Sum): 3. Bid Phase Services (Hourly Not to Exceed) 4. Construction Phase Services (Hourly Not to Exceed) $186,660.00 5. Reimbursable Expenses (Not to Exceed) 6. Total: $186,660.00 C. The CITY shall make payments to the CONSULTANT within thirty (30) days after receipt and approval of a detailed invoice. Invoices shall be submitted on a monthly basis. SECTION IV - THE CITY'S RESPONSIBILITIES A. The CITY shall designate a project manager during the term of this CONTRACT. The project manager has the authority to administer this CONTRACT and shall monitor compliance with all terms and conditions stated herein. All requests for information from or a decision by the CITY on any aspect of the work shall be directed to the project manager. B. The CITY shall review submittals by the CONSULTANT and provide prompt response to questions and rendering of decisions pertaining thereto, to minimize Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287 Professional Services Contract 4 of 5 4/2019 delay in the progress of the CONSULTANT'S work. The CITY will keep the CONSULTANT advised concerning the progress of the CITY'S review of the work. The CONSULTANT agrees that the CITY'S inspection, review, acceptance or approval of CONSULTANT'S work shall not relieve CONSULTANT'S responsibility for errors or omissions of the CONSULTANT or its sub-consultant(s) or in any way affect the CONSULTANT’S status as an independent contractor of the CITY. SECTION V - TERMINATION A. The CITY, at its sole discretion, may terminate this CONTRACT for any reason - - with or without cause -- by delivering written notice to CONSULTANT personally or by certified mail at 2313 West Sam Houston Parkway North, Suite 119 Houston, TX. 77043. Immediately after receiving such written notice, the CONSULTANT shall discontinue providing the services under this CONTRACT. B. If this CONTRACT is terminated, CONSULTANT shall deliver to the CITY all drawings, special provisions, field survey notes, reports, estimates and any and all other documents or work product generated by the CONSULTANT under the CONTRACT, entirely or partially completed, together with all unused materials supplied by the CITY on or before the 15th day following termination of the CONTRACT. C. In the event of such termination, the CONSULTANT shall be paid for services performed prior to receipt of the written notice of termination. The CITY shall make final payment within sixty (60) days after the CONSULTANT has delivered to the CITY a detailed invoice for services rendered and the documents or work product generated by the CONSULTANT under the CONTRACT. D. If the remuneration scheduled under this contract is based upon a fixed fee or definitely ascertainable sum, the portion of such sum payable shall be proportionate to the percentage of services completed by the CONSULTANT based upon the scope of work. E. In the event this CONTRACT is terminated, the CITY shall have the option of completing the work, or entering into a CONTRACT with another party for the completion of the work. F. If the CITY terminates this CONTRACT for cause and/or if the CONSULTANT breaches any provision of this CONTRACT, then the CITY shall have all rights and remedies in law and/or equity against CONSULTANT. Venue for any action or dispute arising out of or relating to this CONTRACT shall be in Brazoria County, Texas. The laws of the State of Texas shall govern the terms of this CONTRACT. The prevailing party in the action shall be entitled to recover its actual damages with interest, attorney’s fees, costs and expenses incurred in connection with the dispute and/or action. CONSULTANT and CITY desire an expeditious means to resolve any disputes that may arise between under this Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287 Professional Services Contract 5 of 5 4/2019 CONTRACT. To accomplish this, the parties agree to mediation as follows: If a dispute arises out of or relates to this CONTRACT, or the breach thereof, and if the dispute cannot be settled through negotiation, then the parties agree first to try in good faith, and before pursuing any legal remedies, to settle the dispute by mediation of a third party who will be selected by agreement of the parties. SECTION VI – ENTIRE AGREEMENT This CONTRACT represents the entire agreement between the CITY and the CONSULTANT and supersedes all prior negotiations, representations, or contracts, either written or oral. This CONTRACT may be amended only by written instrument signed by both parties. SECTION VII – COVENANT AGAINST CONTINGENT FEES The CONSULTANT affirms that he has not employed or retained any company or person, other than a bona fide employee working for the CONSULTANT to solicit or secure this CONTRACT, and that he has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage brokerage fee, gift, or any other consideration, contingent upon or resulting from the award or making of the CONTRACT. For breach or violation of this clause, the CITY may terminate this CONTRACT without liability, and in its discretion, may deduct from the CONTRACT price or consideration, or otherwise recover, the full amount of such fee, commission, percentage brokerage fee, gift, or contingent fee that has been paid. SECTION VIII- SUCCESSORS AND ASSIGNS This CONTRACT shall not be assignable except upon the written consent of the parties hereto. ________________________________ ASSISTANT FINANCE DIRECTOR DATE CITY OF PEARLAND, TEXAS ________________________________ CITY MANAGER/DIRECTOR CITY OF PEARLAND, TEXAS DATE ________________________________ CONSULTANT DATE Ninyo & Moore Geotechnical & EnvironmentalSciences Consultants 9/18/2026 Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287 11/17/2026 | 3:14 PM CST 11/17/2026 | 3:34 PM CST ATTEST: ________________________________ FRANCES AGUILAR, TRMC, MMC CITY SECRETARY Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287 NINYO & MOORE, A SOCOTEC COMPANY 2313 West Sam Houston Parkway North, Suite 119, Houston, Texas 77043 | 713.973.8400 August 10, 2026 Project No. 701915001 Mr. Michael Langley City of Pearland 2016 Old Alvin Road Pearland, Texas 77581 Subject: Construction Materials Testing and Observation Services Shadycrest and Creekview Subdivision Drainage Improvement (DR 2401) Shadycrest Drive between Pearland Parkway and FM 518 Pearland, Texas Dear Mr. Langley: We are pleased to present this revised proposal to provide materials testing services at the subject site. In preparation of this proposal, we have reviewed the provided plans and specifications. The project will consist of the installation of RCP and RCB storm sewers, inlets, and junction boxes, removal and replacement of driveway aprons, installation of sidewalks, and reconstruction of asphalt roads (DR 2401). This proposal was prepared without the benefit of a construction schedule and is based on our assumptions as to the needed materials testing. Ninyo & Moore’s Houston laboratory is supervised by registered civil engineers and meets the requirements of the ASTM E329, ASTM C1077, and ASTM D3740. Ninyo & Moore’s testing equipment is calibrated annually by representatives utilizing equipment traceable to the National Institute of Standards and Technology, and regularly participates in Cement and Concrete Reference Laboratory (CCRL) and AASHTO’s Material Reference Laboratory (AMRL) reference testing. In addition, we are accredited by the American Association for Laboratory Accreditation (A2LA) Certificate No. 3204.01 for Construction Materials and No. 3204.02 for Geotechnical. A complete list of the tests on our scope of accreditation can be found at the A2LA website (www.a2la.org). SCOPE OF SERVICES • Attend preconstruction and site meetings, as requested. • Perform field observation and in-place density testing for utility trench backfill, pavement subgrade, and cement treated base. Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287 NINYO & MOORE, A SOCOTEC COMPANY Shadycrest and Creekview Subdivision Drainage Improvement (DR 2401), Pearland, Texas | 701915001 | August 10, 2026 • Perform concrete sampling/testing for inlets, manholes, concrete driveways, and sidewalks. • Perform in-place density testing and sampling for asphalt pavement. • Perform laboratory testing of soil materials such as Moisture-Density Relationships (Proctor), Atterberg Limits (PI), and 200 Wash. • Perform laboratory testing to evaluate the compressive strength of cement treated sand, cement treated base, and concrete samples. • Consultation and project management. ESTIMATED FEE We propose to provide our services on a time-and-materials basis accrued in accordance with the attached cost estimate. We estimate the fee for our time and materials not to exceed $168,925. Our estimated fee does not include weekend work, stand-by time or costs associated with retesting, or re-inspecting materials that were found not to be in compliance with the project plans or specifications. Any additional services requested and not part of the cost estimate will be charged in accordance with our attached Schedule of Fees. A breakdown of our fee is presented in the attached Table 1. To authorize our services, provide a Professional Services Agreement. We look forward to working with you. Respectfully submitted, NINYO & MOORE Jonathan Howson, PE Senior Project Engineer Managing Principal Engineer JNH/JTS/ls Attachments: Table 1 – Breakdown of Estimated Fee Schedule of Fees Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287 Engineering Technician Utilities / Paving Subgrade 112.5 days @ 8 hours/day @ 60.00$ /hour 54,000.00$ Sample Pick-up 4 days @ 2 hours/day @ 105.00$ /hour 840.00$ Vehicle Usage Charge 908 hours @ 15.00$ /hour 13,620.00$ Nuclear Density Gauge 900 hours @ 15.00$ /hour 13,500.00$ Laboratory Testing Standard Proctor Density, D 698 5 samples @ 230.00$ /sample 1,150.00$ Standard Proctor Density Treated Soils, D 698 2 samples @ 255.00$ /sample 510.00$ Modified Proctor Density Treated Soils, D 1557 4 samples @ 270.00$ /sample 1,080.00$ 200 Wash 5 samples @ 60.00$ /sample 300.00$ Atterberg Limits 5 samples @ 70.00$ /sample 350.00$ CSS Compressives 30 samples @ 80.00$ /sample 2,400.00$ 100 samples @ 281.00$ /sample 28,100.00$ 115,850.00$ Engineering Technician 30 days @ 4 hours/day @ 60.00$ /hour 7,200.00$ onsite for other services)10 days @ 4 hours/day @ 60.00$ /hour 2,400.00$ Vehicle Usage Charge 160 hours @ 15.00$ /hour 2,400.00$ Compression Tests of Cylinders 30 sets @ 4 samples/set @ 80.00$ /set 2,400.00$ 14,400.00$ Engineering Technician 15 days @ 8 hours/day @ 60.00$ /hour 7,200.00$ Engineering Technician (OT)15 days @ 2 hours/day @ 90.00$ /hour 2,700.00$ Vehicle Usage Charge 150 hours @ 15.00$ /hour 2,250.00$ Nuclear Density Gauge 150 hours @ 15.00$ /hour 2,250.00$ Maximum Theoretical Specific Gravity 15 tests @ 105.00$ /test 1,575.00$ Molding Specimens 15 sets of 3 @ 75.00$ /set 1,125.00$ Bulk Density of Lab Molded Specimen 15 sets of 3 @ 65.00$ /set 975.00$ Stability: Hveem 15 sets of 3 @ 110.00$ /set 1,650.00$ Extraction & Gradation Test 15 tests @ 230.00$ /test 3,450.00$ Subtotal 23,175.00$ Principal Engineer 10 hours @ 180.00$ /hour 1,800.00$ Project Manager 120 hours @ 105.00$ /hour 12,600.00$ Data Processor 20 hours @ 55.00$ /hour 1,100.00$ Subtotal 15,500.00$ 168,925.00$ Engineering Review, Consultation, and Data Processing Table 1 - Breakdown of Estimated Fee Earthwork TOTAL ESTIMATED FEE Concrete Asphalt Pavement Shadycrest and Creekview Subdivision Drainage Improvement (DR 2401), Pearland, Texas | 701915001 | August 10, 2026 1 Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287 NINYO & MOORE, A SOCOTEC COMPANY Shadycrest and Creekview Subdivision Drainage Improvement (DR 2401), Pearland, Texas | 701915001 | August 10, 2026 TX4 Schedule of Fees Hourly Charges for Personnel Principal Engineer/Geologist/Environmental Scientist/Certified Industrial Hygienist .............................................. $ 180 Senior Engineer/Geologist/Environmental Scientist ............................................................................................... $ 150 Senior Project Engineer/Geologist/Environmental Scientist ................................................................................... $ 140 Project Engineer/Geologist/Environmental Scientist ............................................................................................... $ 130 Senior Staff Engineer/Geologist/Environmental Scientist ....................................................................................... $ 115 Staff Engineer/Geologist/Environmental Scientist................................................................................................... $ 110 GIS Analyst .............................................................................................................................................................. $ 85 Technical Illustrator/CAD Operator.......................................................................................................................... $ 55 Special Inspector (Concrete, Masonry, Structural Steel, Welding, and Fireproofing) ............................................ $ 140 Nondestructive Examination Technician (UT, MT, LP) ........................................................................................... $ 120 Certified Asbestos/Lead Technician ........................................................................................................................ $ 120 Field Operations Manager ....................................................................................................................................... $ 105 Supervisory Technician ........................................................................................................................................... $ 75 Senior Technician .................................................................................................................................................... $ 65 Technician ................................................................................................................................................................ $ 60 Geotechnical/Environmental/Laboratory Assistant ................................................................................................. $ 55 Information Specialist .............................................................................................................................................. $ 55 Data Processor ........................................................................................................................................................ $ 55 Other Charges Concrete Coring Equipment (includes technician) ............................................................................................... $ 190/hr Anchor Load Test Equipment (includes technician) ............................................................................................. $ 190/hr GPR Equipment .................................................................................................................................................... $ 180/hr Inclinometer ........................................................................................................................................................... $ 100/hr Hand Auger Equipment ........................................................................................................................................ $ 80/hr Rebar Locator (Pachometer) ................................................................................................................................ $ 50/hr Vapor Emission Kit ................................................................................................................................................ $ 75/kit Equipment Charge ................................................................................................................................................ $ 15/hr X-Ray Fluorescence ............................................................................................................................................. $ 70/hr PID/FID.................................................................................................................................................................. $ 50/hr Air Sampling Pump ............................................................................................................................................... $ 25/hr Field Vehicle .......................................................................................................................................................... $ 15/hr Expert Witness Testimony .................................................................................................................................... $ 400/hr Direct Expenses ...................................................................................................................................... Cost plus 15% Special equipment charges will be provided upon request. Notes work performed in excess of 8 hours in one day Monday through Friday, evening hours, and all day on Saturday, Sunday, and holidays. Field technician and special inspection hours are charged at a 2-hour minimum. 30 days. Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287 NINYO & MOORE, A SOCOTEC COMPANY 2026 TX Laboratory Testing TX4 Schedule of Fees for Laboratory Testing SOILS CONCRETE Atterberg Limits, D 4318 .....................................................................$ 70 Compression Strength, C 39 ............................................................... $ 20 California Bearing Ratio (CBR), D 1883, per point ............................$ 240 Flexural Test, C 78 or C 293 ............................................................... $ 30 One Dimensional Consolidation, D 2435 ...........................................$ 450 Splitting Tensile Strength, C 496 ........................................................ $ 125 Consolidation Additional Increments, D 2435....................................$ 60 Time of Setting of Cement by Vicat Needle, C 191 ........................... $ 250 Hydrometer Analysis, D 422 ...............................................................$ 145 Concrete Laboratory Mix Verification, Excluding cylinders .............. $ 500 Double Hydrometer Analysis, D 4221 ................................................$ 250 Concrete Coring, Measurement, and Compressive Strength .......... $ 250 Moisture Content, D 2216 ...................................................................$ 10 Concrete Core Compressive Strength, Includes Prep, C 42 ........... $ 90 Moisture and Density, D 2937 ............................................................$ 55 Concrete Core Measurement, C 174 ................................................. $ 30 Permeability, D 2434 ...........................................................................$ 300 Concrete Coring Minimum Charge ..................................................... $ 600 Specific Gravity, D 854 .......................................................................$ 65 Concrete Coring – 4” Diameter to 6-inch depth ................................. $ 120 Standard Proctor Density, D 698........................................................$ 230 Concrete Coring Additional Thickness 6” to 12” depth ...................... $ 11/in Modified Proctor Density, D 1557 ......................................................$ 250 Concrete Coring Additional Thickness over 12” depth ...................... $ 15/in (Rock corrections add $70) Compressive Strength Lt. Wt. Insulating Concrete, C 495 ................ $ 30 Sieve Analysis, D 422 .........................................................................$ 65 Unit Weight of Lt. Wt. Insulating Concrete, C 495 ............................. $ 25 Sieve Analysis, 200 Wash, D 1140 ....................................................$ 60 Swell Test, D 4546 ..............................................................................$ 350 FIREPROOFING Triaxial Shear, U.U., D 2850 per point ...............................................$ 75 Density of SFRM, E 605 ...................................................................... $ 45 Unconfined Compression, D 2166 .....................................................$ 50 Cohesion/Adhesion of SFRM, E 736 .................................................. $ 35 Pinhole Dispersion Test, D 4647 ........................................................$ 320 Crumb Test Dispersion Test, D 4647 .................................................$ 45 ASPHALT Lime Determination, PI Method ..........................................................$ 275 Asphalt Mix Design Review, Job Spec ........................................... $ 500 Lime Determination, pH Method, D 62765 ........................................$ 265 Asphalt Mix Design, 5 points .......................................................... $ 2500 Compressive Strength Cement Stabilized Sand, D 1633 .................$ 80 Extraction, % Asphalt, including Gradation, Tex 210F ................... $ 230 Standard Proctor Density Treated Soils, D 698 ................................$ 255 Hveem Stability, Tex 208F ............................................................. $ 110/set Modified Proctor Density Treated Soils, D 1557 ...............................$ 270 Bulk Density Lab Molded Samples, Tex 207F ............................... $ 65/set Bulk Density Core, Tex 207F.......................................................... $ 60 Molding Specimens, Tex 206F ....................................................... $ 75/set MASONRY Measurement of Asphalt Cores ...................................................... $ 25 Brick Absorption, 24-hour submersion, C 67 .....................................$ 85 Asphalt Coring Minimum Charge.................................................... $ 600 Brick Absorption, 5-hour boiling, C 67 ...............................................$ 85 Asphalt Coring – 4” Diameter to 6-inch depth ................................ $ 105 Brick Absorption, 7-day, C 67 .............................................................$ 85 Concrete Coring Additional Thickness over 6” depth ..................... $ 10/in Brick Compression Test, C 67 ............................................................$ 50 Maximum Theoretical Unit Weight, Tex 227F ................................ $ 105 Brick Moisture as received, C 67........................................................$ 50 Brick Measurement, C 67 ...................................................................$ 65 AGGREGATES CMU Block Compression Test, 8x8x16, C 140 .................................$ 150 Clay Lumps and Friable Particles, C 142 ....................................... $ 65 CMU Block Unit Weight and Absorption, C 140 ................................$ 100 Los Angeles Abrasion, C 131 or C 535 .......................................... $ 240 CMU Block Moisture Content, C 140 .................................................$ 95 Organic Impurities, C 40 ................................................................. $ 55 CMU Block Measurement, C 140 ......................................................$ 35 Sieve Analysis, Coarse Aggregate, C 136 ..................................... $ 75 Compressive Strength, Grout prism, C 1019, each ..........................$ 55 Sieve Analysis, Fine Aggregate, C 136 .......................................... $ 75 Compressive Strength, Mortar Cube, C 109, each ...........................$ 30 Decantation, C 117 ......................................................................... $ 55 Specific Gravity, Coarse, C 127 ..................................................... $ 120 Specific Gravity, Fine, C 128 .......................................................... $ 135 Special preparation of standard test specimens will be charged at the technician’s hourly rate. Ninyo & Moore is accredited to perform the AASHTO equivalent of many ASTM test procedures. Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287 NINYO & MOORE, A SOCOTEC COMPANY 2313 West Sam Houston Parkway North, Suite 119, Houston, Texas 77043 | 713.973.8400 September 17, 2026 Project No. 701915002 Mr. Michael Langley City of Pearland 2016 Old Alvin Road Pearland, Texas 77581 Subject: Construction Materials Testing and Observation Services Creekview and Shadycrest Transite Pipe Water Line Replacement (WA2405) Shadycrest Drive between Pearland Parkway and FM 518 Pearland, Texas Dear Mr. Langley: We are pleased to present this revised proposal to provide materials testing services at the subject site. In preparation of this proposal, we have reviewed the provided plans and specifications. The project will consist of the installation of approximately 22,500 linear feet of new water line and service connections, with the majority of the project using trenchless construction (WA 2405). This proposal was prepared without the benefit of a construction schedule and is based on our assumptions as to the needed materials testing. Ninyo & Moore’s Houston laboratory is supervised by registered civil engineers and meets the requirements of the ASTM E329, ASTM C1077, and ASTM D3740. Ninyo & Moore’s testing equipment is calibrated annually by representatives utilizing equipment traceable to the National Institute of Standards and Technology, and regularly participates in Cement and Concrete Reference Laboratory (CCRL) and AASHTO’s Material Reference Laboratory (AMRL) reference testing. In addition, we are accredited by the American Association for Laboratory Accreditation (A2LA) Certificate No. 3204.01 for Construction Materials and No. 3204.02 for Geotechnical. A complete list of the tests on our scope of accreditation can be found at the A2LA website (www.a2la.org). SCOPE OF SERVICES • Attend preconstruction and site meetings, as requested. • Perform field observation and in-place density testing for bore pit backfill. Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287 NINYO & MOORE, A SOCOTEC COMPANY Creekview and Shadycrest Transite Pipe Water Line Replacement (WA2405), Pearland, Texas | 701915002 | September 17, 2026 • Perform laboratory testing of soil materials such as Moisture-Density Relationships (Proctor), Atterberg Limits (PI), and 200 Wash. • Perform laboratory testing to evaluate the compressive strength of cement treated sand. • Consultation and project management. ESTIMATED FEE We propose to provide our services on a time-and-materials basis accrued in accordance with the attached cost estimate. We estimate the fee for our time and materials not to exceed $4,050. Our estimated fee does not include weekend work, overtime, stand-by time or costs associated with retesting, or re-inspecting materials that were found not to be in compliance with the project plans or specifications. Any additional services requested and not part of the cost estimate will be charged in accordance with our attached Schedule of Fees. A breakdown of our fee is presented in the attached Table 1. To authorize our services, provide a Professional Services Agreement. We look forward to working with you. Respectfully submitted, NINYO & MOORE Jonathan Howson, PE Senior Project Engineer Managing Principal Engineer JNH/JTS/ls Attachments: Table 1 – Breakdown of Estimated Fee Schedule of Fees Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287 Engineering Technician Utilities 2 days @ 8 hours/day @ 60.00$ /hour 960.00$ Sample Pick-up 2 days @ 2 hours/day @ 60.00$ /hour 240.00$ Vehicle Usage Charge 20 hours @ 15.00$ /hour 300.00$ Nuclear Density Gauge 16 hours @ 15.00$ /hour 240.00$ Laboratory Testing Standard Proctor Density, D 698 4 samples @ 230.00$ /sample 920.00$ 200 Wash 4 samples @ 60.00$ /sample 240.00$ Atterberg Limits 4 samples @ 70.00$ /sample 280.00$ CSS Compressives 4 samples @ 80.00$ /sample 320.00$ 3,500.00$ Principal Engineer 1 hour @ 180.00$ /hour 180.00$ Project Manager 3 hours @ 105.00$ /hour 315.00$ Data Processor 1 hour @ 55.00$ /hour 55.00$ Subtotal 550.00$ 4,050.00$ Engineering Review, Consultation, and Data Processing Table 1 - Breakdown of Estimated Fee Earthwork TOTAL ESTIMATED FEE Creekview and Shadycrest Transite Pipe Water Line Replacement (WA2405), Pearland, Texas | 701915002 | September 17, 2026 1 Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287 NINYO & MOORE, A SOCOTEC COMPANY Creekview and Shadycrest Transite Pipe Water Line Replacement (WA2405), Pearland, Texas | 701915002 | September 17, 2026 TX4 Schedule of Fees Hourly Charges for Personnel Principal Engineer/Geologist/Environmental Scientist/Certified Industrial Hygienist .............................................. $ 180 Senior Engineer/Geologist/Environmental Scientist ............................................................................................... $ 150 Senior Project Engineer/Geologist/Environmental Scientist ................................................................................... $ 140 Project Engineer/Geologist/Environmental Scientist ............................................................................................... $ 130 Senior Staff Engineer/Geologist/Environmental Scientist ....................................................................................... $ 115 Staff Engineer/Geologist/Environmental Scientist................................................................................................... $ 110 GIS Analyst .............................................................................................................................................................. $ 85 Technical Illustrator/CAD Operator.......................................................................................................................... $ 55 Special Inspector (Concrete, Masonry, Structural Steel, Welding, and Fireproofing) ............................................ $ 140 Nondestructive Examination Technician (UT, MT, LP) ........................................................................................... $ 120 Certified Asbestos/Lead Technician ........................................................................................................................ $ 120 Field Operations Manager ....................................................................................................................................... $ 105 Supervisory Technician ........................................................................................................................................... $ 75 Senior Technician .................................................................................................................................................... $ 65 Technician ................................................................................................................................................................ $ 60 Geotechnical/Environmental/Laboratory Assistant ................................................................................................. $ 55 Information Specialist .............................................................................................................................................. $ 55 Data Processor ........................................................................................................................................................ $ 55 Other Charges Concrete Coring Equipment (includes technician) ............................................................................................... $ 190/hr Anchor Load Test Equipment (includes technician) ............................................................................................. $ 190/hr GPR Equipment .................................................................................................................................................... $ 180/hr Inclinometer ........................................................................................................................................................... $ 100/hr Hand Auger Equipment ........................................................................................................................................ $ 80/hr Rebar Locator (Pachometer) ................................................................................................................................ $ 50/hr Vapor Emission Kit ................................................................................................................................................ $ 75/kit Equipment Charge ................................................................................................................................................ $ 15/hr X-Ray Fluorescence ............................................................................................................................................. $ 70/hr PID/FID.................................................................................................................................................................. $ 50/hr Air Sampling Pump ............................................................................................................................................... $ 25/hr Field Vehicle .......................................................................................................................................................... $ 15/hr Expert Witness Testimony .................................................................................................................................... $ 400/hr Direct Expenses ...................................................................................................................................... Cost plus 15% Special equipment charges will be provided upon request. Notes For field and laboratory technicians and special inspectors, overtime rates at 1.5 times the regular rates will be charged for work performed in excess of 8 hours in one day Monday through Friday, evening hours, and all day on Saturday, Sunday, and holidays. Field technician and special inspection hours are charged at a 2-hour minimum. 30 days. Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287 NINYO & MOORE, A SOCOTEC COMPANY 2026 TX Laboratory Testing TX4 Schedule of Fees for Laboratory Testing SOILS CONCRETE Atterberg Limits, D 4318 .....................................................................$ 70 Compression Strength, C 39 ............................................................... $ 20 California Bearing Ratio (CBR), D 1883, per point ............................$ 240 Flexural Test, C 78 or C 293 ............................................................... $ 30 One Dimensional Consolidation, D 2435 ...........................................$ 450 Splitting Tensile Strength, C 496 ........................................................ $ 125 Consolidation Additional Increments, D 2435....................................$ 60 Time of Setting of Cement by Vicat Needle, C 191 ........................... $ 250 Hydrometer Analysis, D 422 ...............................................................$ 145 Concrete Laboratory Mix Verification, Excluding cylinders .............. $ 500 Double Hydrometer Analysis, D 4221 ................................................$ 250 Concrete Coring, Measurement, and Compressive Strength .......... $ 250 Moisture Content, D 2216 ...................................................................$ 10 Concrete Core Compressive Strength, Includes Prep, C 42 ........... $ 90 Moisture and Density, D 2937 ............................................................$ 55 Concrete Core Measurement, C 174 ................................................. $ 30 Permeability, D 2434 ...........................................................................$ 300 Concrete Coring Minimum Charge ..................................................... $ 600 Specific Gravity, D 854 .......................................................................$ 65 Concrete Coring – 4” Diameter to 6-inch depth ................................. $ 120 Standard Proctor Density, D 698........................................................$ 230 Concrete Coring Additional Thickness 6” to 12” depth ...................... $ 11/in Modified Proctor Density, D 1557 ......................................................$ 250 Concrete Coring Additional Thickness over 12” depth ...................... $ 15/in (Rock corrections add $70) Compressive Strength Lt. Wt. Insulating Concrete, C 495 ................ $ 30 Sieve Analysis, D 422 .........................................................................$ 65 Unit Weight of Lt. Wt. Insulating Concrete, C 495 ............................. $ 25 Sieve Analysis, 200 Wash, D 1140 ....................................................$ 60 Swell Test, D 4546 ..............................................................................$ 350 FIREPROOFING Triaxial Shear, U.U., D 2850 per point ...............................................$ 75 Density of SFRM, E 605 ...................................................................... $ 45 Unconfined Compression, D 2166 .....................................................$ 50 Cohesion/Adhesion of SFRM, E 736 .................................................. $ 35 Pinhole Dispersion Test, D 4647 ........................................................$ 320 Crumb Test Dispersion Test, D 4647 .................................................$ 45 ASPHALT Lime Determination, PI Method ..........................................................$ 275 Asphalt Mix Design Review, Job Spec ........................................... $ 500 Lime Determination, pH Method, D 62765 ........................................$ 265 Asphalt Mix Design, 5 points .......................................................... $ 2500 Compressive Strength Cement Stabilized Sand, D 1633 .................$ 80 Extraction, % Asphalt, including Gradation, Tex 210F ................... $ 230 Standard Proctor Density Treated Soils, D 698 ................................$ 255 Hveem Stability, Tex 208F ............................................................. $ 110/set Modified Proctor Density Treated Soils, D 1557 ...............................$ 270 Bulk Density Lab Molded Samples, Tex 207F ............................... $ 65/set Bulk Density Core, Tex 207F.......................................................... $ 60 Molding Specimens, Tex 206F ....................................................... $ 75/set MASONRY Measurement of Asphalt Cores ...................................................... $ 25 Brick Absorption, 24-hour submersion, C 67 .....................................$ 85 Asphalt Coring Minimum Charge.................................................... $ 600 Brick Absorption, 5-hour boiling, C 67 ...............................................$ 85 Asphalt Coring – 4” Diameter to 6-inch depth ................................ $ 105 Brick Absorption, 7-day, C 67 .............................................................$ 85 Concrete Coring Additional Thickness over 6” depth ..................... $ 10/in Brick Compression Test, C 67 ............................................................$ 50 Maximum Theoretical Unit Weight, Tex 227F ................................ $ 105 Brick Moisture as received, C 67........................................................$ 50 Brick Measurement, C 67 ...................................................................$ 65 AGGREGATES CMU Block Compression Test, 8x8x16, C 140 .................................$ 150 Clay Lumps and Friable Particles, C 142 ....................................... $ 65 CMU Block Unit Weight and Absorption, C 140 ................................$ 100 Los Angeles Abrasion, C 131 or C 535 .......................................... $ 240 CMU Block Moisture Content, C 140 .................................................$ 95 Organic Impurities, C 40 ................................................................. $ 55 CMU Block Measurement, C 140 ......................................................$ 35 Sieve Analysis, Coarse Aggregate, C 136 ..................................... $ 75 Compressive Strength, Grout prism, C 1019, each ..........................$ 55 Sieve Analysis, Fine Aggregate, C 136 .......................................... $ 75 Compressive Strength, Mortar Cube, C 109, each ...........................$ 30 Decantation, C 117 ......................................................................... $ 55 Specific Gravity, Coarse, C 127 ..................................................... $ 120 Specific Gravity, Fine, C 128 .......................................................... $ 135 Special preparation of standard test specimens will be charged at the technician’s hourly rate. Ninyo & Moore is accredited to perform the AASHTO equivalent of many ASTM test procedures. Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287 NINYO & MOORE, A SOCOTEC COMPANY 2313 West Sam Houston Parkway North, Suite 119, Houston, Texas 77043 | 713.973.8400 August 10, 2026 Project No. 701915003 Mr. Michael Langley City of Pearland 2016 Old Alvin Road Pearland, Texas 77581 Subject: Construction Materials Testing and Observation Services Shadycrest and Creekview Subdivision Sanitary Sewer Rehabilitation (WW2405) Shadycrest Drive between Pearland Parkway and FM 518 Pearland, Texas Dear Mr. Langley: We are pleased to present this proposal to provide materials testing services at the subject site. In preparation of this proposal, we have reviewed the provided plans and specifications. We understand the project will consist of approximately 2,455 linear feet of 8-inch sanitary sewer by open cut method (WW 2405). This proposal was prepared without the benefit of a construction schedule and is based on our assumptions as to the needed materials testing. Ninyo & Moore’s Houston laboratory is supervised by registered civil engineers and meets the requirements of the ASTM E329, ASTM C1077, and ASTM D3740. Ninyo & Moore’s testing equipment is calibrated annually by representatives utilizing equipment traceable to the National Institute of Standards and Technology, and regularly participates in Cement and Concrete Reference Laboratory (CCRL) and AASHTO’s Material Reference Laboratory (AMRL) reference testing. In addition, we are accredited by the American Association for Laboratory Accreditation (A2LA) Certificate No. 3204.01 for Construction Materials and No. 3204.02 for Geotechnical. A complete list of the tests on our scope of accreditation can be found at the A2LA website (www.a2la.org). SCOPE OF SERVICES • Attend preconstruction and site meetings, as requested. • Perform field observation and in-place density testing for utility trench backfill. • Perform laboratory testing of soil materials such as Moisture-Density Relationships (Proctor), Atterberg Limits (PI), and 200 Wash. Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287 NINYO & MOORE, A SOCOTEC COMPANY Shadycrest and Creekview Subdivision Sanitary Sewer Rehabilitation (WW2405), Pearland, Texas | 701915003 | August 10, 2026 • Perform laboratory testing to evaluate the compressive strength of cement treated sand. • Consultation and project management. ESTIMATED FEE We propose to provide our services on a time-and-materials basis accrued in accordance with the attached cost estimate. We estimate the fee for our time and materials not to exceed $13,685. Our estimated fee does not include weekend work, stand-by time or costs associated with retesting, or re-inspecting materials that were found not to be in compliance with the project plans or specifications. Any additional services requested and not part of the cost estimate will be charged in accordance with our attached Schedule of Fees. A breakdown of our fee is presented in the attached Table 1. To authorize our services, provide a Professional Services Agreement. We look forward to working with you. Respectfully submitted, NINYO & MOORE Jonathan Howson, PE Senior Project Engineer Managing Principal Engineer JNH/JTS/ls Attachments: Table 1 – Breakdown of Estimated Fee Schedule of Fees Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287 Engineering Technician Utilities 13.75 days @ 8 hours/day @ 60.00$ /hour 6,600.00$ Sample Pick-up 1 day @ 4 hours/day @ 60.00$ /hour 240.00$ Vehicle Usage Charge 114 hours @ 15.00$ /hour 1,710.00$ Nuclear Density Gauge 110 hours @ 15.00$ /hour 1,650.00$ Laboratory Testing Standard Proctor Density, D 698 2 samples @ 230.00$ /sample 460.00$ 2 samples @ 255.00$ /sample 510.00$ 200 Wash 2 samples @ 60.00$ /sample 120.00$ Atterberg Limits 2 samples @ 70.00$ /sample 140.00$ CSS Compressives 12 samples @ 80.00$ /sample 960.00$ 12,390.00$ Principal Engineer 1 hour @ 180.00$ /hour 180.00$ Project Manager 8 hours @ 105.00$ /hour 840.00$ Data Processor 5 hours @ 55.00$ /hour 275.00$ Subtotal 1,295.00$ 13,685.00$ Table 1 - Breakdown of Estimated Fee Earthwork TOTAL ESTIMATED FEE Subtotal Engineering Review, Consultation, and Data Processing Shadycrest and Creekview Subdivision Sanitary Sewer Rehabilitation (WW2405), Pearland, Texas | 701915003 | August 10, 2026 1 Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287 NINYO & MOORE, A SOCOTEC COMPANY Shadycrest and Creekview Subdivision Sanitary Sewer Rehabilitation (WW2405), Pearland, Texas | 701915003 | August 10, 2026 TX4 Schedule of Fees Hourly Charges for Personnel Principal Engineer/Geologist/Environmental Scientist/Certified Industrial Hygienist .............................................. $ 180 Senior Engineer/Geologist/Environmental Scientist ............................................................................................... $ 150 Senior Project Engineer/Geologist/Environmental Scientist ................................................................................... $ 140 Project Engineer/Geologist/Environmental Scientist ............................................................................................... $ 130 Senior Staff Engineer/Geologist/Environmental Scientist ....................................................................................... $ 115 Staff Engineer/Geologist/Environmental Scientist................................................................................................... $ 110 GIS Analyst .............................................................................................................................................................. $ 85 Technical Illustrator/CAD Operator.......................................................................................................................... $ 55 Special Inspector (Concrete, Masonry, Structural Steel, Welding, and Fireproofing) ............................................ $ 140 Nondestructive Examination Technician (UT, MT, LP) ........................................................................................... $ 120 Certified Asbestos/Lead Technician ........................................................................................................................ $ 120 Field Operations Manager ....................................................................................................................................... $ 105 Supervisory Technician ........................................................................................................................................... $ 75 Senior Technician .................................................................................................................................................... $ 65 Technician ................................................................................................................................................................ $ 60 Geotechnical/Environmental/Laboratory Assistant ................................................................................................. $ 55 Information Specialist .............................................................................................................................................. $ 55 Data Processor ........................................................................................................................................................ $ 55 Other Charges Concrete Coring Equipment (includes technician) ............................................................................................... $ 190/hr Anchor Load Test Equipment (includes technician) ............................................................................................. $ 190/hr GPR Equipment .................................................................................................................................................... $ 180/hr Inclinometer ........................................................................................................................................................... $ 100/hr Hand Auger Equipment ........................................................................................................................................ $ 80/hr Rebar Locator (Pachometer) ................................................................................................................................ $ 50/hr Vapor Emission Kit ................................................................................................................................................ $ 75/kit Equipment Charge ................................................................................................................................................ $ 15/hr X-Ray Fluorescence ............................................................................................................................................. $ 70/hr PID/FID.................................................................................................................................................................. $ 50/hr Air Sampling Pump ............................................................................................................................................... $ 25/hr Field Vehicle .......................................................................................................................................................... $ 15/hr Expert Witness Testimony .................................................................................................................................... $ 400/hr Direct Expenses ...................................................................................................................................... Cost plus 15% Special equipment charges will be provided upon request. Notes work performed in excess of 8 hours in one day Monday through Friday, evening hours, and all day on Saturday, Sunday, and holidays. Field technician and special inspection hours are charged at a 2-hour minimum. 30 days. Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287 NINYO & MOORE, A SOCOTEC COMPANY 2026 TX Laboratory Testing TX4 Schedule of Fees for Laboratory Testing SOILS CONCRETE Atterberg Limits, D 4318 .....................................................................$ 70 Compression Strength, C 39 ............................................................... $ 20 California Bearing Ratio (CBR), D 1883, per point ............................$ 240 Flexural Test, C 78 or C 293 ............................................................... $ 30 One Dimensional Consolidation, D 2435 ...........................................$ 450 Splitting Tensile Strength, C 496 ........................................................ $ 125 Consolidation Additional Increments, D 2435....................................$ 60 Time of Setting of Cement by Vicat Needle, C 191 ........................... $ 250 Hydrometer Analysis, D 422 ...............................................................$ 145 Concrete Laboratory Mix Verification, Excluding cylinders .............. $ 500 Double Hydrometer Analysis, D 4221 ................................................$ 250 Concrete Coring, Measurement, and Compressive Strength .......... $ 250 Moisture Content, D 2216 ...................................................................$ 10 Concrete Core Compressive Strength, Includes Prep, C 42 ........... $ 90 Moisture and Density, D 2937 ............................................................$ 55 Concrete Core Measurement, C 174 ................................................. $ 30 Permeability, D 2434 ...........................................................................$ 300 Concrete Coring Minimum Charge ..................................................... $ 600 Specific Gravity, D 854 .......................................................................$ 65 Concrete Coring – 4” Diameter to 6-inch depth ................................. $ 120 Standard Proctor Density, D 698........................................................$ 230 Concrete Coring Additional Thickness 6” to 12” depth ...................... $ 11/in Modified Proctor Density, D 1557 ......................................................$ 250 Concrete Coring Additional Thickness over 12” depth ...................... $ 15/in (Rock corrections add $70) Compressive Strength Lt. Wt. Insulating Concrete, C 495 ................ $ 30 Sieve Analysis, D 422 .........................................................................$ 65 Unit Weight of Lt. Wt. Insulating Concrete, C 495 ............................. $ 25 Sieve Analysis, 200 Wash, D 1140 ....................................................$ 60 Swell Test, D 4546 ..............................................................................$ 350 FIREPROOFING Triaxial Shear, U.U., D 2850 per point ...............................................$ 75 Density of SFRM, E 605 ...................................................................... $ 45 Unconfined Compression, D 2166 .....................................................$ 50 Cohesion/Adhesion of SFRM, E 736 .................................................. $ 35 Pinhole Dispersion Test, D 4647 ........................................................$ 320 Crumb Test Dispersion Test, D 4647 .................................................$ 45 ASPHALT Lime Determination, PI Method ..........................................................$ 275 Asphalt Mix Design Review, Job Spec ........................................... $ 500 Lime Determination, pH Method, D 62765 ........................................$ 265 Asphalt Mix Design, 5 points .......................................................... $ 2500 Compressive Strength Cement Stabilized Sand, D 1633 .................$ 80 Extraction, % Asphalt, including Gradation, Tex 210F ................... $ 230 Standard Proctor Density Treated Soils, D 698 ................................$ 255 Hveem Stability, Tex 208F ............................................................. $ 110/set Modified Proctor Density Treated Soils, D 1557 ...............................$ 270 Bulk Density Lab Molded Samples, Tex 207F ............................... $ 65/set Bulk Density Core, Tex 207F.......................................................... $ 60 Molding Specimens, Tex 206F ....................................................... $ 75/set MASONRY Measurement of Asphalt Cores ...................................................... $ 25 Brick Absorption, 24-hour submersion, C 67 .....................................$ 85 Asphalt Coring Minimum Charge.................................................... $ 600 Brick Absorption, 5-hour boiling, C 67 ...............................................$ 85 Asphalt Coring – 4” Diameter to 6-inch depth ................................ $ 105 Brick Absorption, 7-day, C 67 .............................................................$ 85 Concrete Coring Additional Thickness over 6” depth ..................... $ 10/in Brick Compression Test, C 67 ............................................................$ 50 Maximum Theoretical Unit Weight, Tex 227F ................................ $ 105 Brick Moisture as received, C 67........................................................$ 50 Brick Measurement, C 67 ...................................................................$ 65 AGGREGATES CMU Block Compression Test, 8x8x16, C 140 .................................$ 150 Clay Lumps and Friable Particles, C 142 ....................................... $ 65 CMU Block Unit Weight and Absorption, C 140 ................................$ 100 Los Angeles Abrasion, C 131 or C 535 .......................................... $ 240 CMU Block Moisture Content, C 140 .................................................$ 95 Organic Impurities, C 40 ................................................................. $ 55 CMU Block Measurement, C 140 ......................................................$ 35 Sieve Analysis, Coarse Aggregate, C 136 ..................................... $ 75 Compressive Strength, Grout prism, C 1019, each ..........................$ 55 Sieve Analysis, Fine Aggregate, C 136 .......................................... $ 75 Compressive Strength, Mortar Cube, C 109, each ...........................$ 30 Decantation, C 117 ......................................................................... $ 55 Specific Gravity, Coarse, C 127 ..................................................... $ 120 Specific Gravity, Fine, C 128 .......................................................... $ 135 Special preparation of standard test specimens will be charged at the technician’s hourly rate. Ninyo & Moore is accredited to perform the AASHTO equivalent of many ASTM test procedures. Docusign Envelope ID: FCA372E9-1BDB-8187-8350-41AFE0C0A287