Loading...
HomeMy WebLinkAboutR2026-129 20260824RESOLUTION NO. R2026-129 A Resolution of the City Council of the City of Pearland, Texas, approving a professional services agreement associated with the Isla Drive, North Galveston Street, and Cheryl Drive Drainage Improvements (DR2601) and East Plum Drainage (DR2602) to Consor North America, Inc. in the amount of $879,152.25. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That a contract for professional services, a copy of which is attached hereto as Exhibit “A” and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a contract for professional services. PASSED, APPROVED and ADOPTED this on the 24th day of August, A.D., 2026. ________________________________ QUENTIN WILTZ MAYOR ATTEST: ________________________________ FRANCES AGUILAR, TRMC, MMC CITY SECRETARY APPROVED AS TO FORM: ________________________________ LAWRENCE G. PROVINS CITY ATTORNEY Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A Professional Services Contract 1 of 5 4/2019 CONTRACT FOR PROFESSIONAL SERVICES THIS CONTRACT is entered into upon final execution by and between the City of Pearland ("CITY") and Consor North America, Inc. ("CONSULTANT"). The CITY engages the CONSULTANT to perform professional services for a project known and described as Isla Dr., N. Galveston, Cheryl Dr., E.Plum Drainage Improvements ("PROJECT"). (Project #DR2601/DR2602), Contract # 70-26. SECTION I - SERVICES OF THE CONSULTANT The CONSULTANT shall perform the following professional services to CITY standards and in accordance with the degree of care and skill that a professional in Texas would exercise under the same or similar circumstances: A.The CONSULTANT shall provide professional services. See Exhibit A, attached, for a detailed SCOPE OF WORK and PROJECT schedule. The PROJECT schedule shall be submitted in digital and hard copy form in the Microsoft Project for Windows format. B.The CONSULTANT shall prepare and submit a detailed opinion of estimated cost of the PROJECT. C.The CONSULTANT acknowledges that the CITY (through its employee handbook) considers the following to be misconduct that is grounds for termination of a CITY employee: Any fraud, forgery, misappropriation of funds, receiving payment for services not performed or for hours not worked, mishandling or untruthful reporting of money transactions, destruction of assets, embezzlement, accepting materials of value from vendors, or consultants, and/or collecting reimbursement of expenses made for the benefit of the CITY. The CONSULTANT agrees that it will not, directly or indirectly; encourage a CITY employee to engage in such misconduct. D.The CONSULTANT shall submit all final construction documents in both hard copy and electronic format. Plans shall be AutoCAD compatible and all other documents shall be Microsoft Office compatible. The software version used shall be compatible to current CITY standards. Other support documents, for example, structural calculations, drainage reports and geotechnical reports, shall be submitted in hard copy only. All Record Drawings electronic files shall be submitted to the CITY in TIF format. E.The CONSULTANT recognizes that all drawings, special provisions, field survey notes, reports, estimates and any and all other documents or work product generated by the CONSULTANT under the CONTRACT shall be delivered to the CITY upon request, shall become subject to the Open Records Laws of this State. Resolution No. R2026-129 Exhibit A Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A Professional Services Contract 2 of 5 4/2019 F. The CONSULTANT shall procure and maintain for the duration of this Agreement, insurance against claims for injuries to persons, damages to property, or any errors and omissions relating to the performance of any work by the CONSULTANT, its agents, employees or subcontractors under this Agreement, as follows: (1) Workers’ Compensation as required by law. (2) Professional Liability Insurance in an amount not less than $1,000,000 in the aggregate. (3) Comprehensive General Liability and Property Damage Insurance with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for each occurrence of damage to or destruction of property. (4) Comprehensive Automobile and Truck Liability Insurance covering owned, hired, and non-owned vehicles, with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for property damage. The CONSULTANT shall include the CITY as an additional insured under the policies, with the exception of the Professional Liability Insurance and Workers’ Compensation. Certificates of Insurance and endorsements shall be furnished to the CITY before work commences. Each insurance policy shall be endorsed to state that coverage shall not be suspended, voided, canceled, and/or reduced in coverage or in limits (“Change in Coverage”) except with prior written consent of the CITY and only after the CITY has been provided with written notice of such Change in Coverage, such notice to be sent to the CITY either by hand delivery to the City Manager or by certified mail, return receipt requested, and received by the City no fewer than thirty (30) days prior to the effective date of such Change in Coverage. Prior to commencing services under this CONTRACT, CONSULTANT shall furnish CITY with Certificates of Insurance, or formal endorsements as required by this CONTRACT, issued by CONSULTANT’S insurer(s), as evidence that policies providing the required coverage, conditions, and limits required by this CONTRACT are in full force and effect. G. The CONSULTANT shall indemnify and hold the CITY, its officers, agents, and employees, harmless from any claim, loss, damage, suit, and liability of every kind for which CONSULTANT is legally liable, including all expenses of litigation, court costs, and attorney's fees, for injury to or death of any person, for damage to any property, or errors in design, any of which are caused by the Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A Professional Services Contract 3 of 5 4/2019 negligent act or omission of the CONSULTANT, his officers, employees, agents, or subcontractors under this CONTRACT. H. All parties intend that the CONSULTANT, in performing services pursuant to this CONTRACT, shall act as an independent contractor and shall have control of its own work and the manner in which it is performed. The CONSULTANT is not to be considered an agent or employee of the CITY. SECTION II - PERIOD OF SERVICE This CONTRACT will be binding upon execution and end April 29, 2029. SECTION III - CONSULTANT'S COMPENSATION A. The total compensation for the services performed shall not exceed the total noted in Section B. B. The CITY shall pay the CONSULTANT in installments based upon monthly progress reports and detailed invoices submitted by the CONSULTANT based upon the following: 1. Basic Services (Lump Sum) $771,827.25 2. Additional Services shall require independent and specific authorization and shall be billed as (Lump Sum): $18,330.00 3. Bid Phase Services (Hourly Not to Exceed) $14,010.00 4. Construction Phase Services (Hourly Not to Exceed) $74,985.00 5. Reimbursable Expenses (Not to Exceed) 6. Total: $879,152.25 C. The CITY shall make payments to the CONSULTANT within thirty (30) days after receipt and approval of a detailed invoice. Invoices shall be submitted on a monthly basis. SECTION IV - THE CITY'S RESPONSIBILITIES A. The CITY shall designate a project manager during the term of this CONTRACT. The project manager has the authority to administer this CONTRACT and shall monitor compliance with all terms and conditions stated herein. All requests for information from or a decision by the CITY on any aspect of the work shall be directed to the project manager. B. The CITY shall review submittals by the CONSULTANT and provide prompt response to questions and rendering of decisions pertaining thereto, to minimize Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A Professional Services Contract 4 of 5 4/2019 delay in the progress of the CONSULTANT'S work. The CITY will keep the CONSULTANT advised concerning the progress of the CITY'S review of the work. The CONSULTANT agrees that the CITY'S inspection, review, acceptance or approval of CONSULTANT'S work shall not relieve CONSULTANT'S responsibility for errors or omissions of the CONSULTANT or its sub-consultant(s) or in any way affect the CONSULTANT’S status as an independent contractor of the CITY. SECTION V - TERMINATION A. The CITY, at its sole discretion, may terminate this CONTRACT for any reason - - with or without cause -- by delivering written notice to CONSULTANT personally or by certified mail at 1080 Eldridge Parkway, Suite 800 Houston, TX. 77077. Immediately after receiving such written notice, the CONSULTANT shall discontinue providing the services under this CONTRACT. B. If this CONTRACT is terminated, CONSULTANT shall deliver to the CITY all drawings, special provisions, field survey notes, reports, estimates and any and all other documents or work product generated by the CONSULTANT under the CONTRACT, entirely or partially completed, together with all unused materials supplied by the CITY on or before the 15th day following termination of the CONTRACT. C. In the event of such termination, the CONSULTANT shall be paid for services performed prior to receipt of the written notice of termination. The CITY shall make final payment within sixty (60) days after the CONSULTANT has delivered to the CITY a detailed invoice for services rendered and the documents or work product generated by the CONSULTANT under the CONTRACT. D. If the remuneration scheduled under this contract is based upon a fixed fee or definitely ascertainable sum, the portion of such sum payable shall be proportionate to the percentage of services completed by the CONSULTANT based upon the scope of work. E. In the event this CONTRACT is terminated, the CITY shall have the option of completing the work, or entering into a CONTRACT with another party for the completion of the work. F. If the CITY terminates this CONTRACT for cause and/or if the CONSULTANT breaches any provision of this CONTRACT, then the CITY shall have all rights and remedies in law and/or equity against CONSULTANT. Venue for any action or dispute arising out of or relating to this CONTRACT shall be in Brazoria County, Texas. The laws of the State of Texas shall govern the terms of this CONTRACT. The prevailing party in the action shall be entitled to recover its actual damages with interest, attorney’s fees, costs and expenses incurred in connection with the dispute and/or action. CONSULTANT and CITY desire an expeditious means to resolve any disputes that may arise between under this Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A Professional Services Contract 5 of 5 4/2019 CONTRACT. To accomplish this, the parties agree to mediation as follows: If a dispute arises out of or relates to this CONTRACT, or the breach thereof, and if the dispute cannot be settled through negotiation, then the parties agree first to try in good faith, and before pursuing any legal remedies, to settle the dispute by mediation of a third party who will be selected by agreement of the parties. SECTION VI – ENTIRE AGREEMENT This CONTRACT represents the entire agreement between the CITY and the CONSULTANT and supersedes all prior negotiations, representations, or contracts, either written or oral. This CONTRACT may be amended only by written instrument signed by both parties. SECTION VII – COVENANT AGAINST CONTINGENT FEES The CONSULTANT affirms that he has not employed or retained any company or person, other than a bona fide employee working for the CONSULTANT to solicit or secure this CONTRACT, and that he has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage brokerage fee, gift, or any other consideration, contingent upon or resulting from the award or making of the CONTRACT. For breach or violation of this clause, the CITY may terminate this CONTRACT without liability, and in its discretion, may deduct from the CONTRACT price or consideration, or otherwise recover, the full amount of such fee, commission, percentage brokerage fee, gift, or contingent fee that has been paid. SECTION VIII- SUCCESSORS AND ASSIGNS This CONTRACT shall not be assignable except upon the written consent of the parties hereto. ________________________________ ASSISTANT FINANCE DIRECTOR DATE CITY OF PEARLAND, TEXAS ________________________________ CITY MANAGER/DIRECTOR CITY OF PEARLAND, TEXAS DATE ________________________________ CONSULTANT DATE      Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A 8/27/2026 | 8:50 AM CDT 8/27/2026 | 2:56 PM CDT ATTEST: ________________________________ FRANCES AGUILAR, TRMC, MMC CITY SECRETARY Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A EXHIBIT A TRANSPORTATION SCOPE OF SERVICES FOR DR2601 - Isla Drive, North Galveston Avenue, Cheryl Drive Drainage Improvements And DR2602 - East Plum Street (Old Alvin Road to Schlieder Drive) Drainage Improvements Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A East Plum Drainage and Isla/N Galveston/Cheryl Drainage Exhibit A - Scope 2 PROJECT SCOPE OF WORK Existing Facility DR2601 - Isla Drive, North Galveston Avenue, Cheryl Drive The study area includes three neighborhood streets (Isla Drive, North Galveston Avenue, and Cheryl Drive), which are located between Orange Street and Town Ditch in the City of Pearland. The drainage infrastructure for each street drains north from East Orange Street and outfalls into Town Ditch. The project area is composed of residential development and small businesses. The storm sewer system is poorly functioning, with limited capacity, likely due to the age of the original design. Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A East Plum Drainage and Isla/N Galveston/Cheryl Drainage Exhibit A - Scope 3 DR2602 - East Plum Street (Old Alvin Road to Schlieder Drive) The study area is located between SH 35 and Clear Creek within the City of Pearland. East Plum Street extends approximately 2,000 feet within the project area with a roadside ditch of the same length to the south and a storm sewer system to the north. The drainage infrastructure runs west to east from Old Alvin Road to an outfall pipe under Schlieder Drive. The system ultimately outfalls to Bus Barn Ditch. The project area is composed of residential development and small businesses. The study area is located outside of the 100-year and 500-year floodplain. The existing storm sewer system functions poorly, likely due to an outdated design. COP records indicate several complaints from residents of Linwood Oaks, Yupon Circle, and Briar Circle. Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A East Plum Drainage and Isla/N Galveston/Cheryl Drainage Exhibit A - Scope 4 Proposed Facility East Plum Street (Old Alvin Road to Schlieder Drive) Based on the developed Preliminary Engineering Reports (PER) from Halff Associates, Inc. dated October 2022, a 2.5-ft deep trapezoidal channel with a 2-ft bottom width and 4:1 side slopes will provide sufficient capacity to carry the 2-year Atlas 14 storm event for the southern roadside ditch. During analysis phase, a storm sewer system on the south side will be investigated. A storm sewer system with sizes ranging from 36-inch to 42-inch RCP is recommended to replace the existing storm sewer pipe system that ranges in pipe size from 18-inch to 36-inch and will provide sufficient capacity to carry the 2-year Atlas 14 storm event. No additional acquisition of Right-of-Way (ROW) is anticipated although design criteria variances should be investigated where necessary. Potential adverse impacts due to the proposed improvements to the receiving channel (Bus Barn Ditch) were also evaluated with a mitigation volume of 1.3 ac-ft was estimated to mitigate flow increases due to the improved drainage system. The roadway will be milled and overlay with some full depth repairs as identified during design phase. Isla Drive, North Galveston Avenue, Cheryl Drive A storm sewer system with sizes ranging from 36-inch to 42-inch RCP is recommended to replace the existing storm sewer pipe system that ranges in pipe size from 18-inch to 36-inch and will provide sufficient capacity to carry the 2-year Atlas 14 storm event. No additional acquisition of Right-of-Way (ROW) is anticipated although design criteria variances should be investigated where necessary. Potential adverse impacts due to the proposed improvements to the receiving channel (Town Ditch) were also evaluated. All three streets will have full replacement of curb and gutter section including driveways PROJECT SCOPE OF SERVICES BASIC SERVICES: Consor North America, Inc. (CONSOR) team will provide the engineering design services to the City of Pearland (City) necessary for drainage and roadway improvements to East Plum, Isla, North Galveston and Cheryl. The overall scope of services will conform to City procedures and requirements to provide a PS&E package suitable for construction bidding. The design process for this project has been divided into the following phases: PHASE I - Final Design Services PHASE II - Bid Phase Services PHASE III - Construction Phase Services The final design services and bid & phase services deliverables will be in accordance with all adopted City guidelines and specifications and will be included in the following tasks. Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A East Plum Drainage and Isla/N Galveston/Cheryl Drainage Exhibit A - Scope 5 PHASE I - Final Design Services The goal is to prepare construction drawings and specifications accurately and efficiently. Interim submittals will be made at 30 percent, 60 percent and 90 percent should include drawings, a specification table of contents (and/or special specifications, as applicable), and a construction cost estimate. Separate PS&E packages will be developed for each street but produced concurrently. Final Design Services for East Plum and Isla/N Galveston/Cheryl drainage improvements will be performed together as a single design effort. 1. Final Design Phase Services A. Project Management 1. Attend meetings (primarily via Teams or similar) with City, stakeholders, and external agencies including County, State & Federal entities, as required, to identify & solicit necessary information. Prepare Meeting minutes. 2. Management of subconsultants (survey & geotechnical). B. Data Collection 1. Gather City’s existing information (studies, reports, record drawings, GIS maps, etc.) 2. Collect public and private utility information 3. Conduct site visits C. Drainage Analysis 1. Drainage area map boundaries - Identify existing storm sewer systems associated within the study areas and determine the existing and proposed drainage area boundaries for the project based on available drainage study, contour data and site visits. Drainage area peak flows will be calculated for 2- yr, 10-yr, and 100-yr events using Atlas 14 rainfall data. 2. Existing Conditions Analysis - Prepare an existing SWMM model of the drainage systems. Consor will calculate the existing hydraulic grade line for the 2-yr, 10-yr, and 100-yr storm events. Consor will identify existing drainage problems based on the existing analysis, LiDAR data, record drawings, and site visits. All flows draining to the project limits will be included in H&H modeling. Overland flow analysis will be performed for the extreme event (100- year event). Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A East Plum Drainage and Isla/N Galveston/Cheryl Drainage Exhibit A - Scope 6 3. Proposed Conditions Analysis - Prepare a preliminary proposed storm sewer design based on a 2-yr. 10-yr, and 100-yr storm analysis for the project area using SWMM to keep proposed 2-yr HGL below the gutter line and the 100-yr HGL no more than 9 inches above the top of curb. Open Roads DU will be used to size inlets to meet ponding width and capacity design. Storm sewer leads will be 18 inch pipe or larger with 24 inch minimum for leads carrying 5 cfs or more. 4. Detention Analysis a. Perform a detention analysis following the City of Pearland and BDD4 criteria. Calculate the required detention volume. Analyze the outflow to ensure no increase in peak flows during the 2-yr, 10-yr, and 100-yr storm event. Provide appropriate outfall and erosion protection measures. b. For E Plum drainage anticipated to identify detention volume in Bus Barn Ditch. For Isla/N Galveston/Cheryl drainage will review potential for upsizing storm sewer system and/or off-site location within project area. 5. Preliminary Drainage Layouts - Prepare preliminary layouts for the proposed storm system and detention basin. 6. Drainage Impact Analysis Report - Prepare a drainage impact analysis report documenting the results of the preliminary H&H analyses. Report exhibits will include the vicinity map, existing and proposed drainage area maps, and SWMM model outputs for the 2-yr,10-yr, and 100-yr events. The study and analysis will be performed in accordance with City of Pearland and BDD4 criteria. D. Topographic & ROW boundary survey as described in Surveyor’s Scope of Services Attachment A-1. E. Geotechnical Investigation as described in Geotechnical Scope of Services Attachment A-2. 1. Field exploration for six (6) boring logs; three (3) for E Plum Street and three (3) for Isla/N Galveston/Cheryl drainage improvements 2. Engineering analysis including drainage improvements, pavement design, utility construction, and construction considerations, etc. F. Environmental Services as outlined in previous Preliminary Engineering Report and described in Attachment A-3. Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A East Plum Drainage and Isla/N Galveston/Cheryl Drainage Exhibit A - Scope 7 1. Waters of the U.S./Wetland delineation, Threatened and endangered species assessment, cultural Resources Constraints analysis and permitting G. Perform Utility Coordination & Conflict Services: 1. Perform records research and field visits to determine the presence of underground or overhead private or public utilities during the Preliminary Design phase. 2. Send records requests to utility companies and obtain I.D. numbers (CenterPoint and AT&T). 3. Depict utilities to a reasonable degree of accuracy on the plan and profile drawings. 4. Prepare a conflict table to highlight conflicts between existing utilities and proposed improvements. 5. Submit milestone-level drawings to applicable utility companies for their review. 6. Coordinate directly with utility companies to facilitate utility adjustments required by the proposed improvements for relocations prior to construction of project. 7. Obtain utility signatures for the contract plans per City requirements (Final Design). H. Prepare all plans, details, specifications and cost estimate in accordance with City of Pearland’s Engineering Design Criteria Manual (EDCM) 1. Prepare detailed construction drawings, specifications and construction bid packages for the proposed Projects 2. Prepare submittals for 30%, 60%, 90%, and Final. All plans will be submitted electronically 3. Coordinate submittals for review & acquire approvals of all permits including and not limited to: City of Pearland Community Development, TxDOT, Railroads, USACE, Nationwide or Individual permits (if required) & County Drainage Districts 4. Prepare bid sets for distribution via the City’s e-bid system; including Plans, Specifications, Bid Proposal, (utilizing City Standard Details + Specs; for details & specification sections the City does not have, submit proposed supplement specs) Submit to City for signatures Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A East Plum Drainage and Isla/N Galveston/Cheryl Drainage Exhibit A - Scope 8 5. prepare Engineer’s estimate I. 60% Design Phase Submittal will include: 1. Cover sheet 2. Existing & Proposed Typical Sections 3. Overall project layout 4. Survey control map (by Kuo Associates) 5. Drainage area maps with hydraulic calculations 6. Plan and profile sheets, Removal Layouts (22”x 34” plan sheets at 1"=20’ scale; all existing and proposed facilities correctly shown in plan and profile; separate drawings for roadway and storm sewer are not necessary) 7. Signage and pavement marking plans (22”x 34” plan sheets at 1"=50’ scale; double-banked) 8. Traffic control plan – For Isla/N Galveston/Cheryl pavement replacement, it is assumed there will be two (2) traffic control phases for this project. For E Plum milling operation, it is anticipated there will be two (2) traffic control phases for this project with limits on length of disturbance to provide access to homeowners. TCP layouts will be prepared on double-banked 22”x34” plan sheets at 1” = 20’ scale. 9. Storm Water Pollution Prevention Plan (drawings and text; drawings may consist of a layout and details). SWPPP layouts will be prepared on double- banked 22”x34” plan sheets at 1” = 50’ scale and details will be included in the construction drawings. 10. Construction Cost Estimate 11. Project manual (bid form, specification table of contents, any special specifications or conditions; contract documents excluded) J. 90% Design Phase Submittal will include: 1. All items from 60% Submittal 2. General Notes 3. Standard construction details 4. Project manual (bid form, specification table of contents, any special specifications or conditions; contract documents excluded) 5. Responses to 60% comments Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A East Plum Drainage and Isla/N Galveston/Cheryl Drainage Exhibit A - Scope 9 K. Prepare Final plans details specifications and cost estimate in accordance with City of Pearland’s Engineering Design Criteria Manual (EDCM) 1. All items from 90% submittal 2. Responses to 90% comments 2. Bid Phase Services (Phase II) A. Provide Notice to Bidders (NTB) to the Project Manager in an electronic form appropriate for the City’s e-bid system format. City is responsible for advertising. B. Chair pre-bid meeting and attend the Bid Opening C. Attend City Council meeting for award of design contract and award of construction contract. D. Respond in writing to questions from bidders and prepare addendum as necessary. A single addendum will be developed at the end of the question period. E. Prepare Engineer’s Recommendation of Award Letter that includes the following required content: 1. Check for math errors and reconcile any mathematical discrepancies 2. Review for unbalance bid items 3. Certified Bid Tabulation including Engineer’s estimate 4. Review of contractor’s financial standing and references provided 5. Explanation of discrepancies between the Engineer’s estimate and bids 6. Recommendation to award 3. Construction Phase Services (CPS) (Phase III) – CPS will be provided on a Time & Materials basis. For the basis of estimating, it is anticipated that construction duration will be approximately 12 months. A. Provide bound hard copies of the plans (22”x34”) and executed Project Manual (4 sets) B. Construction Administration 1. Attend pre-construction meeting to provide information & answer questions 2. Attend monthly progress meetings with Construction Manager, Contractor & City of Pearland as needed 3. Field visit to sites for review of contractor progress and provide monthly observation report to City of Pearland. Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A East Plum Drainage and Isla/N Galveston/Cheryl Drainage Exhibit A - Scope 10 4. Review/approve & comment on Contractor’s submittals, RFIs, Contractor Proposals, Request for Change Orders (RCO) including coordination with Construction Manager on Proposals & Change Orders using the City of Pearland’s Pro-Trak system. 5. Provide interpretive guidance for Contractor, Construction Manager in resolution of problems 6. Conduct Substantial Completion Inspection with CM or PM to: 1. review progress of work for Substantial Completion walkthrough 2. generate a punch list of items for correction 3. substantiate items that are completed 4. issue both Certificate of Substantial Completion (signed/sealed from Design Engineer) & Final Acceptance or 2 nd walkthrough 7. Issue Final Completion & Acceptance letter to City recommending acceptance & release of final payment 8. Coordinate contractors, CM/CI to provide complete record of As-Builts Drawing 9. Within thirty (30) days after receipt of As-Builts from the contractor to the CM, the project engineer shall provide to the City one (1) set of full-size reproducible record drawings, an electronic file copy (PDF format), AutoCAD file (.dwg), and GIS compatible file (such as .dxf). 10. All Record Drawings must meet City Standards through the most current Engineering Design Criteria Manual (EDCM). Chapter 11 of the EDMC states the graphic and drawing standards and requirements that must be met. It is the responsibility of the Consultant to ensure these standards are met and the newest EDCM requirements are being used. Please refer to the City’s website, for the most current Engineering standards: https://www.pearlandtx.gov/departments/engineering-and-capital- projects/engineering-division. Deliverables 1. Phase I – Final Design (30%) a. Topographic Survey b. Geotechnical Report c. Drainage Report d. Environmental Report e. 30% Design Plans Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A East Plum Drainage and Isla/N Galveston/Cheryl Drainage Exhibit A - Scope 11 f. Drainage Impact Analysis Report g. Utility Conflict Matrix h. Preliminary Cost Estimate 2. Phase I – Final Design (60%) a. 60% Design Plans b. Utility Conflict Matrix updated c. Project Manual d. 60% Cost Estimate 3. Phase I – Final Design (90%) a. 90% Design Plans b. Project Manual & Bid Form c. Utility Conflict Matrix updated d. Responses to City 60% comments e. 90% Cost Estimate f. Proposed ROW Parcel Maps 4. Phase I – Final Design (Final Submittal, Signed & Sealed) a. Final Design Plans b. Project Manual c. Bidding Documents 5. Phase II - Bid Phase (separate for each design package) a. Attend pre-bid meeting. b. Answer bidder questions, prepare clarifications and addenda as needed. c. Bid Tabs & Recommendation Letter 6. Phase III – Construction Phase Services a. Final Completion & Acceptance letter b. Record Drawings Compensation Payment and compensation for the above Scope of Services for Phases I, & II is to be on a lump sum basis. Phase III – Construction Phase Services will be paid on a Time & Materials basis. A budget in the amount of $879,152.25 is established for this agreement and will not be exceeded without prior authorization by City. Items Not In Scope of Services 1. Stormwater Quality 2. Public Involvement 3. Tree protection / Landscaping Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A East Plum/Isla, N. Galveston, Cheryl Drainage Consor Engineers, LLC EXHIBIT B Project Name: Consultant: Project Number: Date: TASKS DESCRIPTION Consor Engineers LLC Kuo & Associates (Survey) Geotest Engineering Inc. (Geotech)TOTAL PROJECT MANAGEMENT 22,482.00$ $22,482.00 DRAINAGE ANALYSIS 79,792.00$ $79,792.00 PS&E 190,312.00$ $190,312.00 TOPO & BOUNDARY SURVEY 29,852.50$ $29,852.50 GEOTECHNICAL STUDY $10,282.00 $10,282.00 ENVIRONMENTAL SERVICES 20,913.25$ $20,913.25 PROJECT MANAGEMENT 24,704.00$ $24,704.00 DRAINAGE ANALYSIS 92,352.00$ $92,352.00 PS&E 226,107.00$ $226,107.00 TOPO & BOUNDARY SURVEY 41,987.50$ $41,987.50 GEOTECHNICAL STUDY $12,311.00 $12,311.00 ENVIRONMENTAL SERVICES 20,732.00$ $20,732.00 ENVIRONMENTAL SERVICES 18,330.00$ $18,330.00 SUBTOTAL OPTIONAL ADDITIONAL SERVICES 18,330.00$ -$ -$ 18,330.00$ PROJECT TOTAL 784,719.25$ 71,840.00$ 22,593.00$ 879,152.25$ Plum and Isla/N. Galveston/Cheryl Drainage CONSOR Engineers, LLC D25193TX.01 7/15/2026 OPTIONAL ADDITIONAL SERVICES EXHIBIT - B - FEE SUMMARY PHASE I - FINAL DESIGN SERVICES-E PLUM PHASE II - BID PHASE SERVICES PHASE I - FINAL DESIGN SERVICES-ISLA/N GALV/CHERYL PHASE III - CONSTRUCTION PHASE SERVICES Page 1 Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A Plum and Isla/N Galveston/Cheryl Drainage Consor Engineers, LLC EXHIBIT C Project Name: Consultant: Project Number: Date: PHASE I - FINAL DESIGN SERVICES - E PLUM TOTAL TOTAL COST NO OF LABOR HRS TASK DESCRIPTION LABOR HRS.DWGS PER SHEET PROJECT COORDINATION/ MANAGEMENT A. Project Management and Administration 4 8 8 20 3,980.00$ N/A B. Project Coordination (City, Stakeholders)8 12 20 4,960.00$ N/A C. Project Coordination with Brazoria Drainage District 4 (BDD4)4 12 16 3,740.00$ N/A D. Project Coordination with Subconsultants 1. Coordination & Review with Kuo & Associates for Surveying 4 4 12 20 3,680.00$ N/A 2. Coordination & Review with Geotest Engineering for Geotechnical 4 4 4 12 2,600.00$ N/A E. Progress Meetings / Prepare Minutes (4 meetings)4 4 4 12 2,600.00$ F. Schedule / Progress Reports / Invoicing 2 4 6 922.00$ N/A SUBTOTAL PROJECT MANAGEMENT 30 0 44 28 0 0 4 106 22,482.00$ DRAINAGE ANALYSIS 1. Drainage Area Map 1 8 8 4 21 3,625.00$ N/A 2. Existing Storm System Conditions Analysis 2 8 36 68 114 19,630.00$ N/A 3. Proposed Storm System Conditions Anaylsis 2 12 48 96 158 27,070.00$ N/A 4. Preliminary Detention Analysis 2 4 12 32 8 58 9,430.00$ N/A 5. Preliminary Drainage Layouts 1 4 8 32 16 24 85 12,205.00$ N/A 6. Drainage Impact Analysis Report 2 2 8 20 8 8 4 52 7,832.00$ N/A SUBTOTAL DRAINAGE STUDY 10 30 120 256 28 40 4 488 79,792.00$ PS&E - E PLUM Cover Sheet 1 1 4 8 14 1,895.00$ 1 14.0 Index Sheet 1 1 4 12 18 2,315.00$ 1 18.0 General Notes 1 4 12 8 25 3,605.00$ 3 8.3 Typical Sections 1 2 2 12 4 4 25 3,895.00$ 1 25.0 Project Layout Sheets 1 4 4 4 8 21 3,085.00$ 1 21.0 Roadway -$ Horiz Alignment Data 1 4 8 13 1,685.00$ 1 13.0 Removal Layout (40 scale, double bank)3 8 16 8 16 51 7,555.00$ 2 25.5 Roadway P&P Sheets (includes Storm Sewer) (40 scale)6 4 16 80 20 40 166 24,130.00$ 3 55.3 Table of Proposed Driveways 1 2 12 8 8 31 4,455.00$ 1 31.0 Drainage -$ Drainage Area Maps 1 2 4 16 4 12 39 5,695.00$ 1 39.0 Design Calculations & Drainage Output Sheets 1 2 4 12 4 4 27 4,315.00$ 1 27.0 Storm Sewer Laterals 1 1 2 16 8 12 40 5,550.00$ 1 40.0 Outfall Details 1 4 8 12 4 8 37 6,145.00$ 1 37.0 Proposed Utilities -$ Waterline & Wastewater Layouts 5 4 8 12 16 32 77 11,565.00$ 2 38.5 Utilities Miscellaneous Details 2 2 4 12 4 12 36 5,460.00$ 2 18.0 Traffic Control Plan (3 Phases)-$ TCP Typical Sections & Narrative 1 8 24 8 12 53 7,605.00$ 2 26.5 TCP Layout Sheets (40 scale, double banked)3 8 16 16 40 83 11,195.00$ 3 27.7 Project Approach Signing 1 8 4 8 21 2,785.00$ 1 21.0 TCP Details 1 4 16 12 8 41 5,825.00$ 2 20.5 Signing & Pavement Marking Layout (100 scale, double banked)1 4 16 8 8 37 5,265.00$ 1 37.0 SWPPP Layout (100 scale, double banked)1 2 4 32 8 24 71 9,675.00$ 2 35.5 SWPPP Notes 1 2 2 4 4 4 17 2,815.00$ 1 17.0 Standard Details 1 2 4 8 15 1,975.00$ 12 1.3 Miscellaneous Details 2 4 16 8 16 46 6,410.00$ 2 23.0 QC Reviews (30, 60, 90, Final)48 48 13,680.00$ Utility Conflict Matrix 1 8 32 41 6,305.00$ Utility Relocation Plan Review & Coordination 1 8 40 49 7,385.00$ Engineer's Cost Estimate & Bid Table 2 8 32 42 6,610.00$ Prepare Project Manual & Specifications 4 4 16 40 4 68 11,432.00$ SUBTOTAL PS&E E PLUM 47 79 140 506 156 320 4 1252 190,312.00$ HOURS SUB-TOTALS 87 109 304 790 184 360 12 1358 292,586.00$ CONTRACT RATE PER HOUR 305.00$ 285.00$ 210.00$ 135.00$ 140.00$ 105.00$ 78.00$ TOTAL LABOR COSTS 26,535.00$ 31,065.00$ 63,840.00$ 106,650.00$ 25,760.00$ 37,800.00$ 936.00$ 292,586.00$ 292,586.00$ % DISTRIBUTION OF STAFFING 9.07% 10.62% 21.82% 36.45% 8.80% 12.92% 0.32% PHASE I - FINAL DESIGN SERVICES 292,586.00$ Plum and Isla/N. Galveston/Cheryl Drainage CONSOR Engineers, LLC D25193TX.01 2026-07-15 SCOPE OF SERVICES - GENERAL Project Manager Senior Engineer Project Engineer Engineer In Training Senior Cadd Operator Cadd Operator Admin/Clerical Page 1 of 1 Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A Plum and Isla/N Galveston/Cheryl Drainage Consor Engineers, LLC EXHIBIT C Project Name: Consultant: Project Number: Date: PHASE I - FINAL DESIGN SERVICES - ISLA/N GALV/CHERYL TOTAL TOTAL COST NO OF LABOR HRS TASK DESCRIPTION LABOR HRS.DWGS PER SHEET PROJECT COORDINATION/ MANAGEMENT A. Project Management and Administration 4 8 8 20 3,980.00$ N/A B. Project Coordination (City, Stakeholders)8 12 20 4,960.00$ N/A C. Project Coordination with Brazoria Drainage District 4 (BDD4)4 12 16 3,740.00$ N/A D. Project Coordination with Subconsultants 1. Coordination & Review with Kuo & Associates for Surveying 4 4 12 20 3,680.00$ N/A 2. Coordination & Review with Geotest Engineering for Geotechnical 4 4 4 12 2,600.00$ N/A E. Progress Meetings / Prepare Minutes (6 meetings)6 6 6 18 3,900.00$ F. Schedule / Progress Reports / Invoicing 4 8 12 1,844.00$ N/A SUBTOTAL PROJECT MANAGEMENT 34 0 46 30 0 0 8 118 24,704.00$ DRAINAGE ANALYSIS 1. Drainage Area Map 1 8 12 8 29 4,725.00$ N/A 2. Existing Storm System Conditions Analysis 2 8 44 100 154 25,630.00$ N/A 3. Proposed Storm System Conditions Anaylsis 2 12 56 120 190 31,990.00$ N/A 4. Preliminary Detention Analysis 2 4 12 32 8 58 9,430.00$ N/A 5. Preliminary Drainage Layouts 1 4 8 32 16 24 85 12,205.00$ N/A 6. Drainage Impact Analysis Report 2 2 8 24 8 8 4 56 8,372.00$ N/A SUBTOTAL DRAINAGE STUDY 10 30 136 320 32 40 4 572 92,352.00$ PS&E - ISLA/N GALV/CHERYL Cover Sheet 1 1 4 8 14 1,895.00$ 1 14.0 Index Sheet 1 1 4 12 18 2,315.00$ 1 18.0 General Notes 1 4 12 8 25 3,605.00$ 3 8.3 Typical Sections 1 2 8 16 8 8 43 6,675.00$ 2 21.5 Project Layout Sheets 1 4 4 4 8 21 3,085.00$ 1 21.0 Roadway -$ Horiz Alignment Data 1 4 8 13 1,685.00$ 1 13.0 Removal Layout (40 scale, double bank)3 12 32 16 24 87 12,515.00$ 3 29.0 Roadway P&P Sheets (includes Storm Sewer) (40 scale)6 6 24 136 56 72 300 42,340.00$ 6 50.0 Table of Proposed Driveways 3 3 16 24 12 58 8,550.00$ 3 19.3 Drainage -$ Drainage Area Maps 3 4 16 32 24 24 103 15,615.00$ 3 34.3 Design Calculations & Drainage Output Sheets 1 4 8 12 4 4 33 5,725.00$ 1 33.0 Storm Sewer Laterals 1 2 8 16 8 8 43 6,675.00$ 2 21.5 Outfall Details 1 4 8 12 4 8 37 6,145.00$ 1 37.0 Proposed Utilities -$ Waterline & Wastewater Layouts (Not in project)0 0 0 0 0 0 0 -$ 5 0.0 Utilities Miscellaneous Details (Not in project)0 0 0 0 0 0 0 -$ 4 0.0 Traffic Control Plan (3 Phases)-$ TCP Typical Sections & Narrative 1 8 24 8 12 53 7,605.00$ 2 26.5 TCP Layout Sheets (40 scale, double banked)3 12 36 24 60 135 17,955.00$ 6 22.5 Project Approach Signing 1 8 4 8 21 2,785.00$ 1 21.0 TCP Details 1 4 24 16 8 53 7,465.00$ 2 26.5 Signing & Pavement Marking Layout (100 scale, double banked)1 4 16 8 8 37 5,265.00$ 1 37.0 SWPPP Layout (100 scale, double banked)1 2 4 32 8 24 71 9,675.00$ 2 35.5 SWPPP Notes 1 2 2 4 4 4 17 2,815.00$ 1 17.0 Standard Details 1 2 4 8 15 1,975.00$ 12 1.3 Miscellaneous Details 2 4 16 8 16 46 6,410.00$ 2 23.0 QC Reviews (30, 60, 90, Final)48 48 13,680.00$ Utility Conflict Matrix 1 8 32 41 6,305.00$ Utility Relocation Plan Review & Coordination 1 8 40 49 7,385.00$ Engineer's Cost Estimate & Bid Table 2 12 40 54 8,530.00$ Prepare Project Manual & Specifications 4 4 16 40 4 68 11,432.00$ SUBTOTAL PS&E ISLA/N GALV/CHERYL 44 81 176 614 232 352 4 1503 226,107.00$ HOURS SUB-TOTALS 88 111 358 964 264 392 16 1621 343,163.00$ CONTRACT RATE PER HOUR 305.00$ 285.00$ 210.00$ 135.00$ 140.00$ 105.00$ 78.00$ TOTAL LABOR COSTS 26,840.00$ 31,635.00$ 75,180.00$ 130,140.00$ 36,960.00$ 41,160.00$ 1,248.00$ 343,163.00$ 343,163.00$ % DISTRIBUTION OF STAFFING 7.82% 9.22% 21.91% 37.92% 10.77% 11.99% 0.36% PHASE I - FINAL DESIGN SERVICES 343,163.00$ Plum and Isla/N. Galveston/Cheryl Drainage CONSOR Engineers, LLC D25193TX.01 2026-07-15 SCOPE OF SERVICES - GENERAL Project Manager Senior Engineer Project Engineer Engineer In Training Senior Cadd Operator Cadd Operator Admin/Clerical Page 1 of 1 Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A Plum and Isla/N Galveston/Cheryl Drainage Consor Engineers, LLC EXHIBIT C Project Name: Consultant: Project Number: Date: PHASE II - BID PHASE SERVICES - E PLUM TOTAL TASK DESCRIPTION LABOR HRS. & COSTS BID PHASE (PACKAGE 1) Prepare and Upload Bid Set to Community Development 1 4 5 845.00$ Attend Pre-Bid Meeting 4 4 1,220.00$ Respond to RFIs & Prepare Addendum 2 2 4 8 16 3,100.00$ Evaluate Bids, Prepare Bid Tabulations & Recommend Award of Contract 2 2 6 10 1,840.00$ SUBTOTAL BID PHASE (PACKAGE 1)9 2 6 18 0 0 0 35 7,005.00$ HOURS SUB-TOTALS 9 2 6 18 0 0 0 35 7,005.00$ CONTRACT RATE PER HOUR 305.00$ 285.00$ 210.00$ 135.00$ 140.00$ 105.00$ 78.00$ TOTAL LABOR COSTS 2,745.00$ 570.00$ 1,260.00$ 2,430.00$ -$ -$ -$ 7,005.00$ 7,005.00$ % DISTRIBUTION OF STAFFING 39.19% 8.14% 17.99% 34.69% 0.00% 0.00% 0.00% DIRECT EXPENSES QTY UNIT RATE COST Parking day 15.00$ -$ Toll Charges each 16.00$ -$ Standard Postage letter 17.00$ -$ Certified Letter Return Receipt each 18.00$ -$ Courier Services each 45.00$ -$ -$ PHASE II - BID PHASE SERVICES - E PLUM 7,005.00$ PHASE II - BID PHASE SERVICES - ISLA/N GALV/CHERYL TOTAL TOTAL COST TASK DESCRIPTION LABOR HRS. BID PHASE (PACKAGE 1) Prepare and Upload Bid Set to Community Development 1 4 5 845.00$ Attend Pre-Bid Meeting 4 4 1,220.00$ Respond to RFIs & Prepare Addendum 2 2 4 8 16 3,100.00$ Evaluate Bids, Prepare Bid Tabulations & Recommend Award of Contract 2 2 6 10 1,840.00$ SUBTOTAL BID PHASE (PACKAGE 1)9 2 6 18 0 0 0 35 7,005.00$ HOURS SUB-TOTALS 9 2 6 18 0 0 0 35 7,005.00$ CONTRACT RATE PER HOUR 305.00$ 285.00$ 210.00$ 135.00$ 140.00$ 105.00$ 78.00$ TOTAL LABOR COSTS 2,745.00$ 570.00$ 1,260.00$ 2,430.00$ -$ -$ -$ 7,005.00$ 7,005.00$ % DISTRIBUTION OF STAFFING 39.19% 8.14% 17.99% 34.69% 0.00% 0.00% 0.00% DIRECT EXPENSES QTY UNIT RATE COST Parking day 15.00$ -$ Toll Charges each 16.00$ -$ Standard Postage letter 17.00$ -$ Certified Letter Return Receipt each 18.00$ -$ Courier Services each 45.00$ -$ -$ PHASE II - BID PHASE SERVICES - ISLA/N GALV/CHERYL 7,005.00$ PHASE II - BID PHASE SERVICES 14,010.00$ DIRECT EXPENSES SUBTOTAL Senior Cadd Operator Cadd Operator Admin/ClericalProject Manager Senior Engineer Project Engineer Engineer In Training DIRECT EXPENSES SUBTOTAL Senior Cadd Operator Cadd Operator Admin/Clerical Plum and Isla/N. Galveston/Cheryl Drainage CONSOR Engineers, LLC D25193TX.01 2026-07-15 SCOPE OF SERVICES - GENERAL Project Manager Senior Engineer Project Engineer Engineer In Training Page 1 of 1 Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A Plum and Isla/N Galveston/Cheryl Drainage Consor Engineers, LLC EXHIBIT C Project Name: Consultant: Project Number: Date: PHASE III - CONSTRUCTION PHASE SERVICES - E PLUM TOTAL TASK DESCRIPTION LABOR HRS. & COSTS CONSTRUCTION PHASE (6 MONTH PROJECT) Pre-Construction Meeting 2 2 4 880.00$ Progress Meetings 4 4 8 2,060.00$ Site Visits & Reports 20 20 40 6,900.00$ Review Submittals 4 12 12 28 5,360.00$ Respond to RFIs 4 12 16 32 5,900.00$ Review Change Orders 2 4 4 10 1,990.00$ Substantial Completion Walk-thru Meeting / Punch List / Cert of Substantial Completion 4 6 10 2,030.00$ Final Walk-thru Meeting / Punch List / Cert of Final Completion 2 4 6 1,150.00$ Prepare Record Drawings E Plum)2 4 8 32 46 5,890.00$ HOURS SUB-TOTALS 24 0 56 72 0 32 0 184 32,160.00$ CONTRACT RATE PER HOUR 305.00$ 285.00$ 210.00$ 135.00$ 140.00$ 105.00$ 78.00$ TOTAL LABOR COSTS 7,320.00$ -$ 11,760.00$ 9,720.00$ -$ 3,360.00$ -$ 32,160.00$ 32,160.00$ % DISTRIBUTION OF STAFFING 22.76% 0.00% 36.57% 30.22% 0.00% 10.45% 0.00% OTHER DIRECT EXPENSES QTY UNIT RATE COST Photocopies B&W (8.5x11)900 sheet 0.15$ 135.00$ Photocopies B&W (11x17)600 sheet 0.25$ 150.00$ 285.00$ PHASE III - CONSTRUCTION PHASE SERVICES E PLUM 32,445.00$ PHASE III - CONSTRUCTION PHASE SERVICES - ISLA/N GALV/CHERYL TOTAL TOTAL COST TASK DESCRIPTION LABOR HRS. CONSTRUCTION PHASE (12 MONTH PROJECT) Pre-Construction Meeting 2 2 4 880.00$ Progress Meetings 4 8 12 2,900.00$ Site Visits & Reports 32 32 64 11,040.00$ Review Submittals 4 20 20 44 8,120.00$ Respond to RFIs 4 12 16 32 5,900.00$ Review Change Orders 2 4 4 10 1,990.00$ Substantial Completion Walk-thru Meeting / Punch List / Cert of Substantial Completion 4 6 10 2,030.00$ Final Walk-thru Meeting / Punch List / Cert of Final Completion 2 4 6 1,150.00$ Prepare Record Drawings E Plum)2 4 16 40 62 7,810.00$ HOURS SUB-TOTALS 24 0 80 100 0 40 0 244 41,820.00$ CONTRACT RATE PER HOUR 305.00$ 285.00$ 210.00$ 135.00$ 140.00$ 105.00$ 78.00$ TOTAL LABOR COSTS 7,320.00$ -$ 16,800.00$ 13,500.00$ -$ 4,200.00$ -$ 41,820.00$ 41,820.00$ % DISTRIBUTION OF STAFFING 22.76% 0.00% 52.24% 41.98% 0.00% 13.06% 0.00% OTHER DIRECT EXPENSES QTY UNIT RATE COST Mileage 600 miles 0.725$ 435.00$ Photocopies B&W (8.5x11)900 sheet 0.15$ 135.00$ Photocopies B&W (11x17)600 sheet 0.25$ 150.00$ 720.00$ PHASE III - CONSTRUCTION PHASE SERVICES ISLA/ N GALV/CHERYL 42,540.00$ PHASE III - CONSTRUCTION PHASE SERVICES (Time & Materials) 74,985.00$ Engineer In Training Plum and Isla/N. Galveston/Cheryl Drainage CONSOR Engineers, LLC D25193TX.01 2026-07-15 SCOPE OF SERVICES - GENERAL Senior Cadd Operator Cadd Operator Admin/Clerical DIRECT EXPENSES SUBTOTAL Project Manager Senior Engineer Project Engineer DIRECT EXPENSES SUBTOTAL Senior Cadd Operator Cadd Operator Admin/ClericalProject Manager Senior Engineer Project Engineer Engineer In Training Page 1 of 1 Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A Plum and Isla/N Galveston/Cheryl Drainage Consor Engineers, LLC EXHIBIT C Project Name: Consultant: Project Number: Date: ENVIRONMENTAL SERVICES TOTAL TOTAL COST TASK DESCRIPTION LABOR HRS. ENVIRONMENTAL FOR E PLUM WOTUS Delineation Preparation and Fieldwork 4 20 8 32 3,740.00$ Draft Report / Final Report (1 round of comments) 2 6 40 16 2 66 7,870.00$ T&E Habitat Report Preparation and Fieldwork (Fieldwork done at same time as WOTUS)1 4 4 9 1,040.00$ Draft Report / Final Report (1 round of comments)2 3 12 8 1 26 3,370.00$ Cultural Resources Desktop Analysis Analysis/Report (Draft / Final Report) Submit to THC 1 1 2 16 20 2,317.00$ Permitting Assessment Assess Need for USACE Permit 3 1 2 2 8 1,445.00$ SUBTOTAL ENVIRONMENTAL E PLUM 8 16 78 40 3 16 161 19,782.00$ HOURS SUB-TOTALS 8 16 78 40 3 16 161 19,782.00$ CONTRACT RATE PER HOUR 275.00$ 200.00$ 105.00$ 105.00$ 120.00$ 102.00$ TOTAL LABOR COSTS 2,200.00$ 3,200.00$ 8,190.00$ 4,200.00$ 360.00$ 1,632.00$ 19,782.00$ 19,782.00$ % DISTRIBUTION OF STAFFING 11.12% 16.18% 41.40% 21.23% 1.82% 8.25% OTHER DIRECT EXPENSES QTY UNIT RATE COST Mileage 250 miles 0.725$ 181.25$ TARL Search (Cultural Resource)1 Search 400.00$ 400.00$ ASTM Haz Mat Search Search 500.00$ 500.00$ Field Supplies (Water, etc)2 each 25.00$ 50.00$ ODE SUBTOTAL 1,131.25$ SUBTOTAL ENVIRONMENTAL SERVICES FOR E PLUM 20,913.25$ ENVIRONMENTAL FOR ISLA/N GALVESTON/CHERYL WOTUS Delineation Preparation and Fieldwork 4 20 8 32 3,740.00$ Draft Report / Final Report (1 round of comments) 2 6 40 16 2 66 7,870.00$ T&E Habitat Report Preparation and Fieldwork (Fieldwork done at same time as WOTUS)1 4 4 9 1,040.00$ Draft Report / Final Report (1 round of comments)2 3 12 8 1 26 3,370.00$ Cultural Resources Desktop Analysis Analysis/Report (Draft / Final Report) Submit to THC 1 1 2 16 20 2,317.00$ Permitting Assessment Assess Need for USACE Permit 3 1 2 2 8 1,445.00$ SUBTOTAL ENVIRONMENTAL FOR ISLA/N GALVESTON/CHERYL 8 16 78 40 3 16 161 19,782.00$ HOURS SUB-TOTALS 8 16 78 40 3 16 161 19,782.00$ CONTRACT RATE PER HOUR 275.00$ 200.00$ 105.00$ 105.00$ 120.00$ 102.00$ TOTAL LABOR COSTS 2,200.00$ 3,200.00$ 8,190.00$ 4,200.00$ 360.00$ 1,632.00$ 19,782.00$ 19,782.00$ % DISTRIBUTION OF STAFFING 11.12% 16.18% 41.40% 21.23% 1.82% 8.25% OTHER DIRECT EXPENSES QTY UNIT RATE COST Mileage miles -$ TARL Search (Cultural Resource)1 Search 400.00$ 400.00$ ASTM Haz Mat Search Search 500.00$ 500.00$ Field Supplies (Water, etc)2 each 25.00$ 50.00$ ODE SUBTOTAL 950.00$ SUBTOTAL ENVIRONMENTAL FOR ISLA/N GALVESTON/CHERYL 20,732.00$ TOTAL ENVIRONMENTAL SERVICES 41,645.25$ Plum and Isla/N. Galveston/Cheryl Drainage CONSOR Engineers, LLC D25193TX.01 2026-07-15 SCOPE OF SERVICES - GENERAL Sr. ENV Planner / QC Environmental Task Lead Environmental Planner Cadd Operator Technical Editor Archaeologist Page 1 of 1 Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A Plum and Isla/N Galveston/Cheryl Drainage Consor Engineers, LLC EXHIBIT C Project Name: Consultant: Project Number: Date: OPTIONAL ENVIRONMENTAL SERVICES TOTAL TOTAL COST TASK DESCRIPTION LABOR HRS. OPTIONAL ENVIRONMENTAL FOR E PLUM NWP with PCN Application Prepare NWP Application 1 2 20 12 1 36 4,155.00$ Coordinate with USACE 2 4 4 2 12 1,980.00$ Address Comments and Prepare Final NWP Application 2 4 12 4 22 3,030.00$ SUBTOTAL OPTIONAL ENVIRONMENTAL E PLUM 5 10 36 18 1 0 70 9,165.00$ HOURS SUB-TOTALS 5 10 36 18 1 0 70 9,165.00$ CONTRACT RATE PER HOUR 275.00$ 200.00$ 105.00$ 105.00$ 120.00$ 102.00$ TOTAL LABOR COSTS 1,375.00$ 2,000.00$ 3,780.00$ 1,890.00$ 120.00$ -$ 9,165.00$ 9,165.00$ % DISTRIBUTION OF STAFFING 15.00% 21.82% 41.24% 20.62% 1.31% 0.00% SUBTOTAL OPTIONAL ENVIRONMENTAL SERVICES FOR E PLUM 9,165.00$ OPTIONAL ENVIRONMENTAL FOR ISLA/N GALVESTON/CHERYL NWP with PCN Application Prepare NWP Application 1 2 20 12 1 36 4,155.00$ Coordinate with USACE 2 4 4 2 12 1,980.00$ Address Comments and Prepare Final NWP Application 2 4 12 4 22 SUBTOTAL OPTIONAL ENVIRONMENTAL FOR ISLA/N GALVESTON/CHERYL 5 10 36 18 1 0 70 9,165.00$ HOURS SUB-TOTALS 5 10 36 18 1 0 70 9,165.00$ CONTRACT RATE PER HOUR 275.00$ 200.00$ 105.00$ 105.00$ 120.00$ 102.00$ TOTAL LABOR COSTS 1,375.00$ 2,000.00$ 3,780.00$ 1,890.00$ 120.00$ -$ 9,165.00$ 9,165.00$ % DISTRIBUTION OF STAFFING 15.00% 21.82% 41.24% 20.62% 1.31% 0.00% SUBTOTAL OPTIONAL ENVIRONMENTAL FOR ISLA/N GALVESTON/CHERYL 9,165.00$ TOTAL OPTIONAL ENVIRONMENTAL SERVICES 18,330.00$ Technical Editor Archaeologist Plum and Isla/N. Galveston/Cheryl Drainage CONSOR Engineers, LLC D25193TX.01 2026-07-15 SCOPE OF SERVICES - GENERAL Sr. ENV Planner / QC Environmental Task Lead Environmental Planner Cadd Operator Page 1 of 1 Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A Topographic Surveying: Survey shall conform to all requirements of City of Pearland as applicable. In general,the scope for survey will includethe following tasks: 1. Horizontal and vertical controls will be established and tied to the Texas State Plane Coordinate System, South Central Zone NAD 83 and datum NAVD 88. 2. City of Pearland Monument will be used as project benchmark. Nearby TSARP monument as well be tied for an equation in elevation difference. 3. Width of survey is defined as Right of Way (ROW) tp ROW as accessible 4. Cross sections will be surveyed at every 100 feet interval along the project corridors/routes, i.e. streets Right of Ways (ROW) to include primarily information on pavement (edges & center line) and roadside ditches (high bank, toe, flow line, etc.) 5. All planimetric features will be surveyed along the project route. The survey will be extended on all sides of street intersections at least 5 unless otherwise warranted for your design. All individual surveyed; however, detail tree survey within wooded area is beyond the scope of this proposal. 6. All visible existing utilities (i.e. manholes, culverts, power poles, etc.) along the project route and pipe size and flow line measure downs in the manholes, inlets and culverts will be obtained. Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A Obtaining Right of Entry to the private properties, if needed Project No. Fee Schedule DR2601 $41,987.50 5 to 6 weeks DR2602 $29,852.50 4to 5 weeks Total $71,840.00 Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A Project:DR2601 Project Streets From To Quantity (LF) Isla Drive E. Orange St.N. top bank +10 of ditch to north 1,100 Galveston Avenue E. Orange St. N. top bank +10 of ditch to north 1,100 Cheryl Drive E. Orange St. N. top bank +10 of ditch to north and end of cul- de-sac 1,250 Total (Project Streets)3,450 Side Street From To Quantity (LF) E. Orange St. 100' East of Isla 100' West of Isla 200 E. Orange St.100' East of Galveston Ave.100' West of Galveston Ave, 200 E. Orange St. 100' East of Cheryl Dr. 100' West of Cheryl Dr. 200 Total (Side Streets)600 Grand Total 4,050 Project:DR2602 Project Streets From To Quantity (LF) E. Plum Drive 100' W of Old Alvin Road 100' E of Schleder Drive 2,300 Total (Project Streets) 2,300 Side Street From To Quantity (LF) Old Alvin Road.100' North of E. Plum Drive 100' South of E. Plum Drive 200 Schleder Drive 100' North of E. Plum Drive 100' South of E. Plum Drive 200 Total (Side Streets) 400 Grand Total 2,700 Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A TASKS SUB TASKS RPLS SIT CADD Crew (2 men) Total Hrs Total Cost FEE $170.00 $125.00 $115.00 $180.00 Survey Controls Tie to Benchmark / Monument 0.5 1.0 1.50 $242.50 $2,937.50 Set Survey Controls 1.0 4.0 5.00 $845.00 Horizontal Control Work (GPS)1.0 3.0 4.00 $665.00 Vertical Control Work (Level Loop)1.0 4.0 5.00 $845.00 QC/QA 2.0 2.00 $340.00 Survey Field Work Survey -Corridor & Site 4 72 76.00 $13,460.00 $18,345.00 Survey -Channel 1 8 9.00 $1,565.00 Inverts - Manhole & Inlet 2 4 6.00 $950.00 Search and Survey Iron Rods 1 6 7.00 $1,195.00 QC/QA 2 1 4 7.00 $1,175.00 CAD (Topo) Survey Control Map 1 4 10 15.00 $1,820.00 $12,625.00 Topo Plan drawing (no utilities)50 50.00 $5,750.00 Limited Abstracting 3 3.00 $375.00 Delineate estimated ROW lines 2 6 8.00 $1,090.00 DTM & Contours 12 4 16.00 $1,960.00 QC / QA - Topo Plan 4 2 4 10.00 $1,630.00 CAD (Utilities) Utility Coordination (One Call / Record Request)4 4.00 $500.00 $8,080.00 Delineate Utilities (Plan View, SUE Level C & D)28 28.00 $3,220.00 Delineate Utilities (Profile View)20 20.00 $2,300.00 Delineate Ground Profiles 12 12.00 $1,380.00 QC / QA - Utilities & Profile 4 4.00 $680.00 TOTAL $41,987.50 Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A TASKS SUB TASKS RPLS SIT CADD Crew (2 men)Total Hrs Total Cost FEE $170.00 $125.00 $115.00 $180.00 Survey Controls Tie to Benchmark / Monument 0.5 1.0 1.50 $242.50 $2,767.50 Set Survey Controls 1.0 4.0 5.00 $845.00 Horizontal Control Work (GPS) 1.0 3.0 4.00 $665.00 Vertical Control Work (Level Loop)1.0 4.0 5.00 $845.00 QC/QA 1.0 1.00 $170.00 Survey Survey -Corridor & Site 5 48 53.00 $9,265.00 $12,055.00Inverts - Manhole & Inlet 2 4 6.00 $950.00 Search and Survey Iron Rods 1 4 5.00 $835.00 QC/QA 1 1 4 6.00 $1,005.00 CAD (Topo) Survey Control Map 1 4 8 13.00 $1,590.00 $9,590.00 Topo Plan drawing (no utilities) 36 36.00 $4,140.00 Limited Abstracting 2 2.00 $250.00 Delineate estimated ROW lines 2 6 8.00 $1,090.00 DTM & Contours 8 2 10.00 $1,230.00 QC / QA - Topo Plan 2 2 4 8.00 $1,290.00 CAD (Utilities) Utility Coordination (One Call / Record Request)4 4.00 $500.00 $5,440.00 Delineate Utilities (Plan View, SUE Level C & D)20 20.00 $2,300.00 Delineate Utilities (Profile View) 12 12.00 $1,380.00 Delineate Ground Profiles 8 8.00 $920.00 QC / QA - Utilities & Profile 2 2.00 $340.00 TOTAL $29,852.50 Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A Proposal No. 1140744499 August 12, 2026 Mr. David Zuhlke, P.E., CFM Vice President, Technical Practice Manager CONSOR 1080 Elridge Parkway, Suite 800 Houston TX 77077 Re: Proposal for Geotechnical Investigation DR 2601-Drainage Improvements for Isla Drive, North Galveston Avenue, Cheryl Drive City of Pearland, Texas Dear Mr. Zuhlke: In accordance with your request, Geotest Engineering, Inc. is pleased to submit this revised proposal for geotechnical investigation for the referenced project. The project consists of drainage improvements along Isla Drive, North Galveston Ave, and Cheryl Drive located north of East Orange Street in City of Pearland, Texas. The proposed storm sewer will be approximately 8 feet deep and will be installed by open cut method of construction. It is our understanding that the project also have total reconstruction of the proposed subject streets with concrete pavement Purpose and Scope The purpose of this investigation is to evaluate the soil and water level conditions along the proposed drainage alignments. The scope of this investigation is based on the information provided to us in your email on November 3, 2025, and comments on August 10, 2026 and will consist of the following: • Calling Texas 811 and coordinating with utility locators to get areas for the proposed borings cleared. • Coring existing pavement along the project alignments for boring access. • Drilling and sampling:  three (3) borings each to a depth of 20 feet for proposed drainage improvements for Isla Drive, North Galveston Avenue, Cheryl Drive Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A Mr. David Zuhlke, P.E., CFM Proposal No. 1140744499 Page 2 August 12, 2026 Approximate boring locations are shown on Figure 1 respectively and proposed boring program is presented in Attachment 1. • Grouting all boreholes using non-shrink cement bentonite grout after completion of drilling and water level measurements. • Performing appropriate laboratory tests in accordance with ASTM methods on selected samples to develop engineering properties of the soil. • Perform engineering analyses and develop geotechnical recommendations for the proposed drainage improvements. The recommendations include trench excavation stability, pipe bedding and backfill, pavement reconstruction recommendations including subgrade stabilization, general earthwork and dewatering recommendations for appropriate construction techniques. • Prepare a geotechnical investigation report. The report will include all field data and laboratory test data including water level conditions and generalized subsurface conditions and geotechnical recommendations as mentioned above. It is assumed that the drilled borings will be tied-in by your firm or your survey subconsultant. Project Schedule The study will commence within one (1) week after receiving your written authorization. The fieldwork will be completed in about one (1) week, barring bad weather. The laboratory tests will be completed in about one (1) week after completion of field work. The draft report, which will include field and laboratory data, and geotechnical recommendations will be submitted in about eight (8) weeks after receiving your written authorization. Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A Mr. David Zuhlke, P.E., CFM Proposal No. 1140744499 Page 3 August 12, 2026 Cost Based on the scope of work outlined above, the cost of the field investigation, laboratory testing, engineering analyses and a geotechnical investigation report will be a lump sum amount of $12,311.00.The cost breakdowns are provided in Attachment No. 2 is for additional information only. The invoices will be billed on a Lump Sum based on percent completion. This cost is based on the assumption that the site is accessible to a truck mounted drilling rig and no site clearance will be required. We appreciate the opportunity to propose on this project. We hope that this proposal meets your approval. If you have any questions, please call us. Sincerely, GEOTEST ENGINEERING, INC. Rony Nishanth Peremu, E.I.T. Assistant Project Manger Naresh Kolli, P.E. Sr. Project Manager NK\RP\ego Copies Submitted: (1-PDF) Enclosure: Figure 1- Proposed Plan of Borings Attachment No. 1 – Proposed Boring Program. Attachment No. 2 – Cost Breakdown- PC38\Geotechnical\Proposals\40744499R.DOC ACCEPTED BY: PRINTED NAME: TITLE: DATE: Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A Geotechnical Investigation DR2601-Drainage Improvements-Isla Drive City of Pearland, Texas Geotest Engineering, Inc. Proposal No. 1140744499 Borings Galveston Drive 1 20 20 Isla Drive 1 20 20 Cheryl Drive 1 20 20 Total 3 60 PROPOSED BORING PROGRAM ATTACHMENT NO. 1 Street Name Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A Geotechnical Investigation Geotest Engineering, Inc. DR2601-Drainage Improvements-Isla Drive Proposal No. 1140744499 City of Pearland, Texas Quantity Unit Unit Cost Amount Mob and Demob of Truck Mounted Drilling Rig 1 LS $800.00 $800.00 Drilling and Continuous Sampling (0'-50')60.0 ft.$30.00 $1,800.00 Grouting of Completed Bore Holes 60.0 ft.$11.00 $660.00 12.0 hr.$96.00 $1,152.00 Concrete Coring (4" Diameter to 6" thickness)3.0 ea.$110.00 $330.00 Concrete Coring, 4", Additional Thickness (Over 6" to 12")9.0 in.$11.00 $99.00 10.0 hr.$10.00 $100.00 Traffic Control (on minor streets)1.0 day $1,100.00 $1,100.00 Subtotal $6,041.00 Laboratory Testing Liquid and Plastic Limits 8 ea.$68.00 $544.00 Moisture Content Only 22 ea.$10.00 $220.00 Percent Passing No. 200 Sieve 6 ea.$52.00 $312.00 2 ea.$62.00 $124.00 8 ea.$69.00 $552.00 Subtotal $1,752.00 Engineering Services Principal, P.E.1.00 hr.$300.00 $300.00 Sr. Engineer, P.E.3.00 hr.$270.00 $810.00 Graduate Engineer 24.00 hr.$126.00 $3,024.00 4.00 hr.$96.00 $384.00 Subtotal $4,518.00 Total $12,311.00 Marking borings, Utility Clearance for Boring Locations, Field Coordination for drilling and Borehole Logging PC38\Geotechnical\Proposals\1140744499R_Cost.xls\Cost Breakdown-2601 Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A Geotest Engineering, Inc. Pr o p o s a l N o . 1 1 4 0 7 4 4 4 9 9 FIGURE 1 PROPOSED PLAN OF BORINGS N Legend Geotest Engineering, Inc Boring DR 2601-Drainage Improvements for Isla Drive, North Galveston Avenue, Cheryl Drive City of Pearland, Texas Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A Proposal No. 1140744599 August 11, 2026 Mr. David Zuhlke, P.E., CFM Vice President, Technical Practice Manager CONSOR 1080 Elridge Parkway, Suite 800 Houston TX 77077 Re: Proposal for Geotechnical Investigation DR 2602-Drainage Improvements for East Plum Street City of Pearland, Texas Dear Mr. Zuhlke: In accordance with your request, Geotest Engineering, Inc. is pleased to submit this revised proposal for geotechnical investigation for the referenced project. The project consists of drainage improvements along E. Plum Street in the City of Pearland, Texas. The proposed storm sewer will be approximately 5 feet deep along E. Plum Street and will be installed by open cut method of construction. It is our understanding that the project also includes mill and overlay of the subject streets. Purpose and Scope The purpose of this investigation is to evaluate the soil and water level conditions along the proposed drainage alignments. The scope of this investigation is based on the information provided to us in your email on December 12, 2025 and December 22, 2025 and comments on August 10, 2026 will consist of the following: • Calling Texas 811 and coordinating with utility locators to get areas for the proposed borings cleared. • Coring existing pavement along the project alignments for boring access. • Drilling and sampling:  Three (3) borings each to a depth of 15 feet for proposed drainage improvements. Approximate boring locations are shown on Figure 1. • Grouting all boreholes using non-shrink cement bentonite grout after completion of drilling and water level measurements. Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A Mr. David Zuhlke, P.E., CFM Proposal No. 1140744599 Page 2 August 11, 2026 • Performing appropriate laboratory tests in accordance with ASTM methods on selected samples to develop engineering properties of the soil. • Perform engineering analyses and develop geotechnical recommendations for the proposed drainage improvements. The recommendations include trench excavation stability, pipe bedding and backfill, pavement reconstruction recommendations including mill and overlay, general earthwork and dewatering recommendations for appropriate construction techniques. • Prepare a geotechnical investigation report. The report will include all field data and laboratory test data including water level conditions and generalized subsurface conditions and geotechnical recommendations as mentioned above. It is assumed that the drilled borings will be tied-in by your firm or your survey subconsultant. Project Schedule The study will commence within one (1) week after receiving your written authorization. The fieldwork will be completed in about one (1) week, barring bad weather. The laboratory tests will be completed in about one (1) week after completion of field work. The draft report, which will include field and laboratory data, and geotechnical recommendations will be submitted in about eight (8) weeks after receiving your written authorization. Cost Based on the scope of work outlined above, the cost of the field investigation, laboratory testing, engineering analyses and a geotechnical investigation report will be a lump sum amount of $10,282.00. The cost breakdowns are provided in Attachment No. 1, is for additional information only. The invoices will be billed on a Lump Sum based on percent completion. This cost is based on the assumption that the site is accessible to a truck mounted drilling rig and no site clearance will be required. Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A Mr. David Zuhlke, P.E., CFM Proposal No. 1140744599 Page 3 August 11, 2026 We appreciate the opportunity to propose on this project. We hope that this proposal meets your approval. If you have any questions, please call us. Sincerely, GEOTEST ENGINEERING, INC. Rony Nishanth Peremu, E.I.T. Assistant Project Manger Naresh Kolli, P.E. Sr. Project Manager NK\RP\ego Copies Submitted: (1-PDF) Enclosure: Figure 1- Proposed Plan of Borings Attachment No. 1 – Cost Breakdown- PC38\Geotechnical\Proposals\40744599_Rev2.DOC ACCEPTED BY: PRINTED NAME: TITLE: DATE: Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A Geotechnical Investigation Geotest Engineering, Inc. DR2602-Drainage Improvements-East Plum Street Proposal No. 1140744599 City of Pearland, Texas Quantity Unit Unit Cost Amount Mob and Demob of Truck Mounted Drilling Rig 1 LS $800.00 $800.00 Drilling and Continuous Sampling (0'-50')45.0 ft.$30.00 $1,350.00 Grouting of Completed Bore Holes 45.0 ft.$11.00 $495.00 10.0 hr.$96.00 $960.00 Concrete Coring (4" Diameter to 6" thickness)3.0 ea.$110.00 $330.00 Concrete Coring, 4", Additional Thickness (Over 6" to 12")9.0 in.$11.00 $99.00 8.0 hr.$10.00 $80.00 Traffic Control (on minor streets)1.0 day $1,100.00 $1,100.00 Subtotal $5,214.00 Laboratory Testing Liquid and Plastic Limits 6 ea.$68.00 $408.00 Moisture Content Only 17 ea.$10.00 $170.00 Percent Passing No. 200 Sieve 4 ea.$52.00 $208.00 2 ea.$62.00 $124.00 6 ea.$69.00 $414.00 Subtotal $1,324.00 Engineering Services Principal, P.E.1.00 hr.$300.00 $300.00 Sr. Engineer, P.E.2.00 hr.$270.00 $540.00 Graduate Engineer 20.00 hr.$126.00 $2,520.00 4.00 hr.$96.00 $384.00 Subtotal $3,744.00 Total $10,282.00 Marking borings, Utility Clearance for Boring Locations, Field Coordination for drilling and Borehole Logging PC38\Geotechnical\Proposals\1140744599_Cost_Rev2.xls\Cost Breakdown-2602 Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A Geotest Engineering, Inc. Pr o p o s a l N o . 11 4 0 7 4 4 5 9 9 FIGURE 1 PROPOSED PLAN OF BORINGS N Legend Geotest Engineering, Inc Boring DR 2601-Drainage Improvements Along E. Plum Street City of Pearland, Texas Docusign Envelope ID: 88984599-0F15-8F6D-8351-5D65E5CAFA9A