Loading...
HomeMy WebLinkAboutR2026-110 20260713RESOLUTION NO. R2026-110 A Resolution of the City Council of the City of Pearland, Texas, amending a professional services agreement with Lockwood, Andrews & Newnam, Inc, associated with TR0601 - Mykawa Road Widening (FM518 to BW8), in the additional estimated amount of $688,097.00. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain amendment to a contract for professional services, a copy of which is attached hereto as Exhibit “A” and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a contract for professional services. PASSED, APPROVED and ADOPTED this the 13th day of July, A.D., 2026. ________________________________ QUENTIN WILTZ MAYOR ATTEST: ________________________________ FRANCES AGUILAR, TRMC, MMC CITY SECRETARY APPROVED AS TO FORM: ________________________________ LAWRENCE G. PROVINS CITY ATTORNEY Docusign Envelope ID: 886A996F-742D-83AF-83B5-1D89B431CED7 Explanation: 1 Right Of Way Acquisition Services (FC 130)Days 2 PS&E Documentation Update 2014 to 2024 (FC 163)Days 3 SUE Quality level C & D (FC 135)Days 4 SUE Quality level A & B (FC 135)Days 5 Drainage Design updates due to Atlas 14 (FC 161)Days 6 Extended Project Management (FC 164)Days 7 Boundary Survey of Drainage Easement (FC 130)Days 8 Geotechnical Testing for Detention Ponds (FC 110)Days Days Days Days Days Days Finance Approval: Date: Date: 14,350.00$ 54,992.00$ 90,990.00$ Consultant: Lockwood, Andrews & Newnam, Inc. Date of Issuance: 6/15/2026 243,000.00$ 73,145.00$ 77,220.00$ 105,600.00$ 28,800.00$ Description of Work Cost No work is to be done until this Amendment is executed. No payment to the Consultant shall be made for work included in the Amendment until this Amendment is executed. Upon execution by all parties, the following changes identified for the contract value and/or contract time shown, are made part of the contract. By:____________________ Date:___________ By:____________________ Consultant Owner *Consultant agrees to perform change(s) included in this Contract Amendment for the price and time indicated. The prices for changes included all costs associated with this Amendment. ACCEPTED*: APPROVED: Net increase (decrease) from this Amendment 688,097.00$ Revised Contract: 4,514,753.13$ Original Contract: 2,987,697.11$ Previous Amendment(s): 838,959.02$ Contract prior to this Amendment: 3,826,656.13$ Please attach back-up documentation Cost & Time Change Summary Cost Time Time This Amendment provides for the provision of services necessary to update the design to meet current design criteria and complete the project design and land acquisition effort. CoP Project No.:TR0601 P.O. No.:2026-00000974 Mykawa Road Widening (Beltway 8 to FM 518) Amendment No.:8 Professional Services Contract Amendment City of Pearland Capital Projects 2016 Old Alvin Road Pearland, Texas 77581 pearlandtx.gov/projects 07/07/2026 Exhibit A to Resolution No. R2026-110 Docusign Envelope ID: 886A996F-742D-83AF-83B5-1D89B431CED7 7/15/2026 | 4:00 PM CDT 7/15/2026 | 4:42 PM CDT CITY OF PEARLAND: Attest: ___________________ Name: ___________________ Title: _____________________ Date: _____________________ Docusign Envelope ID: 886A996F-742D-83AF-83B5-1D89B431CED7 City Secretary 7/17/2026 | 10:15 AM CDT Frances Aguilar 3700 West Sam Houston Parkway South, Suite 400 | Houston, TX 77042 | 713.266.6900 | Fax: 713.266.2089 | www.lan-inc.com - 1 - June 12, 2026 Mr. Lorenzo Wingate, P.E., C.F.M. Director of Engineering & Public Works City of Pearland 2016 Old Alvin Road Pearland, TX 77581 Re: Mykawa Road Reconstruction Project Number TR0601 Purchase Order Number 2026-00000974 Dear Mr. Wingate: Lockwood, Andrews & Newnam, Inc. (LAN) respectfully submit the proposal detailed below for the Mykawa Road project. The following is the executive summary of the scope amendment: 1. Right of Way Acquisition Services. 2. Update PS&E documentation from 2014 version per original scope to 2024 version per TxDOT request. 3. SUE QLD/QLC to map utilities installed since original SUE investigation including new utilities. 4. SUE QLA test holes. 5. Design storm sewer system per Atlas 14 criteria. Amendment 4 excluded plan updates. 6. Extended project management due to prolonged project schedule since Amendment 4 and Environmental reevaluation. 7. Boundary survey for drainage easement and additional drainage improvement. 8. Geotechnical testing and analysis for detention ponds. Docusign Envelope ID: 886A996F-742D-83AF-83B5-1D89B431CED7 3700 West Sam Houston Parkway South, Suite 400 | Houston, TX 77042 | 713.266.6900 | Fax: 713.266.2089 | www.lan-inc.com - 2 - Item Description Fee (labor & expenses) Firm 1 Right of Way Acquisition Services $ 243,000.00 LAN 2 Update 2014 Specs to 2024 $ 73,145.00 LAN 3 SUE QLD/C $ 77,220.00 LAN 4 SUE QLA $ 28,800.00 LAN 5 Drainage Design Updates Due to Atlas 14 $ 90,990.00 LAN 6 Extended Project Management $ 105,600.00 LAN LAN Total $ 618,755.00 7 Boundary Survey $ 14,350.00 MBCO 8 Geotech Testing for Detention Ponds $ 54,992.00 HVJ Sub Total $ 69,342.00 Grand Total $ 688,097.00 We appreciate your consideration of this proposal. Please feel free to contact me at (281)723- 8596 if you have any questions or need additional information. Sincerely, Robin Li Project Manager rli@lan-inc.com Attachment: LAN Right of Way Scope and Fee Schedule LAN Design Scope and Fee Schedule MBCO Scope and Fee Schedule HVJ Scope and Fee Schedule Docusign Envelope ID: 886A996F-742D-83AF-83B5-1D89B431CED7 3700 West Sam Houston Parkway South, Suite 400 | Houston, TX 77042 | 713.266.6900 | Fax: 713.266.2089 | www.lan-inc.com - 1 - June 12, 2026 Lorenzo Wingate Director of Engineering & Public Works City of Pearland 2016 Old Alvin Rd Pearland, TX 77581 Dear Mr. Wingate: Lockwood, Andrews & Newnam, Inc. (LAN) respectfully submits this request for a supplemental work authorization in the amount of $243,000.00 for Right of Way Acquisition Services related to the Mykawa Road Project. These supplemental services address tasks that were not included in the original authorization and are required to maintain compliance with TxDOT standards and City requirements as the project scope and schedule have evolved. These tasks are critical to ensuring accurate valuations, compliance with project requirements, and successful property acquisition and disposition. Additional Right of Way Project Administration services will be on time and material basis not to exceed $48,000 (12 months @ $4,000/ month from date of notice to proceed). Summary of Mykawa Road ROW Fee Schedule: Total ROW Fee Estimate $948,091.00 Previously authorized amount ($705,091.00) Proposed ROW Supplement $243,000.00 We appreciate your consideration of this request and remain committed to supporting the successful completion of the Mykawa Road Project. Please let us know if you need additional details. Sincerely, Shenelle Graves Right of Way Practice Leader Attachments: Mykawa Road ROW Fee Schedule, Mykawa Road ROW Level of Effort Docusign Envelope ID: 886A996F-742D-83AF-83B5-1D89B431CED7 un i t s Residential un i t s Business un i t s Outdoor Advertising Sign un i t s Personal Property or Storage Units 1 101 $5,500 -$ 3,100$ $2,000 -$ $2,000 $10,000 -$ -$ -$ -$ -$ -$ $1,500 $24,100.00 2 102 $5,500 -$ $2,000 -$ $10,000 -$ -$ -$ -$ -$ -$ $1,500 $19,000.00 3 103 $5,500 -$ $2,000 -$ $10,000 -$ -$ -$ -$ -$ -$ $1,500 $19,000.00 4 104 (includes DP 1A & DP 1B) $4,000 -$ 3,100$ $2,000 -$ $2,000 $10,000 -$ -$ -$ -$ -$ -$ $1,500 $22,600.00 5 105 $5,500 4,000$ 3,100$ $2,000 $2,000 $2,000 $10,000 2,250$ -$ 1 7,000.00$ -$ -$ 1 3,500$ $1,500 $42,850.00 6 106 $5,500 4,000$ 3,100$ $2,000 $2,000 $2,000 $10,000 2,250$ -$ -$ -$ -$ -$ $30,850.00 7 107 $5,500 -$ $2,000 -$ $10,000 -$ -$ -$ -$ -$ -$ $17,500.00 8 108 $7,700 3,100$ $2,000 $2,000 $10,000 -$ -$ -$ -$ -$ -$ $1,500 $26,300.00 9 109 $7,700 -$ $2,000 -$ $10,000 -$ -$ 1 7,000.00$ -$ -$ -$ $1,500 $28,200.00 10 110 $7,700 4,000$ 3,100$ $2,000 $2,000 $2,000 $10,000 2,250$ -$ 1 7,000.00$ -$ -$ -$ $1,500 $41,550.00 11 111 $7,700 4,000$ 3,100$ $2,000 $2,000 $2,000 $10,000 2,250$ -$ 1 7,000.00$ -$ -$ -$ $1,500 $41,550.00 12 112 $5,500 -$ $2,000 -$ $10,000 -$ -$ -$ -$ -$ -$ $1,500 $19,000.00 13 113 $7,700 -$ $2,000 -$ $10,000 -$ -$ -$ 1 8,250.00$ -$ -$ $1,500 $29,450.00 14 114 $5,500 4,000$ 3,100$ $2,000 $2,000 $2,000 $10,000 2,250$ -$ -$ -$ -$ 1 3,500.00$ $34,350.00 15 115 $5,500 -$ 3,100$ $2,000 -$ $2,000 $10,000 -$ -$ -$ -$ -$ -$ $1,500 $24,100.00 16 116 $5,500 4,000$ 3,100$ $2,000 $2,000 $2,000 $10,000 2,250$ -$ -$ -$ -$ -$ $30,850.00 17 117 $4,000 -$ 3,100$ $2,000 -$ $2,000 $10,000 -$ -$ 1 7,000.00$ -$ -$ -$ $1,500 $29,600.00 18 118 $4,000 -$ 3,100$ $2,000 -$ $2,000 $10,000 -$ -$ -$ -$ -$ -$ $21,100.00 19 119 & 119 DE $4,000 -$ 3,100$ $2,000 -$ $2,000 $10,000 -$ -$ -$ -$ -$ -$ $21,100.00 20 120, (includes DP 2A, DP 3A, Ped Bridge 304) $4,000 -$ 3,100$ $2,000 -$ $2,000 $10,000 -$ -$ -$ -$ -$ -$ $1,500 $22,600.00 21 121(includes 121 DE & DP 2E) $4,000 -$ 3,100$ $2,000 -$ $2,000 $10,000 -$ -$ -$ -$ -$ -$ $1,500 $22,600.00 22 122 (includes DP 2C) $4,000 -$ 3,100$ $2,000 -$ $2,000 $10,000 -$ -$ -$ -$ -$ -$ $1,500 $22,600.00 23 123 (DP2B & DP 3B)$4,000 -$ 3,100$ $2,000 -$ $2,000 $10,000 -$ -$ -$ -$ -$ -$ $1,500 $22,600.00 24 124 (DP3C)$4,000 -$ 3,100$ $2,000 -$ $2,000 $10,000 -$ -$ -$ -$ -$ -$ $1,500 $22,600.00 25 125 (DP2D)$4,000 -$ 3,100$ $2,000 -$ $2,000 $10,000 -$ -$ -$ -$ -$ -$ $1,500 $22,600.00 26 126 (excess of Block 80)$4,000 -$ 3,100$ $2,000 -$ $2,000 $10,000 -$ -$ -$ -$ -$ -$ $1,500 $22,600.00 27 201 (includes Ped Bridge 305) $4,000 -$ $2,000 -$ $10,000 -$ -$ -$ -$ -$ -$ $1,500 $17,500.00 28 202 $4,000 -$ $2,000 -$ $10,000 -$ -$ -$ -$ -$ -$ $1,500 $17,500.00 29 Ped Bridge 301 $4,000 -$ $2,000 -$ $10,000 -$ -$ -$ -$ -$ -$ $1,500 $17,500.00 30 Ped Bridge 302 $4,000 -$ $2,000 -$ $10,000 -$ -$ -$ -$ -$ -$ $1,500 $17,500.00 31 Ped Bridge 303 $4,000 -$ $2,000 -$ $10,000 -$ -$ -$ -$ -$ -$ $1,500 $17,500.00 $157,500 $24,000 $62,000 $62,000 $12,000 $40,000 $310,000 $13,500 $0 5 $35,000 1 $8,250 0 $0 2 $7,000 $37,500 $768,750.00 $102,000.00 $20,000.00 Appraiser Prep & Testimony / Sanitarian Services $49,500.00 $7,841.00 General Notes: (1) Our Negotiation fee reflects typical title curative efforts.$483,000.00 (2) Preliminary Condemnation services will only be used as needed. City attorney will perform condemnation services. $465,091.00 (3) Property Disposal Services are limited to those reporting notices defined in TxDOT ROWAPS contract.$948,091.00 (4) Pass through costs include miscellaneous recording fees, mileage, and postage/copies $705,091.00 (5) Title expenses (policies, copies, escrow fees and other costs associated with securing a title policy) are paid to the Title Company directly by the City.Proposed ROW Supplement $243,000.00 (6) We estimate 31 parcels required (pending verification by survey) (7) If schedule extends beyond 38-month duration, monthly project management fees will continue. (8) Additional acquisition fees have been added for work to be redone as necessary per Brookside Village requirements. (9) Appraisals will have to be revised for 6 parcels previously completed, per new Brookside Village requirements. Previously authorized Disposal of Property Total Cost Project Administration (25.5 mos @ $4,000 per month_ Apr 1, 2024 - May 31, 2027) - Time & Material Preliminary Condemnation (20 parcels @ $1,000 per parcel) Estimated Fee for Pass through Costs Revised Appraisal Review Fee Total Update Appraisal Review Fee Acquisition Service Acquisition rework Negotiation Service with OAS Relocation Service Total LAN fee Total sub fees/ pass through costs Total Fee Schedule Mykawa Road City of Pearland Limits: Beltway 8 to FM 518 Right of Way Acquisition Services Parcel Count Temporary Parcel Number Total Initial Appraisal Fee Revised Appraisal Fee (75%) Total Update Appraisal Fee Total Initial Appraisal Review Fee Docusign Envelope ID: 886A996F-742D-83AF-83B5-1D89B431CED7 RIGHT OF WAY ACQUISITION SUPPORT - not to exceed 38 months ROW Prog ROW Project Senior ROW ROW Manager Manager ROW Agent Agent Technician Sub-total Subtotal Rounded Date: June 12, 2026 RPGM RPM SRA RA RT Man-hours (cost $) $385.00 $355.00 $250.00 $155.00 $145.00 Task No. 1 Project Administration (per month)- Time & Material a Maintain current status reports & generate additional reports as needed 1 2 1.5 1 5.5 1,625.00$ b Participate in project review meetings as determined by City and/or TxDOT 1 1 2 740.00$ c Provide copies of all correspondence 1 2 3 560.00$ d Maintain copies of all correspondence and contacts with property owners 1 2 2 5 1,165.00$ Subtotal 2 4 4.5 5 0 15.5 4,090.00$ 4,000.00$ 2 Acquisition Services (per parcel) A Title Services (per parcel) 1 Review preliminary title commitments 1 1 1 1 4 905.00$ 2 Secure title commitments updates for parcel payment submissions 1 1 2 605.00$ 3 Provide closing services at a Title Company 1 1 2 405.00$ Subtotal 2 3 2 1 8 1,915.00$ B Negotiation Services (per parcel) 1 Analyze appraisal reports and confirm approved value 1 2 2 5 1,165.00$ 2 Analyze preliminary title report to determine potential problems, propose title curative methods 1 3 1 5 860.00$ 3 Prepare intial offer letter and all required documents including Landowner Bill of Rights 0.5 1 2 1 4.5 882.50$ 4 Contact each owner to present written offer in person where practical, maintain follow up contacts 6 6 930.00$ 5 Provide a copy of the appraisal report to the owner & maintain original signed Receipt of Appraisal 2 2 310.00$ 6 Respond to property owner inquiries verbally and/or in writing within 2 business days 5 5 775.00$ 7 Prepare a separate negotiator contact report for each parcel per contact 1 4 5 870.00$ 8 Maintain parcel files of original documentation related to the purchase of real property 1 3 4 715.00$ 9 Present counteroffers in a form as directed by the City. Transmit counteroffer and recommendation.1 1 2 1 5 1,060.00$ 10 Prepare final offer letter 0.5 0.5 1 1 3 602.50$ Subtotal 0 3 7.5 30 4 44.5 8,170.00$ Total Labor Hours Acquisition & Title Services: 0 5 10.5 32 5 52.5 Total Labor Cost Acquisition & Title Services:$0.00 $1,775.00 $2,625.00 $4,960.00 $725.00 10,085.00$ 10,000.00$ 3 Preliminary Condemnation & Condemnation Support (per parcel) a Mail final offer letter and conveyance documents by CMRRR. 0.5 0.5 77.50$ b Request updated title commitment from title company. 0.5 0.5 77.50$ c Prepare condemnation packet with all relevant project, parcel, & negotiation information.0.5 0.5 1.5 2.5 535.00$ d Submit information packet as requested by Condemning attorney. 0.5 0.5 77.50$ e Use title commitment to join all interested parties in the request for eminent domain proceedings. 0.5 0.5 77.50$ f Request update of appraisal when notified by City Legal Department. 0.5 0.5 125.00$ g Provide expert witness testimony at Special Commissioners hearings as needed 0.5 0.5 77.50$ Subtotal 0 0.5 1 4 0 5.5 1,047.50$ 1,000.00$ 4 Disposal of Property Services (per parcel) a Obtain Release of Property signed by owner 2 2 310.00$ b Provide TxDOT/City Project Manager with Release of Property form and photographs when property is vacant 0.5 1 5 6.5 1,202.50$ Subtotal 0 0.5 1 7 0 8.5 1,512.50$ 1,500.00$ Task No.Quantity Rounded Unit Cost Total 1 Project Administration (per month) 25.5 4,000.00$ 102,000.00$ 2 Acquisition Services (per parcel) 31 10,000.00$ 310,000.00$ 3 Preliminary Condemnation & Condemnation Support (per parcel) 20 1,000.00$ 20,000.00$ 4 Disposal of Property Services (per parcel) 25 1,500.00$ 37,500.00$ Acquisition Rework (per parcel)6 2,250.00$ 13,500.00$ Total LAN Services 483,000.00$ Description Services performed by LAN LEVEL OF EFFORT Billing Rate per Hour Task Description CITY OF PEARLAND Mykawa Road RIGHT OF WAY ACQUISITION SUPPORT Level of Effort Docusign Envelope ID: 886A996F-742D-83AF-83B5-1D89B431CED7 Subconsultant fees (Pass Through Costs) Quantity Unit Cost Total 31 $4,000, $5,500, & $7,700 157,500.00$ 6 4,000.00$ 24,000.00$ Update Appraisal (per parcel) 20 3,100.00$ 62,000.00$ Appraiser Prep & Testimony & Sanitarian Services TBD 275/ hr & $2,460/ parcel 49,500.00$ 31 2,000.00$ 62,000.00$ 6 2,000.00$ 12,000.00$ Update Appraisal Review (per parcel) 20 2,000.00$ 40,000.00$ Relocation (per parcel)8 $3,500, $7,000, $8,250 50,250.00$ 457,250.00$ EXPENSES (Pass Through Costs) Quantity Unit Cost Total 9 11.00$ 99.00$ 132 0.25$ 33.00$ 1 120.96$ 120.96$ 252.96$ Rounded 7,841.76$ 7,841.00$ Description Postage (certified mail) (per parcel) Misc. (copies, fax, etc.) (per parcel) Total Sub Fees Description Appraisals (per parcel) Appraisal Review (per parcel) Revised Appraisals (per parcel) Revised Appraisal Review (per parcel) Mileage (Estimated) (per parcel) Proposed ROW Supplement Total Sub fees/ Expenses (pass through costs) Total ROW Fee Estimate Previously authorized amount Summary of Mykawa Road ROW Fee Estimate: Total LAN fee 483,000.00$ 465,091.00$ $948,091.00 ($705,091.00) $243,000.00 Per Parcel Expenses Total Expenses Docusign Envelope ID: 886A996F-742D-83AF-83B5-1D89B431CED7 Page 1 of 2 ATTACHMENT C SERVICES TO BE PROVIDED BY THE ENGINEER Mykawa Road Widening (Beltway 8 to FM 518) Project Number TR0601 Purchase Order Number 2026-00000974 This amendment will include: 1. Update 2014 specs to 2024 2. SUE QLD/C to map utilities installed since original SUE investigation in 2018 3. SUE QLA Test Holes 4. Update drainage PS&E due to Atlas 14 5. Extended Project Management Assumptions: 1. Assume no change to HCFCD Clear Creek alignment or width 1. Update Specifications from TxDOT 2014 Specification to 2024 Version FC 163 MISCELLANEOUS The 60% plan was prepared based on 2014 version per original contract. TxDOT instructed to use TxDOT 2024 Specifications at 90% submittal. The Engineer shall prepare standard specifications, special specifications, special provisions, and General Notes per TxDOT 2024 specifications. Upon TxDOT and the City’s approval, the Engineer shall incorporate the City of Pearland’s specialty bid items into the PS&E bid package. 2. Quality Level D and Quality Level C SUE to Map Utilities Installed Since the Original SUE investigation FC 135 UTILITY ACTIVITIES The scope of work includes updating the existing SUE file with QLD linework for utilities installed since the original SUE file was completed in 2018. This scope includes the following tasks A. Records research to identify utility updates from 2018. This includes 811 design calls and coordinating with utility owners to receive updated plans, as- builts and record files. B. Determine what infrastructure is already mapped in the SUE file and what has been installed after 2018. Docusign Envelope ID: 886A996F-742D-83AF-83B5-1D89B431CED7 Page 2 of 2 C. Update and maintain SUE CADD file The scope of work excluded QLB and QLA at City of Pearland’s request. 3. Quality Level A SUE FC 135 UTILITY ACTIVITIES The scope of work includes performing QLA test holes to determine the precise location of several critical utilities that affect the design and safety of this project. This scope includes the following tasks A. Perform QLA test holes by utilizing vacuum excavation to safely expose utilities B. Survey the horizontal and vertical position C. Utilize traffic control measures as needed D. Develop a signed/sealed test hole data sheet with coordinates, information, project sketches and pictures for each test hole 4. Update Drainage PS&E Due to Atlas 14 FC 161 DRAINAGE DESIGN The Engineer shall update the plans, specifications, and estimates as a result of drainage memo in Amendment 4. 5. Extended Project Management FC 164 PROJECT COORDINATION The Engineer shall: A. Update project schedule. B. Update project budget. C. Coordinate with TxDOT and USACE on Environmental reevaluation. D. Coordinate with TxDOT on additional boundary survey. Docusign Envelope ID: 886A996F-742D-83AF-83B5-1D89B431CED7 FEE SCHEDULE / BUDGET COST SUMMARY - LOCKWOOD, ANDREWS, & NEWNAM, INC. PROJ SENIOR DESIGN EIT SENIOR CADD CLERICAL TOTAL MNGR ENGR ENGR CADD FC 135 TOTAL 16 100 0 48 148 0 0 312 FC 161 TOTAL 22 44 156 180 0 0 0 402 FC 163 TOTAL 12 90 60 113 0 28 0 303 FC 164 TOTAL 112 176 0 0 0 0 0 288 FC 170 TOTAL 0 0 0 0 0 0 0 - TOTAL HOURS 162 410 216 341 148 28 0 1,305 RATES 385.00$ 355.00$ 250.00$ 155.00$ 190.00$ 145.00$ 145.00$ TOTAL LABOR COSTS 62,370.00$ 145,550.00$ 54,000.00$ 52,855.00$ 28,120.00$ 4,060.00$ -$ 346,955.00$ TOTAL EXPENSE 28,800.00$ GRANT TOTAL 375,755.00$ FC DESCRIPTION FIRM PROJ SENIOR DESIGN EIT SENIOR CADD CLERICAL TOTAL MNGR ENGR ENGR CADD 135 UTILITY ENGINEERING INVESTIGATION 135 QLD/QLC RECORDS RESEARCH TO IDENTIFY UTILITY UPDATES FROM 2018 LAN 36 48 48 132 135 UPDATE AND MAINTAIN SUE CADD FILE LAN 48 100 148 135 UTILITY LAYOUT AND COORDINATION FOR NEW UTILITY AT 95% LAN 16 16 32 135 LABOR HOUR SUBTOTAL 16 100 0 48 148 0 0 312 135 COST SUBTOTAL 6,160.00$ 35,500.00$ -$ 7,440.00$ 28,120.00$ -$ -$ 77,220.00$ 135 SUE UNIT RATES LABOR CLASS UNIT COST UNIT QUANTITY SUBTOTAL 135 SUE QL-A TEST HOLES INCLUDING SURVEY. AS NEEDED BY DIRECTION FROM THE CITY 135 0' - 8' DEPTH LAN Unit Rate Cost 1,900.00$ Each 12 22,800.00$ 135 DEVELOP SIGNED AND SEALED TEST HOLE SHEETS LAN Unit Rate Cost 500.00$ Each 12 6,000.00$ 135 COST SUBTOTAL 28,800.00$ MYKAWA RD June 12, 2026 Docusign Envelope ID: 886A996F-742D-83AF-83B5-1D89B431CED7 FC DESCRIPTION FIRM PROJ SENIOR DESIGN EIT SENIOR CADD CLERICAL TOTAL MNGR ENGR ENGR CADD 161 DRAINAGE DESIGN 161 PS&E UPDATES DUE TO ATLAS 14 161 TOWN DITCH WATERSHED LAN 0 161 ADJUST FLOWLINES AND GRADES OF PROPOSED STORM SEWER LAN 2 4 24 12 42 161 HICKORY SLOUGH LAN 0 161 ADJUST FLOWLINES, GRADES, AND SIZES OF PROPOSED STORM SEWER LAN 12 24 72 96 204 161 CLEAR CREEK LAN 0 161 ADJUST FLOWLINES, GRADES, AND SIZES OF PROPOSED STORM SEWER LAN 8 16 60 72 156 161 LABOR HOUR SUBTOTAL 22 44 156 180 0 0 0 402 161 COST SUBTOTAL 8,470.00$ 15,620.00$ 39,000.00$ 27,900.00$ -$ -$ -$ 90,990.00$ 163 UPDATE TXDOT 2014 SPECIFICATION TO 2024 VERSION 163 UPDATE BID ITEMS TO TXDOT 2024 SPECS (14 DISCIPLINES, 300 ITEMS)LAN 14 28 48 90 163 UPDATE SUMMARY SHEETS TO TXDOT 2024 SPECS (14 DISCIPLINES, 14 SHEETS)LAN 14 28 28 70 163 UPDATE CONSTRUCTION COST ESTIMATES AND TXDOT CONNECT TO TXDOT 2024 SPECS (14 DISCIPLINES)LAN 14 21 35 163 UPDATE GENERAL NOTES TO TXDOT 2024 SPECS LAN 4 16 20 163 PREPARE SPECIAL SPECS TO 2024 VERSION LAN 6 24 24 12 66 163 PREPARE SPECIAL PROVISIONS TO 2024 VERSION LAN 2 8 8 4 22 163 LABOR HOUR SUBTOTAL 12 90 60 113 0 28 0 303 163 COST SUBTOTAL 4,620.00$ 31,950.00$ 15,000.00$ 17,515.00$ -$ 4,060.00$ -$ 73,145.00$ 164 PROJECT COORDINATION (TIME & MATERIALS) 164 UPDATE PROJECT SCHEDULE (24 MONTHS) LAN 24 24 48 164 UPDATE PROJECT BUDGET (24 MONTHS) LAN 24 24 48 164 COORDINATION ON ENV RE-EVAL (36 MONTHS) LAN 48 96 144 164 BOUNDARY SURVEY REVIEW LAN 16 32 48 164 LABOR HOUR SUBTOTAL (T&M) 112 176 0 0 0 0 0 288 164 COST SUBTOTAL (T&M) 43,120.00$ 62,480.00$ -$ -$ -$ -$ -$ 105,600.00$ June 12, 2026 Docusign Envelope ID: 886A996F-742D-83AF-83B5-1D89B431CED7 SURVEY COST PROPOSAL June 16, 2026 Robin Li, PE, PE, ENV, SP Associate, Team Leader LAN 3700 West Sam Houston Parkway South, Ste 400 Houston, Texas 77042 RE: REVISION TWO (2026) Mykawa 2025 Update Surveys of ROW Map and Parcel Surveys, New Acquisition Parcels for Detention Ponds, and Additional ROW parcels for Pedestrian Bridges Robin, I am pleased to provide this proposal for additional surveying services for the Mykawa Rd project. The fees and services outlined herein are based on our meeting in the LAN office and on emails I have received from you, Shenelle Graves and Drew Gartman. The following is a list of services and fees we will provide: 1.) Provide TSPS Cat 1A, Condition ll survey for additional proposed detention pond at the southwest corner of Hickory Slough at Mykawa Rd (5 acres +/-) which will include metes and bounds description. (Shown in Exhibit A). (Note: Boundary survey of the pedestrian bridge previously authorized.) FEE: TOTAL $6,250.00 2.) Two additional easement areas show in green dashed lines along Mykawa and south of the proposed Clear Creek detention pond. We will prepare exhibit maps and metes and bounds descriptions for each easement. (Shown in Exhibit C). FEE: $4,050.00 each TOTAL $8,100.00 DELIVERABLES: We will provide updated ROW maps and metes and bounds descriptions and new parcel acquisition surveys in the same TxDOT compatible format using Microstation software. SCHEDULE: Upon written Notice to Proceed, work will commence within five (5) business days. The work can be scheduled in phases beginning with the highest priorities in the Task list above. It is anticipated that final deliverables can be completed within 45 business days. I will serve as Project Manager and will schedule weekly updates regarding our progress. ASSUMPTIONS: 1.) No provision is made herein for inclement weather or other forces majeure which could affect schedule and cost. 2.) LAN to provide updated title commitments for all parcel acquisition tracts. 3.) MBCO will provide Right of Entry (ROE) for all properties to be surveyed. However, no provision is made for delays in schedule or cost due to non-responsive property owners. INVOICING: All fees listed herein will be billed LUMP SUM and we will invoice you monthly based on percentage of completion for each of the Tasks listed herein. Prompt payment is expected according to the terms of our Master Service Agreement with LAN. Docusign Envelope ID: 886A996F-742D-83AF-83B5-1D89B431CED7 MBCO Engineering + Surveying P|2 We are certainly looking forward to continuing working with you on this Mykawa project again. Should you have any questions, feel free to contact me. Thank you very much. Marion R. Clark, RPLS Sr. Project Manager MBCO Engineering, LLC Docusign Envelope ID: 886A996F-742D-83AF-83B5-1D89B431CED7 MBCO Engineering + Surveying P|3 EXHIBIT A HICKORY SLOUGH DETENTION POND AND PEDESTRIAN BRIDGE (5 ACS +-) Docusign Envelope ID: 886A996F-742D-83AF-83B5-1D89B431CED7 MBCO Engineering + Surveying P|4 EXHIBIT B CLEAR CREEK DETENTION PONDS (8 ACRES +-) Docusign Envelope ID: 886A996F-742D-83AF-83B5-1D89B431CED7 1 May 05, 2026 (Revised on June 11, 2026) Mr. Soo M. Park, PE Bridge Team Leader Lockwood, Andrews & Newnam, Inc. (LAN) 3700 West Sam Houston Parkway South, Suite 400 Houston, Texas 77042 Re: Geotechnical Investigation City of Pearland Mykawa Road Bridge Replacement CSJ: 0912-31-319 Owner: City of Pearland HVJ Proposal No. HGT260243 Dear Mr. Soo: HVJ Associates, Inc. is pleased to submit this revised proposal for providing a geotechnical investigation for the above-captioned project. This proposal outlines our understanding of the scope of the project and presents our approach and our fees for providing the investigation. Project Description The overall project includes bridge replacements along Mykawa Road over Hickory Slough and Clear Creek in Pearland, Texas. It also involves the construction of five (5) detention ponds proposed near the Mykawa Road and Hickory Slough/Clear Creek intersection on both sides of Mykawa Road. Based on information provided by LAN, the bridge replacement at Hickory Slough will also include construction of a cast-in-place (CIP) concrete retaining wall with a maximum height of 7 feet. As requested by LAN, this proposal only covers the detention pond addressed to the City of Pearland. A separate proposal will be submitted to LAN for any work outside the detention pond scope. Based on the plans and layouts provided by LAN, the approximate pond areas are summarized in the table below. The maximum depth of each pond is not expected to exceed 10 feet. S.N. Pond Location Approx. Area (acres) Pond Max. Depth (feet) 1 Miscellaneous Pond West of Mykawa (Hickory Slough) 1.90 10.0 2 HS Pond 1 East of Mykawa (Hickory Slough) 9.95 10.0 3 HS Pond 2 East of Mykawa (Hickory Slough) 4.31 10.0 Docusign Envelope ID: 886A996F-742D-83AF-83B5-1D89B431CED7 Mr. Soo M. Park, PE HGT260243 May 05, 2026 (Revised on June 11, 2026) 2 S.N. Pond Location Approx. Area (acres) Pond Max. Depth (feet) 4 CC Pond 1 West of Mykawa (Clear Creek) 3.34 10.0 5 CC Pond 2 West of Mykawa (Clear Creek) 1.10 10.0 Site clearance will be required to access boring locations at Ponds 2, 3, and 5 above. Scope of Work The scope of work includes providing geotechnical recommendations for the side slopes of the proposed Miscellaneous Pond, HS Pond 1, HS Pond 2, CC Pond 1 and CC Pond 2 and the associated culverts at the HS Pond 1 and CC Pond 1 locations. This also includes design and construction recommendations for the proposed culvert retaining walls (precast or cast-in-place) at Hickory Slough and Clear Creek. Based on our discussions with LAN, the geotechnical investigation will be performed in general accordance with the Texas Department of Transportation (TxDOT) Geotechnical Manual (July 2020) and the City of Pearland Engineering Design Criteria Manual (December 2018). Texas Cone Penetration (TCP) testing will be conducted at 5-foot intervals for the detention pond borings. The proposed drilling program as suggested by LAN and TxDOT is provided in the table below: Proposed Location Number of Borings Boring Depth (feet) Drilling Footage (feet) Miscellaneous Pond West of Mykawa (Hickory Slough) 2* (B-7/PZ-1 & B-4) 20 40 HS Pond 1 East of Mykawa (Hickory Slough) 3* (B-8, B-9 & B-10/PZ-2) 20 60 HS Pond 2 East of Mykawa (Hickory Slough) 2 (B-11 & B-12) 20 40 CC Pond 1 West of Mykawa (Clear Creek) 4* (B-2, B-13, B-14/PZ-3 & B-15) 20 80 CC Pond 2 West of Mykawa (Clear Creek) 1 (B-16) 20 20 Total 12 240 Note: ‘*’- One boring at these detention pond locations will be converted into piezometer. Samples will be collected continuously to the termination depth (20 feet) at each boring location. Texas Cone Penetrometer (TCP) testing will be performed starting at a depth of 5 feet and at 5-foot intervals thereafter for all borings. A boring plan showing the approximate locations, based on the Docusign Envelope ID: 886A996F-742D-83AF-83B5-1D89B431CED7 Mr. Soo M. Park, PE HGT260243 May 05, 2026 (Revised on June 11, 2026) 3 details provided by LAN, is included in this proposal. Upon completion, detention pond borings will be backfilled with soil cuttings. The depth at which groundwater is first encountered during drilling, as well as the level measured after 15 minutes, will be recorded for all borings. One 20-foot-deep piezometer will be installed at three of the five detention ponds, as indicated in the table above, to monitor long-term groundwater levels. Readings will be taken 24 hours and 30 days after installation. The piezometers will be properly abandoned after the final measurements are recorded. The borings will be used to determine site stratigraphy and to obtain samples for laboratory testing. The laboratory-testing program is intended to provide confirmation of the field visual soil classification and to establish properties of the subsurface materials required for design. All the field and laboratory tests will be performed according to ASTM/TxDOT standards, where applicable, or with other well-established procedures. Possible laboratory tests to be performed for this project include: moisture contents (ASTM D2216); Atterberg limits (ASTM D4318); minus No. 200 sieve analysis (ASTM D1140); unconfined compression (ASTM D2166), unconsolidated undrained Triaxial (ASTM D2850), and Consolidated Undrained Triaxial (ASTM D 4767) tests with pore pressure measurements. In addition, some samples will be tested for dispersive soils using Crumb and double hydrometer tests. The actual type and number of tests to be performed will depend on the soils encountered during the field investigation. All the field and laboratory tests will be performed according to ASTM/TxDOT standards, where applicable, or with other established procedures. Results of the field and laboratory data will be used to develop recommendations for the proposed structures. Report A report of our study will be prepared by an engineer specializing in soil mechanics and foundation engineering after reviewing available geologyl, boring, and laboratory data. In general, the following items will be included in our report: • Boring logs and test data, • Groundwater conditions, • Generalized subsurface conditions, • Piezometer installation reports, • Boring log profiles, • Slope stability analysis of the proposed detention pond slopes: Slope stability analyses will be performed for the End of Construction Case, Rapid Drawdown Case and Long Term Case. Weathered strengths of soils will be considered and used in the slope stability analysis for the rapid draw down and long-term cases, • Design parameters for culvert/retaining wall locations, • Dispersive potential of on-site soils, • Erosion control recommendations and • Structural fill requirements and general earthwork recommendations. Docusign Envelope ID: 886A996F-742D-83AF-83B5-1D89B431CED7 Mr. Soo M. Park, PE HGT260243 May 05, 2026 (Revised on June 11, 2026) 4 Schedule An electronic copy of our draft report consisting of field and laboratory test results, analysis, and conclusion of the work outlined above will be submitted in about 12 to 14 weeks from the receipt of fully executed contract. If requested, verbal recommendations can be provided throughout the progress of the investigation as testing is completed. After approval of our draft report, an electronic copy of the final report will be submitted. Fee Based on the scope of work outlined, the estimated fee for our services is $54,992.00. A detailed cost estimate for the proposed work is attached. Our accounting procedures call for the submittal of invoices on a month-end basis or at the conclusion of project should its duration last less than a month. Our credit terms are net 30 days. Conditions The scope of work described is appropriate for the project configuration presented to us. If anomalous conditions are encountered, or if the project configuration changes significantly, a change in scope of work may be required. HVJ Associates will recommend such changes when and if it is deemed necessary. No changes will be implemented without prior authorization from LAN. The following conditions have been assumed for the fee proposal. • Our fees do not include efforts for permits and Right-of-Entry coordination. We understand that this will be coordinated by LAN and/or the City of Pearland. • Our fees do not include any allowance to perform hazard survey to locate the existing utilities prior to drilling. HVJ uses the Texas One Call System to locate buried utilities. • The fieldwork will be performed during normal business hours. • Drilling will be terminated if soil contamination is encountered during field operations. • LAN will provide the applicable drawings and cross sections for the detention ponds in a timely manner. • HVJ will take care to minimize damage to the existing site. However, our activities may result in damage to vegetation or unidentified existing utilities. This proposal specifically excludes any cost associated with restoration of vegetation or repair of such utilities damaged by our operations. • Our proposal does not include the costs of precise surveying of the horizontal and vertical location of the borings. LAN will be responsible for providing survey information of the horizontal and vertical locations upon completion of drilling. • HVJ is not including any level of effort to produce CAD design details. • No Bid & Award or Construction Phase Services are included in this estimate. A proposal can be prepared at the time of Construction Phase Services related to Construction Materials Engineering and Testing if requested. • Laboratory samples will be held for no more than a period of 30 days following completion of the final report or 120 days following completion of the draft report. Docusign Envelope ID: 886A996F-742D-83AF-83B5-1D89B431CED7 Mr. Soo M. Park, PE HGT260243 May 05, 2026 (Revised on June 11, 2026) 5 If this proposal meets with your approval, please forward a copy of the subconsultant agreement for our review and execution. HVJ Associates, Inc. is pleased to be of service on this project. Please call us if you have any questions or require additional information. Sincerely, HVJ ASSOCIATES, INC. Prakash Dahal, PE Geotechnical Project Manager PD/AR/FA; pd Docusign Envelope ID: 886A996F-742D-83AF-83B5-1D89B431CED7 GEOTECHNICAL FEE ESTIMATE City of Pearland Mykawa Road Bridge Replacement Client: LAN Owner: City of Pearland HVJ Proposal No. HGT260243 May 05, 2026 (Revised June 11, 2026) COST BREAKDOWN FOR GEOTECHNICAL INVESTIGATION Field Investigation (12x20-foot borings) Mobilization/Demobilization 1 @ $746.00 lump sum $746.00 ATV Mobilization Surcharge 1 @ $266.00 lump sum $266.00 ATV Surcharge 240 ft @ $11.00 per foot $2,640.00 Drilling and Sampling (Continuous, 0'-20') 240 ft @ $27.00 per foot $6,480.00 Drilling and Sampling (Intermittent, 20'-50') 0 ft @ $24.00 per foot $0.00 Drilling and Sampling (Intermittent, 50'-100') 0 ft @ $27.00 per foot $0.00 THD Cone Penetration Test 48 ft @ $25.00 each $1,200.00 Stand by (Crew of two) 0 hr @ $320.00 pe hour $0.00 Site Cleanup (Borings deeper than 20 feet) 0 hr @ $200.00 per hour $0.00 Piezometer Installation (3x20') 60 ft @ $26.00 per ft $1,560.00 Piezometer Abandonment 60 ft @ $21.00 per ft $1,260.00 Grouting (Tremie Method to full depth of the borings) 0 ft @ $13.00 per ft $0.00 Project Engineer, PE (TCP Plans and Field Coordination) 4 hr @ $176.00 per hour $704.00 Field Technician ( staking, utilities coordination, site clearance, logging, PZ installation etc)60 hr @ $59.00 per hour $3,540.00 Vehicle Trips 56 hr @ $13.00 per hour $728.00 Concrete Coring, (upto 6" thickness) 0 @ $127.00 each $0.00 Additional Thickness (6" to 12") 0 inch@ $12.00 per inch $0.00 Surface Patching 0 @ $36.00 each $0.00 Reimbursable Expenses (cost +10%) - Site Clearance charge/day 2 @ $1,980.00 per day $3,960.00 Reimbursable Expenses - Traffic Control (Drilling and Coring) (Cost+10%) 0 @ $1,400.00 per day $0.00 Field Technician (PZ Readings) 12 hr @ $59.00 per hour $708.00 Vehicle Trips (PZ Readings) 12 hr @ $13.00 per hour $156.00 Subtotal $23,948.00 Laboratory Testing * Moisture Content (ASTM D-2216) 30 @ $12.00 each $360.00 Atterberg Limits (ASTM D-4318) 30 @ $76.00 each $2,280.00 Percent Passing #200 Sieve (ASTM D-1120) 30 @ $59.00 each $1,770.00 Uncofined Compressive Strength (ASTM D-2166) 24 @ $54.00 each $1,296.00 Unconsolidated Undrained (ASTM D-2850) 12 @ $77.00 each $924.00 Mechanical Sieve Analysis with Hydrometer (ATM D-422) 0 @ $164.00 each $0.00 Consolidated Undrained Triaxial Testing (ASTM D-4767) (Undisturbed samples) 4 @ $1,800.00 each $7,200.00 Crumb Test (ASTM D-6572) 12 @ $46.00 each $552.00 Double Hydrometer (ASTM D-4221) 5 @ $266.00 each $1,330.00 Subtotal $15,712.00 Project Management, Engineering Analyses, Report Preparation Principal 4 hr @ $266.00 per hour $1,064.00 Senior Engineer, PE 8 hr @ $218.00 per hour $1,744.00 Project Engineer, PE 30 hr @ $176.00 per hour $5,280.00 Staff Engineer, EIT 52 hr @ $122.00 per hour $6,344.00 Support Personnel 12 hr @ $75.00 per hour $900.00 Subtotal $15,332.00 $54,992.00 *Note: The number and type of tests performed will depend on the actual soil conditions encountered. TOTAL GEOTECHNICAL SERVICES Docusign Envelope ID: 886A996F-742D-83AF-83B5-1D89B431CED7 Docusign Envelope ID: 886A996F-742D-83AF-83B5-1D89B431CED7 Docusign Envelope ID: 886A996F-742D-83AF-83B5-1D89B431CED7