HomeMy WebLinkAboutR2025-192 20251117Docusign Envelope ID: C1E37271-EF28-4D36-A593-15196A68A912
RESOLUTION NO. R2025-192
A Resolution of the City Council of the City of Pearland, Texas, amending a
Construction Manager at Risk contract (Barry Rose Water Reclamation Facility
and Longwood Water Reclamation Facility Decommission Project Project)
with McCarthy Building Companies, establishing a Guaranteed Maximum
Price 3 (GMP 3) in the amount of $23,236,960.00.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS:
Section 1. That the City Council hereby amends a Construction Manager at Risk
contract with McCarthy Building Companies; establishing a GMP 3 in the amount of
$23,236,960.00.
Section 2. The City Manager or his designee is hereby authorized to execute an
amended Construction Manager at Risk contract for the Barry Rose Water Reclamation Facility
Project.
PASSED, APPROVED and ADOPTED this the 17th day of November, A.D., 2025.
DocuSigned by:
21-0008 8DC2A475_.
J. KEVIN COLE
MAYOR
ATTEST:
DocuSigned by:
Fr'atn.lc-s /L ui ar'
FRAESbAGUILAR, TRMC, MMC
CITY SECRETARY
APPROVED AS TO FORM:
DocuSigned by:
E13CA888BB1E4BG
DARRIN M. COKER
CITY ATTORNEY
Docusign Envelope ID: C1E37271-EF28-4D36-A593-15196A68A912
MPCARTHY .�
Prime Contract Change Order
For Barry (lose WRF Replacement and Expahsloh (WW1542) and Longwood Water Reclamation Facility
DecoMtn IsslanIng (WW19e6)
Date of Issuance:
Contractor;
Designer:
McCarlhyhvildingCompanles, Inc.
Freese & Nichols
Change Circlet- No.;
CO Project No.;
P.O. No.;
4
WWi5O2 81NW1906
2O240O04x765
Fxntanatlon•
This change order encompasses the fallowing: Force main package from new Longwood Pump Malkin to new Rarry Rose WRF,
Demolition of exlstlrig Barry Rose and the existing Longwood facilities, Start-up and Commissioning services and critical MO POs
as established in the Guaranteed Maximum Price 3 (GMP 3). Including a 74 calendar day extension for Substantial Completion.
Final Completion date remains the same.
Change Order Breakdown'
1. Barry Rose Replacement and Expansion (WW1S02)
2. Longwood Water Reclamation Facility Decommissioning (4VW1S06)
ragltn9
3,621,939 6Days
19,615,O21
Cost of Work $ 19,7O0,599
Construction Fee $ 1,315,30O
GeneralConditrans $ 1.605.737
CM@RIsk'sContingency $ 815,334
Total Gl4P3Price $ 23,236,960
Contract Change Written Amount: twenty three million two hLind Rd forty seven thousand eight hundred and Ihlrt -I tire€ dollars
Cast & Time Change Summary
PreconstructionfCrlt, Repairs Contract:
Previous Change Order(sj:
Contract prior to this change order:
Net Increase (d ccrease) from this change alder:
Revised Contract;
Thus
$ 2,348,777 2699 days
$ 193,213,069 92 days
$ 195,561,846 2791 days
$ 23,236,964 4days
$ 218,798,806 2791 days
Revised Contract Value - Written Amount: Two hundred eighteen million eight hundred and nine thousand six hundred and
seventy-nine dollars
Revised Value par orojec,t
1. Barry Rose Replacement and Expansion (WW1602)
2. Longwood W ate r Reclamation Facility Decommissioning (V., 1906) (Force main)
3. Preconstructlon Services and Critical Repairs
DocuSigned by:
City Manager Approval:
ACCEPTED:
Ry Contractor;
0838 12 C740423_.
$
$
Cost Time
16,7.62%795 2791 C ays
28,621,234
2,348,777
11/18/202515:10 PM CST
Date:
Date:
10/27/2.8
This amendment Is to existing contract executed September 1, 202O,
Docusign Envelope ID: C1E37271-EF28-4D36-A593-15196A68A912
GMP 3 - Detail Cost Summary
MECARTHY
lin
40.40
Work
Category
Description
GMP Total
3-02A
Forced Main
$ 13,615,999
3-02B
Demolition/Site Grading/Backfill (Barry Rose and Longwood)
$ 2,417,036
3-10A
Signage
$ 85,735
Monument Sign Electrical/ Civil / Concrete
$ 56,733
Landscape (Longwood)
$ 137,246
General Conditions
$ 1,605,737
General Requirements
Commissioning Planning & Assistance
$ 246,509
Plant Start -Up and By -Pass Equipment
$ 103,925
MOPOs
$ 771,833
MOPO Add Alternates
$ 105,395
Allowances
Furniture / Audio Vival Equipment / Laboratory Equipment
$ 500,000
Plant Process Seeding
$ 250,000
Commissioning Assistance - Class B Water Operator
$ 24,960
Cleaning Existing Basins (Barry Rose & Longwood)
$ 500,000
GMP 1 Clear Creek Diversion Allowance (Credit)
$ (142,334)
IFB to IFC Completion Allowance -1%
$ 232,370
CMAR Contingency
$ 615,334
Insurance and Bonds
$ 795,182
Construction Fee
$ 1,315,300
Total $ 23,236,960
Docusign Envelope ID: C1E37271-EF28-4D36-A593-15196A68A912
Project Executive Summary
M2CARTHY
I
zaik
GMP 3 Force Main and Plant Decommissioning: $23,236,960.00
The Guaranteed Maximum Price (GMP 3) proposal for the Barry Rose WRF Replacement and
Expansion and Longwood WRF Decommissioning Project is based on the scope of work that
includes construction of the new force main connecting the Longwood Lift Station to the new Barry
Rose Plant, the supply and installation of project signage, and the decommissioning and backfilling of
the existing Barry Rose and Longwood WRFs.
1. City of Pearland, Texas, Barry Rose WRF Replacement and Expansion and Longwood WRF
Decommissioning Package 3 — Issued for Bid, Project No. WW1502 & WW1906, May 30,
2025. Prepared by Freese and Nichols, Inc.
2. City of Pearland, Texas, Project Manual for Barry Rose WRF Replacement Expansion and
Longwood WRF Decommissioning Package 3 — Issued for Bid, May 30, 2025. Prepared by
Freese and Nichols, Inc.
3. Addendum No. 1 — GMP 3, Dated: August 8, 2025, Addendum No. 2 — GMP 3, Dated August,
2025, Addendum No. 3 — GMP 3, Dated August 21, 2025.
Bid package documents were publicly advertised on July 23, 2025. Bidders submitted both pricing
and qualifications to comply with the best value selection criteria.
McCarthy held pre -bid meetings with all interested subcontractors and vendors on August 5, 2025
and reviewed the bid package contents and requirements.
Bid proposals for work were received from bidders on August 28, 2025.
Bids were submitted via the City of Pearland E -Bids account and were opened privately as part of the
best value selection process.
Docusion Envelope ID: C1E37271-EF28-4D36-A593-15196A68A912
#
Activity ID
Activity Name
Original
Duration
Start
Finish
N1b
2027
2028
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
1
Barry Rose WRF Expansion MASTER 2039 11 -Aug -20 A 01 -Apr -28
• Issue
N.T.P 3 (FM)
O BRWRF
roject S/C
Summary & Key Milestones 1777 11 -Aug -20 A
01 -Apr -2
2
3
KM -1135
Issue N.T.P 3 (FM)
0
13 -Nov -25
—I4
KM -1300
BRWRF Project S/C
0
18 -Oct -27*
5
SUM-DUR-B
Construction Duration (Calendar Days)
1090
12 -Jul -24 A
18 -Oct -27
Construc
on Duration (Calendar
•
Days)
Overall Proje
6
KM -1400
Overall Project Complete
0
01 Apr -28*
7
I
SUM -OUR -1010
BRWRF Startup & Demo Existing Plant (Cal. Days)
166
19 -Oct -27
01 -Apr -28
I
BRWRF Star
8
SUM -1090
Overall Project Duration (Calendar Days)
2761
11 -Aug -20 A
01 -Apr -28
3 - Is
we RFP
• BP 03 - Provide
O BP 03
Recommendation
- CoP City Council
Of Award
Approval
,
Overall Proje
9
BP 03 (F.M)
65
16 -Jul -25 A
10 -Nov -25
10
I
KM -1030
BP 03 - Issue RFP
0
16 -Jul -25 A
11
KM -1060
BP 03 - Provide Recommendation OfAward
0
13 -Oct -25
12
KM -1160
BP 03 - CoP City Council Approval
0
10 -Nov -25
13
Pre -Construction
716
16 -Jun -23 A
11 -Sep -
14
Design Schedule
535
16 -Jun -23 A
31 -Oct -25
®[I
15
Procurement & Cost Model
280
05 -May -25A
11 -Sep -26
16
I
ost Modelling & G
0 -Nov -25
SDI
CI
M
17
•ministration
18
11 -Nov -25
12 -Dec -25
Procurement
210
13 -Nov -25
11 -Sep -26
18
I
Schedule lmpac
85
21 -Feb -25 A
15 -Jul -25 A
19
20
CONSTRUCTION
485
15 -Dec -25
01 -Apr -28
Force Main
328
15 -Dec -25
30 -Jun -27
21
obilization
-ipe Installation
K 0
35
09 -Feb -26
12 -Jan -
22
23
24
I
Trenchless
21
09 -Feb -26
15 -Dec -26
25
I
GOLF Course
55
11 -Feb -26
28 -Apr -26
PVC Trenchless
217
09 -Feb -26
15 -Dec -26
26
Open Cut
Rehab & Reconstruct
- , . • - •- eout
118
101
.16 -Feb -26
19 -Aug -26
7
12 -Jan -27
05 -Fe •
c 0 -Jun
27
I
28
I
I
29
=I I II
I
1 J
30
I
Startup & Cxing
187
30 -Nov -26
18 -Oct -27
I
BRWR 7
187
30 -Nov -26
r 8 -Oct -27
31
32
I
PCC & E&S
Gant Startup
SU&C-1010
Acceptance Testing - BRWRF
147
40
30 -Nov -26
• -27 _.ligifilp
06 -Aug -27
05 -Aug -27
18 -Oct -27
wO III
II II I
33
34
J Acceptance
Testing - BRWRF
35
I
Process Basin Seeding 37 29 -Jul -27 04 -Oct -27
I=EI ❑
❑ ❑
I GM
36
Liquids Process Acceptance Test 35 07 -Sep -27 11 -Oct -27
Solids Process Acceptance Test 56 24 18
37
-Aug -27 -Oct -27
-
38
I
...................a61; -ILL �I
PCC & E&S 20 01 -Jul -27 05 -Aug -27
Plant Startup 8 07 -Sep -27 20 -Sep -27
39
_
_
ITI
I
IEMMIMIN1
O Existing BR%
I Apply For Fi
4o
41
Demolition & Post Demo Scope 136 09 -Aug -27 01 -Apr -28
I
: RWRF 9 • • c 27
I 01 -Apr -28
42
43
I
BR-DEM-1000
Existing BRWRF Plant Demo & Post Demo Scope Complete
0
31 -Mar -28
44
BR -CO -1000
Apply For Final Completoin
1
01 -Apr -28
01 -Apr -28
45
. emo 57 — ct 27Jan-28
46
I I
I I
Grading 45 16 -Dec -27 02 -Mar -28
Pond 62 19 -Nov -27 03 -Mar -28
Pipe 78 29 -Oct -27 09 -Mar -28
I� I
47
I I I III I
48
I
=mO]
m
0
4s
9 I
Paving 65 29 -Nov -27 14 -Mar -28
Run Date - 17 -Oct -25
Data Date - 30 -Sep -25
Project ID - 4774 MSTR
Barry Rose WRF Expansion MASTER
GMP3 Summary Schedule - Rev 17 -Oct -25
1 of 2
, Remaining Level of Effort O O Milestone
�
��
llikAlli
Actual Level of Effort
Actual WorkMICART.....4
Remaining Work
Critical Remaining Work
Docusign Envelope ID: C1E37271-EF28-4D36-A593-15196A68A912
# Activity ID
Activity Name
Original
Duration
Start
Finish
2027
Jun
2028
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
15
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
50
51
52
53
54
Landscaping
Truck Wash Down
1
LW Demo
LW Generator
LW Site -1
laa 29 -Feb -28 31 -Mar -28
15 12 -Nov -27 07 -Dec -27
• 52 19 -Oct -27 18 -Jan -28
109 09 -Aug -27 17 -Feb -28
71 29 -Nov -27 24 -Mar -28
❑❑
IOU]
I I III III
III®
O I CELL
Run Date - 17 -Oct -25
Data Date - 30 -Sep -25
Project ID - 4774 MSTR
Remaining Level of Effort O O Milestone
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Barry Rose WRF Expansion MASTER
GMP3 Summary Schedule - Rev 17 -Oct -25
2 of 2
M9CA RTH