HomeMy WebLinkAboutR2025-141 20250908Docusign Envelope ID: B39F1F8C-5EF2-446B-BDAF-89821992BBA6
RESOLUTION NO. R2025-141
A Resolution of the City Council of the City of Pearland, Texas, adopting a
Five -Year Capital Improvement Program (2026-2030).
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS:
Section 1. That the City Council hereby adopts a Five -Year Capital Improvement
Program in accordance with Exhibit "A" attached hereto.
PASSED, APPROVED and ADOPTED this the 8th day of September, A.D., 2025.
DocuSigned by:
J. _ KEVINc6 LE
MAYOR
ATTEST:
DocuSigned by:
FR WM ASGUILAR, TRMC, MMC
CITY SECRETARY
APPROVED AS TO FORM:
DocuSigned by:
Q/,
DA :r vF4tOKER
CITY ATTORNEY
FY D262u30
CAPITAL IMPROVEMENT PROGRAM
CITY OF PEARLAND, TX
Cfk
TABLE OF CONTENTS
Reader's Guide 7
Introduction Letter 9
Capital Improvement Plan 10
One Year Plan 11
Multi -Year Plan 13
Project Types 15
Capital Projects 33
Drainage 40
DR1904 - West Lea Subdivision Drainage Improvements 45
DR1905 - Hickory Slough Regional Detention Pond 47
DR2102 - Brookland Acres Drainage Improvements 49
DR2103 - Garden Road/O'Day Road Drainage Improvements 51
DR2104 - Woody Road Drainage Improvements 53
DR2301 - Hickory Slough Sportsplex Detention Pond Ph 2 55
DR2303 - Master Drainage Plan Update 57
DR2304 - Hickory Slough Detention Storm Water Pump Station Generator 59
DR2305 - Veterans Drainage Improvements 61
DR2306 - Longwood Park (Roadside Ditch and Culvert) 63
DR2307 - Southwest Quadrant of Old Town (McLean to SH35 South of Broadway) 65
DR2401 - Shady Crest and Creek View Subdivision Drainage Improvement 67
DR2402 - Hickory Creek Subdivision Drainage Improvement 69
DR2403 - Garden Acres Subdivision Drainage Improvements 71
DR2407 - Herridge Miller/Brookland Acre Subdivision Drainage Improvement 73
DR2408 - Hickory Slough Embankment Slope Replacement 75
DR2410 - Shadow Creek Ranch — Ocean Point Ct 100 Year Overflow at Cul-De-Sac 77
DR2501 - Pine Hollow Drainage Improvements 79
DR2502 - Fite Rd Drainage Improvement (Cullen to Harkey) 81
DR2503 - Harkey Road Drainage (Broadway to Mary's Creek) 83
DR2601 - Isla Dr., N Galveston, Cheryl Dr. Drainage Improvements 85
DR2602 - E. Plum Drainage (Old Alvin to Schlieder Dr) 87
DR2603 - Hatf eld Road Drainage (FM 518 to Hickory Slough) 89
DR2604- Hatf eld Rd South Drainage 91
DR2701 - Wagon Trail Road (South of Fite to Mary's Creek) 94
DR2702 - Fite Road Drainage (Harkey to McLean) 96
DR2703 - Tranquility Lakes Detention Pump Station Rehabilitation and Generator 98
Facilities 100
FA1804 - Fire Station #7 - Bailey Road 103
FA1902 - Orange Street Service Center Phase 2 105
FA2002 - Fire Station #6 (Formerly Fire Station #11) - County Road 100 108
FA2104 - Fire Station #3 (HVAC) Repairs 111
FA2106 - Hillhouse Road Annex Phase II 113
FA2107 - Water Operations Building (Alice St.) 116
FA2203 - Natatorium Air -Handling Replacement 119
FA2205 - Reflection Bay WRF Fuel Island 121
FA2401- West Pearland Community Center HVAC Replacement 123
FA2405 - Public Safety Training Complex 125
FA2410 - Emergency Distribution Warehouse 127
FA2501 - Knapp Activity Center Air Conditioning and Building Automation System Integ 130
FA2502 - Fiber Backbone (Cullen Parkway from Hughes Ranch Road to McHard) 132
FA2505 - Stella Roberts Recycling Center HVAC Replacement 134
FA2601 - Fiber Backbone Magnolia (Business Center to Kirby Water Plant) 136
FA2701 - Stella Roberts Recycling Center Roof and Gutter Replacement 138
FA2702 - Fiber Backbone (Dixie Farm from Broadway to Main) 140
FA2802 - Public Safety Building Roof Replacement 142
Parks 144
PK1904 - Clear Creek Trail (Barry Rose WRF to UHCL) 146
PK2301 - Park Equipment Recapitalization Program 149
PK2402 - Hickory Slough Sportsplex Phase II 151
PK2501- Independence Park Phase II 153
PK2503 - Clear Creek Trail Segment 5 155
PK2504 - Centennial Park Storage Building 157
PK2701 - PER for Future Bond Referendum 159
Streets 161
TR0601 - Mykawa Road Widening - BW8 to FM 518 165
TR1501 - Smith Ranch Road Extension (CR 94) - Hughes Ranch Road to Broadway 167
TR1904 - Bailey Road Expansion - Veterans Dr to Main 170
TR1905 - Shadow Creek Parkway Landscaping, Street Lighting, & Sidewalks 173
TR2001 - Pearland Parkway at Broadway Intersection Improvements 176
TR2101 - Broadway Expansion Phase 1 (SH 288 to Old Chocolate Bayou) 178
TR2103 - Intersection Improvements in Shadow Creek Ranch 180
TR2203 - Median Landscaping on Kingsley & Kirby 182
TR2301 - Pearland Parkway at Barry Rose Intersection Improvements 184
TR2302 - Street Reconstruction - Sherwood 186
TR2303 - Hughes Road (Pearland Parkway to City of Pearland City Limit) 188
TR2401 - Concrete Sidewalk Gaps and Replacement 191
TR2402 - Dixie Farm Road at Hastings Friendswood Road Intersection Improvements 193
TR2502 - Broadway Expansion Phase 2 - Old Chocolate Bayou to McLean Rd 195
TR2510 - Pearland Parkway Bridge Soil Erosion Repair (at Clear Creek) 197
TR2601 - Barry Rose Masonry Wall Replacement 199
TR2603 - Traff c Signal at Kingsley/CR48 201
TR2604 - TxDOT Traff c Signal Upgrade along SH35 203
TR2705 - PER for Future Bond Referendum -Streets 205
Wastewater 207
WW1502 - Barry Rose WRF Replacement and Expansion 215
WW1906 - Longwood Water Reclamation Facility Decommissioning 218
WW2006 - Mykawa Road Sewer Relocation - Jasmine to S Orange Circle 221
WW2104 - FM 518 Wastewater Utility Relocations - SH288 to Old Chocolate Bayou 223
WW2303 - Dixie Farm North Regional Lift Station Rehabilitation 225
WW2401 - Barry Rose Gravity Sewer - Plum from Galveston to Barry Rose WRF 227
WW2402 - Riverstone Ranch Regional Lift Station Capacity Expansion 229
WW2403 - Lakes of Country Place Lift Station Rehabilitation 231
WW2404 - Southdown Lift Station Rehabilitation 233
WW2405
WW2406
WW2407
WW2408
WW2501 -
W W2502
WW2503
WW2504
WW2507
WW2508
WW2603
WW2604
WW2608
WW2609
WW2611-
WW2612 -
WW2613 -
W W2614
WW2701 -
W W2702
WW2704
WW2705
WW2707
WW2708
WW2709
- Shady Crest and Creek View Subdivision Sanitary Sewer Rehabilitation
- Whispering Winds Lift Station Relocation
- Wooten Road Lift Station Decommissioning
- Sanitary Sewer Rehabilitation - Longwood Service Area (LW -03)
Sanitary Sewer Rehabilitation - Longwood Service Area (LW -04)
- Green Tee IV Lift Station Rehabilitation
- Sunset Meadows Lift Station Rehabilitation
- Green Tee III Lift Station Rehabilitation
- Kirby North Regional Lift Station Rehabilitation
- Waste Water Master Plan Update
- Green Tee I Lift Station
- Oakbrook Estates Lift Station Replacement
- Sunset Lakes Lift Station Rehabilitation
- FM 518 Utility Relocations Phase 2 (Old Chocolate Bayou to McLean)
JHEC Odor Control System
WWTPs Asset Management Plan
Woodthrush Regional Lift Station Rehabilitation
- Assessment and Rehabilitation of Pearland's Wastewater Treatment Plants
Towne Lake Lift Station Rehabilitation
- Pine Hollow Lift Station Rehabilitation
- Clear Creek Park Lift Station Rehabilitation
- Country Place Lift Station Rehabilitation
- Walmart Lift Station Rehabilitation
- Hughes Ranch Road Gravity Sewer -Cullen to Stone
- Crystal Lakes West Lift Station Rehabilitation
WW2710 -
W W2801
WW2802
WW2901
WW2902
WW2903
WW3001-
Water
Critical Lift Station Electrical Hardening Improvements
- Rustic Oak Elementary School Lift Station Rehabilitation
- Westlea Lift Station Rehabilitation
- Southdown Regional Lift Station & Force Main
- Country Place Waste Water Line Replacement
- Tower Bridge Lift Station Rehabilitation
Villages of Edgewater Lift Station Rehabilitation
WA2103 -
WA2202 -
WA2203 -
WA2301-
FM 518 Utility Relocations - SH288 to Old Chocolate Bayou
McLean Water Production Facility Rehabilitation
Green Tee Transite Pipe Water Line Replacement
Liberty Water Production Facility Rehabilitation
WA2304 - Sherwood Waterline Replacement
WA2305 - Country Place Water Well Generator Replacement
WA2306 - Garden Water Well Generator
WA2401 - Water Plant Chemical Containment Structures
WA2402 - Wood Creek Transite Pipe Water Line Replacement
WA2403 - Cullen Ground Storage Tank Replacement
WA2404 - CR100 Water Line - Harkey to Pearland Sites
WA2405 - Creekview and Shadycrest Transite Pipe Water Line Replacement
WA2501 - Water Master Plan Update
WA2502 - Kirby Elevated and Ground Storage Tank Rehabilitation
WA2503 - Sleepy Hollow Small Waterline Replacement
WA2505 - Mykawa Road Transite Pipe and Water Line Replacement
235
237
239
241
243
245
247
249
251
253
255
257
259
261
263
265
267
270
272
274
276
278
280
282
284
286
288
290
292
294
296
298
300
307
309
311
313
315
317
320
322
324
326
328
330
332
334
336
338
WA2506 - Pump, VFD and Motor Condition Assessment 340
WA2509 - Southwest Quadrant of Old Town Transite Water Line Replacement (McLean to 342
WA2601 - Alice Elevated & Ground Storage Tank Rehabilitation 344
WA2607 - Surface Water Treatment Plant - Plant Redundancy Improvement 346
WA2609 - Alice WTP New 5 MG GST 348
WA2701 - Towne Lakes Water Quality Program 350
WA2702 - Magnolia Water Production Facility Rehabilitation 352
WA2704 - Country Place Well Facility Rehabilitation 354
WA2705 - Garden Well New 1MG GST 357
WA2801 - Alexander Landing, Banbury Cross & Whispering Winds Transite Pipe Water Lin 359
WA2804 - Dixie Hollow Subdivision Transite Pipe Water Line Replacement 361
WA2901- Park View Transite Pipe Water Line Replacement 363
WA2902 - Southdown Transite Pipe Water Line Replacement 365
WA2903 - Country Place Transite Pipe Water Line Replacement 367
WA2904 - Liberty Dr & John Lizer Transite Pipe Water Line Replacement 369
WA3001 - Lakes of Edgewater Estates Water Quality Program 371
WA3002 - West Oaks and West Oaks Village Water Quality Program 373
Reader's Guide
Project Types - Overview
Drainage - DR
Capital improvements related to drainage systems are designed to manage stormwater, prevent flooding, and protect
public infrastructure. Projects under this category include the construction or repair of stormwater drains, retention
ponds, flood control measures, and other infrastructure improvements aimed at reducing the impact of heavy rainfall and
protecting the city's property from water damage.
Facilities - FA
This category covers capital improvements related to the construction, improvement, or maintenance of city facilities.
These may include the development of new buildings, renovation of existing structures, facility upgrades, and general
maintenance to ensure that city buildings are functional, safe, and accessible for public use.
Parks - PK
Capital improvements related to city parks, including the development of new recreational areas, improvements to
existing park facilities, landscaping, playground upgrades, and other enhancements to promote outdoor activities and
community well-being. This category ensures that public parks remain safe, inviting, and accessible for residents.
Streets - TR
This category pertains to capital improvements and ongoing maintenance related to roads and streets. Projects under this
heading include the construction of new roadways, repaving of existing streets, sidewalk improvements, intersection
upgrades, and any other infrastructure work that enhances the city's transportation network. This also covers the regular
upkeep required to maintain road conditions and traffic flow.
Wastewater - WW
Capital improvements related to wastewater management systems, including the construction, expansion, upgrade, and
maintenance of sewer lines, treatment facilities, and wastewater infrastructure. Projects may include installing new sewer
systems, upgrading treatment plants to meet environmental standards, and expanding the capacity to handle increased
demand or ensure efficient wastewater management.
Water - WA
Capital improvements for water utilities projects, including the construction, expansion, and maintenance of water
treatment plants, distribution systems, and infrastructure required to ensure a clean and reliable water supply. This also
includes water storage facilities, pipelines, and any necessary upgrades to maintain or improve service quality for residents.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 7
Reader's Guide
Schedule
• June 23, 2025 - Comprehensive CIP Workshop
• July14, 2025 - Budget Discussion #1 - Enterprise Fund, Special Revenue Funds, Internal Service Funds, and PEDC
• July 28, 2025 - Budget Discussion #2 - Follow-up discussion if needed
• July 28, 2025 - Present and Approval Sale Results for: Permanent Improvement and Refunding Bonds, Series 2025,
Certificates of Obligation, Series 2025A and Certificates of Obligation, Series 2025B (WSS Projects)
• August 11, 2025 - Budget Discussion #3 - General Fund, Debt Service Fund
• August 25, 2025 - Budget Discussion #4 - Follow-up discussion if needed
• August 26, 2025 - Closing/Delivery of the following: Permanent Improvement and Refunding Bonds, Series 2025,
Certificates of Obligation, Series 2025A and Certificates of Obligation, Series 2025B (WSS Projects)
• September 8, 2025 -1st Reading of Budget, Property Tax Rate, Non -Development Fees, CIP Adoption
• September 22, 2025 - 2nd Reading of Budget, Property Tax Rate, Non -Development Fees
Please note the following:
Projects assigned $1 in FY26 are ongoing projects that require a placeholder amount within the Capital Improvement Plan
(CIP) period to ensure their inclusion in the FY26-FY30 CIP.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 8
Introduction Letter
Introduction Letter
The City of Pearland's Capital Improvement Program (CIP) has been developed to further our commitment to the citizens
of Pearland by working to meet today's needs, as well as those of the future, by ensuring a sustainable infrastructure. From
work on underground water and sewer lines to more visible projects such as street paving, street extensions, and new
community facilities, the five-year CIP addresses the needs of the City through responsible City Government with a
comprehensive and fiscally responsible approach.
What is a Capital Improvement? Capital improvement is a major, non -routine expenditure for new construction,
improvements to existing buildings, facilities, land, streets, storm sewers, and expansion of the City's park system, to name
a few. A capital improvement project has a relatively high monetary value ($100,000+), long -life expectancy, and results in
the creation of an asset or extends the life of existing assets. The cost of the capital improvement includes design, legal
fees, land, operating equipment, furniture, construction, etc. that is necessary to put the asset into service. A capital
improvement project is not the purchase of a piece of equipment such as a fire truck, vehicle, etc.
What are the benefits of a Capital Improvement Program? A long-term capital improvement program has many obvious
benefits derived from its organized approach to planning projects. The program can focus attention on community and
City strategic priorities and needs, allowing projects to be prioritized based on need. The CIP can be an effective tool for
achieving goals set forth in the City's Comprehensive Plan, as well as the City's various master plans. Through proper
planning, the need for bond referendums, bond issuances or other revenue production measures can be foreseen, and
action can be taken to fund the projects as identified.
The development of a capital improvement program is a continual process and, consequently, should be viewed as a
working document. Therefore, while the document covers a five-year planning perspective, it is revised every year to
accommodate new projects, reflect changes in ongoing projects, and extend the program an additional year.
The first year of the plan is incorporated into the annual budget to appropriate funds. Improvements identified in
subsequent years are approved only on a planning basis and do not receive expenditure appropriation. Cost estimates for
years two through five are also for planning purposes only, to be used in conjunction with the City's long-range financial
plan for operations.
Projects included in the five-year CIP are either City -managed projects or include just the City's share of projects that will
be managed by other agencies. If an outside agency contributes funding directly to the City for a project that the City will
manage, then that cost and funding are included in the project budgets. The five-year Capital Improvement Program
includes all capital projects which are to be financed in whole or in part from funds subject to control or appropriation by
the City. Therefore, the CIP includes bond appropriations (general obligation, certificates of obligation and revenue bonds),
General Revenue - Cash, Economic Development Corporation Sales Tax, System Revenues - Cash, Impact Fees, Developer
Contributions, and any Federal, State or private foundation grant funds received by the City for capital improvement
projects.
The City considers input from the citizens, the Planning and Zoning Commission, City staff members, and master plans in
the preparation of the Capital Improvement Program. A project list is compiled, prioritized by year, and cost estimates
assigned. The Office of Management and Budget, in coordination with the Finance Department, also looks at the overall
effect of projects, including the need to issue debt, potential impact on the tax rate, and operations and maintenance
impact on the City. The City Council, through workshops, reviews the draft with any recommended changes incorporated
into the final document. A final draft of the five-year CIP is then prepared for Council consideration and approval. Upon
Council adoption, the five-year CIP document is reproduced and distributed for implementation of the program.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 9
Capital Improvement Plan
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 10
One Year Plan
One Year Plan
This is the capital requested for all types of projects that will start or continue in
FY26. Please note that capital requests and funding may not always align due
to the multi -year nature of some projects.
FY26 Total Capital Requested
$173,975,458
FY26 Total Funding Requested
$212,251,907
FY26 Total Funding Requested by Source
• 2007 & 2019 GO Bonds
• 2023 General Obligation Bonds
Certificates of Obligation
• General Revenue - Cash
General Revenue -Cash
• HGAC-TIP
• Impact Fees - Cash
• Impact Fees - Debt
Impact Fees -Debt
Other Funding Sources
PEDC
• TIRZ Reimbursable Debt
• W/S Certificates of Obligation
• W/S Revenue Bonds
W/S Revenues - Cash
$3
$54,680,148
$12,584,883
$0
$274,005
$6,684,126
$0
$0
S21,618,500
$18,173,010
$17,143,721
$1
$80,468,507
$1
$625,002
0.00%
25.76%
5.93%
0.00%
0.13%
3.15%
0.00%
0.00%
10.19%
8.56%
8.08%
0.00%
37.91%
0.00%
0.29%
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 11
One Year Plan
FY26 Total Funding Requested by Department
2026
• 100 - Administration
• 300 - PW Engineering & Capital
Projects
305 - Public Works
• 305 - Traffic Management
311 - Streets
• 312 - Drainage
• 314 - Utilities Department
• 345 - Capital Projects
355 - Wastewater Treatment
365 - Water Production
540 - Parks
S1 0.00%
$102,097,790 58.69%
$300,000
$920,000
$1,411,505
$49,587,150
$550,000
$9,959,011
$8,150,000
$1,000,000
$1
FY26 Capital Cost Breakdown
0.17%
0.53%
0.81%
28.50%
0.32%
5.72%
4.68%
0.57%
0.00%
0 $20M $40M $60M $80M $100M
• Capital Costs
• Operational Costs
$174M
$120M $140M $160M $180M $200M
$173,975,458 99.85%
$261,792 0.15%
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 12
Multi -Year Plan
Capital Improvement Multi -Year Plan
FY26 - FY30 Total Funding Requested by Department (including Historical Budgeted, Future
Budgeted)
$600M
$504M
$400M
$200M
0
$174M $177M
Historical
Budgeted
2026
$62M
$88M
$51n4
$7M
2027 2028
Funding by Department Totals (all years)
• 100 - Administration
• 300 - PW Engineering & Capital
Projects
305 - Public Works
• 305 - Traffic Management
311 - Streets
• 312 - Drainage
• 314 - Utilities Department
• 330 - Facilities Management
345 - Capital Projects
355 - Wastewater Treatment
365 - Water Production
• 540 - Parks
2029
54,625,000 0.43%
$630,312,275 59.28%
$2,250,000
$920,000
534,655,500
$66,575,400
$6,050,000
$1,235,000
5287,466,343
$16,603,000
$11,850,000
$790,000
0.21%
0.09%
3.26%
6.26%
0.57%
0.12%
27.03%
1.56%
1.11%
0.07%
2030
Future
Budgeted
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 13
Multi -Year Plan
FY26 - FY30 Total Funding Requested by Source (including Historical Budgeted, Future
Budgeted)
$600M
$455M
$400M
$200M
0
$212M
$190M
$61M
$88M
$51M
$7M
Historical
Budgeted
2026
2027 2028
Funding by Source Totals (all years)
• 2007 & 2019 GO Bonds
• 2023 General Obligation Bonds
Certificates of Obligation
• General Revenue - Cash
General Revenue -Cash
• HGAC-TIP
• Impact Fees - Cash
• Impact Fees - Debt
Impact Fees -Cash
Impact Fees -Debt
Other Funding Sources
• PEDC
• TIRZ Reimbursable Debt
• Unfunded Future GO Bond
Package
W/S Certificates of Obligation
• W/S Revenue Bonds
W/S Revenues - Cash
2029
$45,003,154
$160,205,366
$119,478,016
$0
$7,959,747
$15,251,782
$0
$0
$700,000
$111,184,632
$57,895,057
$25,143,719
518,364,000
$74,270,000
4.23%
15.05%
11.22%
0.00%
0.75%
1.43%
0.00%
0.00%
0.07%
10.44%
5.44%
2.36%
1.72%
6.98%
$415,732,519 39.05%
$9,800,026 0.92%
$3,681,500 0.35%
2030
Future
Budgeted
FY26 - FY30 Capital Cost Breakdown (including Historical Budgeted, Future Budgeted)
Historical Budgeted $504M
2026 $174M
2027 $178M
2028 $64M
2029 $90M
2030 $53M
Future Budgeted I $7M
0 $50M $100M $150M $200M $250M $300M $350M $400M $450M $500M $55...
Capital Cost Totals (all years)
• Capital Costs
• Operational Costs
$1,063,332,518 99.31%
$7,368,878 0.69%
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 14
Project Types
Capital Improvement Plan - Project Types
FY26 - FY30 Capital Costs By Project Type (including Historical Budgeted, Future Budgeted)
1.06B
• Drainage
• Facilities
Parks
• Streets
Wastewater
• Water
$154,348,696 14.52%
$182,070,053 17.12%
$55,103,124 5.18%
$138,002,223 12.98%
$406,874,172 38.26%
5126,934,250 11.94%
Drainage
Project No. /
Category
Historical
Budgeted
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
Total
DR190 DR1904-West $10,927,404
4 Lea
Subdivision
Drainage
Improvement
s
DR190 DR1905- $4,624,999
5 Hickory
Slough
Regional
Detention
Pond
DR210 DR2102- $810,205
2 Brookland
Acres
Drainage
Improvement
s
DR210 DR2103- $2,126,803
3 Garden
Road/O'Day
Road
Drainage
Improvement
s
DR210 DR2104- $272,180
4 Woody Road
Drainage
Improvement
s
$1
$0 $0 S0 $0 $0 $10,927,405
$1 $0 $0 $0 $0 $0 $4,625,000
$1 $0 $0 $0 $0 $0 5810,206
$1
$0 $0 $0 $0 $o $2,126,804
$1 $0 $0 $0 $0 $0 $272,181
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 15
Project Types
Project No. /
Category
Historical
Budgeted
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
Total
DR23
01
DR23
03
DR23
04
DR23
05
DR23
06
DR23
07
DR24
01
DR24
02
DR24
03
DR24
07
DR2301 -
Hickory
Slough
Sportsplex
Detention
Pond Ph 2
DR2303 -
Master
Drainage Plan
Update
DR2304 -
Hickory
Slough
Detention
Storm Water
Pump Station
Generator
DR2305 -
Veterans
Drainage
Improvement
s
DR2306 -
Longwood
Park
(Roadside
Ditch and
Culvert)
DR2307 -
Southwest
Quadrant of
Old Town
(McLean to
SH35 South of
Broadway)
DR2401 -
Shady Crest
and Creek
View
Subdivision
Drainage
Improvement
DR2402 -
Hickory Creek
Subdivision
Drainage
Improvement
DR2403 -
Garden Acres
Subdivision
Drainage
Improvement
s
DR2407 -
Herridge
Miller/Brookla
nd Acre
Subdivision
$4,259,999
Si So So So So $0 $4,260,000
$765,000 $435,000 $0 $0 $0 $0 $0 $1,200,000
$931,999 $1 $0 $0 $0 $0
$2,185,854 59,144,146
$660,000 $8,480,000
$835,000 $9,408,000
$1,530,000 $14,550,000
$4,729,999
$0
$932,000
$0 $0 $0 $0 $0 $11,330,000
$0 $0 $0 $0 $0 $9,140,000
$0 $0 $0 $0 $0 $10,243,000
$0 $0 So $o $0 $16,080,000
$1 $0 $0 $0 $0 $0 $4,730,000
$561,000 $3,530,000
$1,309,999
$0 $0 $o So $o $4,091,000
$1 $0 $0 SO $0 $0 $1,310,000
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 16
Project Types
Project No. /
Category
Drainage
Improvement
DR24 DR2408 - $638,399 $1 $0 $o So So $0 $638,400
08 Hickory
Slough
Embankment
Slope
Replacement
DR241 D R2410 - $99,999 $1 $0 $0 $0 $0 $0 5100, 000
0 Shadow Creek
Ranch -
Ocean Point
Ct 100 Year
Overflow at
Cul-De-Sac
DR25 DR2501-Pine $0 $1,480,000 $4,745,000 $0 So $0 $0 $6,225,000
01 Hollow
Drainage
Improvement
s
DR25 DR2502-Fite $0 $3,151,000 $6,943,300 $0 $0 $0 $0 $10,094,300
02 Rd Drainage
Improvement
(Cullen to
Harkey)
DR25 DR2503- $0 $4,178,000 $20,654,400 $0 $0 $0 $0 $24,832,400
03 Harkey Road
Drainage
(Broadway to
Mary's Creek)
DR26 DR2601-Isla $0 $704,000 $4,710,000 $0 $0 $0 $0 $5,414,000
01 Dr., N
Galveston,
Cheryl Dr.
Drainage
Improvement
s
DR26 D R2602 - E. $0 $290,000 $1,600,000 $0 $0 $0 $0 $1,890,000
02 Plum
Drainage (Old
Alvin to
Schlieder Dr)
DR26 D R2603 - $0 $486,000 $4,684,000 $0 $0 $0 $0 $5,170,000
03 Hatfield Road
Drainage (FM
518 to Hickory
Slough)
DR26 DR2604- $0 $1,275,000 $0 $0 $0 $0 $0 $1,275,000
04 Hatfield Rd
South
Drainage
DR27 DR2701- $0 $0 $266,500 $1,169,500 $0 $0 $0 $1,436,000
01 Wagon Trail
Road (South of
Fite to Mary's
Creek)
DR27 DR2702-Fite $0 $0 $850,000 $7,071,000 $0 $0 $0 $7,921,000
02 Road
Historical
Budgeted
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
Total
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 17
Project Types
Project No. / Historical
Category Budgeted
Drainage
(Harkey to
McLean)
DR27 DR2703- SO So $580,000 $6,695,000 So So So $7,275,000
03 Tranquility
Lakes
Detention
Pump Station
Rehabilitation
and Generator
Total Drainage $7,268,839 67,111,157 $5,033,200 $4,935,500 $ 0 6 $54,348,696
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
Total
Facilities
Project No. / Historical
Category Budgeted
Future
FY2026 FY2027 FY2028 FY2029FY2030
Budgeted
Total
FA180 FA1804- Fire $1,725,000 $100,000 $15,936,000 $0 $0 $0 So $17,761,000
4 Station #7 -
Bailey Road
FA190 FA1902- $2,423,800 $1,174,050 $29,471,000 $0 $0 $0 $0 $33,068,850
2 Orange Street
Service
Center Phase
2
FA20 FA2002-Fire $575,000 $0 $0 $1,300,000 $17,610,000 $0 $0 $19,485,000
02 Station #6
(Formerly Fire
Station #11) -
County Road
100
FA210 FA2104 - Fire $583,746 $1 $0 $0 $0 $0 $0 $583,747
4 Station #3
(HVAC)
Repairs
FA210 FA2106- $28,474,999 $1 $0 $0 $0 $0 SO $28,475,000
6 Hillhouse
Road Annex
Phase II
FA210 FA2107- $5,068,999 $1 SO $0 $0 $0 $0 $5,069,000
7 Water
Operations
Building
(Alice St.)
FA22 FA2203- $5,398,999 $1 $0 $0 $0 $0 $0 $5,399,000
03 Natatorium
Air -Handling
Replacement
FA22 FA2205- $0 $1,972,000 $0 SO SO $0 $0 $1,972,000
05 Reflection
Bay WRF Fuel
Island
FA24 FA2401- West $154,699 $1 $0 $0 $0 $0 $0 $154,700
01 Pearland
Community
Center HVAC
Replacement
FA24 FA2405- $6,500,000 $0 $0 $9,800,000 $45,560,000 $0 $0 $61,860,000
05 Public Safety
rFY 26-30 Proposed Capital Improvement Plan I Pearland Page 18
Project Types
Project No. / Historical Future
FY2026 FY2027 FY2028 FY2029FY2030 Total
Category Budgeted Budgeted
Training
Complex
FA241 FA2410- $2,378,755 $1 $0 SO SO SO SO $2,378,756
0 Emergency
Distribution
Warehouse
FA25 FA2501- $339,999 $1 $0 $0 $0 $0 $0 $340,000
01 Knapp
Activity
Center Air
Conditioning
and Building
Automation
System
Integration
FA25 FA2502-Fiber $0 $274,000 $o $0 SO So So $274,000
02 Backbone
(Cullen
Parkway from
Hughes
Ranch Road
to McHard)
FA25 FA2505- $89,999 $1 $0 $0 $o $o So $90,000
05 Stella Roberts
Recycling
Center HVAC
Replacement
FA26 FA2601-Fiber SO $0 $620,000 $0 $o $o So $620,000
01 Backbone
Magnolia
(Business
Center to
Kirby Water
Plant)
FA27 FA2701-Stella $0 $0 $0 $684,000 $0 $0 $o $684,000
01 Roberts
Recycling
Center Roof
and Gutter
Replacement
FA27 FA2702-Fiber SO $o $0 $1,235,000 $0 $0 S0 $1,235,000
02 Backbone
(Dixie Farm
from
Broadway to
Main)
FA28 FA2802- So $0 $0 $2,620,000 $0 So $0 $2,620,000
02 Public Safety
Building Roof
Replacement
Total Facilities 83,713,995 $,520,058 $6,027,000 $5,639,000 $3,170,000 9 0 $82,070,053
Parks
Project No. /
Category
Historical
Budgeted
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
Total
PK190 PK1904 - Clear
4 Creek Trail
$1,150,000 $9,065,000
$0 $0 $0 $0 $0 $10,215,000
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 19
Project Types
Project No. /
Category
(Barry Rose
WRFto UHCL)
PK230 PK23O1- Park $453,404 Si $0 $0 $0 $0 $0 $453,405
1 Equipment
Recapitalization
Program
PK240 PK24O2- S0 $16,708,719 $0 $0 $0 $0 $0 $16,708,719
2 Hickory Slough
Sportsplex
Phase II
PK250 PK25O1- $0 $2,255,000 $13,726,000 $0 $0 $0 $0 $15,981,000
1 Independence
Park Phase II
PK25O PK2503-Clear $1,500,000 $100,000 $9,105,000 $0 SO So So $10,705,000
3 Creek Trail
Segment 5
PK25O PK25O4- $789,999 $1 $0 $0 $0 $0 $0 $790,000
4 Centennial Park
Storage
Building
PK27O PK27O1- PER $0 $0 $250,000 $0 $0 $0 $0 $250,000
1 for Future Bond
Referendum
Total Parks 8,893,403 $8,128,721 $3,081,000 $ e e e $5,103,124
Historical
Budgeted
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
Total
Streets
Project No. / Historical Future
FY2026 FY2027 FY2028 FY2029 FY2030 Total
Category Budgeted Budgeted
TR060 TR0601- $12,337,723 $0 $20,800,000 $0 $0 $0 $0 $33,137,723
1 Mykawa Road
Widening -
BW8 to FM 518
TR1501 TR1501- Smith $13,695,999 S1 SO So SO SO $0 $13,696,000
Ranch Road
Extension (CR
94) - Hughes
Ranch Road to
Broadway
TR190 TR1904-Bailey $18,457,999 $1 $0 $0 $0 $0 So $18,458,000
4 Road
Expansion -
Veterans Dr to
Main
TR190 TR1905- $8,081,999 $1 SO $0 $0 So So $8,082,000
5 Shadow Creek
Parkway
Landscaping,
Street Lighting,
& Sidewalks
TR200 TR2001- $1,833,999 $1 $0 $0 $0 $0 $0 $1,834,000
1 Pearland
Parkway at
Broadway
Intersection
Improvements
TR2101 TR2101- $999,999 $1 So So $o So $o $1,000,000
Broadway
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 20
Project Types
Project No. /
Category
Expansion
Phasel (SH 288
to Old
Chocolate
Bayou)
TR210 TR2103- $10,393,999 $1 $o So So $o So $10,394,000
3 Intersection
Improvements
in Shadow
Creek Ranch
TR220 TR2203- $499,999 $1 S0 $0 So So So $500,000
3 Median
Landscaping
on Kingsley&
Kirby
TR230 TR2301- $260,000 $1,638,000 $o $o $o $o $o $1,898,000
1 Pearland
Parkway at
Barry Rose
Intersection
Improvements
TR230 TR2302-Street S8,180,000 $1,030,000 So So So So $0 $9,210,000
2 Reconstruction
-Sherwood
TR230 TR2303- $12,245,999 $1 $0 $0 $0 $0 $0 $12,246,000
3 Hughes Road
(Pearland
Parkway to City
of Pearland City
Limit)
TR240 TR2401- $6,600,000 $4,400,000 $4,400,000 $0 $0 $0 $0 $15,400,000
1 Concrete
Sidewalk Gaps
and
Replacement
TR240 TR2402 - Dixie $979,999 $1 So So So So So $980,000
2 Farm Road at
Hastings
Friendswood
Road
Intersection
Improvements
TR250 TR2502- $6,999,999 $1 $o So So So So $7,000,000
2 Broadway
Expansion
Phase 2 - Old
Chocolate
Bayou to
McLean Rd.
TR251 TR2510- $100,000 $700,000 $o $o So $o So $800,000
0 Pearland
Parkway
Bridge Soil
Erosion Repair
(at Clear Creek)
TR260 TR2601- Barry $0 $1,565,000 $0 $0 $0 $0 $0 $1,565,000
1 Rose Masonry
Historical
Budgeted
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
Total
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 21
Project Types
Project No. / Historical Future
FY2026 FY2027 FY2028 FY2029 FY2030 Total
Category Budgeted Budgeted
Wa l l
Replacement
TR260 TR2603 - Traffic $0 $920,000 $0 $0 $0 $0 $0 $920,000
3 Signal at
Kingsley/CR48
TR260 TR2604- So $381,500 $o $0 So $o So $381,500
4 TxDOT Traffic
Signal Upgrade
along SH35
TR270 TR27O5-PER SO $0 $500,000 $0 So So SO $500,000
5 for Future
Bond
Referendum -
Streets
Total Streets $01,667,713 $0,634,510 $5,700,000 0 0 0 0 $38,002,223
Wastewater
Project No. /
Category
Historical
Budgeted
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
WW15 WW1502 -
02 Barry Rose
WRF
Replacement
and Expansion
WW1 WW1906 -
906 Longwood
Water
Reclamation
Facility
Decommissio
ping
WW2 WW2006 -
006 Mykawa Road
Sewer
Relocation -
Jasmine to S
Orange Circle
WW21 WW2104 - FM
04 518
Wastewater
Utility
Relocations -
SH288 to Old
Chocolate
Bayou
WW2 WW2303 -
303 Dixie Farm
North
Regional Lift
Station
Rehabilitation
WW2 WW2401 -
401 Barry Rose
Gravity Sewer -
Plum from
Galveston to
$229,379,999
$38,072,999
$377,999
$6,799,999
Si $0 $0 S0 $0 $0
$1 $0 $0 SO $0 $0
Si $0 $0 $0 $0 $0
Si SO SO $0 $0 $0
$3,317,000 $1,530,000
$2,853,000 $8,150,000
$0 $0 $0 $0 $0
$0 $0 $o So So
i' FY 26-30 Proposed Capital Improvement Plan I Pearland Page 22
Project Types
Project No. /
Category
Historical
Budgeted
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
Barry Rose
WRF
WW2 WW2402- $820,000 $3,780,000 $0 $0 $0 $0 $0
402 Riverstone
Ranch
Regional Lift
Station
Capacity
Expansion
WW2 WW2403- $64,000 $710,000 $0 $0 $0 $0 $0
403 Lakes of
Country Place
Lift Station
Rehabilitation
WW2 WW2404- $1,200,000 $1,250,000 SO SO $0 $0 $0
404 Southdown
Lift Station
Rehabilitation
WW2 WW2405- $805,171 54,570,000 $0 $0 $0 $0 $0
405 Shady Crest
and Creek
View
Subdivision
Sanitary Sewer
Rehabilitation
WW2 WW2406- $371,000 $1,060,000 SO $0 $0 SO $0
406 Whispering
Winds Lift
Station
Relocation
WW2 WW2407- $592,999 $1 $0 $0 $0 $0 $0
407 Wooten Road
Lift Station
Decommissio
ping
WW2 WW2408- $1,600,000 $7,961,000 $0 $0 $0 $0 $0
408 Sanitary Sewer
Rehabilitation
- Longwood
Service Area
(LW -03)
WW2 WW2501- $1,362,000 $3,920,000 $0 $0 $0 $0 SO
501 SanitarySewer
Rehabilitation
- Longwood
Service Area
(LW -04)
WW2 WW2502- So $0 So $1,708,000 $0 $0 $0
502 Green Tee IV
Lift Station
Rehabilitation
WW2 WW2503- $0 $462,000 $1,628,000 $0 $0 $0 SO
503 Sunset
Meadows Lift
Station
Rehabilitation
WW2 WW2504 - SO $1,335,000 $0 $0 $0 $0 $0
504 Green Tee III
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 23
Project Types
Project No. /
Category
Lift Station
Rehabilitation
WW2 WW2507 -
507 Kirby North
Regional Lift
Station
Rehabilitation
WW2 WW2508 -
508 Waste Water
Master Plan
Update
WW2 WW2603 -
603 Green Tee I Lift
Station
WW2 WW2604 -
604 Oakbrook
Estates Lift
Station
Replacement
WW2 WW2608 -
608 Sunset Lakes
Lift Station
Rehabilitation
WW2 WW2609 - FM
609 518 Utility
Relocations
Phase 2 (Old
Chocolate
Bayou to
McLean)
WW2 WW2611 -
611 JHECOdor
Control
System
WW2 WW2612 -
612 W WTPs Asset
Management
Plan
WW2 WW2613 -
613 Woodthrush
Regional Lift
Station
Rehabilitation
WW2 WW2614 -
614 Assessment
and
Rehabilitation
of Pearland's
Wastewater
Treatment
Plants
WW2 WW2701 -
701 Towne Lake
Lift Station
Rehabilitation
WW2 WW2702 -
702 Pine Hollow
Historical
Budgeted
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
$278,000 $1,740,000
$0 $0 $0 $0 $0
So $625,000 $0 S0 S0 $0 $0
$0 $0 $751,000 $2,340,000 $0 $0 $0
$0 $1,540,000 $0 $0 $0 $0 $0
$0 $0 $0 $222,000 $1,550,000 $0 $0
So $6,800,000
$o So So $o So
$0 $300,000 $1,950,000 $0 $0 $0 $0
$0 $500,000 $2,500,000 $3,000,000 $0 $0 $0
$0 $522,000 $3,413,000 $0 $0 $0 $0
$0 $550,000 $5,500,000 $0 $0 $0 $0
$0 $0 $0 $0 $0 $1 $1,599,999
$0 So $0 $0 $0 $1 S1,010,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 24
Project Types
Project No. /
Category
Lift Station
Rehabilitation
WW2 WW2704 -
704 Clear Creek
Park Lift
Station
Rehabilitation
WW2 WW2705 -
705 Country Place
Lift Station
Rehabilitation
WW2 WW2707 -
707 Walmart Lift
Station
Rehabilitation
WW2 WW2708 -
708 Hughes Ranch
Road Gravity
Sewer -Cullen
to Stone
WW2 WW2709 -
709 Crystal Lakes
West Lift
Station
Rehabilitation
WW2 WW2710-
710 Critical Lift
Station
Electrical
Hardening
Improvements
WW2 WW2801-
801 Rustic Oak
Elementary
School Lift
Station
Rehabilitation
WW2 WW2802 -
802 Westlea Lift
Station
Rehabilitation
WW2 WW2901 -
901 Southdown
Regional Lift
Station & Force
Main
WW2 WW2902 -
902 Country Place
Waste Water
Line
Replacement
WW2 WW2903 -
903 Tower Bridge
Lift Station
Rehabilitation
WW3 WW3001-
001 Villages of
Edgewater Lift
Historical
Budgeted
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
$0 $0 $0 $350,000 $1,512,000 $0 $0
$0 $0 $379,000 $2,050,000
$0 $0 $0 $1,498,000
$1,852,000
$1,920,000
S0
$0
$0 $280,000 $2,457,000 $0
So So
$o $0
$0 $0
$0 $0 $270,000 $1,638,000 $0 $0
$0 $0 $300,000 $5,300,000 $0 $0 $0
$0 $0 So
$0 $0
5180,000 $715,000
$o so
$0 $372,000 $900,000 $0 $0
$100,000 $0 $0 $0 $2,400,000 $16,400,000
$0
$0 $0 $0 $0 $1,150,000 $0 $0
$0 SO $0 $0 $100,000 $290,000 $550,000
$0 $0 $0 $0 $0 $100,000 $1,440,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 25
Project Types
Project No. /
Category
Station
Rehabilitation
Total Wastewater $91,766,166 $7,305,005 $6,701,000 $9,747,000 8,965,000 $6,790,002 $,599,999
Historical
Budgeted
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
Project No. / Category
(continued from above)
Total
WW1502
WW1906
WW2006
WW2104
WW2303
WW2401
WW2402
WW2403
WW2404
WW2405
WW2406
WW2407
WW2408
WW2501
WW2502
WW2503
WW2504
WW2507
WW2508
WW2603
WW2604
WW2608
WW1502 - Barry Rose WRF Replacement and
Expansion
WW1906 - Longwood Water Reclamation Facility
Decommissioning
WW2006 - Mykawa Road Sewer Relocation -
Jasmine to S Orange Circle
WW2104 - FM 518 Wastewater Utility Relocations -
SH288 to Old Chocolate Bayou
WW2303 - Dixie Farm North Regional Lift Station
Rehabilitation
WW2401- Barry Rose Gravity Sewer - Plum from
Galveston to Barry Rose WRF
$229,380,000
$38,073,000
$378,000
$6,800,000
$4,847,000
$11,003,000
WW2402 - Riverstone Ranch Regional Lift Station $4,600,000
Capacity Expansion
WW2403 - Lakes of Country Place Lift Station
Rehabilitation
WW2404 - Southdown Lift Station Rehabilitation
WW2405 - Shady Crest and Creek View
Subdivision Sanitary Sewer Rehabilitation
WW2406 - Whispering Winds Lift Station
Relocation
WW2407 - Wooten Road Lift Station
Decommissioning
WW2408 - Sanitary Sewer Rehabilitation -
Longwood Service Area (LW -03)
$774,000
$2,450,000
$5,375,171
$1,431,000
$593,000
$9,561,000
WW2501 - Sanitary Sewer Rehabilitation - $5,282,000
Longwood Service Area (LW -04)
WW2502 - Green Tee IV Lift Station Rehabilitation
WW2503 - Sunset Meadows Lift Station
Rehabilitation
WW2504 - Green Tee III Lift Station Rehabilitation
WW2507 - Kirby North Regional Lift Station
Rehabilitation
WW2508 - Waste Water Master Plan Update
WW2603 - Green Tee I Lift Station
WW2604 - Oakbrook Estates Lift Station
Replacement
WW2608 - Sunset Lakes Lift Station Rehabilitation
$1,708,000
$2,090,000
$1,335,000
$2,018,000
$625,000
$3,091,000
$1,540,000
$1,772,000
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 26
Project Types
Project No./Category
(continued from above)
Total
WW2609
WW2611
WW2612
WW2613
WW2614
W W2701
WW2702
WW2704
WW2705
WW2707
WW2708
WW2709
W W2710
WW2801
WW2802
WW2901
WW2902
WW2903
WW3001
Total Wastewater
WW2609 - FM 518 Utility Relocations Phase 2 (Old $6,800,000
Chocolate Bayou to McLean)
WW2611 - JH EC Odor Control System
WW2612 - WWTPs Asset Management Plan
WW2613 - Woodth rush Regional Lift Station
Rehabilitation
WW2614 - Assessment and Rehabilitation of
Pea rland's Wastewater Treatment Plants
WW2701-Towne Lake Lift Station Rehabilitation
WW2702 - Pine Hollow Lift Station Rehabilitation
WW2704 - Clear Creek Park Lift Station
Rehabilitation
WW2705 - Country Place Lift Station
Rehabilitation
WW2707 - Walmart Lift Station Rehabilitation
WW2708 - Hughes Ranch Road Gravity Sewer -
Cullen to Stone
WW2709 - Crystal Lakes West Lift Station
Rehabilitation
WW2710 - Critical Lift Station Electrical Hardening
Improvements
WW2801- Rustic Oak Elementary School Lift
Station Rehabilitation
WW2802 - Westlea Lift Station Rehabilitation
WW2901- Southdown Regional Lift Station &
Force Main
WW2902 - Country Place Waste Water Line
Replacement
WW2903 - Tower Bridge Lift Station Rehabilitation
WW3001- Villages of Edgewater Lift Station
Rehabilitation
$2,250,000
$6,000,000
$3,935,000
$6,050,000
$1,600,000
$1,010,001
$1,862,000
$2,429,000
$1,498,000
$4,589,000
$3,828,000
$5,600,000
$895,000
$1,272,000
$18,900,000
$1,150,000
$940,000
$1,540,000
$06,874,172
Water
Project No. / Historical Future
FY2026 FY2027 FY2028 FY2029 FY2030
Category Budgeted Budgeted
WA21 WA2103 - FM $0 66,745,000 S0 So S0 So So
03 518 Utility
Relocations -
SH288 to Old
Chocolate
Bayou
WA22 WA2202- $285,000 $1,850,000 $0 $0 $0 $0 SO
02 McLean Water
Production
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 27
Project Types
Project No. / Historical
Category Budgeted
Facility
Rehabilitation
WA22 WA2203- S6,634,999 Si $o So So So SO
03 Green Tee
Transite Pipe
Water Line
Replacement
WA23 WA2301- $278,000 $3,200,000 $0 $0 S0 $0 $0
01 Liberty Water
Production
Facility
Rehabilitation
WA23 WA2304- $2,049,999 $1 $0 $0 $0 SO So
04 Sherwood
Waterline
Replacement
WA23 WA2305- $841,999 $1 $0 $0 $0 $0 $0
05 Country Place
Water Well
Generator
Replacement
WA23 WA2306- $656,999 Si So So SO $0 So
06 Garden Water
Well Generator
WA24 WA2401- $309,000 $1,810,000 $0 $0 $0 $0 SO
01 Water Plant
Chemical
Containment
Structures
WA24 WA2402- $415,000 $0 $5,000,000 $0 $0 $0 $0
02 Wood Creek
Transite Pipe
Water Line
Replacement
WA24 WA2403- $1,170,000 So 53,760,000 $0 $0 $0 $o
03 Cullen Ground
Storage Tank
Replacement
WA24 WA2404 - CR $374,999 $1 $0 $0 $0 So S0
04 100 Water Line
- Harkey to
Pearland Sites
WA24 WA2405- $520,000 $5,830,000 $0 $0 $0 $0 $0
05 Creekview and
Shadycrest
Transite Pipe
Water Line
Replacement
WA25 WA2501- $649,999 Si $0 $0 $0 $0 $0
01 Water Master
Plan Update
WA25 WA2502- $335,000 $0 $0 $1,350,000 $0 $0 $0
02 Kirby Elevated
and Ground
Storage Tank
Rehabilitation
WA25 WA2503- $400,000 $0 $0 $3,084,000 $0 $0 $0
03 Sleepy Hollow
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 28
Project Types
Project No. / Historical
Category Budgeted
Small
Waterline
Replacement
WA25 WA25OS- $530,000 $3,380,000 $0 $0 $0 $0 $0
05 Mykawa Road
Transite Pipe
and Water
Line
Replacement
WA25 WA2506- $299,999 $1 $0 $0 $0 $0 $0
06 Pump, VFD
and Motor
Condition
Assessment
WA25 WA2509- $0 $2,500,000 $0 $0 $0 $0 $0
09 Southwest
Quadrant of
Old Town
Transite Water
Line
Replacement
(McLean to
SH35 South of
Broadway)
WA26 WA2601-Alice $0 $236,000 $1,215,000 $0 $0 $0 $0
01 Elevated &
Ground
Storage Tank
Rehabilitation
WA26 WA2607- $0 $725,000 $3,228,750 $0 $0 $0 $0
07 Surface Water
Treatment
Plant - Plant
Redundancy
Improvement
WA26 WA2609- So $1,000,000 $6,100,000 $0 $0 $0 $o
09 Alice WTP
New 5 MG GST
WA27 WA2701- So So So S0 S308,000 $790,000 $0
01 Towne Lakes
Water Quality
Program
WA27 WA2702- $0 $0 $0 $350,000 $500,000 $0 $0
02 Magnolia
Water
Production
Facility
Rehabilitation
WA27 WA2704- $0 $0 $150,000 $400,000 $0 $0 $0
04 Country Place
Well Facility
Rehabilitation
WA27 WA2705- So $0 $700,000 $3,500,000 $0 $0 $0
05 Garden Well
New1MG GST
WA28 WA2801- $0 $0 $0 $0 $1,039,500 $9,000,000 $0
01 Alexander
Landing,
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 29
Project Types
Project No. / Historical
Category Budgeted
Banbury Cross
& Whispering
Winds Transite
Pipe Water
Line
Replacement
WA28 WA2804 -
04 Dixie Hollow
Subdivision
Transite Pipe
Water Line
Replacement
WA29 WA2901- Park
01 View Transite
Pipe Water
Line
Replacement
WA29 WA2902 -
02 Southdown
Transite Pipe
Water Line
Replacement
WA29 WA2903 -
03 Country Place
Transite Pipe
Water Line
Replacement
WA29 WA2904 -
04 Liberty Dr &
John Lizer
Transite Pipe
Water Line
Replacement
WA30 WA3001 -
01 Lakes of
Edgewater
Estates Water
Quality
Program
WA30 WA3002 -
02 West Oaks
and West
Oaks Village
Water Quality
Program
Total Water
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
$80,000 S0
S0 $2,100,000 S0
$0 S0 $0 $0
$700,000
$0 $0
$6,300,000 $0
$0 $0 $0 $0 $1,980,000 $15,000,000
So So $o
So So
$1,150,000 $9,775,000
$0
so $0
$0 So $300,000 $2,808,000 So
$0 $0 $0 $0 $0 $350,000 $830,000
$0 $0 $0 $0 $0 $399,000 $1,660,000
$5,830,993 $7,276,007 $0,153,750 $1,934,000 $4,602,500 $4,647,000 $,490,000
Project No. / Category
(continued from above)
Total
WA2103 WA2103 - FM 518 Utility Relocations - SH288 to Old
Chocolate Bayou
WA2202 WA2202 - McLean Water Production Facility
Rehabilitation
WA2203 WA2203 - Green Tee Transite Pipe Water Line
Replacement
WA2301 WA2301- Liberty Water Production Facility
Rehabilitation
$6,745,000
$2,135,000
$6,635,000
$3,478,000
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 30
Project Types
Project No. / Category
(continued from above)
Total
WA2304
WA2305
WA2306
WA2401
WA2402
WA2403
WA2404
WA2405
WA2501
WA2502
WA2503
WA2505
WA2506
WA2509
WA2601
WA2607
WA2609
WA2701
WA2702
WA2704
WA2705
WA2801
WA2304 - Sherwood Waterline Replacement
WA2305 - Country Place Water Well Generator
Replacement
WA2306 - Garden Water Well Generator
WA2401- Water Plant Chemical Containment
Structures
WA2402 - Wood Creek Transite Pipe Water Line
Replacement
WA2403 - Cullen Ground Storage Tank
Replacement
WA2404 - CR 100 Water Line - Harkey to Pearland
Sites
WA2405 - Creekview and Shadycrest Transite Pipe
Water Line Replacement
$2,050,000
$842,000
$657,000
$2,119,000
$5,415,000
$4,930,000
$375,000
$6,350,000
WA2501- Water Master Plan Update $650,000
WA2502 - Kirby Elevated and Ground Storage $1,685,000
Tank Rehabilitation
WA2503 - Sleepy Hollow Small Waterline
Replacement
WA2505 - Mykawa Road Transite Pipe and Water
Line Replacement
WA2506 - Pump, VFD and Motor Condition
Assessment
WA2509 - Southwest Quadrant of Old Town
Transite Water Line Replacement (McLean to
SH35 South of Broadway)
WA2601-Alice Elevated & Ground Storage Tank
Rehabilitation
WA2607 - Surface Water Treatment Plant - Plant
Redundancy Improvement
WA2609 - Alice WTP New 5 MG GST
WA2701-Towne Lakes Water Quality Program
WA2702 - Magnolia Water Production Facility
Rehabilitation
WA2704 - Country Place Well Facility
Rehabilitation
WA2705-Garden Well New1MG GST
WA2801-Alexander Landing, Banbury Cross &
Whispering Winds Transite Pipe Water Line
Replacement
WA2804 WA2804 - Dixie Hollow Subdivision Transite Pipe
Water Line Replacement
WA2901 WA2901- Park View Transite Pipe Water Line
Replacement
$3,484,000
$3,910,000
$300,000
$2,500,000
$1,451,000
$3,953,750
$7,100,000
$1,098,000
$850,000
$550,000
$4,200,000
$10,039,500
$2,180,000
$7,000,000
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 31
Project Types
Project No. / Category
(continued from above)
Total
WA2902 WA2902 - Southdown Transite Pipe Water Line
Replacement
WA2903 WA2903 - Country Place Transite Pipe Water Line
Replacement
WA2904 WA2904 - Liberty Dr &John LizerTransite Pipe
Water Line Replacement
WA3001 WA3001- Lakes of Edgewater Estates Water
Quality Program
WA3002 WA3002 - West Oaks and West Oaks Village Water
Quality Program
$16,980,000
$10,925,000
$3,108,000
$1,180,000
$2,059,000
Total Water $26,934,250
01044
FY 26-30 Proposed Capital Improvement Plan I Pearland
ASP -
Page 32
Capital Projects
Capital Projects
Capital Projects
Project No. / Project Name Years
DR1904 DR1904 - West Lea Subdivision 2026
Drainage Improvements
DR1905 DR1905 - Hickory Slough 2026
Regional Detention Pond
DR2102 DR2102 - Brookland Acres 2026
Drainage Improvements
DR2103 DR2103 - Garden Road/O'Day 2026
Road Drainage Improvements
DR2104 DR2104 - Woody Road Drainage 2026
Improvements
DR2301 DR2301 - Hickory Slough 2026
Sportsplex Detention Pond Ph 2
DR2303 DR2303 - Master Drainage Plan 2026
Update
DR2304 DR2304 - Hickory Slough 2026
Detention Storm Water Pump
Station Generator
DR2305 DR2305 - Veterans Drainage 2026
Improvements
DR2306 DR2306 - Longwood Park 2026
(Roadside Ditch and Culvert)
DR2307 DR2307 - Southwest Quadrant 2026
of Old Town (McLean to SH35
South of Broadway)
DR2401 DR2401 - Shady Crest and Creek 2026
View Subdivision Drainage
Improvement
DR2402 DR2402 - Hickory Creek 2026
Subdivision Drainage
Improvement
DR2403 DR2403 - Garden Acres 2026
Subdivision Drainage
Improvements
DR2407 DR2407 - Herridge 2026
Miller/Brookland Acre
Subdivision Drainage
Improvement
DR2408 DR2408 - Hickory Slough 2026
Embankment Slope
Replacement
DR2410 DR2410 - Shadow Creek Ranch - 2026
Ocean Point Ct 100 Year
Overflow at Cul-De-Sac
DR2501 DR2501 - Pine Hollow Drainage 2026 -
Improvements 2027
DR2502 DR2502 - Fite Rd Drainage 2026 -
Improvement (Cullen to Harkey) 2027
Departments Type
300 - PW Engineering & Capital Drainage
Projects
100 - Administration
345 - Capital Projects
345 - Capital Projects
345 - Capital Projects
312 - Drainage
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
312 - Drainage
312 - Drainage
312 - Drainage
312 - Drainage
312 - Drainage
312 - Drainage
312 - Drainage
312 - Drainage
Drainage
Drainage
Drainage
Drainage
Drainage
Drainage
Drainage
Total
$1
$1
$1
Drainage $9,144,146
Drainage $8,480,000
Drainage $9,112,000
Drainage $14,252,000
Drainage
$1
Drainage $3,530,000
Drainage
Drainage
300 - PW Engineering & Capital Drainage
Projects
$1
$1
$1
300 - PW Engineering & Capital Drainage $6,225,000
Projects
300 - PW Engineering & Capital Drainage $10,094,300
Projects
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 33
Capital Projects
Project No. / Project Name
DR2503 DR2503 - Harkey Road Drainage
(Broadway to Mary's Creek)
DR2601 DR2601 - Isla Dr., N Galveston,
Cheryl Dr. Drainage
Improvements
DR2602 DR2602 - E. Plum Drainage (Old
Alvin to Schlieder Dr)
DR2603 DR2603 - Hatfield Road
Drainage (FM 518 to Hickory
Slough)
DR2604 DR2604 - Hatfield Rd South 2026
Drainage
DR2701 DR2701 - Wagon Trail Road 2027
(South of Fite to Mary's Creek)
DR2702 DR2702 - Fite Road Drainage
(Harkey to McLean)
DR2703 DR2703 - Tranquility Lakes
Detention Pump Station
Rehabilitation and Generator
FA1804 FA1804 - Fire Station #7 - Bailey
Road
FA1902 FA1902 - Orange Street Service
Center Phase 2
FA2002 FA2002 - Fire Station #6 2028 -
(Formerly Fire Station #11) - 2029
County Road 100
FA2104 FA2104 - Fire Station #3 (HVAC) 2026
Repairs
FA2106 FA2106 - Hillhouse Road Annex 2026
Phase II
FA2107 FA2107 - Water Operations 2026
Building (Alice St.)
FA2203 FA2203 - Natatorium Air- 2026
Handling Replacement
FA2205 FA2205 - Reflection Bay WRF 2026
Fuel Island
FA2401 FA2401- West Pearland 2026
Community Center HVAC
Replacement
FA2405 FA2405 - Public Safety Training 2028 -
Complex 2029
FA2410 FA2410 - Emergency 2026
Distribution Warehouse
FA2501 FA2501- Knapp Activity Center 2026
Air Conditioning and Building
Automation System Integration
FA2502 FA2502- Fiber Backbone (Cullen2026
Parkway from Hughes Ranch
Road to McHard)
FA2505 FA2505 - Stella Roberts 2026
Recycling Center HVAC
Replacement
FA2601 FA2601-Fiber Backbone 2027
Magnolia (Business Center to
Kirby Water Plant)
FA2701 FA2701 - Stella Roberts 2028
Recycling Center Roof and
Years
2026 -
2027
2026 -
2027
2026 -
2027
2026 -
2027
2027 -
2028
2027 -
2028
2026 -
2027
2027
Departments
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
312 - Drainage
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
345 - Capital Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
345 - Capital Projects
311 - Streets
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
Type Total
Drainage $24,832,400
Drainage $5,414,000
Drainage $1,890,000
Drainage $5,170,000
Drainage $1,275,000
Drainage $1,436,000
Drainage $7,921,000
Drainage $7,275,000
Facilities $16,036,000
Facilities $29,459,560
Facilities $18,910,000
Facilities $1
Facilities $1
Facilities $1
Facilities $1
Facilities $1,340,500
Facilities $1
Facilities $55,360,000
Facilities $1
Facilities $1
Facilities $274, 000
Facilities $1
Facilities $620,000
Facilities $684, 000
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 34
Capital Projects
Project No. / Project Name
Gutter Replacement
FA2702 FA2702 - Fiber Backbone (Dixie 2028
Farm from Broadway to Main)
FA2802 FA2802 - Public Safety Building 2028
Roof Replacement
PK1904 PK1904 - Clear Creek Trail (Barry 2026
Rose WRF to UHCL)
PK2301 PK2301 - Park Equipment 2026
Recapitalization Program
PK2402 PK2402 - Hickory Slough 2026
Sportsplex Phase II
PK2501 PK2501- Independence Park
Phase II
PK2503 PK2503 - Clear Creek Trail
Segment 5
PK2504 PK2504 - Centennial Park
Storage Building
PK2701 PK2701 - PER for Future Bond 2027
Referendum
TR0601 TR0601 - Mykawa Road 2027
Widening - BW8 to FM 518
TR1501 TR1501 - Smith Ranch Road 2026
Extension (CR 94) - Hughes
Ranch Road to Broadway
TR1904 TR1904 - Bailey Road Expansion 2026
- Veterans Dr to Main
TR1905 TR1905 - Shadow Creek Parkway 2026
Landscaping, Street Lighting, &
Sidewalks
TR2001 TR2001 - Pearland Parkway at 2026
Broadway Intersection
Improvements
TR2101 TR2101 - Broadway Expansion 2026
Phase 1 (SH 288 to Old
Chocolate Bayou)
TR2103 TR2103 - Intersection 2026
Improvements in Shadow Creek
Ranch
TR2203 TR2203 - Median Landscaping 2026
on Kingsley & Kirby
TR2301 TR2301 - Pearland Parkway at 2026
Barry Rose Intersection
Improvements
TR2302 TR2302 - Street Reconstruction - 2026
Sherwood
TR2303 TR2303 - Hughes Road 2026
(Pearland Parkway to City of
Pearland City Limit)
TR2401 TR2401 - Concrete Sidewalk 2026 -
Gaps and Replacement 2027
TR2402 TR2402 - Dixie Farm Road at 2026
Hastings Friendswood Road
Intersection Improvements
TR2502 TR2502 - Broadway Expansion 2026
Phase 2 - Old Chocolate Bayou
to McLean Rd.
Years Departments
2026 -
2027
2026 -
2027
2026
330 - Facilities Management
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
345 - Capital Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
540 - Parks
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
311- Streets
300 - PW Engineering & Capital
Projects
311- Streets
311 - Streets
300 - PW Engineering & Capital
Projects
311- Streets
311- Streets
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
Type Total
Facilities $1,235,000
Facilities $2,620,000
Parks $9,065,000
Parks $1
Parks $16,708,719
Parks $15,981,000
Parks $9,205,000
Parks $1
Parks $250,000
Streets $20,800,000
Streets $1
Streets $1
Streets $1
Streets $1
Streets $1
Streets $1
Streets $1
Streets $1,638,000
Streets $1,030,000
Streets $1
Streets $8,800,000
Streets $1
Streets $1
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 35
Capital Projects
Project No. / Project Name Years
TR2510 TR2510 - Pearland Parkway 2026
Bridge Soil Erosion Repair (at
Clear Creek)
TR2601 TR2601 - Barry Rose Masonry 2026
Wall Replacement
TR2603 TR2603 - Traffic Signal at 2026
Kingsley/CR48
TR2604 TR2604 - TxDOT Traffic Signal 2026
Upgrade along SH35
TR2705 TR2705 - PER for Future Bond 2027
Referendum -Streets
WA2103 WA2103 - FM 518 Utility 2026
Relocations - SH288 to Old
Chocolate Bayou
WA2202 WA2202 - McLean Water 2026 -
Production Facility 2028
Rehabilitation
WA2203 WA2203 - Green Tee Transite 2026 -
Pipe Water Line Replacement 2028
WA2301 WA2301 - Liberty Water 2026
Production Facility
Rehabilitation
WA2304 WA2304 - Sherwood Waterline 2026
Replacement
WA2305 WA2305 - Country Place Water 2026 -
Well Generator Replacement 2028
WA2306 WA2306 - Garden Water Well 2026
Generator
WA2401 WA2401 - Water Plant Chemical 2026
Containment Structures
WA2402 WA2402 - Wood Creek Transite 2027
Pipe Water Line Replacement
WA2403 WA2403 - Cullen Ground 2027
Storage Tank Replacement
WA2404 WA2404 - CR 100 Water Line - 2026
Harkey to Pearland Sites
WA2405 WA2405 - Creekview and 2026
Shadycrest Transite Pipe Water
Line Replacement
WA2501 WA2501 - Water Master Plan 2026
Update
WA2502 WA2502 - Kirby Elevated and 2028
Ground Storage Tank
Rehabilitation
WA2503 WA2503 - Sleepy Hollow Small 2028
Waterline Replacement
WA2505 WA2505 - Mykawa Road Transite 2026
Pipe and Water Line
Replacement
WA2506 WA2506 - Pump, VFD and Motor 2026
Condition Assessment
WA2509 WA2509 - Southwest Quadrant 2026
of Old Town Transite Water Line
Replacement (McLean to SH35
South of Broadway)
WA2601 WA2601 - Alice Elevated & 2026 -
Ground Storage Tank 2027
Departments
345 - Capital Projects
300 - PW Engineering & Capital
Projects
305 - Traffic Management
311 - Streets
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
312 - Drainage
345 - Capital Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
345 - Capital Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
345 - Capital Projects
345 - Capital Projects
345 - Capital Projects
300 - PW Engineering & Capital
Projects
FY 26-30 Proposed Capital Improvement Plan I Pearland
Type Total
Streets $700,000
Streets $1,565,000
Streets $920,000
Streets $381,500
Streets $500,000
Water $6,021,000
Water $250,000
Water $1
Water $3,200,000
Water $1
Water $1
Water $1
Water $1,810,000
Water $4,915,000
Water $3,760,000
Water $1
Water $5,800,000
Water $1
Water $1,350,000
Water $3,084,000
Water $3,380,000
Water $1
Water $2,500,000
Water $1,451,000
Page 36
Capital Projects
Project No. / Project Name
Rehabilitation
WA2607 WA2607 - Surface Water 2026 -
Treatment Plant - Plant 2027
Redundancy Improvement
WA2609 WA2609 - Alice WTP New 5 MG 2026 -
G ST 2027
WA2701 WA2701 - Towne Lakes Water 2029 -
Quality Program 2030
WA2702 WA2702 - Magnolia Water 2028 -
Production Facility 2029
Rehabilitation
WA2704 WA2704 - Country Place Well 2027 -
Facility Rehabilitation 2028
WA2705 WA2705 - Garden Well New 1 MG 2027 -
G ST 2028
WA2801 WA2801 - Alexander Landing, 2029 -
Banbury Cross & Whispering 2030
Winds Transite Pipe Water Line
Replacement
WA2804 WA2804 - Dixie Hollow 2028
Subdivision Transite Pipe Water
Line Replacement
WA2901 WA2901 - Park View Transite 2029 -
Pipe Water Line Replacement 2030
WA2902 WA2902 - Southdown Transite 2029 -
Pipe Water Line Replacement 2030
WA2903 WA2903 - Country Place Transite 2028 -
Pipe Water Line Replacement 2029
WA2904 WA2904 - Liberty Dr & John 2029 -
Lizer Transite Pipe Water Line 2030
Replacement
WA3001 WA3001 - Lakes of Edgewater
Estates Water Quality Program
WA3002 WA3002 - West Oaks and West
Oaks Village Water Quality
Program
WW1502 WW1502 - Barry Rose WRF
Replacement and Expansion
WW1906 WW1906 - Longwood Water
Reclamation Facility
Decommissioning
WW2006 WW2006 - Mykawa Road Sewer
Relocation - Jasmine to S
Orange Circle
WW2104 WW2104 - FM 518 Wastewater
Utility Relocations - SH288 to
Old Chocolate Bayou
WW2303 WW2303 - Dixie Farm North
Regional Lift Station
Rehabilitation
WW2401 WW2401 - Barry Rose Gravity
Sewer - Plum from Galveston to
Barry Rose WRF
WW2402 WW2402 - Riverstone Ranch
Regional Lift Station Capacity
Expansion
WW2403 WW2403 - Lakes of Country 2026
Place Lift Station Rehabilitation
Years Departments
300 - PW Engineering & Capital
Projects
365 - Water Production
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
365 - Water Production
365 - Water Production
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
2030 300 - PW Engineering & Capital
Projects
2030 300 - PW Engineering & Capital
Projects
2026 -
2027
2026
345 - Capital Projects
345 - Capital Projects
2026 300 - PW Engineering & Capital
Projects
2026 300 - PW Engineering & Capital
Projects
2026 300 - PW Engineering & Capital
Projects
2026 355 - Wastewater Treatment
2026 300 - PW Engineering & Capital
Projects
345 - Capital Projects
Type Total
Water $3,953,750
Water $7,100,000
Water $1,098,000
Water $850,000
Water $550,000
Water $4,200,000
Water $10,039,500
Water $2,100,000
Water $7,000,000
Water $16,980,000
Water $10,925,000
Water $3,108,000
Water $350,000
Water $399,000
Wastewater$55 , 237 , 000
Wastewater $1
Wastewater $1
Wastewater $1
Wastewater $1,323,000
Wastewater $8,150,000
Wastewater $3,780,000
Wastewater $710,000
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 37
Capital Projects
Project No. / Project Name
Years Departments
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
WW2404
WW2405
WW2406
WW2407
WW2408
WW2501
WW2502
WW2503
WW2504
WW2507
WW2508
WW2603
WW2604
WW2608
WW2609
WW2611
WW2612
WW2613
WW2614
WW2701
2701
WW2702
WW2704
WW2705
WW2707
WW2708
WW2709
WW2404 - Southdown Lift 2026
Station Rehabilitation
WW2405 - Shady Crest and 2026
Creek View Subdivision Sanitary
Sewer Rehabilitation
WW2406 - Whispering Winds 2026
Lift Station Relocation
WW2407 - Wooten Road Lift 2026
Station Decommissioning
WW2408 - Sanitary Sewer 2026
Rehabilitation - Longwood
Service Area (LW -03)
WW2501 - Sanitary Sewer 2026
Rehabilitation - Longwood
Service Area (LW -04)
WW2502 - Green Tee IV Lift 2028
Station Rehabilitation
WW2503 - Sunset Meadows Lift 2026 -
Station Rehabilitation 2027
WW2504 - Green Tee III Lift 2026
Station Rehabilitation
WW2507 - Kirby North Regional 2026
Lift Station Rehabilitation
WW2508 - Waste Water Master 2026
Plan Update
WW2603 - Green Tee I Lift 2027 -
Station 2028
WW2604 - Oakbrook Estates Lift 2026
Station Replacement
WW2608 - Sunset Lakes Lift 2028 -
Station Rehabilitation 2029
WW2609 - FM 518 Utility 2026
Relocations Phase 2 (Old
Chocolate Bayou to McLean)
WW2611 - JHEC Odor Control 2026 -
System 2027
WW2612 - WWTPs Asset 2026 -
Management Plan 2028
WW2613 - Woodthrush Regional 2026 -
Lift Station Rehabilitation 2027
WW2614 - Assessment and 2026 -
Rehabilitation of Pearland's 2027
Wastewater Treatment Plants
WW2701 -Towne Lake Lift
Station Rehabilitation
WW2702 - Pine Hollow Lift
Station Rehabilitation
WW2704 - Clear Creek Park Lift
Station Rehabilitation
WW2705 - Country Place Lift
Station Rehabilitation
WW2707 - Walmart Lift Station
Rehabilitation
WW2708 - Hughes Ranch Road
Gravity Sewer -Cullen to Stone
WW2709 - Crystal Lakes West
Lift Station Rehabilitation
345 - Capital Projects
345 - Capital Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
345 - Capital Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
305 - Public Works
300 - PW Engineering & Capital
Projects
300 - PW Engineering & Capital
Projects
314 - Utilities Department
Type Total
Wastewater $1,250,000
Wastewater $4,570,000
Wastewater $1,060,000
Wastewater $1
Wastewater $7,961,000
Wastewater $3,920,000
Wastewater $1,708,000
Wastewater $2,090,000
Wastewater $1,335,000
Wastewater $1,740,000
Wastewater $625,000
Wastewater $3,091,000
Wastewater $1,540,000
Wastewater $1,772,000
Wastewater $6,800,000
Wastewater $2,250,000
Wastewater $6,000,000
Wastewater $3,935,000
Wastewater $6,050,000
2030 300 - PW Engineering & Capital Wastewater
Projects
2030 300 - PW Engineering & Capital Wastewater
Projects
2028 - 300 - PW Engineering & Capital
2029 Projects
2027 - 300 - PW Engineering & Capital
2028 Projects
2028 300 - PW Engineering & Capital
Projects
2027 - 300 - PW Engineering & Capital
2028 Projects
2028 - 300 - PW Engineering & Capital
2029 Projects
$1
$1
Wastewater $1,862,000
Wastewater $2,429,000
Wastewater $1,498,000
Wastewater $2,737 , 000
Wastewater $1,908,000
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 38
Capital Projects
Project No. / Project Name
WW2710 WW2710 - Critical Lift Station
Electrical Hardening
Improvements
WW2801 WW2801 - Rustic Oak
Elementary School Lift Station 2029
Rehabilitation
WW2802 WW2802 - Westlea Lift Station
Rehabilitation
WW2901 WW2901 - Southdown Regional
Lift Station & Force Main
WW2902 WW2902 - Country Place Waste
Water Line Replacement
WW2903 WW2903 - Tower Bridge Lift
Station Rehabilitation
WW3001 WW3001- Villages of Edgewater
Lift Station Rehabilitation
Years
2027 -
2028
Departments
Type Total
355 - Wastewater Treatment Wastewater $5,600,000
2028 - 300 - PW Engineering & Capital
Projects
2028 - 300 - PW Engineering & Capital
2029 Projects
2029 - 300 - PW Engineering & Capital
2030 Projects
2029 345 - Capital Projects
2029 - 300 - PW Engineering & Capital
2030 Projects
2030 300 - PW Engineering & Capital
Projects
Wastewater $895,000
Wastewater $1,272,000
Wastewater$18 , 800 , 000
Wastewater $1,150,000
Wastewater $390, 000
Wastewater $100,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 39
Drainage
Drainage
FY26 - FY30 Drainage Projects (including Historical Budgeted, Future Budgeted)
$60M
$40M
$20M
0
$39M
$57M
$46M
$14M
■ 0
0 0
Historical
Budgeted
2026 2027 2028 2029 2030 Future
Budgeted
• DR1904 - West Lea Subdivision $10,927,405 7.04%
Drainage Improvements
• DR1905 - Hickory Slough Regional $4,625,000 2.98%
Detention Pond
DR2102 - Brookland Acres $810,206 0.52%
Drainage Improvements
• DR2103 - Garden Road/O'Day $2,126,804 1.37%
Road Drainage Improvements
DR2104 - Woody Road Drainage $272,181 0.18%
Improvements
• DR2301 - Hickory Slough $4,260,000 2.74%
Sportsplex Detention Pond Ph 2
• DR2303 - Master Drainage Plan $1,200,000 0.77%
Update
• DR2304 - Hickory Slough $932,000 0.60%
Detention Storm Water Pump
Station Generator
DR2305 - Veterans Drainage $11,330,000 7.30%
Improvements
DR2306 - Longwood Park $9,140,000 5.89%
(Roadside Ditch and Culvert)
DR2307 - Southwest Quadrant of $10,243,000 6.60%
Old Town (McLean to SH35 South
of Broadway)
• DR2401 - Shady Crest and Creek $16,080,000 10.36%
View Subdivision Drainage
Improvement
• DR2402 - Hickory Creek $5,440,000 3.50%
Subdivision Drainage
Improvement
• DR2403 - Garden Acres $4,091,000 2.64%
Subdivision Drainage
Improvements
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 40
Drainage
• DR2407-Herridge $1,499,000 0.97%
Miller/Brookland Acre Subdivision
Drainage Improvement
• DR2408 - Hickory Slough $638, 400 0.41%
Embankment Slope Replacement
• DR2410 - Shadow Creek Ranch — $100,000 0.06%
Ocean Point Ct 100 Year Overflow
at Cul-De-Sac
• DR2501- Pine Hollow Drainage $6, 225, 000 4.01%
Improvements
• DR2502 - Fite Rd Drainage $10, 094, 300 6.50%
Improvement (Cullen to Harkey)
• DR2503 - Harkey Road Drainage $24,832,400 16.00%
(Broadway to Mary's Creek)
• DR2601 - Isla Dr., N Galveston, $5,414,000 3.49%
Cheryl Dr. Drainage
Improvements
• DR2602- E. Plum Drainage (Old $1,890,000 1.22%
Alvin to Schlieder Dr)
• DR2603 - Hatfield Road Drainage $5,170,000 3.33%
(FM 518 to Hickory Slough)
• DR2604- Hatfield Rd South $1,275,000 0.82%
Drainage
• DR2701 - Wagon Trail Road (South $1,436,000 0.92%
of Fite to Mary's Creek)
• DR2702 - Fite Road Drainage $7, 921, 000 5.10%
(Harkey to McLean)
• DR2703 - Tranquility Lakes $7, 275, 000 4.69%
Detention Pump Station
Rehabilitation and Generator
Summary of Requests
Project No./
Category
Historical
Budgeted
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
Total
DR190 DR1904 - West
4 Lea
Subdivision
Drainage
Improvements
DR190 DR1905 -
5 Hickory Slough
Regional
Detention
Pond
DR210 DR2102 -
2 Brookland
Acres Drainage
Improvements
DR210 DR2103 -
3 Garden
Road/O'Day
Road Drainage
Improvements
$10,927,404
$4,624,999
$810,205
$2,126,803
$1 $0 $0 $0 $0 $0 $10,927,405
$1 $0 $0 $0 $0 $0 $4,625,000
$1 $0 $0 $0 $0 $0 $810,206
$1 $0 $0 S0 S0 $0 $2,126,804
FY 26-30 Proposed Capital Improvement Plan i Pearland
Page 41
Drainage
Project No. /
Category
Historical
Budgeted
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
Total
DR210 DR2104-
4 Woody Road
Drainage
Improvements
DR230 DR2301-
1 Hickory Slough
Sportsplex
Detention
Pond Ph 2
DR230 DR2303 -
3 Master
Drainage Plan
Update
DR230 DR2304-
4 Hickory Slough
Detention
Storm Water
Pump Station
Generator
DR230 DR2305 -
5 Veterans
Drainage
Improvements
DR230 DR2306 -
6 Longwood
Park (Roadside
Ditch and
Culvert)
DR230 DR2307 -
7 Southwest
Quadrant of
Old Town
(McLean to
SH35 South of
Broadway)
DR24 DR2401 -
01 Shady Crest
and Creek
View
Subdivision
Drainage
Improvement
DR24 DR2402-
02 Hickory Creek
Subdivision
Drainage
Improvement
DR24 DR2403 -
03 Garden Acres
Subdivision
Drainage
Improvements
DR24 DR2407-
07 Herridge
Miller/Brooklan
d Acre
Subdivision
$272,180 $1 SO $0 SO So
$4,259,999
$765,000
$931,999
$1
$435,000
$1
$2,185,854 $9,144,146
$660,000 $8,480,000
$1,131,000 S9,112,000
$1,828,000 $14,252,000
$5,439,999
$1
$561,000 $3,530,000
$1,498,999
$1
$0 $0 $0 $0
$0 $0 $0 so
$0 $0 $0 $0
So
$272,181
$0 $4,260,000
$0 $1,200,000
$0
$932,000
$0 $0 $0 $0 $0 $11,330,000
$0 $0 $0 $0
$0 89,140,000
$0 S0 SO SO $0 $10,243,000
So $0 So $0 $0 $16,080,000
$0 $0 $0 $0
$0 $0 $0 $0
So $o $o so
$0 $5,440,000
$0 $4,091,000
S0 $1,499,000
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 42
Drainage
Project No. /
Category
Drainage
Improvement
DR24 DR2408 - $638,399 $1 $0 $o $o $0 $0 5638,400
08 Hickory Slough
Embankment
Slope
Replacement
DR241 DR2410- $99,999 $1 $0 $0 $0 $0 $0 $100,000
0 Shadow Creek
Ranch - Ocean
Point Ct 100
Year Overflow
at Cul-De-Sac
DR250 DR2501-Pine $0 $1,480,000 $4,745,000 $0 $0 $0 $0 $6,225,000
1 Hollow
Drainage
Improvements
DR250 DR2502-Fite $0 $3,151,000 $6,943,300 $0 $0 $0 $0 $10,094,300
2 Rd Drainage
Improvement
(Cullen to
Harkey)
DR250 DR2503- $0 $4,178,000 $20,654,400 $0 $0 $0 $0 $24,832,400
3 Harkey Road
Drainage
(Broadway to
Mary's Creek)
DR26 DR2601-Isla $0 $704,000 $4,710,000 $0 $0 $0 $0 $5,414,000
01 Dr., N
Galveston,
Cheryl Dr.
Drainage
Improvements
DR26 D R2602 - E. $0 $290,000 $1,600,000 $0 $0 $0 $0 $1,890,000
02 Plum Drainage
(Old Alvin to
Schlieder Dr)
DR26 D R2603 - $0 $486,000 $4,684,000 $0 $0 $0 $0 $5,170,000
03 Hatfield Road
Drainage (FM
518 to Hickory
Slough)
DR26 DR2604- $0 $1,275,000 $0 $0 $0 $0 $0 $1,275,000
04 Hatfield Rd
South
Drainage
DR27 DR2701- $0 $0 $1,436,000 $0 $0 $0 $0 $1,436,000
01 Wagon Trail
Road (South of
Fite to Mary's
Creek)
DR27 DR2702-Fite So $0 $850,000 $7,071,000 $0 $0 $0 $7,921,000
02 Road Drainage
(Harkey to
McLean)
DR27 D R2703 - So $0 $580,000 $6,695,000 $0 SO $0 $7,275,000
03 Tranquility
Lakes
Historical
Budgeted
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
Total
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 43
Drainage
Project No. /
Category
Detention
Pump Station
Rehabilitation
and Generator
Total Summary of $8,761,839 $6,517,157 $6,202,700 $3,766,000 $ $ $ $55,247,696
Requests
Historical
Budgeted
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
Total
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 44
DR1904 - West Lea Subdivision Drainage Improvements
DR1904 - West Lea Subdivision Drainage
Improvements
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number DR1904
Request Groups Drainage
Estimated Start 10/1/2020
Date
ar
Description
Located in the West Lea Subdivision, bounded by Manvel Road, Bailey Road, BDD4 Ditch, and Mary's Creek. Drainage
improvements will require removal and replacement of driveway culverts, upsizing of culverts, widening and re -grading of
bar ditches. The project will also include an asphalt overlay of the intersections to repair damage due to the drainage
improvements. The project will also require the re -grading of the ditch along Manvel Road all the way to Mary's Creek outfall
and deepening the area drainage ditch along the eastern perimeter to Mary's Creek.
Details
Strategic Priority: Sustainable Infrastructure Impact on Operating Budget: Yes
Type of Project: Improvement
Project Justification
Homes in this neighborhood have a history of repetitive loss. Concerns related to drainage have been expressed by the
residents on several occasions. In addition, the City staff have participated in several HOA meetings to understand the
drainage concerns. The majority of the subdivision is located within the FIRM 100 -year floodplain. Subdivision drainage is
currently severed by an inadequate open ditch system. BDD4 is participating in this area by expanding the detention basin
on the east side of the subdivision and widening Mary's Creek from FM1128 to Magnolia.
Explain & Identify Type of Other Sources:
2020 PIB $600,000
2021 PIB $1,000,000
2022 2007 GO $505,000
2022 2019 GO $5,037,000
2024A CO $1,643,663
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 45
DR1904 - West Lea Subdivision Drainage Improvements
$395,344 from fund balance 506
$409,062 transferred from DR2201
Capital Cost
$10.9M
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$10.9M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Prelim. Engineering Report
Contingency
Land/Right of Way
Total
$10,150,000
$575,000
$201,904
$500
$0,927,404
$0
$0
$1
$0
$
$0 $10,150,000
$0 $575,000
$0 $201,905
$0 $500
$ $0,927,405
Funding Sources
$10.9M
FY2026 Budget
Total Budget (all years) Project Total (to date)
$10.9M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
2007 & 2019 GO Bonds
Other Funding Sources
Certificates of Obligation
Total
$7,142,000
$2,141,742
$1,643,662
$0,927,404
$0
$0
$1
$
$0 $7,142,000
$0 $2,141,742
$0 $1,643,663
$ $0,927,405
Operational Costs
$2.6K
FY2026 Budget
$2.73K
Total Budget (all years)
$8.6K
Project Total (to date)
$11.2K
Detailed Breakdown
Category
Historical FY2026 FY2027 FY2028
Budgeted Requested Requested Requested Future Budgeted
Total
Operations & Maintenance
Total
$2,599 $2,729
$,599 $,729
$2,865 $3,008
$,865 $,008
$0
9
$11,201
$1,201
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 46
DR1905 - Hickory Slough Regional Detention Pond
DR1905 - Hickory Slough Regional Detention
Pond
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 100 - Administration
Type Capital Improvement
Project Number DR1905
Request Groups Drainage
Estimated Start 10/1/2025
Date
"rc
G yn{. G M•a. •-4a
Description
Excavate and provide regional detention to an area that needs stormwater mitigation. The City and BDD4 partnered to
purchase and excavate the property to its ultimate capacity and will provide approximately 230 acre-feet of storage along the
Hickory Slough located between Hatfield Road and Woody Road.
Images
DR1905
Details
Strategic Priority: Sustainable Infrastructure Impact on Operating Budget: Yes
Type of Project: Improvement
Project Justification
The Hickory Slough area needs conveyance and detention capacity as defined in the City/BDD4 Master Drainage Plan. The
Master Drainage Plan calls for approximately 3,800 -acre feet of detention to provide a 100-yr level of service for the entire
stretch of Hickory Slough. The project will provide approximately 6% of this need detention. The Hickory Slough currently has
limited capacity due to the channel width, depth and lack of detention. This is a 50/50 partnership between BDD4 and the
City for land acquisition, design, construction, and maintenance.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 47
DR1905 - Hickory Slough Regional Detention Pond
Explain & Identify Type of Other Sources:
$1M transferred from DL Smith (DR2002), $600K received from BDD4, and $25K from fund balance.
2023 A CO - $697,438
2023 PIB 2007 GO $2,302,562
Capital Cost
$4.62M
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$4.63M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Land/Right of Way
Contingency
Design/Surveying
Total
$2,800,000
$1,600,000
$199,999
$25,000
$,624,999
$0
$0
$1
$0
$
$0 82,800,000
$0 $1,600,000
$0 $200,000
$0 $25,000
9 $,625,000
Funding Sources
$4.62M
FY2026 Budget
Total Budget (all years) Project Total (to date)
$4.63M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
2007 & 2019 GO Bonds
Other Funding Sources
Certificates of Obligation
Total
$2,302,562
$1,624,999
$697,438
$,624,999
$0 $2,302,562
$0 $1,625,000
$0 $697,438
$ $,625,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 48
DR2102 - Brookland Acres Drainage Improvements
DR2102 - Brookland Acres Drainage
Improvements
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 345 - Capital Projects
Type Capital Improvement
Project Number DR2102
Request Groups Drainage
Estimated Start 10/1/2024
Date
r
Description
Brookland Acres subdivision is located north of Hickory Slough between Mykawa Road and Woody Rd. The project will
include regrading of the ditch as well as replacement of culverts and driveways along the right of way of Scott Ln
approximately 4,100 LF and Woody Street approximately 4,500 LF. The regrading of the ditch along with properly sized
culverts will improve conveyance capacity of the ditches which will help reduce the flooding in Brookland Acres subdivision.
The subdivision lies within the CDBG target area and was identified in the Harvey Drainage Assessment Report for a local
drainage improvement project.
Images
DR2102
Details
Strategic Priority: Safe Community Impact on Operating Budget: No
Type of Project: Improvement
Project Justification
The project will help reduce the flooding of homes and streets by improving the conveyance capacity of ditches and
removing storm water to Hickory Slough.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 49
DR2102 - Brookland Acres Drainage Improvements
Explain & Identify Type of Other Sources:
GLO Grant funding awarded.
Capital Cost
$810K
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$810K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Design/Surveying
Total
$699,378 $1
$110,827 $0
810,205 $
$0 $699,379
$0 $110,827
9 810,206
Funding Sources
$810K
FY2026 Budget
Total Budget (all years) Project Total (to date)
$810K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Other Funding Sources
Total
$810,205 $1
810,205 $
$0
9
$810,206
810,206
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 50
DR2103 - Garden Road/O'Day Road Drainage Improvements
DR2103 - Garden Road/O'Day Road Drainage
Improvements
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 345 - Capital Projects
Type Capital Improvement
Project Number DR2103
Request Groups Drainage
Estimated Start 10/1/2024
Date
Frroxs•o9Q
lelp¢ Dry
a�+kxuagrrbes�.n
Description
Drainage ditch improvement along Garden Road and O'Day Road from Broadway Street to approximately 5,700' North. The
project will include regrading of the ditch as well as replacement of culverts and driveways within the road right of way. The
regrading of the ditch along with properly sized culverts will improve the conveyance capacity of the ditches, which will help
reduce the flooding in the neighborhoods located between Garden Rd and O'Day Rd. The area was identified in the Harvey
Drainage Assessment Report for a local drainage improvement project.
Images
DR2103
Details
Strategic Priority: Safe Community Impact on Operating Budget: No
Type of Project: Improvement
Project Justification
The project will help reduce the flooding of homes and streets by improving the conveyance capacity of ditches and
removing storm water to Hickory Slough.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 51
DR2103 - Garden Road/O'Day Road Drainage Improvements
Explain & Identify Type of Other Sources:
GLO Grant funding awarded.
Capital Cost
$2.13 M
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$2.13M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Design/Surveying
Total
$1,982,736 $1
$144,067 $0
$,126,803 $
$0 $1,982,737
$0 $144,067
g $,126,804
Funding Sources
$2.13 M
FY2026 Budget
Total Budget (all years) Project Total (to date)
$2.13 M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Other Funding Sources
Total
$2,126,803 $1
$,126,803 $
$0 $2,126,804
9 $,126,804
in FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 52
DR2104 - Woody Road Drainage Improvements
DR2104 - Woody Road Drainage
Improvements
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 345 - Capital Projects
Type Capital Improvement
Project Number DR2104
Request Groups Drainage
Estimated Start 10/1/2024
Date
Description
Drainage ditch improvement along Woody Road approximately 2,700 LF between Broadway Street and Orange Street. The
project will include regrading of the ditch as well as replacement of culverts and driveways within the road right of way. The
regrading of the ditch along with properly sized culverts will improve conveyance capacity of the ditches which will help
reduce the flooding in Mimosa Acre Subdivision and Corrigan North Subdivision. The area was identified in the Harvey
Drainage Assessment Report for a local drainage improvement project.
Images
DR2104
Details
Strategic Priority: Safe Community Impact on Operating Budget: No
Type of Project: Improvement
Project Justification
The project will help reduce the flooding of homes and streets by improving the conveyance capacity of ditches and
removing storm water to the storm sewer system along Orange Street.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 53
DR2104 - Woody Road Drainage Improvements
Explain & Identify Type of Other Sources:
GLO Grant funding awarded.
Capital Cost
$272 K
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$272 K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Design/Surveying
Total
$240,002 $1
$32,178 $0
$72,180 $
$0 $240,003
$0 $32,178
$ $72,181
Funding Sources
$272 K
FY2026 Budget
Total Budget (all years) Project Total (to date)
$272 K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Other Funding Sources
Total
$272,180 $1
$72,180 $
$0
9
$272,181
$72,181
in FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 54
DR2301 - Hickory Slough Sportsplex Detention Pond Ph 2
DR2301 - Hickory Slough Sportsplex
Detention Pond Ph 2
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 312 - Drainage
Type Capital Improvement
Project Number DR2301
Request Groups Drainage
Estimated Start 10/1/2025
Date
7600 Hughes Ranch Road
9
.od
5\•i. • Liu+5. 7%,
Description
This project consists of the construction of the final phase of the detention pond for Hickory Slough, including the final build
out of the storm water lift station and weir structure. The pond provides for an additional 95 -acre-feet of detention. The
detention pond basin floor is designed to match the existing layout for the future construction of 6 sports fields (2
multipurpose and 4 soccer) and an expanded parking area, plus construction of back slope swales and drains, and
established turf for erosion control.
Images
DR2301
Details
Strategic Priority: Sustainable Infrastructure Impact on Operating Budget: Yes
Type of Project: New Construction
Project Justification
The pond will provide an additional 95 -acre-feet of detention, for a total of 248 -acre-feet of detention, to mitigate extreme
weather events that have historically flooded the area. This pond will serve current and future City projects in addition to
providing mitigation of localized events that adversely impact the Hickory Slough.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 55
DR2301 - Hickory Slough Sportsplex Detention Pond Ph 2
Explain & Identify Type of Other Sources:
2023 PIB 2019 GO $499,000
2O24PIB 2019 GO $3,761,000
Capital Cost
$4.26M
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$4.26M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$3,139,999
$628,000
$492,000
$,259,999
$1
$0
$0
$0 $3,140,000
$0 $628,000
$0 $492,000
9 $,260,000
Funding Sources
$4.26M
FY2026 Budget
Total Budget (all years) Project Total (to date)
$4.26M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
2007 & 2019 GO Bonds
Total
$4,259,999
$,259,999
$0
9
$4,260,000
$,260,000
Operational Costs
FY2026 Budget
$0
Total Budget (all years) Project Total
$0 $0
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Capital Outlay
Operations & Maintenance
Personnel Services
Total
SO $0
$0 $0
$0 $0
0 0
$o $0
$0 $0
$0 $0
0 0
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 56
DR2303 - Master Drainage Plan Update
DR2303 - Master Drainage Plan Update
Overview
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number DR2303
Request Groups Drainage
Estimated Start 10/1/2025
Date
Project Location
Description
The Master Drainage Plan update will include the use of Atlas 14 rainfall data and a 2D modeling approach consistent with
the Harris County Flood Control District (HCFCD) MaapNext project to evaluate various creeks, ditches, flooding potential of
neighborhoods and recommend mitigation measures which may include long-term and short-term drainage capital
improvement projects. The scope will also include the update to section 5 of the Engineering Drainage Criteria Manual
(EDCM).
Images
iie
DR2303
Details
Strategic Priority: Safe Community Impact on Operating Budget: No
Type of Project: Improvement
Project Justification
The Master Drainage Plan is scheduled to be updated at a five-year interval. New rainfall data issued by NOAA, Atlas 14, has
shown a significant increase in the depth of rainfall, which will ultimately change the basis of the hydrologic and hydraulic
assumptions used to prepare flood map and CIP drainage recommendations in MDP 2019. Historically, the MDP has been
considered to be a high-level drainage study to assess the capacity of ditches, bayous and recommend drainage
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 57
DR2303 - Master Drainage Plan Update
improvement projects, but with the use of new 2D hydraulic modeling, the MDP will also be able to recommend small
capital drainage improvements at a neighborhood level.
Capital Cost
$765K
FY2026 Budget
$435K
Total Budget (all years) Project Total (to date)
$435K $1.2M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Design/Surveying
Total
$765,000
$65,000
$435,000
$35,000
$0
0
$1,200,000
$,200,000
Funding Sources
$765K
FY2026 Budget
$435K
Total Budget (all years)
$435K
Project Total (to date)
$1.2M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
PEDC
General Revenue -Cash
Other Funding Sources
Total
$0
$435,000
$330,000
$65,000
$435,000
$0
$0
$35,000
$0 $435,000
$0 $435,000
$0 $330,000
0 $,200,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 58
DR2304 - Hickory Slough Detention Storm Water Pump Station Generator
DR2304 - Hickory Slough Detention Storm
Water Pump Station Generator
Overview
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number DR2304
Request Groups Drainage
Estimated Start 10/1/2022
Date
Project Location
Amy Coykendall, CIP Coordinator Hughes Ranch Road
99
Description
Hickory Slough Pump Station is located in a critical detention pond that requires a natural gas permanent backup generator
with automatic transfer switch during times of power loss.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on Operating Budget: Yes
Type of Project: Improvement
Project Justification
Due to the critical nature of this storm water pump station, it will require an alternate power source in the event of loss of line
power. The City operates 6 storm water pump stations at regional detention facilities. Hickory Slough is the second of four
facilities needing back-up power to provide needed stormwater pumping to protect a large service area against flooding
during emergency events such as Hurricane Harvey.
Explain & Identify Type of Other Sources:
2023A CO $110,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 59
DR2304 - Hickory Slough Detention Storm Water Pump Station Generator
2024A CO $110,000
Capital Cost
$932 K
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$932K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$710,000
$111,999
$110,000
831,999
SO
Si
$0
$0 $710,000
$0 $112,000
$0 $110,000
0 832,000
Funding Sources
$932 K
FY2026 Budget
Total Budget (all years) Project Total (to date)
$932K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Certificates of Obligation
Total
$931,999
831,999
$0 $932,000
8 $32,000
Operational Costs
FY2026 Budget
$9.1K
Total Budget (all years)
$38.8K
Project Total
$38.8K
Detailed Breakdown
Category
Historical FY2026 FY2027 FY2028 FY2029 Future
Budgeted Requested Requested Requested Requested Budgeted
Total
Personnel Services $0 $7,432 $7,729 $8,038 $8,360 $0 831,559
Operations&Maintenance So $1,670 $1,754 $1,842 $1,934 $0 $7,200
Total 8 8,102 8,483 8,880 $0,294 0 $8,759
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 60
DR2305 - Veterans Drainage Improvements
DR2305 - Veterans Drainage Improvements
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator Centennial
Department 312 - Drainage
Type Capital Improvement
Project Number DR2305
Request Groups Drainage
Estimated Start 10/1/2025
Date
LZINIE
Description
The project will encompass the installation of an underground storm water conveyance system and replacing the roadside
ditches. This will connect to the storm water system that was installed with the Walnut Road construction project to Mary's
Creek via an underground conveyance system. The project will include the acquisition of a parcel at the northeast corner of
Veterans Drive and Mary's Creek, mill and overlay of existing asphalt pavement, installing approximately 3,000 feet of storm
water drainage pipe and converting the system from a roadside ditch to an underground system with shallow swales. The
storm water system will be sized to convey the flows per the Engineering Design Criteria Manual (EDCM) requirements and
have the capacity for the future expansion of Veteran's Road to 4 lanes.
Images
DR2305
Details
Strategic Priority: Sustainable Infrastructure Impact on Operating Budget: No
Type of Project: Improvement
Project Justification
The area served by the Walnut Road system experiences localized flooding during intense rain events. During the installation
of the stormwater system, the underground pipeline was installed in the ultimate flowline in preparation for a pipeline down
Veterans Road. The Walnut Road underground system is about 2 feet lower than the Veterans Road roadside ditch system.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 61
DR2305 - Veterans Drainage Improvements
This causes water to remain in the system and restricts capacity and conveyance. A preliminary Engineering Report with
recommended drainage improvements has been prepared for the project area.
Explain & Identify Type of Other Sources:
2024 PIB 2023 GO $1,570,000
Capital Cost
$2.19 M
FY2026 Budget
$9.14M
Total Budget (all years) Project Total (to date)
$9.14M $11.3 M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Land/Right of Way
Total
$0 $8,130,000
$1,500,000 $1,014,146
$670,754 $0
$15,100 $0
$,185,854 9,144,146
$0 $8,130,000
$0 $2,514,146
$0 $670,754
$0 $15,100
9 $1,330,000
Funding Sources
$2.19 M
FY2026 Budget
$9.14M
Total Budget (all years) Project Total (to date)
$9.14M $11.3 M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
2023 General Obligation
Bonds
Certificates of Obligation
Total
$2,185,854 $8,794,146
$0 $350,000
2,185,854 9,144,146
$0 $10,980,000
$0 $350,000
9 $1,330,000
in FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 62
DR2306 - Longwood Park (Roadside Ditch and Culvert)
DR2306 - Longwood Park (Roadside Ditch
and Culvert)
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator Longwood Drive
Department 312 - Drainage
Type Capital Improvement
Project Number DR2306
Request Groups Drainage
Estimated Start 10/1/2025
Date
r,
Ar.rmma
car
Description
The project area is in the Longwood Park subdivision, which is bounded by Mary's Creek on the south, Clear Creek on the
north, the city limit on the east, and Longwood Drive on the west. Drainage improvements for the subdivision will require the
removal/replacement of driveways, driveway culverts, utility adjustment, and regrading of the roadside ditches to improve
the drainage conveyance. The project will also include mills and overlay of existing asphalt pavement within the project limit.
The drainage system will be upgraded to meet the current EDCM drainage standards.
Images
DR2306
Details
Strategic Priority: Sustainable Infrastructure Impact on Operating Budget: Yes
Type of Project: Improvement
Project Justification
This is an older neighborhood with a subdivision plat date of 1964. Several homes in the area have a history of repetitive
flooding, even though only a portion of the subdivision is in the 100 -year floodplain. Undersized culverts, poorly functioning
drainage ditches, and the age of infrastructure are found to be the main causes of the flooding of the neighborhood. Several
homes in the neighborhood experienced flooding during Hurricane Harvey. Flooding of homes was also observed more
elk FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 63
DR2306 - Longwood Park (Roadside Ditch and Culvert)
recently during Tropical Storm Beta. A preliminary Engineering Report with recommended drainage improvements has
been prepared for the project area.
Explain & Identify Type of Other Sources:
2024 PIB 2023 GO $660,000
Capital Cost
$660K
FY2026 Budget
$8.48M
Total Budget (all years) Project Total (to date)
$8.48M $9.14M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
S0 $8,000,000
$120,000 $480,000
$540,000 $0
860,000 8,480,000
$0 $8,000,000
$0 $600,000
$0 $540,000
8 8,140,000
Funding Sources
$660K
FY2026 Budget
Total Budget (all years) Project Total (to date)
$8.48M $8.48M $9.14M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
2023 General Obligation
Bonds
Total
$660,000 $8,480,000
860,000 8,480,000
$0 $9,140,000
8 8,140,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 64
DR2307 - Southwest Quadrant of Old Town (McLean to SH35 South of Broadway)
DR2307 - Southwest Quadrant of Old Town
(McLean to SH35 South of Broadway)
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 312 - Drainage
Type Capital Improvement
Project Number DR2307
Request Groups Drainage
Estimated Start 10/1/2025
Date
East Walnut Street
ulcue
tr
Description
The project area, located in the Old Town area, is bound by Broadway Street on the North, Walnut St on the South, McLean St
on the West, and the Railroad tracks on the East. Drainage improvements for the subdivision will require the
removal/replacement of driveways, sidewalks, and driveway culverts, utility adjustments, and the regrading of the roadside
ditches to improve the drainage conveyance. The project will also include mill and overlay of existing asphalt pavement
within the project limit. The drainage system will be upgraded to meet the current EDCM drainage standards.
Images
DR2307
Details
Strategic Priority: Sustainable Infrastructure Impact on Operating Budget: No
Type of Project: Improvement
Project Justification
The project area, located in the Old Town area, is bounded by Broadway Street on the North, Walnut St on the South, McLean
St on the West, and the Railroad tracks on the East. Drainage improvements for the subdivision will require the
removal/replacement of driveways, sidewalks, and driveway culverts, utility adjustments, and the regrading of the roadside
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 65
DR2307 - Southwest Quadrant of Old Town (McLean to SH35 South of Broadway)
ditches to improve the drainage conveyance. The project will also include mill and overlay of existing asphalt pavement
within the project limit. The drainage system will be upgraded to meet the current EDCM drainage standards.
Explain & Identify Type of Other Sources:
2024 PIB 2023 GO $1,131,000
Capital Cost
$835K
FY2026 Budget
$9.41M
Total Budget (all years) Project Total (to date)
$9.41M $10.2M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Design/Surveying
Contingency
Total
$0 $8,900,000
$835,000 $0
$0 $508,000
$35,000 9,408,000
$0 $8,900,000
$0 $835,000
$0 $508,000
$ $0,243,000
Funding Sources
$1.13M
FY2026 Budget
$9.11M
Total Budget (all years)
$9.11M
Project Total (to date)
$10.2M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
2023 General Obligation
Bonds
Certificates of Obligation
Total
$1,131,000 $7,812,000
$0 $1,300,000
$,131,000 9,112,000
$0 $8,943,000
$0 $1,300,000
$ $0,243,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 66
DR2401 - Shady Crest and Creek View Subdivision Drainage Improvement
DR2401 - Shady Crest and Creek View
Subdivision Drainage Improvement
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 312 - Drainage
Type Capital Improvement
Project Number DR2401
Request Groups Drainage
Estimated Start 10/1/2025
Date
Description
The project area, located in Creekview Subdivision and Shadycrest Subdivision, is generally bounded by FM 518 (Broadway),
Longherridge Dr., Misty Ln., Redwood Grove St. and Pearland Parkway, with Mary's Creek splitting the subdivisions into two
sections. Drainage improvements for the subdivisions will require the removal/replacement of driveways, sidewalks, and
driveway culverts, utility adjustment, and the regrading of the roadside ditches to improve the drainage conveyance. The
project will also include mill and overlay of existing asphalt pavement within the project limit. The drainage system will be
upgraded to meet the current EDCM drainage standards.
Images
DR2401
Details
Type of Project: Improvement Impact on Operating Budget: No
Project Justification
This is an older neighborhood with a subdivision plat date of 1955. Several homes in the area have a history of repetitive
flooding and the area is in a 500 -year floodplain. Flooding has been associated with undersized culverts and poorly
functioning ditch conveyances. The area was not identified in the Hurricane Harvey Drainage Assessment Report but did
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 67
DR2401 - Shady Crest and Creek View Subdivision Drainage Improvement
experience roadway and structure flooding. A preliminary Engineering Report with recommended drainage improvements
has been prepared for the project area.
Explain & Identify Type of Other Sources:
2024 PIB 2023 GO $1,828,000
Capital Cost
$1.53 M
FY2026 Budget
$14.6 M
Total Budget (all years) Project Total (to date)
$14.6M $16.1 M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0 $12,650,000
$230,000 $1,900,000
$1,300,000 $0
$,530,000 $4,550,000
$0 $12,650,000
$0 $2,130,000
$0 $1,300,000
$ $6,080,000
Funding Sources
$1.83M
FY2026 Budget
$14.3 M
Total Budget (all years)
$14.3 M
Project Total (to date)
$16.1 M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
2023 General Obligation
Bonds
Certificates of Obligation
Total
$1,828,000 $12,550,000
$0 $1,702,000
$,828,000 $4,252,000
$0 $14,378,000
$0 $1,702,000
$ $6,080,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 68
DR2402 - Hickory Creek Subdivision Drainage Improvement
DR2402 - Hickory Creek Subdivision
Drainage Improvement
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 312 - Drainage
Type Capital Improvement
Project Number DR2402
Request Groups Drainage
Estimated Start 10/1/2025
Date
P
Description
The project area, located in the northeastern part of the city, is bounded by Garden Road on the West, Hickory Slough on the
North, Oday Rd on the East, and Dublin Ln on the South. Drainage improvements for the subdivision will require the
removal/replacement of driveways, utility adjustment, driveway culverts, and the regrading of the roadside ditches to
improve the drainage conveyance. This project will complement the earlier phase of the GLO-funded Garden Road/O'Day
Road ditch improvement project. The project will also include milling and overlaying of existing asphalt pavement within the
project limit. The drainage system will be upgraded to meet the current EDCM drainage standards.
Images
DR2402
Details
Type of Project: Improvement
Impact on Operating Budget: No
Project Justification
The project area includes the Hickory Creek Subdivision located on the south side of Hickory Slough between Garden Rd and
O'day Road. It is an old subdivision with a substandard drainage system and a history of flooding dating back to 1965. Homes
in this neighborhood were flooded during Hurricane Harvey. The subdivision is located in a FEMA100-year/500-year
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 69
DR2402 - Hickory Creek Subdivision Drainage Improvement
floodplain. Existing streets, drainage ditches and the majority of homes were built prior to the adoption of engineering
criteria and do not meet the current engineering guidelines.
Explain & Identify Type of Other Sources:
GLO Funded
Capital Cost
$4.73M
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$4.73M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Total
$4,029,999
$700,000
$,729,999
si
$0
$0 $4,030,000
$0 $700,000
S $,730,000
Funding Sources
$5.44 M
FY2026 Budget
Total Budget (all years) Project Total (to date)
$5.44M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Other Funding Sources
Total
$5,439,999
5,439,999
$1
$
$0
e
$5,440,000
5,440,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 70
DR2403 - Garden Acres Subdivision Drainage Improvements
DR2403 - Garden Acres Subdivision Drainage
Improvements
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 312 - Drainage
Type Capital Improvement
Project Number DR2403
Request Groups Drainage
Estimated Start 10/1/2025
Date
1.12{.. GI%
4 yn{• G M• P. -4a
Description
The project area, located in the northeastern part of the city, is bounded by Garden Road on the west, Hickory Creek
subdivisions on the north, Oday Rd on the east, and Broadway St on the south. Drainage improvements for the subdivision
will require the removal/replacement of driveways, utility adjustment, driveway culverts, and the regrading of the roadside
ditches to improve the drainage conveyance. This project will complement the earlier phase of the GLO-funded Garden
Road/O'Day Road ditch improvement project. The project will also include milling and overlaying of existing asphalt
pavement within the project limit. The drainage system will be upgraded to meet the current EDCM drainage standards.
Images
DR2403
Details
Strategic Priority: Sustainable Infrastructure Impact on Operating Budget: No
Type of Project: Improvement
Project Justification
The project area includes the Hickory Creek Subdivision located on the north side of FM 518 between Garden Rd and O'day
Road. It is an old subdivision with a substandard drainage system and a history of flooding dating back to 1965. Homes in
both neighborhoods have a repetitive flood loss history despite being located outside the FEMA 100 -year floodplain. Existing
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 71
DR2403 - Garden Acres Subdivision Drainage Improvements
streets, drainage ditches and the majority of homes were built prior to the adoption of engineering criteria and do not meet
the current engineering guidelines.
Capital Cost
$561 K
FY2026 Budget
$3.53 M
Total Budget (all years) Project Total (to date)
$3.53 M $4.09 M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0 $3,030,000
$106,000 $500,000
$455,000 $0
$61,000 $,530,000
$0 $3,030,000
$0 $606,000
$0 $455,000
$ $,091,000
Funding Sources
$561 K
FY2026 Budget
$3.53 M
Total Budget (all years)
$3.53 M
Project Total (to date)
$4.09 M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Other Funding Sources
Total
$561,000
$61,000
$3,530,000
$,530,000
$0 $4,091,000
$ $,091,000
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 72
DR2407 - Herridge Miller/Brookland Acre Subdivision Drainage Improvement
DR2407 - Herridge Miller/Brookland Acre
Subdivision Drainage Improvement
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 312 - Drainage
Type Capital Improvement
Project Number DR2407
Request Groups Drainage
Estimated Start 10/1/2025
Date
Fwalmaid
Description
The project area, located in the Herridge Miller and Brookland Acre subdivisions, is bounded by Hatfield Road on the West,
City Limits on the north, Mykawa on the East, and McHard Road on the South. Drainage improvements for the subdivision
will require the removal/replacement of driveways, utility adjustment, driveway culverts, and the regrading of the roadside
ditches to improve the drainage conveyance. This project will complement the earlier phase of the GLO-funded Brookland
Acre drainage improvement project. The project will also include mills and overlay of existing asphalt pavement within the
project limit. The drainage system will be upgraded to meet the current EDCM drainage standards.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on Operating Budget: No
Type of Project: Improvement
Project Justification
The project area includes Herridge Miller and Brookland Acre subdivisions. The project site is located on the north side of
Hickory Slough between Mykawa Road and Hatfield Road. It is an old subdivision with a substandard drainage system and a
history of flooding dating back to 1963. The project site is located in a FEMA 100 -year flood plain and the homes in both
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 73
DR2407 - Herridge Miller/Brookland Acre Subdivision Drainage Improvement
neighborhoods have a repetitive flood loss history. Existing streets, drainage ditches and the majority of homes were built
prior to the adoption of engineering criteria and do not meet the current engineering guidelines.
Explain & Identify Type of Other Sources:
GLO Funded
Capital Cost
$1.31M
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$1.31M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Total
$1,109,999 $1
$200,000 $0
$,309,999 $
$0 $1,110,000
$0 $200,000
A $,310,000
Funding Sources
$1.5M
FY2026 Budget
Total Budget (all years) Project Total (to date)
$1.5M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Other Funding Sources
Total
$1,498,999
$,498,999
$1
$
$0 $1,499,000
$ $,499,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 74
DR2408 - Hickory Slough Embankment Slope Replacement
DR2408 - Hickory Slough Embankment
Slope Replacement
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 312 - Drainage
Type Capital Improvement
Project Number DR2408
Request Groups Drainage
Estimated Start 10/1/2025
Date
Suburban Garden Road
9
-,MC,--{4
uc Cm
Description
Approximately 1,650 square feet of concrete cladding along the east side of the embankment to Hickory Slough at its
intersection with Garden Road, located adjacent to the bridge on Garden Road, has separated from its previous attachment
to the roadway. The embankment slope is the subject of possible erosion damage to the sub -layer, and the weight of the
concrete structure is causing it to fall into the Slough. Removal and replacement of the embankment slope is necessary,
which may involve a potential redesign of the methodology used to secure this portion of cladding.
Images
DR2408
Details
Type of Project: Improvement
Impact on Operating Budget: No
Project Justification
The damaged embankment slope poses a critical threat to the conveyance of drainage within Hickory Slough, which could
result in damming of the drainage channel, preventing flood water from flowing downstream and causing overflow of the
banks along Hickory Slough upstream. In either case, the potential for flood damage to residential properties and further
damage to the drainage channel could occur. The damaged slope also has the potential to threaten the structural integrity
of the adjacent bridge on Garden Road if it were to give way.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 75
DR2408 - Hickory Slough Embankment Slope Replacement
Explain & Identify Type of Other Sources:
GLO Funded
Capital Cost
$638K
FY2026 Budget
Total Budget (all years) Project Total (to date)
$638K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Total
$531,999 $1
$106,400 $0
638,399 $
$0 $532,000
$0 $106,400
6 638,400
Funding Sources
$638K
FY2026 Budget
Total Budget (all years) Project Total (to date)
$638K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Other Funding Sources
Total
$638,399
638,399
$0 $638,400
6 638,400
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 76
DR2410 - Shadow Creek Ranch - Ocean Point Ct 100 Year Overflow at Cul-De-Sac
DR2410 - Shadow Creek Ranch - Ocean Point
Ct 100 Year Overflow at Cul-De-Sac
Overview
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number DR2410
Request Groups Drainage
Estimated Start 10/1/2025
Date
Project Location
Amy Coykendall, CIP Coordinator Ocean Point Court
YRq,ly..•
,-:.1
.4493.
Description
Several homes in the Shadow Creek Ranch Subdivision in the vicinity of Ocean Point Ct received floodwater during Hurricane
Harvey. The Ocean Point Ct. cul-de-sac worked as an extreme event sheet flow path during Hurricane Harvey based on the
review of a publicly available YouTube drone video. A review of the depth of flooding in homes (up to 6") and a recorded
drawing of the subdivision indicated that the removal of the curb and grading of the area from the end of the cul-de-sac to
the Clear Creek Relief ditch (construction of extreme event structure) will be helpful to reduce the flooding of the homes in
the area.
Images
DR2410
Details
Strategic Priority: Sustainable Infrastructure Impact on Operating Budget: No
Type of Project: Improvement
Project Justification
The area is located outside 100 -year and 500 -year floodplains with a properly functioning drainage system. The proposed
project will improve extreme event conveyance and reduce flooding of the properties during extreme storm events such as
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 77
DR2410 - Shadow Creek Ranch - Ocean Point Ct 100 Year Overflow at Cul-De-Sac
Hurricane Harvey. A preliminary Engineering Report was not prepared for this project as it is a small project consisting of the
construction of one extreme event structure.
Explain & Identify Type of Other Sources:
2O24PIB 2023 GO $100,000
Capital Cost
$100K
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$100K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Design/Surveying
Contingency
Total
$70,000
$21,999
$8,000
$9,999
So
$1
$o
$0 570,000
$0 522,000
$0 $8,000
s $00,000
Funding Sources
$100K
FY2026 Budget
Total Budget (all years) Project Total (to date)
$100K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
2023 General Obligation
Bonds
Total
$99,999 $1
$9,999 $
$0 $100,000
8 $00,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 78
DR2501 - Pine Hollow Drainage Improvements
DR2501 - Pine Hollow Drainage
Improvements
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator Pine Hollow Drive
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number DR2501
Request Groups Drainage
Estimated Start 10/1/2024
Date
Description
The Pine Hollow Subdivision is on the eastern side of the City, south of FM 518. The drainage project includes the
improvement of the drainage system from Pine Tree Dr. to Mary's Creek Bypass Channel, which includes the installation of
box culverts, storm pipes, and an additional outfall. The project was identified in Staffs Hurricane Harvey after action. The
drainage system will be upgraded to meet the current EDCM drainage standards. This project will also include land
acquisition for storm water detention to mitigate the potential storm water impact.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on Operating Budget: Yes
Type of Project: Improvement
Project Justification
Several homes in the area have a history of repetitive flooding, more specifically Pine Hollow Section 1-C, despite its location
outside a 100 -year floodplain. Homes along Pine Tree Dr., Pine Tree Ct., and Pine Forest Dr. were flooded during Hurricane
Harvey and other intense rainfall events. Based on the drainage study performed after the incident, the main reason for the
flooding of homes is reported to be an inefficient drainage system. The proposed drainage improvement project will reduce
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 79
DR2501 - Pine Hollow Drainage Improvements
the potential for flooding of residential homes. A preliminary Engineering Report with recommended drainage
improvements has been prepared for the project area.
Capital Cost
FY2026 Budget Total Budget (all years)
$1.48M $6.23M
Project Total
$6.23M
Detailed Breakdown
Category Historical Budgeted
FY2026 FY2027
Requested Requested
Future Budgeted Total
Construction
Contingency
Land/Right of Way
Design/Surveying
Total
$0
$0
$0
$0
6
$0 $3,650,000
$130,000 $1,095,000
$800,000 So
$550,000 $0
$,480,000 $,745,000
$0 $3,650,000
$0 $1,225,000
$0 $800,000
$0 $550,000
A 6,225,000
Funding Sources
FY2026 Budget
$1.48M
Total Budget (all years) Project Total
$6.23M $6.23M
Detailed Breakdown
Category Historical Budgeted
FY2026 FY2027
Requested Requested
Future Budgeted Total
2023 General Obligation
Bonds
Total
$0 $1,480,000 $4,745,000
6 $,480,000 $,745,000
$0 $6,225,000
6 6,225,000
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 80
DR2502 - Fite Rd Drainage Improvement (Cullen to Harkey)
DR2502 - Fite Rd Drainage Improvement
(Cullen to Harkey)
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator Fite Road
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number DR2502
Request Groups Drainage
Estimated Start 10/1/2024
Date
Description
The project area is located between Harkey Rd on the east and Cullen Pkwy on the west. Approximately 10,500 LF drainage
improvements for Fite Road also include drainage improvements along the west side of Manvel Rd to the Mary's Creek
outfall. The project will require the removal/replacement of driveways, driveway culverts, and the regrading of the roadside
ditches to improve the drainage conveyance. The project will also include mills and overlay of existing asphalt pavement
within the project limit. The project may require additional right-of-way (ROW) to install the proposed ditch. The drainage
system will be upgraded to meet the current EDCM drainage standards.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on Operating Budget: No
Type of Project: Improvement
Project Justification
The area is mostly located in 100 -year and 500 -year floodplains with poorly functioning ditch systems. The existing drainage
system is characterized by small, shallow under -maintained roadside ditches with years of uncoordinated driveway culvert
installations. During heavy rain events, Fite Road holds water resulting from inefficient roadside ditch/culverts along the Fite
,r1 FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 81
DR2502 - Fite Rd Drainage Improvement (Cullen to Harkey)
Road and the Manvel Rd Drainage system to the Mary's Creek outfall. The proposed improvement will reduce nuisance
flooding along Fite Rd and help to reduce the flooding of property in Westchester Circle. A preliminary Engineering Report
with recommended drainage improvements has been prepared for the project area.
Capital Cost
FY2026 Budget
$3.15M
Total Budget (all years)
$10.1 M
Project Total
$10.1 M
Detailed Breakdown
Category Historical Budgeted
FY2026 FY2027
Requested Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Land/Right of Way
Total
$0
$0
$0
$0
e
$0
$526,000
$1,345,000
$1,280,000
$,151,000
$5,341,000
$1,602,300
$0
$0
8,943,300
$0 $5,341,000
$0 $2,128,300
$0 $1,345,000
$0 $1,280,000
e $0,094,300
Funding Sources
FY2026 Budget
$3.15M
Total Budget (all years) Project Total
$10.1M $10.1M
Detailed Breakdown
Category Historical Budgeted
FY2026 FY2027
Requested Requested
Future Budgeted Total
2023 General Obligation
Bonds
Total
$0 $3,151,000 $6,943,300
9 $,151,000 6,943,300
$0 $10,094,300
s $0,094,300
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 82
DR2503 - Harkey Road Drainage (Broadway to Mary's Creek)
DR2503 - Harkey Road Drainage (Broadway
to Mary's Creek)
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator Harkey Road
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number DR2503
Request Groups Drainage
Estimated Start 10/1/2024
Date
Description
The proposed project includes the improvement of the street, sidewalks and drainage of Harkey Road and will include the
removal of the existing two-lane asphalt roadway pavement, roadside ditches, and associated drainage culverts, utility
adjustment, and replacement with a new 4 -lane divided boulevard curb and gutter concrete roadway with underground
storm sewers. The roadway limits to be reconstructed and widened are from FM 518 to the existing Mary's Creek Bridge -
approximately 4,800 feet. This project will also include land acquisition for stormwater detention to mitigate the potential
stormwater impact, as well as replacement of 2,800 feet of fiber optic networking from FM518 at Harkey to Fire Station #2.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on Operating Budget: No
Type of Project: Improvement
Project Justification
This corridor experiences nuisance flooding along the roadway and into yards, swelling at cross streets. Repetitive flood loss
of Josephine Rd properties adjacent to Harkey Rd is associated with the poor drainage conveyance capacity of Harkey Road.
The drainage system along Harkey Rd is also causing a nuisance flooding situation in and around Harkey and Fite Rd
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 83
DR2503 - Harkey Road Drainage (Broadway to Mary's Creek)
intersection. In addition, Fire Station #2 ponding for an extended period was found to be caused by the Harkey Drainage
system. This flooding poses a traffic hazard for school traffic at Charleston Elementary. A preliminary Engineering Report with
recommended drainage improvements has been prepared for the project area.
Capital Cost
FY2026 Budget
$4.18M
Total Budget (all years)
$24.8M
Project Total
$24.8M
Detailed Breakdown
Category Historical Budgeted
FY2026 FY2027 Future Budgeted
Requested Requested
Total
Construction
Contingency
Design/Surveying
Land/Right of Way
Total
$0 $0 $15,888,000
$0 $258,000 $4,766,400
$0 $2,370,000 $0
$0 $1,550,000 $0
0 $,178,000 $0,654,400
$0 $15,888,000
$0 $5,024,400
$0 $2,370,000
$0 $1,550,000
$ $4,832,400
Funding Sources
FY2026 Budget
$4.18M
Total Budget (all years) Project Total
$24.8M $24.8M
Detailed Breakdown
Category Historical Budgeted
FY2026 FY2027 Future Budgeted
Requested Requested
Total
2023 General Obligation
Bonds
Certificates of Obligation
Total
$0 $4,178,000 $18,690,000
$0 $0 $1,964,400
$ $,178,000 $0,654,400
$0 $22,868,000
$0 $1,964,400
$ $4,832,400
Operational Costs
FY2026 Budget
$0
Total Budget (all years)
$33.1K
Project Total
$33.1K
Detailed Breakdown
Category Historical Budgeted
FY2028 FY2029
Requested Requested
Future Budgeted Total
Personnel Services
Operations & Maintenance
Total
$0
So
9
$15,804 $16,437
$442 $464
$6,246 $6,901
$0 $32,241
$0 8906
$ $3,147
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 84
DR2601 - Isla Dr., N Galveston, Cheryl Dr. Drainage Improvements
DR2601 - Isla Dr., N Galveston, Cheryl Dr.
Drainage Improvements
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator Cheryl Drive
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number DR2601
Request Groups Drainage
Estimated Start 10/1/2025
Date
Description
The proposed project includes the improvement of the street, sidewalks and drainage along Isla Dr., N Galveston St., and
Cheryl Dr. These roadways are located between Orange Street and Old Town Ditch. The project will include the removal of
the existing concrete road, asphalt roadway pavement, roadside ditches, and associated drainage culverts, utility adjustment,
and replacement with a City Standard concrete curb and gutter roadway with underground storm sewers.
Images
Details
DR2601
Strategic Priority: Sustainable Infrastructure Impact on Operating Budget: Yes
Type of Project: Improvement
Project Justification
Located in the old town site north of E Orange Street, on the west side of Old Alvin Road and east of SH 35, the drainage
system along N Galveston Rd, Isla Dr, and Cheryl Dr. is inefficiently functioning. The ditch system on Isla Dr. and N. Galveston
St. was converted to an underground storm system without proper engineering design and is undersized. Several homes
and streets were flooded during Hurricane Harvey. Engineering and Street Drainage have made several site visits to listen to
the residents' concerns related to the inefficient functioning drainage system and continuously elevated asphalt pavement
,r1 FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 85
DR2601 - Isla Dr., N Galveston, Cheryl Dr. Drainage Improvements
cross-section. A preliminary Engineering Report with recommended drainage improvements has been prepared for the
project area.
Capital Cost
FY2026 Budget
$704K
Total Budget (all years)
$5.41M
Project Total
$5.41M
Detailed Breakdown
Category
FY2026 FY2027
Historical Budgeted
Requested Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0 $0 $4,010,000
$0 $102,000 $700,000
$0 $602,000 $0
0 $04,000 $,710,000
$0 $4,010,000
$0 $802,000
$0 $602,000
0 5,414,000
Funding Sources
FY2026 Budget
$704K
Total Budget (all years)
$5.41M
Project Total
$5.41M
Detailed Breakdown
Category
Historical Budgeted FY2026 FY2027
Requested Requested
Future Budgeted Total
2023 General Obligation
Bonds
Total
$0 $704,000 $4,710,000
e $04,000 $,710,000
$0 $5,414,000
e 8,414,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 86
DR2602 - E. Plum Drainage (Old Alvin to Schlieder Dr)
DR26O2 - E. Plum Drainage (Old Alvin to
Schlieder Dr)
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator East Plum Street
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number DR2602
Request Groups Drainage
Estimated Start 10/1/2025
Date
Description
The project area is located between Old Alvin Rd and Schlieder Dr. along E Plum Street. Approximately 2000 LF drainage
improvements for the project limits will require the removal/replacement of driveways, driveway culverts, storm system,
inlets, utility adjustment, and regrading of the roadside ditches to improve the drainage conveyance. The project will also
include mills and overlay of existing asphalt pavement within the project limit. The drainage system will be upgraded to
meet the current EDCM drainage standards.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on Operating Budget: No
Type of Project: Improvement
Project Justification
The project area lies outside a 100 -year and 500 -year floodplain. The existing drainage system is undersized and functions
poorly. It appears that the north side ditch system was converted to an underground storm sewer without proper design. The
city received several calls from the residents of Linwood Oaks, Yupon Cir, and Briar Circle related to potential flooding. EPW
staff met with the residents and cleaned the storm system to help improve the drainage, but the storm system needs
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 87
DR2602 - E. Plum Drainage (Old Alvin to Schlieder Dr)
replacement as the storm sewer holds water due to inefficient design and construction. A preliminary Engineering Report
with recommended drainage improvements has been prepared for the project area.
Capital Cost
FY2026 Budget Total Budget (all years)
$290K $1.89M
Project Total
$1.89M
Detailed Breakdown
Category
FY2026 FY2027
Historical Budgeted
Requested Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0 $0 $1,400,000
$0 $80,000 $200,000
$0 $210,000 $0
9 $90,000 $,600,000
$0 $1,400,000
$0 $280,000
$0 $210,000
9 $,890,000
Funding Sources
FY2026 Budget
$290K
Total Budget (all years)
$1.89M
Project Total
$1.89M
Detailed Breakdown
Category
FY2026 FY2027
Historical Budgeted
Requested Requested
Future Budgeted Total
2023 General Obligation
Bonds
Total
$0 $290,000 $1,600,000
9 $90,000 $,600,000
S0 $1,890,000
9 $,890,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 88
DR2603 - Hatf eld Road Drainage (FM 518 to Hickory Slough)
DR2603 - Hatt Id Road Drainage (FM 518 to
Hickory Slough)
Overview
Request Owner Amy Coykendall, CIP Coordinator Hatfield Road
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number DR2603
Request Groups Drainage
Estimated Start 10/1/2025
Date
Project Location
mac,
Description
The project area is located between FM 518 and Hickory Slough along Hatfield Road. Approximately 6,600 LF drainage
improvements for Hatfield Rd. will require the removal/replacement of driveways, driveway culverts, storm system, inlets,
utility adjustment, and regrading of the roadside ditches to improve the drainage conveyance. The project will also include
mills and overlaying of existing asphalt pavement within the project limit. The drainage system will be upgraded to meet the
current EDCM drainage standards.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on Operating Budget: Yes
Type of Project: Improvement
Project Justification
The project site lies outside a 100 -year and 500 -year floodplain, but the roadside ditch system holds water for an extended
time after each rainfall event due to an inefficient drainage system. Hurricane Harvey's GIS dashboard indicates flooding of
the street as well as homes on Hatfield Road. A preliminary Engineering Report with recommended drainage improvements
has been prepared for the project area.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 89
DR2603 - Hatf eld Road Drainage (FM 518 to Hickory Slough)
Capital Cost
FY2026 Budget
$486K
Total Budget (all years)
$5.17M
Project Total
$5.17M
Detailed Breakdown
Category
Historical Budgeted FY2026 FY2027
Requested Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0 $0 $3,430,000
$0 $186,000 $1,029,000
$0 $300,000 $225,000
$ $86,000 $,684,000
$0 $3,430,000
$0 $1,215,000
So $525,000
$ 8,170,000
Funding Sources
FY2026 Budget Total Budget (all years)
$486K $5.17M
Project Total
$5.17M
Detailed Breakdown
Category
FY2026 FY2027
Historical Budgeted
Requested Requested
Future Budgeted Total
2023 General Obligation
Bonds
Total
$0 $486,000 $4,684,000
8 $86,000 $,684,000
$0 $5,170,000
8 8,170,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 90
DR2604 - Hatf eld Rd South Drainage
DR2604 - Hatti Id Rd South Drainage
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 312 - Drainage
Type Capital Improvement
Project Number DR2604
Request Groups Drainage
Estimated Start 10/1/2025
Date
Estimated 10/1/2029
Completion Date
Description
The project area is between Fite Road and Mary's Creek along Hatfield Road. Approximately 2,100 LF drainage improvements
for Hatfield Rd. will require the removal/replacement of driveways, driveway culverts, utility adjustment, and regrading of the
roadside ditches to improve the drainage conveyance. In addition, the east -west ditch between Hatfield Rd and Corrigan
Ditch should be re -graded. The project will also include a mill and overlay of existing asphalt pavement within the project
limit. The drainage system will be upgraded to meet the current EDCM drainage standards.
Images
kw.
DR2604
Details
Strategic Priority: Sustainable Infrastructure
Impact on Operating Budget: Yes
Type of Project: Improvement Estimated Project Life Span: 4 years
Project Justification
The project site lies in a 100 -year floodplain. The southeast side roadside ditch adjacent to Fite Rd holds water for an
extended time after each rainfall event due to an inefficient drainage system. There have been several complaints from the
residents about the ditch holding water and waiting several days for the water to evaporate. The proposed project will
improve conveyance and reduce flooding of the properties.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 91
DR2604 - Hatf eld Rd South Drainage
Capital Cost
FY2026 Budget
$1.28M
Total Budget (all years)
$1.28 M
Project Total
$1.28 M
Detailed Breakdown
Category
Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Equipment and Furniture
Land/Right of Way
Prelim. Engineering Report
Total
$0
$0
$o
$0
So
$0
0
$850,000
$255,000
$170,000
$0
$o
$o
$,275,000
$0 $850,000
$0 $255,000
$o $170,000
So $0
$0 S0
$0 $0
0 $,275,000
Funding Sources
FY2026 Budget
$1.28 M
Total Budget (all years)
$1.28 M
Project Total
$1.28 M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Certificates of Obligation
Other Funding Sources
PEDC
HGAC-TI P
TIRZ Reimbursable Debt
Unfunded Future GO Bond
Package
2023 General Obligation
Bonds
2007 & 2019 GO Bonds
General Revenue -Cash
Total
$0 $1,275,000
$0 $o
$0 $0
$0 $0
$0 SO
So So
so so
So
So
9
$0
$0
$,275,000
$0 $1,275,000
$0 $0
$o So
S0 $0
$0 $0
$0 $0
So So
$0 $0
$0 $0
0 $,275,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 92
DR2604 - Hatf eld Rd South Drainage
Operational Costs
FY2026 Budget
so
Total Budget (all years)
So
Project Total
So
Detailed Breakdown
Category Historical Budgeted
Future Budgeted Total
Capital Outlay
Operations & Maintenance
Personnel Services
Total
So
So
So
9
$o so
So So
So So
s S
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 93
DR2701 - Wagon Trail Road (South of Fite to Mary's Creek)
DR2701 - Wagon Trail Road (South of Fite to
Mary's Creek)
Overview
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number DR2701
Request Groups Drainage
Estimated Start 10/1/2026
Date
Project Location
Amy Coykendall, CIP Coordinator Wagon Trail Road
Description
The project area is located between South Fite Rd and Mary's Creek along Wagon Trail Rd. Approximately 2100 LF drainage
improvements for the project limits will require the removal/replacement of driveways, driveway culverts, and regrading of
the roadside ditches to improve the drainage conveyance. The project will also include mill and overlay of existing asphalt
pavement within the project limits. The drainage system will be upgraded to meet the current EDCM drainage standards.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on Operating Budget: Yes
Type of Project: Improvement
Project Justification
The area is mostly located in 100 -year and 500 -year floodplains with poorly functioning ditch systems. There are several
complaints from business owners and residents living in the vicinity of Fite Rd and Wagon Trail intersection. The proposed
project will improve conveyance and reduce flooding of the properties. Drainage improvements between FM518 and Fite
Road were completed in 2018. A preliminary Engineering Report has been prepared for the project area with recommended
drainage improvements.
,r1 FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 94
DR2701 - Wagon Trail Road (South of Fite to Mary's Creek)
Capital Cost
FY2026 Budget
so
Total Budget (all years) Project Total
$1.44M $1.44M
Detailed Breakdown
Category
Historical Budgeted FY2027 FY2028
Requested Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0 $0 $1,063,000
$0 $106,500 $106,500
$0 $160,000 $0
0 $66,500 $,169,500
$0 $1,063,000
$0 $213,000
$0 $160,000
0 8,436,000
Funding Sources
FY2026 Budget
so
Total Budget (all years)
$1.44M
Project Total
$1.44M
Detailed Breakdown
Category Historical Budgeted
FY2027
Requested
Future Budgeted Total
2023 General Obligation
Bonds
Total
$0 $1,436,000
0 8,436,000
$0 $1,436,000
9 8,436,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 95
DR2702 - Fite Road Drainage (Harkey to McLean)
DR27O2 - Fite Road Drainage (Harkey to
McLean)
Overview
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number DR2702
Request Groups Drainage
Estimated Start 10/1/2026
Date
Amy Coykendall, CIP Coordinator
Project Location
a�+,.a.• c xnaw
Description
The project area is located between Harkey Rd and McLean St. along Fite Road. Approximately 5300 LF drainage
improvements for Fite Road will require the removal/replacement of driveways, driveway culverts, and regrading of the
roadside ditches to improve the drainage conveyance. The project will also include mill and overlay of existing asphalt
pavement within the project limits. The project may require additional ROW to install the proposed ditch. The drainage
system will be upgraded to meet the current EDCM drainage standards.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on Operating Budget: Yes
Type of Project: Improvement
Project Justification
This area is characterized by small, shallow under -maintained roadside ditches with years of uncoordinated driveway culvert
installations. During heavier rain events, the Corrigan ditch backs up through outfalls and surcharges the roadside ditches
swelling out into the narrow roadway, making travel hazardous and threatening lower -lying residential properties. A
preliminary Engineering Report with recommended drainage improvements has been prepared for the project area.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 96
DR2702 - Fite Road Drainage (Harkey to McLean)
Capital Cost
FY2026 Budget
$0
Total Budget (all years) Project Total
$7.92M $7.92M
Detailed Breakdown
Category
Historical Budgeted FY2027 FY2028
Requested Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Land/Right of Way
Total
$0 $0 $5,230,000
$0 $0 $1,569,000
$0 $710,000 $272,000
$0 $140,000 $0
0 $50,000 8,071,000
$0 $5,230,000
$0 $1,569,000
$0 $982,000
$0 $140,000
0 8,921,000
Funding Sources
FY2026 Budget
$0
Total Budget (all years)
$7.92M
Project Total
$7.92M
Detailed Breakdown
Category
FY2027 FY2028
Historical Budgeted
Requested Requested
Future Budgeted Total
2023 General Obligation
Bonds
Certificates of Obligation
Total
$0 $850,000 $5,071,000
$0 $0 $2,000,000
0 $50,000 8,071,000
$0 $5,921,000
S0 82,000,000
0 8,921,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 97
DR2703 - Tranquility Lakes Detention Pump Station Rehabilitation and Generator
DP2703 - Tranquility Lakes Detention Pump
Station Rehabilitation and Generator
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator Tranquility Lakes Boulevard
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number DR2703
Request Groups Drainage
Estimated Start 10/1/2026
Date
n
Description
Upgrade the existing undersized storm water lift station and force main at Tranquility Lakes Detention. The system provides
the removal of stormwater from the detention pond and forces the water into the BDD4 drainage ditch on the north side of
FM518. The existing 4" pumps and 4" force main will be replaced with the appropriate size system to meet the EDCM criteria
for a pumped stormwater system. The station is located in a critical detention pond that requires a permanent backup
natural gas generator with an automatic transfer switch during times of power loss.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on Operating Budget: Yes
Type of Project: Improvement
Project Justification
The drainage system was turned over to the City when MUD1 was dissolved. The existing pumps are undersized to remove
the required amount of water during a storm event. The force main is also undersized and cannot transmit the correct
amount of flow out of the system and discharge to the BDD4 ditch. During intense rains or prolonged rain events, there is
significant roadside flooding as the system backs up and cannot keep up with the rainfall. Due to the critical nature of this
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 98
DR2703 - Tranquility Lakes Detention Pump Station Rehabilitation and Generator
stormwater pump station, it will require an alternate power source in the event of loss of line power. The City operates six
stormwater pump stations at regional detention facilities. Some facilities do not have backup power and require generator
backup power to provide needed stormwater pumping to protect against flooding during emergency events such as
Hurricane Harvey.
Capital Cost
FY2026 Budget
$o
Total Budget (all years)
$7.28M
Project Total
$7.28M
Detailed Breakdown
Category
Historical Budgeted FY2027 FY2028
Requested Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0 $0 $5,000,000
$0 $80,000 $1,500,000
$0 $500,000 $195,000
8 $80,000 6,695,000
$0 $5,000,000
$0 $1,580,000
$0 $695,000
8 $,275,000
Funding Sources
FY2026 Budget
$0
Total Budget (all years)
$7.28M
Project Total
$7.28M
Detailed Breakdown
Category
FY2027 FY2028
Historical Budgeted
Requested Requested
Future Budgeted Total
Certificates of Obligation
2023 General Obligation
Bonds
Total
$0 $0 $4,334,300
$0 $580,000 $2,360,700
8 $80,000 6,695,000
$0 $4,334,300
$0 $2,940,700
8 $,275,000
Operational Costs
FY2026 Budget
$0
Total Budget (all years)
$19.5K
Project Total
$19.5K
Detailed Breakdown
Category Historical Budgeted
FY2028 FY2029
Requested Requested
Future Budgeted Total
Personnel Services
Operations & Maintenance
Total
$0 $7,729 $8,038
$0 $1,833 $1,925
8 9,562 8,963
$0 $15,767
$0 $3,758
6 $9,525
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 99
Facilities
Facilities
FY26 - FY30 Facilities Projects (including Historical Budgeted, Future Budgeted)
$75M
$50M
$25M
0
$56M
$2M
Historical
Budgeted
$46M
$16M
$63M
0 0
2026 2027 2028 2029 2030 Future
Budgeted
• FA1804 - Fire Station #7 - Bailey $17,761,000 9.76%
Road
• FA1902 - Orange Street Service $33,068,850 18.16%
Center Phase 2
FA2002 - Fire Station #6 (Formerly $19,485,000 10.70%
Fire Station #11) - County Road 100
• FA2104 - Fire Station #3 (HVAC) $583,747 0.32%
Repairs
FA2106- Hillhouse Road Annex $28,475,000 15.64%
Phase II
• FA2107 - Water Operations $5,069,000 2.78%
Building (Alice St.)
• FA2203 - Natatorium Air -Handling $5,399,000 2.97%
Replacement
• FA2205 - Reflection Bay WRF Fuel $1,972,000 1.08%
Island
FA2401- West Pearland $154,700 0.08%
Community Center HVAC
Replacement
FA2405 - Public Safety Training $61,860,000 33.98%
Complex
FA2410 - Emergency Distribution $2,378,756 1.31%
Warehouse
• FA2501 - Knapp Activity Center Air $340,000 0.19%
Conditioning and Building
Automation System Integration
• FA2502 - Fiber Backbone (Cullen $274,000 0.15%
Parkway from Hughes Ranch
Road to McHard)
• FA2505 - Stella Roberts Recycling $90,000 0.05%
Center HVAC Replacement
FA2601- Fiber Backbone $620,000 0.34%
Magnolia (Business Center to
Kirby Water Plant)
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 100
Facilities
FA2701 - Stella Roberts Recycling $684,000 0.38%
Center Roof and Gutter
Replacement
FA2702 - Fiber Backbone (Dixie $1,235,000 0.68%
Farm from Broadway to Main)
FA2802 - Public Safety Building $2,620,000 1.44%
Roof Replacement
Summary of Requests
Project No. / Historical
Category Budgeted
Future
FY2026 FY2027 FY2028 FY2029 FY2030
Budgeted
Total
FA180 FA1804-Fire $1,725,000 $100,000 $15,936,000 $0 $0 $0 $0 $17,761,000
4 Station #7 -
Bailey Road
FA190 FA1902- $3,609,290 $0 $29,459,560 $0 $0 $0 $0 $33,068,850
2 Orange Street
Service Center
Phase 2
FA20 FA2002-Fire $575,000 $0 $0 $1,300,000 $17,610,000 $0 $0 $19,485,000
02 Station #6
(Formerly Fire
Station #11) -
County Road
100
FA210 FA2104-Fire $583,746 $1 $0 $0 $0 $0 $0 $583,747
4 Station #3
(HVAC)
Repairs
FA210 FA2106- $28,474,999 $1 $0 $0 $0 $0 $0 $28,475,000
6 Hillhouse
Road Annex
Phase II
FA210 FA2107- $5,068,999 $1 $0 $0 $0 $0 $0 $5,069,000
7 Water
Operations
Building (Alice
St.)
FA220 FA2203- $5,398,999 $1 $0 $0 $0 $0 $0 $5,399,000
3 Natatorium
Air -Handling
Replacement
FA220 FA2205- $631,500 $1,340,500 $0 $0 $0 $0 $0 $1,972,000
5 Reflection Bay
WRF Fuel
Island
FA24 FA2401- West $154,699 $1 $0 $0 $0 $0 $0 $154,700
01 Pearland
Community
Center HVAC
Replacement
FA24 FA2405- $6,500,000 $0 $0 $9,800,000 $45,560,000 $0 $0 $61,860,000
05 Public Safety
Training
Complex
FA241 FA2410- $2,378,755 $1 $0 $0 $0 $0 $0 $2,378,756
0 Emergency
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 101
Facilities
Project No. / Historical
Category Budgeted
Distribution
Warehouse
FA250 FA2501- $339,999 $1 $0 $0 S0 $0 $0 $340,000
1 Knapp Activity
Center Air
Conditioning
and Building
Automation
System
Integration
FA250 FA2502-Fiber So $274,000 $0 S0 $0 $0 S0 $274,000
2 Backbone
(Cullen
Parkway from
Hughes
Ranch Road
to McHard)
FA250 FA2505 - Stella $89,999 $1 $0 $0 $0 $0 $0 $90,000
5 Roberts
Recycling
Center HVAC
Replacement
FA260 FA2601-Fiber So $o $620,000 $0 $0 $0 $0 $620,000
1 Backbone
Magnolia
(Business
Center to
Kirby Water
Plant)
FA270 FA2701-Stella $o $o $0 $684,000 $0 $0 $0 $684,000
1 Roberts
Recycling
Center Roof
and Gutter
Replacement
FA270 FA2702-Fiber $0 $0 $0 $1,235,000 $0 $0 $0 $1,235,000
2 Backbone
(Dixie Farm
from
Broadway to
Main)
FA28 FA2802- $0 $0 $0 $2,620,000 $0 $0 $0 $2,620,000
02 Public Safety
Building Roof
Replacement
Total Summary of $5,530,985 $,714,508 $6,015,560 $5,639,000 $3,170,000 6 6 $82,070,053
Requests
Future
FY2026 FY2027 FY2028 FY2029 FY2030
Budgeted
Total
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 1O2
FA1804 - Fire Station #7 - Bailey Road
FA1804 - Fire Station #7 - Bailey Road
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number FA1804
Request Groups Facilities
Estimated Start 06/24/2025
Date
Estimated 11/26/2027
Completion Date
9
League Cn
W.•F
Description
Construction of an approximately 14,300 sq. ft. station. Stations should include a generator, sleeping rooms, restrooms with
showers, a kitchen dining area, a day room, a Lieutenant's office, a station command office, and an exercise room. The
equipment area will consist of 4 -80 -foot -deep drive-thru apparatus bays, a bunker gear storage area, medical supply storage,
and an EMS decontamination area. Also, the station will support the separation of dirty/clean areas for firefighter health,
which will include showers and restroom showers for decontamination. Initially, this station would only be staffed by one fire
engine pumper. An ambulance will be staffed based upon future demand. The facility will be located north of Bailey Road
just west of the Bailey Water Plant and will require a flashing signal.
Images
Details
Strategic Priority: Safe Community Impact on Operating Budget: Yes
Type of Project: New Construction Estimated Project Life Span: 20 years
Project Justification
This project was recommended by the City's 2012 Master Fire Station Location Plan.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 103
FA1804 - Fire Station #7 - Bailey Road
Explain & Identify Type of Other Sources:
Certificates of Obligation Sold- $1,485,000 in 2018.
Capital Cost
$1.73M
FY2026 Budget
$100K
Total Budget (all years) Project Total (to date)
$16M $17.8M
Detailed Breakdown
Category
FY2026 FY2027
Historical Budgeted
Requested Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Equipment and Furniture
Total
$0 $0 $12,636,000
$200,000 $0 $2,800,000
$1,525,000 $100,000 $0
$0 $0 $500,000
$,725,000 $00,000 $5,936,000
$0 $12,636,000
$0 $3,000,000
$0 $1,625,000
$0 $500,000
$ $7,761,000
Funding Sources
$1.73M
FY2026 Budget
$100K
Total Budget (all years)
$16M
Project Total (to date)
$17.8M
Detailed Breakdown
Category
FY2026 FY2027
Historical Budgeted
Requested Requested
Future Budgeted Total
2023 General Obligation
Bonds
Certificates of Obligation
Total
$240,000 $100,000 $15,619,000
$1,485,000 $0 $317,000
$,725,000 $00,000 $5,936,000
$0 $15,959,000
$0 $1,802,000
$ $7,761,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 104
FA1902 - Orange Street Service Center Phase 2
FA1902 - Orange Street Service Center Phase
2
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator 2016 Old Alvin Road
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number FA1902
Request Groups Facilities
Estimated Start 10/1/2023
Date
9
Description
A new 50,000 sf Operations & Maintenance building with parking is planned, housing field Superintendents and staff for
Water & Sewer, Streets and Drainage, ROW, Engineering Inspectors, Environmental Services, and Facilities. This building will
replace and consolidate existing buildings scattered throughout the site, provide covered storage for sensitive equipment
and meet current windstorm requirements and emergency shelter resiliency to operate as a shelter -in -place facility for
Public Works First Responders. The existing buildings will be demolished with site drainage configured to the future layout.
Parking and landscaping on the site will be expanded. The building will include locker rooms and showers, a 40 -50 -person
training room that doubles as sleeping quarters during emergency situations, a break room, commercial kitchen, backup
generator, landscaping, and irrigation.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on Operating Budget: Yes
Type of Project: Replacement Estimated Project Life Span: 20 years
Project Justification
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 105
FA1902 - Orange Street Service Center Phase 2
The facilities at this site are over forty years old and have exceeded their useful life. To make more efficient use of the site, one
large operations & maintenance building will be constructed to replace numerous smaller buildings on the site. As a result of
Hurricane Harvey lessons learned, the Orange Street campus needs upgraded Public Works First Responder staff quarters
and amenities to stay fully operational through a disaster operation.
Explain & Identify Type of Other Sources:
Other funding sources- $2,434,290 transferred from Orange St Service Center Phase I (FA1404).
Debt:
2022A CO's -$175,000
2019B Revenue Bonds -$675,000
2022C W/S CO's -$325,000
Capital Cost
$2.42M
FY2026 Budget
$1.17M
Total Budget (all years)
$30.6M
Project Total (to date)
$33.1M
Detailed Breakdown
Category Historical Budgeted
FY2026 FY2027
Requested Requested Future Budgeted
Total
Construction
Contingency
Design/Surveying
Equipment and Furniture
Prelim. Engineering Report
Total
$0 $694,050 $24,301,000
$0 $480,000 $4,190,000
$1,740,000 $0 $0
$0 $0 $980,000
$683,800 $0 $0
8,423,800 $,174,050 $9,471,000
$0 $24,995,050
$0 $4,670,000
$0 $1,740,000
$0 $980,000
$0 $683,800
$ $3,068,850
Funding Sources
$3.61M
FY2026 Budget
$0
Total Budget (all years)
$29.5M
Project Total (to date)
$33.1M
Detailed Breakdown
Category Historical Budgeted
FY2027
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Certificates of Obligation
Other Funding Sources
W/S Revenue Bonds
Total
$325,000
$175,000
$2,434,290
$675,000
$,609,290
$19,148,714
$10,310,846
$0
$0
$9,459,560
$0 $19,473,714
$0 $10,485,846
$0 $2,434,290
$0 $675,000
$ $3,068,850
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 106
FA1902 - Orange Street Service Center Phase 2
Operational Costs
FY2026 Budget
$0
Total Budget (all years)
$212K
Project Total
$212K
Detailed Breakdown
Category Historical Budgeted
FY2029
Requested
Future Budgeted Total
Operation & Maintenance
Personnel Services
Total
$0
$o
e
$195,046
$17,164
$12,210
$0 $195,046
$0 $17,164
e $12,210
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 107
FA2002 - Fire Station #6 (Formerly Fire Station #11) - County Road 100
FA2OO2 - Fire Station #6 (Formerly Fire
Station #11) - County Road 100
Overview
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number FA2002
Request Groups Facilities
Estimated Start 10/1/2024
Date
Project Location
-gym •xtl
LEK,LIE Or,
a+.w�• c xnaw
Description
Construction of an approximately 14 -year -ft. station is to house a one - 4 -person Engine Crew and one - 2 -person EMS
Ambulance Crew, and 2 trainees. The station will include a generator, sleeping rooms, restrooms with showers, and a kitchen
dining area, a day room, a Lieutenant's office, a station command office, and an exercise room. The equipment area will
consist of 4 -80 -foot -deep drive-thru apparatus bays, a bunker gear storage area, medical supply storage, and an EMS
decontamination area. Also, the station will support a separation of dirty/clean areas for firefighter health, which will include
showers and a restroom shower for decontamination. Initially, this station would only be staffed by one fire engine pumper.
An ambulance will be staffed based upon future demand. A fiber run will be included, running from Bailey Road to the
project site. The facility will be located on County Road 100 and include landscaping and irrigation.
Images
471
Details
Strategic Priority: Safe Community Impact on Operating Budget: Yes
Type of Project: New Construction Estimated Project Life Span: 20 Years
Project Justification
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 108
FA2OO2 - Fire Station #6 (Formerly Fire Station #11) - County Road 1OO
As indicated and proposed by the 2012 Master Fire Station Location Plan as adopted by City Council resolution. The 2017
Citygate Standards of Cover and Staffing Study also supports this location.
O&M expenses include hiring 15-18 personnel in FY28, the purchase of a pumper truck in FY27/28, down payment in FY27 and
balance in FY28 and an ambulance in FY32.
Explain & Identify Type of Other Sources:
2023A CO $575,000.00
Capital Cost
$575 K
FY2026 Budget
Total Budget (all years) Project Total (to date)
$0 $18.9M $19.5M
Detailed Breakdown
Category Historical Budgeted
FY2028 FY2029
Requested Requested Future Budgeted
Total
Construction
Contingency
Design/Surveying
Land/Right of Way
Equipment and Furniture
Total
$0 $0 $13,000,000
$0 $0 $3,600,000
$0 $1,300,000 $510,000
$575,000 $0 $0
$0 $0 $500,000
875,000 $,300,000 $7,610,000
$0 $13,000,000
$0 $3,600,000
$0 $1,810,000
$0 $575,000
$0 $500,000
$ $9,485,000
Funding Sources
$575 K
FY2026 Budget
Total Budget (all years) Project Total (to date)
$0 $18.9M $19.5M
Detailed Breakdown
Category Historical Budgeted
FY2028 FY2029
Requested Requested Future Budgeted
Total
Unfunded Future GO Bond
Package
Certificates of Obligation
Total
$0 $1,300,000 $17,610,000
$575,000 $0 $0
$75,000 $,300,000 $7,610,000
$0 $18,910,000
$0 $575,000
$ $9,485,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 109
FA2002 - Fire Station #6 (Formerly Fire Station #11) - County Road 100
Operational Costs
FY2026 Budget
so
Total Budget (all years)
$1.84M
Project Total
$1.84M
Detailed Breakdown
Category Historical Budgeted
FY2030
Requested
Future Budgeted Total
Personnel Services
Operation & Maintenance
Total
So
So
9
$1,683,646
$159,204
$,842,850
$0 $1,683,646
$0 $159,204
9 $,842,850
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 110
FA2104 - Fire Station #3 (HVAC) Repairs
FA2104 - Fire Station #3 (HVAC) Repairs
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 345 - Capital Projects
Type Capital Improvement
Project Number FA2104
Request Groups Facilities
3207 Yost Road
9
Description
Provide air-conditioning system evaluation and repairs to address humidity and condensation in the air-conditioning system.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on Operating Budget: No
Type of Project: Refurbishment Estimated Project Life Span: 15 years
Project Justification
Fire Station #3 was completed in 2014. Since the completion, there have been reoccurring air conditioning issues. The issues
have resulted in water damage to the ceiling tiles and diffusers, humidity and condensation is occurring in the air
conditioning system, there is also a build-up of biological growth on and in the ductwork, metal supports, registers, and CMU
walls. The project will evaluate the entire HVAC system, including the load, exhaust, ventilation calculations and the building
envelope to report and recommend a solution to remedy the air conditioning issues.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 111
FA21O4 - Fire Station #3 (HVAC) Repairs
Capital Cost
$584K
FY2O26 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$584K
Detailed Breakdown
Category Historical Budgeted
FY2O26
Requested
Future Budgeted Total
Construction
Design/Surveying
Contingency
Total
$486,747
$60,000
$36,999
$83,746
$0
$0
$1
$0 $486,747
$0 $60,000
$0 537,000
8 $83,747
Funding Sources
$584K
FY2O26 Budget
Total Budget (all years) Project Total (to date)
$584K
Detailed Breakdown
Category Historical Budgeted
FY2O26
Requested
Future Budgeted Total
General Revenue -Cash
Total
$583,746
$83,746
$0 $583,747
9 $83,747
in FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 112
FA2106 - Hillhouse Road Annex Phase II
FA2106 - Hillhouse Road Annex Phase I I
Overview
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number FA2106
Request Groups Facilities
Estimated Start 10/1/2020
Date
Amy Coykendall, CIP Coordinator
Project Location
9
League Cn.
Description
Phase II will complement the construction of Phase II Orange Street project and centralize services with the renovation of
the existing 8,073 sf building for the Traffic division, construction of an approximately 20,000 sf Fleet Building and a 14,000 sf
Parks Maintenance Building including offices, locker rooms, and material and equipment storage. The site will require
additional detention and be fully paved for fleet vehicle maintenance queue, will provide storage for auction items, and will
centralize services for PD (the City's largest fleet utilizer).
Images
Details
Strategic Priority: Resilient Finances Impact on Operating Budget: Yes
Type of Project: New Construction
Estimated Project Life Span: 20 years
Project Justification
Property was acquired in 2004 for a city facility. The improvements will make best use of the property to centralize services of
the City while reducing time spent by employees in traveling to the service center for repairs. The location will improve
response times for Parks by the central location.
Explain & Identify Type of Other Sources:
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 113
FA2106 - Hillhouse Road Annex Phase II
2021A CO $417,000
2022A CO $834,750
2021B W/S CO $208,500
2022C W/S CO $278,250
2024A CO $15,229,000
Other Sources $7,500 from fund 500 fund balance.
Capital Cost
$28.5M
FY2026 Budget
Total Budget (all years) Project Total (to date)
$28.5M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Equipment and Furniture
Total
$22,500,000 $0
$4,520,000 $0
$954,999 $1
$500,000 $0
$8,474,999 $
$0 $22,500,000
$0 $4,520,000
$0 $955,000
$0 $500,000
$ $8,475,000
Funding Sources
$28.5M
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$28.5M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Certificates of Obligation
W/S Certificates of
Obligation
W/S Revenue Bonds
General Revenue -Cash
Total
$26,830,750
$1,428,250
$0
$0
$208,500 $0
$7,499 $1
$8,474,999 $
$0 $26,830,750
$0 $1,428,250
$0 $208,500
$0 $7,500
$ $8,475,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 114
FA2106 - Hillhouse Road Annex Phase II
Operational Costs
FY2026 Budget
$95.9K
Total Budget (all years)
$437K
Project Total
$437K
Detailed Breakdown
Category
Historical FY2026 FY2027 FY2028 FY2029 Future
Budgeted Requested Requested Requested Requested Budgeted
Total
Operation & Maintenance $0 $80,165 $92,331 $96,948 $101,795 $0 $371,239
Personnel Services $0 $15,708 $16,179 $16,664 $17,164 $0 $65,715
Total 9 95,873 $08,510 $13,612 $18,959 9 $36,954
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 115
FA2107 - Water Operations Building (Alice St.)
FA2107 - Water Operations Building (Alice St.)
Overview
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number FA2107
Request Groups Facilities
Estimated Start 10/1/2020
Date
Project Location
9
Description
The need for a building that can house 25 staff members with a climate control building. It will include restrooms/showers for
women and men with a locker room area and a break room/multi-purpose training room. A natural gas backup generator
will be installed to operate the entire building's mechanical, electrical, plumbing, and emergency functions. The design
needs to be considered a shelter -in -place building, per city standards, and must be constructed to at withstand 140-mph/3
sec wind gusts. A laboratory area is needed to calibrate meters and process samples. Irrigation, landscaping, and onsite
drainage and detention will be designed as required by the McHard Corridor overlay district. A telecommunications
Intermediate Distribution Frame (IDF) room to serve all the offices and workstations in the building. Security cameras and
access control for entries. 20 vehicle spots will be provided next to the building with 25 parking spots provided next to the
Water Tower.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on Operating Budget: Yes
Type of Project: New Construction
Estimated Project Life Span: 20 years
Project Justification
The project would encompass the construction of a Water Production Operation & Maintenance (O&M) building with a
supporting parking lot. The present O&M building is a modular trailer that is located on the far east side of Pearland and
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 116
FA2107 - Water Operations Building (Alice St.)
another modular trailer at the Alice Water Plant, the new building would incorporate both sites into the Alice Water Plant
location. This trailer was designed for resident -living for a family of four. Currently, it is acting as an office for 15 Water
Production staff members. The new building and parking lot will support the present and growing water production
professionals of the City.
Explain & Identify Type of Other Sources:
2021B $234,000
2022C $1,615,000
2024C CO $3,220,000
Capital Cost
$5.07M
FY2026 Budget
Total Budget (all years) Project Total (to date)
$5.07 M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Equipment and Furniture
Total
$3,990,000
$717,999
$186,000
$175,000
$,068,999
$0
$1
$0
$0
$0 $3,990,000
$0 $718,000
$0 $186,000
$0 $175,000
9 5,069,000
Funding Sources
$5.07M
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$5.07M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
W/S Certificates of
Obligation
W/S Revenue Bonds
Total
$4,835,000 $0
$233,999
5,068,999
$0 $4,835,000
$0 $234,000
0 8,069,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 117
FA2107 - Water Operations Building (Alice St.)
Operational Costs
FY2026 Budget
$0
Total Budget (all years)
$204K
Project Total
$204K
Detailed Breakdown
Category
Historical FY2027 FY2028 FY2029
Budgeted Requested Requested Requested Future Budgeted
Total
Operation & Maintenance
Personnel Services
Total
$0 $48,735 $51,171 $53,730 $0 $153,636
$0 $16,179 $16,664 $17,164 $0 $50,007
0 64,914 67,835 $0,894 0 $03,643
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 118
FA2203 - Natatorium Air -Handling Replacement
FA2203 - Natatorium Air -Handling
Replacement
Overview Project Location
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number FA2203
Request Groups Facilities
Estimated Start 10/1/2025
Date
Amy Coykendall, CIP Coordinator 4141 Bailey Road
9
4%4.., xt+. -�a
Description
Replacement of two existing Dectron packaged -units with a 4 -pipe hydronic system that will dehumidify, condition the air in
the Natatorium, and provide supplemental heat for the pool water. Includes decommissioning, demo/removal, installation of
new air-cooled chillers, hydronic pumps, and water boilers, commissioning and integration with Building Automation
System (converting from Siemens to Climatec). Temporary units will be utilizied during construction phase.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on Operating Budget: Yes
Type of Project: Replacement Estimated Project Life Span: 20 years
Project Justification
The existing Dectron units are from 2009 and run 24 hours per day. The units have suffered many failures over the years,
including 6 compressors and 8 coil replacements. During the life of the unit, an estimated amount in repairs is $900K to $1M.
Additionally, the R-22 freon is no longer manufactured, so locating any will be very costly and prohibitive.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 119
FA2203 - Natatorium Air -Handling Replacement
Explain & Identify Type of Other Sources:
Cash funding from PISD buyout in FY23.
2022A CO $305,000
2023A CO $1,899,000
Capital Cost
$5.4M
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$5.4M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$4,220,000
$843,999
$335,000
$,398,999
$0 $4,220,000
$0 $844,000
$0 $335,000
9 $,399,000
Funding Sources
$5.4M
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$5.4M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
General Revenue -Cash
Certificates of Obligation
Total
$3,500,000
$1,898,999
$,398,999
$0 $3,500,000
$0 $1,899,000
9 $,399,000
Operational Costs
FY2026 Budget Total Budget (all years)
$2.52K $10.9K
Project Total
$10.9K
Detailed Breakdown
Category
Historical FY2026 FY2027 FY2028 FY2029 Future
Budgeted Requested Requested Requested Requested Budgeted
Total
Operation & Maintenance $0 $2,520 $2,646
Total 0
$2,778 $2,917
$,520 $,646 $,778 $,917
$0 $10,861
$ $0,861
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 12O
FA2205 - Reflection Bay WRF Fuel Island
FA2205 - Reti ction Bay WRF Fuel Island
Overview
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number FA2205
Request Groups Facilities
Estimated Start 10/1/2021
Date
Project Location
W. • F
Description
The project will furnish and supply an additional fuel island located at the Reflection Bay WRF and will provide fueling
capabilities west of SH288. The project will include a fuel island for diesel and unleaded fuel, associated piping and
dispensers, concrete and canopy structure.
Images
Details
Strategic Priority: Resilient Finances Impact on Operating Budget: Yes
Type of Project: New Construction
Estimated Project Life Span: 20 years
Project Justification
The project will provide a third fuel site and effectively create 3 zones in the city where vehicles can fuel. With recent flooding
and emergencies that have resulted in road closures and isolating the facilities west of SH288 from obtaining fuel from
Hillhouse and Service Center fuel island shows a vulnerability. Additionally, recently constructed facilities that house
additional fleet vehicles and having a closer fueling site will reduce time and mileage and fueling needs that result from
driving to the east side of the City for fuel.
Explain & Identify Type of Other Sources:
$46,500 from Fund 500
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 121
FA2205 - Reflection Bay WRF Fuel Island
$46,500 from Fund 570
2024A CO $538,500
Capital Cost
FY2026 Budget
$1.97M
Total Budget (all years)
$1.97M
Project Total
$1.97M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Design/Surveying
Contingency
Total
$0 $1,532,000
So $350,000
$0 $90,000
0 8,972,000
$0 $1,532,000
$0 $350,000
$0 $90,000
0 8,972,000
Funding Sources
$632K
FY2026 Budget
$1.34M
Total Budget (all years) Project Total (to date)
$1.34M $1.97M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Certificates of Obligation
Other Funding Sources
Total
$538,500
$93,000
$31,500
$1,340,500
$0
8,340,500
$o $1,879,000
$0 $93,000
$ 8,972,000
Operational Costs
FY2026 Budget
$0
Total Budget (all years) Project Total
$52.1K $52.1K
Detailed Breakdown
Category
Historical FY2027 FY2028 FY2029
Budgeted Requested Requested Requested Future Budgeted
Total
Operation & Maintenance
Total
$0 $16,538 $17,364 $18,233 $0
0 86,538 87,364 88,233 0
$52,135
$2,135
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 122
FA2401- West Pearland Community Center HVAC Replacement
FA2401- West Pearland Community Center
HVAC Replacement
Overview
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number FA2401
Request Groups Facilities
Estimated Start 10/1/2023
Date
Project Location
Amy Coykendall, CIP Coordinator 2150 Country Place Parkway
9
dav
4 �..i•+Liu+a —uy
Description
This project will replace the existing split system HVAC units with a new Carrier 18 Seer system which will heat and cool a
total of 6500 sf. This will include all decommissioning, removal, installation of new units, electrical bringing the lifespan to 15
years and improving the FCI score.
Details
Strategic Priority: Sustainable Infrastructure
Type of Project: Refurbishment
Impact on Operating Budget: Yes
Estimated Project Life Span: 20 YEARS
Project Justification
The existing units are 10 years old and have suffered several failures. This replacement is identified as a priority 1.1 in the
Facility Condition Assessment Phase II report.
Explain & Identify Type of Other Sources:
2024A CO- $154,702
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 123
FA2401- West Pearland Community Center HVAC Replacement
Capital Cost
$155 K
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$155K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Total
$100,000
$54,699
$54,699
$o
si
$
$0 $100,000
$0 $54,700
9 $54,700
Funding Sources
$155 K
FY2026 Budget
Total Budget (all years) Project Total (to date)
$155K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Certificates of Obligation
Total
$154,699
$54,699
si
$
$0
9
$154,700
$54,700
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 124
FA2405 - Public Safety Training Complex
FA2405 - Public Safety Training Complex
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator 2555 Cullen Boulevard
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number FA2405
Request Groups Facilities
Estimated Start 10/1/2026
Date
LISMIM OW
Description
This project is composed of three primary elements, which are defined as the Training Building and Emergency Vehicle
Operations Course (EVOC) located on Freedom Drive and the Outdoor Firing Range located on Bahler Ave. The Training
Building includes areas for public access, administrative support, educational support, indoor firing range, range support,
simulation house, and facility support. The EVOC has two interconnected primary areas, a 175'x700' area, and a 450'x750' pad.
PPD and PFD will utilize the EVOC, which could also be utilized for training by COP departments. The Freedom site also
includes an area for a future EOC/E-911 facility. The exterior firing range will be located on the southwest portion of the city -
owned site at Balhler Avenue and consists of 25 lanes at 200 yards and 50 lanes at 50 yards.
Images
Details
Strategic Priority: Resilient Finances Impact on Operating Budget: Yes
Type of Project: New Construction
Estimated Project Life Span: zo years
Project Justification
The Police Department has completed licensing processes to provide Basic Peace Officer Certification training to new police
employees in the Pearland Police Academy. Critical components are firearms training and emergency driver training. While
this is important to academy training, training continues throughout each law enforcement professional's career. Emergency
Driver training is conducted at the Pasadena Police Academy facility, while firearms training is performed at the Alvin
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 125
FA2405 - Public Safety Training Complex
Community College or the Brazoria County Tactical Officers Association Range in Lake Jackson. All these facilities involve
travel and time spent away from the City. Additionally, these facilities are used for a fee and scheduled around the priorities of
the providing agency.
Capital Cost
$6.5M
FY2026 Budget
$0
Total Budget (all years)
$55.4M
Project Total (to date)
$61.9M
Detailed Breakdown
Category Historical Budgeted
FY2028 FY2029 Future Budgeted
Requested Requested
Total
Construction
Design/Surveying
Contingency
Land/Right of Way
Total
$0
$0
$0
$6,500,000
6,500,000
$0
$8,800,000
$1,000,000
$0
6,800,000
$38,850,000
$0
$6,710,000
$0
$5,560,000
so $38,850,000
So 88,800,000
$0 $7,710,000
$0 $6,500,000
6 61,860,000
Funding Sources
$6.5M
FY2026 Budget
Total Budget (all years) Project Total (to date)
$0 $55.4M $61.9M
Detailed Breakdown
Category Historical Budgeted
FY2028 FY2029 Future Budgeted
Requested Requested
Total
Unfunded Future GO Bond
Package
Certificates of Obligation
Total
$0 $9,800,000 $45,560,000
$6,500,000 $0 $0
6,500,000 8,800,000 $5,560,000
$0 $55,360,000
$0 $6,500,000
6 61,860,000
Operational Costs
FY2026 Budget
$0
Total Budget (all years)
$269K
Project Total
$269K
Detailed Breakdown
Category Historical Budgeted
FY2029
Requested
Future Budgeted Total
Operation & Maintenance
Personnel Services
Total
S0
So
6
$248,497
$20,211
$68,708
$0 $248,497
so $20,211
6 $68,708
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 126
FA2410 - Emergency Distribution Warehouse
FA2410 - Emergency Distribution Warehouse
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator 2703 Veterans Drive
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number FA2410
Request Groups Facilities
Estimated Start 10/1/2025
Date
4
Description
The building involves a metal warehouse design (possibly prefabricated), with structural beam framework, access doorways,
garage/bay style doors for mobilization and distribution of large items, HVAC climate control and utilities (water/sewer,
electricity, information technology). The facility should be 5,000 square feet in size, but with a possible 15,000 sf concrete pad
sites for vehicle access, parking, loading/unloading, and with a drive-thru-style driveway that allows access to
assistance/supplies if/when needed. Driveway lanes should include surface gromets that accept awning poles, and the facility
height will need to support the dimensions for forklifts and possible ingress/egress for large emergency equipment. A total of
2-4 workstations should be incorporated into the interior design for personnel. The facility will be located behind the
existing Fire Administration Building on 2703 Veterans Drive, and will include a generator.
Images
Details
Strategic Priority: Safe Community Impact on Operating Budget: Yes
Type of Project: New Construction Estimated Project Life Span: 20 years
Project Justification
Several major disasters, including but not limited to the 2017 Hurricane Harvey floods and the 2021 Texas Winter Storm, have
resulted in situations where local water production and wastewater treatment facilities have failed due to loss of power.
Water and other supplies being essential community lifeline resources, there is no dedicated facility with the capacity to
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 127
FA2410 - Emergency Distribution Warehouse
house emergency supplies for distribution to the community if/when this happens. The proposed Emergency Distribution
Warehouse fills that unmet need and provides the City with the ability to store and disburse important supplies and
materials during and in the aftermath of a disaster. A Preliminary Engineering Report (PER) has been completed by Joiner
Architects; staff created an ancillary/adjunct detail report for the purposes of responding to a FEMA Request for Information
(RFI), and the basic cost elements have been determined.
Explain & Identify Type of Other Sources:
2023A CO $201,782
FEMA Grant
Capital Cost
$2.38M
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$2.38M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Design/Surveying
Total
$2,204,256
$174,499
$,378,755
$0
Si
$0 $2,204,256
$0 $174,500
0 $,378,756
Funding Sources
$2.38M
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$2.38M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Other Funding Sources
Certificates of Obligation
Total
$1,304,484
$1,074,271
$,378,755
$0
si
$0 $1,304,484
$0 $1,074,272
0 2,378,756
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 128
FA2410 - Emergency Distribution Warehouse
Operational Costs
FY2026 Budget
$0
Total Budget (all years)
$31.6K
Project Total
$31.6K
Detailed Breakdown
Category Historical Budgeted
FY2027 FY2028
Requested Requested
Future Budgeted Total
Operation & Maintenance
Total
$0 $15,802 $15,802
8 $5,802 $5,802
$0
9
$31,604
$1,604
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 129
FA2501 - Knapp Activity Center Air Conditioning and Building Automation System
Integration
FA2501 - Knapp Activity Center Air
Conditioning and Building Automation
System Integration
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator 2424 South Park Avenue
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number FA2501
Request Groups Facilities
Estimated Start 10/1/2024
Date
S. 'MC • G xt+x -4a
Description
This project will install the City's standard remote monitoring and control equipment on the facility's HVAC systems and
provide a signal interface to send this information back to the monitoring and control system via the City's network. Replace
the buildings' air conditioning systems, add new systems to the intermediate distribution frame (IDF) room and add a
Building Automation System (BAS) system to all new HVAC equipment.
Images
I
Details
Strategic Priority: Sustainable Infrastructure Impact on Operating Budget: Yes
Type of Project: Refurbishment
Estimated Project Life Span: 20 years
Project Justification
The 10,500 -square -foot Senior Center was remodeled between 2007 and mid -2008, adding 4,500 -square -feet, including the
replacement of the air conditioning and heating systems. Since then, due to aging and lifecycle replacements, it is
recommended that the split AC systems now be replaced as they are now 14 years in service as identified in the facility
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 130
FA2501 - Knapp Activity Center Air Conditioning and Building Automation System
Integration
condition assessment. Additionally, the intermediate distribution frame (IDF) room currently does not have air conditioning
and should be added. There was no building automation system in place at that time, but all city -operated facilities were
subsequently very equipped. This project will retro-fit the City's standard building automation system to allow Facilities
Maintenance to monitor and set internal environmental parameters.
Capital Cost
$340 K
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$340 K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Total
$339,999
$39,999
$0
e
$340,000
$40,000
Funding Sources
$340 K
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$340 K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Certificates of Obligation
Total
$339,999
$39,999
$1
$
$0 $340,000
9 $40,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 131
FA2502 - Fiber Backbone (Cullen Parkway from Hughes Ranch Road to McHard)
FA2502 - Fiber Backbone (Cullen Parkway
from Hughes Ranch Road to McHard)
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 345 - Capital Projects
Type Capital Improvement
Project Number FA2502
Request Groups Facilities
Estimated Start 10/1/2025
Date
1
-�mc;•xtl
-0•iW • G M• n -4a
Description
Extend and build out the fiber network to reach all city facilities, including traffic signals and support the SCADA network.
Funds in 2024 will bring fiber along Cullen Parkway from Hughes Ranch Rd to McHard for approximately 4,200 LF. This fiber
run will pick up 1 traffic signal as well as provide a loop from PSB to City Hall.
Images
V
FA2502
Details
Strategic Priority: Connected Community Impact on Operating Budget: Yes
Type of Project: New Construction Estimated Project Life Span: 20 years
Project Justification
The City currently relies on Fiber Optic cabling to connect major facilities to their applications, as well as traffic signal and
camera operations along major thoroughfares. The IT Department began consolidating the City's data centers down to a
single data center in an effort to reduce cost, streamline operations, and centralize technology. This effort could only be
accomplished by having the Fiber Optic infrastructure in place to support system operations. As the City continues to build
new facilities, remodel old facilities, and install critical infrastructure components, reliable connectivity to the applications
and systems is essential. Fiber Optic cabling provides seemingly limitless connectivity between sites and provides superior
quality over other mediums. There are a few standalone fiber projects proposed to connect remaining sites as well as traffic
signals.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 132
FA2502 - Fiber Backbone (Cullen Parkway from Hughes Ranch Road to McHard)
Capital Cost
FY2026 Budget
$274K
Total Budget (all years)
$274K
Project Total
$274K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0
$0
$0
e
$210,000
$34,000
$30,000
$74,000
$0 $210,000
$0 $34,000
$0 530,000
s $74,000
Funding Sources
FY2026 Budget
$274K
Total Budget (all years) Project Total
$274K $274K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
General Revenue -Cash
Total
$o
e
$274,000
$74,000
$0 $274,000
0 $74,000
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 133
FA2505 - Stella Roberts Recycling Center HVAC Replacement
FA2505 - Stella Roberts Recycling Center
HVAC Replacement
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 311 - Streets
Type Capital Improvement
Project Number FA2505
Request Groups Facilities
Estimated Start 10/1/2025
Date
5800 Magnolia Parkway
70.1
Description
Replacement of the existing heating, ventilation and air conditioning systems with two new HVAC split systems, fresh air
exhaust systems and integrate with the City's building automation system.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on Operating Budget: No
Type of Project: Replacement
Estimated Project Life Span: 15 years
Project Justification
The existing HVAC systems are 15 years of age and run 16 hours a day. These units have been identified as a priority 1 end -of -
life cycle in the 2021 Facilities Condition Assessment.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 134
FA2505 - Stella Roberts Recycling Center HVAC Replacement
Capital Cost
$90K
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$90K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Total
$89,999
$9,999
$0
$
$90,000
$0,000
Funding Sources
$90K
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$90K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
General Revenue -Cash $89,999
Total $9,999
$0
$
$90,000
$0,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 135
FA2601- Fiber Backbone Magnolia (Business Center to Kirby Water Plant)
FA2601 - Fiber Backbone Magnolia (Business
Center to Kirby Water Plant)
Overview
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number FA2601
Request Groups Facilities
Estimated Start 10/1/2026
Date
Amy Coykendall, CIP Coordinator
Project Location
Description
Extend and build the fiber network to reach all city facilities, including buildings, parks, lift stations, traffic signal, and water
facilities and support the SCADA network. Funds in 2026 will bring fiber along Magnolia from the Business Center to Kirby
Water Plant for approximately 7,600 LF. This fiber run will pick up a water plant, 3 traffic signals, and is part of a loop that will
connect the entire City from West to East. This loop will provide redundancy for all communications West of Cullen as well as
city-wide. South Gate Lift Station at 3551 Kirby Drive will be connected to the City network.
Details
Strategic Priority: Connected Community Impact on Operating Budget: No
Type of Project: New Construction
Estimated Project Life Span: 10 years
Project Justification
The City currently relies on Fiber Optic cabling to connect major facilities to their applications, as well as traffic signal and
camera operations along major thoroughfares. The IT Department began consolidating the City's data centers down to a
single data center in an effort to reduce cost, streamline operations, and centralize technology. This effort could only be
accomplished by having the Fiber Optic infrastructure in place to support system operations. As the City continues to build
new facilities, remodel old facilities, and install critical infrastructure components, reliable connectivity to the applications &
systems is essential. Fiber Optic cabling provides seemingly limitless connectivity between sites and provides superior quality
over other mediums. There are a few standalone fiber projects proposed to connect remaining sites as well as traffic signals.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 136
FA2601 - Fiber Backbone Magnolia (Business Center to Kirby Water Plant)
Capital Cost
FY2026 Budget
$0
Total Budget (all years)
$620K
Project Total
$620K
Detailed Breakdown
Category Historical Budgeted
FY2027
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0
$0
$0
e
$520,000
$60,000
$40,000
$20,000
$0 $520,000
$0 560,000
$0 $40,000
e $20,000
Funding Sources
FY2026 Budget
$0
Total Budget (all years) Project Total
$620K $620K
Detailed Breakdown
Category Historical Budgeted
FY2027
Requested
Future Budgeted Total
W/S Revenues - Cash
General Revenue -Cash
Total
$0 $310,000
$0 $310,000
0 $20,000
$0 $310,000
$0 $310,000
0 $20,000
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 137
FA2701 - Stella Roberts Recycling Center Roof and Gutter Replacement
FA2701 - Stella Roberts Recycling Center Roof
and Gutter Replacement
Overview
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number FA2701
Request Groups Facilities
Estimated Start 10/1/2026
Date
Project Location
Amy Coykendall, CIP Coordinator 5800 Magnolia Parkway
,-:.1
L �.i•+L xt+k -�4a
Description
This project will replace the existing metal on the building with a similar seamless metal roofing system. The work will
include removal and installation of the roof and all gutters and downspouts. The roof must meet city criteria.
Images
Details
Strategic Priority: Sustainable Infrastructure
Impact on Operating Budget: No
Type of Project: Replacement Estimated Project Life Span: 20 years
Project Justification
This replacement is identified as a priority 2.1 in the Facility Condition Assessment Phase II report with an end of life in 2026.
The gutter system leaks and no longer functions properly.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 138
FA2701 - Stella Roberts Recycling Center Roof and Gutter Replacement
Capital Cost
FY2026 Budget
$0
Total Budget (all years)
$684K
Project Total
$684K
Detailed Breakdown
Category Historical Budgeted
FY2028
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0
$0
$0
8
$520,000
$104,000
$60,000
$84,000
$0 $520,000
$0 $104,000
$0 $60,000
$ $84,000
Funding Sources
FY2026 Budget
$0
Total Budget (all years) Project Total
$684K $684K
Detailed Breakdown
Category Historical Budgeted
P12028
Requested
Future Budgeted Total
Certificates of Obligation
Total
$o
8
$684,000
$84,000
$0 $684,000
$ $84,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 139
FA2702 - Fiber Backbone (Dixie Farm from Broadway to Main)
FA2702 - Fiber Backbone (Dixie Farm from
Broadway to Main)
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 330 - Facilities Management
Type Capital Improvement
Project Number FA2702
Request Groups Facilities
Estimated Start 10/1/2026
Date
0, ..".,,...
LEl the Gn
4a. •G M•5. -4a
Description
The goal of this project is to extend the fiber network by approximately 20,000 LF along Dixie Farm Rd from Broadway to
Main to connect 4 traffic signals (Westfield Ln, Hastings Friendswood, Pearland Parkway, Main St) and 4 wastewater lift
stations (Pine Hollow, Rustic Elementary, Oakbrook Estates, Dixie Farm 5).
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on Operating Budget: No
Type of Project: New Construction
Estimated Project Life Span: 30
Project Justification
Fiber optic networking provides increased reliability and speed over the existing cellular connections currently utilized for the
locations targeted by this project. Providing fiber optic networking to the 4 traffic signals and 4 lift stations in this project will
allow for improved speed of traffic preemption for emergency vehicles, real-time monitoring of cameras, and reliable
monitoring and alerting for the SCADA system. This run will also serve as a connection point for a future loop (via Pearland
Parkway) for facilities East of Liberty for which there is currently no redundancy.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 140
FA2702 - Fiber Backbone (Dixie Farm from Broadway to Main)
Capital Cost
FY2026 Budget
so
Total Budget (all years)
$1.24 M
Project Total
$1.24M
Detailed Breakdown
Category Historical Budgeted
FY2028
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0 $1,060,000
So $100,000
$0 $75,000
8 $,235,000
$0 $1,060,000
$0 $100,000
So $75,000
9 $,235,000
Funding Sources
FY2026 Budget
so
Total Budget (all years) Project Total
$1.24 M $1.24 M
Detailed Breakdown
Category Historical Budgeted
FY2028
Requested
Future Budgeted Total
W/S Revenues - Cash
General Revenue -Cash
Total
$0 $617,500
$0 $617,500
0 $,235,000
$0 $617,500
$0 $617,500
9 $,235,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 141
FA2802 - Public Safety Building Roof Replacement
FA2802 - Public Safety Building Roof
Replacement
Overview
Request Owner
Department
Type
Project Number
Request Groups
Estimated Start
Date
Amy Coykendall, CIP Coordinator
300 - PW Engineering & Capital
Projects
Capital Improvement
FA2802
Facilities
10/1/2027
Project Location
2555 Cullen Boulevard
4
Description
This project will replace the existing thermoplastic- olefin roof on the building with a new material. The work will include the
installation of mechanical fasteners on spacings to meet current City standards for windstorm uplift requirements, including
roof dams and copings, equipment curbs and heat fusing seams and reinstalling metal wall caps and cleats.
Images
Details
Strategic Priority: Sustainable Infrastructure
Type of Project: Replacement
Impact on Operating Budget: No
Estimated Project Life Span: 20 years
Project Justification
The 80,000 -square -foot Public Safety Building was constructed between 2008 and 2010 and incorporated a thermoplastic
olefin (TPO) roof membrane to meet LEED heat island requirements. This material has a 20 -year life expectancy and has
been in service for 14 years and is beginning to show fatigue in high -stress areas on corners and at folds, producing leaks. The
Facilities Condition Assessment priority is 4.0 for future life -cycle replacement. Over the next 7-10 years, maintenance and
repair will increase 15% year -over -year due to the ongoing stress on the membrane surface caused by climate and aging
issues. The replacement is scheduled for 2028.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 142
FA2802 - Public Safety Building Roof Replacement
Capital Cost
FY2026 Budget
$o
Total Budget (all years)
$2.62M
Project Total
$2.62M
Detailed Breakdown
Category Historical Budgeted
FY2028
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0 $1,750,000
$0 $670,000
$0 $200,000
8 $,620,000
$0 $1,750,000
$0 $670,000
$0 $200,000
9 $,620,000
Funding Sources
FY2026 Budget Total Budget (all years)
$0
$2.62M
Project Total
$2.62M
Detailed Breakdown
Category Historical Budgeted
FY2028
Requested
Future Budgeted Total
Certificates of Obligation
Total
So $2,620,000
8 $,620,000
$0 $2,620,000
0 $,620,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 143
Parks
Parks
FY26 - FY30 Parks Projects (including Historical Budgeted, Future Budgeted)
$3OM
$2OM
$1OM
0
$4M
$23M
0 0
0 0
Historical
Budgeted
2026 2027 2028 2029 2030 Future
Budgeted
• PK1904- Clear Creek Trail (Barry $10,215,000 18.54%
Rose WRF to UHCL)
• PK2301- Park Equipment $453,405 0.82%
Recapitalization Program
PK2402 - Hickory Slough $16,708,719 30.32%
Sportsplex Phase II
• PK2501-Independence Park $15,981,000 29.00%
Phase II
PK2503 - Clear Creek Trail $10,705,000 19.43%
Segment 5
• PK2504 - Centennial Park Storage $790,000 1.43%
Building
• PK2701 - PER for Future Bond $250,000 0.45%
Referendum
Summary of Requests
Historical
Budgeted
Project No. / Category
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
Total
PK190 PK1904-Clear $1,150,000 $9,065,000 $0 $0 $0 $0 $0 $10,215,000
4 Creek Trail
(Barry Rose
WRF to UHCL)
PK23O1 PK2301- Park $453,404 $1 $0 $0 $0 $0 $0 $453,405
Equipment
Recapitalization
Program
PK240 PK2402- $0 $16,708,719 $0 $0 $0 $0 $0 $16,708,719
2 Hickory Slough
Sportsplex
Phase II
PK2501 PK2501- $0 $2,255,000 $13,726,000 $0 $0 $0 $0 $15,981,000
Independence
Park Phase II
PK25O PK2503-Clear $1,500,000 $100,000 $9,105,000 $0 $0 $0 $0 $10,705,000
3 Creek Trail
Segment 5
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 144
Parks
Project No. / Category
Historical
Budgeted
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
Total
P K25O PK2504 -
4 Centennial Park
Storage
Building
P K2701 PK2701 - PER for
Future Bond
Referendum
Total Summary of
Requests
$789,999
$1
S0 $0 $0 $0 $0 $790,000
$0 $0 $250,000 $0 $0 $0 $0 $250,000
$,893,403 $8,128,721 $3,081,000 0 0 0 $ $5,103,124
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 145
PK1904 - Clear Creek Trail (Barry Rose WRF to UHCL)
PK19O4 - Clear Creek Trail (Barry Rose WRF to
UHCL)
Overview
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number PK1904
Request Groups Parks
Estimated Start 10/1/2018
Date
Project Location
IRrportr
obrmir-
Description
When complete, the Clear Creek Trail will span more than 21 miles across 3 counties and two cities, providing a signature
recreational amenity to Pearland's Park and Trail system. The project will consist of the installation of 10,000 linear feet (1.9
miles) of 10 -foot -wide concrete multi -use path with benches, waste receptacles, and furnishings, a pedestrian bridge that
crosses Clear Creek, and a trail head that will include parking, lighting, irrigation, and drinking fountain. The trail will connect
with the Green Tee Trail and continue along the south side of Clear Creek to the UHCL. This segment is identified as part of
sections 4.4 and 4.5 in the Clear Creek Trail Master Plan.
Images
Details
Strategic Priority: Connected Community Impact on operating budget: Yes
Type of Project: New Construction
Project Justification
This project is an extension of the Trail Master Plan that was adopted by the Council and received HGAC funding. Previous
citizen surveys have listed the hike and bike trails as a priority for acquisition and development. The segment positions the
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 146
PK1904 - Clear Creek Trail (Barry Rose WRF to UHCL)
trail to eventually tie into the future segments planned for the banks of Clear Creek and across the northern boundaries of
the City.
Explain & Identify Type of Other Sources:
2021A CO $500,000.00
2023A CO $250,000.00
Other Funding Sources: Fund 501 Fund Balance $169,672 and Park Zone 1 Funds $230,328 (2022)
Capital Cost
$1.15M
FY2026 Budget
$9.07M
Total Budget (all years)
$9.07 M
Project Total (to date)
$10.2M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Land/Right of Way
Total
SO $8,100,000
$0 $965,000
$900,000
$250,000
$,150,000
$0
$0
9,065,000
$0 $8,100,000
$0 $965,000
$o $900,000
$0 $250,000
9 $0,215,000
Funding Sources
$1.15M
FY2026 Budget
$9.07M
Total Budget (all years) Project Total (to date)
$9.07M $10.2M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
HGAC-TIP
P
Certificates of Obligation
Other Funding Sources
Total
$0 $6,684,126
$750,000 $2,380,874
$400,000 $0
$,150,000 9,065,000
$0 $6,684,126
$0 $3,130,874
$0 $400,000
9 $0,215,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 147
PK1904 - Clear Creek Trail (Barry Rose WRF to UHCL)
Operational Costs
FY2026 Budget
$o
Total Budget (all years)
$1.19M
Project Total
$1.19M
Detailed Breakdown
Category
Historical FY2027 FY2028 FY2029
Budgeted Requested Requested Requested Future Budgeted
Total
Personnel Services
Capital Outlay
Operation & Maintenance
Total
$0 $301,584 $310,632 $319,951 $0 $932,167
$0 $142,057 $0 $0 $0 $142,057
$0 $42,014 $37,336 $39,203 $0 $118,553
$ $85,655 $47,968 $59,154 9 $,192,777
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 148
PK23O1 - Park Equipment Recapitalization Program
PK23O1 - Park Equipment Recapitalization
Program
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 345 - Capital Projects
Type Capital Improvement
Project Number PK23O1
Request Groups Parks
Estimated Start 10/1/2023
Date
L.etfJ�c Gn
G jai, G M•!. -4a
Description
Recapitalization will utilize a capital replacement program that is regularly updated, to provide updates, & replacement of
equipment or facilities, such as water play features & structures, playground equipment, irrigation & dog park amenities. This
project will focus on replacement of pathways and walkways that need repair as recommended by the Parks Masterplan and
Multi -modal Masterplan. Through these efforts, the department will bridge the gap and make connections that continue to
improve on overall accessibility and longevity of the Parks system. Types of improvements will include repair to sidewalks,
trails and pathways. Primary target areas will be identified through the multi -modal master plan findings.
Details
Strategic Priority: Connected Community Impact on operating budget: No
Type of Project: Other improvement
Project Justification
As our population base grows, proportionally the use and wear on our assets grows. A proactive decision to maintain a safe
and desirable park infrastructure is a trademark of a signature community. Based on several in-depth studies, most recently
from a joint endeavor among the Brookings Institute and the school of economics at Harvard University, it has been
determined that deferred maintenance can cost as much as 600% of the figures associated with a proactive systemic
maintenance culture.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 149
PK2301 - Park Equipment Recapitalization Program
Capital Cost
$453 K
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$453 K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Equipment and Furniture
Total
$453,404
$53,404
$0
9
$453,405
$53,405
Funding Sources
$453K
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$453 K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
2007&2019GO Bonds
Total
$453,404
$53,404
$1
$
$0
9
$453,405
$53,405
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 150
PK24O2 - Hickory Slough Sportsplex Phase II
PK24O2 - Hickory Slough Sportsplex Phase II
Overview
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number PK24O2
Request Groups Parks
Estimated Start 10/1/2023
Date
Project Location
Amy Coykendall, CIP Coordinator 7600 Hughes Ranch Road
Description
Proposed improvements include the addition of six lighted sports fields, a mix of turf and artificial fields, within the expanded
detention pond, a pavilion, doubling the size of the parking lot, expanding the restroom and concession facilities, adding a
small maintenance building, playground and lighting the remaining three existing fields. This project also includes the
evaluation of trees and sidewalk connectivity, along with the extension of fiber and the incorporation of security cameras.
Images
(1fI!
Details
Strategic Priority: Connected Community Impact on operating budget: Yes
Type of Project: New Construction
Project Justification
Hickory Slough Sportsplex serves as the home of two youth sports associations that help meet community needs. Pearland
Youth Lacrosse (PYLAX) has utilized Hickory Slough since its opening and Shadow Creek Soccer Club (SCSC) has called
Hickory Slough home since 2018. The two organizations provide recreational and competitive sports programs. In 2021,
PYLAX and SCSC served 1,334 participants combined over two seasons. Hickory Slough Sportsplex has hosted events such as
the TAAF Winter Games from 2018-2020 and draws significant interest as potential sites for large athletic tournaments. The
City of Pearland has formalized a cost -sharing agreement with the Pearland Economic Development Corporation (PEDC).
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 151
PK2402 - Hickory Slough Sportsplex Phase II
Explain & Identify Type of Other Sources:
PEDC $16,708,719
Capital Cost
FY2026 Budget
$16.7M
Total Budget (all years)
$16.7M
Project Total
$16.7M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Design/Surveying
Contingency
Equipment and Furniture
Total
$0
$0
$0
$0
6
$12,390,415
$1,962,202
$1,798,502
$557,600
$6,708,719
$0 $12,390,415
$0 $1,962,202
$0 $1,798,502
$0 $557,600
0 $6,708,719
Funding Sources
FY2026 Budget
$16.7 M
Total Budget (all years) Project Total
$16.7 M $16.7 M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
PEDC
Total
$0
6
$16,708,719
$6,708,719
$0
6
$16,708,719
$6,708,719
Operational Costs
FY2026 Budget
so
Total Budget (all years) Project Total
$1.28 M $1.28 M
Detailed Breakdown
Category
Historical FY2027 FY2028 FY2029
Budgeted Requested Requested Requested Future Budgeted
Total
Operation & Maintenance
Personnel Services
Capital Outlay
Total
$0 $15,955 $313,220 $323,285 $0 $652,460
$0 $0 $216,891 $254,880 $0 $471,771
$0 $0 $153,449 $0 $0 $153,449
0 $5,955 $83,560 $78,165 0 $,277,680
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 152
PK25O1- Independence Park Phase II
PK25O1- Independence Park Phase II
Overview
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number PK25O1
Request Groups Parks
Estimated Start 10/1/2024
Date
Project Location
Description
Phase II improvements to Independence Park will build on amenities completed in Phase I. Planned amenities include the
incorporation of the adjacent detention pond as a usable park amenity lake, addition of landscaping, parking, restrooms,
irrigation, lighting, internal trails and sidewalk connections, additional electrical service to support the parks' infrastructure,
the pavilion for a seasonal ice rink and permanent outlet installation at the Vendor Allee. Phase II improvements also include
a water spray park (recirculation system) and expanding the playground space. In addition to the added amenities, the
needed support infrastructure (walkways, tables, benches, lighting, water, electrical, etc.) will be completed as well.
Images
Details
Strategic Priority: Connected Community Impact on operating budget: Yes
Type of Project: New Construction
Project Justification
For Independence Park to become a premier regional festival/event venue for Pearland, several facilities -related
improvements must be implemented; many of which are included within the park's Phase 2 enhancement program. Based
on prioritization exercises conducted with the 2020 Parks, Recreation Open Spaces and Trails Master Plan Independence
Park is highly utilized, and Phase II enhancements are a top priority.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 153
PK25O1- Independence Park Phase II
Capital Cost
FY2026 Budget
$2.26M
Total Budget (all years)
$16M
Project Total
$16M
Detailed Breakdown
Category Historical Budgeted
FY2026 FY2027 Future Budgeted
Requested Requested
Total
Construction
Contingency
Design/Surveying
Total
$0
$0
$0
$0 $11,200,000
$500,000 $2,250,000
$1,755,000 $276,000
2,255,000 $3,726,000
$0 $11,200,000
$0 $2,750,000
$0 $2,031,000
$ $5,981,000
Funding Sources
FY2026 Budget
$2.26M
Total Budget (all years) Project Total
$16M $16M
Detailed Breakdown
Category Historical Budgeted
FY2026 FY2027 Future Budgeted
Requested Requested
Total
2023 General Obligation
Bonds
Total
$0 $2,255,000
$13,726,000
$ $,255,000 $3,726,000
$0 $15,981,000
$ $5,981,000
Operational Costs
FY2026 Budget
$0
Total Budget (all years) Project Total
$557 K $557 K
Detailed Breakdown
Category
Historical FY2027 FY2028 FY2029
Budgeted Requested Requested Requested Future Budgeted
Total
Personnel Services
Operation & Maintenance
Capital Outlay
Total
$0 $0 $181,065 $177,380 $0 $358,445
$0 $3,888 $54,176 $65,626 $0 $123,690
$0 $0 $74,609 $0 $0 $74,609
$ $,888 $09,850 $43,006 $ $56,744
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 154
PK25O3 - Clear Creek Trail Segment 5
PK25O3 - Clear Creek Trail Segment 5
Overview
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number PK25O3
Request Groups Parks
Estimated Start 10/1/2025
Date
Project Location
V �giltl ':
9
uc Cirp
a++,.a�• Fxna
Description
Approximately 19,000 linear feet of 10 -ft -wide recreational/utility trail along Clear Creek, from Province Village's trail end to
Dixie Farm Park.
Images
Clear Creek Trail Segment 5
Details
Strategic Priority: Connected Community Impact on operating budget: No
Type of Project: New Construction
Project Justification
This project is identified within the Clear Creek Trail Master Plan as trail segments 5.2, 5.3, and 5.4, with references to the
Multi -Modal Master Plan, Pearland Parks Master Plan, and the Pearland Capital Improvement Program. The project supports
the continuity of trail segments that will ultimately make up a 21 -mile stretch of improved hike and bike trail along Clear
Creek, connecting the City from end to end, from Shadow Creek Ranch to Dixie Farm Park.
Explain & Identify Type of Other Sources:
2024 Harris County Precinct 2 Partnership Program ($4,141,950.00)
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 155
PK2503 - Clear Creek Trail Segment 5
Capital Cost
$1.5M
FY2026 Budget Total Budget (all years)
$100K $9.21M
Project Total (to date)
$10.7M
Detailed Breakdown
Category
Historical Budgeted FY2026 FY2027
Requested Requested
Future Budgeted Total
Construction
Design/Surveying
Land/Right of Way
Contingency
Total
$0 $0 $8,500,000
$1,000,000 $100,000 $255,000
$500,000 $0 $0
$0 $0 $350,000
$,500,000 $00,000 9,105,000
$0 $8,500,000
$0 $1,355,000
$0 $500,000
$0 $350,000
8 $0,705,000
Funding Sources
$1.5M
FY2026 Budget
$100K
Total Budget (all years) Project Total (to date)
$9.21M $10.7M
Detailed Breakdown
Category Historical Budgeted
FY2026 FY2027
Requested Requested
Future Budgeted Total
Certificates of Obligation
Other Funding Sources
Total
$750,000
$750,000
$,500,000
$100,000 $5,713,050
$0 $3,391,950
$00,000 9,105,000
$0 $6,563,050
$0 $4,141,950
8 $0,705,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 156
PK25O4 - Centennial Park Storage Building
PK25O4 - Centennial Park Storage Building
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 540 - Parks
Type Capital Improvement
Project Number PK25O4
Request Groups Parks
Estimated Start 12/11/2024
Date
Estimated 09/6/2025
Completion Date
Description
This project will include the design and construction of a new 1,800 -square -foot storage building (inclusive of utilities and site
preparations) located in Centennial Park between fields 2 & 3.
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: New Construction Estimated Project Life Span: 50 years
Project Justification
Centennial Park is one of the City of Pearland's largest community parks that serves residents and visitors through a wide
variety of amenities. The existing restroom facility between fields 1-4 was renovated in 2022 to help accommodate the highly
attended event rentals such as tournaments. To accommodate the expanded restroom capacity, the building's storage
space had to be removed. This project provides a remedy to the lost storage space following the 2022 restroom expansion
project.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 157
PK25O4 - Centennial Park Storage Building
Capital Cost
$790K
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$790K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Design/Surveying
Contingency
Total
$550,000
$149,999
$90,000
$89,999
$0
$1
$0
$0 $550,000
$0 $150,000
$0 $90,000
s $90,000
Funding Sources
$790K
FY2026 Budget
Total Budget (all years) Project Total (to date)
$790K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
General Revenue -Cash
Total
$789,999
$89,999
$0 $790,000
9 $90,000
Operational Costs
FY2026 Budget
$o
Total Budget (all years)
$0
Project Total
$0
Detailed Breakdown
Category Historical Budgeted
Future Budgeted Total
Capital Outlay
Total
$o
e
$o
9
S0
e
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 158
PK27O1 - PER for Future Bond Referendum
PK27O1 - PER for Future Bond Referendum
Overview
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number PK27O1
Request Groups Parks
Estimated Start 10/1/2027
Date
Project Location
Ldrd
ungLeCrty
Description
Provide funding for preliminary engineering on 5-7 future projects to be identified that would be funded within the City's
next bond referendum. Preliminary engineering would tighten down scopes and provide for estimated construction dollars
that would be needed to take a proposition to the voters.
Details
Strategic Priority: Resilient Finances Impact on operating budget: Yes
Type of Project: Other improvement
Project Justification
The Parks Master Plan provides a list of recommendations for future projects and upgrade criteria that will be incorporated
into a prioritized list of projects.
Capital Cost
FY2026 Budget
$o
Total Budget (all years) Project Total
$250 K $250 K
Detailed Breakdown
Category Historical Budgeted
FY2027
Requested
Future Budgeted Total
Prelim. Engineering Report $0 $250,000
Total 0 $50,000
$o
e
$250,000
$50,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 159
PK27O1 - PER for Future Bond Referendum
Funding Sources
FY2026 Budget
$0
Total Budget (all years)
$250K
Project Total
$250K
Detailed Breakdown
Category Historical Budgeted
FY2027
Requested
Future Budgeted Total
General Revenue -Cash
Total
$0
9
$250,000
$50,000
$0
9
$250,000
$50,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 160
Streets
Streets
FY26 - FY30 Streets Projects (including Historical Budgeted, Future Budgeted)
$150M
$102M
$100M
$50M
0
$11M
$26M
0 0
0 0
Historical
Budgeted
2026 2027 2028 2029 2030 Future
Budgeted
• TR0601 - Mykawa Road Widening $33,137,723 23.94%
- BW8 to FM 518
• TR1501 - Smith Ranch Road $13,696,000 9.89%
Extension (CR 94) - Hughes Ranch
Road to Broadway
TR1904 - Bailey Road Expansion - $18,458,000 13.33%
Veterans Dr to Main
• TR1905 - Shadow Creek Parkway $8,520,000 6.15%
Landscaping, Street Lighting, &
Sidewalks
TR2001 - Pearland Parkway at $1,834,000 1.32%
Broadway Intersection
Improvements
• TR2101 - Broadway Expansion $1,000,000 0.72%
Phase 1 (SH 288 to Old Chocolate
Bayou)
• TR2103-Intersection $10,394,000 7.51%
Improvements in Shadow Creek
Ranch
• TR2203 - Median Landscaping on $500,000 0.36%
Kingsley & Kirby
TR23O1-Pearland Parkway at $1,898,000 1.37%
Barry Rose Intersection
Improvements
TR2302 - Street Reconstruction - $9,210,000 6.65%
Sherwood
TR2303 - Hughes Road (Pearland $12,246,000 8.85%
Parkway to City of Pearland City
Limit)
• TR2401 - Concrete Sidewalk Gaps $15,400,000 11.12%
and Replacement
• TR2402 - Dixie Farm Road at $980,000 0.71%
Hastings Friendswood Road
Intersection Improvements
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 161
Streets
• TR2502 - Broadway Expansion $7, 000, 000 5.06%
Phase 2 - Old Chocolate Bayou to
McLean Rd.
• TR2510 - Pearland Parkway Bridge $800, 000 0.58%
Soil Erosion Repair (at Clear
Creek)
• TR2601 - Barry Rose Masonry Wall $1, 565, 000 1.13%
Replacement
• TR2603 - Traffic Signal at $920, 000 0.66%
Kingsley/CR48
• TR2604 - TxDOT Traffic Signal $381, 500 0. 28%
Upgrade along SH35
• TR2705 - PER for Future Bond $500, 000 0.36%
Referendum -Streets
Summary of Requests
Project No./
Category
Historical
Budgeted
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
Total
TR060 TR0601- $12,337,723 $0 $20,800,000 $0 $0 $0 $0 $33,137,723
1 Mykawa Road
Widening -
BW8 to FM 518
TR1501 TR1501-Smith $13,695,999 $1 $0 $0 $0 $0 $0 513,696,000
Ranch Road
Extension (CR
94) - Hughes
Ranch Road to
Broadway
TR190 TR1904-Bailey $18,457,999 $1 $0 $0 $0 $0 $0 $18,458,000
4 Road
Expansion -
Veterans Dr to
Main
TR1905 TR1905- $8,519,999 $1 $0 $0 $0 $0 $0 $8,520,000
Shadow Creek
Parkway
Landscaping,
Street Lighting,
& Sidewalks
TR200 TR2001 - $1,833,999 $1 $0 $0 $0 $0 $0 $1,834,000
1 Pearland
Parkway at
Broadway
Intersection
Improvements
TR2101 TR2101- $999,999 $1 $0 $0 $0 $0 $0 $1,000,000
Broadway
Expansion
Phase l (SH 288
to Old
Chocolate
Bayou)
TR2103 TR2103- $10,393,999 $1 $0 $0 $0 S0 S0 $10,394,000
Intersection
Improvements
in Shadow
Creek Ranch
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 162
Streets
Project No. /
Category
Historical
Budgeted
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
Total
TR220 TR2203 -
3 Median
Landscaping
on Kingsley &
Kirby
TR2301 TR2301-
Pearland
Parkway at
Barry Rose
Intersection
Improvements
TR230 TR2302 - Street
2 Reconstruction
-Sherwood
TR230 TR2303-
3 Hughes Road
(Pearland
Parkway to City
of Pearland City
Limit)
TR240 TR2401-
1 Concrete
Sidewalk Gaps
and
Replacement
TR240 TR2402 - Dixie
2 Farm Road at
Hastings
Friendswood
Road
Intersection
Improvements
TR250 TR2502 -
2 Broadway
Expansion
Phase 2 -Old
Chocolate
Bayou to
McLean Rd.
TR2510 TR2510 -
Pearland
Parkway Bridge
Soil Erosion
Repair (at Clear
Creek)
TR2601 TR2601-Barry
Rose Masonry
Wa l l
Replacement
TR260 TR2603 - Traffic
3 Signal at
Kingsley/CR48
TR260 TR2604 -
4 TxDOTTraffic
Signal Upgrade
along SH35
TR270 TR2705 - PER
5 for Future Bond
$499,999 $1 $0 $0 $0 $0 $0
$260,000 $1,638,000
$8,180,000
$12,245,999
$6,600,000
$979,999
$6,999,999
$100,000
$1,030,000
$1
$500,000
So So $0 $0 $o $1,898,000
$0 $0 $0 So So $9,210,000
$0 $0 $0 $0 $0 $12,246,000
$4,400,000 $4,400,000
$1
$1
$700,000
$0 $1,565,000
$o
$0
so
$920,000
$381,500
so
$0 $0 $0 So $15,400,000
$0 $0 $0
so
so
$980,000
$0 $0 $0 $0 So $7,000,000
$0
$0
$0
$0
$0
$800,000
$0 $0 $0 $0 So $1,565,000
$0
$o
$500,000
$0
$o
so
$0
$o
so
$0
So
so
$0
So
so
$920,000
$381,500
$500,000
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 163
Streets
Project No. /
Category
Referendum -
Streets
Total Summary of $02,105,713 $0,634,510 $5,700,000 9 0 0 0 $38,440,223
Requests
Historical
Budgeted
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
Total
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 164
TR0601 - Mykawa Road Widening - BW8 to FM 518
TR0601 - Mykawa Road Widening - BW8 to
FM 518
Overview
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number TR0601
Request Groups Streets
Estimated Start 10/1/2021
Date
Amy Coykendall, CIP Coordinator
Project Location
171
Description
Construct approximately 3 miles of 4 -lane concrete curb and gutter -divided boulevard section roadway, including storm
sewers, outfalls and detention, traffic signals, streetlights, and related items, landscape and irrigation, and a 10' shared use
path. This project will require full environmental assessment and ROW acquisitions along the alignment. Installation of
approximately 11,000' of fiber from FM 518 to the intersection at Brookside Rd. Funding is an 80/20 split with TxDOT. TxDOT
will bid, construct, and manage the project.
Images
Details
Strategic Priority: Connected Community Impact on operating budget: Yes
Type of Project: Expansion
Project Justification
This proposed roadway, included in the City's Thoroughfare Plan and one of the 2007 Bond Program, projects to alleviate
North -South traffic between Beltway 8 and FM 518. This roadway is heavily industrial and will provide an additional
thoroughfare for commercial truck traffic.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 165
TR0601 - Mykawa Road Widening - BW8 to FM 518
Explain & Identify Type of Other Sources:
Prior to 2008 $108,723 (CO's)
2017 PIB $1,036,639
2018 PIB $2,240,720
2022 2007 GO $4,777,600
Funds from the Traffic Fund $1,141 and the Sidewalk Fund $4,220. HGAC TIP estimated funding $31,641,226 (construction
managed by TxDOT and AFA for a total of $2,237,680. The design is $759,280 and the land is $1,478,400( managed by the
City).
Capital Cost
$12.3M
FY2026 Budget
Total Budget (all years) Project Total (to date)
$0 $20.8M $33.1M
Detailed Breakdown
Category Historical Budgeted
FY2027
Requested
Future Budgeted Total
Construction
Land/Right of Way
Design/Surveying
Contingency
Prelim. Engineering Report
Total
$0 $19,600,000
$7,690,000 $0
$4,050,000 $0
$489,000 $1,200,000
$108,723 $0
$2,337,723 $0,800,000
$0 $19,600,000
$0 $7,690,000
SO $4,050,000
$0 $1,689,000
$0 $108,723
$ $3,137,723
Funding Sources
$12.3M
FY2026 Budget
Total Budget (all years) Project Total (to date)
$0 $20.8M $33.1M
Detailed Breakdown
Category Historical Budgeted
FY2027
Requested
Future Budgeted Total
Certificates of Obligation
2007 & 2019 GO Bonds
HGAC-TIP
Other Funding Sources
General Revenue -Cash
Total
$1,485,823 $20,800,000
$8,606,859 $0
$2,237,680 $0
$5,361 $0
$2,000 $0
$2,337,723 $0,800,000
$0 $22,285,823
$0 $8,606,859
$0 $2,237,680
SO $5,361
So $2,000
$ $3,137,723
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 166
TR1501 - Smith Ranch Road Extension (CR 94) - Hughes Ranch Road to Broadway
TR1501 - Smith Ranch Road Extension (CR 94)
- Hughes Ranch Road to Broadway
Overview
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number TR1501
Request Groups Streets
Estimated Start 10/1/2021
Date
Amy Coykendall, CIP Coordinator
Project Location
L!CL,c [.T,
Description
Expansion of Smith Ranch Road from 2 -lane asphalt into divided 4 -lane with raised medians, concrete curb and gutter,
storm sewer, shared use path, streetlights, landscaping, and irrigation. Limits are from Hughes Ranch Road, south of
approximately 3,250 LF to 2,040 LF north of Broadway. It includes approximately 6,000' of fiber from FM 518 to Westside
Event Center. Smith Ranch Road Lift Station at 23101/2 Smith Ranch Road will be connected to a fiber optic network.
Images
Details
Strategic Priority: Safe Community Impact on operating budget: Yes
Type of Project: Expansion
Project Justification
Construction of the SH 288 Toll Lanes and the T -Ramp Access point at Hughes Ranch Road will increase traffic on this
roadway. Demand for improved access to the toll lanes from FM518 requires the expansion of this roadway. The project also
provides additional North/South capacity by running parallel to the SH 288 corridor and Cullen Parkway. HGAC selected the
project to receive 80% federal funding through the 2013 TIP.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 167
TR1501 - Smith Ranch Road Extension (CR 94) - Hughes Ranch Road to Broadway
Explain & Identify Type of Other Sources:
2015 PIB $114,700
2017 PIB & REFUNDING $609,628
2018 PIB $716,000
2022A $774,400
2024 PIB 2007 GO $2,340,000
Includes HGAC TIP funds in the amount of $3,899,591. Funding from the Traffic Improvement Funds totals $91 in 2015.
$609,700 transferred from Old Alvin in 2017. $201,505 transferred from Hughes Ranch Rd (TR1201). Other Funding Sources -
Community Project Funds -$2,000,000
Capital Cost
$13.7 M
FY2026 Budget
Total Budget (all years) Project Total (to date)
$13.7 M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Land/Right of Way
Contingency
Design/Surveying
Total
$8,330,000
$2,200,000
$1,665,999
$1,500,000
$3,695,999
$0 $8,330,000
$0 $2,200,000
$0 $1,666,000
So $1,500,000
9 $3,696,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 168
TR1501 - Smith Ranch Road Extension (CR 94) - Hughes Ranch Road to Broadway
Funding Sources
$13.7M
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$13.7M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
HGAC-TI P
2007 & 2019 GO Bonds
Other Funding Sources
Certificates of Obligation
Total
$6,329,976 $0
$3,780,328 $0
$2,811,295 $1
$774,400 $0
$3,695,888 $
$0 $6,329,976
$0 $3,780,328
$0 $2,811,296
$0 $774,400
$ $3,696,000
Operational Costs
FY2026 Budget Total Budget (all years)
$4
$145K
Project Total
$145K
Detailed Breakdown
Category
Historical FY2027 FY2028 FY2029
Budgeted Requested Requested Requested Future Budgeted Total
Operations & Maintenance
Personnel Services
Total
$0 $39,132 $41,089 $43,143 $0 $123,364
$0 $7,155 $7,369 $7,590 $0 $22,114
$ $6,287 $8,458 $0,733 8 $45,478
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 169
TR1904 - Bailey Road Expansion - Veterans Dr to Main
TR1904 - Bailey Road Expansion - Veterans Dr
to Main
Overview
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number TR1904
Request Groups Streets
Estimated Start 10/1/2025
Date
Amy Coykendall, CIP Coordinator
Project Location
Description
This project consists of widening the current two-lane roadway to a four -lane lane boulevard section to match the existing
roadway cross-section to the east and west. The project will include the addition of a new above grade crossing over the
railroad to achieve the desired ultimate width as required in the Thoroughfare Plan. The project will include a 10' shared use
path on the southside as well as landscaping and irrigation. This will provide improved vehicular mobility in the east/west
corridors by having a four -lane boulevard from Pearland Pkwy to SH288.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: Intersection Improvements
Project Justification
Bailey Rd is identified as a Major Thoroughfare in the City's Thoroughfare plan. This project will widen the current lane
configuration to the ultimate width and match the previous Bailey Rd projects. The project will improve traffic reliability
along the corridor, an alternate route to 518, and overall mobility throughout the City.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 170
TR1904 - Bailey Road Expansion - Veterans Dr to Main
Explain & Identify Type of Other Sources:
2020 PIB $1,360,000
2022 2019 GO $1,325,000
2023 2019 GO $4,000,000
2024 PIB 2019 GO $11,773,000
Capital Cost
$18.5 M
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$18.5 M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Design/Surveying
Land/Right of Way
Contingency
Total
$15,260,000
$1,435,000
$1,000,000
$762,999
$8,457,999
$0
$0
$0
$1
$
$0 $15,260,000
$0 $1,435,000
$0 51,000,000
$0 $763,000
$ $8,458,000
Funding Sources
$18.5 M
FY2026 Budget
Total Budget (all years) Project Total (to date)
$18.5 M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
2007 & 2019 GO Bonds
Total
$18,457,999
$8,457,999
S1
$
So
9
$18,458,000
$8,458,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 171
TR1904 - Bailey Road Expansion - Veterans Dr to Main
Operational Costs
FY2026 Budget
$43.7K
Total Budget (all years)
$188K
Project Total
$188K
Detailed Breakdown
Category
Historical FY2026 FY2027 FY2028 FY2029 Future
Budgeted Requested Requested Requested Requested Budgeted
Total
Operations & Maintenance
Total
$0 $43,670 $45,853 $48,146 $50,553 $0 $188,222
0 $3,670 $5,853 $8,146 $0,553 0 $88,222
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 172
TR1905 - Shadow Creek Parkway Landscaping, Street Lighting, & Sidewalks
TR1905 - Shadow Creek Parkway
Landscaping, Street Lighting, & Sidewalks
Overview
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number TR1905
Request Groups Streets
Estimated Start 10/1/2025
Date
Amy Coykendall, CIP Coordinator
Project Location
Liimm:
-0++nic•F.M•Y. -4a
Description
The project will provide enhanced landscaping, irrigation, street lighting and continuous sidewalks along the Shadow Creek
Parkway Corridor from SH288 to FM521. The project will provide safe travel for vehicular traffic and pedestrians that will travel
from the residential areas to the commercial areas. The project is located on the TxDOT right of way and will require
partnership with TxDOT and will consist of approximately 15,000 LF of 6' and 10' sidewalks, installation of 2 pedestrian bridges,
installation of street lighting, and installation of landscaping improvements along with an irrigation system. Landscaping
improvements are required to meet standard City requirements for major thoroughfares.
Images
Details
Strategic Priority: Safe Community Impact on operating budget: Yes
Type of Project: Intersection Improvements
Project Justification
The Shadow Creek Parkway is one of the City's major thoroughfares that provides east/west citizen movement from SH288 to
FM521. This road is utilized by the SCR residents as a major travel route and providing landscaping, streetlight enhancements
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 173
TR1905 - Shadow Creek Parkway Landscaping, Street Lighting, & Sidewalks
and continuous sidewalks will provide additional safety for traveling. Additionally, Shadow Creek Parkway provides access to
the Lower Kirby Business district and, as those businesses continue to grow, saving travel for them is important.
Explain & Identify Type of Other Sources:
2020B CO TIRZ $915,000.00
2022B CO TIRZ $7,055,000.00
2024B CO $550,000
Capital Cost
$8.08M
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$8.08M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$6,392,000
$954,999
$735,000
8,081,999
$0
$1
$0
$0 $6,392,000
$0 $955,000
$0 $735,000
8 8,082,000
Funding Sources
$8.52M
FY2026 Budget
Total Budget (all years) Project Total (to date)
$8.52M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
TIRZ Reimbursable Debt
Certificates of Obligation
Total
$7,970,000
$549,999
8,519,999
$0 $7,970,000
$0 $550,000
0 $,520,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 174
TR1905 - Shadow Creek Parkway Landscaping, Street Lighting, & Sidewalks
Operational Costs
$1.89K
FY2026 Budget
$1.97K
Total Budget (all years)
$8.38K
Project Total (to date)
$10.3K
Detailed Breakdown
Category
Historical FY2026 FY2027 FY2028 FY2029 Future
Budgeted Requested Requested Requested Requested Budgeted
Total
Operations & Maintenance $1,101 $1,156 $1,214 $1,275 $1,339 $0 $6,085
Personnel Services $787 $810 $835 $860 $886 $0 $4,178
Total $,888 $,966 $,049 $,135 $,225 9 $0,263
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 175
TR2001 - Pearland Parkway at Broadway Intersection Improvements
TR2001 - Pearland Parkway at Broadway
Intersection Improvements
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 311 - Streets
Type Capital Improvement
Project Number TR2001
Request Groups Streets
Estimated Start 08/1/2025
Date
Limmiesi9
P
Description
Continuous development in the City has resulted in changes to traffic patterns and counts. Intersections are encountering
increased traffic flows more than they were originally constructed to handle resulting in increasing congestion and
heightened safety concerns. The rapidly changing traffic patterns has resulted in a "reactive" effort aimed at modifying
intersection geometry or signalization to address these conditions as they occur. The 2015 Traffic Management Plan identifies
short term intersection improvements throughout the city. Broadway at Pearland Parkway Northbound dual left turn lanes
and additional right turn lanes north and south bound is scheduled for reconfiguration in 2022. ROW and land acquisition is
estimated to be 35,000 SF for stacking lane.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: NO
Type of Project: Intersection Improvements
Project Justification
Each of the citizen's surveys conducted (2013, 2015, 2017 & 2019), made apparent citizens are concerned with traffic and
congestion issues. This project will allow the city to fund the project to address their concerns and the needs of the City to
maintain or improve mobility efficiency throughout the City, while improving safety. The City had success with a similar
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 176
TR2001 - Pearland Parkway at Broadway Intersection Improvements
project on the southbound lanes at Pearland Parkway and Broadway. In the July 2015 Traffic Management Plan this
intersection was identified as a priority to help address congestion and safety at this intersection.
Capital Cost
$1.83M
FY2026 Budget
Total Budget (all years) Project Total (to date)
$1.83M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Land/Right of Way
Total
$1,370,000 $0
$233,999 $1
$130,000 $0
$100,000 $0
$,833,999 $
$0 $1,370,000
$0 $234,000
$0 $130,000
$0 $100,000
9 $,834,000
Funding Sources
$1.83 M
FY2026 Budget
Total Budget (all years) Project Total (to date)
$1.83M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Certificates of Obligation
Total
$1,833,999
$,833,999
S0 $1,834,000
A $,834,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 177
TR2101 - Broadway Expansion Phase 1 (SH 288 to Old Chocolate Bayou)
TR21O1 - Broadway Expansion Phase 1 (SH 288
to Old Chocolate Bayou)
Overview
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number TR2101
Request Groups Streets
Estimated Start 10/1/2025
Date
Project Location
Description
TxDOT will be widening Broadway to provide three lanes in each direction, raised medians, access controls, new City standard
signals and controls, and additional turn lanes where required for traffic management purposes. Relocation of City -owned
utilities within the right of way is included in the water and wastewater section of the CIP and will be at the City's cost.
Construction will be phased with the first phase from SH288 to Old Chocolate Bayou and the second phase from Old
Chocolate Bayou to McLean. This project will provide funding for the City's share of the ROW acquisition. The city is currently
anticipating the intelligent transportation system fiber located from SH 288 to Old Chocolate Bayou, approximately 11,800 LF,
will be relocated by TxDOT as part of the project. This fiber is in TxDOT ROW of FM 518 and will need to be relocated for the
roadway widening. PEDC will be addressing the aesthetic enhancements to the corridor.
Images
Details
Strategic Priority: Safe Community
Type of Project: Expansion
Project Justification
Impact on operating budget: Yes
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 178
TR2101 - Broadway Expansion Phase 1 (SH 288 to Old Chocolate Bayou)
Traffic counts between SH 288 and Cullen and rapid growth within this segment of Broadway warrant the expansion of this
major artery. Reconfiguration will add capacity to assist traffic movements towards accessing both State Highway 288 and
State Highway 288 Toll Lanes via Broadway while relieving congestion along major commercial frontages. TxDOT has
construction funding in 2025.
Explain & Identify Type of Other Sources:
$407,500 Contributed by PEDC Sept. 2022
Capital Cost
$1,000K
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$1M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Land/Right of Way
Total
$999,999
$99,999
So
9
$1,000,000
$,000,000
Funding Sources
$1,000K
FY2026 Budget
Total Budget (all years) Project Total (to date)
$1M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
PEDC
Total
$999,999
$99,999
$o
9
81,000,000
$,000,000
Operational Costs
FY2026 Budget
$97.1K
Total Budget (all years) Project Total
$419K $419K
Detailed Breakdown
Category
Historical FY2026 FY2027 FY2028 FY2029 Future
Budgeted Requested Requested Requested Requested Budgeted
Total
Operations & Maintenance
Total
$0 $97,113
0 $7,113
$101,969
$01,969
$107,067
$07,067
$112,421
$12,421
$0 $418,570
0 $18,570
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 179
TR2103 - Intersection Improvements in Shadow Creek Ranch
TR2103 - Intersection Improvements in
Shadow Creek Ranch
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 311 - Streets
Type Capital Improvement
Project Number TR2103
Request Groups Streets
Estimated Start 10/1/2024
Date
Fwrdwactl
1
Description
This project will provide intersection improvements to help reduce vehicular congestion and improve mobility throughout
the business and residential areas of Shadow Creek Ranch. Improvements include the following: modify/add the left and
right turning lanes at various intersections, construct two (2) traffic signals at Memorial Hermann/Business Center Drive
intersection and HEB Plus!/Academy Sports+Outdoors driveway, complete connection trail link to Clear Creek Trail at Shadow
Creek Parkway/Business Center Drive intersection, provide safe merging lane for westbound traffic on Broadway Street west
of Broadway Street/Kingsley Drive intersection, and modify business driveway at Market Place Boulevard/Shadow Creek
Parkway intersection. 1800 LF of fiber from 518 at Business Center Drive to the new intersection at Memorial Hermann.
Images
TR2103
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: NO
Type of Project: Intersection Improvements
Project Justification
Shadow Creek Parkway and Broadway are some of the most heavily traveled roads and, as Pearland continues to grow, the
traffic has increased. Dual left turn lanes on Shadow Creek Parkway will provide increased left turn movement, reducing the
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 180
TR2103 - Intersection Improvements in Shadow Creek Ranch
back-up on the main lanes and will provide additional capacity to reduce vehicular congestion.
Explain & Identify Type of Other Sources:
2021B CO (TIRZ) $1,000,000
2023B CO (TIRZ) $9,394,000
Capital Cost
$10.4M
FY2026 Budget
Total Budget (all years) Project Total (to date)
$10.4M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Land/Right of Way
Total
$8,077,354
$1,308,142
$904,503
$104,000
$0,393,999
$0
$1
$0
$0
$
$0 $8,077,354
$0 $1,308,143
$0 $904,503
$0 $104,000
9 $0,394,000
Funding Sources
$10.4M
FY2026 Budget
Total Budget (all years) Project Total (to date)
$10.4M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
TIRZ Reimbursable Debt
Total
$10,393,999
$0,393,999
so
9
$10,394,000
$0,394,000
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 181
TR2203 - Median Landscaping on Kingsley & Kirby
TR2203 - Median Landscaping on Kingsley &
Kirby
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 311 - Streets
Type Capital Improvement
Project Number TR2203
Request Groups Streets
Estimated Start 10/1/2025
Date
� 9
Description
Landscape the medians of Kirby south of Broadway to Magnolia and Kingsley south of Broadway to Southern Trails. The
landscaping will include trees, plants, and irrigation bringing the landscaping to City standards.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: NO
Type of Project: Intersection Improvements
Project Justification
The roads are not currently landscaped, and these roads are entrances to the City and to the commercial area. Kirby was built
by the developer and expanded by the City, but due to limited funding the City only expanded the roadway. Kingsley was
built by the County and no landscaping was included.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 182
TR2203 - Median Landscaping on Kingsley & Kirby
Capital Cost
$500K
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$500K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Design/Surveying
Total
$470,000 $0
$29,999 $1
$99,999 $
$0 $470,000
$0 $30,000
9 $00,000
Funding Sources
$500K
FY2026 Budget
Total Budget (all years) Project Total (to date)
$500K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
General Revenue -Cash
Total
$499,999
$99,999
si
$
$0
9
$500,000
$00,000
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 183
TR2301 - Pearland Parkway at Barry Rose Intersection Improvements
TR2301 - Pearland Parkway at Barry Rose
Intersection Improvements
Overview
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number TR2301
Request Groups Streets
Estimated Start 10/1/2022
Date
Project Location
timimmuni
Description
Continuous development in the City has resulted in changes to traffic patterns and counts. Intersections are encountering
increased traffic flows than they were originally constructed to handle, resulting in increasing congestion and heightened
safety concerns. The rapidly changing traffic patterns have resulted in a "reactive" effort aimed at modifying intersection
geometry or signalization to address these conditions as they occur. The 2015 Traffic Management Plan identifies short-term
intersection improvements throughout the city. Pearland Parkway at Barry Rose Pd, dual left turn lanes and dedicated right
turn lanes in 2025-2026 will be installed to increase traffic volume capacity to improve the traffic intersection level of service.
Images
Details
Strategic Priority: Safe Community Impact on operating budget: Yes
Type of Project: Intersection Improvements
Project Justification
Each of the citizen surveys conducted (2013, 2015, 2017, 2019 & 2021) made apparent that citizens are concerned with traffic
and congestion issues. This project will allow the city to fund the project to address their concerns and the needs of the City
to maintain or improve mobility and efficiency throughout the City, while improving safety. The City had success with a
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 184
TR2301 - Pearland Parkway at Barry Rose Intersection Improvements
similar project on the southbound lanes at Pearland Parkway and Broadway. In the July 2015 Traffic Management Plan, this
intersection was identified as a priority to help address congestion and safety at this intersection.
Explain & Identify Type of Other Sources:
Fund 501 Balance
Capital Cost
$260K
FY2026 Budget
$1.64M
Total Budget (all years) Project Total (to date)
$1.64M $1.9M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0 $1,260,000
$80,000 $378,000
$180,000 $0
$60,000 $,638,000
$0 $1,260,000
$0 $458,000
$0 $180,000
A $,898,000
Funding Sources
$260K
FY2026 Budget
$1.64M
Total Budget (all years) Project Total (to date)
$1.64M $1.9M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Other Funding Sources
Total
$260,000
$60,000
$1,638,000
$,638,000
$0 S1,898,000
0 $,898,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 185
TR2302 - Street Reconstruction - Sherwood
TR2302 - Street Reconstruction - Sherwood
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 311 - Streets
Type Capital Improvement
Project Number TR2302
Request Groups Streets
Estimated Start 08/1/2025
Date
Estimated 05/31/2027
Completion Date
Description
Reconstruction of concrete neighborhood streets and sidewalks in Sherwood subdivision as identified in the 2019 Bond
Program. The street reconstruction projects are based on priorities derived from the Right -of -Way Assessment and resulting
Pavement Condition Index (PCI). The performance of the drainage system in these areas will be reviewed and any identified
drainage improvements will be included. Additionally, the waterlines will be replaced in conjunction with the roadway
reconstruction. The projects will replace existing concrete pavement with new concrete pavement in the identified
neighborhoods.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: NO
Type of Project: Intersection Improvements
Project Justification
The Sherwood subdivision was originally developed in the late 1960s. Currently, a majority of the existing streets in this
subdivision are in poor condition with an average Pavement Condition Rating (PCI) range between 56-87. There is also
evidence of sub -grade failure resulting in major cracking and panel dislocation on most of the subdivision streets. Because of
the nature of the failures, it is not fiscally efficient to replace individual concrete slabs. This recurring portion of the pavement
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 186
TR2302 - Street Reconstruction - Sherwood
program will focus on the reconstruction of the streets identified in the Assessment as requiring reconstruction. Except for
Westminister Road, which received a slightly higher PCI score in 2014, the average PCI of Sherwood Subdivision is 51.
Explain & Identify Type of Other Sources:
2023PIB 2019 GO $930,000
2O24PIB 2019GO $4,450,000
Capital Cost
$8.18M
FY2026 Budget
$1.03 M
Total Budget (all years) Project Total (to date)
$1.03 M $9.21 M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Design/Surveying
Contingency
Total
$7,100,000
$830,000
$250,000
8,180,000
$1,030,000
$0
$0
$,030,000
$0 $8,130,000
$0 $830,000
$0 $250,000
0 9,210,000
Funding Sources
$8.18M
FY2026 Budget
$1.03 M
Total Budget (all years)
$1.03 M
Project Total (to date)
$9.21 M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Certificates of Obligation
Total
$8,180,000
8,180,000
$1,030,000
$,030,000
$0 $9,210,000
0 9,210,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 187
TR2303 - Hughes Road (Pearland Parkway to City of Pearland City Limit)
TR2303 - Hughes Road (Pearland Parkway to
City of Pearland City Limit)
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 311 - Streets
Type Capital Improvement
Project Number TR2303
Request Groups Streets
Estimated Start 10/1/2025
Date
Description
An expansion of Hughes Road from Pearland Parkway to the City of Pearland City Limit, approximately 5,200 LF. The project
is to widen the existing 2 -lane roadway to a 4 -lane boulevard section to achieve the city's desired ultimate width, including
sidewalks, street lighting, landscaping, and irrigation. Installation of approximately 4,000 metres of fiber from Pearland
Parkway to Riverstone Falls. This project will also include relocation of a portion of the City sanitary sewer force main for the
installation of the second bridge.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: Expansion
Project Justification
Hughes Road is identified as a secondary thoroughfare in the City's thoroughfare plan. The Riverstone Ranch development
has added numerous homes within the area. The project would widen the road to provide increased mobility for these
developments to Pearland Parkway. The Riverstone Ranch subdivision has installed the 4 -lane intersection and signal and
Pasadena ISD will be constructing 1 -lane of the west 2 -lane boulevard section from Riverstone Falls to Alexander.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 188
TR2303 - Hughes Road (Pearland Parkway to City of Pearland City Limit)
Explain & Identify Type of Other Sources:
2O24PIB 2023GO $2,694,000
Potential TIP Funding
Capital Cost
$12.2 M
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$12.2 M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Land/Right of Way
Design/Surveying
Total
$7,959,999
$1,592,000
$1,500,000
$1,194,000
$2,245,999
$1
$0
$0
$0
$
$0 $7,960,000
$0 $1,592,000
$0 $1,500,000
$0 $1,194,000
9 $2,246,000
Funding Sources
$12.2 M
FY2026 Budget
Total Budget (all years) Project Total (to date)
$12.2M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
2023 General Obligation
Bonds
Other Funding Sources
Total
$7,365,365 $1
$4,880,634
$2,245,999
$0
$
$0 $7,365,366
$0
9
$4,880,634
$2,246,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 189
TR2303 - Hughes Road (Pearland Parkway to City of Pearland City Limit)
Operational Costs
FY2026 Budget
$1.19K
Total Budget (all years)
$27.2K
Project Total
$27.2K
Detailed Breakdown
Category
Historical FY2026 FY2027 FY2028 FY2029 Future
Budgeted Requested Requested Requested Requested Budgeted
Total
Operations&Maintenance $o $32 $7,090 $7,444 $7,816 So $22,382
Personnel Services $o $1,158 $1,192 $1,228 $1,265 So $4,843
Total 0 $,190 8,282 8,672 8,081 0 $7,225
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 190
TR2401 - Concrete Sidewalk Gaps and Replacement
TR2401 - Concrete Sidewalk Gaps and
Replacement
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number TR2401
Request Groups Streets
Estimated Start 10/1/2023
Date
561 -J
FwrIAIRIccd
Description
The project is intended to systematically replace sections of concrete sidewalks that would benefit from complete removal
and replacement within mature sections of the community and to analyze connectivity to adjacent subdivisions and
commercial areas. The intent is to audit the City's sidewalk infrastructure and determine broad locations based on age, safety,
gaps, and used to create a programmed -based approach to sidewalk replacement. This, in conjunction with the City's
ongoing sidewalk management program, will ensure safe and accessible sidewalks for years to come. This will also allow the
sidewalk repair program to maximize resources and focus on locations manageable by the current repair program, while
allowing a comprehensive project to be focused on more severely aged and damaged sections of the sidewalk network.
Images
TR2401
Details
Strategic Priority: Safe Community Impact on operating budget: Yes
Type of Project: Expansion
Project Justification
This project will include the auditing of the City's sidewalk network, defining strategic locations to focus on complete large-
scale removal and replacement efforts and developing a schedule with the required budget to systematically remove and
replace broad sections of sidewalks. Areas to qualify under this project would include complete streets or subdivisions as
determined by the sidewalk audit. The project will then transition into the construction phase and ensure the sidewalks are
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 191
TR2401 - Concrete Sidewalk Gaps and Replacement
removed and replaced per construction standards and within the designated locations per schedule and budget.
Explain & Identify Type of Other Sources:
2024 PIB 2023 GO $2,200,000
Capital Cost
$6.6M
FY2026 Budget
$4.4M
Total Budget (all years) Project Total (to date)
$8.8M $15.4M
Detailed Breakdown
Category Historical Budgeted
FY2026 FY2027
Requested Requested
Future Budgeted Total
Construction
Design/Surveying
Total
$6,000,000 $4,000,000 $4,000,000
$600,000 $400,000 $400,000
6,600,000 $,400,000 $,400,000
$0 $14,000,000
$0 $1,400,000
6 $5,400,000
Funding Sources
$6.6M
FY2026 Budget
$4.4M
Total Budget (all years) Project Total (to date)
$8.8M $15.4M
Detailed Breakdown
Category Historical Budgeted
FY2026 FY2027
Requested Requested
Future Budgeted Total
2023 General Obligation
Bonds
Total
$6,600,000
6,600,000
$4,400,000 $4,400,000
$,400,000 $,400,000
$0 $15,400,000
6 $5,400,000
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 192
TR2402 - Dixie Farm Road at Hastings Friendswood Road Intersection Improvements
TR2402 - Dixie Farm Road at Hastings
Friendswood Road Intersection
Improvements
Overview
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number TR2402
Request Groups Streets
Estimated Start 10/1/2024
Date
Project Location
Amy Coykendall, CIP Coordinator Hastings Friendswood Road
4 %LA • G -4a
Description
The project will consist of the design and construction of a traffic signal at the Dixie Farm Road and Hastings Friendswood
Drive Intersection. The project is anticipated to require realigning Hastings Friendswood Drive with Tall Oak Drive to enhance
the intersection's safety and mobility. The design plan should include the proposed signal layout, signal cabinets, detection
equipment, etc., along with the roadway's realignment and associated drainage, signal detail, proposed elevation sheets,
signing and pavement marking, standards, utility adjustments and traffic control plans.
Images
TR2402
Details
Strategic Priority: Sustainable Infrastructure
Type of Project: Intersection Improvements
Project Justification
Impact on operating budget: Yes
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 193
TR2402 - Dixie Farm Road at Hastings Friendswood Road Intersection Improvements
Several vehicular accidents have been reported by residents at Dixie Farm at Tall Oak Drive (Hastings Friendswood Drive).
The absence of a traffic signal, proximity to the narrow bridge widening into a boulevard section, improper alignment of
north -south driveways, sight distance, and speed contribute to the higher number of crashes at this intersection. The
intersection is warranted for a traffic signal for the safety and mobility of vehicular traffic based on traffic signal warrant
analysis. This is a high -priority project due to the need for the prevention and reduction of life -threatening vehicular crashes.
Capital Cost
$980K
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$980K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Design/Surveying
Equipment and Furniture
Total
$799,999
$100,000
$80,000
879,999
$1
So
$0
S0 $800,000
$0 $100,000
$0 $80,000
8 880,000
Funding Sources
$980K
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$980K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Certificates of Obligation
General Revenue -Cash
Total
$879,999
$100,000
879,999
si
so
$
$0 $880,000
$0 $100,000
8 880,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 194
TR2502 - Broadway Expansion Phase 2 - Old Chocolate Bayou to McLean Rd.
TR2502 - Broadway Expansion Phase 2 - Old
Chocolate Bayou to McLean Rd.
Overview
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number TR2502
Request Groups Streets
Estimated Start 10/1/2024
Date
Project Location
9 9
a•.,.• c ana.,o-w
Description
TxDOT will be widening Broadway to provide three lanes in each direction, raised medians, access controls, new City standard
signals and controls, and additional turn lanes where required for traffic management purposes. Relocation of City -owned
utilities within the utility easement will be at TxDOT cost. The city is currently anticipating the intelligent transportation
system fiber located from Old Chocolate Bayou to McLean Road, approximately 16,000 LF, will be relocated/replaced by
TxDOT as part of the project. The fiber connection will be switched from aerial to underground and connect West Gate Lift
Station at 7737 Broadway and Food Town Lift Station at 7101 Broadway. This fiber is in TxDOT ROW of FM 518 and will need to
be relocated for the roadway widening. PEDC will be addressing the aesthetic enhancements to the corridor.
Images
■
Details
Strategic Priority: Connected Community Impact on operating budget: NO
Type of Project: Expansion
Project Justification
Traffic counts between SH 288 and Cullen and rapid growth within this segment of Broadway warrant the expansion of this
major artery. Reconfiguration will add capacity to assist traffic movements towards accessing both State Highway 288 and
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 195
TR2502 - Broadway Expansion Phase 2 - Old Chocolate Bayou to McLean Rd.
State Highway 288 Toll Lanes via Broadway while relieving congestion along major commercial frontages. TxDOT anticipates
construction funding in 2030. Fiber along this section of the corridor also serves as critical backbone from the Public Safety
Building to all City facilities eat of Old Chocolate Bayou.
Capital Cost
$7M
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$7M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Land/Right of Way
Total
$6,999,999
6,999,999
si
$
$0
6
$7,000,000
$,000,000
Funding Sources
$7M
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$7M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
PEDC
Certificates of Obligation
Total
$6,999,999 $1
$0 $0
6,999,999 $
$0 $7,000,000
$0 $0
6 $,000,000
Operational Costs
FY2026 Budget Total Budget (all years)
so
$112K
Project Total
$112K
Detailed Breakdown
Category Historical Budgeted
FY2029
Requested
Future Budgeted Total
Operations & Maintenance
Total
$o
6
$112,421
$12,421
$0
s
$112,421
$12,421
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 196
TR2510 - Pearland Parkway Bridge Soil Erosion Repair (at Clear Creek)
TR2510 - Pearland Parkway Bridge Soil
Erosion Repair (at Clear Creek)
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 345 - Capital Projects
Type Capital Improvement
Project Number TR2510
Request Groups Streets
Estimated Start 10/1/2025
Date
Description
The project will consist of rehabilitating the slope embankment, repairing score holes at the bottom, concrete slope
pavement etc. to provide stability to the bridge pier and protect it from further erosion.
Images
TR2510
Details
Strategic Priority: Safe Community Impact on operating budget: Yes
Type of Project: Intersection Improvements
Project Justification
The Pearland Pkwy bridge pier has been exposed due to soil erosion around the pier (drilled shafts) and along the northern
bank of Clear Creek. The bridge inspection by TxDOT in 2023 recommended repairing soil erosion and providing erosion
countermeasures to avoid compromised structural ability of the bridge shafts. The soil erosion is on the Harris County side of
Pearland Pkwy but was built by the City connecting FM 518 to Beltway 8.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 197
TR2510 - Pearland Parkway Bridge Soil Erosion Repair (at Clear Creek)
Capital Cost
$100K
FY2026 Budget Total Budget (all years)
$700K $700K
Project Total (to date)
$800K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Design/Surveying
Contingency
Total
$0 $650,000
$100,000 S0
$0 $50,000
$00,000 $00,000
$0 $650,000
$0 $100,000
$0 $50,000
$ $00,000
Funding Sources
$100K
FY2026 Budget
$700K
Total Budget (all years) Project Total (to date)
$700K $800K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Certificates of Obligation
Total
$100,000
$00,000
$700,000
$00,000
$0 $800,000
$ $00,000
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 198
TR2601 - Barry Rose Masonry Wall Replacement
TR2601 - Barry Rose Masonry Wall
Replacement
Overview Project Location
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number TR2601
Request Groups Streets
Estimated Start 10/1/2026
Date
Amy Coykendall, CIP Coordinator
Larnimimme
*I. , Gan. -4a
Description
Replacement of 3,700 LF of stained concrete masonry wall along Barry Rose Rd adjacent to the Pilgrims Point and Alexander
Landing Subdivision.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: NO
Type of Project: Intersection Improvements
Project Justification
The current wall structure is showing signs of distress; panels are deteriorating and collapsing in several locations due to age
root intrusions and this type of wall design typically has an estimated service life of roughly 20 years.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 199
TR2601 - Barry Rose Masonry Wall Replacement
Capital Cost
FY2026 Budget
$1.57 M
Total Budget (all years)
$1.57 M
Project Total
$1.57 M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Design/Surveying
Contingency
Total
$0 $1,300,000
So $200,000
$0 $65,000
$,565,000
$0 $1,300,000
$0 $200,000
$0 $65,000
$,565,000
Funding Sources
FY2026 Budget
$1.57 M
Total Budget (all years) Project Total
$1.57 M $1.57 M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Certificates of Obligation
Total
$0 $1,565,000
9 $,565,000
$0 $1,565,000
9 $,565,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 200
TR2603 - Traff c Signal at Kingsley/CR48
TR26O3 - Traffi Signal at Kingsley/CR48
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 305 - Traffic Management
Type Capital Improvement
Project Number TR2603
Request Groups Streets
Estimated Start 10/1/2025
Date
9
F nercalIWd
MDar
Description
The project will involve designing and constructing a traffic signal at the Kingsley Drive and Southern Trail Drive Intersection.
The traffic signal will be in the overlapping/shared jurisdiction between the City of Pearland and Brazoria County. The design
plan should include the proposed decorative traffic signal, signal cabinets, detection equipment, pedestrian signals, and
other relevant components. Additionally, the plan should include signal details, proposed elevation sheets, signing and
pavement markings, design standards, utility adjustments, and traffic control plans, all in accordance with the City of
Pearland EDCM Chapter 9 guidelines.
Images
Kingsley at CR48
Details
Strategic Priority: Safe Community Impact on operating budget: Yes
Type of Project: Intersection Improvements
Project Justification
Several vehicular accidents have been reported by residents and verified using accident reports at Kingsley Drive/CR 48 and
Southern Trails Drive intersection. Between 2019 and 2024, there were 29 traffic accidents ranging from minor injuries to
suspected serious injuries. Based on a traffic signal warrant analysis in accordance with the TMUTCD (Texas Manual on
Uniform Traffic Control Devices) guidelines, the intersection meets the criteria for a traffic signal. Installing a traffic signal will
help reduce accidents, enhance the mobility of vehicular traffic, and provide safer crossing opportunities for pedestrians.
This is a high -priority project due to the need for the prevention and reduction of life -threatening vehicular crashes.
,r1 FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 201
TR2603 - Traff c Signal at Kingsley/CR48
Explain & Identify Type of Other Sources:
50/50 w/ Brazoria Co.
Capital Cost
FY2026 Budget
$920 K
Total Budget (all years) Project Total
$920 K $920 K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Design/Surveying
Prelim. Engineering Report
Contingency
Total
$0 $600,000
$0 $120,000
S0 $120,000
S0 $80,000
0 $20,000
$0 $600,000
$0 $120,000
$0 $120,000
$0 $80,000
0 $20,000
Funding Sources
FY2026 Budget Total Budget (all years)
$920 K $920 K
Project Total
$920 K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Other Funding Sources
Certificates of Obligation
Total
S0 $460,000
$0 $460,000
0 $20,000
$0 $460,000
$0 $460,000
9 $20,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 202
TR2604 - TxDOT Traff c Signal Upgrade along SH35
TR2604 - TxDOT Traffic Signal Upgrade along
SH35
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 311 - Streets
Type Capital Improvement
Project Number TR2604
Request Groups Streets
Estimated Start 10/1/2025
Date
1.12{.. GI%
a. •G M•},-uy
Description
TxDOT is upgrading existing span -wire (string -arm) signal intersections to mast -arm traffic signals. Three intersections within
the City of Pearland along SH 35 will be upgraded as part of this project:
•SH 35 at Oiler/Bailey
•SH 35 at No Name/School Driveway
•SH 35 at Hastings Cannon
TxDOT will manage both the design and construction phases of the traffic signal upgrade. This project will involve
coordination with the City of Pearland through an Advanced Funding Agreement (AFA) to upgrade the traffic signals to the
city's standard.
Images
Details
Strategic Priority: Safe Community Impact on operating budget: NO
Type of Project: Intersection Improvements
Project Justification
The City of Pearland has adopted ornamental, powder -coated traffic signals as its standard. To meet this standard, the project
will include upgrading TxDOT's standard signal infrastructure, including signal poles, mast arms, pedestrian signal poles,
ink FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 203
TR2604 - TxDOT Traff c Signal Upgrade along SH35
signal detection cameras, and PTZ (pan -tilt -zoom) cameras. The upgraded standard will improve aesthetics and increase
operational efficiency by reducing long-term maintenance and operational costs.
Capital Cost
FY2026 Budget
$382K
Total Budget (all years)
$382K
Project Total
$382K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted
Design/Surveying
Total
$0
9
$381,500
$81,500
$0
9
Total
$381,500
$81,500
Funding Sources
FY2026 Budget
$382K
Total Budget (all years)
$382K
Project Total
$382K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Certificates of Obligation
Total
SO $381,500
0 $81,500
Future Budgeted
$o
0
Total
$381,500
$81,500
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 2O4
TR2705 - PER for Future Bond Referendum -Streets
TR2705 - PER for Future Bond Referendum -
Streets
Overview Project Location
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number TR2705
Request Groups Streets
Estimated Start 10/1/2027
Date
Amy Coykendall, CIP Coordinator
Description
Provide funding for preliminary engineering on 8-12 future projects to be identified that would be funded with the City's next
bond referendum. Preliminary engineering would develop detailed scopes and provide for estimated construction dollars
that would be needed to make a proposition to the voters.
Images
Details
Strategic Priority: Resilient Finances Impact on operating budget: NO
Type of Project: New Road
Project Justification
These planning efforts will develop detailed scopes and provide detailed cost estimates for a bond referendum.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 205
TR2705 - PER for Future Bond Referendum -Streets
Capital Cost
FY2026 Budget
so
Total Budget (all years)
$500K
Project Total
$500K
Detailed Breakdown
Category Historical Budgeted
FY2027
Requested
Future Budgeted Total
Prelim. Engineering Report
Total
$0 $500,000
$00,000
$0 $500,000
0 $00,000
Funding Sources
FY2026 Budget
so
Total Budget (all years)
$500K
Project Total
$500 K
Detailed Breakdown
Category Historical Budgeted
FY2027
Requested
Future Budgeted Total
General Revenue -Cash
Total
$0
$
$500,000
$00,000
$0 $500,000
0 $00,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 206
Wastewater
Wastewater
FY26 - FY30 Wastewater Projects (including Historical Budgeted, Future Budgeted)
$300M
$237M
$200M
$100M
0
$90M
$29M
$20M
$10M
$17M
$5M
Historical
Budgeted
2026 2027 2028 2029 2030 Future
Budgeted
• WW1502 - Barry Rose WRF
Replacement and Expansion
• WW1906 - Longwood Water
Reclamation Facility
Decommissioning
WW2006 - Mykawa Road Sewer
Relocation - Jasmine to S
Orange Circle
• WW2104 - FM 518 Wastewater
Utility Relocations - SH288 to Old
Chocolate Bayou
WW2303 - Dixie Farm North
Regional Lift Station
Rehabilitation
• WW2401 - Barry Rose Gravity
Sewer - Plum from Galveston to
Barry Rose WRF
• WW2402 - Riverstone Ranch
Regional Lift Station Capacity
Expansion
• WW2403 - Lakes of Country
Place Lift Station Rehabilitation
WW2404 - Southdown Lift
Station Rehabilitation
WW2405 - Shady Crest and
Creek View Subdivision Sanitary
Sewer Rehabilitation
WW2406 - Whispering Winds
Lift Station Relocation
• WW2407 - Wooten Road Lift
Station Decommissioning
• WW2408 - Sanitary Sewer
Rehabilitation - Longwood
Service Area (LW -03)
$229,380,000 56.38%
$38,073,000 9.36%
$378,000
$6,800,000
$4,847,000
0.09%
1.67%
1.19%
$11,003,000 2.70%
$4,600,000 1.13%
$774,000
$2,450,000
$5,375,171
$1,431,000
$593,000
$9,561,000
0.19%
0.60%
1.32%
0.35%
0.15%
2.35%
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 207
Wastewater
• WW2501 - Sanitary Sewer $5,282,000 1.30%
Rehabilitation - Longwood
Service Area (LW -04)
• WW2502 - Green Tee IV Lift $1,708,000 0.42%
Station Rehabilitation
• WW2503 - Sunset Meadows Lift $2,090,000 0.51%
Station Rehabilitation
• WW2504 - Green Tee III Lift $1,335,000 0.33%
Station Rehabilitation
• WW2507- Kirby North Regional $2,018,000 0.50%
Lift Station Rehabilitation
• WW2508 - Waste Water Master $625,000 0.15%
Plan Update
• WW2603 - Green Tee I Lift $3,091,000 0.76%
Station
• WW2604 - Oakbrook Estates Lift $1,540,000 0.38%
Station Replacement
• WW2608 - Sunset Lakes Lift $1,772,000 0.44%
Station Rehabilitation
• WW2609 - FM 518 Utility $6,800,000 1.67%
Relocations Phase 2 (Old
Chocolate Bayou to McLean)
• WW2611-JHECOdor Control $2,250,000 0.55%
System
• WW2612 - WWTPs Asset $6,000,000 1.47%
Management Plan
• WW2613 - Woodthrush Regional $3,935,000 0.97%
Lift Station Rehabilitation
• WW2614 - Assessment and $6,050,000 1.49%
Rehabilitation of Pearland's
Wastewater Treatment Plants
• WW2701 - Towne Lake Lift $1,600,000 0.39%
Station Rehabilitation
• WW2702 - Pine Hollow Lift $1,010,001 0.25%
Station Rehabilitation
• WW2704 - Clear Creek Park Lift $1,862,000 0.46%
Station Rehabilitation
• WW2705 - Country Place Lift $2,429,000 0.60%
Station Rehabilitation
• WW2707-WalmartLift Station $1,498,000 0.37%
Rehabilitation
• WW2708 - Hughes Ranch Road $4,589,000 1.13%
Gravity Sewer -Cullen to Stone
• WW2709 - Crystal Lakes West 63,828,000 0.94%
Lift Station Rehabilitation
• WW2710 - Critical Lift Station $5,600,000 1.38%
Electrical Hardening
Improvements
• WW2801 - Rustic Oak $895,000 0.22%
Elementary School Lift Station
Rehabilitation
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 208
Wastewater
• WW2802 - Westlea Lift Station
Rehabilitation
• WW2901 - Southdown Regional
Lift Station & Force Main
WW2902 - Country Place Waste
Water Line Replacement
• WW2903 - Tower Bridge Lift
Station Rehabilitation
WW3001- Villages of Edgewater
Lift Station Rehabilitation
$1,272,000
$18,900,000
$1,150,000
$940,000
$1,540,000
0.31%
4.65%
0.28%
0.23%
0.38%
Summary of Requests
Project No. /
Category
Historical
Budgeted
FY2026 FY2027
FY2028 FY2029
FY2030 Future
Budgeted
WW15 WW1502 -
02 Barry Rose
WRF
Replacement
and Expansion
WW19 WW1906 -
06 Longwood
Water
Reclamation
Facility
Decommission
ing
WW2 WW2006 -
006 Mykawa Road
Sewer
Relocation -
Jasmine to S
Orange Circle
WW21 WW2104- FM
04 518
Wastewater
Utility
Relocations -
SH288 to Old
Chocolate
Bayou
WW2 WW2303 -
303 Dixie Farm
North Regional
Lift Station
Rehabilitation
WW2 WW2401 -
401 Barry Rose
Gravity Sewer -
Plum from
Galveston to
Barry Rose
WRF
WW2 WW2402 -
402 Riverstone
Ranch
Regional Lift
Station
$174,143,000 $43,237,000 $12,000,000
$38,072,999
$377,999
$6,799,999
$1 $0
$1 $0
si $0
$3,524,000 $1,323,000 $0
$2,853,000 $8,150,000 $0
$820,000 $3,780,000 $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
S0
$0
$0
$0
$0
$0
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 209
Wastewater
Project No. /
Category
Capacity
Expansion
WW2 WW2403- $64,000 $710,000 $0 $0 $0 $0 $0
403 Lakes of
Country Place
Lift Station
Rehabilitation
WW2 WW2404- $1,200,000 $1,250,000 $0 $0 $0 $0 $0
404 Southdown
Lift Station
Rehabilitation
WW2 WW2405- $805,171 $4,570,000 $0 $0 $0 $0 $0
405 Shady Crest
and Creek
View
Subdivision
Sanitary Sewer
Rehabilitation
WW2 WW2406- $371,000 $1,060,000 $0 $0 $0 $0 $0
406 Whispering
Winds Lift
Station
Relocation
WW2 WW2407 - $592,999 $1 $0 $0 $0 $0 $0
407 Wooten Road
Lift Station
Decommission
ing
WW2 WW2408- $1,600,000 $7,961,000 $0 $0 $0 $0 $0
408 Sanitary Sewer
Rehabilitation -
Longwood
Service Area
(LW -03)
WW2 WW2501- $1,362,000 $3,920,000 $0 $0 $0 $0 $0
501 Sanitary Sewer
Rehabilitation -
Longwood
Service Area
(LW -04)
WW2 WW2502- $0 $0 $0 $1,708,000 $0 S0 $0
502 Green Tee IV
Lift Station
Rehabilitation
WW2 WW2503- $0 $462,000 $1,628,000 $0 $0 $0 $0
503 Sunset
Meadows Lift
Station
Rehabilitation
WW2 WW2504- $0 $1,335,000 $0 $0 $0 $0 $0
504 Green Tee III
Lift Station
Rehabilitation
WW2 WW2507- $278,000 $1,740,000 $0 $0 $0 S0 S0
507 Kirby North
Regional Lift
Station
Rehabilitation
Historical
Budgeted
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 210
Wastewater
WW2508 -
508 Waste Water
Master Plan
Update
WW2603 -
Green Tee I Lift
Station
WW2604 -
Oakbrook
Estates Lift
Station
Replacement
WW2608 -
Sunset Lakes
Lift Station
Rehabilitation
WW2609 - FM
609 518 Utility
Relocations
Phase 2 (Old
Chocolate
Bayou to
McLean)
WW2611 -
611 JHECOdor
Control System
WW2612 -
WWTPs Asset
Management
Plan
WW2613 -
Woodthrush
Regional Lift
Station
Rehabilitation
WW2614 -
614 Assessment
and
Rehabilitation
of Pearland's
Wastewater
Treatment
Plants
WW2701 -
701 Towne Lake
Lift Station
Rehabilitation
WW2702 -
702 Pine Hollow
Lift Station
Rehabilitation
WW2704 -
Clear Creek
Park Lift
Station
Rehabilitation
WW2705 -
Country Place
Project No. /
Category
Historical
Budgeted
FY2026 FY2027 FY2028 FY2029 FY2030
WW2
WW2
603
WW2
604
WW2
608
WW2
WW2
WW2
612
WW2
613
WW2
WW2
WW2
WW2
704
WW2
705
$0 $625,000 $0 $0 $0 $0
$0 $0 $751,000 $2,340,000 $0 $0
$0 $1,540,000
$0 $0 $0 $0
$0 $0 $0 $222,000 $1,550,000
$0 $6,800,000
$0
So
$0 $300,000 $1,950,000 $0
$0 $500,000 $2,500,000 $3,000,000
$0 $522,000 $3,413,000
$0 $550,000 $5,500,000
$0
$0
So
SO
$0
$0
$0
SO
So
SO
$0
$0
$0
Future
Budgeted
$0
$0
$0
SO
So
SO
$0
$0
$0
SO $0 $0 $0 SO $1 $1,599,999
So So $0 $0 $0 $1 $1,010,000
So $0 $0 $350,000 $1,512,000
$0 $0 $379,000 $2,050,000
$0
$0
$0
$0
$0
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 211
Wastewater
Project No. /
Category
Lift Station
Rehabilitation
WW2 WW2707 - SO $0 $0 $1,498,000 $0 $0 $0
707 Walmart Lift
Station
Rehabilitation
WW2 WW2708- $1,852,000 $0 $280,000 $2,457,000 $0 $0 S0
708 Hughes Ranch
Road Gravity
Sewer -Cullen
to Stone
WW2 WW2709- $1,920,000 $0 $0 $270,000 $1,638,000 $0 $0
709 Crystal Lakes
West Lift
Station
Rehabilitation
WW2 WW2710- $0 $0 $300,000 $5,300,000 $0 $0 $0
710 Critical Lift
Station
Electrical
Hardening
Improvements
WW2 WW2801- $0 $0 $0 $180,000 $715,000 $0 $0
801 Rustic Oak
Elementary
School Lift
Station
Rehabilitation
WW2 WW2802- $0 $0 $0 $372,000 $900,000 $0 $0
802 Westlea Lift
Station
Rehabilitation
WW2 WW2901- $100,000 $0 $0 $0 $2,400,000 $16,400,000 $0
901 Southdown
Regional Lift
Station & Force
Main
WW2 WW2902 - SO $0 $0 $0 $1,150,000 $0 SO
902 Country Place
Waste Water
Line
Replacement
WW2 WW2903- $0 $0 $0 $0 $100,000 $290,000 $550,000
903 Tower Bridge
Lift Station
Rehabilitation
WW3 WW3001- S0 $0 $0 SO SO $100,000 $1,440,000
001 Villages of
Edgewater Lift
Station
Rehabilitation
Total Summary of $36,736,167 80,335,004 $8,701,000 $9,747,000 8,965,000 $6,790,002 $,599,999
Requests
Historical
Budgeted
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
Project No. / Category
(continued from above)
Total
WW1502
WW1502 - Barry Rose WRF Replacement and $229,380,000
Expansion
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 212
Wastewater
Project No./Category
(continued from above)
Total
WW1906
WW2006
WW2104
WW2303
WW2401
WW2402
WW2403
WW2404
WW2405
WW2406
WW2407
WW2408
WW2501
WW2502
WW2503
WW2504
WW2507
WW2508
WW2603
WW2604
WW2608
WW2609
WW2611
WW2612
WW1906 - Longwood Water Reclamation Facility
Decommissioning
WW2006 - Mykawa Road Sewer Relocation -
Jasmine to S Orange Circle
WW2104 - FM 518 Wastewater Utility Relocations -
SH288 to Old Chocolate Bayou
WW2303 - Dixie Farm North Regional Lift Station
Rehabilitation
WW2401 - Barry Rose Gravity Sewer - Plum from
Galveston to Barry Rose WRF
$38,073,000
$378,000
$6,800,000
$4,847,000
$11,003,000
WW2402- Riverstone Ranch Regional Lift Station $4,600,000
Capacity Expansion
WW2403 - Lakes of Country Place Lift Station
Rehabilitation
WW2404 - Southdown Lift Station Rehabilitation
WW2405 - Shady Crest and Creek View Subdivision
Sanitary Sewer Rehabilitation
WW2406 - Whispering Winds Lift Station
Relocation
WW2407 - Wooten Road Lift Station
Decommissioning
WW2408 - Sanitary Sewer Rehabilitation -
Longwood Service Area (LW -03)
$774,000
$2,450,000
$5,375,171
$1,431,000
$593,000
$9,561,000
WW2501- Sanitary Sewer Rehabilitation - $5,282, 000
Longwood Service Area (LW -04)
WW2502 - Green Tee IV Lift Station Rehabilitation
WW2503 - Sunset Meadows Lift Station
Rehabilitation
WW2504 - Green Tee III Lift Station Rehabilitation
WW2507 - Kirby North Regional Lift Station
Rehabilitation
WW2508 - Waste Water Master Plan Update
WW2603 - Green Tee I Lift Station
WW2604 - Oakbrook Estates Lift Station
Replacement
WW2608 - Sunset Lakes Lift Station Rehabilitation
WW2609 - FM 518 Utility Relocations Phase 2 (Old
Chocolate Bayou to McLean)
WW2611 -JHEC Odor Control System
WW2612 - WWTP5 Asset Management Plan
$1,708,000
$2,090,000
$1,335,000
$2,018,000
$625,000
$3,091,000
$1,540,000
$1,772,000
$6,800,000
$2,250,000
$6,000,000
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 213
Wastewater
Project No. / Category
(continued from above)
Total
WW2613
WW2614
WW2701
WW2702
WW2704
WW2705
WW2707
WW2708
WW2709
WW2710
WW2801
WW2802
WW2901
WW2902
WW2903
WW2613 - Woodth rush Regional Lift Station
Rehabilitation
WW2614 - Assessment and Rehabilitation of
Pearland's Wastewater Treatment Plants
WW2701-Towne Lake Lift Station Rehabilitation
WW2702 - Pine Hollow Lift Station Rehabilitation
WW2704 - Clear Creek Park Lift Station
Rehabilitation
WW2705 - Country Place Lift Station Rehabilitation
WW2707 - Walmart Lift Station Rehabilitation
WW2708 - Hughes Ranch Road Gravity Sewer -
Cullen to Stone
WW2709 - Crystal Lakes West Lift Station
Rehabilitation
WW2710 - Critical Lift Station Electrical Hardening
Improvements
WW2801- Rustic Oak Elementary School Lift
Station Rehabilitation
WW2802 - Westlea Lift Station Rehabilitation
WW2901- Southdown Regional Lift Station & Force
Main
WW2902 - Country Place Waste Water Line
Replacement
WW2903 - Tower Bridge Lift Station Rehabilitation
WW3001 WW3001- Villages of Edgewater Lift Station
Rehabilitation
Total Summary of Requests
$3,935,000
$6,050,000
$1,600,000
$1,010,001
$1,862,000
$2,429,000
$1,498,000
$4,589,000
$3,828,000
$5,600,000
$895,000
$1,272,000
S18,900,000
$1,150,000
$940,000
$1,540,000
$06,874,172
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 214
WW1502 - Barry Rose WRF Replacement and Expansion
WW1502 - Barry Rose WRF Replacement and
Expansion
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 345 - Capital Projects
Type Capital Improvement
Project Number WW1502
Request Groups Water
Estimated Start 10/1/2025
Date
9
Description
In 2022, staff are conducting an evaluation of the overall placing for plan consolidation. Evaluation includes costs, review,
treatment process and new Waste Water Treatment Plant (WWTP) location. Replacement of the existing treatment plant
with expanded capacity to meet TCEQ standards. This includes a possible alternate WWTP location. The plant will utilize the
current conventional activated sludge process, Sequencing Batch Reactor (SBR). The project delivery model will be
Construction Manager at Risk (CMAR). The existing plant will remain online during construction with emergency repairs as
necessary. Existing plant structures and equipment are currently being evaluated for viability of continued use after
expansion is performed. A parallel project also includes the decommissioning of the 2.5 MGD Longwood WRF and
conveyance to the new or expanded plant.
Images
WW1502
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 215
WW1502 - Barry Rose WRF Replacement and Expansion
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: Improvement
Project Justification
The Texas Commission on Environmental Quality (TCEQ) rules require the initiation of engineering design and financial
planning to upgrade a water reclamation facility when the flows reach 75% of the plant capacity. The plant was built in 1964,
the existing structures are beyond useful life. The facility reached the 75% threshold in 2016 and this began the process as
required by TCEQ to begin the engineering process. Over the last few years, Public Works has been investing in l&I to help
reduce flows. However, during rain events we have exceeded this requirement several times, which has led to several
overflow reporting's to TCEQ and a potential "Notice of Enforcement". This approach is also inline with the initiative for the
regionalization of wastewater treatment facilities. In 2016, a Preliminary Engineering Report began to determine the specific
design parameters required for the plant expansion, including volume and biological loading.
Explain & Identify Type of Other Sources
2017C Revenue Bonds $400,000
2018B Revenue Bonds $2,990,000
2020B Revenue Bonds $620,000
2022C W/S CO $6,920,265
2023C W/S CO $32,032,265
2024C W/S CO $36,555,735
Fund 550 Fund Balance $513,209. Waste water project I in 2017 impact fee update.
Bonds previously sold for JHEC WRF $1,505,000 in 2016 and $2,111,526 in 2018 repurposed to Barry Rose.
Capital Cost
$229 M
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$229 M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Design/Surveying
Contingency
Land/Right of Way
Prelim. Engineering Report
Equipment and Furniture
Total
$194,400,000
$14,500,000
$9,720,000
$9,000,000
$1,260,000
$499,999
$29,379,999
$0
$0
$0
$0
$0
$1
$
$0 5194,400,000
$0 $14,500,000
$0 $9,720,000
$0 $9,000,000
$0 $1,260,000
$0 $500,000
5 $29,380,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 216
WW1502 - Barry Rose WRF Replacement and Expansion
Funding Sources
$174M
FY2026 Budget
$43.2M
Total Budget (all years)
$55.2M
Project Total (to date)
$229M
Detailed Breakdown
Category Historical Budgeted
FY2026 FY2027 Future Budgeted
Requested Requested
Total
W/S Certificates of
Obligation
Impact Fees -Debt
W/S Revenue Bonds
Impact Fees -Cash
Other Funding Sources
Total
$82,651,633 $21,618,500
$82,651,632
$7,626,526
$700,000
$513,209
$74,143,000
$21,618,500
$0
SO
$0
$3,237,000
$6,000,000
$6,000,000
$0
$0
$0
$2,000,000
$0 $110,270,133
$0 $110,270,132
$0 $7,626,526
$0 $700,000
$0 $513,209
9 $29,380,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 217
WW1906 - Longwood Water Reclamation Facility Decommissioning
WW1906 - Longwood Water Reclamation
Facility Decommissioning
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 345 - Capital Projects
Type Capital Improvement
Project Number WW1906
Request Groups Water
Estimated Start 10/1/2025
Date
9
,,!NC [.n
Description
The project consists of the decommissioning of the Longwood Water Reclamation Facility (LWRF) and construction of a
regional lift station to transfer the 2 MGD flows (plus peak) to the expanded Barry Rose Water Reclamation Facility (BRWRF)
via a new force main. The Longwood force main's anticipated length is approximately 25,000 linear feet to run along the
Harris County Flood Control District Clear Creek limits and discharge to Barry Rose WRF.
Images
•
•r `ti•LA
WW1902
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: Improvement
Project Justification
The LWRF is located on Dixie Farm directly adjacent to Clear Creek. The plant is subject to repeated inundation during heavy
rains and was rendered inoperable due to flooding from Hurricane Harvey. Age (built in 1960s), condition, and location make
it more cost-effective to decommission this facility and redirect its flows to BRWRF. The approach is also in line with the
initiative to regionalize our WRF's.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 218
WW1906 - Longwood Water Reclamation Facility Decommissioning
Explain & Identify Type of Other Sources
2020B Revenue Bonds $1,056,000
2022C W/S COs $490,000
2023C W/S COs $4,454,000
2024 W/S COs $17,573,000
Capital Cost
$38.1 M
FY2026 Budget
Total Budget (all years) Project Total (to date)
$38.1 M
Detailed Breakdown
Category Historical Budgeted
FY2O26
Requested
Future Budgeted Total
Construction
Design/Surveying
Contingency
Land/Right of Way
Total
$29,430,000
$3,100,000
$2,942,999
$2,600,000
$8,072,999
$0
$0
$1
$0
$0 $29,430,000
$0 $3,100,000
$0 $2,943,000
$0 $2,600,000
$ $8,073,000
Funding Sources
$38.1 M
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$38.1 M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
W/S Certificates of
Obligation
W/S Revenue Bonds
Total
$37,016,999 $1
$1,056,000
$8,072,999
$0
$
$0 $37,017,000
$0
$
$1,056,000
$8,073,000
in FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 219
WW1906 - Longwood Water Reclamation Facility Decommissioning
Operational Costs
FY2026 Budget
$o
Total Budget (all years)
$33.5 K
Project Total
$33.5 K
Detailed Breakdown
Category Historical Budgeted
FY2028 FY2029
Requested Requested
Future Budgeted Total
Operation & Maintenance
Total
$0 $16,357 $17,174
$6,357 $7,174
$0
9
$33,531
$3,531
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 220
WW2006 - Mykawa Road Sewer Relocation - Jasmine to S Orange Circle
WW2006 - Mykawa Road Sewer Relocation -
Jasmine to S Orange Circle
Overview
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW2006
Request Groups Wastewater
Estimated Start 10/1/2025
Date
Amy Coykendall, CIP Coordinator
Project Location
Description
Install approximately 400 feet of 15 -inch gravity sewer line from 300 feet north of Jasmine to the manhole at South Orange
Circle in Mykawa Road. Includes installation of two manholes, the abandonment and filling of the existing 12 -inch sanitary
siphon under Mykawa ditch. Work includes traffic control and dewatering.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: Improvement
Project Justification
Installation of this gravity segment will remove the inaccessible sanitary siphon currently under the Mykawa Road widening
project.
Explain & Identify Type of Other Sources
Bonds: 2023C $324,600.00
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 221
WW2006 - Mykawa Road Sewer Relocation - Jasmine to S Orange Circle
Capital Cost
$378 K
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$378 K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$270,000
$53,999
$54,000
$77,999
$0
$1
$0
$0 $270,000
$0 $54,000
$0 $54,000
e $78,000
Funding Sources
$378 K
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$378 K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
W/S Certificates of
Obligation
W/S Revenues - Cash
Total
$323,999 $1
$54,000
$77,999
$0
$0 $324,000
$0
9
$54,000
$78,000
Operational Costs
$174
FY2026 Budget
Total Budget (all years) Project Total (to date)
$179 $748 $922
Detailed Breakdown
Category
Historical FY2026 FY2027 FY2028 FY2029 Future
Budgeted Requested Requested Requested Requested Budgeted
Total
Personnel Services
Operation & Maintenance
Total
$169 $174 $179 $184 $190 $0 $896
$5 $5 $5 $5 $6 $0 $26
$74 $79 $84 $89 $96 0 822
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 222
WW2104 - FM 518 Wastewater Utility Relocations - SH288 to Old Chocolate Bayou
WW2104 - FM 518 Wastewater Utility
Relocations - SH288 to Old Chocolate Bayou
Overview
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW2104
Request Groups Water
Estimated Start 10/1/2025
Date
Project Location
Amy Coykendall, CIP Coordinator Old Chocolate Bayou Road
YRq,ly..•
,-:.1
Description
This project will relocate the sanitary sewer from SH 288 to Old Chocolate Bayou. The existing sewer line is in the current and
future TxDOT ROW of FM 518 and will need to be relocated for the roadway widening.
Images
I I V:
WW2104
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
TxDOT is scheduling to widen FM518 from SH288 to SH35. The first phase is to start at SH 288 and end at Old Chocolate
Bayou. The existing and future sanitary sewer that is located in the existing ROW per TxDOT utilities will need to be relocated
out of the widening project. TxDOT has construction funding in 2025.
Explain & Identify Type of Other Sources
PEDC $6,550,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 223
WW2104 - FM 518 Wastewater Utility Relocations - SH288 to Old Chocolate Bayou
2023 C $250,000
Capital Cost
$6.8M
FY2026 Budget
Total Budget (all years) Project Total (to date)
$6.8M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Design/Surveying
Contingency
Total
$6,550,000
$200,000
$49,999
6,799,999
$0
So
Si
$0 $6,550,000
SO $200,000
$0 $50,000
0 6,800,000
Funding Sources
$6.8M
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$6.8M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Other Funding Sources
W/S Certificates of
Obligation
Total
$6,549,999
$250,000
$1
$0
6,799,999 $
$0 $6,550,000
$0 $250,000
6 6,800,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 224
WW2303 - Dixie Farm North Regional Lift Station Rehabilitation
WW2303 - Dixie Farm North Regional Lift
Station Rehabilitation
Overview Project Location
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW2303
Request Groups Water
Estimated Start 10/1/2025
Date
Amy Coykendall, CIP Coordinator Dixie Farm Road
9
,-:.1
Description
This project will rehabilitate the aging regional lift station and will include rehabilitation of the wet well, removing the
previous coating and replacing it with corrosion -resistant lining, providing temporary bypass pumping, replacing
submersible pumps, flow meters, and guide -rails, replacing piping, providing new electrical control panels along with new
electrical rack and new upgraded electrical service, SCADA, provide a new automatic transfer switch for permanent
generator connection and natural gas generator. This will also include the installation of an odor control unit on the lift
station and a 2" water service and cedar fence.
Images
WW2303
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: Improvement
Project Justification
The lift station wet well and equipment have experienced exceptionally corrosive materials, accelerating wear and aging of
wet wells and pumps. A structural rehabilitation of the wet well to prevent total replacement and prolong the life by another
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 225
WW2303 - Dixie Farm North Regional Lift Station Rehabilitation
20 years is necessary. Changes to the pumps will require the upgrade of the electrical controller and SCADA control. City
criteria for regional facilities require the addition of an automatic transfer switch, emergency generator and odor control. This
lift station's priority rating is based on being in fair condition with a very high impact due to location or high probability of
sanitary sewer overflow, according to the Wastewater Master Plan.
Explain & Identify Type of Other Sources
2023C W/S COs $274,000
Capital Cost
$3.32M
FY2026 Budget
$1.53M
Total Budget (all years)
$1.53M
Project Total (to date)
$4.85M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$3,000,000
$294,000
$23,000
8,317,000
$1,530,000
$0
$0
$,530,000
$0 $4,530,000
$0 $294,000
$0 S23,000
$,847,000
Funding Sources
$3.52M
FY2026 Budget
$1.32M
Total Budget (all years) Project Total (to date)
$1.32M $4.85M
Detailed Breakdown
Category Historical Budgeted
FY2O26
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$3,524,000 $1,323,000
8,524,000 8,323,000
$0 $4,847,000
8 8,847,000
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 226
WW2401 - Barry Rose Gravity Sewer - Plum from Galveston to Barry Rose WRF
WW2401 - Barry Rose Gravity Sewer - Plum
from Galveston to Barry Rose WRF
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 355 - Wastewater Treatment
Type Capital Improvement
Project Number WW2401
Request Groups Water
Estimated Start 10/1/2026
Date
9
L.etfJ�c Gn
aai.. F M•!. -4a
Description
This project will be to replace the undersized trunk wastewater main with the size required to be dictated by the Wastewater
Master Plan. The project will pipe burst from the existing lines to the required size of 18" - 42" The project will replace the line
in Plum from Galveston to Barry Rose and then the main trunk main in Barry Rose to the Waste Water Treatment Plant. The
project includes 7,600 LF and associated manholes.
Images
WW2401
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
The City's Wastewater Master Plan has provided recommendations to improve the collection system. The main trunk line into
Barry Rose is undersized and currently surcharges, causing sanitary sewer overflows during rain events. Increasing the line
size will provide the correct capacity.
Explain & Identify Type of Other Sources
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 227
WW2401 - Barry Rose Gravity Sewer - Plum from Galveston to Barry Rose WRF
2024C W/S CO $1,223,000
Capital Cost
$2.85M
FY2026 Budget
$8.15M
Total Budget (all years) Project Total (to date)
$8.15M $11M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0 $8,150,000
$1,630,000 $0
$1,223,000 $0
$,853,000 8,150,000
$0 $8,150,000
$0 $1,630,000
$0 $1,223,000
8 $1,003,000
Funding Sources
$2.85M
FY2026 Budget
$8.15M
Total Budget (all years)
$8.15M
Project Total (to date)
$11M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
W/S Certificates of
Obligation
General Revenue -Cash
Total
$2,853,000 $8,150,000
$0
$,853,000
$0
8,150,000
$0 $11,003,000
$o So
0 $1,003,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 228
WW2402 - Riverstone Ranch Regional Lift Station Capacity Expansion
WW2402 - Riverstone Ranch Regional Lift
Station Capacity Expansion
Overview
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW2402
Request Groups Wastewater
Estimated Start 10/1/2023
Date
Project Location
Description
The project will increase the capacity as required by the Wastewater Master Plan. A PER will be completed to determine if
pumps should be upgraded to a 2.4 MGD. Also, install an odor control unit, new electrical control panel, flow meter, new
electrical rack and SCADA. As a regional lift station, this site will require a permanent natural gas generator with automatic
transfer switch. Installation of a 2" water service and cedar fence.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: Improvement
Project Justification
Installation of an odor control unit for this lift station will reduce odors. These unpleasant odors are a nuisance to the
residents. The pump station is a main regional pump station that has flow coming from several other lift stations. Due to the
critical nature of these lift stations, they will require an alternate power source to maintain wastewater flows in the event of
loss of line power. This lift station's priority rating is based on being in fair condition with a very high impact due to location or
high probability of sanitary sewer overflow, according to the Wastewater Master Plan.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 229
WW2402 - Riverstone Ranch Regional Lift Station Capacity Expansion
Explain & Identify Type of Other Sources
2024C W/S COs $300,000
Capital Cost
$820K
FY2026 Budget
$3.78M
Total Budget (all years) Project Total (to date)
$3.78M $4.6M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0
$520,000
$300,000
$20,000
$3,480,000
$300,000
$0
$,780,000
$0
$0
so
e
$3,480,000
$820,000
$300,000
8,600,000
Funding Sources
$820K
FY2026 Budget
$3.78M
Total Budget (all years) Project Total (to date)
$3.78M $4.6M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$820,000 $3,780,000
$20,000 $,780,000
$0 $4,600,000
0 8,600,000
Operational Costs
FY2026 Budget
$0
Total Budget (all years) Project Total
$23.1K $23.1K
Detailed Breakdown
Category
Historical FY2027 FY2028 FY2029
Budgeted Requested Requested Requested Future Budgeted
Total
Personnel Services
Operation & Maintenance
Total
$0 $7,278 $7,496 $7,721 $0 $22,495
$0 $202 $212 $223 $0 $637
0 8,480 8,708 8,944 0 $3,132
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 230
WW2403 - Lakes of Country Place Lift Station Rehabilitation
WW2403 - Lakes of Country Place Lift Station
Rehabilitation
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator 510 Countryplace Boulevard
Department 345 - Capital Projects
Type Capital Improvement
Project Number WW2403
Request Groups Water
Estimated Start 10/1/2025
Date
Description
This project will rehabilitate the aging lift station, which will involve the re -coating of the wet well with a coat lining, flow
meter, operational site lighting, replacing the piping and pumps, upgrading the electrical control panel, SCADA, and a
manual transfer switch. Installation of a 2" water service and cedar fence.
Images
WW2403
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: Improvement
Project Justification
This lift station has been in service since 1997 when it was in MUD #4. The city assumed responsibility in 2012 when MUD #4
was dissolved. The lift station is nearing the end of its useful life for the equipment and coatings and will also require
elevation upgrades to meet city standards. According to the wastewater masterplan, this lift station is in poor condition and
has a high impact rating.
Explain & Identify Type of Other Sources
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 231
WW2403 - Lakes of Country Place Lift Station Rehabilitation
2024C W/S COs $832,000
Capital Cost
$64K
FY2026 Budget
$710K
Total Budget (all years) Project Total (to date)
$710K $774K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0 $610,000
S0 $100,000
$64,000 $0
04,000 $10,000
$0 S610,000
$0 $100,000
S0 $64,000
0 $74,000
Funding Sources
$64K
FY2026 Budget Total Budget (all years)
$710K $710K
Project Total (to date)
$774K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$64,000 $710,000
04,000 $10,000
$0 $774,000
0 $74,000
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 232
WW2404 - Southdown Lift Station Rehabilitation
WW2404 - Southdown Lift Station
Rehabilitation
Overview
Project Location
Request Owner Amy Coykendall, CIP Coordinator Southdown Drive
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW2404
Request Groups Wastewater
Estimated Start 10/1/2023
Date
Description
The project is part of the program to rehabilitate or replace system -wide lift stations. The project will include removing and
replacing the wet well coating with a corrosion -resistant coating, removing and replacing existing submersible pumps,
guide -rails, flow meters, ductile iron discharge piping, check valves, plug valves, SCADA, electrical panel and service racks.
The project will remove and replace the fence and gates and install a new manual transfer switch for a portable generator
and a 2" water service. The project will also extend fiber from the Southdown Water Plant, install a fiber optic path panel, and
fiber optic switch.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: Improvement
Project Justification
This lift station has been in service since 1998. The city assumed responsibility in 2005 from the MUD. The lift station must
have coatings and metal removed and replaced. According to the wastewater masterplan, this lift station is in poor condition
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 233
WW2404 - Southdown Lift Station Rehabilitation
and has a high impact rating. This lift station's priority rating is based on being in poor condition with a high impact due to
location or high probability of sanitary sewer overflow, according to the Wastewater Master Plan.
Explain & Identify Type of Other Sources
2024C W/S COs $334,000
Capital Cost
$1.2M
FY2026 Budget
$1.25M
Total Budget (all years) Project Total (to date)
$1.25M $2.45M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$850,000
$170,000
$180,000
$,200,000
$1,150,000
$100,000
$0
$,250,000
$0 $2,000,000
$0 $270,000
$0 $180,000
8 $,450,000
Funding Sources
$1.2M
FY2026 Budget
$1.25M
Total Budget (all years) Project Total (to date)
$1.25M $2.45M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$1,200,000 $1,250,000
$,200,000 $,250,000
$0 $2,450,000
$,450,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 234
WW2405 - Shady Crest and Creek View Subdivision Sanitary Sewer Rehabilitation
WW2405 - Shady Crest and Creek View
Subdivision Sanitary Sewer Rehabilitation
Overview
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW2405
Request Groups Water
Estimated Start 10/1/2025
Date
Project Location
Amy Coykendall, CIP Coordinator East Circle Drive
7
,-:.1
Leecue
a.+,w.. c•xna.�rw.
Description
This subdivision was built in the mid -1960s & 1970s and has been identified as an area with high infiltration and intrusion (I &
I). The project will evaluate the best method to rehab or replace approximately 16,000 LF of existing pipe that will reduce the
l&l. The manholes will then be repaired and re -coated to reduce rainfall intrusion.
Images
WW2405
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: Improvement
Project Justification
This project will rehabilitate the sanitary sewer collection system located within the subdivision. Rehabilitation of the lines will
utilize the pipe -bursting method.
Explain & Identify Type of Other Sources
2024C W/S COs $1,200,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 235
WW2405 - Shady Crest and Creek View Subdivision Sanitary Sewer Rehabilitation
Capital Cost
$805K
FY2026 Budget
$4.57M
Total Budget (all years) Project Total (to date)
$4.57M $5.38M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Design/Surveying
Contingency
Total
$0
$405,171
$400,000
$05,171
$4,570,000
$0
$0
$,570,000
$0
$0
$0
$
$4,570,000
$405,171
$400,000
8,375,171
Funding Sources
$805K
FY2026 Budget
$4.57 M
Total Budget (all years) Project Total (to date)
$4.57M $5.38M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
W/S Certificates of
Obligation
General Revenue -Cash
Total
$805,171 $4,570,000
$0
$05,171
$0
8,570,000
$0 $5,375,171
$o
$
S0
8,375,171
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 236
WW2406 - Whispering Winds Lift Station Relocation
WW2406 - Whispering Winds Lift Station
Relocation
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 345 - Capital Projects
Type Capital Improvement
Project Number WW2406
Request Groups Water
Estimated Start 10/1/2024
Date
.i{Lu 67,
Description
Relocate and replace the aging lift station, including installation of a new wet well with corrosion -resistant lining, extending
the gravity and force main to a new location, replacing two self -priming pumps with submersibles including guiderails and
new wet well top, replace valves and discharge piping, provide new city standard electrical control panel along with new
electrical rack and provide a new City standard manual transfer switch for portable generator connection. Additional items
include the installation of a concrete work slab surrounding the wet well, installation of a new 8 -foot cedar picket fence and a
2" water service, and an extension of the fiber connection to the intersection of FM518 and Westminister.
Images
WW2406
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
A plan is in place to relocate this lift station approximately 200 ft east to the end of the cul-de-sac. The self -priming pumps
are 30 plus years old and require replacement. Changes to the pumps will require the upgrade of the electrical controller and
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 237
WW2406 - Whispering Winds Lift Station Relocation
the site requires the addition of a manual transfer switch for emergency power. This lift station's priority rating is based on
being in very poor condition according to the Wastewater Master Plan.
Explain & Identify Type of Other Sources
2024C W/S COs $159,000
Capital Cost
$371K
FY2026 Budget
$1.06M
Total Budget (all years) Project Total (to date)
$1.06M $1.43M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0 $1,060,000
$212,000 $0
$159,000 $0
$71,000 $,060,000
$0 $1,060,000
$0 $212,000
$0 $159,000
8 $,431,000
Funding Sources
$371K
FY2026 Budget
$1.06M
Total Budget (all years) Project Total (to date)
$1.06M $1.43M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$371,000 $1,060,000
$71,000 $,060,000
$0 $1,431,000
$ $,431,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 238
WW2407 - Wooten Road Lift Station Decommissioning
WW2407 - Wooten Road Lift Station
Decommissioning
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator 10235 West Broadway Street
Department 345 - Capital Projects
Type Capital Improvement
Project Number WW2407
Request Groups Water
Estimated Start 10/1/2023
Date
Description
The project is part of the program to rehabilitate or replace system -wide lift stations. The lift station was installed by a private
developer without a lift station easement and the maintenance responsibility was transferred to the City. The City performed
a preliminary analysis of the lift station to evaluate the potential for converting the lift station to a sanitary sewer manhole
and gravity system, which indicated that the lift station could be decommissioned and converted to a gravity system. The
proposed project will include removal of mechanical and electrical equipment, conversion of the lift station to manhole, and
the construction of approximately 250 linear feet of sanitary sewer to discharge the flow into the Wooten Road sanitary sewer
system.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
The lift station has been in service for over 30 years and is at the end of its useful life for the equipment and coatings.
Currently, a generator is being used to provide power because cannot get Centerpoint to provide direct power. An address
issue exists due to the location of this lift station and meter boxes which conflict with the strip center. This lift station's priority
rating is based on being in very poor condition with a low impact due to location and/or high probability of sanitary sewer
,r1 FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 239
WW2407 - Wooten Road Lift Station Decommissioning
overflow, according to the Wastewater Master Plan. Conversion of this lift station into a manhole and gravity sewer will
remove the need for the maintenance of electrical and mechanical equipment and redundancy during power disruption.
Explain & Identify Type of Other Sources
2024C W/S COs $294,000
2025B W/S COs $299,000
Capital Cost
$593 K
FY2026 Budget
Total Budget (all years) Project Total (to date)
$593 K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Design/Surveying
Land/Right of Way
Contingency
Total
$450,000
$65,710
$39,290
$37,999
$92,999
$0
$0
$0
Si
$
$0 $450,000
$0 $65,710
$0 $39,290
$0 $38,000
9 $93,000
Funding Sources
$593 K
FY2026 Budget
Total Budget (all years) Project Total (to date)
$593 K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$592,999 $1
$92,999 $
$0 $593,000
$ $93,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 240
WW2408 - Sanitary Sewer Rehabilitation - Longwood Service Area (LW -03)
WW2408 - Sanitary Sewer Rehabilitation -
Longwood Service Area (LW -03)
Overview
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW2408
Request Groups Water
Estimated Start 10/1/2025
Date
Project Location
Amy Coykendall, CIP Coordinator Barry Rose Road
LILY.. 4n
Description
Inflow and infiltration (I&I) program to rehabilitate failing sanitary collection systems over thirty years of age in the following
basins over a period of years. The Barry Rose and John Hargrove Reclamation Facilities have areas within the sanitary sewer
basins that have reached an age where I&I have increased the flows at critical areas like lift stations and the treatment plants.
The team will focus on the essential and immediate sanitary sewer rehabilitation needs in Longwood Service Area, west of
Dixie Farm, north of Mary's Creek, and south of Clear Creek between Liberty and Dixie Farm. There are approximately 13 miles
of sewer line that will be evaluated to determine I&I and areas that need to be repaired.
Images
WW2408
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: Improvement
Project Justification
Through analysis of Public Works work order history and institutional knowledge, the wastewater lines in these older areas
are responsible for the majority of I&I in the service area that impact the wastewater treatment plant treatment ability. The
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 241
WW2408 - Sanitary Sewer Rehabilitation - Longwood Service Area (LW -03)
City's Waste Water Master Plan identified these areas with high l&l. This project will address the areas with the most frequent
failures and improve system reliability for the residents. The program will include best practices, trench -less technology and
manhole rehabilitation for the service area. The Waste Water Master Plan identified this area for improvement.
Explain & Identify Type of Other Sources
2024C W/S COs $1,000,000
Capital Cost
$1.6M
FY2026 Budget
$7.96M
Total Budget (all years) Project Total (to date)
$7.96M $9.56M
Detailed Breakdown
Category Historical Budgeted
FY2O26
Requested
Future Budgeted Total
Construction
Design/Surveying
Contingency
Total
$0 $7,510,000
$1,300,000 $0
$300,000 $451,000
$,600,000 $,961,000
$0 $7,510,000
$0 $1,300,000
$0 $751,000
$ 9,561,000
Funding Sources
$1.6M
FY2026 Budget
$7.96M
Total Budget (all years)
$7.96M
Project Total (to date)
$9.56M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
W/S Certificates of
Obligation
General Revenue -Cash
Total
$1,600,000 $7,961,000
S0
$,600,000
$0
$,961,000
$0 $9,561,000
So
9
So
9,561,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 242
WW2501 - Sanitary Sewer Rehabilitation - Longwood Service Area (LW -04)
WW2501 - Sanitary Sewer Rehabilitation -
Longwood Service Area (LW -04)
Overview
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW2501
Request Groups Wastewater
Estimated Start 10/1/2024
Date
Amy Coykendall, CIP Coordinator
Project Location
9
L.etfJ�c Gn
4 jai • G M•5. -4a
Description
Inflow and infiltration (I&I) program to rehabilitate failing sanitary collection systems over thirty years of age in the following
basins over a period of years. The Barry Rose and John Hargrove Reclamation Facilities have areas within the sanitary sewer
basins that have reached an age where I&I have increased the flows at critical areas like lift stations and the treatment plants.
The team will focus on the essential and immediate sanitary sewer rehabilitation needs in Longwood Service Area, bounded
by Pearland Parkway, City Limit, FM 518, and Mary's Creek. There are approximately 9 miles of sewer line that will be
evaluated to determine I&I and areas that need to be repaired.
Images
Details
Strategic Priority: Resilient Finances Impact on operating budget: No
Type of Project: Improvement
Project Justification
Through analysis of Public Works work order history and institutional knowledge, the wastewater lines in these older areas
are responsible for the majority of I&I in the service area that impact the wastewater treatment plant treatment ability. The
City's Wastewater Master Plan identified these areas with high l&l. This project will address the areas with the most frequent
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 243
WW2501 - Sanitary Sewer Rehabilitation - Longwood Service Area (LW -04)
failures and improve system reliability for the residents. The program will include best practices, trench -less technology and
manhole rehabilitation for the service area.
Capital Cost
$1.36M
FY2026 Budget
$3.92M
Total Budget (all years) Project Total (to date)
$3.92M $5.28M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Design/Surveying
Contingency
Total
$0 $3,620,000
$1,300,000 $0
$62,000 $300,000
$,362,000 $,920,000
$0 $3,620,000
$0 $1,300,000
$0 $362,000
$ 5,282,000
Funding Sources
$1.36M
FY2026 Budget
$3.92M
Total Budget (all years) Project Total (to date)
$3.92M $5.28M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$1,362,000 $3,920,000
$,362,000 $,920,000
$0 $5,282,000
5 $,282,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 244
WW2502 - Green Tee IV Lift Station Rehabilitation
WW2502 - Green Tee IV Lift Station
Rehabilitation
Overview
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW2502
Request Groups Wastewater
Estimated Start 10/1/2024
Date
Project Location
9
-_� - -- - . .•F{vu:•xd
...rrc Gn
',VP, M•}, -uy
Description
Rehabilitation of this lift station will include removal and replacement of pumps, valves, piping, and wet well with corrosion -
resistant coating. Provide new electrical panel, service rack, SCADA (if needed), manual transfer switch, and 8' cedar wood
fence and gates and a 2" water service.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
This lift station's priority rating is based on being in fair condition with a very high impact due to location or high probability
of sanitary sewer overflow, according to the Wastewater Master Plan.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 245
WW2502 - Green Tee IV Lift Station Rehabilitation
Capital Cost
FY2026 Budget
so
Total Budget (all years)
$1.71 M
Project Total
$1.71 M
Detailed Breakdown
Category Historical Budgeted
FY2028
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
So $1,200,000
$0 $388,000
So $120,000
e $,708,000
$0 $1,200,000
$0 $388,000
$0 $120,000
$,708,000
Funding Sources
FY2026 Budget
so
Total Budget (all years) Project Total
$1.71 M $1.71 M
Detailed Breakdown
Category Historical Budgeted
FY2028
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0 $1,708,000
e $,708,000
$0 $1,708,000
0 $,708,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 246
WW2503 - Sunset Meadows Lift Station Rehabilitation
WW2503 - Sunset Meadows Lift Station
Rehabilitation
Overview
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW2503
Request Groups Wastewater
Estimated Start 10/1/2027
Date
Amy Coykendall, CIP Coordinator
Project Location
9
a•.,.• c Ana
Description
Rehabilitate the lift station with the removal and installation of a new 6' wet well with corrosion -resistant lining, replace two
pumps with submersibles including guide -rails and new wet well top, replace valves and discharge piping, flow meter,
provide new city standard electrical control panel along with new electrical rack, SCADA, and provide a new City standard
manual transfer switch for mobile generator connection. Additional items include replacement of the concrete work slab
surrounding the wet well and installing a new 8 -foot cedar fence and a 2" water service.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
The aging lift station is at the end of its useful life for the equipment and coatings and will also require upgrades to meet city
standards. City criteria for local facilities require the additional manual transfer switch (MTS) for portable generators. This lift
station's priority rating has been labeled as being in very poor condition.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 247
WW2503 - Sunset Meadows Lift Station Rehabilitation
Capital Cost
FY2026 Budget
$462K
Total Budget (all years)
$2.09 M
Project Total
$2.09 M
Detailed Breakdown
Category
Historical Budgeted FY2026 FY2027
Requested Requested
Future Budgeted Total
Construction
Design/Surveying
Contingency
Total
$0 S0 $1,200,000
$0 $462,000 $0
$0 $0 $428,000
$ $62,000 $,628,000
$0 $1,200,000
$0 $462,000
SO $428,000
2,090,000
Funding Sources
FY2026 Budget
$462K
Total Budget (all years) Project Total
$2.09M $2.09M
Detailed Breakdown
Category
Historical Budgeted FY2026 FY2027
Requested Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0 $462,000 $1,628,000
$62,000 $,628,000
S0 $2,090,000
9 2,090,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 248
WW2504 - Green Tee III Lift Station Rehabilitation
WW2504 - Green Tee III Lift Station
Rehabilitation
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 345 - Capital Projects
Type Capital Improvement
Project Number WW2504
Request Groups Water
Estimated Start 10/1/2025
Date
✓qlp r 9
-�mc;•xtl
LEK.. GI,
a. •G M•},-uy
Description
This lift station is part of a program to rehabilitate or replace system -wide lift stations. The project will include corrosion
resistant coating, flow meter, SCADA, removal and replacement of submersible pumps, guiderails, ductile Iron discharge
piping, check valves and plug valves. By-pass pumping will be needed. Remove and replace electrical panel with an
underground service, electrical service rack and installation of a manual transfer switch for portable generator, a 2" water
service and cedar fence.
Images
WW2504
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: Improvement
Project Justification
The lift station has been in service for over 30 years and is at the end of its useful life for the equipment and coatings. This lift
station's priority rating is based on being in very poor condition with a low impact due to location and/or high probability of
sanitary sewer overflow, according to the Wastewater Master Plan.
ink FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 249
WW2504 - Green Tee III Lift Station Rehabilitation
Capital Cost
FY2026 Budget
$1.34M
Total Budget (all years)
$1.34M
Project Total
$1.34M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Design/Surveying
Contingency
Total
So $810,000
$0 $265,000
$0 $260,000
8 $,335,000
So $810,000
$0 $265,000
S0 $260,000
9 $,335,000
Funding Sources
FY2026 Budget
$1.34M
Total Budget (all years) Project Total
$1.34M $1.34M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$o
0
$1,335,000
$,335,000
$0 $1,335,000
$ $,335,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 250
WW2507 - Kirby North Regional Lift Station Rehabilitation
WW2507 - Kirby North Regional Lift Station
Rehabilitation
Overview
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW2507
Request Groups Wastewater
Estimated Start 10/1/2024
Date
Amy Coykendall, CIP Coordinator
Project Location
9
4 4.{.. G M•a. -4a
Description
Rehabilitation of a regional lift station, including rehabilitation of the wet wells, removing and replacing the existing coating,
providing temporary by-pass pumping, removing and replacing existing submersible pumps, adding the required third
pump including guardrails, replacing valves and piping, providing new electrical control panels, new electrical rack and new
upgraded electrical service, provide a natural gas generator and new automatic transfer switch for permanent generator.
Installation of a 2" water service and cedar fence.1700 LF of fiber will be included.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: Improvement
Project Justification
This lift station wet wells and equipment due to corrosive sewer gases accelerating corrosion of the wet well structure and
metal components. A structural rehabilitation of the wet well by installing a corrosive -resistant coating. Pumps replacement
will require a new electrical controller and SCADA control. Per City criteria for regional facilities, this lift station will require the
installation of an automatic transfer switch, permanent generator and odor control. The system will provide for some
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 251
WW2507 - Kirby North Regional Lift Station Rehabilitation
expansion of the capacity as called for in the Waste Water Master Plan (WWMP). This lift station's priority rating is based on it
being in poor condition with a high impact due to location and/or high probability of sanitary sewer overflow, according to
the Wastewater Master Plan.
Capital Cost
$278K
FY2026 Budget
$1.74M
Total Budget (all years)
$1.74M
Project Total (to date)
$2.02M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
So $1,490,000
$48,000 $250,000
$230,000 $0
$78,000 $,740,000
$0 $1,490,000
$0 5298,000
$0 $230,000
A $,018,000
Funding Sources
$278K
FY2026 Budget
$1.74M
Total Budget (all years) Project Total (to date)
$1.74M $2.02M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$278,000 $1,740,000
$78,000 $,740,000
$0 $2,018,000
$ $,018,000
Operational Costs
FY2026 Budget
$0
Total Budget (all years) Project Total
$92.7 K $92.7 K
Detailed Breakdown
Category
Historical FY2027 FY2028 FY2029
Budgeted Requested Requested Requested Future Budgeted
Total
Operation & Maintenance
Personnel Services
Total
$0 $22,252 $23,365 $24,533 $0 $70,150
$0 $7,290 $7,508 $7,734 $0 $22,532
8 $9,542 $0,873 $2,267 9 82,682
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 252
WW2508 - Waste Water Master Plan Update
WW2508 - Waste Water Master Plan Update
Overview
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW2508
Request Groups Wastewater
Estimated Start 10/1/2024
Date
Project Location
Description
This project will be to update the 2020 Waste Water Master Plan. Since 2020 there has been significant growth and
development along with system rehabilitation and the model has not been updated to reflect these changes. The project will
include the updating of the system changes.
Images
Details
Strategic Priority: Resilient Finances Impact on operating budget: No
Type of Project: Improvement
Project Justification
The 2008 Waste Water Master Plan is the last major update that has been conducted to the model. Modeling is used to help
assist in location potential overflows and deficient line sizes that result in system capacity issues. These results are then used
to develop priorities for CIP projects. Modeling is also utilized to assist in determining development impacts to the system.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 253
WW2508 - Waste Water Master Plan Update
Capital Cost
FY2026 Budget
$625 K
Total Budget (all years)
$625K
Project Total
$625K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Design/Surveying
Contingency
Total
$0 $475,000
$0 $150,000
9 $25,000
$0 $475,000
$0 $150,000
9 $25,000
Funding Sources
FY2026 Budget
$625 K
Total Budget (all years) Project Total
$625K $625K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
W/S Revenues - Cash
Total
so
9
$625,000
$25,000
$0
9
$625,000
$25,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 254
WW2603 - Green Tee I Lift Station
WW2603 - Green Tee I
Overview
Request Owner
Department
Type
Project Number
Request Groups
Estimated Start
Date
Amy Coykendall, CIP Coordinator
300 - PW Engineering & Capital
Projects
Capital Improvement
WW2603
Wastewater
10/1/2025
Lift Station
Project Location
9
•
Description
The project is part of the program to rehabilitate or replace system -wide lift stations. The project will consist of evaluating the
service area at this lift station to determine relocation, abandonment or a combination to move from the resident driveway
potentially relocating it to the end of Donegal Road. This will include acquisition of a utility site, construction of a new wet
well and top with hatch and fall protection, odor control, extending gravity lines to and from the current location and
constructing a new force main. New submersible pumps and ductile iron discharge piping, SCADA, flow meter, check valves,
and plug valves. A new electrical service and control panel and a new manual transfer for a portable mobile generator.
Installation of a 2" water service and cedar fence.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
The lift station is located in a residential driveway. During repairs or maintenance activities, the homeowner is restricted
access to the home. The current controls are located over 200 feet away. This is a safety concern as maintenance activities are
conducted and the operator cannot see the panel. This lift station's priority rating is based on being in very poor condition
according to the Wastewater Master Plan.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 255
WW2603 - Green Tee I Lift Station
Capital Cost
FY2026 Budget Total Budget (all years)
so
$3.09 M
Project Total
$3.09 M
Detailed Breakdown
Category
FY2027 FY2028
Historical Budgeted
Requested Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0
$0
$0
9
$0 $1,800,000
$400,000 $540,000
$351,000 $0
$51,000 $,340,000
S0 $1,800,000
$0 $940,000
$0 $351,000
$ $,091,000
Funding Sources
FY2026 Budget Total Budget (all years)
so
$3.09 M
Project Total
$3.09 M
Detailed Breakdown
Category
Historical Budgeted FY2027 FY2028
Requested Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0 $751,000 $2,340,000
$ $51,000 $,340,000
$0 $3,091,000
s $,091,000
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 256
WW2604 - Oakbrook Estates Lift Station Replacement
WW2604 - Oakbrook Estates Lift Station
Replacement
Overview Project Location
Request Owner Mark Baker, Asset Reliability 1800 Branch Hill Drive
Manager
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW2604
Request Groups Wastewater
Estimated Start 10/1/2025
Date
YRq,ly..•
9
mac,
Description
This project is a key component of the broader infrastructure program aimed at rehabilitating or replacing lift stations across
the system. The scope of work includes the removal and replacement of critical components such as the wet well coating,
submersible pumps, guiderails, ductile iron discharge piping, SCADA system, flow meter, check valves, and plug valves.
Repairs will also be made to the discharge valve pit. Additionally, the existing electrical panel and service rack will be
replaced to ensure improved reliability and safety. The project includes the installation of new gates and an automatic
transfer switch for a stationary generator, enhancing the station's emergency readiness. A new 2" water service line will be
installed, along with a cedar fence to provide site security and aesthetic improvement.
Images
Details
Strategic Priority: Sustainable Infrastructure
Type of Project: Improvement
Project Justification
Impact on operating budget: No
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 257
WW2604 - Oakbrook Estates Lift Station Replacement
The lift station, which has been in continuous operation since 1995, has reached the end of its serviceable life. The station's
mechanical equipment and protective coatings are exhibiting advanced wear and degradation, increasing the risk of system
failures. Routine maintenance is no longer sufficient to ensure reliable performance, and many components are now
obsolete, making repairs increasingly difficult and costly.
A condition assessment conducted as part of the Wastewater Master Plan has classified this station in "poor" condition and
assigned it a high priority rating for rehabilitation. In addition to the physical deterioration, the station no longer meets
current design and safety standards, which may compromise operational efficiency and worker safety.
Rehabilitating the lift station will address these critical issues by replacing outdated infrastructure with modern, energy -
efficient components. This will improve system reliability, reduce maintenance costs, and extend the station's operational life
for decades to come. Furthermore, the upgrades will enhance the City's ability to manage wastewater effectively, protect the
environment, and meet future regulatory requirements.
Capital Cost
FY2026 Budget
$1.54 M
Total Budget (all years)
$1.54M
Project Total
$1.54M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$o
So
$0
9
$1,200,000
$240,000
$100,000
$,540,000
$0 $1,200,000
$0 $240,000
$0 $100,000
0 $,540,000
Funding Sources
FY2026 Budget
$1.54M
Total Budget (all years)
$1.54M
Project Total
$1.54M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0
0
$1,540,000
$,540,000
S0 $1,540,000
0 $,540,000
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 258
WW2608 - Sunset Lakes Lift Station Rehabilitation
WW2608 - Sunset Lakes Lift Station
Rehabilitation
Overview
Request Owner
Department
Project Location
Amy Coykendall, CIP Coordinator 1310 Chelsea Lane
300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW2608
Request Groups Wastewater
Estimated Start 10/1/2025
Date
Description
The lift station will be completely rehabilitated including recoating wet well, remove and replace centrifugal pumps with
submersible pumps, guide rail system, replace piping, check valves and plug valves. Install flow meter, replace panel, SCADA,
service rack, install manual transfer switch for portable generator. Installation of a 2" water service and cedar fence.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
The lift station has been in service since 2001 and is at the end of its useful life for the equipment and coatings and will also
require elevation upgrades to meet city standards. The efficiency of the pumps has decreased from years of service and
repairs. This lift station's priority rating has been labeled as being in poor condition with a moderate impact due to location or
high probability of sanitary sewer overflow, according to the Waste Water Master Plan.
Ank FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 259
WW2608 - Sunset Lakes Lift Station Rehabilitation
Capital Cost
FY2026 Budget
so
Total Budget (all years)
$1.77 M
Project Total
$1.77 M
Detailed Breakdown
Category
FY2028 FY2029
Historical Budgeted
Requested Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0 $0 $1,310,000
$0 $22,000 $240,000
$0 $200,000 $0
$ $22,000 $,550,000
$0 $1,310,000
$0 $262,000
$0 $200,000
9 $,772,000
Funding Sources
FY2026 Budget
so
Total Budget (all years) Project Total
$1.77 M $1.77 M
Detailed Breakdown
Category
Historical Budgeted FY2028 FY2029
Requested Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0 $222,000 $1,550,000
0 $22,000 $,550,000
$0 $1,772,000
8 $,772,000
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 26O
WW2609 - FM 518 Utility Relocations Phase 2 (Old Chocolate Bayou to McLean)
WW2609 - FM 518 Utility Relocations Phase 2
(Old Chocolate Bayou to McLean)
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW2609
Request Groups Wastewater
Estimated Start 10/1/2026
Date
Fnerc:.xtl
"rc
..n{... M P. -4a
Description
This project will relocate the sanitary sewer from SH 288 to Old Chocolate Bayou. The existing sewer line is in the current and
future TxDOT ROW of FM 518 and will need to be relocated for the roadway widening.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: New Construction
Project Justification
TxDOT is scheduling to widen FM518 from SH288 to SH35. The first phase is to start at SH 288 and end at Old Chocolate
Bayou. The existing and future sanitary sewer that is located in the existing ROW per TxDOT utilities will need to be relocated
as a result of the widening project. TxDOT has construction funding in 2025.
Explain & Identify Type of Other Sources
TxDOT may pay the City a portion of the relocation of utilities.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 261
WW2609 - FM 518 Utility Relocations Phase 2 (Old Chocolate Bayou to McLean)
PEDC FY26 $6,800,000
PEDC funded the design in FY25 in the amount of $200,000.
Capital Cost
FY2026 Budget
$6.8M
Total Budget (all years)
$6.8M
Project Total
$6.8M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0
S0
S0
0
$5,600,000
$1,000,000
$200,000
6,800,000
$0 $5,600,000
$0 $1,000,000
$0 $200,000
0 6,800,000
Funding Sources
FY2026 Budget
$6.8M
Total Budget (all years) Project Total
$6.8M $6.8M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Other Funding Sources
Total
S0 $6,800,000
6 6,800,000
So $6,800,000
6 6,800,000
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 262
WW2611 - JHEC Odor Control System
WW2611 -JHEC Odor Control System
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 305 - Public Works
Type Capital Improvement
Project Number WW2611
Request Groups Water
Estimated Start 12/8/2025
Date
Estimated 10/26/2026
Completion Date
5900 Magnolia Parkway
Irradvkl
LINKLIC
a :, "•c��nx��w
Description
Install odor control system at JHEC.
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: New Construction
Project Justification
Because of the current site configuration, two separate systems are needed: one for the lift stations and one for the head
works. This system will capture foul smells during wastewater treatment and eliminate these odors before reaching the
environment depending on the method used (e.g. chemical, bio-filtration, chemical adsorption, etc.).
Capital Cost
FY2026 Budget
$300K
Total Budget (all years) Project Total
$2.25M $2.25M
Detailed Breakdown
Category
FY2026 FY2027
Historical Budgeted
Requested Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0 $0 $1,500,000
$0 $50,000 $450,000
$0 $250,000 $0
0 $00,000 $,950,000
$0 $1,500,000
$0 $500,000
$0 $250,000
0 2,250,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 263
WW2611 - JHEC Odor Control System
Funding Sources
FY2026 Budget
$300K
Total Budget (all years)
$2.25M
Project Total
$2.25M
Detailed Breakdown
Category
Historical Budgeted FY2026 FY2027
Requested Requested
Future Budgeted Total
W/S Certificates of
Obligation
Other Funding Sources
Total
$0 $300,000 $1,950,000
$0 50 $0
9 $00,000 $,950,000
$0 $2,250,000
S0 $0
A $,250,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 264
WW2612 - WWTPs Asset Management Plan
WW2612 - WWTPs Asset Management Plan
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW2612
Request Groups Water
Estimated Start 10/1/2025
Date
9
Description
The City of Pearland operates five wastewater treatment facilities. Given the expansion of the Barry Rose Water Reclamation
Facility, it is imperative to assess all existing plants to ensure they meet current and future demands. This project proposes a
comprehensive evaluation of all wastewater treatment infrastructure and assets installed before 2022 to identify areas
requiring rehabilitation, replacement, or new implementation.
Project Scope
1. Infrastructure Assessment
Structural Evaluation: Inspect tanks, pipelines, and foundations for signs of wear, corrosion, or structural deficiencies.
Mechanical Systems: Assess the condition and performance of pumps, motors, and aeration equipment.
Electrical Systems: Review the functionality and safety of electrical panels, backup generators, and SCADA systems.
2. Operational Efficiency
Process Performance: Evaluate treatment processes to ensure compliance with environmental regulations and efficiency in
pollutant removal.
Capacity Analysis: Determine if current capacities align with present and projected wastewater volumes.
3. Regulatory Compliance
Verify adherence to local, state, and federal regulations, including Texas Commission on Environmental Quality (TCEQ)
standards.
Identify any permit violations or areas at risk of non-compliance.
4. Environmental and Community Impact
Assess odor control measures and their effectiveness.
Evaluate the impact of effluent discharge on local water bodies and surrounding communities.
5. Documentation and Records
Update existing facility plans and as -built drawings to reflect current conditions.
Compile comprehensive records for future reference and planning.
Details
Strategic Priority: Sustainable Infrastructure
Type of Project: Improvement
Project Justification
Impact on operating budget: Yes
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 265
WW2612 - WWTPs Asset Management Plan
With aging infrastructure, many components have been in service for decades, potentially leading to inefficiencies and
increased maintenance costs. This project is needed to meet and ensure the following
Regulatory Compliance: Ensuring all facilities meet current standards is crucial to avoiding penalties and protecting public
health.
Operational Efficiency: Identifying and addressing inefficiencies can lead to cost savings and improved service delivery.
Environmental Stewardship: Proper assessment and rehabilitation minimize environmental impacts, aligning with the city's
sustainability goals.
Capital Cost
FY2026 Budget
$500K
Total Budget (all years)
$6M
Project Total
$61%/1
Detailed Breakdown
Category
Historical FY2026 FY2027 FY2028 Future
Budgeted Requested Requested Requested Budgeted
Total
Construction $0 $0 $2,500,000 $3,000,000 $0
Prelim. Engineering Report $0 $500,000 $0 $0 So
Total $ 500,000 $,500,000 $,000,000 6
$5,500,000
$500,000
6,000,000
Funding Sources
FY2026 Budget Total Budget (all years)
$500K $6M
Project Total
$6M
Detailed Breakdown
Category
Historical FY2026 FY2027 FY2028 Future
Budgeted Requested Requested Requested Budgeted
Total
W/S Certificates of
Obligation
Total
$0 $500,000 $2,500,000 $3,000,000 $0 $6,000,000
6 800,000 9,500,000 8,000,000
6 6,000,000
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 266
WW2613 - Woodthrush Regional Lift Station Rehabilitation
WW2613 - Woodth rush Regional Lift Station
Rehabilitation
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator 1100 Woodthrush
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW2613
Request Groups Wastewater
Estimated Start 10/1/2026
Date
•
rw.rmsoa
OW
Description
This project will rehabilitate a regional lift station and will include removing the existing coating and replacing it with
corrosion -resistant lining, providing temporary by-pass pumping, replacing existing submersible pumps including guiderails,
flow meters, SCADA, odor control, replacing valves and blast and re -coat piping, provide new City standard electrical control
panel along with new electrical rack, new upgraded electrical service, provide a new automatic transfer switch for permanent
natural gas generator connection, and replace existing fence and installation of a 2" water service.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: Improvement
Project Justification
Installation of an odor control filtration unit for this wastewater lift station location will process gaseous material that
produces nuisance odor conditions caused by the decomposition of organic matter found in wastewater. With the pipe
surfaces exposed to the corrosive atmosphere in the wet well, the piping is subject to premature deterioration, leading to
pipe pitting and eventually leaks will occur. The pump station is a main regional pump station that has flow coming from
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 267
WW2613 - Woodthrush Regional Lift Station Rehabilitation
several other lift stations. Due to the critical nature of these lift stations, they will require an alternate power source to
maintain wastewater flows in the event of loss of line power. This lift station's priority rating is based on being in good
condition with a very high impact due to location or high probability of sanitary sewer overflow, according to the Waste
Water Master Plan.
Explain & Identify Type of Other Sources
Capital Cost
FY2026 Budget
$522K
Total Budget (all years) Project Total
$3.94M $3.94M
Detailed Breakdown
Category
Historical Budgeted FY2026 FY2027
Requested Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Prelim. Engineering Report
Land/Right of Way
Total
$0 $0 $2,500,000
$0 $50,000 $750,000
$0 $325,000 $163,000
$0 $97,000 $0
$0 $50,000 $0
$ $22,000 $,413,000
$0 $2,500,000
$0 $800,000
$0 $488,000
$0 $97,000
$0 $50,000
9 8,935,000
Funding Sources
FY2026 Budget
$522K
Total Budget (all years)
$3.94M
Project Total
$3.94M
Detailed Breakdown
Category
Historical Budgeted FY2026 FY2027
Requested Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0 $522,000 $3,413,000
9 $22,000 8,413,000
$0 $3,935,000
6 $,935,000
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 268
WW2613 - Woodthrush Regional Lift Station Rehabilitation
Operational Costs
FY2026 Budget
$0
Total Budget (all years)
$20.2K
Project Total
$20.2K
Detailed Breakdown
Category Historical Budgeted
FY2028 FY2029
Requested Requested
Future Budgeted Total
Operation & Maintenance
Personnel Services
Total
$0 $9,493 $9,945
$0 $0 $772
9 9,493 $0,717
$0 $19,438
S0 8772
9 $0,210
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 269
WW2614 - Assessment and Rehabilitation of Pearland's Wastewater Treatment Plants
WW2614 - Assessment and Rehabilitation of
Pearland's nd's Wastewater Treatment Plants
Overview
Request Owner Julian Kelly, Water Production
Superintendent
Department 314 - Utilities Department
Type Capital Improvement
Project Number WW2614
Request Groups Water
Estimated Start 02/4/2026
Date
Estimated 02/4/2027
Completion Date
Project Location
9 0
Description
The City of Pearland operates five wastewater treatment facilities. Given the expansion of the Barry Rose Water Reclamation
Facility, it is imperative to assess all existing plants to ensure they meet current and future demands. This project proposes a
comprehensive evaluation of all wastewater treatment infrastructure and assets installed before 2022 to identify areas
requiring rehabilitation, replacement, or new implementation.
Project Scope
1. Infrastructure Assessment
• Structural Evaluation: Inspect tanks, pipelines, and foundations for signs of wear, corrosion, or structural deficiencies.
• Mechanical Systems: Assess the condition and performance of pumps, motors, and aeration equipment.
• Electrical Systems: Review the functionality and safety of electrical panels, backup generators, and SCADA systems.
2. Operational Efficiency
• Process Performance: Evaluate treatment processes to ensure compliance with environmental regulations and
efficiency in pollutant removal.
• Capacity Analysis: Determine if current capacities align with present and projected wastewater volumes.
3. Regulatory Compliance
• Verify adherence to local, state, and federal regulations, including Texas Commission on Environmental Quality (TCEQ)
standards.
• Identify any permit violations or areas at risk of non-compliance.
4. Environmental and Community Impact
• Assess odor control measures and their effectiveness.
• Evaluate the impact of effluent discharge on local water bodies and surrounding communities.
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 270
WW2614 - Assessment and Rehabilitation of Pearland's Wastewater Treatment Plants
5. Documentation and Records
• Update existing facility plans and as -built drawings to reflect current conditions.
• Compile comprehensive records for future reference and planning.
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Estimated Project Life Span: 20 plus years
Project Justification
With aging infrastructure, many components have been in service for decades, potentially leading to inefficiencies and
increased maintenance costs. This project is needed to meet and ensure the following
• •Regulatory Compliance: Ensuring all facilities meet current standards is crucial to avoid penalties and protecting public
health.
• Operational Efficiency: Identifying and addressing inefficiencies can lead to cost savings and improved service delivery.
• Environmental Stewardship: Proper assessment and rehabilitation minimize environmental impacts, aligning with the
city's sustainability goals.
Capital Cost
FY2026 Budget
$550K
Total Budget (all years) Project Total
$6.05M $6.05M
Detailed Breakdown
Category
FY2026 FY2027
Historical Budgeted
Requested Requested
Future Budgeted Total
Construction
Design/Surveying
Total
$0 $0 $5,500,000
$0 $550,000 $0
8 650,000 8,500,000
$0 $5,500,000
$0 $550,000
6,050,000
Funding Sources
FY2026 Budget
$550K
Total Budget (all years)
$6.05M
Project Total
$6.05M
Detailed Breakdown
Category
FY2026 FY2027
Historical Budgeted
Requested Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0 $550,000 $5,500,000
0 $50,000 $,500,000
$0 $6,050,000
0 6,050,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 271
WW2701 - Towne Lake Lift Station Rehabilitation
WW2701 - Towne Lake Lift Station
Rehabilitation
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator 3803 Conroe Lake Court
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW2701
Request Groups Wastewater
Estimated Start 10/1/2030
Date
9
Description
This project will be rehabilitation, which involves removal and replacement of the corrosion -resistant coating of the wet well,
SCADA, flow meter, piping, valves, pumps, electrical control panel, service rack, a manual transfer switch, replacing fencing
with 8' cedar wood fence and installing a 2" water service.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
The lift station has been in service since 1998 and is at the end of its useful life for the equipment and coatings. This lift
station's priority rating is based on being in fair condition according to the Wastewater Master Plan.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 272
WW2701 - Towne Lake Lift Station Rehabilitation
Capital Cost
FY2026 Budget
so
Total Budget (all years)
$1
Future
$1.6M
Project Total
$1.6M
Detailed Breakdown
Category Historical Budgeted
FY2030
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0 $0
$0 $0
$0 $1
e $
$1,000,000
$300,000
$299,999
$,599,999
$1,000,000
$300,000
$300,000
$,600,000
Funding Sources
FY2026 Budget Total Budget (all years) Future Project Total
$0 $1
$1.6M $1.6M
Detailed Breakdown
Category Historical Budgeted
FY2030
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0 $1
e $
$1,599,999 $1,600,000
$,599,999 $,600,000
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 273
WW2702 - Pine Hollow Lift Station Rehabilitation
WW2702 - Pine Hollow Lift Station
Rehabilitation
Overview Project Location
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW2702
Request Groups Wastewater
Estimated Start 10/1/2026
Date
Amy Coykendall, CIP Coordinator 3711 Pine Lawn Drive
•
NOW iejah
-#
} Prsi dcar
Description
This lift station project will include removal and replacement of wet well coating with corrosion -resistant coating,
submersible pumps, guide -rails, new wet well tops, replacing valves, flow meters, SCADA (if needed), discharge piping,
electrical control panel, new electrical racks, and providing a new manual transfer switch for portable generator. Additional
items include replacement of the concrete work slab surrounding the wet well and installing an 8 -foot cedar picket fence,
repairs to the concrete driveway and installation of a 2" water service.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
This lift station was wet well and the equipment is approaching the end of its useful life. Replacement of the pumps will
include the upgrade of the electrical controller and the site requires the installation of a manual transfer switch for the
portable generator. This lift station's priority rating is based on being in poor condition according to the Wastewater Master
Plan.
,r1 FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 274
WW2702 - Pine Hollow Lift Station Rehabilitation
Capital Cost
FY2026 Budget Total Budget (all years) Future Project Total
$0 $1
$1.01 M $1.01 M
Detailed Breakdown
Category Historical Budgeted
FY2030
Requested
Future Budgeted Total
Design/Surveying
Total
so si
e $
$1,010,000
$,010,000
$1,010,001
$,010,001
Funding Sources
FY2026 Budget
$0
Total Budget (all years)
$1
Future
$1.01 M
Project Total
$1.01 M
Detailed Breakdown
Category Historical Budgeted
FY2030
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
So S1
6 $
$1,010,000 $1,010,001
$,010,000 $,010,001
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 275
WW2704 - Clear Creek Park Lift Station Rehabilitation
WW2704 - Clear Creek Park Lift Station
Rehabilitation
Overview
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW2704
Request Groups Wastewater
Estimated Start 10/1/2026
Date
Project Location
Amy Coykendall, CIP Coordinator 2600 Pebble Creek Drive
LILY.. CPI
Description
The project will rehabilitate the aging lift station and will include the replacement of pumps, valves, piping, flow meters,
SCADA, and rehabilitating the wet well with a corrosion -resistant lining system. Provide new City standard electrical panels, a
service rack, a manual transfer switch, installation of a 2" water service, and cedar fence.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
The lift station will be rehabilitated to extend its usable life by another 20+ years. This lift station's priority rating is based on
being in poor condition with a moderate impact due to location or high probability of sanitary sewer overflow, according to
the Waste Water Master Plan.
Explain & Identify Type of Other Sources
Project carryover to FY28.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 276
WW2704 - Clear Creek Park Lift Station Rehabilitation
Capital Cost
FY2026 Budget
$o
Total Budget (all years)
$1.86M
Project Total
$1.86M
Detailed Breakdown
Category
FY2028 FY2029
Historical Budgeted
Requested Requested
Future Budgeted Total
Construction
Design/Surveying
Contingency
Total
$0 $0 $1,200,000
$0 $250,000 $112,000
$0 $100,000 $200,000
A $50,000 $,512,000
$0 $1,200,000
$0 $362,000
$0 $300,000
A $,862,000
Funding Sources
FY2026 Budget
so
Total Budget (all years) Project Total
$1.86M $1.86M
Detailed Breakdown
Category
Historical Budgeted FY2028 FY2029
Requested Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0 $350,000 $1,512,000
$50,000 $,512,000
So $1,862,000
$ $,862,000
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 277
WW2705 - Country Place Lift Station Rehabilitation
WW2705 - Country Place Lift Station
Rehabilitation
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator 3210 South Peach Hollow Circle
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW2705
Request Groups Wastewater
Estimated Start 10/1/2026
Date
Description
The project will rehabilitate the aging lift station. The project will include the removal and replacement of the wet well's
corrosion -resistant lining, pumps, valves, and piping. Provide new City standard electrical panel, service rack, flow meter,
SCADA (if needed), automatic transfer switch, replace perimeter fencing with 8' cedar wood picket fence, and the installation
of a 2" water service. Replace the existing generator with an appropriately sized generator along with enclosure and heater.
Images
F
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
The lift station will be rehabilitated to extend its usable lift by another 20+ years. This lift station's priority rating has been
labeled as being in fair condition with a high impact of sanitary sewer overflow, according to the Waste Water Master Plan.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 278
WW2705 - Country Place Lift Station Rehabilitation
Capital Cost
FY2026 Budget
$0
Total Budget (all years)
$2.43M
Project Total
$2.43M
Detailed Breakdown
Category
FY2027 FY2028
Historical Budgeted
Requested Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0 $0 $1,500,000
$0 $87,000 $450,000
$0 $292,000 $100,000
e $79,000 $,050,000
$0 $1,500,000
$0 $537,000
$0 $392,000
8 $,429,000
Funding Sources
FY2026 Budget
$0
Total Budget (all years) Project Total
$2.43M $2.43M
Detailed Breakdown
Category
Historical Budgeted FY2027 FY2028
Requested Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0 $379,000 $2,050,000
0 $79,000 $,050,000
$0 $2,429,000
A $,429,000
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 279
WW2707 - Walmart Lift Station Rehabilitation
WW2707 - Walmart Lift Station
Rehabilitation
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator 1919 North Main Street
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW2707
Request Groups Wastewater
Estimated Start 10/1/2031
Date
9
..•r�.c 4n
4 •L xt+3. 7%,
Description
The project will rehabilitate the existing wet well that services Walmart on Main and will include corrosion -resistant coating.
Remove and replace existing submersible pumps, guide rail system, replace ductile iron discharge pipe, SCADA, install new
check valves, plug valves and flow meters. Remove and replace the electrical control panel and remove and replace the
electrical service rack. Install generator manual transfer switch for portable generator. Install 2" water service line with back
flow prevention for wet well/equipment wash down and 8' cedar fencing.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
This facility was first put into service in 1998. The pumps have exceeded their life expectancy and show a visible reduction in
efficiency on the pump curve. The existing electrical control panel and service rack are outdated and require updating.
Existing piping and valves are past their serviceable lives.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 280
WW2707 - Walmart Lift Station Rehabilitation
Capital Cost
FY2026 Budget
$o
Total Budget (all years)
$1.5 M
Project Total
$1.5 M
Detailed Breakdown
Category Historical Budgeted
FY2028
Requested
Future Budgeted Total
Construction
Land/Right of Way
Contingency
Design/Surveying
Total
$0 $924,000
$0 $250,000
$0 $185,000
$0 $139,000
$ $,498,000
$0 $924,000
$0 $250,000
$0 $185,000
$0 $139,000
$ $,498,000
Funding Sources
FY2026 Budget Total Budget (all years)
$o
$1.5M
Project Total
$1.5 M
Detailed Breakdown
Category Historical Budgeted
FY2028
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0 $1,498,000
$ $,498,000
$0 $1,498,000
$ $,498,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 281
WW2708 - Hughes Ranch Road Gravity Sewer -Cullen to Stone
WW2708 - Hughes Ranch Road Gravity
Sewer -Cullen to Stone
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW2708
Request Groups Wastewater
Estimated Start 10/1/2026
Date
0
Fnnx, ;ry
U!
pi••r•• --3111
Description
This project will include the installation of sanitary sewer along Hughes Ranch Road between Cullen and Stone. Included
within this project is the installation of sanitary sewer along Hawk Meadows and Lee Rd. Currently, there are no sanitary
sewer services in this section of the community, and it is the intent of the City to expand current systems to provide all
residents with waste water services. Approximately 1.3 miles of sanitary sewer will be installed as part of this project.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: Improvement
Project Justification
The City is the utility provider for the City of Pearland and its residents. It is the goal of the City to provide service to all
residents within the City limits. This project will be to evaluate, design, and construct a sewer collection system for the area of
Hughes Ranch Road, Lee Drive and Hawk Meadows that do not currently have city sewer service.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 282
WW2708 - Hughes Ranch Road Gravity Sewer -Cullen to Stone
Capital Cost
$1.85M
FY2026 Budget
$0
Total Budget (all years)
$2.74M
Project Total (to date)
$4.59M
Detailed Breakdown
Category
Historical Budgeted FY2027 FY2028
Requested Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Land/Right of Way
Total
$1,110,000 $0 $1,800,000
$222,000 $40,000 $540,000
$170,000 $240,000 $117,000
$350,000 $0 $0
$,852,000 $80,000 $,457,000
$0 $2,910,000
$0 $802,000
$0 $527,000
$0 $350,000
$ $,589,000
Funding Sources
$1.85M
FY2026 Budget
Total Budget (all years) Project Total (to date)
$0 $2.74M $4.59M
Detailed Breakdown
Category
FY2027 FY2028
Historical Budgeted
Requested Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$1,852,000
$,852,000
$280,000 $2,457,000
$80,000 $,457,000
$0 $4,589,000
$ $,589,000
Operational Costs
FY2026 Budget
$0
Total Budget (all years) Project Total
$11.6K $11.6K
Detailed Breakdown
Category Historical Budgeted
FY2029
Requested
Future Budgeted Total
Operation & Maintenance
Personnel Services
Total
$o
S0
9
$8,432
$3,163
$1,595
$0
$0
9
$8,432
$3,163
$1,595
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 283
WW2709 - Crystal Lakes West Lift Station Rehabilitation
WW2709 - Crystal Lakes West Lift Station
Rehabilitation
Overview Project Location
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW2709
Request Groups Wastewater
Estimated Start 10/1/2026
Date
Amy Coykendall, CIP Coordinator
9
C
Description
This project will rehabilitate the wet well by removing and replacing the corrosion -resistant coating, flow meter, piping,
valves, pumps, electrical control panel, service rack, SCADA, and adding a manual transfer switch for the portable generator.
Installation of a 2" water service and cedar fence.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
The lift station has been in service since 1996 and is at the end of its useful life for the equipment and coatings. This lift
station's priority rating is based on poor condition according to the Wastewater Master Plan.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 284
WW2709 - Crystal Lakes West Lift Station Rehabilitation
Capital Cost
$1.92 M
FY2026 Budget
$0
Total Budget (all years)
$1.91M
Project Total (to date)
$3.83M
Detailed Breakdown
Category
FY2028 FY2029
Historical Budgeted
Requested Requested
Future Budgeted Total
Construction
Design/Surveying
Contingency
Total
$900,000 $0 $1,200,000
$900,000 $200,000 $78,000
$120,000 $70,000 $360,000
$,920,000 $70,000 $,638,000
$0 $2,100,000
$0 $1,178,000
$0 $550,000
A $,828,000
Funding Sources
$1.92 M
FY2026 Budget
Total Budget (all years) Project Total (to date)
$0 $1.91M $3.83M
Detailed Breakdown
Category
Historical Budgeted FY2028 FY2029
Requested Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$1,920,000
$,920,000
$270,000 $1,638,000
$70,000 $,638,000
$0 $3,828,000
A 0,828,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 285
WW2710 - Critical Lift Station Electrical Hardening Improvements
WW2710 - Critical Lift Station Electrical
Hardening Improvements
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 355 - Wastewater Treatment
Type Capital Improvement
Project Number WW2710
Request Groups Water
Estimated Start 11/1/2025
Date
Estimated 11/1/2027
Completion Date
a.... •. er'4a
Description
The purpose of this project is to strategically install backup generators, automatic transfer switches or manual switches
across the collection system. These generators and associated equipment will help the utilities maintain sanitary sewer
levels across the city during events like Hurricane Beryl, Winter Storm Uri or anytime there is a power loss.
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: New Construction Estimated Project Life Span: 15
Project Justification
The majority of the 72 sanitary lift stations are without any kind of back-up power. During Hurricane Beryl, Utilities and EPW
staff had to deploy portable generators across the collection system to protect the residents and the environment from
sanitary sewer overflows. With critical equipment installed, Pearland Water staff will be better prepared to mitigate sewer
overflows during emergency events.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 286
WW2710 - Critical Lift Station Electrical Hardening Improvements
Capital Cost
FY2026 Budget
so
Total Budget (all years)
$5.6 M
Project Total
$5.6M
Detailed Breakdown
Category
Historical Budgeted FY2027 FY2028
Requested Requested
Future Budgeted Total
Construction
Design/Surveying
Total
$0 $0 $5,300,000
$0 $300,000 $0
$ $00,000 $,300,000
$0 $5,300,000
$0 $300,000
0 8,600,000
Funding Sources
FY2026 Budget Total Budget (all years)
so
$5.6 M
Project Total
$5.6M
Detailed Breakdown
Category
Historical Budgeted FY2027 FY2028
Requested Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0 $300,000 $5,300,000
0 $00,000 $,300,000
$0 $5,600,000
$ $,600,000
Operational Costs
FY2026 Budget Total Budget (all years)
so
$50 K
Project Total
$50 K
Detailed Breakdown
Category Historical Budgeted
FY2029 FY2030
Requested Requested
Future Budgeted Total
Operation & Maintenance
Total
$0 $25,000 $25,000
0 $5,000 $5,000
$0 $50,000
$ $0,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 287
WW2801 - Rustic Oak Elementary School Lift Station Rehabilitation
WW2801 - Rustic Oak Elementary School Lift
Station Rehabilitation
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW2801
Request Groups Wastewater
Estimated Start 10/1/2025
Date
9
. 2{ILC UT
Description
Replace lift station, including installation of a new wet well with corrosion -resistant coating, remove and replace two
submersible pumps, including guardrails, new wet well top, replace valves, flow meter, SCADA, operational lighting,
discharge piping, control panel, electrical rack and install manual transfer switch for portable generator connection.
Additional items include the installation of a concrete work slab surrounding the wet well and installing a new 8 -foot cedar
fence and a 2" water service.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
The lift station has been in service since 1993 and is at the end of its useful life for the equipment and coatings. This lift
station's priority rating is based on being in fair condition with a high impact due to location and/or high probability of
sanitary sewer overflow, according to the Wastewater Master Plan.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 288
WW2801 - Rustic Oak Elementary School Lift Station Rehabilitation
Capital Cost
FY2026 Budget
$0
Total Budget (all years)
$895K
Project Total
$895K
Detailed Breakdown
Category Historical Budgeted
FY2028 FY2029
Requested Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0 $0 $550,000
$0 $30,000 $165,000
$0 $150,000 $0
8 $80,000 $15,000
$0 $550,000
$0 $195,000
$0 $150,000
8 895,000
Funding Sources
FY2026 Budget
$0
Total Budget (all years) Project Total
$895K $895K
Detailed Breakdown
Category Historical Budgeted
FY2028 FY2029
Requested Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0 $180,000 $715,000
8 $80,000 $15,000
$0 $895,000
8 895,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 289
WW2802 - Westlea Lift Station Rehabilitation
WW2802 - Westlea Lift Station Rehabilitation
Overview
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW2802
Request Groups Wastewater
Estimated Start 10/1/2025
Date
Amy Coykendall, CIP Coordinator
Project Location
9
Description
This project will rehabilitate the aging lift station, which will involve the re -coating of the wet well with corrosion -resistant
lining, replacing the piping and up -sizing the pumps, flow meter, upgrading the electrical control panel for SCADA, service
rack and a manual transfer switch. Installation of a 2" water service and cedar fence.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
The lift station has been in service since 2004 and is nearing the end of its useful life for the equipment and coatings and will
also require elevation upgrades to meet city standards and meet the WWMP requirement for capacity requirements. This lift
station's priority rating is based on being in poor condition with a moderate impact due to location or high probability of
sanitary sewer overflow, according to the Waste Water Master Plan, and will need to be remedied rapidly.
Explain & Identify Type of Other Sources
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 290
WW2802 - Westlea Lift Station Rehabilitation
Capital Cost
FY2026 Budget
$o
Total Budget (all years)
$1.27 M
Project Total
$1.27 M
Detailed Breakdown
Category Historical Budgeted
FY2028 FY2029
Requested Requested
Future Budgeted Total
Construction
Design/Surveying
Contingency
Total
$0 $0 $800,000
$0 $322,000 $0
$0 $50,000 $100,000
$ $72,000 $00,000
$0 $800,000
$0 $322,000
$0 $150,000
$ $,272,000
Funding Sources
FY2026 Budget
$o
Total Budget (all years)
$1.27 M
Project Total
$1.27 M
Detailed Breakdown
Category Historical Budgeted
FY2028 FY2029
Requested Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0 $372,000 $900,000
$ $72,000 $00,000
$0 $1,272,000
0 $,272,000
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 291
WW2901 - Southdown Regional Lift Station & Force Main
WW2901 - Southdown Regional Lift Station &
Force Main
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW2901
Request Groups Water
Estimated Start 10/1/2028
Date
0
Description
Construct regional lift stations and force main to serve the Southdown service area. The construction of the force main, wet
well, flow meter, and pumps will be sized to pump to the Reflection Bay Water Reclamation Facility (WRF). Construction
includes approximately 12,300' of 16" force main from the Southdown Regional Lift Station to Reflection Bay WRF. The route
will take a line beneath SH 288 and remain within McHard and Shadow Creek Parkway ROW to tie into gravity trunk on
Reflection Bay. This project will also include decommissioning of the Southdown Water reclamation Facility. City
specifications require that regional lift stations will require a permanent natural gas generator, automatic transfer switch and
odor control. Installation of a 2" water service and cedar fence.
As per the WW Master Plan: This project includes the construction of an expansion/replacement diversion lift station with a
firm capacity of 6.8 MGD. This project also includes approximately 12,500 feet of 18 -inch force main and a 27 -inch gravity line
between the existing Southdown WRF and the proposed diversion lift station. The existing Southdown WRF is proposed to
be decommissioned, and all flow will be sent to the diversion lift station. This project is sized to serve the model's predicted
build out (2042) peak wet weather flow. The 24 -inch gravity line is sized to convey a peak wet weather flow of 4.7 MGD.
Images
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 292
WW2901 - Southdown Regional Lift Station & Force Main
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: Improvement
Project Justification
This project will collect regional wastewater flows from an expanded service area and divert them to the regional treatment
facility at Reflection Bay WRF, eliminating the Southdown plant and the need for a future 2 MGD expansion of the
Southdown Plant. The current Reflection Bay WRF Expansion includes the capacity to allow for the abandonment of the
Southdown Plant. This is also to meet TCEQ's goal of regionalization of wastewater treatment facilities.
Explain & Identify Type of Other Sources
Waste water project 4 in 2017 impact fee update.
Capital Cost
$100K
FY2026 Budget
so
Total Budget (all years)
$18.8M
Project Total (to date)
$18.9M
Detailed Breakdown
Category Historical Budgeted
FY2029 FY2030 Future Budgeted
Requested Requested
Total
Design/Surveying
Contingency
Land/Right of Way
Prelim. Engineering Report
Total
$0 $1,200,000 $12,000,000
$0 $300,000 $3,600,000
$0 $900,000 $800,000
$100,000 $0 $0
$00,000 2,400,000 $6,400,000
$0 $13,200,000
$0 $3,900,000
$0 51,700,000
$0 $100,000
$ $8,900,000
Funding Sources
$100K
FY2026 Budget
Total Budget (all years) Project Total (to date)
$0 $18.8M $18.9M
Detailed Breakdown
Category Historical Budgeted
FY2029 FY2030
Requested Requested Future Budgeted
Total
W/S Certificates of
Obligation
Impact Fees -Debt
Total
$100,000 $1,485,500
$0 $914,500
$00,000 2,400,000
$16,400,000
$0
$6,400,000
$0 $17,985,500
$0 $914,500
$ $8,900,000
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 293
WW2902 - Country Place Waste Water Line Replacement
WW2902 - Country Place Waste Water Line
Replacement
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 345 - Capital Projects
Type Capital Improvement
Project Number WW2902
Request Groups Water
Estimated Start 10/1/2025
Date
0
Description
The City has approximately 82 miles of transite pipe water lines to be replaced over a period of years. This project will
strategically replace approximately 7.5 miles of transite water line infrastructure in the Country Place subdivision. In addition
to the replacement of transite pipe, all existing 2, 3 and 4 -inch water lines will be up -sized with 6 or 8" polyvinyl chloride (PVC)
or high -density polyethylene (HDPE) pipe materials and service lines will also be replaced. This will also include the
installation of sampling and pressure sensors. Replacing small diameter pipes with current materials meeting City standard
line sizes in coordination with the City's water model is expected to provide higher flow capacities for these neighborhoods,
resolve dead-end water line issues resulting in improved water quality, improve fire protection, and reduce water loss due to
broken lines. Pressure sensor and water sampling station(s) will be included.
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: Improvement
Project Justification
Transite pipe water line has a failure rate significantly higher than that of comparable and like -sized PVC. This project will
replace the transite pipe infrastructure with PVC which was not prevalent in the industry at the time the transite pipelines
were installed. The transite pipelines are responsible for a higher percentage of work orders per foot than comparable PVC
lines and require greater resources to maintain relative to PVC. The project will also provide the opportunity to resolve dead-
end water line issues in the affected areas, which will improve water quality.
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 294
WW2902 - Country Place Waste Water Line Replacement
Capital Cost
FY2026 Budget
so
Total Budget (all years)
$1.15M
Project Total
$1.15M
Detailed Breakdown
Category Historical Budgeted
FY2029
Requested
Future Budgeted Total
Design/Surveying
Prelim. Engineering Report
Land/Right of Way
Contingency
Total
$0 $650,000
$0 $350,000
$0 $100,000
SO $50,000
0 $,150,000
$0 $650,000
$0 $350,000
So $100,000
So $50,000
0 $,150,000
Funding Sources
FY2026 Budget Total Budget (all years)
so
$1.15M
Project Total
$1.15M
Detailed Breakdown
Category Historical Budgeted
FY2029
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
SO $1,150,000
0 $,150,000
$0 $1,150,000
0 $,150,000
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 295
WW2903 - Tower Bridge Lift Station Rehabilitation
WW2903 - Tower Bridge Lift Station
Rehabilitation
Overview
Request Owner
Department
Project Location
Amy Coykendall, CIP Coordinator Dawn
300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW2903
Request Groups Wastewater
Estimated Start 10/1/2025
Date
Description
The project is part of the program to rehabilitate or replace system -wide lift stations. The project will explore the possibility of
decommissioning the lift station and gravity flowing to Barry Rose Rd. If possible, this option could require the acquisition of
a Utility Easement. If gravity is not possible, the project would still proceed with the rehabilitation of the wet well with
corrosion -resistant coating, replacement of existing submersible pumps, SCADA, flow meter, and ductile iron discharge
piping, check valves and plug valves, provide a new electrical service and control panel, and replace perimeter fencing with 8'
cedar wood picket fence and odor control. The 2020 Wastewater Master Plan calls for the rehabilitation of this lift station.
Installation of a 2" water service.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
The lift station has been in service since 1992 and is at the end of its useful life for the equipment and coatings and will also
require elevation upgrades to meet city standards. With the lift station being next to the homeowner, it is vital to maintain
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 296
WW2903 - Tower Bridge Lift Station Rehabilitation
this asset. This lift station is located next to a residential home. The project will also evaluate the potential to relocate the lift
station away from residential property. This lift station's priority rating is based on being in poor condition according to the
Waste Water Master Plan.
Capital Cost
FY2026 Budget
$o
Total Budget (all years)
$390K
Future
$550K
Project Total
$940K
Detailed Breakdown
Category Historical Budgeted
FY2029 FY2030
Requested Requested
Future Budgeted Total
Construction
Design/Surveying
Land/Right of Way
Total
$0 $0 $0 $550,000 $550,000
$0 $0 $290,000 $0 $290,000
$0 $100,000 $0 $0 $100,000
$ $00,000 $90,000 $50,000 940,000
Funding Sources
FY2026 Budget
$o
Total Budget (all years) Future
$390K
$550K
Project Total
$940K
Detailed Breakdown
Category Historical Budgeted
FY2029 FY2030
Requested Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0 $100,000 $290,000
9 $00,000 $90,000
$550,000 $940,000
$50,000 940,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 297
WW3001- Villages of Edgewater Lift Station Rehabilitation
WW3001- Villages of Edgewater Lift Station
Rehabilitation
Overview
Request Owner Mark Baker, Asset Reliability
Manager
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WW3001
Request Groups Wastewater
Estimated Start 10/1/2025
Date
Project Location
3400 Irish Shores Lane
9
:.zed
Description
This project is a key component of the broader infrastructure program aimed at rehabilitating or replacing lift stations across
the system. The scope of work includes the removal and replacement of critical components such as the wet well coating,
submersible pumps, guiderails, ductile iron discharge piping, SCADA system, flow meter, check valves, and plug valves.
Repairs will also be made to the discharge valve pit. Additionally, the existing electrical panel and service rack will be
replaced to ensure improved reliability and safety. The project includes the installation of new gates and an automatic
transfer switch for a stationary generator, enhancing the station's emergency readiness. A new 2" water service line will be
installed, along with a cedar fence to provide site security and aesthetic improvement.
Images
Details
Strategic Priority: Sustainable Infrastructure
Type of Project: Improvement
Project Justification
Impact on operating budget: No
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 298
WW3001- Villages of Edgewater Lift Station Rehabilitation
The lift station, which has been in continuous operation since 1998, has reached the end of its serviceable life. The station's
mechanical equipment and protective coatings are exhibiting advanced wear and degradation, increasing the risk of system
failures. Routine maintenance is no longer sufficient to ensure reliable performance, and many components are now
obsolete, making repairs increasingly difficult and costly.
A condition assessment conducted as part of the Wastewater Master Plan has classified this station in "poor" condition and
assigned it a high priority rating for rehabilitation. In addition to the physical deterioration, the station no longer meets
current design and safety standards, which may compromise operational efficiency and worker safety.
Rehabilitating the lift station will address these critical issues by replacing outdated infrastructure with modern, energy -
efficient components. This will improve system reliability, reduce maintenance costs, and extend the station's operational life
for decades to come. Furthermore, the upgrades will enhance the City's ability to manage wastewater effectively, protect the
environment, and meet future regulatory requirements.
Capital Cost
FY2026 Budget
$o
Total Budget (all years) Future
$100 K $1.44M
Project Total
$1.54M
Detailed Breakdown
Category Historical Budgeted
FY2030
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0
So
$0
9
$0
$0
$100,000
$00,000
$1,200,000 $1,200,000
$240,000 $240,000
$0 $100,000
$,440,000 $,540,000
Funding Sources
FY2026 Budget
so
Total Budget (all years)
$l 00 K
Future
$1.44 M
Project Total
$1.54M
Detailed Breakdown
Category Historical Budgeted
FY2030
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0 $100,000
$ $00,000
$1,440,000 $1,540,000
$,440,000 $,540,000
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 299
Water
Water
FY26 - FY3O Water Projects (including Historical Budgeted, Future Budgeted)
$40M
$30M
$20M
$1OM
0
$18M
$25 M
•
$20M
$12M
1
$15M
Historical 2026 2027
Budgeted
$35M
$2M
2028 2029 2030 Future
Budgeted
• WA2103 - FM 518 Utility $6,745,000 5.31%
Relocations - SH288 to Old
Chocolate Bayou
• WA2202- McLean Water $2,135,000 1.68%
Production Facility Rehabilitation
• WA2203 - Green Tee Transite Pipe $6,635,000 5.23%
Water Line Replacement
• WA2301 - Liberty Water $3,478,000 2.74%
Production Facility Rehabilitation
• WA2304 - Sherwood Waterline $2,050,000 1.62%
Replacement
• WA2305 - Country Place Water $842, 000 0.66%
Well Generator Replacement
• WA2306 - Garden Water Well $657,000 0.52%
Generator
• WA2401 - Water Plant Chemical $2,119,000 1.67%
Containment Structures
• WA2402 - Wood Creek Transite $5,415,000 4.27%
Pipe Water Line Replacement
• WA2403 - Cullen Ground Storage $4,930,000 3.88%
Tank Replacement
• WA2404 - CR100 Water Line - $375, 000 0.30%
Harkey to Pearland Sites
• WA2405 - Creekview and $6,350,000 5.00%
Shadycrest Transite Pipe Water
Line Replacement
• WA2501 - Water Master Plan $650,000 0.51%
Update
• WA2502 - Kirby Elevated and $1,685,000 1.33%
Ground Storage Tank
Rehabilitation
• WA2503 - Sleepy Hollow Small $3,484,000 2.74%
Waterline Replacement
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 300
Water
• WA2505 - Mykawa Road Transite $3,910,000 3.08%
Pipe and Water Line
Replacement
• WA2506 - Pump, VFD and Motor $300,000 0.24%
Condition Assessment
• WA2509 - Southwest Quadrant of $2,500,000 1.97%
Old Town Transite Water Line
Replacement (McLean to SH35
South of Broadway)
• WA2601 - Alice Elevated & Ground $1,451,000 1.14%
Storage Tank Rehabilitation
• WA2607 - Surface Water $3,953,750 3.11%
Treatment Plant - Plant
Redundancy Improvement
• WA2609 - Alice WTP New 5 MG $7,100,000 5.59%
GST
• WA2701 - Towne Lakes Water $1,098,000 0.87%
Quality Program
• WA2702 - Magnolia Water $850,000 0.67%
Production Facility Rehabilitation
• WA2704 - Country Place Well $550,000 0.43%
Facility Rehabilitation
• WA2705 - Garden Well New1MG $4,200,000 3.31%
GST
• WA2801- Alexander Landing, $10,039,500 7.91%
Banbury Cross & Whispering
Winds Transite Pipe Water Line
Replacement
• WA2804 - Dixie Hollow $2,180,000 1.72%
Subdivision Transite Pipe Water
Line Replacement
• WA2901 - Park View Transite Pipe $7,000,000 5.51%
Water Line Replacement
• WA2902 - Southdown Transite $16,980,000 13.38%
Pipe Water Line Replacement
• WA2903 - Country Place Transite $10,925,000 8.61%
Pipe Water Line Replacement
• WA2904 - Liberty Dr &John Lizer $3,108,000 2.45%
Transite Pipe Water Line
Replacement
• WA3001 - Lakes of Edgewater $1,180,000 0.93%
Estates Water Quality Program
• WA3002 - West Oaks and West $2,059,000 1.62%
Oaks Village Water Quality
Program
Summary of Requests
Project No. /
Category
Historical
Budgeted
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
WA21 WA2103 - FM
03 518 Utility
$724,000 $6,021,000
$0 so $0 $0 $0
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 301
Water
Project No. /
Category
Relocations -
SH288 to Old
Chocolate
Bayou
WA22 WA2202 -
02 McLean Water
Production
Facility
Rehabilitation
WA22 WA2203 -
03 Green Tee
Transite Pipe
Water Line
Replacement
WA23 WA2301 -
01 Liberty Water
Production
Facility
Rehabilitation
WA23 WA2304 -
04 Sherwood
Waterline
Replacement
WA23 WA2305 -
05 Country Place
Water Well
Generator
Replacement
WA23 WA2306 -
06 Garden Water
Well Generator
WA24 WA2401 -
01 Water Plant
Chemical
Containment
Structures
WA24 WA2402 -
02 Wood Creek
Transite Pipe
Water Line
Replacement
WA24 WA2403 -
03 Cullen Ground
Storage Tank
Replacement
WA24 WA2404 - CR
04 100 Water Line
- Harkey to
Pearland Sites
WA24 WA2405 -
05 Creekview and
Shadycrest
Transite Pipe
Water Line
Replacement
WA25 WA2501 -
01 Water Master
Plan Update
Historical
Budgeted
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
$1,885,000
$6,634,999
$250,000 $0
$0 $0 $0 $0
Si $0 $0 $0 $0 $0
$278,000 $3,200,000
$2,049,999
$0 $0 $0 $0 S0
Si $0 $0 $0 $0 $0
$841,999 $1 $0 $0 $0 $0 $0
$656,999 $1 $0 $0 $0 $0 S0
$309,000 $1,810,000
$500,000
$1,170,000
$0 $0 $0 $0 $0
$0 $4,915,000
$0 $0
$0 $0
$0 $3,760,000 $0 $0 $0 $0
$374,999 $1 $0 $0 $0 $0 $0
$550,000 $5,800,000
$0 $0 $0
$0 $0
$649,999 $1 $0 $0 $0 $0 $0
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 302
Water
Project No. / Historical Future
FY2026 FY2027 FY2028 FY2029 FY2030
Category Budgeted Budgeted
WA25 WA2502- Kirby $335,000 $0 $0 $1,350,000 $0 $0 $0
02 Elevated and
Ground
Storage Tank
Rehabilitation
WA25 WA2503- $400,000 $0 $0 $3,084,000 $0 $0 $0
03 Sleepy Hollow
Small
Waterline
Replacement
WA25 WA2505- $530,000 $3,380,000 $0 $0 $0 $0 $0
05 Mykawa Road
Transite Pipe
and Water Line
Replacement
WA25 WA2506 - $299,999 $1 $0 S0 $0 $0 $0
06 Pump, VFD
and Motor
Condition
Assessment
WA25 WA2509- $0 $2,500,000 $0 $0 $0 $0 $0
09 Southwest
Quadrant of
Old Town
Transite Water
Line
Replacement
(McLean to
SH35 South of
Broadway)
WA26 WA2601-Alice $0 $236,000 $1,215,000 $0 $0 $0 $0
01 Elevated &
Ground
Storage Tank
Rehabilitation
WA26 WA2607- $0 $725,000 $3,228,750 $0 $0 $0 $0
07 Surface Water
Treatment
Plant - Plant
Redundancy
Improvement
WA26 WA2609 - Alice S0 $1,000,000 $6,100,000 $0 $0 S0 $0
09 WTP New 5
MG GST
WA27 WA2701- So So $0 $0 $308,000 $790,000 $0
01 Towne Lakes
Water Quality
Program
WA27 WA2702- SO $0 $0 $350,000 $500,000 $0 $0
02 Magnolia
Water
Production
Facility
Rehabilitation
WA27 WA2704- $0 $0 $150,000 $400,000 $0 $0 $0
04 Country Place
Well Facility
Rehabilitation
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 303
Water
Project No. /
Category
Historical
Budgeted
FY2026 FY2027 FY2028 FY2029 FY2030 Future
Budgeted
WA27 WA2705- $0 $0 $700,000 $3,500,000 $0 $0 SO
05 Garden Well
New 1MG GST
WA28 WA2801- $0 $0 SO SO $1,039,500 $9,000,000 SO
01 Alexander
Landing,
Banbury Cross
& Whispering
Winds Transite
Pipe Water
Line
Replacement
WA28 WA2804- $80,000 So So $2,100,000 $0 $0 So
04 Dixie Hollow
Subdivision
Transite Pipe
Water Line
Replacement
WA29 WA2901- Park So So So So $700,000 $6,300,000 $0
01 View Transite
Pipe Water
Line
Replacement
WA29 WA2902- So So So $0 $1,980,000 $15,000,000 $0
02 Southdown
Transite Pipe
Water Line
Replacement
WA29 WA2903- $o $0 $0 $1,150,000 $9,775,000 $0 $0
03 Country Place
Transite Pipe
Water Line
Replacement
WA29 WA2904- $0 $o $0 $0 $300,000 $2,808,000 $0
04 Liberty Dr &
John Lizer
Transite Pipe
Water Line
Replacement
WA30 WA3001- $0 $0 $0 $0 $0 $350,000 $830,000
01 Lakes of
Edgewater
Estates Water
Quality
Program
WA30 WA3002- SO $0 $0 $0 $0 $399,000 $1,660,000
02 West Oaks and
West Oaks
Village Water
Quality
Program
Total Summary of $8,269,993 $4,922,007 $0,068,750 $1,934,000 $4,602,500 $4,647,000 $,490,000
Requests
Project No. / Category
(continued from above)
Total
WA2103 WA2103 - FM 518 Utility Relocations - SH288 to Old
Chocolate Bayou
$6,745,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 304
Water
Project No. / Category
(continued from above)
Total
WA2202
WA2203
WA2301
WA2304
WA2305
WA2306
WA2401
WA2402
WA2403
WA2404
WA2405
WA2501
WA2502
WA2202 - McLean Water Production Facility
Rehabilitation
WA2203 - Green Tee Transite Pipe Water Line
Replacement
WA2301 - Liberty Water Production Facility
Rehabilitation
WA2304 - Sherwood Waterline Replacement
WA2305 - Country Place Water Well Generator
Replacement
WA2306 - Garden Water Well Generator
WA2401 - Water Plant Chemical Containment
Structures
WA2402 - Wood Creek Transite Pipe Water Line
Replacement
WA2403 - Cullen Ground Storage Tank
Replacement
WA2404 - CR 100 Water Line - Harkey to Pearland
Sites
WA2405 - Creekview and Shadycrest Transite Pipe
Water Line Replacement
$2,135,000
$6,635,000
$3,478,000
$2,050,000
$842,000
$657,000
$2,119,000
$5,415,000
$4,930,000
$375,000
$6,350,000
WA2501- Water Master Plan Update $650,000
WA2502 - Kirby Elevated and Ground Storage Tank $1, 685, 000
Rehabilitation
WA2503 WA2503 - Sleepy Hollow Small Waterline
Replacement
WA2505 WA2505 - Mykawa Road Transite Pipe and Water
Line Replacement
WA2506 WA2506 - Pump, VFD and Motor Condition
Assessment
WA2509 WA2509 - Southwest Quadrant of Old Town
Transite Water Line Replacement (McLean to SH35
South of Broadway)
WA2601 WA2601 -Alice Elevated &Ground Storage Tank
Rehabilitation
WA2607 WA2607 - Surface Water Treatment Plant - Plant
Redundancy Improvement
WA2609
WA2701
WA2702
WA2704
WA2705
WA2801
WA2609-Alice WTP New5 MG GST
WA2701 - Towne Lakes Water Quality Program
WA2702 - Magnolia Water Production Facility
Rehabilitation
WA2704 - Country Place Well Facility Rehabilitation
WA2705 - Garden Well New 1 MG GST
WA2801 -Alexander Landing, Banbury Cross &
Whispering Winds Transite Pipe Water Line
Replacement
$3,484,000
$3,910,000
$300,000
$2,500,000
51,451,000
$3,953,750
$7,100,000
$1,098,000
$850,000
$550,000
$4,200,000
$10,039,500
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 305
Water
Project No. / Category
(continued from above)
Total
WA2804 WA2804 - Dixie Hollow Subdivision Transite Pipe
Water Line Replacement
WA2901 WA2901- Park View Transite Pipe Water Line
Replacement
WA2902 WA2902 - Southdown Transite Pipe Water Line
Replacement
WA2903 WA2903 - Country Place Transite Pipe Water Line
Replacement
WA2904 WA2904 - Liberty Dr & John Lizer Transite Pipe
Water Line Replacement
WA3001 WA3001- Lakes of Edgewater Estates Water Quality
Program
WA3002 WA3002 - West Oaks and West Oaks Village Water
Quality Program
$2,180,000
$7,000,000
$16,980,000
$10,925,000
$3,108,000
$1,180,000
$2,059,000
Total Summary of Requests $26,934,250
0004
FY 26-30 Proposed Capital Improvement Plan I Pearland
ASP -
Page 306
WA2103 - FM 518 Utility Relocations - SH288 to Old Chocolate Bayou
WA2103 - FM 518 Utility Relocations - SH288
to Old Chocolate Bayou
Overview Project Location
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WA2103
Request Groups Water
Estimated Start 10/1/2025
Date
Amy Coykendall, CIP Coordinator
:22{1.'0 I.T.
Description
This project will relocate approximately 12,100 LF (2.3 miles) of 16" water main from SH 288 to Old Chocolate Bayou. This
waterline is on the TxDOT right of way (ROW) of FM 518 and will need to be relocated for the roadway widening.
Images
mage
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
TxDOT is scheduling to widen FM518 from SH288 to SH35. The first phase is to start at SH 288 and end at Old Chocolate
Bayou. The existing 12,100 LF 16" water main is located in the existing ROW. Per TxDOT, utilities will need to be relocated as
part of the widening project. TxDOT has construction funding in 2025.
Explain & Identify Type of Other Sources
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 307
WA2103 - FM 518 Utility Relocations - SH288 to Old Chocolate Bayou
$100,000 w/s cash funded in FY21. $50,000 in FY23. Additional w/s cash funded amount from fund balance.
2023C C/O $399,000.00
Capital Cost
FY2026 Budget
$6.75M
Total Budget (all years)
$6.75M
Project Total
$6.75M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Total
$0
$o
e
$5,745,000
$1,000,000
6,745,000
$0 $5,745,000
$0 $1,000,000
6 6,745,000
Funding Sources
$724K
FY2026 Budget
$6.02M
Total Budget (all years) Project Total (to date)
$6.02M $6.75M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Other Funding Sources
W/S Certificates of
Obligation
W/S Revenues - Cash
Total
$0 $5,745,000
$399,000 $276,000
$325,000
$24,000
$0
6,021,000
$0 $5,745,000
$0 $675,000
$0
e
$325,000
6,745,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 308
WA2202 - McLean Water Production Facility Rehabilitation
WA2202 - McLean Water Production Facility
Rehabilitation
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WA2202
Request Groups Water
Estimated Start 10/1/2029
Date
9
Description
Based on the preliminary engineering report findings, priority improvements will be made at the McLean Water Plant -
remove and replacing two (2) existing booster pumps, motors and adding variable frequency drives (VFDs). Replace all plant
piping and valves between ground storage tank and plant discharge. Replace natural gas generator and enclosure. Replace
underground piping within the plant, repair and extend fencing around the facility, and update the facility's storage room. A
new drainage system for the residual water from the inline analyzers and a flowmeter. Prepare as -built drawings of plant site
and perform testing.
Images
mage4
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
The Public Works Department has experienced several failures of water lines at the water production facilities over the past
several years. Most of the water line infrastructure at the production facilities is original to the facilities and has not been
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 309
WA2202 - McLean Water Production Facility Rehabilitation
replaced. This program will reduce service interruptions. The 2018 assessment report identified each plant site and ranked
McLean as a priority to address along with the water model to correctly size the pumps for distribution.
Explain & Identify Type of Other Sources
$170K cash funded FY22 Adopted.
2023C $1,715,000
Capital Cost
$285K
FY2026 Budget
$1.85M
Total Budget (all years) Project Total (to date)
$1.85M $2.14M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Design/Surveying
Contingency
Total
$0 $1,800,000
$185,000 $0
$100,000 $50,000
$85,000 $,850,000
$0 $1,800,000
$0 $185,000
$0 $150,000
$ $,135,000
Funding Sources
$1.89M
FY2026 Budget Total Budget (all years)
$250K $250K
Project Total (to date)
$2.14M
Detailed Breakdown
Category Historical Budgeted
FY2026 FY2028
Requested Requested
Future Budgeted Total
W/S Certificates of
Obligation
W/S Revenues - Cash
Impact Fees - Debt
Total
$1,715,000 $250,000 $0
$170,000 $0 $0
$0 $0 $0
$,885,000 $50,000 6
$0 $1,965,000
$0 $170,000
$0 S0
8 2,135,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 310
WA2203 - Green Tee Transite Pipe Water Line Replacement
WA2203 - Green Tee Transite Pipe Water Line
Replacement
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WA2203
Request Groups Water
Estimated Start 10/1/2025
Date
9
Description
The City has approximately 82 miles of transite pipe water lines to be replaced over a period of years. This project will
strategically replace approximately 7.33 miles of transite water line infrastructure in the Green Tee subdivision. In addition to
the replacement of transite pipe, all existing 2, 3 and 4 -inch water lines will be up -sized with 6 or 8" polyvinyl chloride (PVC) or
high -density polyethylene (HDPE) pipe materials and service lines, pressure sensors and sampling stations will also be
replaced.
Images
mage5
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
Transite pipe water line has a failure rate significantly higher than that of comparable and like -sized (PVC). This project will
replace the transite pipe infrastructure with PVC which was not prevalent in the industry at the time the Transite pipelines
were installed. The Transite pipelines are responsible for a higher percentage of work orders per foot than comparable PVC
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 311
WA2203 - Green Tee Transite Pipe Water Line Replacement
lines and require greater resources to maintain relative to PVC. The project will also provide the opportunity to resolve dead
end water line issues in the affected areas, which will improve water quality. Replacing small -diameter pipes with current
materials meeting City standard line sizes in coordination with the City's water model is expected to provide higher flow
capacities for these neighborhoods, resolve dead-end water line issues resulting in improved water quality, improve fire
protection, and reduction in water loss due to broken lines.
Explain & Identify Type of Other Sources
2022C $450,000
2024C $6,185,000
Capital Cost
$6.63M
FY2026 Budget
Total Budget (all years) Project Total (to date)
$6.64M
Detailed Breakdown
Category
Historical FY2026 FY2027 FY2028 Future
Budgeted Requested Requested Requested Budgeted
Total
Construction
Contingency
Design/Surveying
Land/Right of Way
Equipment and Furniture
Prelim. Engineering Report
Total
$5,600,000 $0 $0 $0 $0 $5,600,000
$600,000 $0 $0 $0 $0 $600,000
$334,999 $1 $0 $0 $0 $335,000
$100,000 $0 $0 $0 $0 $100,000
S0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 S0
6,634,999 $ 0 0 0 6,635,000
Funding Sources
$6.63M
FY2026 Budget
Total Budget (all years) Project Total (to date)
$6.64M
Detailed Breakdown
Category
Historical FY2026 FY2027 FY2028 Future
Budgeted Requested Requested Requested Budgeted
Total
W/S Certificates of
Obligation
Impact Fees - Debt
Impact Fees - Cash
W/S Revenue Bonds
Other Funding Sources
W/S Revenues - Cash
General Revenue - Cash
Total
$6,634,999
$1
$0 $0
$0 $6,635,000
SO SO SO So SO SO
SO SO SO SO SO $0
So $0 So $0 So So
$0 $0 $0 $0 $0 $0
$0 $0 $0 So $0 S0
So SO SO $0 $0 $0
6,634,999 $ 0 0 0 6,635,000
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 312
WA2301 - Liberty Water Production Facility Rehabilitation
WA2301 - Liberty Water Production Facility
Rehabilitation
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 312 - Drainage
Type Capital Improvement
Project Number WA2301
Request Groups Water
Estimated Start 06/1/2025
Date
3519 Liberty Drive
:.zed
4%4., xt+,. -uy
Description
Based on the preliminary engineering report findings, priority improvements will be made at the Liberty Water Plant -
replacing three (3) existing booster pumps, adding variable frequency drives (VFD), motors and rehabilitating building(s),
including environmental control. Replace plant discharge piping above and below ground to the property line, flow meters,
valves, and instrumentation. Replace the existing driveway, fence, and make landscape and drainage improvements. Prepare
as -built drawings of plant site and perform testing.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
Public Works has experienced several failures of water lines at the water production facilities over the past several years. Most
of the water line infrastructure at the production facilities is original to the facilities and has not been replaced. This program
will reduce service interruptions.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 313
WA2301 - Liberty Water Production Facility Rehabilitation
Explain & Identify Type of Other Sources
2023C $120,000
2024C $158,000
Capital Cost
$278K
FY2026 Budget
$3.2M
Total Budget (all years) Project Total (to date)
$3.2M $3.48M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Design/Surveying
Contingency
Total
$0 $3,040,000
$278,000 $0
$0 $160,000
$78,000 $,200,000
$0 $3,040,000
$0 $278,000
$0 $160,000
9 $,478,000
Funding Sources
$278K
FY2026 Budget
$3.2M
Total Budget (all years) Project Total (to date)
$3.2M $3.48M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$278,000 $3,200,000
$78,000 $,200,000
$0 $3,478,000
0 0,478,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 314
WA2304 - Sherwood Waterline Replacement
WA2304 - Sherwood Waterline Replacement
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 345 - Capital Projects
Type Capital Improvement
Project Number WA2304
Request Groups Water
Estimated Start 10/1/2025
Date
Description
The City has approximately 82 miles of transite pipe water lines to be replaced over a period of years. Replacement of 7,200 LF
of transite waterlines in conjunction with the street reconstruction located south of FM 518, west of Westminister Drive, and
north of Windsor Drive. In addition to the replacement of transite pipe, and replacing an existing sampling station, all
existing 2, 3 and 4 -inch water lines will be up -sized with 6 or 8" polyvinyl chloride (PVC) or high -density polyethylene (HDPE)
pipe materials and service lines will also be replaced. Replacing small diameter pipes with current materials meeting City
standard line sizes in coordination with the City's water model is expected to provide higher flow capacities for these
neighborhoods, resolve dead-end water line issues resulting in improved water quality, improve fire protection, and reduce
water loss due to broken lines.
Images
Urn aqaurom
—
WA2304
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: Improvement
Project Justification
Replacement of the waterline is required due to reconstruction of the street and utilities being located in proximity to the
pavement. Additionally, the existing waterline is transite pipe and, due to age, will be replaced with PVC pipe. Transite pipe
water lines have a failure rate significantly higher than that of comparable and like -sized PVC. This project will replace the
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 315
WA2304 - Sherwood Waterline Replacement
transite pipe infrastructure with PVC, which was not prevalent in the industry at the time the Transite pipelines were
installed. The Transite pipelines are responsible for a higher percentage of work orders per foot than comparable PVC lines
and require greater resources to maintain relative to PVC.
Explain & Identify Type of Other Sources
2023C $250,000
2024C $150,000
Capital Cost
$2.05 M
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$2.05 M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$1,590,000
$259,999
$200,000
$,049,999
$0
$1
$0
$0
$0
$o
e
$1,590,000
$260,000
$200,000
$,050,000
Funding Sources
$2.05 M
FY2026 Budget
Total Budget (all years) Project Total (to date)
$2.05 M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$2,049,999 $1
$,049,999 $
$0 $2,050,000
e $,050,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 316
WA2305 - Country Place Water Well Generator Replacement
WA2305 - Country Place Water Well
Generator Replacement
Overview
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WA2305
Request Groups Water
Estimated Start 10/1/2024
Date
Amy Coykendall, CIP Coordinator
Project Location
9
L.etfJ�c Gn
4yn{•F M•a. -4a
Description
This project will replace the existing 19 -year -old natural gas 500 -kilowatt (kw) generator at this facility and an automatic
transfer switch. The generator will be sized to provide full power redundancy and connect to SCADA.
Images
mageWA2305
g e WA2305
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: Improvement
Project Justification
The Country Place development was annexed into the City in 2012 and the City inherited all existing infrastructure in place,
including the water well, booster pumps, ground storage tank (GST), and generator. The existing generator, replaced in 2002,
is now 19 years old. This generator failed multiple times during Winter Storm Uri in February 2021, and has been evaluated,
revealing the need for extensive repairs that were deemed not cost-effective.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 317
WA2305 - Country Place Water Well Generator Replacement
Explain & Identify Type of Other Sources
2023C $62,000
2024C $208,500
Transfer to WA2306 - $124,234
Capital Cost
$842K
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$842K
Detailed Breakdown
Category Historical Budgeted
FY2026 FY2028
Requested Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$720,000 $0 $0
$71,999 $1 $0
$50,000 $0 $0
$41,999 $ 0
S0 $720,000
$0 $72,000
$0 $50,000
9 $42,000
Funding Sources
$842K
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$842K
Detailed Breakdown
Category Historical Budgeted
FY2026 FY2028
Requested Requested
Future Budgeted Total
Other Funding Sources
W/S Certificates of
Obligation
Impact Fees - Debt
Total
$571,499
$270,500
$0
$41,999
$1 $0
$0 $0
$0 $0
$ 6
$0 $571,500
$0 $270,500
so
9
$0
$42,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 318
WA2305 - Country Place Water Well Generator Replacement
Operational Costs
$7.04K
FY2026 Budget
$7.26K
Total Budget (all years)
$30.4K
Project Total (to date)
$37.4K
Detailed Breakdown
Category
Historical FY2026 FY2027 FY2028 FY2029 Future
Budgeted Requested Requested Requested Requested Budgeted
Total
Personnel $6,860 $7,066 $7,278 $7,496 $7,721 $0 $36,421
Operations & Maintenance $183 $192 $202 $212 $223 $0 $1,012
Total $,043 $,258 $,480 $,708 $,944 0 $7,433
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 319
WA2306 - Garden Water Well Generator
WA2306 - Garden Water Well Generator
Overview
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WA2306
Request Groups Water
Estimated Start 10/1/2025
Date
Project Location
Lucia Cn
W.•G
Description
Replace an existing diesel gas generator with an engineered -sized Cummins natural (if available) or diesel gas generator.
Images
mageWA2306
Details
Strategic Priority: Safe Community Impact on operating budget: Yes
Type of Project: Improvement
Project Justification
The existing year model 1999 Kohler 265 kilowatt (KW) generator, originally undersized, has consistently demonstrated
limitations by supplying power exclusively to select components of the site since its' acquisition by the City of Pearland.
Furthermore, the generator has failed multiple full -load bank tests, confirming its unreliability and inability to supply fully
redundant power when needed.
Explain & Identify Type of Other Sources
2023C $72,000
2024C $273,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 320
WA2306 - Garden Water Well Generator
Capital Cost
$657 K
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$ 657 K
Detailed Breakdown
Category Historical Budgeted
FY2026 FY2028
Requested Requested
Future Budgeted Total
Construction
Design/Surveying
Contingency
Equipment and Furniture
Total
$540,000
$62,999
$54,000
$0
$56,999
$0 $0
$1 $0
$0 $0
$0 $0
$ e
$0 $540,000
$0 $63,000
$0 $54,000
$0 $0
9 $57,000
Funding Sources
$657 K
FY2026 Budget
Total Budget (all years) Project Total (to date)
$ 657 K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Other Funding Sources
Total
$344,999 $1
$312,000 $0
$56,999 $
$0 $345,000
$0 $312,000
9 $57,000
Operational Costs
$183
FY2026 Budget
$192
Total Budget (all years) Project Total (to date)
$829 $1.01K
Detailed Breakdown
Category
Historical FY2026 FY2027 FY2028 FY2029 Future
Budgeted Requested Requested Requested Requested Budgeted
Total
Operations & Maintenance $183 $192 $202 $212 $223 $0 $1,012
Total $83 $92 $02 $12 $23 0 $,012
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 321
WA2401 - Water Plant Chemical Containment Structures
WA2401 - Water Plant Chemical
Containment Structures
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WA2401
Request Groups Water
aai.. F M•a. -4a
Description
To rehabilitate the current drinking water chemical containment and enclosures to meet Texas Commission on
Environmental Quality (TCEQ) standards at eleven (12) drinking water facilities within city limits. All chemical storage,
containment, and feed structures must meet the requirements of TCEQ and Texas Department of Insurance (TDI) windstorm
specification.
Details
Strategic Priority: Safe Community Impact on operating budget: No
Type of Project: Improvement
Project Justification
On 3/23/23, the City of Pearland completed its tri-annual inspection with the governing state agency, TCEQ. After the
investigation, TCEQ provided an exit interview that detailed all aspects of our water system that were out of compliance with
state regulations. The city's drinking water chemical containment structures were deemed out of compliance according to
Texas Administrative Code Chapter 290 Public Drinking Water. The rule reads: Hyperchlorination solution containers and
pumps must be housed in a secure enclosure to protect them from adverse weather conditions and vandalism. The solution
container top must be completely covered to prevent the entry of dust, insects, and other contaminants.
Explain & Identify Type of Other Sources
2024C 94,000
ink FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 322
WA2401 - Water Plant Chemical Containment Structures
Capital Cost
$309K
FY2026 Budget
$1.81M
Total Budget (all years)
$1.81M
Project Total (to date)
$2.12M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0 $1,510,000
$62,000 $300,000
$247,000 $0
$09,000 $,810,000
$0 $1,510,000
$0 $362,000
$0 $247,000
2,119,000
Funding Sources
$309K
FY2026 Budget
$1.81M
Total Budget (all years) Project Total (to date)
$1.81M $2.12M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$309,000 $1,810,000
$09,000 $,810,000
$0 $2,119,000
0 2,119,000
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 323
WA2402 - Wood Creek Transite Pipe Water Line Replacement
WA2402 - Wood Creek Transite Pipe Water
Line Replacement
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WA2402
Request Groups Water
Estimated Start 10/1/2025
Date
Fo.l,lumad
Description
The City has approximately 82 miles of transite pipe water lines to be replaced over a period of years. This project will
strategically replace approximately 4.5 miles of transite water line infrastructure, replace the sampling station, and install
pressure sensors in the Wood Creek subdivision. In addition to the replacement of transite pipe and pressure sensors, all
existing 2, 3 and 4 -inch water lines will be up -sized with 6 or 8" polyvinyl chloride (PVC) or high -density polyethylene (HDPE)
pipe materials and service lines will also be replaced.
Images
mageWA2402
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
Transite pipe water line has a failure rate significantly higher than that of comparable and like -sized polyvinyl chloride (PVC).
This project will replace the transite pipe infrastructure with PVC, which was not prevalent in the industry at the time the
Transite pipelines were installed. The Transite pipelines are responsible for a higher percentage of work orders per foot than
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 324
WA2402 - Wood Creek Transite Pipe Water Line Replacement
comparable PVC lines and require greater resources to maintain relative to PVC. The project will also provide the opportunity
to resolve dead end water line issues in the affected areas, which will improve water quality.
Explain & Identify Type of Other Sources
2024C $500,000
Capital Cost
$415K
FY2026 Budget
Total Budget (all years) Project Total (to date)
$0 $5M $5.42M
Detailed Breakdown
Category Historical Budgeted
FY2027
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0 $4,600,000
$100,000 $400,000
$315,000 $0
$15,000 $,000,000
$0 $4,600,000
$0 $500,000
$0 $315,000
8 8,415,000
Funding Sources
$500K
FY2026 Budget
Total Budget (all years) Project Total (to date)
$0 $4.92M $5.42M
Detailed Breakdown
Category Historical Budgeted
FY2027
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$500,000 $4,915,000
$00,000 $,915,000
$0 $5,415,000
$ 8,415,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 325
WA2403 - Cullen Ground Storage Tank Replacement
WA2403 - Cullen Ground Storage Tank
Replacement
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator Cullen Pkwy
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WA2403
Request Groups Water
Estimated Start 10/1/2026
Date
9
Description
The project is replacing the existing 500,000 -gallon bolted galvanized storage tank with a one -million -gallon pre -stressed
concrete tank. Add a water mixer to this structure to circulate water and eliminate thermal stratification. In addition to the
tank replacement, this project will also replace and relocate the underground piping needed for the new location of the pre-
stressed concrete tank. Booster pumps, chemical containment, and electrical equipment will also be included to make this
facility meet TCEQ guidelines.
Images
imageWA2403
ag eWA2403
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
This ground storage tank (GST) was built in the early 2000s. The annual Texas Commission on Environmental Quality (TCEQ)
tank inspection reports show leakage of the tank around the bolts and gaskets and with the panels. The tank is showing
signs of failure due to the galvanized coating failing, causing leaks from other areas. Galvanized tanks are inexpensive and
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 326
WA2403 - Cullen Ground Storage Tank Replacement
only last 15-20 years and must be fully replaced. With the new pre -stressed concrete tank there will be a need for longer runs
of underground piping and booster pumps will also need to be upgraded. Chemical containment will also need to be
addressed in this project as it will begin construction in FY25.
Explain & Identify Type of Other Sources
2024C $550,000
Capital Cost
$1.17M
FY2026 Budget
Total Budget (all years) Project Total (to date)
$0 $3.76M $4.93M
Detailed Breakdown
Category Historical Budgeted
FY2027
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0 $3,100,000
$270,000 $660,000
$900,000 $0
$,170,000 $,760,000
$0 $3,100,000
$0 $930,000
$0 $900,000
$ $,930,000
Funding Sources
$1.17M
FY2026 Budget
$0
Total Budget (all years)
$3.76M
Project Total (to date)
$4.93M
Detailed Breakdown
Category Historical Budgeted
FY2027
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$1,170,000 $3,760,000
$,170,000 $,760,000
$0 $4,930,000
$ $,930,000
in FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 327
WA2404 - CR100 Water Line - Harkey to Pearland Sites
WA2404 - CR 100 Water Line - Harkey to
Pearland Sites
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WA2404
Request Groups Water
Estimated Start 10/1/2025
Date
9
Cater
-�mc;•xtl
LINKLIC
Description
Install approximately 7,900 feet of water line, including a pressure sensor, along CR100 from Harkey to Pearland Sites Road.
The timing of this project is developer -driven and the city cost is for line oversizing only, not 100% of the estimated cost.
Images
imagewa2404
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: Improvement
Project Justification
This will supply water for future development along this corridor based on the 2018 Water Model Update, projected growth.
Explain & Identify Type of Other Sources
2024C $375,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 328
WA2404 - CR 100 Water Line - Harkey to Pearland Sites
Capital Cost
$375K
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$375K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Total
$374,999
$74,999
$0
9
$375,000
$75,000
Funding Sources
$375K
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$375 K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$374,999 $1
$74,999 $
$0 $375,000
$ $75,000
Operational Costs
FY2026 Budget
$0
Total Budget (all years) Project Total
$7.38K $7.38K
Detailed Breakdown
Category Historical Budgeted
FY2027 FY2028
Requested Requested
Future Budgeted Total
Personnel
Operations & Maintenance
Total
$o
$o
A
$2,456 $2,530
$1,170 $1,228
8,626 8,758
$0 $4,986
$0 $2,398
0 $,384
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 329
WA2405 - Creekview and Shadycrest Transite Pipe Water Line Replacement
WA2405 - Creekview and Shadycrest Transite
Pipe Water Line Replacement
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WA2405
Request Groups Water
Estimated Start 10/1/2026
Date
F
• - • Fne+c:-xa
&W.
LL' LO Gn
4.4W F
Description
The City has approximately 82 miles of transite pipe water lines to be replaced over a period of years. This project will
strategically replace approximately 5 miles of transite water line infrastructure and replace sampling stations in the Creek
View and Shady Crest subdivisions. This project would be completed in conjunction with the drainage project. In addition to
the replacement of transite pipe and pressure sensors, all existing 2, 3 and 4 -inch water lines will be up -sized with 6 or 8"
polyvinyl chloride (PVC) or high -density polyethylene (HDPE) pipe materials and service lines will also be replaced.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
Transite pipe water line has a failure rate significantly higher than that of comparable and like -sized polyvinyl chloride (PVC).
This project will replace the transite pipe infrastructure with PVC, which was not prevalent in the industry at the time the
Transite pipelines were installed. The Transite pipelines are responsible for a higher percentage of work orders per foot than
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 330
WA2405 - Creekview and Shadycrest Transite Pipe Water Line Replacement
comparable PVC lines and require greater resources to maintain relative to PVC. The project will also provide the opportunity
to resolve dead end water line issues in the affected areas, which will improve water quality.
Explain & Identify Type of Other Sources
2024C W/S $550,000
Capital Cost
$520K
FY2026 Budget
$5.83M
Total Budget (all years) Project Total (to date)
$5.83M $6.35M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Land/Right of Way
Total
$0 $5,200,000
$0 $630,000
$420,000 $0
$100,000 $0
820,000 8,830,000
$0 $5,200,000
$0 $630,000
$0 $420,000
$0 $100,000
8 6,350,000
Funding Sources
$550K
FY2026 Budget
$5.8M
Total Budget (all years) Project Total (to date)
$5.8M $6.35M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$550,000 $5,800,000
850,000 8,800,000
$0 $6,350,000
0 6,350,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 331
WA2501 - Water Master Plan Update
WA2501 - Water Master Plan Update
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 345 - Capital Projects
Type Capital Improvement
Project Number WA2501
Request Groups Water
Estimated Start 10/1/2025
Date
9
Description
This project will be to update the Water Master Plan that was created in 2020. Although there has been some updates to the
model for specific projects, no city-wide update has been done. This project will update the city infrastructure, water
demands and include new Surface Water Treatment Plant supply.
Details
Strategic Priority: Resilient Finances Impact on operating budget: No
Type of Project: Improvement
Project Justification
The Water Model Plan was created in 2002 and has been updated periodically due to specific projects that were planned for
in the CIP. With the pallned water from the Surface Water Treatment Plant, the system needs to be updated to determin
how this will interface with the current system. The update will include system improvements and new development that
has occurred and not been included in the current model.
Capital Cost
$650K
FY2026 Budget
$1
Total Budget (all years) Project Total (to date)
$1 $650K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Design/Surveying
Contingency
Total
$500,000
$149,999
$49,999
So
Si
So
$0
9
$500,000
$150,000
650,000
FY 26-3O Proposed Capital Improvement Plan I Pearland Page 332
WA2501 - Water Master Plan Update
Funding Sources
$650 K
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$650 K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
W/S Revenues - Cash
Total
$649,999
649,999
$0
6
$650,000
$50,000
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 333
WA2502 - Kirby Elevated and Ground Storage Tank Rehabilitation
WA2502 - Kirby Elevated and Ground Storage
Tank Rehabilitation
Overview
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WA2502
Request Groups Water
Estimated Start 10/1/2025
Date
Project Location
P
9
Description
A full assessment of all ground storage tank (GST) and elevated storage tank (EST) coatings to assess and rank for
interior/exterior coating replacement. Typical interior coating life expectancy is between 12-15 years, exterior coating is 7-10
years. It is recommended to replace the interior and exterior coating systems, City logo, electrical repairs, vent systems and
pipe work necessary to maintain the integrity of this asset. Install a water mixer to circulate water and eliminate thermal
stratification.
Images
WA2502
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: Improvement
Project Justification
This EST was built in late 2009 and, reviewing the annual Texas Commission on Environmental Quality (TCEQ) tank inspection
reports, the coatings have exceeded their useful life. To protect the integrity of the metal structure from corrosion as well as
extend the useful life of the tank, protective coating system replacement is required. Interior coating systems meet their
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 334
WA2502 - Kirby Elevated and Ground Storage Tank Rehabilitation
useful life in about 12-15 years and require system replacement to continue to provide adequate protection. The useful life of
an exterior coating can be 7-10 years depending on the type of paint and thickness applied.
Capital Cost
$335 K
FY2026 Budget
Total Budget (all years) Project Total (to date)
$0 $1.35 M $1.69 M
Detailed Breakdown
Category Historical Budgeted
FY2028
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0
$185,000
$150,000
$35,000
$1,350,000
$0
$0
$,350,000
$0 $1,350,000
$0 $185,000
$0 $150,000
9 $,685,000
Funding Sources
$335 K
FY2026 Budget
Total Budget (all years) Project Total (to date)
$0 $1.35 M $1.69 M
Detailed Breakdown
Category Historical Budgeted
FY2028
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$335,000 $1,350,000
$35,000 $,350,000
$0 $1,685,000
A $,685,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 335
WA2503 - Sleepy Hollow Small Waterline Replacement
WA2503 - Sleepy Hollow Small Waterline
Replacement
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WA2503
Request Groups Water
Estimated Start 10/1/2025
Date
Description
The City has approximately 82 miles of transite pipe water lines to be replaced over a period of years. Replacement of
approximately 15,200 LF of small -diameter and transite waterlines throughout the Sleepy Hollow subdivision, which includes
pipe sizes of 2, 3, 4, and 6 inches. This project will also include the placement of additional fire hydrant assemblies and valves,
and a pressure sensor. Additional valves will help alleviate the isolation of water in the entire subdivision when waterline
breaks occur or maintenance is needed, while the addition of fire hydrants will improve fire suppression.
Images
WA2503
WA2503
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: Improvement
Project Justification
This project will replace the failing transite and small diameter pipe infrastructure with polyvinyl chloride (PVC). PVC was not
prevalent in the industry at the time the transite pipelines were installed. The transite pipe and small diameter pipelines are
responsible for a higher percentage of work orders per foot than comparable PVC lines and require greater resources to
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 336
WA2503 - Sleepy Hollow Small Waterline Replacement
maintain relative to PVC. The project will also provide the opportunity to resolve dead-end water line issues, add adequate
fire protection and valves in the affected areas, which will improve water quality and life safety.
Capital Cost
$400K
FY2026 Budget
Total Budget (all years) Project Total (to date)
$0 $3.08M $3.48M
Detailed Breakdown
Category Historical Budgeted
FY2028
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0 $2,570,000
$14,000 $514,000
$386,000 $0
$00,000 $,084,000
$0 $2,570,000
$0 $528,000
$0 $386,000
e $,484,000
Funding Sources
$400K
FY2026 Budget
Total Budget (all years) Project Total (to date)
$0 $3.08M $3.48M
Detailed Breakdown
Category Historical Budgeted
FY2028
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$400,000 $3,084,000
$00,000 $,084,000
$0 $3,484,000
e $,484,000
Arlak
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 337
WA2505 - Mykawa Road Transite Pipe and Water Line Replacement
WA2505 - Mykawa Road Transite Pipe and
Water Line Replacement
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 345 - Capital Projects
Type Capital Improvement
Project Number WA2505
Request Groups Water
Estimated Start 10/1/2025
Date
Description
The City has approximately 80 miles of transit pipe wate line to be replaced over a period of years. This project will
strategically replace approximately 1.96 miles of transite pipe water line infrastructure, including sampling stations along
Mykawa Rd., in conjunction with with the Mykawa Rd. Expansion Project. In addition to the replacement of transit pipe,
pressure sensor, all existing 2, 3, and 4 -inch water lines will be up -sized with 6" or 8" polyvinyl chloride (PVC) or high density
polyethylene (HDPE) pipe materials and service lines will also be replaced.
Images
WA2505
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
Transite water line material has a useful life of 50 - 70 years, under good conditions, but as droughts continue to impact the
environment, lines will continue to break causing a loss of water from the water distribution system.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 338
WA2505 - Mykawa Road Transite Pipe and Water Line Replacement
Capital Cost
$530K
FY2026 Budget
$3.38M
Total Budget (all years)
$3.38M
Project Total (to date)
$3.91M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0 $2,600,000
$130,000 $780,000
$400,000 $0
830,000 $,380,000
so $2,600,000
$0 $910,000
$0 $400,000
A 8,910,000
Funding Sources
$530K
FY2026 Budget
$3.38M
Total Budget (all years) Project Total (to date)
$3.38M $3.91M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$530,000 $3,380,000
830,000 $,380,000
$0 $3,910,000
0 8,910,000
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 339
WA2506 - Pump, VFD and Motor Condition Assessment
WA2506 - Pump, VFD and Motor Condition
Assessment
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 345 - Capital Projects
Type Capital Improvement
Project Number WA2506
Request Groups Water
Estimated Start 10/1/2027
Date
0
Description
The City of Pearland water facilities have antiquated pumps, motors, VFD's and electrical components that present
challenges in meeting federal water pressure requirements during high demand. Most of these pumps and motors were
original to build. It is suggested that pumps and motors be replaced every 12 years; however, Pearland has pumps and
motors that have been in operation for over 15 years. This project will assess the current condition of the existing pumps,
motors and VFD's and provide a prioritized replacement schedule.
Images
WA2506
Details
Strategic Priority: Resilient Finances Impact on operating budget: No
Type of Project: Improvement
Project Justification
The scope would be to asset all pumps and motors within utilities for efficiency & reliability. A replacement program will be
designed under a tiered methodology to determine which pumps, motors, and components need to be replaced to meet
demand. All pumps, motors, and related components will be replaced to meet demand and federal regulations.
,r1 FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 340
WA2506 - Pump, VFD and Motor Condition Assessment
Capital Cost
$300K
FY2026 Budget
Total Budget (all years) Project Total (to date)
$300K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Prelim. Engineering Report
Total
$299,999
$99,999
$0 $300,000
9 $00,000
Funding Sources
$300K
FY2026 Budget
$1
Total Budget (all years)
$1
Project Total (to date)
$300K
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted
W/S Revenues - Cash
Total
$299,999
$99,999
$0
9
Total
$300,000
$00,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 341
WA2509 - Southwest Quadrant of Old Town Transite Water Line Replacement (McLean to
SH35 South of Broadway)
WA2509 - Southwest Quadrant of Old Town
Transite Water Line Replacement (McLean to
SH35 South of Broadway)
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 345 - Capital Projects
Type Capital Improvement
Project Number WA2509
Request Groups Water
Estimated Start 10/1/2026
Date
_.1
Description
The project area is bounded by Broadway St. to the north, McLean St. to the west, Walnut St. to the south, and the railroad
tracks to the east. Water line improvements within the project area will consist of replacing existing water lines, ranging in
size from 2 -inch to 12 -inch, with new minimum 6 -inch water lines and appurtenances, including but not limited to sampling
stations and pressure sensors.
Images
WA2509
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: Improvement
Project Justification
The City has approximately 80 miles of transite water lines to be replaced over time. Transite water line material has an
estimated lifespan of 50 - 70 years. Aged transite water line becomes brittle, making the infrastructure susceptible to
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 342
WA2509 - Southwest Quadrant of Old Town Transite Water Line Replacement (McLean to
SH35 South of Broadway)
breaks/damages as soils shift around the water lines, causing water loss within the water distribution system. The project also
allows for increasing line sizes to meet the minimum 6 -inch line size required for fire hydrant installation.
Capital Cost
FY2026 Budget Total Budget (all years)
$2.5M $2.5M
Project Total
$2.5M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
Construction
Contingency
Total
$0 $2,400,000
$0 $100,000
9 2,500,000
$0 $2,400,000
$0 $100,000
0 2,500,000
Funding Sources
FY2026 Budget
$2.5 M
Total Budget (all years)
$2.5M
Project Total
$2.5M
Detailed Breakdown
Category Historical Budgeted
FY2026
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0 $2,500,000
$ 2,500,000
$0 $2,500,000
9 2,500,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 343
WA2601 - Alice Elevated & Ground Storage Tank Rehabilitation
WA2601 - Alice Elevated & Ground Storage
Tank Rehabilitation
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator Alice Street
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WA2601
Request Groups Water
Estimated Start 10/1/2025
Date
Frprarmod
imps. DIT
Description
A full assessment of all ground storage tank (GST) and elevated storage tank (EST) coatings to assess and rank for
interior/exterior coating replacement. Typical interior coating life expectancy is between 12-15 years, exterior is 7 -10 years. It is
recommended to replace the interior and exterior coating systems, City logo, electrical, vent and pipe necessary to maintain
the integrity of this asset. Install a water mixer to circulate water and eliminate thermal stratification.
Images
WA2601
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
This EST was built in the early 1980's and the GST was built in 2011 and, reviewing the required annual Texas Commission on
Environmental Quality (TCEQ) tank inspection reports, the coatings have exceeded its useful life. To protect the integrity of
the structures from corrosion as well as extend the useful life of the tank, protective coating system replacement is required.
Interior coating systems meet their useful life in about 12-15 years and require system replacement to continue to provide
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 344
WA2601 - Alice Elevated & Ground Storage Tank Rehabilitation
adequate protection. The useful life of an exterior coating can be 7-10 years depending on the type of paint and thickness
applied.
Capital Cost
FY2026 Budget
$236K
Total Budget (all years)
$1.45M
Project Total
$1.45M
Detailed Breakdown
Category
FY2026 FY2027
Historical Budgeted
Requested Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0 $0 $980,000
$0 $86,000 $235,000
$0 $150,000 $0
0 $36,000 $,215,000
$0 $980,000
$0 $321,000
$0 $150,000
0 $,451,000
Funding Sources
FY2026 Budget
$236K
Total Budget (all years)
$1.45M
Project Total
$1.45M
Detailed Breakdown
Category
Historical Budgeted FY2026 FY2027
Requested Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0 $236,000 $1,215,000
6 $36,000 $,215,000
$0 $1,451,000
A $,451,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 345
WA2607 - Surface Water Treatment Plant - Plant Redundancy Improvement
WA2607 - Surface Water Treatment Plant -
Plant Redundancy Improvement
Overview
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WA2607
Request Groups Water
Estimated Start 10/1/2024
Date
Project Location
LimmirePtt
r.wn
-
Description
This project will increase the efficiency and reliability of the Surface Water Treatment Plant (SWTP) to produce 10 MGD of
potable water for the residents of Pearland consistently with the installation of one additional membrane rack, including
modules and all necessary valving and piping comparable to the existing racks, additional electrical components and yard
piping, as well as integration of the new rack into existing SCADA systems and the installation of butterfly valves and spool
pieces to prepare the plant for future expansion without forcing the plant to be offline. This additional rack reduces the cost
of purchasing membrane racks during the 20 MGD capacity expansion from 4 to 3 racks.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: New Construction
Project Justification
The City owns and operates a 10 MGD SWTP that serves the City with drinking water. The City is continuing to grow, and the
City will continue to provide quality drinking water. To meet these demands, the SWTP will need to expand capacity from the
current base of 10 MGD towards the ultimate build -out capacity of 20 MGD. The current number of racks limits actual plant
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 346
WA2607 - Surface Water Treatment Plant - Plant Redundancy Improvement
production to 9.0 MGD on average at an inflow rate of 10 MGD while pushing the existing racks to their maximum threshold
continuously, shortening their useful lifespans. The addition of a 4th rack will provide a full 10 MGD of deliverable water and
lessen the stresses on the membrane modules, elongating their lifespans. This methodology will reduce overall O&M costs by
allowing more time before module replacement and using fewer chemicals for treatment and maintenance cleanings.
Capital Cost
FY2026 Budget
$725 K
Total Budget (all years)
$3.95 M
Project Total
$3.95 M
Detailed Breakdown
Category
FY2026 FY2027
Historical Budgeted
Requested Requested
Future Budgeted Total
Construction
Design/Surveying
Contingency
Total
$0 $0 $3,075,000
$0 $725,000 $0
$0 $0 $153,750
0 $25,000 $,228,750
$0
$0
$0
e
$3,075,000
$725,000
$153,750
0,953,750
Funding Sources
FY2026 Budget
$725 K
Total Budget (all years)
$3.95 M
Project Total
$3.95 M
Detailed Breakdown
Category
FY2026 FY2027
Historical Budgeted
Requested Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0 $725,000 $3,228,750
s $25,000 $,228,750
$0 $3,953,750
s $,953,750
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 347
WA2609 - Alice WTP New 5 MG GST
WA2609 - Alice WTP New 5 MG GST
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 365 - Water Production
Type Capital Improvement
Project Number WA2609
Request Groups Water
Estimated Start 10/15/2025
Date
Estimated 10/14/2026
Completion Date
9
LflCL {.n
Description
Design and construct a new 5 MG ground storage tank at the Alice Water Plant.
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: New Construction
Project Justification
The Alice Water Plant's initial design included provisions for this GST to address anticipated growth in Pearland's east end.
Constructing the tank now will:
• Increase Storage Capacity: Provide an additional 5 MG of potable water storage to meet peak demand and emergency
needs.
• Enhance System Reliability: Improve operational flexibility and reduce dependence on external water sources.
• Support Future Growth: Align with the city's strategic plans for infrastructure expansion and service delivery.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 348
WA2609 - Alice WTP New 5 MG GST
Capital Cost
FY2026 Budget
$1 M
Total Budget (all years)
$7.1 M
Project Total
$7.1 M
Detailed Breakdown
Category Historical Budgeted
FY2026 FY2027
Requested Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0 $0 $5,000,000
$0 $250,000 $1,100,000
$0 $750,000 $0
e $,000,000 6,100,000
$0 $5,000,000
$0 $1,350,000
$0 $750,000
e $,100,000
Funding Sources
FY2026 Budget
$1 M
Total Budget (all years) Project Total
$7.1 M $7.1 M
Detailed Breakdown
Category Historical Budgeted
FY2026 FY2027
Requested Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0 $1,000,000 $6,100,000
9 $,000,000 6,100,000
$0 $7,100,000
0 6,100,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 349
WA2701 - Towne Lakes Water Quality Program
WA2701 - Towne Lakes Water Quality
Program
Overview
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WA2701
Request Groups Water
Estimated Start 10/1/2026
Date
Project Location
Description
The proposed project will address water quality issues related to the age of the water in the system. As part of the City's
mulit-year water distribution system improvement program this project will improve the circulation of water within the
Lakes of Edgewater Estates subdivision. This will be accomplished by increasing the water line size to 6" from current fire
hydrant locations and installing fire hydrants at each dead end water lines in the system, installation of a pressure sensor and
sampling station. Though this methodology will still require flushing, the installation of fire hydrants will allow for routine
pigging of waterlines for best maintenance practices and water quality improvements.
Images
WA2701
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
As the water system continues to grow, opportunities are developed to continue the extension of water lines or improvement
of dead ends by connection to fire hydrants. By extending waterlines to connect to other parts of the system or ending at a
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 350
WA2701 - Towne Lakes Water Quality Program
fire -hydrant and maintenance practices and capabilities are expanded to include water line pigging and complete flushing.
Removing dead end waterlines and allowing routine pigging enhances water quality by scouring lines, circulating or
allowing a higher volume of water to be flushed in a given time.
Capital Cost
FY2026 Budget
$o
Total Budget (all years)
$1.1 M
Project Total
$1.1 M
Detailed Breakdown
Category Historical Budgeted
FY2029 FY2030
Requested Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Land/Right of Way
Total
$0 $0 $790,000
$0 $158,000 $0
$0 $100,000 $0
$0 $50,000 $0
$ $08,000 $90,000
S0 $790,000
$0 $158,000
$0 $100,000
$0 $50,000
$,098,000
Funding Sources
FY2026 Budget
$o
Total Budget (all years) Project Total
$1.1M $1.1M
Detailed Breakdown
Category Historical Budgeted
FY2029 FY2030
Requested Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0 $308,000 $790,000
9 $08,000 $90,000
$0 $1,098,000
9 $,098,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 351
WA2702 - Magnolia Water Production Facility Rehabilitation
WA2702 - Magnolia Water Production Facility
Rehabilitation
Overview
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WA2702
Request Groups Water
Estimated Start 10/1/2026
Date
Amy Coykendall, CIP Coordinator
Project Location
Description
Based on the preliminary engineering report findings, priority improvements will be made at the Magnolia Water Plant -
Rehabilitate booster pump building, including environmental control, paving the existing driveway, fence, and landscaping
improvements. A study for an onsite generator will be needed.
Images
WA2702
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: Improvement
Project Justification
The Public Works Department has experienced several failures of water lines at the water production facilities over the past
several years. Most of the water line infrastructure at the production facilities is original to the facilities and has not been
replaced. This program will reduce service interruptions.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 352
WA2702 - Magnolia Water Production Facility Rehabilitation
Capital Cost
FY2026 Budget
$0
Total Budget (all years)
$850K
Project Total
$850 K
Detailed Breakdown
Category Historical Budgeted
FY2028 FY2029
Requested Requested
Future Budgeted Total
Construction
Design/Surveying
Contingency
Total
$0 $0 $500,000
$0 $250,000 $0
So $100,000 So
8 $50,000 800,000
$0 $500,000
$0 $250,000
$0 $100,000
$ 850,000
Funding Sources
FY2026 Budget
$0
Total Budget (all years) Project Total
$850 K $850 K
Detailed Breakdown
Category Historical Budgeted
FY2028 FY2029
Requested Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0 $350,000 $500,000
$ $50,000 800,000
$0 $850,000
$ $50,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 353
WA2704 - Country Place Well Facility Rehabilitation
WA2704 - Country Place Well Facility
Rehabilitation
Overview
Request Owner Amy Coykendall, CIP Coordinator
Department 365 - Water Production
Type Capital Improvement
Project Number WA2704
Request Groups Water
Estimated Start 02/4/2026
Date
Estimated 02/10/2027
Completion Date
Project Location
0
L.
Description
The Country Place Water Well Facility, annexed by the City of Pearland from a Municipal Utility District (MUD), requires a
comprehensive assessment to address aging infrastructure, ensure compliance with regulatory standards, and support long-
term service delivery. The facility's latest available plans date back to November 22, 2011, highlighting the need for updated
evaluations and modernization efforts.
Project Scope
1 Assessment Objectives
• Conduct a detailed evaluation of the facility to identify deficiencies, potential risks, and opportunities for improvements.
• Ensure the plant meets current and future operational demands.
• Establish a phased rehabilitation plan to minimize service disruptions.
2 Key Focus Areas
• Infrastructure and Structural Review:
• Assess the condition of tanks, well casings, pump structures, and piping.
• Review fencing, site layout, and drainage systems for compliance and adequacy.
3 Mechanical and Electrical Systems
• Evaluate the performance of existing pumps, motors, and electrical panels.
• Assess SCADA integration and identify gaps in automation or remote monitoring.
4 Process Evaluation
• Analyze current water production capacity versus demand projections.
• Inspect treatment systems and storage solutions for operational efficiency.
5 Regulatory Compliance
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 354
WA2704 - Country Place Well Facility Rehabilitation
• Verify adherence to TAC Chapter 290 and other relevant standards.
• Review safety measures for workers and public health considerations.
6 Environmental and Community Impact
• Assess well recharge rate, overflow systems, and potential environmental hazards.
7 Proposed Deliverables
• Comprehensive Condition Report: A detailed document outlining the current state of the plant and critical areas
needing attention.
• Rehabilitation Recommendations: Prioritized action items, including cost estimates for repairs, upgrades, and
replacements.
• Phased Rehabilitation Plan: Timelines and strategies to address deficiencies while ensuring uninterrupted service.
• Updated Facility Plans: Creation of up-to-date as -built drawings for accurate future reference and regulatory
submissions.
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Estimated Project Life Span: 20 plus years
Project Justification
The rehabilitation of the Country Place Water Well Facility is critical to:
• Ensure reliable water production for the community.
• Address risks associated with aging infrastructure and limited documentation.
• Align with the City of Pearland's commitment to sustainable and compliant public utility operations.
Capital Cost
FY2026 Budget
$o
Total Budget (all years) Project Total
$550 K $550 K
Detailed Breakdown
Category Historical Budgeted
FY2027 FY2028
Requested Requested
Future Budgeted Total
Construction
Design/Surveying
Contingency
Total
$0 $0 $300,000
$0 $150,000 $0
$0 $0 $100,000
s $50,000 ✓$00,000
So
so
$o
e
$300,000
$150,000
$100,000
$50,000
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 355
WA2704 - Country Place Well Facility Rehabilitation
Funding Sources
FY2026 Budget
$0
Total Budget (all years)
$550 K
Project Total
$550 K
Detailed Breakdown
Category Historical Budgeted
FY2027 FY2028
Requested Requested
Future Budgeted Total
W/S Revenues - Cash
Total
$0
e
$150,000
$50,000
$400,000
$00,000
$0 $550,000
0 $50,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 356
WA2705 - Garden Well New 1MG GST
WA2705 - Garden Well New 1MG GST
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 365 - Water Production
Type Capital Improvement
Project Number WA2705
Request Groups Water
Estimated Start 10/8/2025
Date
Estimated 10/14/2026
Completion Date
9
LflCL {.n
Description
Design and construct a new 1 MG ground storage tank at the Garden Well Facility
Details
Strategic Priority: Sustainable Infrastructure
Type of Project: New Construction
Impact on operating budget: No
Estimated Project Life Span: 20 plus years
Project Justification
The current 428,000 -gallon GST at the Garden Water Well facility is insufficient to meet the growing water demands of
Pearland's east end. Replacing it with a 2 million -gallon pre -stressed concrete tank will:
• Enhance Storage Capacity: Provide additional reserves to support peak usage and emergency situations.
• Improve System Reliability: Utilize durable materials that reduce maintenance needs and extend service life.
• Support Future Growth: Align with the city's strategic plans for infrastructure expansion and increased service delivery.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 357
WA2705 - Garden Well New 1MG GST
Capital Cost
FY2026 Budget
so
Total Budget (all years)
$4.2 M
Project Total
$4.2M
Detailed Breakdown
Category
FY2027 FY2028
Historical Budgeted
Requested Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0 $0 $2,500,000
$0 $0 $1,000,000
$0 $700,000 $0
$ $00,000 $,500,000
$0 $2,500,000
$0 $1,000,000
$0 $700,000
A $,200,000
Funding Sources
FY2026 Budget
so
Total Budget (all years) Project Total
$4.2 M $4.2 M
Detailed Breakdown
Category
Historical Budgeted FY2027 FY2028
Requested Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0 $700,000 $3,500,000
0 $00,000 $,500,000
$0 $4,200,000
A 0,200,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 358
WA2801 - Alexander Landing, Banbury Cross & Whispering Winds Transite Pipe Water Line
Replacement
WA2801 - Alexander Landing, Banbury Cross
& Whispering Winds Transite Pipe Water Line
Replacement
Overview
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WA2801
Request Groups Water
Estimated Start 10/1/2028
Date
Project Location
zcd
Description
The City has approximately 82 miles of transite pipe water lines to be replaced over a period of years. This project will
strategically replace approximately 5.25 miles of transite water line infrastructure and replacement of sampling stations on
Alexander Landing Sub. This project would be completed in conjunction with the drainage project. In addition to the
replacement of transite pipe and pressure sensor, all existing 2, 3 and 4 -inch water lines will be up -sized with 6 or 8" polyvinyl
chloride (PVC) or high -density polyethylene (HDPE) pipe materials and service lines will also be replaced.
Images
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
Replacement of Transite water line within the City. Transite has an estimated lifespan of 50-70 years under good condition
but as the droughts continue across the state the lines keep breaking and causing a loss of water from the system.
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 359
WA2801 - Alexander Landing, Banbury Cross & Whispering Winds Transite Pipe Water Line
Replacement
Capital Cost
FY2026 Budget
$o
Total Budget (all years)
$10 M
Project Total
$10M
Detailed Breakdown
Category Historical Budgeted
FY2029 FY2030
Requested Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0 $0 $7,000,000
S0 $0 $2,000,000
$0 $1,039,500 $0
0 $,039,500 9,000,000
$0 $7,000,000
$0 $2,000,000
$0 $1,039,500
0 $0,039,500
Funding Sources
FY2026 Budget
$o
Total Budget (all years) Project Total
$10M $10M
Detailed Breakdown
Category Historical Budgeted
FY2029 FY2030
Requested Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0 $1,039,500 $9,000,000
0 $,039,500 9,000,000
S0 $10,039,500
8 $0,039,500
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 360
WA2804 - Dixie Hollow Subdivision Transite Pipe Water Line Replacement
WA2804 - Dixie Hollow Subdivision Transite
Pipe Water Line Replacement
Overview
Request Owner
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WA2804
Request Groups Water
Estimated Start 10/1/2030
Date
Amy Coykendall, CIP Coordinator
Project Location
9
_!PLC 1.1!
Description
The City has approximately 82 miles of failing transite pipe water lines to be replaced over a period of years. This project will
strategically replace approximately 1.25 miles of transite water line infrastructure and the installation of a pressure sensor and
sampling station in the Dixie Hollow subdivision. In addition to the replacement of transite pipe, pressure sensor, all existing
2,3 and 4 -inch water lines will be up -sized with 6 or 8" polyvinyl chloride (PVC) or high density polyethylene (HDPE) pipe
materials and service lines will also be replaced.
Images
WA2703
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
Transite pipe water line has a failure rate significantly higher than that of comparable and like sized polyvinyl chloride (PVC).
This project will replace the failing transite pipe infrastructure with PVC which was not prevalent in the industry at the time
the Transite pipe lines were installed. The Transite pipe lines are responsible for a higher percentage of work orders per foot
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 361
WA2804 - Dixie Hollow Subdivision Transite Pipe Water Line Replacement
than comparable PVC lines and requires greater resources to maintain relative to PVC. The project will also provide the
opportunity to resolve dead end water line issues in the affected areas which will improve water quality.
Capital Cost
$80K
FY2026 Budget
Total Budget (all years) Project Total (to date)
$0 $2.1M $2.18M
Detailed Breakdown
Category Historical Budgeted
FY2028
Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
$0 $1,650,000
$0 $450,000
$80,000 $0
$0,000 $400,000
$0 $1,650,000
$0 $450,000
$0 $80,000
$ $,180,000
Funding Sources
$80K
FY2026 Budget
Total Budget (all years) Project Total (to date)
$0 $2.1M $2.18M
Detailed Breakdown
Category Historical Budgeted
FY2028
Requested
Future Budgeted Total
W/S Certificates of
Obligation
W/S Revenues - Cash
Total
So $2,100,000
$80,000
$0,000
So
$,100,000
So $2,100,000
So
9
580,000
$,180,000
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 362
WA2901 - Park View Transite Pipe Water Line Replacement
WA2901 - Park View Transite Pipe Water Line
Replacement
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WA2901
Request Groups Water
Estimated Start 10/1/2028
Date
Description
The City has approximately 82 miles of transite pipe water lines to be replaced over a period of years. This project will
strategically replace approximately 4.25 miles of transite water line infrastructure in the Park View subdivision and Liberty Dr
from Shady Bend to north of City Hall. In addition to the replacement of transite pipe, pressure sensor, all existing 2, 3 and 4 -
inch water lines will be up -sized with 6 or 8" polyvinyl chloride (PVC) or high density polyethylene (HDPE) pipe materials and
service lines will also be replaced. Replacing small diameter pipe with current materials meeting City standard line sizes in
coordination with the City's water model is expected to provide higher flow capacities for these neighborhoods, resolve dead
end water line issues resulting in improved water quality, improve fire protection, and reduce in water loss due to broken
lines. Water sampling station will be included.
Images
WA2604
WA2901
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 363
WA2901 - Park View Transite Pipe Water Line Replacement
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
Transite pipe water line has a failure rate significantly higher than that of comparable and like sized PVC. This project will
replace the transite pipe infrastructure with PVC which was not prevalent in the industry at the time the transite pipe lines
were installed. The transite pipe lines are responsible for a higher percentage of work orders per foot than comparable PVC
lines and requires greater resources to maintain relative to PVC. The project will also provide the opportunity to resolve dead
end water line issues in the affected areas which will improve water quality.
Capital Cost
FY2026 Budget
$o
Total Budget (all years)
$7 M
Project Total
$7M
Detailed Breakdown
Category
FY2029 FY2030
Historical Budgeted
Requested Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Land/Right of Way
Total
$0 $0 $5,000,000
$0 $200,000 $1,300,000
$0 $400,000 $0
$0 $100,000 $0
0 $00,000 6,300,000
$0 $5,000,000
$0 $1,500,000
$0 $400,000
$o $100,000
0 $,000,000
Funding Sources
FY2026 Budget Total Budget (all years)
$o
$7 M
Project Total
$7M
Detailed Breakdown
Category
FY2029 FY2030
Historical Budgeted
Requested Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0 $700,000 $6,300,000
6 $00,000 6,300,000
$0 $7,000,000
6 $,000,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 364
WA2902 - Southdown Transite Pipe Water Line Replacement
WA2902 - Southdown Transite Pipe Water
Line Replacement
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WA2902
Request Groups Water
Estimated Start 10/1/2028
Date
Description
The City has approximately 82 miles of transite pipe water lines to be replaced over a period of years. This project will
strategically replace approximately 10 miles of transite water line infrastructure and replacement of sampling stations in the
Southdown subdivision. This project would be completed in conjunction with the drainage project. In addition to the
replacement of transite pipe, pressure sensor, all existing 2, 3 and 4 -inch water lines will be up -sized with 6 or 8" polyvinyl
chloride (PVC) or high density polyethylene (HDPE) pipe materials and service lines will also be replaced.
Images
Details
Asicam]
WA2902
Strategic Priority: Sustainable Infrastructure Impact on operating budget: No
Type of Project: Improvement
Project Justification
Replacement of Transite water line within the City. Transite has an estimated lifespan of 50-70 years under good condition
but as the droughts continue across the state the lines keep breaking and causing a loss of water from the system.
FY 26-30 Proposed Capital Improvement Plan I Pearland Page 365
WA2902 - Southdown Transite Pipe Water Line Replacement
Capital Cost
FY2026 Budget
so
Total Budget (all years)
$17M
Project Total
$17 M
Detailed Breakdown
Category Historical Budgeted
FY2029 FY2030 Future Budgeted
Requested Requested
Total
Construction
Contingency
Design/Surveying
Total
$0 S0 $12,000,000
$0 $0 $3,000,000
$0 $1,980,000 $0
9 $,980,000 $5,000,000
$0 $12,000,000
$0 $3,000,000
$0 $1,980,000
9 $6,980,000
Funding Sources
FY2026 Budget
so
Total Budget (all years) Project Total
$17M $17M
Detailed Breakdown
Category Historical Budgeted
FY2029 FY2030 Future Budgeted
Requested Requested
Total
W/S Certificates of
Obligation
Total
$0 $1,980,000 $15,000,000
9 $,980,000 $5,000,000
$0 $16,980,000
9 $6,980,000
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 366
WA2903 - Country Place Transite Pipe Water Line Replacement
WA2903 - Country Place Transite Pipe Water
Line Replacement
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WA2903
Request Groups Water
Estimated Start 10/1/2029
Date
0
Description
The City has approximately 82 miles of transite pipe water lines to be replaced over a period of years. This project will
strategically replace approximately 7.5 miles of transite water line infrastructure in the Country Place subdivision. In addition
to the replacement of transite pipe, all existing 2, 3 and 4 -inch water lines will be up -sized with 6 or 8" polyvinyl chloride (PVC)
or high -density polyethylene (HDPE) pipe materials and service lines will also be replaced. This will also include the
installation of sampling and pressure sensors. Replacing small diameter pipe with current materials meeting City standard
line sizes in coordination with the City's water model is expected to provide higher flow capacities for these neighborhoods,
resolve dead end water line issues resulting in improved water quality, improve fire protection, and reduce in water loss due
to broken lines. Pressure sensor and water sampling station(s) will be included.
Images
WA2605
WA2802
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 367
WA2903 - Country Place Transite Pipe Water Line Replacement
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: Improvement
Project Justification
Transite pipe water line has a failure rate significantly higher than that of comparable and like sized PVC. This project will
replace the transite pipe infrastructure with PVC which was not prevalent in the industry at the time the transite pipe lines
were installed. The transite pipe lines are responsible for a higher percentage of work orders per foot than comparable PVC
lines and requires greater resources to maintain relative to PVC. The project will also provide the opportunity to resolve dead
end water line issues in the affected areas which will improve water quality.
Capital Cost
FY2026 Budget
$o
Total Budget (all years)
$10.9 M
Project Total
$10.9 M
Detailed Breakdown
Category Historical Budgeted
FY2028 FY2029
Requested Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Land/Right of Way
Total
$0 $0 $8,500,000
$0 $50,000 $1,275,000
$0 $1,000,000 $0
$0 5100,000 $0
0 $,150,000 9,775,000
$0 $8,500,000
$0 $1,325,000
$o $1,000,000
So $100,000
8 $0,925,000
Funding Sources
FY2026 Budget Total Budget (all years)
so
$10.9M
Project Total
$10.9 M
Detailed Breakdown
Category Historical Budgeted
FY2028 FY2029
Requested Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0 $1,150,000 $9,775,000
0 $,150,000 9,775,000
SO S10,925,000
8 $0,925,000
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 368
WA2904 - Liberty Dr & John Lizer Transite Pipe Water Line Replacement
WA2904 - Liberty Dr & John Lizer Transite
Pipe Water Line Replacement
Overview
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WA2904
Request Groups Water
Estimated Start 12/31/2025
Date
Project Location
Description
The City has approximately 80 miles of transite pipe water lines to be replaced over a period of years. This project will
strategically replace approximately 1.5 miles of transite water line infrastructure and replacement sampling stations in the
John Lizer & Liberty Dr. This project would be completed in conjunction with the drainage project. In addition to the
replacement of transite pipe and pressure sensors, all existing 2, 3 and 4 -inch water lines will be up -sized with 6 or 8"
polyvinyl chloride (PVC) or high -density polyethylene (HDPE) pipe materials and service lines will also be replaced.
Images
Details
WA2606
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: Improvement
Project Justification
Replacement of transite water line within the City. Transite has an estimated lifespan of 50-70 years in good conditions, but
as the droughts continue across the state, the lines keep breaking and causing a loss of water from the system.
016191 FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 369
WA2904 - Liberty Dr & John Lizer Transite Pipe Water Line Replacement
Capital Cost
FY2026 Budget
so
Total Budget (all years)
$3.11 M
Project Total
$3.11 M
Detailed Breakdown
Category
FY2029 FY2030
Historical Budgeted
Requested Requested
Future Budgeted Total
Construction
Contingency
Design/Surveying
Total
So So $2,000,000
$0 $0 $600,000
$0 $300,000 $208,000
8 $00,000 5,808,000
$0 $2,000,000
$0 $600,000
$0 $508,000
8 $,108,000
Funding Sources
FY2026 Budget
so
Total Budget (all years) Project Total
$3.11 M $3.11 M
Detailed Breakdown
Category
Historical Budgeted FY2029 FY2030
Requested Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0 $300,000 $2,808,000
0 $00,000 8,808,000
$0 $3,108,000
8 8,108,000
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 370
WA3001- Lakes of Edgewater Estates Water Quality Program
WA3OO1 - Lakes of Edgewater Estates Water
Quality Program
Overview
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WA3001
Request Groups Water
Estimated Start 10/1/2028
Date
Project Location
Lwouimmmo.d
e�+.w�• c•xna��
Description
The proposed project will address water quality issues related to the age of the water in the system. As part of the City's
multi -year water distribution system improvement program, this project will improve the circulation of water within the
Lakes of Edgewater Estates subdivision. This will be accomplished by increasing the water line size to 6" from current fire
hydrant locations and installing fire hydrants at each dead end water line in the system and also reviewing loop lines where
possible. Though this methodology will still require flushing, the installation of pressure sensors and fire hydrants will allow
for routine pigging of waterlines for best maintenance practices and water quality improvements. Also, a water sampling
station will be included.
Images
WA2602
Details
Strategic Priority: Sustainable Infrastructure
Type of Project: Improvement
Project Justification
Impact on operating budget: No
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 371
WA3001 - Lakes of Edgewater Estates Water Quality Program
As the water system continues to grow, opportunities are developed to continue the extension of water lines or improvement
of dead ends by connection to fire hydrants. By extending waterlines to connect to other parts of the system or ending at a
fire -hydrant, maintenance practices and capabilities are expanded to include water line pigging and complete flushing.
Removing dead end waterlines and allowing routine pigging enhances water quality by scouring lines, circulating or
allowing a higher volume of water to be flushed at a given time.
Capital Cost
FY2026 Budget
$0
Total Budget (all years) Future
$350K $830K
Project Total
$1.18M
Detailed Breakdown
Category Historical Budgeted
FY2030
Requested
Future Budgeted Total
Construction
Design/Surveying
Contingency
Land/Right of Way
Total
$0
$0
$0
$0
0
$0
$150,000
$100,000
$100,000
$50,000
$830,000 $830,000
$0 $150,000
$0 $100,000
$0 $100,000
$30,000 $,180,000
Funding Sources
FY2026 Budget Total Budget (all years) Future Project Total
$0
$350K
$830K $1.18M
Detailed Breakdown
Category Historical Budgeted
FY2030
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0 $350,000
0 $50,000
$830,000 $1,180,000
$30,000 $,180,000
FY 26-3O Proposed Capital Improvement Plan I Pearland
Page 372
WA3002 - West Oaks and West Oaks Village Water Quality Program
WA3002 - West Oaks and West Oaks Village
Water Quality Program
Overview Project Location
Request Owner Amy Coykendall, CIP Coordinator
Department 300 - PW Engineering & Capital
Projects
Type Capital Improvement
Project Number WA3002
Request Groups Water
Estimated Start 10/1/2029
Date
Fxr�.can
Description
As the City has developed there are areas where dead end waterlines have been identified that need to be extended
looped/connected to other water system mainlines. These areas are also being confirmed by the City's water system model.
Extended connections will assist in enhancing water quality and maintenance in the system by removing these areas and
increase looping or improving deadend lines and redundancy for West Oaks and West Oaks Village neighborhoods. The
project will also include a pressure sensor and replacement of the sampling station.
Images
WA2504
CFI
WA2803
Details
Strategic Priority: Sustainable Infrastructure Impact on operating budget: Yes
Type of Project: Improvement
Project Justification
As the water system continues to grow, opportunities are developed to continue the extension of water lines to connect and
loop existing dead-end lines. By extending waterlines to connect to other parts of the system and removing dead end
,r1 FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 373
WA3002 - West Oaks and West Oaks Village Water Quality Program
waterlines this will assist in enhancing water quality by circulating water, reduce staff time called out to flush waterlines and
also reduce system water loss.
Capital Cost
FY2026 Budget
$o
Total Budget (all years) Future
$399K $1.66M
Project Total
$2.06M
Detailed Breakdown
Category Historical Budgeted
FY2030
Requested
Future Budgeted Total
Construction
Design/Surveying
Land/Right of Way
Contingency
Total
S0 S0
$0 $249,000
$0 $100,000
$0 $50,000
9 $99,000
$1,660,000 $1,660,000
$0 $249,000
$0 $100,000
$0 $50,000
$,660,000 $,059,000
Funding Sources
FY2026 Budget Total Budget (all years) Future Project Total
$0
$399K
$1.66M $2.06M
Detailed Breakdown
Category Historical Budgeted
FY2030
Requested
Future Budgeted Total
W/S Certificates of
Obligation
Total
$0 $399,000
e $99,000
$1,660,000 $2,059,000
$,660,000 $,059,000
FY 26-30 Proposed Capital Improvement Plan I Pearland
Page 374