R2002-0174 11-11-02 RESOLUTION NO. R2002-174 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AUTHORIZING THE CITY MANAGER OR HIS DESIGNEE TO EXECUTE A CHANGE ORDER ASSOCIATED WITH THE SWEC DETENTION BASIN AND CONTROL STRUCTURE. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain change order associated with the SWEC Detention Basin and Control Structure, a copy of which is attached hereto as Exhibit '%" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest the change order associated with the SWEC Detention Basin and Control Structure. PASSED, APPROVED and ADOPTED thisthe llth dayof November ., A.D., 2002. ATTEST: Y, NG ~/-/ ,/ APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY TOM REID MAYOR Exhibit "A" R2002-174 SWEC Detention Basin and Control Structure, B2001-063 CHANGE ORDER NO. 3 October 30, 2002 1. Fumish and operate 6" pump with hoses for 15 days at $200.00/day (Pump-down from August 16, 2002 storm). All work down time caused bY basin flooding, pumping time, and muddy work areas will be credited as allowed rain days. Amount of Item 1. (ADD) Contract Time Change for Item 1. (NONE - Provided by allowed rain days) $3,000.00 N/A 2. Furnish all material, equipment and labor to construct the SWEC 2na Outlet Outfall Structure in accordance with the attached plans and technical specifications. Amount of Item 2. (ADD) Contract Time Change for Item 2. (ADD) $13,804.00 28 Days 3. Furnish and install additional 125 CY along hard edge at $43.50/CY. Amount of Item 3. (ADD) Contract Time Change for Item 3. (NONE - Concurrent with Item 2 & 4) $5,437.50 N/A 4. Install Additional 62 LF of handrail on top of box culvert beam and upper end of sidewalls of end treatment at lake (south) end of intake structure at $150/LF. Amount of Item 4. Contract Time Change for Item 4. (ADD) 62 L.F. ~ $150 $ 9,300 21 Days TOTAL AMOUNT OF CHANGE ORDER No. 3 Increase Contract $31,541.50 END OF SHEET ONE of Change Order No. 3, B2001-063 b1063co3(CO#3Cont.) Sheet 2 of 2 Contract Time is hereby increased 49 Calendar days from 246 Calendar Days (reference Change Order No. 2) to 317 Calendar days by this Change Order No. 3. Contract Price is increased from $2,054,857.71 to $2,086,399.21 by this Change Order No. 3. This Change Order No.3 to Contract B2001-063 is effective upon date of signature by the City Manager. OWNER City of Peadand Bill Eisen Date CONTRACTOR Bean Construction Company W. B. Bean Date END CHANGE ORDER NO. 3, B2001-063 Exhibit "A" R2002-174 SWEC Detention Basin and Control Structure, B2001-063 CHANGE ORDER NO. 3 October 30, 2002 1 Furnish and operate 6 pump with hoses for 15 days at $200.00/day (Pump -down from August 16, 2002 storm). All work down time caused by basin flooding, pumping time, and muddy work areas will be credited as allowed rain days. Amount of Item 1. (ADD) $3,000.00 Contract Time Change for Item 1. (NONE - Provided by allowed rain days) N/A 2. Furnish all material, equipment and labor to construct the SWEC 2nd Outlet Outfall Structure in accordance with the attached plans and technical specifications. Amount of Item 2. (ADD) Contract Time Change for Item 2. (ADD) 3. Furnish and install additional 125 CY along hard edge at $43.50 /CY. Amount of Item 3. (ADD) $5,437.50 Contract Time Change for Item 3. (NONE - Concurrent with Item 2 & 4) N/A 4. Install Additional 62 LF of handrail on top of box culvert beam and upper end of sidewalls of end treatment at lake (south) end of intake structure at $150/LF. Amount of Item 4. 62 LF @ $150 $ 9,300 Contract Time Change for Item 4. (ADD) 21 Days $13, 804.00 28 Days TOTAL AMOUNT OF CHANGE ORDER No. 3 Increase Contract $31,541.50 END OF SHEET ONE of Change Order No. 3, B2001-063 b 1063 co3 (CO#3 Cont.) Sheet 2 of 2 Contract Time is hereby increased 49 Calendar days from 246 Calendar Days (reference Change Order No. 2) to 317 Calendar days by this Change Order No. 3. Contract Price is increased from $2,054,857.71 to $2,086,399.21 by this Change Order No. 3. This Change Order No.3 to Contract B2001-063 is effective upon date of signature by the City Manager. OWNER City of Pearland CONTRACTOR Bean Construction Company W. B. Bean END CHANGE ORDER NO. 3, B2001-063 Date