R2002-0180 11-25-02 RESOLUTION NO. R2002-180 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AWARDING A BID FOR CONSTRUCTION SERVICES ASSOCIATED WITH IMPROVEMENTS TO GREEN TEE LIFT STATIONS II AND II1. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That the City opened bids for construction services associated with improvements to Green Tee Lift Stations II and III, and such bids have been reviewed and tabulated. Section 2. That the City Council hereby awards the bid to R & B Group, Inc., in the amount of $216,661.00. Section 3. The City Manager or his designee is hereby authorized to execute a contract for construction services associated with the improvements to Green Tee Lift Stations II and III. PASSED, APPROVED and ADOPTED this the 25th day of November , A.D., 2002. ATTEST: ~i~yNG L~,,~v// // SECRETARY ~' APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY TOM REID MAYOR CLAUNCH & MILLER, INC. Engineering Consultants November 13, 2001 Mr. Tom Reid Honorable Mayor City of Pearland 3519 Liberty Drive Pearland, Texas 77581 Re: Green Tee Lift Stations II & III Improvements City of Pearland CMI Job No. 02-019 Dear Mr. Reid: On November 7, 2002, four (4) bids were received on the above referenced project. following is a summary of our bid evaluation: 1.Bid Tabulation Sheet - Four (4) construction firms participated bids for the total project are as follows: Lowest Responsive Bidder - Second Lowest Bidder - Third Lowest Bidder - Fourth Lowest Bidder - Contractor R&B Group, Inc. B-5 Construction Co. G&N Enterprises Peltier Brothers Construction $310,721.00 The in the bidding process. The Total Bid $198,911.00 $210,049.00 $236,149.00 A copy of the bid tabulation is attached in Section 1 of this report. Each bid was checked for mathematical errors and/or bid irregularities. R&B Group, Inc. provided CMI with a profit and loss statement, current balance sheet, and qualification statement. 2. Resume with References — R&B Group, Inc. provided a qualification statement. Please see Section 2 of this report. 3. Financial Statement — R&B Group, Inc. provided a profit and loss statement for the year ending September 2002 and a current balance sheet. Please see Section 3 of this report. 4. Telephone Conversations with References - Various references were contacted by telephone and asked to respond to a series of questions. Please see Section 4 of this report. In view of the attached documentation, R&B Group, Inc. appears to be a responsible firm that is capable of perfoiuiing the specified work in a satisfactory manner. For these reasons, we recommend that the City of Pearland award the Green Tee Lift Stations II & III Improvements to R&B Group, Inc. for a total of $198,911.00. If you have any questions, please contact me. Sincerely, CLAUNCH & MILLER, INC. yol - '�'�'�_ Sam Kruse, P E Senior Project Manager SK/md co a 0 0) 0 r) -0 co m 0 m Demolition and removal of existing sidewalks, wheelchair ramps, mechanical, pumps, I .,..a nnntrnl oni dnmont including disoosal L.S.I 1, $6,000.001 56,000.001 $6,258.001 56,258.00I _i,..,......,i • 61.0-ZO'0N clot' IWO 0 r m H 0 CD M G) �rD O mz -m0 m - a m m List of projects bidder is currently engaged in completing: Name of Project Amount Of Contract Type of Work Percentage Subcontracted Percentage Completed Scheduled Completion Blossom Street Lift Station Expansion $ 144,313 Lift Station 15% 25% Dec•02 118 Webster, TX. Location Phone No. of General Contractor Abyss Construction, Inc. 1414 Friendswood Dr. Name. Address and Frendswood, TX 77546 Mr. Bill Nielsen 281/992.0102 Phone No, of Project Engineer Walsh/Freese & Nichols 2010 East Broadway Name, Address and Pearland, TX 77581 281.485.2404 Owner Name of Project Amount Of Contract Type of Work Percentage Subcontracted Percentage Completed Scheduled Completion City of Webster FM 528 Lift Station $ 150,000 Lift Station 20% 60% Dec•02 117 Webster, TX Location Phone No. of General Contractor Abyss Construction, Inc. 1414 Friendswood Dr. Name, Address and Friendswood TX 77546 Mr. Bill Nielsen 281/992.0102 Phone No. of Project Engineer Walsh/Freese & Nichols 2010 East Broadway Name, Address and Peal -land, TX 77581 281.485.2404 Owner City of Webster Name of Project Amount Of Contract Type of Work Percentage Subcontracted Percentage Completed Scheduled Completion Location Name, Address and Phone Owner Name of Project Amount Of Contract $ 354,100 Type of Work Lift Station Percentage Subcontracted 15% Percentage Completed 50% Scheduled Completion Nov02 Location Spring TX. Name, Address and Phone No. of Project Engineer Jones & Carter, Inc. 6335 Gulfton Suite 100 Houston, TX 77081.1169 Contact P.E. 713 / 777.5337 Owner Bilma PUD c/o Bacon & Wallace, L.L.P. Mr. Paul D. Bacon 600 Jefferson Ste. 780 Hou, TX 77002.7395 Olympia Estates Lift Station 162,100 Lift Station 20% 10% Missouri City, TX. No. of Project Engineer Jones & Carter, Inc. 6335 Gulfton Suite 100 Houston, TX 77081.1169 Brody Maedgen 713 / 777.5337 Olympia Estates, LTD. on behalf of FB MUD #48 114 113 Name of Project Amount Of Contract Type of Work Percentage Subcontracted Percentage Completed Scheduled Completion Location Name, Address and Phone No Owner Kuykendahl Lift Station Postwood MUD Lift Station Rehab 250,605 Lift Station 25% 95% Nov02 Spring, TX of Project Engineer Lockwood, Andrews, & Newnam 2925 Briarpark Dr. Suite 500 Houston, TX 77042 Mr. William G. Rosenbaum, P.E. 713 / 266.6900 Postwood MUD Contact 6018 Knotty Post Spring. TX 77373 112 Name of Protect Amount Of Contract Type of Work Percentage Subcontracted Percentage Completed Scheduled Completion Location Name. Address and Phone No Owner Name of Project Amount Of Contract Shadow Creek Ranch g 2,160,888 Water Plant 48% 95% Aug-02 Pearland, Harris Co. TX of Project Engineer Houston, TX 77056 Mr. Luis Cadado, P.E. 713 / 403.1600 City of Pearland Mr. Gene Simeon 3519 Liberty Dr. Pearland, TX 77581 111 Montgomery, Watson, Harza 5100 Westheimer, Suite 580 West Park Toliway Section 9 • Briar Park Storm Water Pump Station $ 620,000 108 Type of Work Percentage Subcontracted Storm Water Pump Station 32% " 'O Percentage Completed Dec•02 Scheduled Completion Houston, Harris Co. TX Location Phone No. of General Contractor Balfour Beatty Construction, Inc. III Fountian Park Plaza Name, Address and 2800 IH 35, Suite 140 Austin, TX 78704 Mr. James Webster 512 / 707.0797 Phone No. of Project Engineer Harris County Toll Road Authority 330 Meadowfern, Suite 200 Name. Address and Houston, TX 281 / 875.1400 Owner Harris County To Road Authority Name of Protect Amount Of Contract Type of Work Percentage Subcontracted Percentage Completed Scheduled Completion Location Thomas Street Lift Station $ 872,500 Lift Station 15% 98%„ Dec•02 Pasadena, Harris Co. TX Name, Address and Phone No. of General Contractor Name, Address and Phone No. of Project Engineer Owner 105 BRH Garver 5402 Lawndale Houston, TX 77023 Mr Phil Reed 713 / 921.2929 J.A Costanza & Associates Engineering. Inc. 4301 Certer St. Deer Park, TX 77536 281 / 930.9339 City of Pasadena c/o J.A. Costanza & Associates Engineering, Inc. List of projects successfully completed: Name of Project Amount Of Contract Type of Work Percentage Subcontracted Scheduled Completion Location Name, Address and Phone No Dunvale•Liooan Storm Sewer g 153,000 Lift Station 5% Jul•02 Pearland. Harris Co. TX of General Contractor Name, Address and Phone No. of Protect En neer Colt Utilities, Inc. P.O. Box 802244 Houston. TX 77280.2244 Mr. Robert Breeden 713 / 465.6181 110 Owner City of Houston Name of Project Amount Of Contract Type of Work Percentage Subcontracted Amount Subcontracted Completion Date Location Name. Address and Phone No. Pasadena Structures $ 94,000 Concrete Junction Boxes 1% $ 100 Apr•02 Pasadena. Harris Co. TX of General Contractor Name, Address and Phone No. of Project Engineer Owner E.P. Brady, Inc. 3414 Persimmon Hou.. TX 77093 Mr. Dan Brady 713 / 691.0923 Sparks Barlow & Barnett, Inc. 1717 St. James Place. Suite 380 Houston, TX 77056 713 / 965.9996 City of Pasadena c/o Sparks, Barlow & Barnett, Inc. 109 Name of Project Amount 01 Contract Type of Work Percentage Subcontracted Scheduled Completion Location Name, Address and Phone No. of General Contractor Chelsea Harbour Lift Station $ 202,100 Lift Station 28% May02 Fi. Bend County, TX Name, Address andsPhone No. of Project Engineer Owner Name of Project Amount Of Contract Type of Work Percentage Subcontracted Amount Subcontracted Completion Date Location Name, Address and Phone No. of Project Engineer LJA Engineers. Inc. 2929 Briarpark Dr.. *500 Hou.. TX 77042 Mr. David Tinney 713 / 953.5200 Ft. Bend County Municipal Utility Distirct No. 23 c/o LJA Engineers 106 Colt Utilities, Inc. P.O. Box 802244 Houston, TX 77280-2244 Mr. Robert Breeden 713 / 465.6181 Pate Engineers, Inc. 13405 NW Frwy., Suite 300 Houston, TX 77040 713 / 462.3178 Ft. Bend County M.U.D. No. 25 c./o Pate Engineers, Inc. Owner Name of Project Amount Of Contract Type of Work Percentage Subcontracted Scheduled Completion Location Sanitary Sewer & Interium Lilt Station $ 121,000 Lift Station 15% 17.800 Dec•01 Fresno. Ft. Bend Co.. TX Green River 526,700 Lift Station Rehab 25% Apr•02 Houston. Harris Co. TX Name. Acldress and Phone No. of Project Engineer Owner Name of Project Amount 0f Contract $ Type of Work Percentage Subcontracted Amount Subcontracted Completion Date Location Pearland. Brazoria Co.. TX Name. Address and Phone No. of General Contractor Power Trak. Inc. 1720 East Sam Houston Pkwy. North Houston, TX 281 / 590.6566 Name. Address and Phone No, of Project Engineer Walter P. Moore. Inc. 3131 Eastslcle. 2nd Floor Houston. TX 77098 Owner City of Pearland c/o Power Trak. Inc. 1720 East Sam Houston Pkwy. North Houston, TX 104 103 Mr, Rai Ranibar, P.E. City of Houston Dept. o! Engineering 611 Walker. 15th Floor Houston. TX 77002 713 / 837.7392 Same Pearland Seconclay School Campus 101 108.500 Lift Station 23% $24.300 Nov01 Name of Project Amount Of Contract Type of Work Percentage Subcontracted Scheduled Completion Location Name. Address and Phone No. of Project Engineer Owner Ft. Bend Co. MUD #23 WWTP $ 2.283.000 WWTP 47% Jul 02 Fresno. Ft. Bend, TX 100 LJA Engineers Inc. 2929 Briarpark Dr.. #500 Hou.. TX 77042 Mr. David Tinney 713 / 953.5200 Ft. Bend County Municipal Wily Distirct No. 23 c/o LJA Engineers Name of Project Amount 01 Contract Type of Work Percentage Subcontracted Amount Subcontracted Completion Date Location Name. Address and Phone No. of Project Engineer Owner Name of Protect Amount 01 Contract Type of Work Percentage Subcontracted Percentage Completed Scheduled Completion Location Name, Address and Phone No Owner Name of Protect Amount Of Contract Type of Work Percentage Subcontracted Percentage Completed Scheduled Completion Location Brazoria Co., Texas Name, Address and Phone No. of Protect Engineer HC MUD #367 Water Plant Expansion 98 $ 322,000 WP Expansion 50% $ 157,000 Aug-01 Houston. Harris Co. TX Costello. Inc. 9990 Richmond Ave.. Suite 450 Houston. TX 77042 Mr. John Potts 713 / 783.7788 Harris Co. Municipal Utility District No. 367 c/o Costello, Inc. Aeration Sys & Clarifier Repairs $ 150,000 Wastewater Treatment Plant Rehabilitation 2% 3 3,000 Sep-01 Houston, Harris Co. TX of Project Engineer 97 R. G. Miller 1313 Sherwood Forest Houston, TX 77043 Mr. Jeff Dillard 713 / 464•6900 Northwest Harris Co. MUD No. 20 c/o R.G. Miller Owner Name of Project Amount 01 Contract Type of Work Percentage Subcontracted Amount Subcontracted Completion Date Location WWTP Phase 11 Expansior $725,000 Wastewater Treatment 16% $ 115,000 Sep•01 94 Hultt•Zollars, Inc. 1500 S. Dairy Ashford, Suite 200 Hou., TX 77077 Mr. John Savage Brazoria County M.U.D. No. 5 c/o Huitt•Zollars Inc. Woodtrace Water Plant No. 1 31 482,450 Water Plant 60% 926.000 Jul•01 Montgomery Co.. Texas N ame, Address and Phone No. of Project Engineer N ame. Address and Phone No. of Owner Name of Project Amount 01 Contract Type of Work Percentage Subcontracted Amount Subcontracted Completion Date Location HC MUD 249 S1.215,900 300.000 GPD WWTP 18% $ 207.560 AuA-01 Houston. Harris Co. TX N ame, Address and Phone No. of Project Engineer N ame. Address and Phone No. of Owner 96 LJA Engineers. Inc. 2929 Briarpark Dr. #500 Hou.. TX 77042 Mr. David Theisen 713/953.5200 Woodtrace Municipal Utility Distirct No. 1 c/o LJA Engineers 91 Van De Weile Engineering 2925 Briar Park. Suite 275 Hou.. TX Mr. Ron Sanders 713 / 782.0042 Harris Co. M.U.D. No. 249 c/o Van De Welle Engineering Company: R + B Group, Inc. 1213 N, Durham Dr. Houston, TX 77008 Incorporated in the State of Texas, August 1994 Officers: Brian D. Morrison, President 1208 Tulane Houston TX 77008 SUPPLEMENTAL INFORMATION SHEET Phone: 713 / 862.5800 Fax: 713 / 862-5807 BANK: Sterling Bank • Heights Officer: Mr. Scott Lester 414 West 19th Street Houston, Texas 77007 Phone: 713/507-2094 Account Nos 059011110 / 051021230 Accountant: Mr. Bob Murray Murray & Co P.C. 12707 N. Freeway, Suite 350 Houston, TX 77060 713/873.0088 Surety: The St Paul c/o Mr. Leeland Rauch Insurance Alliance 1776 Yorktown, Suite 200 Houston, TX 77056 4114 713/966.1776 Equipment Schedule 2 John Deere 310 Backhoes 2 Case Backhoes 1 P & H Hydraulic Crane 1 American Crane 4260 Other major equipment is secured by lease agreements. Additional information can be provided upon request. R + B GROUP INC 1213 N. DURHAM DR HOUSTON, TEXAS 77008 713 / 862-5800 REFERENCES Alexander Engineering, Inc. 400 Randal Way, Suite 200 Spring, TX 77388-8908 Jones & Carter, Inc. 6335 Gulfton, Suite 200 Houston, TX 77081 Stiver Engineering, Inc. 1305 Peden St. Houston, TX 77006 City of Shenandoah 709A Pinewood Dr. Shenandoah, TX 77381 Thompson Professional Group, Inc. 6110 Clarkston Houston, TX 77055 Cobourn Linseisen & Ratcliff, Inc. 13100 Northwest Frwy., Suite 500 Houston, TX 77040 Turner Collie & Braden, Inc. P.O. Box 130089 Houston, Texas 77219.0089 Mr. Norman F. Scholes, P.E. Mr. Michael Mooney, P.E. (281) 350-7027 Mr. Larry Weppler, P.E. Mr. Patrick Hogan, P.E. (713) 777-5337 Mr. Maury E. Stiver, P.E. (713) 526-3478 Mr. Paul Frederickson (281) 298.5522 Mr. Martin Christofaro P.E. 713 / 956-4100 Mr, David Hunn P.E. 713 / 462-0993 Mr. Bruce Baumel 713 / 267 2851 BILMA P.U.D. Bridgestone M.0 D. c/o Jones & Carter, Inc. 6335 Gulfton, Suite 200 Houston, TX 77081 R + B GROUP, INC 1213 N. DURHAM DRIVE HOUSTON, TEXAS 77008 713 / 862-5800 REFERENCES Mr. Larry Weppler, P.E. Mr. Patrick Hogan, P.E. (713) 777-5337 City of Shenandoah Mr. Paul Frederickson c/o Thompson Professional Group, In Mr. Martin Christofaro P.E. 6110 Clarkston 713 / 956 4100 Houston, TX 77055 North Gate Crossing M.U.D. North West Harris County M.0 D. No. 5 c/o Cobourn Linseisen & Ratcliff, Inc. Mr. David Hunn P.E. 13100 Northwest Frwy., Suite 500 713 / 462 0993 Houston, TX 77040 San Jacinto River Authority c/o Turner Collie & Braden, Inc. P.O. Box 130089 Houston, Texas 77219-0089 Mr. Bruce Baumel 713 / 267-2851 November 7, 2002 City of Pearland 3519 Liberty Dive Suite 353 Pearland, TX 77581 Re: Green Tee Lift Station II & III Improvements List of Subcontractors & Suppliers SUBCONTRACTORS Electrical Painting SUPPLIERS Pumps and Controls Fabricated Piping Bes gards, Brian D Morrison President Pfeiffer & Son PO Box 1116 Laporte TX 77572 Universal Coating Specialists PO Box 5744 Pasadena, TX 77508 Hahn Equipment 5636 Kansas Houston, TX 77007 Metro Tex PO Box 87705 Houston, TX 77287 R + B GROUP, INC. • 1213 N. Durham, Houston, Texas 77008 • (713) 862-5800 • FAX (713) 862-5807 C:' EVENUES flJNSTRU FHER HET 1 F 1 I01'• 1...i.: I I:..t4 :':,...... :i;t1::.1.T 11::'1:::Fi,f:•l..i• a:I'••{i: F:'1:::i:::l•1i:ili'' IJ:::' LITIsTIE t.:t.!H !1 11 l:::li: SOFTWMRE '"I''li•ii...l... (:'t::•:i •I j•:II:Ji::: ::: I".'.ia:.i:!.a1.I..1. I :l: i ::I ..l:i ::1„ 1F:'1:::It TI `!::iRi !:::!i:: I :I: i:::li:a•i:'' i.. .;,i::iri?:!:i ,•.• i"01.4'i:`ii::i::: fi!•••::I.4.I i. H. ;i..1I•F•1f..1!'i 1... I::.I'I.•:il::.l'•1tJ1. D EX: : i::. 1.11•1' :1:..I..I Is;I E3 F.::::i 1:::i::r.L.:::= 1 1...1::.1••Ii'i!..J1••il::. ::1 't:: • I .... i'.' i.:.: i t ... F:'t: S (:;1;;:...i 1 Ina 'G I:1:1: i D1••:!i:::l :'•l :l::'i:1: i••d:'.i i. i.. l••Il...: i'::l'•1'1 i::.!', i r i.+.l•_'WENT TRAYS. 4'':.11:''....I•:I..I...i: .. i li t.i.i''i 1:.1'irlill C:1:4: i'ii t:1:I' I"I Et: i'••ii:!i'.I:1::: 1 :°Ri::tl''Ii..!..i•:1: (:il'' 1 LICENSES I is •' I:: EXPENSE I::il:: N !. I : i•',;:; r;t.1... TRANSPORTATION EXPENSE :>l WAK CHARGES '.:1i:ii j:? :!::'lt: E ..I. EXPENSE }1. L.:I:::I::'l ;i..• t'1!:::a::!::Jl.11'•1•.1•.a:i••I!:ii i1 1 t..1..JUi i•t1..J1..!. hart I:!I::J !::! 11 !.....J a '•ad, 19 I. ). liJ i::.I 135. :1. ,, ..::I,.. 1, 67 6,500. • 0.00 11,110.00 11,900.00 0.00 •1 • • : O 0.00 6,538.03 00 I 1%.:I'.1:.. S . 0 1: ,... , 0 01 :I 1: 0.00 • , OvEICE y.... zkyc: FOR EODIggE f 3UPPL• I k\PEG4 6RINTI11 CASYS z1)1. (1 6 + RAI &I 1 G ORiOmiTC TA2ES 6-1 :1: TION 11110141i2A?IOw gE SUES DRIwfIOR2 9G*I*:E IONS \ DONATIONS II ISCELLAHEOUS EXPENSE .... TOTAL OpER 1.1 EXPENSES 1 1:1 1 INCO! T.£Fs: INCOME i1%1 I • INCOME TOTAL Cif Ill INCOME NET 2.Di•e <L PROF «( AND LOSS SrdyEMEmI '::1 EO 1.4ITH09i AU»IT .DI) 1,r) 09 11... 1 is . 1 9 6, • i9 ±3 2R.2 3,1E B. 8 S 8is 0 :3 Ime= Pare: l,533,96 P,323,CA 6328,63 ga2.a2 CCA,S91.is I• a 35,1iG,A9 n 01. .01. 1:: lot LA CASH ON HAND PHD IN l:::1.:i.•1•.(1iss..lis :::..f. i::l:i:i' •li ll:l::::: 1:is::!:::1::::i:'• :"`I•i:1...1: CASH i ld...l! ::. LIFE .0 I•d:::l.iRti•lI'i!..:1::. DSTS IN EXCESS OF BILLIN TOTAL i:::URR::.l•••I •!• (i:::1:ii;E::'I I:: I::' .f: !:: F.:: I .1::: I `i.i•i•igli... I .C: E::1. i'%:i SI... i fOII`ll... ASSETS pAQ 481080 '.. r.:• `:I. 30,700, 3034936035 :1;1'•11:•.1:D. .'. 11. III ! ' }; :1..1.: ... ::. ... .i..i i`!t: I:::01. [1•..1..1.5. 11i1a16-11i:!.,!...!::: 11: 1..1... 1 1'•1t33 !.1'••1 1:./.1..1•..*.. :i i::.1l" ;.I:i.h:. ltI::•i.:!:i;1::iii:::lli I::....::}p,! .. i n..:... C::1; 1...11i1 1.. t.! 'i• f'! L:. l !'•li: 1:'Ft:I:::I7I:I:l.1l1l i:i1::14•t:1I lJl 1 r11 1::1:ik i 3:CI1`1 l...C11••1l: I':I1•'i....1••'i'!!•'•:I::..t.! 1:0.i. } !"!L..11.„i i P•Il.JI d. Ft: 1•'1 i..... i:.;..1. I. CD*Si:t!... 1..;1...iit:l:l:::1'1"i' 1...:i:i:i1 :i:`:.....i: i .1.::.1:: .01 !:: 1 ! .3•••. 1 !::.RI'`! !...:!: i-•la:1:1: 1...:1. i :1: L::'::; ..i•i.:i..i.AI... !...I.11•••11::;....I:::k171 I...:!:i::!:i:,a:l...:!:'i :1.. :! 1.13:..i....j: c6;4; I" 1:' 1.1••1!••'.!. i 1.41•:. I I••I.1: h•IL:1 ) !::. i• l!•'.:... 1.11;1. a:::1•,1 I. i••!i•• i :1:1 1i: i:ii H::: ( l...t .............. . i.l.:! ..i .!'.:•I I... 1...:!: i.'!! ; 1 !...:i: • ..: i::i1•1I) I:::!::111..!:1: , 1. he'lldefg It ES 1•: i , j':.... , , .1.:1. L '•.':! ., !:; I I. I I.. 1:: l i:.'! • •. , „ !:ii! :I. iii::' :4. i. i:: „ I:: i :! REFERENCE: Jones & Carter, Inc. TELEPHONE NO.: 713-777-5337 CONTACT: Larry Weppler, P E PROJECT Various Projects QUESTIONS 1. How did R&B Group, Inc. perform on the projects? ANSWER: Good. 2. Were you satisfied with their performance? ANSWER: Yes. 3. How would you rate the quality of their work? ANSWER: Excellent — put out quality products. 4. Did they have any problems with the Job? If so, what was the nature of the problem? ANSWER: If there was they were willing to work with you. 5. Were there many change orders on the project? If so, what were the reasons? Were they reasonable? ANSWER: No. Not change order happy. 6. How would you rate their ability to cooperate with a client? ANSWER' Excellent. 7 Would you like to have them perform a job for you again? ANSWER* Yes. REFERENCE• Thompson Professional Group TELEPHONE NO.: 713-956-4100 CONTACT: Martin Christofaro, P.E PROJECT City of Shenandoah — Lift Station & gravity sewer lines QUESTIONS 1. How did R&B Group, Inc. perform on the project? ANSWER Great. 2. Were you satisfied with their performance? ANSWER: Yes. 3. How would you rate the quality of their work? ANSWER Great. 4. Did they have any problems with the job? If so, what was the nature of the problem? ANSWER: No. 5. Were there many change orders on the project? If so, what were the reasons? Were they reasonable? ANSWER: No. 6. How would you rate their ability to cooperate with a client? ANSWER: They cooperate well. 7. Would you like to have them perform a job for you again? ANSWER: Yes. REFERENCE: Stiver Engineering TELEPHONE NO.: 713-526-3478 CONTACT: Maury Stiver, P.E PROJECT Various Projects over the years QUESTIONS 1. How did R&B Group, Inc. perfouui on the projects? ANSWER: Good. 2. Were you satisfied with their perfoiinance? ANSWER: Yes. 3. How would you rate the quality of their work? ANSWER: Good. 4. Did they have any problems with the job? If so, what was the nature of the problem? ANSWER: No. 5. Were there many change orders on the project? If so, what were the reasons? Were they reasonable? ANSWER* No. 6. How would you rate their ability to cooperate with a client? ANSWER: They cooperate well. 7 Would you like to have them perform a job for you again? ANSWER: Certainly. REFERENCE: TELEPHONE NO.: CONTACT: PROJECT: 1 Alexander Engineering 281-350-7027 Michael Mooney, P E. Various Projects QUESTIONS How did R&B Group, Inc. perfouun on the projects? ANSWER• No problems. 2. Were you satisfied with their performance? ANSWER• Yes. 3. How would you rate the quality of their work? ANSWER• They are good contractors. 4. Did they have any problems with the job? If so, what was the nature of the problem? ANSWER• No. 5. Were there many change orders on the project? If so, what were the reasons? Were they reasonable? ANSWER: No. 6. How would you rate their ability to cooperate with a client? ANSWER: No problems with cooperation. 7. Would you like to have them perform a job for you again? ANSWER: Yes.