Loading...
R2006-135 08-28-06 RESOLUTION NO. R2006-135 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AUTHORIZING THE CITY MANAGER OR HIS DESIGNEE TO ENTER INTO A CONTRACT WITH PSI, INC., FOR MATERIALS TESTING SERVICES ASSOCIATED WITH THE BAILEY ROAD EXTENSION PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain contract by and between the City of Pearland and PSI, Inc., a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a contract with PSI, Inc., for materials testing services associated with the Bailey Road Extension Project. PASSED, APPROVED and ADOPTED this the 28th day of August, A.D., 2006. ~~ TO REID MAYOR ATTEST: APPROVED AS TO FORM: a~ It. C:t- DARRIN M. COKER CITY ATTORNEY Exhibit "A" Resolution 2006-135 8/28/06 1 --1 ~y This Contract (Contract) is made between the City of Pearland, Texas (hereinafter "City"), and PSI (hereinafter "Consultant") as follows: CITY OF PEARLAND STANDARD AGREEMENT FOR CONSULTANT SERVICES i (' (1 1. Summary of Contract Terms. The following information and referenced documents shall be a part of this Contract: V f). '" ) Description of Project: Provide Materials Testing and Inspection Services for the V ,t " Bailey Road Extension Project between SH35 and Veterans Drive. Consu Itant/Subconsu Itant( s) Fee Basis of Compensation PSI $156,190.00 NTE Maximum Contract Amount $156,190.00 NTE *AII financial obligations created by this agreement are between the City and Consultant, and shall not be construed to be between City and any subconsultant. Delivery of plans, specifications and estimates: Sixty (60) days after services rendered. Attachments: Scope of Services - Exhibit A 2. Services and Payment. A. Consultant will furnish services to the City in accordance with the terms and conditions specified in this Contract. Payment for the services of Consultant shall be due and payable upon submission and approval of a statement for services to City. Statements for services shall not be submitted more frequently than monthly. After consultation with the City, the Consultant shall specify the basis of compensation in the scope of work for the project. The Consultant shall provide adequate detail of the basis of compensation so that the City can determine the reasonableness of the fees and have the ability to make reasonable progress payments to the Consultant based upon work completed at the payment intervals. The Consultant shall subcontract for all subconsultants, subject to City approval, necessary to complete the scope of work. The subconsultant's fees and administrative mark-up, if any, shall be included in the scope of work. Unless otherwise agreed upon, the method of compensation shall be one of the following methods: 1. Salary Cost Times Multiplier Plus Direct Nonsalary Expense ("Salary") Compensation shall be based on 1) the direct salaries (including benefits) of the Consultant's employees whose time is directly chargeable to the project; 2) an agreed upon multiplier to compensate the Consultant for overhead and profit; and 3) reimbursement for direct nonsalary expenditures and subconsultant contracts as defined in the scope of work for the project. The Consultant shall provide a proposal that includes the total fees for the project, which shall not be exceeded without prior City approval. 2. Per Diem ("Per Diem") Compensation shall be based upon 1) an agreed upon lump sum per day for specific services; and 2) reimbursement for direct nonsalary expenditures and subconsultant contracts as defined in the scope of work for the project. This method is best suited to expert witness work or other short-term engagements involving intermittent services. 3. Cost Plus Fixed Fee ("Cost Plus") Compensation shall be based upon 1) reimbursement of the actual costs of all services and supplies related to the project and 2) an agreed upon fixed fee (profit). The Consultant shall provide an estimate of the costs to be reimbursed, but actual compensation shall be based upon invoices and supporting documentation provided by the Consultant. 4. Lump Sum ("Lump") Compensation shall be based upon an agreed lump sum payment for completing the entire scope of work. This method is best suited to investigations or studies and for basic services with limited scope and complexity. If City fails to make any payment due Consultant for services and expenses within thirty (30) days after receipt and approval of Consultant's statement for services therefore, the amounts due Consultant will be increased at the rate of one half percent (1/2%) per month from said thirtieth (30th) day, and, in addition, Consultant may, after giving seven (7) days' written notice to City, suspend services under this Contract until Consultant has been paid in full, all amounts due for services, expenses, and charges. B. All the Consultant's working drawings, plans, and specifications, if required under this Contract, shall be sufficiently accurate, detailed, and complete so that competitive bids for the work can be obtained and the improvements constructed. 2 C. Approval of the Consultant's work by the City shall not release the Consultant, its employees, agents, or consultants, from the responsibility and liability for the accuracy and competency of their designs, working drawings, and specifications, or other documents and services. D. Subject to Article 8 herein or as otherwise agreed, the Consultant shall promptly correct errors in the Consultant's work, including errors discovered after final payment, without receiving additional compensation. E. Prior to execution of this agreement, the Consultant shall have prepared a project schedule identified as an attachment to this agreement. The Project Schedule shall be submitted in digital and paper form, in the Microsoft Project for Windows format. The Project Schedule shall contain a complete schedule so that the Consultant's scope of services under this contract can be accomplished within the specified time and contract cost. The Project Schedule will provide specific work sequence and definite review times by the City and the Consultant of the work performed. If the review time should take longer than shown on the project schedule, through no fault of the Consultant, additional contract time may be authorized by the City through a supplemental agreement, if requested by a timely written request from the Consultant and approved by the City. 3. Term and Termination. This Contract term will begin upon execution and end sixty days after issuance of the certification of completion of construction by the Consultant. The City may terminate this Contract at any time during its term by giving written notice to Consultant. The City shall pay the Consultant for all services rendered to the date of termination. 4. Modifications. City without invalidating the Contract, may order changes within the general scope of the work required by the Contract by altering, adding to and/or deducting from the work to be performed. If any change under this clause causes an increase or decrease in Consultant's cost of, or the time required for, the performance of any part of the Services under the Contract, an equitable adjustment will be made by mutual agreement and the Contract modified in writing accordingly. 5. Subcontracts. If, for any reason, at any time during the progress of providing services, City determines that any subcontractor for Consultant is incompetent or undesirable, City will notify Consultant accordingly and Consultant shall take immediate corrective action, which may include cancellation of such subcontract. Subletting by subcontractors shall be subject to the same regulations. Nothing contained in the Contract shall create any contractual relation between any subcontractor and City. 6. Ownership of Documents. All drawings, report data, and other project information developed in the execution of the services provided under this Contract shall be the property of the City upon payment of Consultant's fees for services. Consultant may retain copies for record purposes. Owner agrees such documents are not intended or represented to be suitable for reuse by City or others. Any reuse by City or by those who obtained said documents from City without written verification or adaptation by 3 Consultant will be at City's sole risk and without liability or legal exposure to Consultant, or to Consultant's independent associates or consultants, and City shall indemnify and hold harmless Consultant and Consultant's independent associates from all claims, damages, losses, and expenses including attorneys' fees arising out of or resulting therefrom. Any such verification or adaptation will entitle Consultant to further reasonable compensation. Consultant may reuse all drawings, report data, and other project information in the execution of the services provided under this Contract in Consultant's other activities. Any reuse by Consultant will be at Consultant's sole risk and without liability or legal exposure to City, and Consultant shall indemnify and hold harmless City from all claims, damages, losses, and expenses including attorneys' fees arising out of or resulting therefrom. 7. Insurance. A. The Consultant shall procure and maintain for the duration of this Agreement, insurance against claims for injuries to persons, damages to property, or any errors and omissions relating to the performance of any work by the Consultant, its agents, employees or subcontractors under this Agreement, as follows: (1) Workers' Compensation as required by law. (2) Professional Liability Insurance in an amount not less than $1,000,000 in the aggregate. (3) Comprehensive General Liability and Property Damage Insurance with minimum limits of $1,000,000 for injury or death of anyone person, $1,000,000 for each occurrence, and $1,000,000 for each occurrence of damage to or destruction of property. (4) Comprehensive Automobile and Truck Liability Insurance covering owned, hired, and non-owned vehicles, with minimum limits of $1,000,000 for injury or death of anyone person, $1,000,000 for each occurrence, and $1,000,000 for property damage. B. The Consultant shall include the City as an additional insured under the policies, with the exception of the Professional Liability Insurance and Workers' Compensation. Certificates of Insurance and endorsements shall be furnished to the City before work commences. Each insurance policy shall be endorsed to state that coverage shall not be suspended, voided, canceled, reduced in coverage or in limits except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. Upon request, certified copies of all insurance policies shall be furnished to the City. 4 8. Indemnity. Consultant shall indemnify and hold the City, its officers, agents, and employees, harmless from any claim, loss, damage, suit, and liability of every kind for which Consultant is legally liable, including all expenses of litigation, court costs, and attorney's fees, for injury to or death of any person, for damage to any property, or errors in design, any of which are caused by the negligent act or omission of the Consultant, his officers, employees, agents, or subcontractors under this Contract. 9. Assiqnment. Consultant shall not assign this Contract without the prior written consent of the City. 10. Law Governinq and Venue. This Contract shall be governed by the law of the State of Texas and no lawsuit shall be prosecuted on this Contract except in a court of competent jurisdiction located in Brazoria County, Texas. 11. Entire Contract. This Contract represents the entire Contract between the City and the Consultant and supersedes all prior negotiations, representations, or contracts, either written or oral. This Contract may be amended only by written instrument signed by both parties. Purchase orders issued under this Agreement shall contain a statement nullifying additional terms and conditions on the reverse side of the purchase order and referencing this Agreement. 12. Conflicts in Contract Documents. The above provIsions shall govern over any conflicting provision contained in any referenced contract document specified above. 13. Dispute Resolution Procedures. The Consultant and City desire an expeditious means to resolve any disputes that may arise between them regarding this Contract. To accomplish this, the parties agree to mediation as follows: If a dispute arises out of or relates to this Contract, or the breach thereof, and if the dispute cannot be settled through negotiation, then the parties agree first to try in good faith, and before bringing any legal action, to settle the dispute by mediation of a third party who will be selected by agreement of the parties. 5 EXECUTED and EFFECTIVE as of the 28th day of August, 2006. CITY OF PEARLAND ENGINEER By: t3t~ r Printed Name: Bill Eisen Title: City Manaqer By: kill; ~().~. Pri nted Nilrne: :I: ~ Mf ~ Y"1't-z:. i Title: V.. . STATE OF TEXAS ~ !h- .. ~ COUNTY OF I ~ lOAifY'J (J..; ~ BEFORE ME, the undersigned Notary Public, on this day personally appeared Bill Eisen, known to me to be the person whose name is subscribed to the foregoing instrument and acknowledged to me that he/she executed the same for the purposes and consideration therein expressed. ~ UNDER MY HAND ,A.D., 2006. ~\\\\\\\I\III1I/f/f",It. ~\\\\~ R 08 '1Iij///,\ ~ .......... /'1; ~ ~ .." ", "^ ~ ~ .' ~OT-1..~' ~ ff .... ~k/,l;..:"'~ (~{~~ ~ ~i)~J -;;,0:>'1>? r" .0", % ~"'~& (C-\"AS J ":0$ ~ 0 ..... .... -r- ~ ~ 10 ,,,..,,' ~ ~~J: ~~ '//1111. \\\\\'\ '"11//111/111\\\\\\\\\\ AND SEAL OF OFFICE THIS 2~<fWoAY OF N~Wu~~RTHE STATE OF TEXAS Printed Name: &~..E'~ W My Commission Expires: S1 ~ 0 STATE OF TEXAS COUNTY OF {/ ILr r /j ~ ~ ~ BE~OR~ ME,. the undersigned Notary Public, on this day personally appeared -:Iv4.d) L/Cl L ( , known to me to be the person whose name is subscribed to the foregoing instrument and acknowledged to me that he/she executed the same for the purposes and consideration therein expressed. -q I J GIVE~MY HAND AND SEAL OF OFFICE THIS ~ DAY OF ~ ' A.D., 20~. YESENIA CRUZ MY COMMISSION EXPIRES JUlY 24. 2010 NOTARY HE STATE 0 TEXAS Printed Name: ~.(..~-e11 iVv (!t...uz.- My Commission Expires: 1- 2-t./-IO 6 1,---.k y/ :,. _;... AUG 0 9 2006 RETURN COPY 13P ,JECi DE7'- V-' ' PLEASE SIGN AND RETURN THIS COPY OF PROPOSAL INTACT PSI CANNOT ISSUE ANY REPORTS ON THIS PROJECT UNTIL A SIGNED COPY OF THIS PROPOSAL IS IN OUR FILE VI=X 1 Information ./ ®To Build On Engineering•Consulting• Testing • August 7, 2006 City of Pearland 3519 Liberty Drive Pearland, Texas 77581 Attn: Cecil Bowery Re: Proposal for Construction Materials Testing and Inspection Services Bailey Road Extension Bid No. 2006-052 Pearland, Texas PSI Proposal No.: 204-60015 rev. 1 Dear Mr. Bowery, Professional Service Industries Inc., (PSI), PSI is pleased to submit the following proposal for providing construction materials testing and inspection services for the referenced project. PSI proposes to provide experienced technical personnel to perform testing as requested by our client in general accordance with the project specifications provided to PSI by City of Pearland, and also proposes that the work be accomplished on a unit price basis in accordance with the City of Pearland Schedule of Fees, Evergreen Contract dated May 5, 2005. Copies of the Schedule of Fees are enclosed herewith and are incorporated into this proposal. PSI estimates the cost of materials testing and inspection to be approximately: $ 159,190.00. PSI's fees would be determined by the actual amount of technical time expended for this project and the amount of laboratory testing performed. PSI will proceed with the work on the basis of verbal authorization; however, please sign and return one (1) copy of this proposal intact. PSI can not issue any reports until a signed copy of the proposal or alternate form of contract is received. When returning the proposal, please complete the attached Project Data Sheet so that your file can be properly established. PSI performs a complete range of construction materials testing and inspection services. In addition to those listed in the Schedule of Fees, your project can be provided with the following, if requested: Professional Service Industries,Inc.•1413 West Barbours Cut Blvd.•LaPorte,TX 77571 •Phone 281/471-2900•Fax 281/471-2956 City of Pearland August 7, 2006 PSI Proposal No.: 204-60015 rev. 1 Page 2 of 4 - Roofing installation observation, inspection and testing; - Welder qualification and testing; - Structural Steel fabrication and field erection inspection and testing, including non-destructive testing of welds and tests on high strength bolts; - Physical tests on metals and other construction materials, including pressure and load testing; - Asbestos inspection, analysis and management; - Environmental site assessments; Geotechnical drilling and foundation design; PSI appreciates the opportunity to offer its services to your project and looks forward to working with you during the construction phase. You will be contacted within five days to answer any questions you may have concerning this proposal and the services that PSI can provide your project. Respectfully submitted, Professional Service Industries, Inc. Reggie ac Department Manager Construction Services Attachments: Construction Materials Testing Cost Estimate Schedule of Fees (Exhibit A) Project Data Sheet AGREED TO THIS DAY OF BY: TITLE: FIRM: • City of Pearland August 7, 2006 PSI Proposal No.204-60015 rev. 1 Page 3 of 4 CONSTRUCTION MATERIALS ESTIMATE Bailey Road Extension Bid No.2006-052-City of Pearland PSI proposes to provide an experienced technician to perform inspection and testing to verify compliance with the project specifications associated with the installation of the concrete, asphaltic concrete pavement and placement of embankment fill. Paving/Embankment Service Description Unit Rate Quantity Amount NICET II Technician,per hour $53.00 740 $39,220.00 NICET II Technician OT,per hour $64.50 120.0 $7,740.00 Moisture Density Relationship $150.00 40 $6,000.00 Atterberg Limits $45.00 200 $9,000.00 Percent Passing#200 Sieve $35.00 4 $140.00 ACI Technician,per hour $46.00 160 $7,360.00 ACI Technician OT,per hour $54.00 40 $2,160.00 Concrete Compression Tests,each $13.00 156 $2,028.00 Asphaltic Concrete Testing,per sample $357.00 8 $2,856.00 Concrete Coring for Thickness, each $72.00 26 $1,872.00 Additional Thickness 6" - 12" $6.75 100 $675.00 Measuring for Thickness of Concrete Cores $9.50 24 $228.00 Subtotal $79,279.00 PSI proposes to provide an experienced technician to perform inspection and testing to verify compliance with the project specifications associated with the installation of the bridge. Bridge installation Service Description Unit Rate Quantity Amount ACI Technician,per hour $46.00 352.0 $16,192.00 ACI Technician OT,per hour $54.00 48.0 $2,592.00 Cylinder Pick-Up per hour $42.00 16.0 $672.00 Concrete Compression Tests,each $13.00 120.0 $1,560.00 Subtotal $21,016.00 PSI proposes to provide an experienced technician to perform testing and inspection to verify compliance with the project specifications associated with the installation of 18" RCP through 10' x 7' RCB. Drainage Service Description Unit Rate Quantity Amount NICET II Technician,per hour $53.00 600 $31,800.00 NICET II Technician OT,per hour $64.50 100.0 $6,450.00 MDR Cement Sand ASTM D-558 $165.00 3.0 $495.00 Compressive Strength Cubes, each $17.00 30.0 $510.00 Compressive Strength CSS ASTM D1632/D-1633 each $52.00 320.0 $16,640.00 Subtotal $55,895.00 Estimated Total' '6'1 City of Pearland August 7, 2006 PSI Proposal No.: 204-60015 rev. 1 Page 4 of 4 PROFESSIONAL SERVICE INDUSTRIES, INC. PROJECT DATA SHEET Project Name: Project Location: Your Job No.: Purchase Order No.: Project Manager: • Telephone No.: Number and Distribution of Reports: ( ) Copies To: ( ) Copies To: Attn: Attn: ( ) Copies To: ( ) Copies To: Attn: Attn: _ Invoicing Address: Attn: Site Contact: _Telephone No.: Other Pertinent Information: City of Pearland EXHIBIT A August 1, 2006 PSI Proposal No. 204-60015 rev. 1 CITY OF PEARLAND SCHEDULE OF FEES CONSTRUCTION MATERIALS ENGINEERING TESTING AND INSPECTION SERVICES CONTRACT Hourly fee PERSONNEL Regular Time Overtime 1 Principal* $ 143.00 $ 143.00 2 Sr. Engineer, PE (10 years Exp.) $ 105.00 $ 105.00 3 Project Engineer, PE $ 82.00 $ 82.00 4 Staff Engineer, EIT $ 65.00 $ 65.00 5 Graduate Engineer, CMT Manager $ 58.00 $ 58.00 6 Technician NICET IV $ 63.00 $ 79.50 7 Technician NICET III, HMA II $ 58.00 $ 72.00 8 Technician NICET II, HMA IA $ 53.00 $ 64.50 9 Technician ACI I, II $ 46.00 $ 54.00 10 Technician HMA IB $ 48.00 $ 57.00 11 Technician, Non-certified $ 42.00 $ 48.00 12 Welding Inspector(CWI) $ 77.00 $ 100.50 13 Welding Inspector(Associate CWI) $ 58.00 $ 72.00 14 NDT Inspector(ASNT Level II) $ 58.00 $ 72.00 15 NDT Inspector(ASNT Level III) $ 62.00 $ 78.00 16 NDT Inspector(ASNT Level II)with assistant $ 96.00 $ 129.00 17 Support Personnel* $ 31.00 $ 46.50 18 Traffic control Cost+10% *Services of these personnel must be authorized by the Projects Director in advance MATERIAL TESTING 100 Concrete Aggregates Unit Price 101 Screen or Sieve Analysis (ASTM C-136) $ 39.00 102 Specific Gravity (ASTM C-127 or C-128) $ 39.00 103 Unit Weight (ASTM C-29) $ 28.00 104 Absorption (ASTM C-127 or C-128) $ 33.00 105 Finer than 200 Mesh (ASTM C-117) $ 36.00 106 Organic Impurities (ASTM C-40) $ 35.00 107 Scratch Hardness (ASTM C-851) $ 31.00 108 L A Abrasion (ASTM C-131 or C-535) $ 153.00 109 Clay Lumps (ASTM C-142) $ 40.00 110 Light Weight Pieces (ASTM C-123) $ 47.00 111 Sand Equivalent (ASSTM C-2419) $ 48.00 112 Sodium/Magnesium Sulfate Soundness (5 cycles) $ 260.00 113 Na/Mg Sulfate Soundness additional cycles $ 150.00 114 Petrographic Exam of concrete Aggregates (ASTM C-295) by quotation City of Pearland, Schedule of fees Page 1 of 7 jlp 8/1/06 City of Pearland EXHIBIT A August 1, 2006 PSI Proposal No. 204-60015 rev. 1 200 Concrete Mix Design Inspection and Testing Unit Price Unit 201 Mix Design review(ACI-214): Using predetermined aggregate properties and other design factors; excluding test costs $ 115.00 each 202 Trial Batch Tests (ASTM C-192): Using aggregate admixtures and cement proposed for use; each batch or curve point $ 200.00 each 203 Cylinder Test(ASTM C-39) or Hold $ 13.00 each 204 Beam Test (ASTM C-78, C-293) or Hold $ 20.00 each 205 Concrete Coring (4" dia. To 6"thickness)ASTM C-42 includes personnel, vehicle, and patching holes $ 72.00 each 206 Measuring Thickness of Concrete Cores (ASTM C-174) $ 9.50 each 207 Additional Thickness (6"to 12") $ 6.75 inch 208 Additional Thickness (over 12") $ 12.00 inch 209 Concrete Coring, Minimum charge (min. 3 cores) $ 275.00 LS 210 Preparation of Cores, Capping & Test (ASTM C-42, C-39) $ 57.00 each 211 Cement Compressive Strength, one age (ASTM C-109) $ 104.00 set 212 Cement Compressive Strength, two ages (ASTM C-109) $ 127.00 set 213 Mortar/Grout Compressive Strength Cubes (ASTM C-109) $ 17.00 each 214 Mortar/Grout Compressive Strength 3"x 6" (ASTM C-495) $ 17.00 each 215 Mortar/Grout Compressive Strength (ASTM C-1019) $ 17.00 each 216 Structural Coring by quotation 217 Windsor Probes (ASTM C-803) $ 68.00 set 218 Bar Linear Shrinkage $ 235.00 set 219 Unit Weight of Lightweight Cylinders $ 25.00 set 220 Split Tensile Strength including preparation (ASTM C-496) $ 80.00 each 221 Petrographic Exam of Hardened Concrete (ASTM C-856) by quotation 222 Concrete Shrinkage Test (ASTM C-157, C-490) $ 125.00 test 300 Brick Unit Price All brick tests will be performed in accordance with ASTM C-67 (minimum 5 bricks) 301 Compressive Strength (ASTM C-67) $ 24.00 302 Absorption -five hours boiling (ASTM C-67) $ 52.00 303 Absorption -24 hours boiling (ASTM C-67) $ 53.00 400 Reinforcing Steel: ASTM A-370 &ASTM A-675 Unit Price 401 Tension Test(size 11 and under) $ 36.00 402 Tension Test(over size 11) $ 48.00 403 Bend Test(size 6 and under) $ 29.00 404 Bend Test (over size 6) $ 35.00 405 Deformation Examination $ 21.00 406 Bolt Tensile Test (ASTM A-325) $ 42.00 500 Welded Specimens Unit Price 501 Welding Coupons (ASTM A-370) Cost+ 10% 600 Tension Tests (ASTM A-370) Unit Price 601 Without use of Extensometer $ 38.00 602 Without use of Extensometer(with curves) $ 67.00 603 Steel Strand Cable $ 94.00 City of Pearland, Schedule of fees Page 2 of 7 jlp 8/1/06 City of Pearland EXHIBIT A August 1, 2006 PSI Proposal No. 204-60015 rev. 1 700 Nondestructive Testing (Steel) Unit Price 701 Radiographic Films (ASTM E-142) Cost+ 10% 702 Radiographic Source, Iridium (E-1114) $ 91.00 703 Radiographic Source, Cobalt 60 $ 104.00 704 Ultrasonic Equipment (AWS D11) $ 67.00 800 Asphalt Concrete Mix Design & Inspection Unit Price Unit 801 Mix Design Review (using predetermined aggregate properties and other design factors), excluding test costs $ 160.00 each 802 Trial Batch Test(up to 5 curve points) $ 1,200.00 each 803 Additional Curve points for item 802, per point $ 173.00 each 804 Extraction & Gradation Test(ASTM D-2172, ASTM C-136, or TEX-210F) $ 149.00 each 805 Specific Gravity (ASTM D-2041, TEX 201F) $ 53.00 each 806 Stability: Hveem, 3 per set(ASTM D-1560 or TEX 208F) $ 70.00 set Stability: Marshall, 3 per set(ASTM D-1559) $ 70.00 set 807 Bulk Density of Lab molded or Field specimen (core), 3 per set (TEX 207F) $ 39.00 set 808 Molding Specimens, 3 per set, for items 806 &807 (ASTM D- 1560, TEX 208F) $ 46.00 set 809 Penetration (ASTM D-5) $ 63.00 each 810 Ductility (ASTM D-113) $ 85.00 each 811 Viscosity (ASTM D-2170) $ 70.00 each 812 Asphalt coring (4" dia up to 6"thickness), includes personnel, vehicle and patching holes $ 68.00 each 813 Asphalt Coring minimum charge $ 250.00 LS 814 Additional thickness over 6" $ 6.00 inch 815 Abson Recovery (TEX 211F) $ 240.00 each 816 Measuring Thickness of Asphalt Cores $ 7.00 each 817 Maximum Theoretical Specific Gravity (TEX 227F) $ 67.00 each 818 Hot Mix In-Place Asphalt Design $ 1,600.00 each 819 Apparent Specific Gravity (TEX 202F) $ 50.00 each 820 Moisture Susceptibility Test (TEX 531C) $ 350.00 each 821 PMA Extraction/Gradation (ASTM D-2172) $ 200.00 each 822 PMA Extraction/Gradation by Ignition (ASTM D-6307) $ 124.00 each 900 Build-up Roof and Roof Fill Unit Price Unit 901 Cut Out Roofing Sample Evaluation/Analysis (ASTM D-2928) $ 259.00 each 902 Dry Density Test and 28-day Compressive Strength Tests (ASTM C-495) $ 58.00 each 903 Laboratory Preparation of Sample for Testing Applicable Tech Rate 1000 Soils Tests Unit Price Unit 1001 Liquid and Plastic Limits (Atterberg Limits) (ASTM D-4318) $ 45.00 each 1002 Moisture Content Only (ASTM D-2216) $ 6.00 each 1003 Mechanical Sieve Analysis, through #200 sieve (ASTM D-422) $ 42.00 each 1004 Percent Passing #200 sieve (ASTM D-1120) $ 35.00 each 1005 Specific Gravity (ASTM D-854, D-204) $ 44.00 each 1006 OMD Standard Compaction (ASTM D-698) $ 150.00 each 1007 OMD Modified Compaction (ASTM D-1557) $ 160.00 each City of Pearland, Schedule of fees Page 3 of 7 jlp 8/1/06 City of Pearland EXHIBIT A August 1, 2006 PSI Proposal No. 204-60015 rev. 1 1008 OMD Lime or Cement Stabilized Soil (ASTM D-698, D-558, D- 1557) $ 165.00 each 1009 California Bearing Ratio (ASTM D-1883) $ 158.00 each 1010 Percent Solids in Lime Slurry (ASTM D-2216) $ 32.00 test 1011 Four-point Lime content Recommendation Series (PI) $ 178.00 test 1012 Cement Content of Freshly-mixed CSS Mixture (ASTM D-806) $ 230.00 each 1013 Nuclear Density Equipment Rental (Max. 8 hrs/day) N/A 1014 Compressive Strength of CSS Sample, Including Molding (ASTM D-1632, D-1633) $ 52.00 each 1015 Maximum & Minimum Density, sands (ASTM D-4254) $ 156.00 test 1016 Density and Moisture of Soil Sample $ 19.00 each 1017 Unconfined Compression (ASTM D-2166) $ 33.00 each 1018 Unconsolidated Undrained (ASTM D-2850) $ 46.00 each 1019 Consolidation, One cycle (ASTM D-2435) $ 265.00 each 1020 Consolidation -Additional increments $ 38.00 each 1021 pH of soil (ASTM D-4972) $ 13.00 each 1022 Optimum Lime content pH Method $ 173.00 each 1023 Sieve analysis - Base materials (ASTM C-136) $ 70.00 each 1024 Compressive Strength of Cement Stabilized Base Materials (TEX 120E, ASTM D-2166) $ 190.00 each 1025 Soil Shrinkage Factor(ASTM D-427) $ 46.00 each 1026 One-dimensional Swell Cohesive Soils $ 215.00 each 1027 Triaxial Testing By Quotation 1028 Permeability Test, Constant Head Method (ASTM D-2434) $ 170.00 test 1029 Pinhole Test $ 210.00 test 1030 Crumb Test (ASTM D-4647) $ 28.00 each 1031 Double Hydrometer(ASTM D-4221) $ 130.00 each 1032 Free Swell (FHA) $ 75.00 each 1033 Soil Suction - Filter Paper Method $ 42.00 each 1100 Subsurface Field Investigation Unit Price Unit 1101 Intermittent 3-inch diameter(0 -50 ft) $ 13.50 ft 1102 Intermittent 3-inch diameter(51 - 100 ft) $ 15.00 ft 1103 Continuous 3-inch diameter(0 -20 ft) $ 15.00 ft 1104 Boring over 100 ft additional surcharge $ 5.00 ft 1105 Wash boring $ 7.00 ft 1106 Auger boring $ 8.00 ft 1107 Undisturbed or Split Spoon Sample in Wash or Auger Borings $ 29.00 each 1108 Grouting of completed bore holes $ 4.00 ft 1109 Boring not accessible by truck-mounted equipment, surcharge $ 5.00 ft 1110 Minimum charge $ 575.00 LS 1111 Mobilization/Demobilization $ 250.00 project 1112 Piezometer Installation By Quotation 1113 THD cone Penetration Test $ 20.00 each 1114 ATV Mobilization Surcharge $ 100.00 LS 1115 Portable Rig Drilling (two-man crew) $ 132.00 hr 1116 Stand by (two-man crew) $ 125.00 hr 1117 Materials Cost+ 10% City of Pearland, Schedule of fees Page 4 of 7 jlp 8/1/06 City of Pearland EXHIBIT A August 1, 2006 PSI Proposal No. 204-60015 rev. 1 1200 Sliplining and Manhole Rehabilitation Unit Price Unit 1201 Micro Silica Content (Petrographic Analysis) By Quotation 1202 Coring/Drilling of Manhole Grout $ 45.00 hole 1203 Coring of Gunite Panels (incl. Compressive strength) $ 90.00 core 1204 Thickness of Liner Materials (ASTM D-2122) Applicable Tech Rate 1205 Flexural Strength/Modulus of Elasticity of Liner Material $ 120.00 coupon 1206 Holiday Testing equipment rental $ 70.00 trip 1207 Compressive Strength 3x6 cyls (Elastizel) (ASTM D-790) $ 200.00 set 1300 Reimbursable Expenses Unit Price Unit 1300 Reimbursable Expenses, including outside testing, equipment and supplies Cost+ 10% GENERAL NOTES Technicians Reimbursement for personnel performing sampling, testing and inspection services shall be as as stated above and shall include reasonable travel time between Consultant's facility and the subject City of Pearland project. The billing rates are inclusive of all tools, equipment and consumable supplies and all else needed to perform the subject services, except as specifically noted in this Attachment. Consultant shall document hours of service for each visit to the City of Pearland project, including sample pick-up. The document shall contain the following: 1. Project Number and Name 2. Personnel name and classification typed or printed legibly 3. Time of departure from Consultant's facility 4. Time of arrival at City of Pearland project 5. Standby time, if any 6. Work requested and performed 7. Time of departure from City of Pearland project 8. Time of arrival at Consultant's facility 9. Overtime hours, if any 10. Signature of reviewing supervisor Testing & Reporting Field services shall be at the request of the City's Project Manager or his designee. Standard safety equipment will be required at all times on City projects. Results of tests that indicate a failure to meet specifications shall be transmitted immediately(telephone, fax, etc.)to the City. Construction materials engineering, testing and inspection reports shall be reviewed and signed by a licensed professional engineer. The engineer does not need to sign sample pick-up or project cancellation reports. All test results and inspection reports must be received by the city within 10 calendar days of the original test date. Report preparation, other than test reports, shall be billed as actual hours worked by the applicable laboratory personnel. Reproduction, except for six (6) copies of each test report, shall be reimbursed at cost. Personnel Rates All services on an hourly basis will be charged at the applicable rate, from the time the technician or City of Pearland, Schedule of fees Page 5 of 7 jlp 8/1/06 City of Pearland EXHIBIT A August 1, 2006 PSI Proposal No. 204-60015 rev. 1 inspector leaves the laboratory until he or she returns from the assignment. Hourly personnel overtime rates will be charged for the hours worked over 40 hours from Sunday through Saturday. Hourly services shall be invoiced to the nearest 1/4 hour. Testing services requested by the city for which no rate is listed shall be negotiated and authorized in writing prior to implementation. Documentation for such testing, unless specifically called for in the Scope of Services of individual Work Authorizations, shall include a daily activity sheet signed by the City representative requesting the designated test. Subcontractor/Subconsultant Rates Upon approval by the City Project Manager, required tests which are beyond the capability and/or capacity of the Consultant may be subcontracted to a qualified laboratory. Reimbursement for such subcontracted testing shall be at cot and shall be supported by an itemized invoice from the subconsultant/subcontractor. First-tier subconsultants/subcontractors shall be bound by the fee schedule and the rates as stated therein. Personnel Certifications Only certified engineering technicians are allowed for concrete or asphalt testing (ACI-1 or HMA I or II). Non-certified technicians are allowed for other testing projects, with the approval of the City of Pearland Project Manager. Certified technicians shall be provided when specifically requested by the city and should carry their certification cards with them while on the project site. Field Testing & Inspection A minimum two (2) hours personnel time will be allowed for each site visit for observations or testing except for sample pick-ups. If a technician/inspector is assigned to more than one City of Pearland project in one day, his or her actual time on the projects will be charged, provided the total time exceeds two hours. A minimum of a 30 minute lunch must be taken for work days of eight (8) hours or more. Sample pick-ups will be performed as a part of a scheduled field trip, whenever possible. If a separate trip for the sample pick-up is required, only the actual personnel time will be paid. A non- certified technician rate will be paid for concrete sample pick-ups, with the exception of a full-time technician assigned to the project. The city, wherever possible, will notify the laboratory at least 24 hours in advance that field testing service are required. If a technician has departed for the site prior to receipt of a cancellation notice, a maximum of two (2) hours will be paid for scheduled site activities. Testing and sampling procedures conducted in the field, including the use of nuclear moisture/ density machines, shall not be paid separately but shall be considered as part of the applicable rate for field technician time. Surcharges, as noted in the fee schedule, will be added where applicable. Invoices & Documentation Invoices covering all current Work Authorizations and conforming to the requirements of Contract Article 7, "Invoicing and Payment", shall be submitted monthly for each Work Authorization. One full set of supporting documentation, acceptable to the City, shall accompany the invoice. Acceptable documentation shall include, but not be limited to, fully completed and signed: (1) daily project specific activity reports (DPAR), signed and accepted by the appropriate City representative, for all personnel time being billed; and (2)summary/affidavits for all laboratory tests being billed. All hours invoiced must be supported by copies of test reports and an original signed time sheet or City of Pearland, Schedule of fees Page 6 of 7 jlp 8/1/06 • City of Pearland EXHIBIT A August 1, 2006 PSI Proposal No. 204-60015 rev. 1 daily activity report sheets, signed by the project inspector,which contains the name and classification of the personnel. Invoices should be separated by individual project, with a weekly summary to explain any overtime paid. All claims for minimum call-out and premium time must have the DPAR showing that time signed by the appropriate City representative. Invoices without the proper documentation will be returned. Firms whose billings are more than 60 days in arrears will not be issued additional Work Authorizations until the billings are current. Reimbursable Expenses All reimbursable expenses shall have the prior approval of and be supported by documentation acceptable to the Project Manager. Non-reimbursable overhead expenses include telephone and fax charges (except long distance); local travel and vehicle expenses; preparation time for field trips; test report preparation, typing and reproduction; invoice preparation, reproduction and delivery; field and laboratory supervision; project proposal and set-up; equipment charges, except for those specifically authorized in writing by the City Project Manager; and any other costs or expenses not specifically included and/or addressed in this Fee Schedule. Rate Period All rates contained in this Fee Schedule shall remain firm for Work Authorizations issued within the term of the Contract, even if a Work Authorization issued during the term of the Contract extends past the original term of the Contract. The fees stated for laboratory tests are all-inclusive. No other charges shall be levied for personnel services and/or materials related to such testing, except as specifically noted in this Attachment. City of Pearland, Schedule of fees Page 7 of 7 jlp 8/1/06