HomeMy WebLinkAboutR2025-029 20250217RESOLUTION NO. R2025-29 A Resolution of the City Council of the City of Pearland, Texas, amending a Construction Manager at Risk contract (Barry Rose Water Reclamation Facility and Longwood Water Reclamation Facility Decommission Project Project) with McCarthy Building Companies; establishing a Guaranteed Maximum Price 2 (GMP 2) in the amount of $126,643,050.00. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That the City Council hereby amends a Construction Manager at Risk contract with McCarthy Building Companies; establishing a GMP 2 in the amount of $126,643,050.00. Section 2. The City Manager or his designee is hereby authorized to execute an amended Construction Manager at Risk contract for the Barry Rose Water Reclamation Facility Project. PASSED, APPROVED and ADOPTED this the 17th day of February, A.D., 2025. ________________________________ J.KEVIN COLE MAYOR ATTEST: ________________________________ FRANCES AGUILAR, TRMC, MMC CITY SECRETARY APPROVED AS TO FORM: ________________________________ DARRIN M. COKER CITY ATTORNEY Docusign Envelope ID: E1C19543-6D0C-4144-8E4A-FEBB0296B71D Docusign Envelope ID: B5C9BD1B-940B-4639-AB88-BD04B7A1561F2/18/2025 | 10:15 AM CST GMP 2 - Detail Cost Summary Work Category Description GMP Total 2-01A Longwood Package 5,211,633 $ 2-01B Solids Handling 10,155,000 $ 2-01C Liquids Side (Process, Structural, Earthwork, Misc. Metals) 40,821,300 $ 2-02A Landscaping 1,052,281 $ 2-02C Site Precast Fencing 765,770 $ 2-02D Chain Link Fencing (Barry Rose) 105,610 $ 2-02E Paving (Barry Rose) 1,895,994 $ 2-03A Sunken Caisson (Barry Rose site) 2,767,701 $ 2-04A Masonry 507,805$ 2-05A Structural Steel 135,578$ 2-06A Interior Architectural Woodwork & Stone 45,721 $ 2-07A/C Waterproofing & Joint Sealants 142,896 $ 2-07B Roofing 140,047$ 2-08A Doors and Frames 345,204 $ 2-08B Overhead Doors 22,268$ 2-08C Windows and Glazing 60,673 $ 2-09A Plaster and Gypsum Board/Acoustical Ceiling 261,580 $ 2-09B Tiling/Flooring 32,997$ 2-09C Architectural Paintings & Resinous Flooring 50,886 $ 2-09D Protective Coatings 353,053 $ 2-09E Concrete Protective Coatings 740,021 $ 2-10A Division 10 Specialties 15,263 $ 2-10B Lab Equipment (Appliances Only) 8,838 $ 2-11A/14A Pre-Engineered Metal Building & Hoist 1,089,840 $ 2-15A HVAC 3,280,106$ 2-15B Plumbing (Allowance) 250,000 $ 2-16A Electrical 22,503,705$ 2-16B Instrumentation & Control 2,233,026 $ 2-46A Odor Control Equipment 579,458 $ 2-46B Re-Aeration System Diffusers 89,336 $ General Requirements 5,482,047 $ General Conditions 10,321,205$ Insurance and Bonds 3,307,392$ Allowances 1,316,831$ CMAR Contingency 3,383,510$ Construction Fee 7,168,475$ Total 126,643,050$ Docusign Envelope ID: B5C9BD1B-940B-4639-AB88-BD04B7A1561F Project Executive Summary GMP 2 Balance of Plant Package: $126,643,050.00 The Barry Rose WRF Replacement and Expansion and Longwood WRF Decommissioning Project- Guaranteed Maximum Price (GMP 2) Proposal is based on the scope of work associated with the new construction of various process and ancillary structures at the Barry Rose WRF located at 1975 Pearland Pkwy, a new pump station and ancillary structures at the Longwood WRF located at 2727 Dixie Farm Rd, and the required modifications to both existing facilities required to tie-in and divert flow, as outlined in the following documents: 1. City of Pearland, Texas, Barry Rose WRF Replacement, Expansion and Longwood WRF Decommissioning Balance of Plant (BOP) IFB (GMP 2) Submittal Drawings, Project No. PRL23245, June 7, 2024. Prepared by Freese and Nichols, Inc. 2. City of Pearland, Texas, Project Manual for Barry Rose WRF Replacement, Expansion and Longwood WRF Decommissioning Balance of Plant (BOP) IFB (GMP 2), Volume 1&2, June 7, 2024. Prepared by Freese and Nichols, Inc. 3. Addendum No. 1 – GMP 2, Dated: Sept. 5, 2024, Addendum No. 2 – GMP 2, Dated Sept. 18, 2024, Addendum No. 3 – GMP 2, Dated Sept.23, 2024, Addendum No. 4 – GMP 2, Dated Sept. 30, 2024, Addendum No. 5 – GMP 2, Dated Oct. 11, 2024. General Description of the work: (refer to listed Work Categories above) 1. Barry Rose WRF – new administration building and process structures including influent lift station, headworks, splitter box, SBR blower, ASHT and dewatering, odor control, filters, NPW and UV. Includes yard piping, paving, landscaping, fencing, and ancillary structures. 2. Longwood Lift Station – new pump station including associated yard piping, paving, fencing, and ancillary structures. Work category bid package documents were publicly advertised on August 28, 2024, September 4, 2024, and September 11, 2024. Bidders submitted both pricing and qualifications to comply with the best value selection criteria. McCarthy held pre-bid meetings with all interested subcontractors and vendors on September 04, 2024 and on September 11, 2024, and reviewed the bid package contents and requirements. Bid proposals for Work categories 2-01A through 2-46B were received from bidders on Oct. 17, 2024. Bids were submitted via the City of Pearland E-Bids account and were opened privately as part of the best value selection process. Docusign Envelope ID: B5C9BD1B-940B-4639-AB88-BD04B7A1561F #Activity IDActivity NameOriginalDurationStartFinish1Barry Rose WRF Expansion FIELD Reflection 2024-12 UPDATEBarry Rose WRF Expansion FIELD Reflection 2024-12 UPDATE285301-Apr-20 A01-Apr-282Summary & Key MilestonesSummary & Key Milestones212111-Aug-20 A01-Apr-283KM-1050Issue CMAR Precon N.T.P011-Aug-20 A4KM-1000City Council Approval - Designer020-Feb-23 A5KM-1170Issue N.T.P 1 (Early Works)012-Jul-24 A6KM-1100Design Development (Calendar Days)36920-Feb-23 A04-Feb-257KM-1125Issue N.T.P 2 (BRWRF B.O.P & LW Lift Station)026-Feb-258KM-1135Issue N.T.P 3 (FM)024-Sep-259KM-1300BRWRF Project S/C005-Aug-27*10SUM-DUR-1000Construction Duration (Calendar Days)109012-Jul-24 A05-Aug-2711KM-1400Overall Project Complete001-Apr-28*12SUM-DUR-1010BRWRF Startup & Demo Existing Plant (Cal. Days)24006-Aug-2701-Apr-2813SUM-1090Overall Project Duration (Calendar Days)276111-Aug-20 A01-Apr-2814BP 01 (LLE;SW & Deep Foundation)BP 01 (LLE;SW & Deep Foundation)13807-Dec-23 A24-Jun-24 A15BP 02 (B.O. BRWRF & LW LS)BP 02 (B.O. BRWRF & LW LS)13617-Jun-24 A24-Feb-2516BP 03 (F.M)BP 03 (F.M)10321-Mar-2522-Sep-2517Milestones & SummaryMilestones & Summary34429-Aug-23 A10-Oct-2518Pre-ConstructionPre-Construction165301-Apr-20 A06-Apr-2719Designer SelectionDesigner Selection73201-Apr-20 A17-Feb-23 A20Design ScheduleDesign Schedule65118-Nov-22 A11-Sep-2521ScopingScoping6618-Nov-22 A20-Feb-23 A22Design PhaseDesign Phase59020-Feb-23 A11-Sep-2523Special ServicesSpecial Services53203-Mar-23 A30-May-2524Bid Phase ServicesBid Phase Services41915-Jan-24 A21-Aug-2525PermittingPermitting86402-May-23 A06-Apr-2726VDC CoordinationVDC Coordination16826-Jul-24 A25-Mar-2527Procurement & Cost ModelProcurement & Cost Model63321-Aug-23 A22-Oct-2628Cost Modelling & GMPCost Modelling & GMP40521-Aug-23 A22-Sep-2529Cost ModellingCost Modelling9921-Aug-23 A05-Apr-24 A30GMP 1 - Early Works (Procress Mech; Electrical; Civil & Concrete)GMP 1 - Early Works (Procress Mech; Electrical; Civil & Concrete)13807-Dec-23 A24-Jun-24 A31GMP 2 - BR WRF B.O.PGMP 2 - BR WRF B.O.P14618-Jun-24 A24-Feb-2532GMP 3 - Force MainGMP 3 - Force Main10519-Mar-2522-Sep-2533AdministrationAdministration29230-May-24 A21-Oct-2534ProcurementProcurement48401-Jul-24 A22-Oct-2635GMP 1GMP 145901-Jul-24 A09-Sep-2636GMP 2GMP 234726-Feb-2522-Oct-2637GMP 3GMP 319022-Oct-2517-Sep-2638Schedule ImpactsSchedule Impacts27026-Feb-24 A30-May-2539FR 01 - Texas Historical CommissionFR 01 - Texas Historical Commission7726-Feb-24 A17-May-24 A40FR 02 - Force Main Land EasementsFR 02 - Force Main Land Easements5921-Feb-2530-May-2541CONSTRUCTIONCONSTRUCTION119410-Nov-22 A01-Apr-2842Enabling WorkEnabling Work13610-Nov-22 A09-Jun-23 A43BRWRFBRWRF70712-Jul-24 A29-Nov-2744GMP 1GMP 170412-Jul-24 A22-Nov-2745SITESITE70412-Jul-24 A22-Nov-2746General Requirements & Early WorksGeneral Requirements & Early Works25512-Jul-24 A14-Jul-2547Earthwork & GradingEarthwork & Grading52108-Aug-24 A24-Aug-2648Detention PondDetention Pond52120-Aug-24 A31-Aug-266789101112131415161718192021222324252627282930313233343536373839404142434445464748DecJanFMAprMJJulASOctNDJanFMAprMJJulASOctNDJanFMAprMJJulASOctNDJanFMAprMJ2025202620272028Issue N.T.P 1 (Early Works)Design Development (Calendar Days)Issue N.T.P 2 (BRWRF B.O.P & LW Lift Station)Issue N.T.P 3 (FM)BRWRF Project S/CConstruction Duration (Calendar Days)Overall Project CompleteBRWRF Startup & Demo Existing Plant (Cal. Days)Overall Project Duration (Calendar Days)Run Date - 23-Jan-25 Data Date - 07-Jan-25 Project ID - 4774 GMP2 R2Remaining Level of EffortActual Level of EffortActual WorkRemaining WorkCritical Remaining WorkMilestoneBarry Rose WRF Expansion - Summary Schedule @ GMP2 1 of 2 Docusign Envelope ID: B5C9BD1B-940B-4639-AB88-BD04B7A1561F #Activity IDActivity NameOriginalDurationStartFinish49Yard PipingYard Piping11229-Jan-2507-Jul-2550Utilities & Drain LineUtilities & Drain Line64816-Oct-24 A22-Nov-2751CloseoutCloseout408-Jul-2511-Jul-2552006 - SBR Structure006 - SBR Structure24526-Sep-24 A09-Sep-2553Earthwork & SubstructureEarthwork & Substructure10426-Sep-24 A19-Feb-2554StructuralStructural16909-Dec-24 A11-Aug-2555Leak TestingLeak Testing2012-Aug-2509-Sep-2556WeatherWeather25024-Jul-24 A10-Oct-2557GMP 2GMP 257726-Feb-2529-Nov-2758SITESITE57726-Feb-2529-Nov-2759General Requirements & Early WorkGeneral Requirements & Early Work55426-Feb-2518-Oct-2760Yard PipingYard Piping55728-Mar-2529-Nov-2761Site ElectricalSite Electrical25722-Aug-2516-Nov-2662Site RoadsSite Roads11622-Jan-2705-Aug-2763CWA 1CWA 144014-Apr-2517-May-2764Influent Junction BoxInfluent Junction Box15916-Dec-2515-Sep-2665Lift Station (BR)Lift Station (BR)35622-Apr-2508-Jan-2766HeadworksHeadworks40817-Apr-2529-Mar-2767Odor ControlOdor Control13416-Jun-2609-Feb-2768Elect. Pad 1 (MVSG 1/2 / TRNF1)Elect. Pad 1 (MVSG 1/2 / TRNF1)12305-May-2614-Dec-2669Influent Electrical BuildingInfluent Electrical Building11829-May-2624-Dec-2670Generator Pad (G1-G2)Generator Pad (G1-G2)9922-Jun-2615-Dec-2671FiltersFilters35114-Apr-2522-Dec-2672UVUV31524-Nov-2517-May-2773NPW & ChemicalNPW & Chemical20402-Feb-2621-Jan-2774Transformer Pad 2 (TRNF-2)Transformer Pad 2 (TRNF-2)10312-Jun-2614-Dec-2675CWA 2CWA 238608-Jul-2506-May-2776Splitter BoxSplitter Box9802-Apr-2622-Sep-2677Sequencing Batch ReactorSequencing Batch Reactor38215-Jul-2506-May-2778SBR Blower BuildingSBR Blower Building30308-Jul-2522-Dec-2679Transformer Pad 3 (TRNF-3)Transformer Pad 3 (TRNF-3)3404-Sep-2603-Nov-2680Transformer Pad 4 (TRNF-4)Transformer Pad 4 (TRNF-4)3421-Sep-2617-Nov-2681Generators 3,4 & ESB2 PadGenerators 3,4 & ESB2 Pad5113-Oct-2611-Jan-2782Admin BldgAdmin Bldg18111-Jun-2619-Apr-2783CWA 3CWA 331310-Oct-2501-Apr-2784Generator Pad 3 (G5 & G6)Generator Pad 3 (G5 & G6)4730-Oct-2621-Jan-2785Transformer Pad 4 (TRNF-5)Transformer Pad 4 (TRNF-5)2702-Oct-2617-Nov-2686Aerated Sludge Holding Tank (ASHT) 150x125Aerated Sludge Holding Tank (ASHT) 150x12529910-Oct-2511-Mar-2787ASHT BLOWER BUILDINGASHT BLOWER BUILDING16129-Jun-2601-Apr-2788DEWATERING BUILDINGDEWATERING BUILDING23027-Feb-2630-Mar-2789Longwood WRFLongwood WRF47429-Apr-2505-Aug-2790Force MainForce Main29622-Oct-2518-Mar-2791Startup & CxingStartup & Cxing8418-May-2718-Oct-2792BRWRFBRWRF8418-May-2718-Oct-2793Longwood Lift StationLongwood Lift Station2006-Aug-2702-Sep-2794DemolitionDemolition9719-Oct-2701-Apr-2895BRWRFBRWRF9719-Oct-2701-Apr-2896Longwood Lift StationLongwood Lift Station8804-Nov-2731-Mar-286789101112131415161718192021222324252627282930313233343536373839404142434445464748DecJanFMAprMJJulASOctNDJanFMAprMJJulASOctNDJanFMAprMJJulASOctNDJanFMAprMJ2025202620272028Run Date - 23-Jan-25 Data Date - 07-Jan-25 Project ID - 4774 GMP2 R2Remaining Level of EffortActual Level of EffortActual WorkRemaining WorkCritical Remaining WorkMilestoneBarry Rose WRF Expansion - Summary Schedule @ GMP2 2 of 2 Docusign Envelope ID: B5C9BD1B-940B-4639-AB88-BD04B7A1561F