Loading...
R2024-070 2024-04-22RESOLUTION NO. R2024-70 A Resolution of the City Council of the City of Pearland, Texas, authorizing a contract with Bowman Engineering & Consulting, Inc., for professional services associated with the Longwood Park Drainage Improvement Project, in the estimated amount of $516,326.69. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain contract for professional services associated with the Longwood Park Drainage Improvement Project, a copy of which is attached hereto as Exhibit “A” and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a contract for professional services associated with Longwood Park Drainage Improvement Project. PASSED, APPROVED and ADOPTED this the 22nd day of April, A.D., 2024. ________________________________ J.KEVIN COLE MAYOR ATTEST: ________________________________ FRANCES AGUILAR, TRMC, MMC CITY SECRETARY APPROVED AS TO FORM: ________________________________ DARRIN M. COKER CITY ATTORNEY DocuSign Envelope ID: F25E1A52-F3F8-41AE-893A-162395EB8E28 Design 1 of 7 D2. Revised 04/2019 CONTRACT FOR PROFESSIONAL SERVICES THIS CONTRACT is entered into upon final execution by and between the City of Pearland ("CITY") and Bowman Engineering & Consulting, Inc. ("CONSULTANT"). The CITY engages the CONSULTANT to perform professional services for a project known and described as Longwood Park (Roadside Ditch and Culvert) Drainage Improvement ("PROJECT"). (Project #DR2306 Contract # ) SECTION I - SERVICES OF THE CONSULTANT The CONSULTANT shall perform the following professional services to CITY standards and in accordance with the degree of care and skill that a professional in Texas would exercise under the same or similar circumstances: A.The CONSULTANT shall render the following professional engineering services: Basic design services, bid phase services, construction phase services. See Exhibit A, attached, for a detailed SCOPE OF WORK and PROJECT schedule. The PROJECT schedule shall be submitted in digital and hard copy form in the Microsoft Project for Windows format. B.The CONSULTANT shall prepare and submit a detailed opinion of estimated cost of the PROJECT. C.The CONSULTANT acknowledges that the CITY (through its employee handbook) considers the following to be misconduct that is grounds for termination of a CITY employee: Any fraud, forgery, misappropriation of funds, receiving payment for services not performed or for hours not worked, mishandling or untruthful reporting of money transactions, destruction of assets, embezzlement, accepting materials of value from vendors, or consultants, and/or collecting reimbursement of expenses made for the benefit of the CITY. The CONSULTANT agrees that it will not, directly or indirectly; encourage a CITY employee to engage in such misconduct. D.The CONSULTANT shall submit all final construction documents in both hard copy and electronic format. Plans shall be AutoCAD compatible and all other documents shall be Microsoft Office compatible. The software version used shall be compatible to current CITY standards. Other support documents, for example, structural calculations, drainage reports and geotechnical reports, shall be submitted in hard copy only. All Record Drawings electronic files shall be submitted to the CITY in TIF format. E.The CONSULTANT recognizes that all drawings, special provisions, field survey notes, reports, estimates and any and all other documents or work product generated by the CONSULTANT under the CONTRACT shall be delivered to the CITY upon request, shall become subject to the Open Records Laws of this State. Exhibit A DocuSign Envelope ID: 2DF05F5D-2C1B-4510-8B8E-E9556A0CFBF4 Design 2 of 7 D2 Revised 04/2019 F.The CONSULTANT shall procure and maintain for the duration of this Agreement, insurance against claims for injuries to persons, damages to property, or any errors and omissions relating to the performance of any work by the CONSULTANT, its agents, employees or subcontractors under this Agreement, as follows: (1)Workers’ Compensation as required by law. (2)Professional Liability Insurance in an amount not less than $1,000,000 in the aggregate. (3)Comprehensive General Liability and Property Damage Insurance with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for each occurrence of damage to or destruction of property. (4)Comprehensive Automobile and Truck Liability Insurance covering owned, hired, and non-owned vehicles, with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for property damage. The CONSULTANT shall include the CITY as an additional insured under the policies, with the exception of the Professional Liability Insurance and Workers’ Compensation. The CONSULTANT shall agree to waive its Right to Subrogation. Certificates of Insurance and endorsements shall be furnished to the CITY before work commences. Each insurance policy shall be endorsed to state that coverage shall not be suspended, voided, canceled, and/or reduced in coverage or in limits (“Change in Coverage”) except with prior written consent of the CITY and only after the CITY has been provided with written notice of such Change in Coverage, such notice to be sent to the CITY either by hand delivery to the City Manager or by certified mail, return receipt requested, and received by the City no fewer than thirty (30) days prior to the effective date of such Change in Coverage. Prior to commencing services under this CONTRACT, CONSULTANT shall furnish CITY with Certificates of Insurance, or formal endorsements as required by this CONTRACT, issued by CONSULTANT’S insurer(s), as evidence that policies providing the required coverage, conditions, and limits required by this CONTRACT are in full force and effect. G.The CONSULTANT shall indemnify and hold the CITY, its officers, agents, and employees, harmless from any claim, loss, damage, suit, and liability of every kind for which CONSULTANT is legally liable, including all expenses of litigation, court costs, and attorney's fees, for injury to or death of any person, for damage to any property, or errors in design, any of which are caused by the negligent act or omission of the CONSULTANT, his officers, employees, agents, or subcontractors under this CONTRACT. H.All parties intend that the CONSULTANT, in performing services pursuant to this CONTRACT, shall act as an independent contractor and shall have control of its DocuSign Envelope ID: 2DF05F5D-2C1B-4510-8B8E-E9556A0CFBF4 Design 3 of 7 D2 Revised 04/2019 own work and the manner in which it is performed. The CONSULTANT is not to be considered an agent or employee of the CITY. SECTION II - PERIOD OF SERVICE This CONTRACT will be binding upon execution and end October 9, 2025. SECTION III - CONSULTANT'S COMPENSATION A.The total compensation for the services performed shall not exceed the total noted in Section B. B.The CITY shall pay the CONSULTANT in installments based upon monthly progress reports and detailed invoices submitted by the CONSULTANT based upon the following: 1.Basic Services (Not to Exceed)$420,097.86 2.Additional Services shall require independent and specific authorization and shall be billed as (Not to Exceed):$6,050.00 3.Bid Phase Services (Hourly Not to Exceed)$16,157.79 4.Construction Phase Services (Hourly Not to Exceed)$74,021.04 5.Reimbursable Expenses (Not to Exceed)$0.00 6.Total:$516,326.69 C.The CITY shall make payments to the CONSULTANT within thirty (30) days after receipt and approval of a detailed invoice. Invoices shall be submitted on a monthly basis. D.CONSULTANT shall invoice for work performed during the preceding thirty day period (“Billing Period”). The Billing Period shall run from the 26th day to the 25th day of each consecutive month. Invoices shall be submitted to CITY not more frequently than once every 30 days. CONSULTANT shall be responsible for timely submittal of all invoices and CONSULTANT shall not be entitled to payment for invoices in arrears. All invoices shall reflect most recent single Billing Period only and represent the true, correct and accurate account of work performed during the Billing Period. E.For an agreed contract amount identified as “Lump Sum”, Not to Exceed” and “Reimbursable” the CONSULTANT shall not exceed the fixed contractual amount without written authorization in the form of a Contract Amendment. CONSULTANT shall provide 45 days prior notice to the CITY in the event contract DocuSign Envelope ID: 2DF05F5D-2C1B-4510-8B8E-E9556A0CFBF4 Design 4 of 7 D2 Revised 04/2019 fees may exceed the fixed contract amount. CONSULTANT shall be responsible for ensuring that such authorization is complete and executed by all parties performing any work or submitting any invoices for work that exceeds the fixed contract amount under any expense category. F.Allowable Reimbursable Expenses CONSULTANT shall identify and include in the proposal any anticipated Reimbursable Expenses, and shall itemize Reimbursable Expenses by work category. Reimbursable Expenses shall be invoiced AT COST without subsequent markup by the CONSULTANT. All invoices containing a request for Reimbursable Expenses shall include copies of the original expense receipts itemized per the allowable category. Allowable Reimbursable Expenses include: •Hard copy reproductions, copies and/ or binding costs •Postage •Mileage, for travel from Consultant’s local office (within a 25 mile radius) to meetings at the City or job-site. Mileage shall be charged at the current IRS rates. •Travel expenses, mileage from local office to State or federal regulatory agency office beyond 100 miles. •Lodging expenses, for destinations beyond 100 miles from the Consultant’s local office AND when business hours exceed eight hours within one business day OR requires more than one eight hour day. F.2.Disallowed Expenses Disallowed Expenses include travel expenses for professional expertise traveling into the greater Houston area from Consultant offices outside of the greater Houston area. SECTION IV - THE CITY'S RESPONSIBILITIES A.The CITY shall designate a project manager during the term of this CONTRACT. The project manager has the authority to administer this CONTRACT and shall monitor compliance with all terms and conditions stated herein. All requests for information from or a decision by the CITY on any aspect of the work shall be directed to the project manager. B.The CITY shall review submittals by the CONSULTANT and provide prompt response to questions and rendering of decisions pertaining thereto, to minimize delay in the progress of the CONSULTANT'S work. The CITY will keep the CONSULTANT advised concerning the progress of the CITY'S review of the work. The CONSULTANT agrees that the CITY'S inspection, review, acceptance or approval of CONSULTANT'S work shall not relieve CONSULTANT'S DocuSign Envelope ID: 2DF05F5D-2C1B-4510-8B8E-E9556A0CFBF4 Design 5 of 7 D2 Revised 04/2019 responsibility for errors or omissions of the CONSULTANT or its sub- consultant(s) or in any way affect the CONSULTANT’S status as an independent contractor of the CITY. SECTION V - TERMINATION A.The CITY, at its sole discretion, may terminate this CONTRACT for any reason -- with or without cause -- by delivering written notice to CONSULTANT personally or by certified mail at 7322 Southwest Freeway, Suite #806 Houston, TX 77074. Immediately after receiving such written notice, the CONSULTANT shall discontinue providing the services under this CONTRACT. B.If this CONTRACT is terminated, CONSULTANT shall deliver to the CITY all drawings, special provisions, field survey notes, reports, estimates and any and all other documents or work product generated by the CONSULTANT under the CONTRACT, entirely or partially completed, together with all unused materials supplied by the CITY on or before the 15th day following termination of the CONTRACT. C.In the event of such termination, the CONSULTANT shall be paid for services performed prior to receipt of the written notice of termination. The CITY shall make final payment within sixty (60) days after the CONSULTANT has delivered to the CITY a detailed invoice for services rendered and the documents or work product generated by the CONSULTANT under the CONTRACT. D.If the remuneration scheduled under this contract is based upon a fixed fee or definitely ascertainable sum, the portion of such sum payable shall be proportionate to the percentage of services completed by the CONSULTANT based upon the scope of work. E.In the event this CONTRACT is terminated, the CITY shall have the option of completing the work, or entering into a CONTRACT with another party for the completion of the work. DocuSign Envelope ID: 2DF05F5D-2C1B-4510-8B8E-E9556A0CFBF4 Design 6 of 7 D2 Revised 04/2019 F.If the CITY terminates this CONTRACT for cause and/or if the CONSULTANT breaches any provision of this CONTRACT, then the CITY shall have all rights and remedies in law and/or equity against CONSULTANT. Venue for any action or dispute arising out of or relating to this CONTRACT shall be in Brazoria County, Texas. The laws of the State of Texas shall govern the terms of this CONTRACT. The prevailing party in the action shall be entitled to recover its actual damages with interest, attorney’s fees, costs and expenses incurred in connection with the dispute and/or action. CONSULTANT and CITY desire an expeditious means to resolve any disputes that may arise between under this CONTRACT. To accomplish this, the parties agree to mediation as follows: If a dispute arises out of or relates to this CONTRACT, or the breach thereof, and if the dispute cannot be settled through negotiation, then the parties agree first to try in good faith, and before pursuing any legal remedies, to settle the dispute by mediation of a third party who will be selected by agreement of the parties. SECTION VI – ENTIRE AGREEMENT This CONTRACT represents the entire agreement between the CITY and the CONSULTANT and supersedes all prior negotiations, representations, or contracts, either written or oral. This CONTRACT may be amended only by written instrument signed by both parties. SECTION VII – COVENANT AGAINST CONTINGENT FEES The CONSULTANT affirms that he has not employed or retained any company or person, other than a bona fide employee working for the CONSULTANT to solicit or secure this CONTRACT, and that he has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage brokerage fee, gift, or any other consideration, contingent upon or resulting from the award or making of the CONTRACT. For breach or violation of this clause, the CITY may terminate this CONTRACT without liability, and in its discretion, may deduct from the CONTRACT price or consideration, or otherwise recover, the full amount of such fee, commission, percentage brokerage fee, gift, or contingent fee that has been paid. SECTION VIII- SUCCESSORS AND ASSIGNS This CONTRACT shall not be assignable except upon the written consent of the parties hereto. ____________________________ CITY OF PEARLAND, TEXAS DATE ____________________________ CONSULTANT DATE 04/02/2024 DocuSign Envelope ID: 2DF05F5D-2C1B-4510-8B8E-E9556A0CFBF4 4/23/2024 | 1:44 PM CDT Design 7 of 7 D2 Revised 04/2019 House Bill 89 Verification I, ______________________________________ (Person name), the undersigned representative (hereafter referred to as “Representative”) of ______________________ __________________________________________________________ (company or business name, hereafter referred to as “Business Entity”), being an adult over the age of eighteen (18) years of age, after being duly sworn by the undersigned notary, do hereby depose and affirm the following: 1.That Representative is authorized to execute this verification on behalf of Business Entity; 2.That Business Entity does not boycott Israel and will not boycott Israel during the term of any contract that will be entered into between Business Entity and the City of Pearland; and 3.That Representative understands that the term “boycott Israel” is defined by Texas Government Code Section 2270.001 to mean refusing to deal with, terminating business activities with, or otherwise taking any action that is intended to penalize, inflict economic harm on, or limit commercial relations specifically with Israel, or with a person or entity doing business in Israel or in an Israeli-controlled territory, but does not include an action made for ordinary business purposes. _____________________________________ SIGNATURE OF REPRESENTATIVE SUBSCRIBED AND SWORN TO BEFORE ME, the undersigned authority, on this _____ day of ____________________, 20___. ___________________________________________ Notary Public DocuSign Envelope ID: 2DF05F5D-2C1B-4510-8B8E-E9556A0CFBF4 7 1 3 7 7 9 2 9 9 0 phone | 7 3 2 2 S o u t h w e s t F r e e w a y , S u i t e 8 0 6 , H o u s t o n , T X 7 7 0 7 4 www.bec-inc.com February 27, 2024 City of Pearland Mr. Lap Trinh Senior Project Manager | Engineering & Public Works 2016 Old Alvin Road Pearland, Texas 77581 RE: Professional Engineering Services Proposal for the City of Pearland’s 2024 Bond Drainage Project - Longwood Park (Roadside Ditch and Culvert) Drainage Improvements (DR2306), Pearland, Texas Dear Mr. Trinh, Bowman Engineering & Consulting, Inc. (BEC) is pleased to present our proposal to perform Professional Engineering Services concerning Drainage Improvements for Longwood Park Subdivision, Pearland, Texas. SCOPE OF WORK The object of the project is to improve the drainage system in the Longwood Park Subdivision by implementing the recommendations contained in Alternative 1 of the Drainage and Sheet Flow Analysis prepared by HT&J, LLC, issued in August 2022. The proposed Scope of Services will include the following: Preliminary Design Phase & Data Collection 1. Attend Design Kick-off meeting with City to review City’s objectives a. Refine, define, and agree on project scope and limits 2. Review adjacent projects, current and future, to identify any interplay or impact to or from subject project a. Identify any requirements stemming from this relationship if it exists 3. Identify existing data sources and resources currently held by the City and make arrangements to obtain this information 4. Identify any gaps in this data and make arrangements to supplement through other sources, specifically: a. Surveys b. Geotechnical c. H&H d. Environmental 5. Prepare and submit for review of 30% plan and proposed specifications based on the Preliminary Engineering Report provided by the City of Pearland, but not limited to: a. Calculate the percent impervious/ discharge coefficients b. Calculate time of concentrations c. Develop flow rates for each system within the study area d. Develop starting collection system flow line elevations and tailwater elevations e. Compile top of pavement and curb elevations and determine inlet sizes and storm sewer pipe sizes Final Design Phase Services 6. Incorporate review comments and revisions into preparation of 60% and eventually 90% plans and Spec’s including, but not limited to: DocuSign Envelope ID: 2DF05F5D-2C1B-4510-8B8E-E9556A0CFBF4 February 27, 2024 City of Pearland Longwood Park Proposal Page 2 a. Calculate hydraulic grade lines within the system for the 2 year event (50%) and design for the 100 yr (1%) event with overland flow b. Prepare trunk and branch line system plan and profiles for pipe and associated ditches c. Identify utility conflicts with private and other public utilities, submit plans to all affected entities and organize and chair a Utility Relocation Conference to coordinate relocation schedule and efforts d. Identify, plan for and incorporate revisions and upgrades to existing infrastructure associated with and made necessary or in conjunction with drainage objectives and work including asphalt resurfacing of existing streets affected by this project. Coordinate the work of this project with that of adjacent present and future projects e. Complete designs incorporating City’s review comments at 60% and 90% including update of construction cost estimate f. Submit plans to Private Utilities and Drainage Districts for signatures g. Fully develop engineer’s construction cost estimate for each item of work including plan quantities h. prepare bid sheet identifying each item and its planned quantity and include supplemental work items Bid Phase Services 7. Bidding Phase a. Provide Notice to Bidders (NTB) to the Project Manager in an electronic form appropriate for the City’s e-bid system format. City is responsible for advertising. b. Attend pre-bid meeting c. Respond in writing to questions from bidders and prepare addenda as necessary. d. Assist with design of Bid Proposal* e. Prepare Engineer’s Recommendation of Award Letter that includes the following required content: i. Check for math errors and reconcile any mathematical discrepancies ii. Review for unbalance bid items iii. Certified Bid Tabulation including Engineer’s estimate iv. Review of contractor’s financial standing and references provided v. Explanation of discrepancies between the Engineer’s estimate and bids vi. Recommendation to award 8. Attend City Council meeting and recommendation for award of Contract for Construction. 9. Produce and transmit to selected contractor five (5) sets of project manuals ready for execution with City’s Notice of Intent to Award (NOI) Construction Phase Services 10. Construction Administration a. Attend pre-construction meeting to provide information & answer questions b. Attend monthly progress meetings with Construction Manager, Contractor & City of Pearland as needed c. Review/approve & comment on Contractor’s submittals, RFIs, Contractor Proposals, Request for Change Orders (RCO) including coordination with Construction Manager on Proposals & Change Orders. d. Provide interpretive guidance for Contractor, Construction Manager in resolution of problems e. Conduct Substantial Completion Inspection with CM or PM to: i. review progress of work for Substantial Completion walk through ii. generate a punch list of items for correction DocuSign Envelope ID: 2DF05F5D-2C1B-4510-8B8E-E9556A0CFBF4 February 27, 2024 City of Pearland Longwood Park Proposal Page 3 *This is the use of bid strategies to attain lowest possible prices for work, use of alternatives, etc. Construction Phase Services iii. substantiate items that are completed iv. issue both Certificate of Substantial Completion (signed/sealed from Design Engineer) & Final Acceptance or 2nd walk through f. Issue Final Completion & Acceptance letter to City recommending acceptance & release of final payment g. Coordinate contractors, CM/CI to provide complete record of As-Built Drawings, including GIS files and CAD files h. Within thirty (30) days after receipt of As-Builts from the contractor to the CM, the project engineer shall provide to the City one (1) set of full size reproducible record drawings, an electronic file copy (PDF format) and an AutoCAD file (.dwg), or compatible .dxf file Information to be provided by City of Pearland:  Record Drawings showing the original design of the subdivision roads and drainage ditches  Hydrologic and Hydraulic (H&H) models from previous studies All work will be done in accordance with the City of Pearland Engineering Design Criteria Manual and the Brazoria Drainage District No. 4 (BDD4) Rules, Regulations, & Guidelines. PROJECT SCHEDULE BEC is prepared to begin work immediately following your Authorization to Proceed and will provide a detailed design schedule within 10 days following the Authorization to Proceed. ESTIMATED CONSTRUCTION COST BEC will prepare an updated Construction Cost Estimate at the 30%, 60%, and 90% completion levels. PROFESSIONAL SERVICES FEE We propose to accomplish the work described above for a lump sum fee of $516,326.69. The breakdown of the engineering services fee is shown in the attached Level of Effort. Thank you for giving us the opportunity to submit this proposal. We look forward to assisting you with this important project. If you have questions or require additional information, please contact me. Sincerely, Bowman Engineering & Consulting Inc. Willie V. Brown, PE, ENV SP Senior Project Manager Attachment: Level of Effort DocuSign Envelope ID: 2DF05F5D-2C1B-4510-8B8E-E9556A0CFBF4 City of Pearland Longwood Park Drainage Improvements LEVEL OF EFFORT (LOE) FEE ESTIMATE Date: 01/23/2024 Revision: 02/27/2024 BILLABLE HOURLY RATE $231.75 $183.60 $157.56 $133.71 $132.39 $131.67 PRELIMINARY DESIGN PHASE AND DATA COLLECTION 1.- 3 3 - - - 6 1,023.48$ 2. - 2 8 16 - 26 3,767.04$ 3. - 2 4 16 - 2 24 3,400.14$ 4. - 2 4 8 - - 14 2,067.12$ a.- - - - - - 0 114,642.00$ b.- - - - - - 0 24,032.00$ c.- - - - - - 0 19,512.00$ d.- - - - - - 0 4,000.00$ 5. - 48 120 240 360 40 808 112,737.60$ Subtotal Hours - 57 139 280 360 42 878 Subtotal Preliminary Design Phase & Data Collection -$ 10,465.20$ 21,900.84$ 37,438.80$ 47,660.40$ 5,530.14$ 285,181.38$ FINAL DESIGN PHASE SERVICES 6. - 120 180 240 288 40 868 125,878.32$ a. - 2 2 8 - 8 20 2,805.36$ b. - 2 4 8 - 12 26 3,647.16$ c. - 2 4 4 - 8 18 2,585.64$ Subtotal Hours - 126 190 260 288 68 932 Subtotal Design Phase Services -$ 23,133.60$ 29,936.40$ 34,764.60$ 38,128.32$ 8,953.56$ 134,916.48$ FINAL DESIGN ADDITIONAL SERVICES Reproduction Services (B&E)6,050.00$ Subtotal Hours Subtotal Final Design Additional Services -$ -$ 6,050.00$ Attend Design Kick-off meeting with City Review adjacent projects, current and future, to identify any interplay or impact to or from subject project Identify existing data sources and resources currently held by the City and make arrangements to obtain this information Identify any gaps in this data and make arrangements to supplement through other sources, including the following: Admin / Clerical Total Hours Total Cost Principal Project Manager Civil / Project Engineer Project Engineer Sr. CADD Tech Surveys (Landtech) Geotechnical (Geotest) Environmental Prepare and submit for review of 30% plans and proposed specifications based on the Drainage Report provided by the City of Pearland. Incorporate review comments and revisions into preparation of 60% and eventually 90% plans and Specs. H&H (Decon) Prepare bid sheet identifying each item and its planned quantity and include supplemental work items Fully develop engineer’s construction cost estimate for each item of work including plan quantities Submit plans to Private Utilities and Drainage Districts for signatures Page 1 of 3 DocuSign Envelope ID: 2DF05F5D-2C1B-4510-8B8E-E9556A0CFBF4 City of Pearland Longwood Park Drainage Improvements LEVEL OF EFFORT (LOE) FEE ESTIMATE Date: 01/23/2024 Revision: 02/27/2024 BILLABLE HOURLY RATE $231.75 $183.60 $157.56 $133.71 $132.39 $131.67 Admin / Clerical Total Hours Total Cost Principal Project Manager Civil / Project Engineer Project Engineer Sr. CADD Tech BID PHASE SERVICES 7. a. - 2 2 - - 4 682.32$ b.- 3 3 - - - 6 1,023.48$ c. - 4 4 - - 8 16 2,418.00$ d.- 2 4 - - 4 10 1,524.12$ e. I.Check for math errors and reconcile any mathematical discrepancies - 2 4 2 - 4 12 1,791.54$ II.Review for unbalance bid items - - 2 2 - 4 8 1,109.22$ III.Certified Bid Tabulation including Engineer’s estimate - 2 8 - - 4 14 2,154.36$ IV.Review of contractor’s financial standing and references provided - - 4 4 - - 8 1,165.08$ V.Explanation of discrepancies between the Engineer’s estimate and bids - - 4 - - - 4 630.24$ VI.Recommendation to award - 2 - 1 3 498.87$ 8. - 6 - - - 6 1,101.60$ 9. - 2 4 4 - 4 14 2,058.96$ Subtotal Hours - 25 39 12 - 29 105 Subtotal Bid Phase Services -$ 4,590.00$ 6,144.84$ 1,604.52$ -$ 3,818.43$ 16,157.79$ Bidding Phase Prepare Engineer’s Recommendation of Award Letter that includes the following required content: Assist with design of Bid Proposal Respond in writing to questions from bidders and prepare addenda as necessary. Attend pre-bid meeting Provide Notice to Bidders (NTB) to the Project Manager in an electronic form appropriate for the City’s e-bid system format. City is responsible for advertising. Attend City Council meeting and recommendation for award of Contract for Construction. Produce and transmit to selected contractor five (5) sets of project manuals ready for execution with City’s Notice of Intent to Award (NOI) Page 2 of 3 DocuSign Envelope ID: 2DF05F5D-2C1B-4510-8B8E-E9556A0CFBF4 City of Pearland Longwood Park Drainage Improvements LEVEL OF EFFORT (LOE) FEE ESTIMATE Date: 01/23/2024 Revision: 02/27/2024 BILLABLE HOURLY RATE $231.75 $183.60 $157.56 $133.71 $132.39 $131.67 Admin / Clerical Total Hours Total Cost Principal Project Manager Civil / Project Engineer Project Engineer Sr. CADD Tech CONSTRUCTION PHASE SERVICES 10.- - - - - - 0 -$ a. - 4 4 - - - 8 1,364.64$ b. - 24 48 12 - - 84 13,573.80$ c. - 12 48 120 - 8 188 26,864.64$ d. - - 24 48 - - 72 10,199.52$ e. - - - - - 0 -$ i.review progress of work for Substantial Completion walk through - - 16 12 - - 28 4,125.48$ ii.generate a punch list of items for correction - - 2 4 - 2 8 1,113.30$ iii.substantiate items that are completed - - 4 12 - - 16 2,234.76$ iv.issue both Certificate of Substantial Completion (signed/sealed from Design Engineer) & Final Acceptance or 2nd walk through - 2 8 8 - 4 22 3,224.04$ f. - 2 4 - - 2 8 1,260.78$ g. - 2 8 - - - 10 1,627.68$ h. - 2 4 16 40 - 62 8,432.40$ Subtotal Hours - 48 170 232 40 16 506 Subtotal Construction Phase Services -$ 8,812.80$ 26,785.20$ 31,020.72$ 5,295.60$ 2,106.72$ 74,021.04$ Total Hours 0 256 538 784 688 155 2,421 TOTAL LEVEL OF EFFORT -$ 47,001.60$ 84,767.28$ 104,828.64$ 91,084.32$ 20,408.85$ 516,326.69$ Within thirty (30) days after receipt of As-Builts from the contractor to the CM, the project engineer will provide to the City one (1) set of full size reproducible record drawings, an electronic file copy in PDF format, AutoCAD (dwg) files, and GIS files, as required by the City of Pearland's Engineering Design Criteria Manual. Coordinate contractors, CM/CI to provide complete record of As- Builts Drawing Issue Final Completion & Acceptance letter to City recommending acceptance & release of final payment Conduct Substantial Completion Inspection with CM or PM to: Provide interpretive guidance for Contractor, Construction Manager in resolution of problems Review/approve & comment on Contractor’s submittals, RFIs, Contractor Proposals, Request for Change Orders (RCO) including coordination with Construction Manager on Proposals & Change Orders. Attend monthly progress meetings with Construction Manager, Contractor & City of Pearland as needed Attend pre-construction meeting to provide information & answer questions Construction Administration Page 3 of 3 DocuSign Envelope ID: 2DF05F5D-2C1B-4510-8B8E-E9556A0CFBF4 Controlling Name of Interested Party4 Nature of interest City, State, Country (place of business) Intermediary (check applicable) CERTIFICATE OF INTERESTED PARTIES 1295FORM 1 of 1 1 OFFICE USE ONLY 2 03/19/2024 Complete Nos. 1 - 4 and 6 if there are interested parties. Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties. Name of business entity filing form, and the city, state and country of the business entity's place of business. Bowman Engineering & Consulting, Inc. Houston, TX United States Name of governmental entity or state agency that is a party to the contract for which the form is being filed. Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a description of the services, goods, or other property to be provided under the contract. 3 City of Pearland Longwood Park (Roadside Ditch and Culvert) Drainage Improvements (DR2306) DR2306 2024-1136083 Date Filed: Date Acknowledged: Certificate Number: CERTIFICATION OF FILING 6 Signature of authorized agent of contracting business entity My name is _______________________________________________________________, UNSWORN DECLARATION Check only if there is NO Interested Party.5 X My address is _______________________________________________, _______________________, and my date of birth is _______________________. Executed in ________________________________________County, I declare under penalty of perjury that the foregoing is true and correct. (street)(state) (zip code) (country) (year)(month) _______, ______________, _________. State of ________________, on the _____day of ___________, 20_____. (city) (Declarant) Version V3.5.1.5b35d027www.ethics.state.tx.usForms provided by Texas Ethics Commission Shauna Bowman, PE Dallas TX 75206 USA5646 Milton Street, Suite 640 Dallas 24March19thTexas 09/05/1970 DocuSign Envelope ID: 2DF05F5D-2C1B-4510-8B8E-E9556A0CFBF4