R2023-218 2023-09-25DocuSign Envelope ID: 9B4B004F-F6BC-43DC-A994-EF092B76B63B RESOLUTION NO. R2023-218 A Resolution of the City Council of the City of Pearland, Texas, approving a Change Order with James Construction Group, LLC., in the amount of $791,371.15 (total contract amount of $30,615,991.66), associated with the McHard Extension Project. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain change order associated with the McHard Extension Project, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a change order associated with the McHard Extension Project. PASSED, APPROVED and ADOPTED this the 25th day of September, A.D., 2023. ATTEST: DocuSigned by: r FrrUAtt,s a t &9CC2253-1 FFF4�5... FRANCES AGUILAR, TRMC, MMC CITY SECRETARY APPROVED AS TO FORM: ,-DocuSigned by: E13CAOBB4F4BG... DARRINg8M. COKER CITY ATTORNEY DocuSigned by: --B4SS4 A(i1 Sn2F4F2.._ J. KEVIN COLE MAYOR DocuSign Envelope ID: 4DDFB63B-7ADO-41B1-B32F-OEBCA9573CB9 Form 2146-L (Rev. 10/11) Page 1 of 1 CONSTRUCTION CONTRACT CHANGE ORDER NUMBER: 1. CONTRACTOR: James Construction Group, LLC 2. Change Order Work Limits: Sta. to Sta. 3. Type of Change (on federal -aid non-exempt projects): Minor (Major/Minor) 4. Describe the change and the reason for the change order. When necessary, Include exceptions to this agreement. This change order Is to include water line impacts that conflicted with the proposed storm sewer, added extension arms for pedestrian push buttons due to the decorated base, power for irrigation system, street light conduit stubup modifications to meet CenterPoint requirements, BDD4 ouHall modifications at pond HS2 and CC-1, additional compensation related to Time Impact Analysis No. 1 Settlement and drainage revisions along Hatfield. This change order also includes items that were not required to complete the project and therefore those quantities were deducted from the contract. 6 CCSJ: 0912-31-290 Protect: TR1405 Highway: McHard Road County: Brazoria HOU District: Contract Number: 5. New or revised plan sheet(s) are attached and numbered: See attached backup documentation Each signatory hereby warrants that each has the authority to execute this Change Order. By signing this change order, the contractor agrees to waive any and all claims for additional compensation due to any and all other expenses; additional changes for time, overhead and profit; or loss of compensation as a resuh of this change. Further, the contractor agrees that this agreementis made In accordance with Item 4 and the Contract. Exceptions should be noted In the response for 15 above. THE CONTRACTOR Date Ert1an g le By bran beetle ISep II :ton 14_34 C6'1 Typed/Printed Name Brian Beetle Typed/Printed Title President Sep 11, 2023 Tho following Information must be provided Time Ext. #: N/A Days added on this C.O.:.120 Amt. added by this change order; $791,371,15 For TxDOT use only: Days participating: Amount participating: 120 $318,907.15 Signature Date Maria Aponte, P.E./Area Engineer NameTtle RF,COMME FOR EXECUTION: "---F938812 C716123... Trent Epperson, City Manager, City of Pearland Date EAPPROVED 0 REQUEST APPROVAL Lem- 08.30.23 9/28/2023 1 4:49 PM CDT Name/Title ❑ APPROVED Date ❑ REQUEST APPROVAL Je a�rLee, Senl! oject Manager, City of Pea rla nd Date Name/Title ❑APPROVED ❑ REQUEST APPROVAL 9/12/2023 JB Fe r: ,• P.E., Project Manage , reeso and Nichols, Inc. Date PPROVED _ ® REQUEST APPROVAL 9/11/2023 ❑ APPROVED Date ❑ REQUEST APPROVAL Name/Title ❑ APPROVED Date ❑ REQUEST APPROVAL Ed ell, P.E., Project Manager, HDREng`neerIng,Inc. Date Name/Title U APPROVED ® REQUEST APPROVAL ❑ APPROVED Engineer's Seal: Date DocuSign Envelope ID: 4DDFB63B-7ADO-41B1-B32F-OEBCA9573CB9 ED BD RYzt RVDB DocuSign Envelope ID: 4DDFB63B-7ADO-41B1-B32F-OEBCA9573CB9 CHANGE ORDER SUMMARY McHard Road Extension Cullen Blvd to Mykawa Rd Change Order No. 6 CoP Project TR1405 CSJ #0912-31-290 Purpose of Change Order: This change order is to include water line impacts that conflicted with the proposed storm sewer, added extension arms for pedestrian push buttons due to the decorated base, power for irrigation system, street Tight conduit stubup modifications to meet CenterPoint requirements, BDD4 outfall modifications at pond HS2 and CC-1, additional compensation related to Time Impact Analysis No. 1 Settlement and drainage revisions along Hatfield. This change order also includes items that were not required to complete the project and therefore those quantities were deducted from the contract. Justification: Item #1 (Fire Hydrant Relocation): During the installation of the 7'x4' box culvert at station 30+50, an existing fire hydrant was found to be within 2 feet of the edge of the box culvert. To ensure that no damage would occur to the fire hydrant or water main, the contractor was directed to remove the fire hydrant, install the 7'x4' box culvert, and then re -install the fire hydrant in its original location. Item #2 (Water Main Relocation — Stone Road): During installation of the 7'x4' box culvert on the east side of Stone Road (station 36+60), the existing water main was found to be in direct conflict with the proposed box culvert. The contractor was directed to remove the existing water main and casing pipe, install the planned 7'x4' box culvert, and then re -install the original water main and casing pipe. This pipe was also then pressure tested to verify that no damage was done to the water main pipe after re -installation. Item #3 (6'x3' Box Culvert Realignment): During the installation of the 6'x3' concrete box culvert between junction box JB-H25 and Inlet HI100DP5 near Woody Drive, an existing water main pipe was found in conflict with the planned alignment of the 6'x3' box culvert. The existing water main had a lowered segment just east of the box culvert's planned alignment. To avoid the water main, it was agreed to realign the 6'x3' box culvert to the east to eliminate the conflict with the lowered water main segment. This work required removal of previously installed 6'x3' box culvert sections to allow for the installation of new 6'x3' box culvert bends to realign the culvert to avoid the conflict. With the box culvert adjustments, inlet H1100DP5 had DocuSign Envelope ID:4DDFB63B-7ADO-41B1-B32F-OEBCA9573CB9 to be modified and a steel plate placed over one of the two grates to allow the area around the inlet to be graded to allow it to drain. Item #4 (Water Main Relocation — Max and Future Max Road): During installation of the 6'x3' box culvert, two water main pipes were found to conflict with the proposed storm box culvert and needed to be removed and reset. The first water main was on the east side of Max Road and the second water main was on the west side of Future Max Road. Item #4 has been separated out into four portions of work: 4.1: The water mains in question were verified by vac -truck to conflict with the storm box culvert. 4.2: The existing signal poles and mast arms stored at the intersections for use in the contract conflicted with the work to remove the water mains and needed to be moved. 4.3: The water main pipes at Max Road and Future Max Road were removed by an agreed upon price. 4.4: The water main pipes at Max Road and Future Max Road were re -installed and then pressure tested using force account tracking. Item #5 (Extension Arms for Pedestrian Push Buttons): The plans called for the placement of pedestrian push buttons at each signalized intersection. With the decorative base on each traffic signal pole, the push buttons could not be placed as shown in the plans. A field meeting was held with the City of Pearland traffic department where it was determined that an extension would be required to install the push button and meet ADA compliant height. The Traffic Department along with the contractor, determined the proposed parts for field modifying the extension arms. The contractor provided a price for the extension arms which was approved, ordered, and installed. Item #6 (Power for Irrigation): The plans did not include details of placing power to run the irrigation controllers for the 2 irrigation systems. After discussions with the landscaper and contractor, it was determined that power lines could be run to the power meters being used for the signalized intersections of Cullen and Hatfield. To get from the irrigation controller to the intersection power, conduit and wire were installed between the two locations as well as having to bore under the McHard Road pavement as the city moved the controllers into the median. Item #7 (Street Light Stubup): The conduit and stubups for future streetlights were installed based on the plans. When they were completed, CenterPoint Energy Street Lights Department reviewed the locations in the field and revised the illumination plans that added new stub ups, removed stub ups not allowed in pipeline easements and adjusted conduit locations. The contractor had to make these adjustments so that the future streetlights could be installed. This work was tracked by force account. Item #8 (BDD4 Outfall Modifications): Brazoria County Drainage District No. 4 (BDD4) updated their standard details after this project was bid which included a new pipe miter detail. During regular inspections by BDD4 at Pond HS2, it was determined that the riprap and outfall miters were not meeting the new standards and modifications needed to be made to the installed riprap at Pond HS2 prior to their approval and acceptance of the detention pond. The DocuSign Envelope ID:4DDFB63B-7ADO-41B1-B32F-OEBCA9573CB9 contractor was directed to modify constructed work to be tracked by force account per BDD4 detail and field direction. Item #9 (BDD 4 Outfall Modifications): Brazoria County Drainage District No. 4 (BDD4) updated their standard details after this project was bid which modified the safety end section of outfalls. During regular inspections by BDD4 at Pond CC-1, it was determined that the box culvert tie-in at the three outfalls C1, C2, and C3 in Pond CC-1 were not meeting the new standards and modifications needed to be made prior to their approval and acceptance of the detention pond. The work has been completed and inspected by BDD4. Item #10 (Additional Compensation for Settlement): James Construction Group (JCG) submitted a claim for extra work and compensation for items they believed they were entitled to base on the contract. The City of Pearland City's Attorney and Public Works staff met with JCG and through negotiations, the two mutually agreed to resolve JCG's request for additional compensation relating to the cost of Time Impact Analysis No. 1 — specifically the productivity loss, additional overhead and other impacts related to the water line conflicts identified in the above Items #1 through 4. This also includes the additional contract days (remaining 92 calendar days from the total 172 calendar days) as well as an additional 7 calendar days for the CenterPoint Traffic Signal Energization time extension. As a result, total calendar days for this item will include an additional 99 calendar days. Item #11 (Hatfield Drainage Revisions): The drainage along the west side of Hatfield, both north and south of McHard, was placed according to the plans. After the drainage was completed, several rainfall events occurred showing that adjustments to the system would be required to drain the areas around the box culverts and inlets. The Engineer of Record reviewed the site and submitted changes to the system to allow for the water to drain into the box culverts. This updated plan was reviewed and approved by the City and is being used to complete this work. This work includes an additional 21 calendar days to perform the work. Change Order Change Order Amount TxDOT Funding City Funding No. 1 $13,396.74 $10,717.39 $2,679.35 No. 2 $18,527.70 $14,822.16 $3,705.54 No. 3 $40,856.86 $32,685.49 $8,171.37 No. 4 $0.00 $0.00 $0.00 No. 5 $89,346.16 $31,265.35 $58,080.81 No.6 $791,371.15 $318,907.15 $472,464.00 DocuSign Envelope ID: 4DDFB63B-7ADO-41B1-B32F-OEBCA9573CB9 CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive, Suite300 Pearland, TX 77581 www.cityofpearland.com/projects CHANGE ORDER McHard Road Extension Cullen Blvd to Mykawa Rd Date of Issuance: 8/25/2023 Change OrderNo.: 6 Contractor: James Construction Group LLC CoP Project No.: TR1405 Consultant: Freese & Nichols P.O. No.: 2020-00001598 Explanation: This change order is to include water line impacts that conflicted with the proposed storm sewer, added extension arms for pedestrian push buttons due to the decorated base, power for irrigation system, street light conduit stubup modifications to meet CenterPoint requirements, BDD4 outfall modifications at pond HS2 and CC-1, additional compensation related to Time Impact Analysis No. 1 Settlement and drainage revisions along Hatfield. This change order also includes items that were not required to complete the project and therefore those quantities were deducted from the contract. Description of Work and Item No. 244 Removal and reinstallation of fire hydrant near Station 30+50 245 Removal, relocation, reinstallation and testing for Stone Road N/S Water Line 246 6'x3' Box Culvert Realignment at Woody - Item #1: Work Stoppage - Discovery of Conflict with Existing Water Main 247 6'x3' Box Culvert Realignment at Woody - Item #2: Removal of 24 LF of Previously Set Box Culvert 248 RCB Bend 6'x3' 249 Modification to ADD inlet - install steel plate over half of double inlet for INLET H1100DP5 250 Water Line Conflicts at Future Max Road and Max Road - Item #1: Vacuum Truck Services 251 Water Line Conflicts at Future Max Road and Max Road - Item #2: City Lynx Relocation of MOH Materials (Light Poles) to relocate water line 252 Water Line Conflicts at Future Max Road and Max Road - Item #3: Water Line Removal Only 253 Water Line Conflicts at Future Max Road and Max Road - Item #4: - Water line reinstallation and testing Cost Time $ 3,194.02 0 Days $ 39,024.02 0 Days $2,137.92 $2,201.29 $7,000.00 $769.92 $ 3,500.52 $1,325.63 $36,882.89 $21,828.58 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days Admin 1 of 3 6. Revised 7/25/08 DocuSign Envelope ID: 4DDFB63B-7ADO-41B1-B32F-OEBCA9573CB9 CHANGE ORDER McHard Road Extension Cullen Blvd to Mykawa Rd CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive, Suite300 Pearland, TX 77581 www.cityofpearland.com/projects Date of Issuance: 8/25/2023 Change OrderNo.: 6 Contractor: James Construction Group LLC CoP Project No.: TR1405 Consultant: Freese & Nichols P.O. No.: 2020-00001598 Description of Work and Item No. 254 Added Extension Arms for Pedestrian Push Buttons 255 Install power for irrigation at Cullen and Hatfield locations: Bore conduit, tie into signal power, install power wire 256 Street Lights Conduit Stubup Modifications 257 BDD4 Outfall Modifications at Pond HS2 258 BDD4 Outfall Modifications at Pond CC-1 259 Additional Compensation Related to Time Impact Analysis No. 1 Settlement 260 Hatfield Drainage Revisions 2 Barbed Wire Fence (5-Strand) 21 Wood Fence 22 Chain Link Fence 23 Iron Fence (Match Exist) 76 Dewatering (Control of Ground Water as Needed) Please attach back-up documentation. Cost Time $ 16,739.99 0 Days $ 42,313.47 0 Days $36,808.68 0 Days $32,873.10 0 Days $45,431.46 0 Days $833,000.00 99 Days $ 212,358.11 21 Days ($140,149.70) 0 Days ($51,750.00) 0 Days ($81,168.75) 0 Days ($22,950.00) 0 Days ($250,000.00) 0 Days Admin 2 of 3 6. Revised 7/25/08 DocuSign Envelope ID: 4DDFB63B-7ADO-41B1-B32F-OEBCA9573CB9 CHANGE ORDER McHard Road Extension Cullen Blvd to Mykawa Rd CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive, Suite300 Pearland, TX 77581 www.cityofpearland.com/projects Date of Issuance: 8/25/2023 Change OrderNo.: 6 Contractor: James Construction Group LLC CoP Protect No.: TR1405 Consultant: Freese & Nichols P.O. No.: 2020-00001596 Cost & Time Change Summary Original Contract: Cost Time $ 29,658,286.30 700 Days Previous Change Order(s): $ 166,334.21 126 Days Contract prior to this ChangeOrder: $ 29,824,620.51 826 Days Net increase (decrease) from this Change Order: $791,371.15 120 Days Revised Contract: $ 30,615,991.66 946 Days Finance Approval: RECOMMENDED: By: tant ,-DocuSigned by: $oG Pca4cc C80D8FA1 B5BD467_. ACCEPTED*: &YIan Bk1'!P By: Brian Beetle (Sep 11, 2023 14:04 COI) Contractor Date 9/12/2023 Sep 11, 2023 By: RECO r E D D: lion Manager ,-DocuSigned by: APPR D. Date Date By: • F838B12DC74642 Date Owner 9/28/2023 1 4:01 PM CDT 9/11/2023 9/28/2023 1 4:49 PM CDT Admin 3 of 3 6. Revlsed 7/25/08 DocuSign Envelope ID: 4DDFB63B-7ADO-41B1-B32F-OEBCA9573CB9 BD RYbB RVDB DocuSign Envelope ID:4DDFB63B-7ADO-41B1-B32F-OEBCA9573CB9 McHard Road Extension Change Order No. 6 ATTACHMENT "A" Item Pay Doc # Item No. Sub Item Item Description Unit Current Q Bhty Bid Unit Price Bid Cost Revised Quantities Add/ Deduct Negotiated Unit Price Revised Cost Cost Difference RFI No. TxDOT funding City funding 01 244 Removal and reinstallation of fire hydrant near Station 30+50 LS 0 N/A $0.00 1 1 $3,194.02 $3,194.02 $3,194.02 $0.00 $3,194.02 02 245 Removal, relocation, reinstallation and testing for Stone Road N/S Water Line LS 0 N/A $0.00 1 1 $39,024.02 $39,024.02 $39,024.02 47 $0.00 $39,024.02 03.1 246 6'x3' Box Culvert Realignment at Woody - Item #1: Work Stoppage - Discovery of Conflict with Existing Water Main LS 0 N/A $0.00 1 1 $2,137.92 $2,137.92 $2,137.92 44 $1,710.34 $427.58 03.2 247 6'x3' Box Culvert Realignment at Woody - Item #2: Removal of 24 LF of Previously Set Box Culvert LS 0 N/A $0.00 1 1 $2,201.29 $2,201.29 $2,201.29 44 $1,761.03 $440.26 03.3 248 RCB Bend 6'x3' EA 0 N/A $0.00 2 2 $3,500.00 $7,000.00 $7,000.00 44 $5,600.00 $1,400.00 03.4 249 Modification to ADD inlet - install steel plate over half of double inlet for INLET HI100DP5 LS 0 N/A $0.00 1 1 $769.92 $769.92 $769.92 84 $615.94 $153.98 04.1 250 Water Line Conflicts at Future Max Road and Max Road - Item #1: Vacuum Truck Services LS 0 N/A $0.00 1 1 $3,500.52 $3,500.52 $3,500.52 59/60 $0.00 $3,500.52 04.2 251 Water Line Conflicts at Future Max Road and Max Road - Item #2: City Lynx Relocation of MOH Materials (Light Poles) to relocate water line LS 0 N/A $0.00 1 1 $1,325.63 $1,325.63 $1,325.63 59/60 $0.00 $1,325.63 04.3 252 Water Line Conflicts at Future Max Road and Max Road - Item #3: Water Line Removal Only LS 0 N/A $0.00 1 1 $36,882.89 $36,882.89 $36,882.89 59/60 $0.00 $36,882.89 04.4 253 Water Line Conflicts at Future Max Road and Max Road - Item #4: - Water line reinstallation and testing LS 0 N/A $0.00 1 1 $21,828.58 $21,828.58 $21,828.58 59/60 $0.00 $21,828.58 05 254 Added Extension Arms for Pedestrian Push Buttons LS 0 N/A $0.00 1 1 $16,739.99 $16,739.99 $16,739.99 105 $13,391.99 $3,348.00 06 255 Install power for irrigation at Cullen and Hatfield locations: Bore conduit, tie into signal power, install power wire LS 0 N/A $0.00 1 1 $42,313.47 $42,313.47 $42,313.47 65.5 $33,850.78 $8,462.69 07 256 Street Lights Conduit Stubup Modifications LS 0 N/A $0.00 1 1 $36,808.68 $36,808.68 $36,808.68 108 $29,446.94 $7,361.74 08 257 BDD4 Outfall Modifications at Pond HS2 LS 0 N/A $0.00 1 1 $32,873.10 $32,873.10 $32,873.10 $26,298.48 $6,574.62 09 258 BDD4 Outfall Modifications at Pond CC-1 LS 0 N/A $0.00 1 1 $45,431.46 $45,431.46 $45,431.46 96 $36,345.17 $9,086.29 10 259 Additional Compensation Related to Time Impact Analysis No. 1 Settlement LS 0 N/A $0.00 1 1 $833,000.00 $833,000.00 $833,000.00 59/60 $0.00 $833,000.00 11 260 Hatfield Drainage Revisions LS 0 N/A $0.00 1 1 $212,358.11 $212,358.11 S212,358.11 99 $169,886.49 $42,471.62 2 1.2 Barbed Wire Fence (5-Strand) LF 43490 $3.23 $140,472.70 0 -43390 $3.23 -$140,149.70 -$140,149.70 $0.00 -$140,149.70 21 1.18 Wood Fence LF 1800 $28.75 $51,750.00 0 -1800 $28.75 -551,750.00 -$51,750.00 50.00 -551,750.00 22 1.19 Chain Link Fence LF 4625 $17.55 $81,168.75 0 -4625 $17.55 -$81,168.75 -$81,168.75 $0.00 -$81,168.75 23 1.20 Iron Fence (Match Exist) LF 270 $85.00 $22,950.00 0 -270 $85.00 -$22,950.00 -$22,950.00 $0.00 -$22,950.00 76 3.33 Dewatering (Control of Ground Water as Needed) LF 10000 $25.00 $250,000.00 0 -10000 $25.00 -$250,000.00 -$250,000.00 $0.00 -$250,000.00 Total (This Change Order) $791,371.15 $318.907.15 $472,464.00 DocuSign Envelope ID: 4DDFB63B-7ADO-41B1-B32F-OEBCA9573CB9 McHard Change Order No. 6 Revised COP - Signature Routing Final Audit Report 2023-09-11 Created: 2023-09-11 By: Megan Hubbard (mhubbard@prim.com) Status: Signed Transaction ID: CBJCHBCAABAA3fUTjSyEYlvdZvDBmbQocwMOiMpzsbSE "McHard Change Order No. 6 Revised COP - Signature Routing " History IL) Document created by Megan Hubbard (mhubbard@prim.com) 2023-09-11 - 6:02:34 PM GMT C4 Document emailed to Brent Dixon (bdixon@prim.com) for approval 2023-09-11 - 6:05:54 PM GMT n Email viewed by Brent Dixon (bdixon@prim.com) 2023-09-11 - 6:33:18 PM GMT C`Co Document approved by Brent Dixon (bdixon@prim.com) Approval Date: 2023-09-11 - 6:34:12 PM GMT - Time Source: server E?. Document emailed to Rik Van Den Berg (rvandenberg@prim.com) for approval 2023-09-11 - 6:34:13 PM GMT ' Email viewed by Rik Van Den Berg (rvandenberg@prim.com) 2023-09-11 - 6:58:19 PM GMT 6o Document approved by Rik Van Den Berg (rvandenberg@prim.com) Approval Date: 2023-09-11 - 6:58:54 PM GMT - Time Source: server E Document emailed to Brian Beetle (bbeetle@prim.com) for signature 2023-09-11 - 6:58:56 PM GMT t Email viewed by Brian Beetle (bbeetle@prim.com) 2023-09-11 - 7:02:22 PM GMT d0 Document e-signed by Brian Beetle (bbeetle@prim.com) Signature Date: 2023-09-11 - 7:04:31 PM GMT - Time Source: server pa Adobe Acrobat Sign DocuSign Envelope ID: 4DDFB63B-7ADO-41B1-B32F-OEBCA9573CB9 (.) Agreement completed. 2023-09-11 - 7:04:31 PM GMT el Adobe Acrobat Sign SETTLEMENT AGREEMENT This Settlement Agreement ("the Agreement") is made by and between the City of Pearland ("CITY") and Freese and Nichols,'Inc. ("FNI"), collectively (the "Parties"), effective the CO day of ,` , 2024 Recitals 1 On August 1, 2014, the Parties entered a contract for professional engineering design services associated with the McHard Road Expansion Project ("Project"); and 2. The Final Change Order ("Change Order") for the Project resulted in a payment by CITY to the Project contractor in the amount of $791,371 15, and 3 CITY disputed responsibility for the costs of the Change Order amount and has since been in negotiations with FNI to resolve the dispute, and the Parties have since reached an agreement and understanding with respect to the amount owed under the Change Order; and 4 The Parties agree that the Change Order amount was previously paid to the contractor for the Project, and that FNI will reimburse CITY $174,487 52 of the $791,371 15 Change Order 5 To avoid the uncertainties, annoyance and expense of litigation, the parties have agreed, without any party making any admission to any other party, to settle the disputes and controversies regarding the Contract. Agreements, Covenants and Releases 6 For and in consideration of the agreements, covenants and releases set forth herein, upon the execution of this Agreement, FNI shall pay to CITY the aggregate sum of $174,487.52 7 In further consideration of the agreements, covenants and releases set forth herein, FNI hereby releases, acquits and discharges CITY, together with its directors, officers, shareholders, employees, subcontractors, agents, attorneys, representatives, consultants and subsidiary and parent organizations, from and against any and all claims, damages, debts, obligations, controversies, attorneys fees, costs, suits, demands, liabilities, or causes of action, of any kind or nature whatsoever, at law or in equity, in contract or tort, general or special, for injuries or damages, liquidated or unliquidated, known or unknown, now existing or that might arise hereafter, relating to or ansing out of or in any way connected to the Contract. 8. In further consideration of the agreements, covenants and releases set forth herein, CITY hereby releases, acquits and discharges FNI, together with its directors, officers, shareholders, employees, subcontractors, agents, attorneys, representatives, consultants and subsidiary and parent organizations, from and against any and all claims, damages, debts, obligations, controversies, attorneys fees, costs, suits, demands, liabilities, or causes of action, of any nature whatsoever, at law or in equity, in contract or tort, general or special, for injuries or damages, liquidated or unliquidated, known or unknown, now existing or that might arise hereafter, relating to or arising out of or in any way connected to the Contract. 9 No party to this Agreement makes any acknowledgment or admission of any liability to any other party to this agreement, and each party expressly agrees that this Agreement is made for the sole purpose of compromising a claim which is disputed as to validity and amount. 10 This Agreement reflects the entire agreement between the parties. There are no other agreements, either written or oral, and the execution and delivery of this written Agreement supersedes any and all prior representations, negotiations or agreements pertaining to the subject matter thereof. -2- 11 This Agreement may be executed in multiple counterparts, all of which, taken together, shall constitute but a single agreement, and each of which shall be deemed an original. 12. This Agreement shall be governed and construed by the substantive laws of the state of Texas, without regard to the choice of law rules of Texas or of any other jurisdiction. -3- STATE OF TEXAS COUNTY OF TARRANT§ § § VERIFICATION BEFORE ME, the undersigned authority, on this day personally appeared Charles M. Wolf, who, being first duly sworn, stated that he is an authorized representative of and is entitled to make this verification on behalf of Freese and Nichols, Inc., and that he has read the foregoing Settlement Agreement and the facts asserted in the fore 1ng ettlement Agreement are within his personal knowledge and are true and correct. Sworn to and subscribed before me the O2-/ day of Nlkriai(/ , 2024 ) Notary Public in or the Stated as..a... �,. _ _ ANA RODRIGUEZ Notary Public, State of Texas Comm. Expires 07-17-2027 NotarylO 13210014-4 IP -4- VERIFICATION STATE OF TEXAS COUNTY OF HARRIS BEFORE ME, the undersigned authority, on this day personally appeared , who, being first duly sworn, stated that he is an authorized re resentative of and is entitled to make this venfication on behalf of P-Pct-(, has read the foregoing Settlement Agreement and the facts asserted fn the foregoing Settlement Agreement are within his personal knowledge and are true and correct. Sworn to and subscribed before me the day of A�� l , 2024 tary P b bhc in 3 d for the ate of Texas ,, .,,PY Pjj'' JENNIFER SHYLAN CADMUS < t Notary Public, State of Texas N *= My Commission Expires ,,Fops+V December 17, 2024 - NOTARY ID 1166200-6 -5-