HomeMy WebLinkAboutR2023-012 2023-02-20DocuSign Envelope ID:45279FCE-086B-4A7C-B61D-8AF1FAC492C0
RESOLUTION NO. R2023-12
A Resolution of the City Council of the City of Pearland, Texas, amending a
Construction Manager at Risk contract (Barry Rose Water Reclamation Facility
Project) with McCarthy Building Companies in the additional amount of
$1,170,857.00 (total contract amount of $2,348,777.00) for pre -construction
services.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS:
Section 1. That the City Council hereby amends a Construction Manager at Risk
contract with McCarthy Building Companies in the additional amount of $1,170,857.00 (total
contract amount of $2,348,777.00) for pre -construction services.
Section 2. The City Manager or his designee is hereby authorized to execute an
amended Construction Manager at Risk contract for the Barry Rose Water Reclamation Facility
Project.
PASSED, APPROVED and ADOPTED this the 20th day of February, A.D., 2023.
a— DocuSigned by:
9z
"-B^881A61503F1IF2...
J. KEVIN COLE
MAYOR
ATTEST:
LDocuSigned by:
Firm/ m gOt ar
FRAM TRMC, MMC
CITY SECRETARY
APPROVED AS TO FORM:
DocuSigned by:
F4BG...
DARRIN M. COKER
CITY ATTORNEY
DocuSign Envelope ID: 4687ECF5-49BD-43E8-B578-BD9C74C7FCF3
Date of Issuance:
Contractor:
Explanation:
CITY OF PEARLAND
PROJECTS DEPARTMENT
CMAR Contract Amendment
For Barry Rose WRF Expansion & Longwood ARP Decommissioning
2/13/2022
McCarthy Building Companies, Inc.
2016 Old Alvin
Pearlaud, Texas 77581
pea riand tx,gov/p rej ects
Amendment No.: 1
CoP Project No.: WW I502 & WW1906
P.D. No.: 2020-00001765
This amendment encompasses the following: 1.) Replenishing schedule of value items for 30% design documents with new
Design firm; 2.) CMAR &. Preconstruction Phase Services and support through Consolidation Study; and 3) Adding
funding for critical repairs of existing equipment for maintenance of plant operations during design & constuction.
Description of Work Cost Time
Add line item 21: 30% Estimation & Costing for Stantec Design to
1 Reallocate Previously Billed Items (BR) $ I89,480.00 Days
Add line item 22: CMAR & Precon Services Consolidation Study
2 & Post-Stantec (BR) $ 282,875.00 Days
3 Add line item 23: Critical Repair Equipment Allowance (BR) $ 321,857,00 Days
Add line item 24: 30% Estimation & Costing for Stantec Design to
4 Reallocate Previously Billed Items (LW) $ 47,370,00 Days
Add line item 25: CMAR & Precon Services Consolidation Study
5 & Post-Stantec (LW) 59,257.00 Days
6 Add line item 26: Critical Repair Equipment Allowance (LW) $ 240,018,00 Days
Please attach back-up documentation
Cost & Time Chance Summary
Original Contract:
Previous Arnendment(s):
Contract prior to this amendment:
Net increase (decrease) from this amendment
Revised Contract:
Finance Approve]:
ACCEPTED*:
DocuSigned by:
6-14^a Muvplii
—2.. i tSu._.[ .158D '.5r...
Consultant Date
Cost
$ 1,177,920.00
$ 1,177,920 kit}
$ 1.170,857,00
$ 2,348,777.00
APPROVED:
By:
—DocuSigned by:
Time
Days
Days
Days
Days
0 Days
2/22/2023 11:12 PM CST
lXite
2/22/2023 I 3:00 PM PST
‘— Ft338B 12DC74(Sd23...
Owner Date
*Contractor agrees W perform changes} included in this Change Order far the price and lime indicated. The prices for changes included all costs associated with this
Change Order.
Nu work is to be done until this change order is executed. No payment to the Contractor (or Consultant) shall he made for work included in the thange order until the
Contractor's pay estimate is updated.
Revise site prajeci plans and spacifcasioas as referenced and insofar as the original prujccr drawings and specifications are rnconsissenl, this Change Order governs. Upon
escculion by all parties, the fallowing changes identified for the Ceetr7ell Value etndfor Contract Tame sbow., are made part of the Contract
Design
I of I D4_ Revised 4l/15
DocuSign Envelope ID: 4687ECF5-49BD-43E8-6578-BD9C74C7FCF3
MECARTHY
15415 Market Street, Channelview, TX 77534
v 713-953-9796
rnaarkhy.corn
February 01, 2023
Mr. Jameson Appel
Assistant Director of Capital Projects, Engineering & Public Works
2016 Old Alvin Rd.
Pearland, TX 77581
RE: Barry Rose WRF Expansion and Longwood Water Reclamation Facility Decommissioning
Projects It WW1502 and WW1906
Change Order #1 for Preconstruction Phase Services for Construction Manager At Risk
Mr. Appel,
McCarthy was awarded the contract to provide Preconstruction Services for the above referenced
projects in September 2020. To date, McCarthy has provided CMAR Preconstruction Services totaling
$743,282_DO as approved by the City through various changes to project partners and scope. This is inclusive
of services including but not limited to Constructability, Market Analysis, Budget Confirmation Reviews, an
Opinion of Probable Cost and Preliminary Estimates based upon the 30% design documents provided by
Stantec Inc., the City's original designer through January 2021.
Around February of 2021, the City of Pearland and Stantec mutually parted ways in progressing the
project design, as the City contemplated alternate solutions and treatment processes for the Barry Rose
project. The City engaged Freese and Nichols to perform a Consolidation Study where McCarthy continued to
provide preconstruction services from October 2021 through May 2022 and during the selection phase for a
new Designer from July 2022 through November 2022.
To date, these additional services have been captured against Schedule of Value items from the
original Preconstruction Services contract through Progress Invoice #03_ In order to capture the additional
value of these changes and prepare for CMAR Preconstruction Services that entail a new 30% estimate from
any newly selected Design Engineer, these SOV items represent deliverables that will be recreated upon the
selection of said new designer and development of a new 30% design (and subsequent cost estimate).
McCarthy proposes to capture the cost of these deliverables as follows:
CMAR and Precon Services Post Stantec, including WRF Consolidation Study Support
$ 372,132.00
Cost Modelling — New 30% Design Documents
_
$ 236,850.00
Cost Allowance —Critical Repairs at Barry Rose WRF & Longwood WRF
$ 561,875.00
Total Cost
$1,170,857.00
Furthermore, as discussed amongst the project team stakeholders including City staff and operations
personnel, and as noted in the consolidation study, both Longwood and Barry Rose need some critical
A, McCarthy Holdings, Inc. company
DocuSign Envelope ID: 4687ECF5-49BD-43E8-B578-BD9C74C7FCF3
Pro Forma - SOV R2
Work to date - as adjusted by PCO #1
CONTINUATION SHEET
AIA DOCUMENT G703
PAGE OF PAGES
AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing
Contractor's signed certification is attached.
In tabulations below, amounts are stated to the nearest dollar.
Use Column I on Contracts where variable retainage for line items may apply.
APPLICATION NO. IN /AU
APPLICATION DATE: 00/31/2
PERIOD TO: 00/31/2
OWNER PROJECT NO: WW1502 WW1906
B
C I D
E I F
G
H
I
ID
DESCRIPTION OF WORK
SCHEDULED
VALUE
WORK COMPLETED
MATERIALS
PRESENTLY
STORED
TOTAL
COMPLETED
AND STORED
TO DATE
Complete
(I _ E)
BALANCE
TO FINISH
(D- H)
FROM PREVIOUS
APPLICATION
(E + F)
THIS PERIOD
1
Budget Confirmation Review (BARRY ROSE)
$ 14,960.00
$ 14,960.00
$ 14,960.00
100.00%
$
-
2
Opinion of Probable Construction Cost (OPCC) (BARR'
$ 28,480.00
$ 28,480.00
billed items
to the CO 1.1
$
28,480.00
100.00%
$
-
3
30% Cost Estimate (BARRY ROSE)
$ 142,400.00
$ -
Previously
-
0.00%
$
142,400.00
4
30%-60% Continuous Costing (BARRY ROSE)
$ 156,936.00
$ -
transferred
-
0.00%
$
156,936.00
5
60% Cost Estimate (BARRY ROSE)
$ 170,160.00
$
item
-
0.00%
$
170,160.00
6
60%-90% Continuous Costing (BARRY ROSE)
$ 116,856.00
$ -
-
0.00%
$
116,856.00
t
7
Early GMP Documents (BARRY ROSE)
$ 40,768.00
$ -
$ -
0.00%
$
40,768.00
8
Bid Package and Award Phase (BARRY ROSE)
$ 117,376.00
$ -
I
$ -
0.00%
$
117,376.00
9
90% Cost Estimate / GMP (BARRY ROSE)
$ 74,400.00
$ -
$ -
0.00%
$
74,400.00
10
Owner Preconstruction Allowance (BARRY ROSE)
$ 80,000.00
$ 80,000.00
$ 80,000.00
100.00%
$
-
11
Budget Confirmation Review (LONGWOOD)
$ 3,740.00
$ 3,740.00
$ 3,740.00
100.00%
$
-
12
Opinion of Probable Construction Cost (OPCC) (LONG
$ 7,120.00
$ 7,120.00 (
$ 7,120.00
100.00%
$
-
13
30% Cost Estimate (LONGWOOD)
$ 35,600.00
$ -
$ -
0.00%
$
35,600.00
14
30%-60% Continuous Costing (LONGWOOD)
$ 39,234.00
$ -
$ -
0.00%
$
39,234.00
15
60% Cost Estimate (LONGWOOD)
$ 42,540.00
$ -
$ -
0.00%
$
42,540.00
16
60%-90% Continuous Costing (LONGWOOD)
$ 29,214.00
$ -
$ -
0.00%
$
29,214.00
17
Early GMP Documents (LONGWOOD)
$ 10,192.00
$ -
$ -
0.00%
$
10,192.00
18
Bid Package and Award Phase (LONGWOOD)
$ 29,344.00
$ -
$ -
0.00%
$
29,344.00
19
90% Cost Estimate / GMP (LONGWOOD)
$ 18,600.00
$ -
$ -
0.00%
$
18,600.00
20
Owner Preconstruction Allowance (LONGWOOD)
$ 20,000.00
$ -
$ -
0.00%
$
20,000.00
SUB TOTAL
$1,177,920
$134,3 0
$0.00
$0
$134,300.00
11.40%
$1,043,620
Change orders
$1,170,857
$608,
$0
$0
$608,982
52.01%
$561,875
CO #1.1
30% Estimating & Costing Stantec Design
$236,850.00
$236,850.00
$236,850
100.00%
$0.00
Items from PA3 Col. F
transferred to CO#1.2
CO #1.2
CMAR & Precon Post-Stantec & Consolidation Study
$372,132.00
$372,132.0
$372,132
100.00%
$0.00
CO #1.3
Owner Preconstruction Allowance - Critical Repairs
$561,875.10
$ -
-
o.00%
$561,875.10
GRAND TOTALS
$2,348,777
$743,282
$0
$0.00
$743,282
31.65%
$1,605,495.10
Users may obtain validation of this document by requesting of
Proposed Allowance
included in CO#1
license a completed AIA Document D401 - Certification of Document's Authenticity
DocuSign Envelope ID: 4687ECF5-49BD-43E8-B578-BD9C74C7FCF3
M2CARTHY
15415 Market Street, Channelview, TX 77530
a 713-963-9790
mccarthy.com
January 31, 2023
Jameson Appel
Assistant Director of Capital Projects, Engineering & Public Works
2016 Old Alvin Rd.
Pearland, TX 77581
RE: Barry Rose WRF Expansion and Longwood Water Reclamation Facility Decommissioning
Projects # WW1502 and WW1906
Change Order #1 — Barry Rose & Longwood Critical Repairs Proposal Terms and Conditions Revision 3 —
31 January 2022
Dear Mr. Appel,
As a follow up to our meeting of January 30th, McCarthy is pleased to submit our revised proposal for
the Critical Repairs of the Barry Rose and Longwood Water Reclamation Facilities. Attached you will find a
breakdown of our pricing, a listing of assumptions and clarifications included with this pricing along with a
detailed inclusions log for each line item and scope.
Should you have any questions regarding this proposal, we will be available to meet and discuss with
at your convenience. Once again, we appreciate the opportunity to be part of this exciting project and hope
that our proposal meets your needs.
Very Respectfully,
John Walker
Project Manager
Cc: Aaron Moss
Lars Erickson
Jake Stones
A McCarthy Holdings, Inc. company
DocuSign Envelope ID: 4687ECF5-49BD-43E8-B578-BD9C74C7FCF3
1/31/2023 - Pre -construction Phase Change Order #1 — Critical Repairs at Barry Rose WRF & Longwood
WRF — Assumptions and clarifications
1. McCarthy to furnish all necessary labor, supervision, materials and equipment to Install Critical
Repairs scope as identified in the attached Critical Repairs Matrix.
2. McCarthy is providing construction services and "like for like" replacement of existing
components only; no engineering evaluation of components has been performed nor is the
performance of any component guaranteed or implied beyond those provided by individual
equipment manufacturers.
3. This proposal is based on completing all work in one mobilization and in a continuous manner.
4. Acceptance of this proposal assumes acceptance of the quoted equipment models &
manufacturers; procurement of equipment will commence upon notice to proceed for this
change order.
5. New Equipment including valves, pumps and instrumentation will be warranted by
Manufacturer's standard Warranty for duration shown in same; McCarthy warrants all other
material furnished with the Critical Repairs scope will be new and to the best standards
commonly used in the industry; the work shall be free of defects in material or workmanship,
and shall be safe and suitable for the particular purpose for which it is to be used. This warranty
shall remain in effect for twelve (12) months from the date of installation.
6. Prices presented in the attached matrix are cost -reimbursable and McCarthy's best estimate of
maximum cost per item following visual inspection of existing conditions. Upon discovery of un-
seen conditions that would cause an increase in repair cost McCarthy will notify the City of
Pearland in writing and request further direction before proceeding with any additional repairs
that would increase the cost above those presented in the pricing matrix.
7. Small size sump pumps for Barry Rose items B-102 and B-901 will be furnished by the City of
Pearland and installed by McCarthy
Specific Exclusions
8. All costs for permitting are excluded.
9. Sales tax on permanently incorporated materials — a sales tax exempt certificate will be
provided. Owner is Tax Exempt.
10. Dust control and the installation, maintenance and/or removal of any SW3P plans or devices is
excluded.
11. Cleaning/solids removal from lift stations and treatment structures (Clarifiers, Digesters, etc.)
and disposal of accumulated solids. This work will be provided by City of Pearland resources.
12. Supply of pumps/equipment necessary to reduce influent lift station flow levels to allow access
for pump repair.
13. Preparation of submittals or approval packages for equipment or any other component of this
work; pricing on equipment offered is valid for 30 days of this proposal, the incorporation of a
review cycle that results in delayed ordering may incur price escalation.
DocuSign Envelope ID: 4687ECF5-49BD-43E8-6578-BD9C74C7FCF3
PCO 001 - CRITICAL REPAIRS
PEARLAND, TX
BARRY ROSE / LONGWOOD IMPROVEMENTS
M2CARTHY
fin
Item #
Area
Pearland
Priority
Description
Amount
ROM (-)
Status
I Comments / Action
B-101
100 - INFLUENT LIFT STATION
4K
Mid -Level Pump # 3 12" Check Valve Replacement
$10,177
Approved
Per CoP: Repair completed, remove
B-102
100 - INFLUENT LIFT STATION
4J
Sump pump in bottom level @ pump #1 & 2 needs fixed /replaced
$822
Approved
B-103
100 - INFLUENT LIFT STATION
Add Radar Level Instrument (Vega 90 Mhz) at Wet Well
$9,902
Approved
B-104
100 - INFLUENT LIFT STATION
Replace All Lift Station Check Valves
$8,401
Approved
B-105
100 - INFLUENT LIFT STATION
Pump and Motor Alignment - Lift Station Bottom Level
$3,538
Approved
B-201
200 - HEADWORKS
3M
Influent Flow Meters
$21,495
Rejected
Per CoP: Remove
B-202
200 - HEADWORKS
Low
RACO Alarm Agent - Alarm & Administrative Assistance
$2,810
Approved
B-301
300 - AERATION BASIN (RACE TRACK)
3L
NPW 90 to be replaced at Bar Screens / A -Basin
$115
Approved
B-302
300 - AERATION BASIN (RACE TRACK)
5C
Securing Floating Mixer in A Basin
$4,915
Approved
B-401
400 - CLARIFIERS
5A
Clarifier #2 Rake Repair
$59,430
Approved
B-402
400 - CLARIFIERS
5B
Clarifier #2 Drain Valve Repair/Replace
$43,061
$15,000.00
Approved
ROM -$15,000 Line StopNalve insert if required
B-403
400 - CLARIFIERS
5D
Clarifier #1 & #2 Weir Adjustments
$33,025
Approved
B-404
400 - CLARIFIERS
3O
Clarifier #2 RAS check valve leaking
$7,060
Approved
B-405
400 - CLARIFIERS
Clarifier #1 & #2 Limitorque Valves & Actuators not functioning
$47,321
Approved
Investigate/troubleshoot only, replacement actuators in
ROM+ est. only need Limitorque Pricing
B-501
500 - DISC FILTERS
N/A
Disc Filters not working (No Action right now)
$0
Rejected
B-601
600 - CHLORINE CONTACT
Air drops need to be fixed (Qty 2)
$2,702
Approved
B-701
700 - CHLORINE / DECHLOR (SB)
51
Chlor / SB Pumps - Add Controls to Run in Flow Pace
$1,405
Approved
B-801
800 - NON -POTABLE SYSTEM (NPW)
5H
Non Potable System Pump & Piping Replacement
$11,268
Approved
B-851
850 - EFFLUENT CHANNEL
Online Chlorine Residual Monitor at Effluent Channel
$24,777
Rejected
Per CoP: Remove, Flow pace Only
B-852
850 - EFFLUENT CHANNEL
5H
SB Injection Replacement / Heat Trace
$3,280
Approved
Added power feed - was included w/ B-851 add circuit
B-901
900 - DIGESTERS
5E
Digester #1 Drops Replacement & Valve Repair
$5,801
Approved
B-902
900 - DIGESTERS
5F
Digester #2 Transfer Valves Need Repair/ Replaced
$11,955
Approved
B-951
950 - SLUDGE PUMP STATION
3N
Sludge Sump Pump Needs Repair / Replace
$702
Approved
Revised - Per CoP they will provide Pump
B-952
950 - SLUDGE PUMP STATION
5G
Sludge Pump #1 Needs Repair / Replace
$12,027
Approved
B-953
950 - SLUDGE PUMP STATION
Sludge Pump #2 Needs Repair / Replace
$12,027
Approved
B-960
950 - SLUDGE PUMP STATION
Centrifuge Repair
$20,162
$5,000.00
Approved
ROM - $5,000 TBD Vendor replacement parts
B-1001
1000 - SITE / MISC
General SCADA Maintenance
$0
Rejected
Not investigated/priced
L-1001
1000 - SITE / MISC
General SCADA Maintenance
$0
Rejected
Not investigated/priced
L-101
100 - INFLUENT LIFT STATION
5A
Replace / Repair (1) 12" LS Pump
$12,716
Approved
Per CoP 1/30/23 - repair pumps not new pumps
L-102
100 - INFLUENT LIFT STATION
5B
Replace / Repair (2) 8" LS Pumps
$62,250
Approved
Per CoP 1/30/23 - provide 2x Pumps
L-103
100 - INFLUENT LIFT STATION
Level Instrument at Lift Station
$8,277
Approved
L-301
300 - AERATION BASIN (RACE TRACK)
3L
Air Leak on Rear Side of Tank Number 1
$4,597
Approved
L-401
400 - CLARIFIERS
5E
Clarifier #1 Drain Valve Repair / Replace
$52,014
$15,000.00
Approved
ROM -$15,000 Line StopNalve insert if not required
L-402
400 - CLARIFIERS
5F
Clarifier Skimming Rakes Fix
$3,081
Approved
L-403
400 - CLARIFIERS
5F
Clarifier #1 Scum Pump Repair
$11,990
$10,000.00
Approved
ROM $10,000 Skid mounted Replacement Pump if reqd
L-404
400 - CLARIFIERS
4G
RAS Pump Mechanical Seal (Pump #3)
$32,258
Approved
L-405
400 - CLARIFIERS
4H
RAS Pump #2 Isolation Valve Replace
$3,728
$3,728.00
Approved
McCarthy to investigate Valve replacement required
L-406
400 - CLARIFIERS
41
RAS Pump #3 Check Valve - Repair / Replace
$9,232
Approved
L-501
500 - DISC FILTERS
N/A
Disc Filters not working
$0
Rejected
L-601
600 - CHLORINE CONTACT
5D
Fix Air Lines and Main Blower Feed
$8,887
Approved
L-602
600 - CHLORINE CONTACT
5C
Flow Meter Repair / Replace
$14,784
Approved
Per CoP 1/30/23 -Will try the VEGA meter, add back
L-701
700 - CHLORINE / DECHLOR (SB)
4J
Insulate SB Lines
$3,959
Approved
L-901
900 - DIGESTERS
4K
Replace/repair gooseneck and valve on Air Header
$2,294
Approved
G-100
1000 - SITE / MISC
General Conditions
$19,903
Approved
Includes:
Bonds
Small Tools & Consumables
Overhead and Profit (OH&P)
Liability Insurance
1.37%
5.00%
6.00%
2.70%
TOTAL APPROVED
TOTAL REJECTED
TOTAL PENDING
TOTAL ROM (-)
$561,875
$46,273
$0
$48,728
Total - Barry Rose Only $321,857
Total - Longwood Only $240,018
DocuSign Envelope ID: 4687ECF5-49BD-43E8-6578-BD9C74C7FCF3
PCO 001 - CRITICAL REPAIRS
PEARLAND, TX
BARRY ROSE / LONGWOOD IMPROVEMENTS
A+ 2CARTHE.. A.
Item
Plant
Area
Description
Includes
Excludes
Quoted Procurement Lead Time
B-101
Barry Rose
100 - INFLUENT LIFT STATION
Mid -Level Pump # 3 12" Check Valve Replacement
Furnish & replace one 12" Check Valve for Pump #3 on the mid -level of the
Influent Lift Station. This includes new 12" Henry Pratt Wafer Style Model 700 12"
Henry Pratt Wafer Style Model 700 with external lever &
spring, Cast iron body, 316 SS disc & shaft, Buna-n seat,
Coating: 4 mils Amerlock in & out. Also includes reauired hardware.
1 week
B-102
Barry Rose
100 - INFLUENT LIFT STATION
Sump pump in bottom level @ pump #1 & 2 needs fixed /replaced
Replace the sump pump in the drywell, bottom level. This includes a new sump
pump and required miscellaneous fittings to ensure proper operation.
2 weeks
B-103
Barry Rose
100 - INFLUENT LIFT STATION
Add Radar Level Instrument (Vega 90 Mhz) at Wet Well
Furnish and Install one (1) VEGAPULS C 21 wired radar sensor for continuous level
measurement of the influent lift station wet well. Range is up to 15m with an
accuracy of+/- 2mm. Includes VEGAMET 861 controller and display insturment for
level sensor. Includes 316L SST mounting bracket with adjustable sensor holder
and required mounting hardware. Includes install of power, including all applicable
conduit. wire. cable.
7 weeks
B-104
Barry Rose
100 - INFLUENT LIFT STATION
Replace All Lift Station Check Valves
Furnish & replace two (2) 8" check valve for lower level of influent pump station,
and provide one (1) 8" check valve as a spare only. Inlcudes new Henry Pratt,
AWWA, Swing Check Valve, Flanged, CI Body, Cover
and Disc, Bronze Body Seat Ring, Buna-N Disc Seat Ring with Single
Lever and Weight, Coating: 8 Mils Carboguard 891 Interior and
Exterior. Also includes reauired Baskets & hardware.
1 week
B-105
Barry Rose
100 - INFLUENT LIFT STATION
Pump and Motor Alignment - Lift Station Bottom Level
Inlcudes 8 hours of investigation, and install two (2) flap valve repair kits for the
pumps in the influent lift station lower level.
Removal of solids from wet well and supply/operation of pumps to lower wet well
flow level by City of Pearland
1 week
B-201
Barry Rose
200 - HEADWORKS
Influent Flow Meters
Removed from Scope
B-202
Barry Rose
200 - HEADWORKS
RACO Alarm Agent - Alarm & Administrative Assistance
Includes investigation and administration time to fix phone numbers for alarm and
ensure proper login capabilities for the city, as well as brief training with
operators. Assumes RACO unit is working correctly.
N/A
B-301
Barry Rose
300 - AERATION BASIN (RACE TRACK)
NPW 90 to be replaced at Bar Screens / A -Basin
Replace PVC Sch 80 elbow at Headworks/A-basin to tie-in NPW system hose for
wash down water at A -Basin.
N/A
B-302
Barry Rose
300 - AERATION BASIN (RACE TRACK)
Securing Floating Mixer in A Basin
Includes securing the floating mixer in the A -Basin with three 3/8 304 SST wire
rope at three (3) connection points. Existing connection points from previously
installed securing wires will be used.
1 week
B-401
Barry Rose
400 - CLARIFIERS
Clarifier #2 Rake Repair
Includes two weeks of investigation and repair of clarifier #2 rakes. Includes
allowance for $25,000 in metal fabrication & installation to aid in the repair of the
rake system.
Excludes draining clarifiers and/or solids removal- assumed to be
drained/vacuumed by City of Pearland.
B-402
Barry Rose
400 - CLARIFIERS
Clarifier #2 Drain Valve Repair/Replace
Supply of Hot -Tap valve insertion if replacement of valve determined necessary,
this cost will be credited if valve replacement not required.
B-403
Barry Rose
400 - CLARIFIERS
Clarifier #1 & #2 Weir Adjustments
Replacement/overlay of carbon steel weir material over existing weirs to achieve
proper elevation.
saw -tooth cutting/notching of replacement weir material
1 week
B-404
Barry Rose
400 - CLARIFIERS
Clarifier #2 RAS check valve leaking
Replace 10" check valve with Pratt AWWA, Swing Check Valve, Flanged, CI Body,
Cover and Disc, Bronze Body Seat Ring, Buna-N Disc Seat Ring with Single Lever
and Weight, Coating: 8 Mils Carboguard 891 Interior and Exterior. Also includes
replacement of existing gaskets and hardware.
1 week
B-405
Barry Rose
400 - CLARIFIERS
Clarifier #1 & #2 Limitorque Valves & Actuators not functioning
8 Hours to troubleshoot existing actuator and recommend repair, pricing inlcudes
full replacement of 2x actuators - to be credited if repair not elected or required.
B-501
Barry Rose
500 - DISC FILTERS
Disc Filters not working (No Action right now)
N/A
No work planned on Disc Filters.
B-601
Barry Rose
600 - CHLORINE CONTACT
Air drops need to be fixed (Qty 2)
Air Drop replacements at Barry rose will be Galvanized Steel, Sch. 80 similar to
existing hardware/fittings for air drops.
B-701
Barry Rose
700 - CHLORINE / DECHLOR (SB)
Chlor / SB Pumps - Add Controls to Run in Flow Pace
McCarthy EIC superintendent to troubleshoot; small parts/components
B-801
Barry Rose
800 - NON -POTABLE SYSTEM (NPW)
Non Potable System Pump & Piping Replacement
Includes full replacement of NPW pump area including two (2) new NPW pumps
and applicable PVC piping.
B-851
Barry Rose
850 - EFFLUENT CHANNEL
Online Chlorine Residual Monitor at Effluent Channel
Removed from Scope
B-852
Barry Rose
850 - EFFLUENT CHANNEL
SB Injection Replacement / Heat Trace
Install manually operated Heat tracing, insulate over at exposed SB piping
No automatic controller for heat tracing; must be plugged/un-plugged manually
B-901
Barry Rose
900 - DIGESTERS
Digester #1 Drops Replacement & Valve Repair
Install valves supplied by City of Pearland; McCarthy to provided hardware
(nut/bolt kits)
Supply of Valves with integral gasktes
B-902
Barry Rose
900 - DIGESTERS
Digester #2 Transfer Valves Need Repair/ Replaced
Supply of Hot -Tap valve insertion if replacement of valve determined necessary,
this cost will be credited if valve replacement not required.
B-951
Barry Rose
950 - SLUDGE PUMP STATION
Sludge Sump Pump Needs Repair / Replace
Replace the sump pump in the drywell, bottom level. This includes a new sump
pump and required miscellaneous fittings to ensure proper operation.
1 week
B-952
Barry Rose
950 - SLUDGE PUMP STATION
Sludge Pump #1 Needs Repair / Replace
Remove existing pump and replace with skid mounted Allweiler AEB1F553
Progressing Cavity Pump w/7.5 -HP 1800 RPM Motor. Pump will be connected to
existing piping system with 150CL flex reinforced hose & fittings; existing valving
will not be replaced.
Replacement of existing valves.
B-953
Barry Rose
950 - SLUDGE PUMP STATION
Sludge Pump #2 Needs Repair / Replace
Remove existing pump and replace with skid mounted Allweiler AEB1F553
Progressing Cavity Pump w/7.5 -HP 1800 RPM Motor. Pump will be connected to
existing piping system with 150CL flex reinforced hose & fittings; existing valving
will not be replaced.
Replacement of existing valves.
B-1001
Barry Rose
1000 - SITE / MISC
General SCADA Maintenance
N/A
No work included with Critical Repairs Scope
DocuSign Envelope ID: 4687ECF5-49BD-43E8-6578-BD9C74C7FCF3
PCO 001 - CRITICAL REPAIRS
PEARLAND, TX
BARRY ROSE / LONGWOOD IMPROVEMENTS
M2CARTHY
L-1001
Longwood
1000 - SITE / MISC
General SCADA Maintenance
N/A
No work included with Critical Repairs Scope
L-101
Longwood
100 - INFLUENT LIFT STATION
Replace / Repair (1) 12" LS Pump
Includes clean pump & replace internal flap valve assembly,
Removal of solids from wet well and supply/operation of pumps to lower wet well
flow level by City of Pearland
2 weeks
L-102
Longwood
100 - INFLUENT LIFT STATION
Replace / Repair (2) 8" LS Pumps
Inlcudes furnish/install 2x new FLYGT model NP3153, 6 inch disch. Electrical
submersible pumps with 460v/3 phase/60 HZ, 1750 RPM motor with 50'
connector cable and 304SS lifting Chain.
Repair or replacement of guide rails; guiderails appear to be functioning properly
following additional investigation
13 weeks
L-103
Longwood
100 - INFLUENT LIFT STATION
Level Instrument at Lift Station
Furnish and Install one (1) VEGAPULS C 21 wired radar sensor for continuous level
measurement of the influent lift station wet well. Range is up to 15m with an
accuracy of+/- 2mm. Includes VEGAMET 861 controller and display insturment for
level sensor. Includes 316L SST mounting bracket with adjustable sensor holder
and required mounting hardware. Includes install of power, including all applicable
conduit. wire. cable.
7 weeks
L-301
Longwood
300 - AERATION BASIN (RACE TRACK)
Air Leak on Rear Side of Tank Number 1
Repair damaged pipe section with Smith Blair style coupling
2 weeks
L-401
Longwood
400 - CLARIFIERS
Clarifier #1 Drain Valve Repair / Replace
Supply of Hot -Tap valve insertion if replacement of valve determined necessary,
this cost will be credited if valve replacement not required.
Replacement of concrete sidewalk - removed concrete will be replaced with
crushed rock material.
L-402
Longwood
400 - CLARIFIERS
Clarifier Skimming Rakes Fix
Installation of repair parts currently located at Longwood, McCarthy to supply
hardware to affix componets (nuts/bolts)
custom fabrication of new components
L-403
Longwood
400 - CLARIFIERS
Clarifier #1 Scum Pump Repair
Troubleshoot ing of existing pump - Pump appears to be running; Price includes
$10,000 replacement pump which will be creditted if replacement determined not
required following further troubleshooting
L-404
Longwood
400 - CLARIFIERS
RAS Pump Mechanical Seal (Pump #3)
Replace 2 of 3 exisitng RAS Pumps with Skid Mounted Gormann Rupp Model
T6A35-B 6" Dia. Centrifugal Self Priming Pump with 20HP - 1200 RPM motor.
Pump skids to be connected to existing piping with 150 CL reinforced hoses and
fittings.
10 weeks
L-405
Longwood
400 - CLARIFIERS
RAS Pump #2 Isolation Valve Replace
Includes 6" Gate valve & Nut/Bolt/Gasket replacment - On further investigation
appears operation, will credit if not required
2 weks
L-406
Longwood
400 - CLARIFIERS
RAS Pump #3 Check Valve - Repair / Replace
Replacement of 3 each RAS pump discharge check valves with 8 Inch PRATT
AWWA Swing Check Valve, Flanged, CI Body, Cover and Disc, Bronze Body Seat
Ring, Buna-N Disc Seat Ring with Single Lever and Weight, Coating: 8 Mils
Carboguard 891 Interiror and Exteriro
L-501
Longwood
500 - DISC FILTERS
Disc Filters not working
N/A
No work planned on Disc Filters.
L-601
Longwood
600 - CHLORINE CONTACT
Fix Air Lines and Main Blower Feed
Repair ccorroded air header section with Smith -Blair style repair coupling
2 weeks
L-602
Longwood
600 - CHLORINE CONTACT
Flow Meter Repair / Replace
Furnish and Install one (1) VEGAPULS C 21 wired radar sensor for continuous level
measurement of the influent lift station wet well. Range is up to 15m with an
accuracy of+/- 2mm. Includes VEGAMET 861 controller and display insturment for
level sensor. Includes 316L SST mounting bracket with adjustable sensor holder
and required mounting hardware. Includes install of power, including all applicable
conduit. wire. cable.
7 weeks
L-701
Longwood
700 - CHLORINE / DECHLOR (SB)
Insulate SB Lines
Install manually operated Heat tracing, insulate over at exposed SB piping
No automatic controller for heat tracing; must be plugged/un-plugged manually
L-901
Longwood
900 - DIGESTERS
Replace/repair gooseneck and valve on Air Header
Gooseneck pipe to be Shc. 80 galvanized steel ; 5x air header drops at CCB to be
replaced with 304SS Pipe/Valve & hardware
G-100
General
1000 - SITE / MISC
General Conditions
General conditions as listed on G-100 detail sheet provided with package.