R2023-001 2023-01-09RESOLUTION NO. R2023-1 A Resolution of the City Council of the City of Pearland, Texas, amending a contract for professional services (Sleepy Hollow Street Reconstruction Project), with HDR Engineering, Inc., in the additional amount of $49,393.10 (total contract amount of $399,549.30). BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That a contract for professional services was previously awarded to HDR Engineering, Inc. Section 2. The City Manager or his designee is hereby authorized to execute an amended contract for professional services in the additional amount of $49,393.10. PASSED, APPROVED and ADOPTED this the 9th day of January, A.D., 2023. _____________________________ J.KEVIN COLE MAYOR ATTEST: _____________________________ FRANCES AGUILAR, TRMC, MMC CITY SECRETARY APPROVED AS TO FORM: ________________________________ DARRIN M. COKER CITY ATTORNEY DocuSign Envelope ID: 9D53D159-2DD4-4DB8-903E-BA25AACC1A27 Design 1 of 1 D6. Revised 6/16 CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive, Suite 300 Pearland, Texas 77581 pearlandtx.gov/projects Professional Services Contract Amendment Sleepy Hollow Repackaged Storm Sewer-Drainage Easement Date of Issuance: December 8, 2022 Amendment No: 03 Consultant: HDR Engineering, Inc.CoP Project No: TR2002 PO#: 2020-00001037 Explanation: During the execution of the Sleepy Hollow Road Reconstruction project, the residents in the neighborhood brought to the attention of the project team that the storm sewer was collapsed in the drainage easement between two homes causing high water levels in the yards. While investigating this complaint, it was also discovered that there was also a collapsed storm sewer at the Clear Creek outfall. This contract amendment encompasses the following: the repackaging of contract documents, additional geotechnical borings, the design of a storm sewer outfall to replace the existing damaged outfall, bid and construction phase services. Description of Work Cost Time 1.Basic Services $ 18,095.00 60 Days 2.Geotechnical Services $ 5,468.10 0 Days 3. Reimbursables $ 1,650.00 0 Days 4.Bid Phase $ 4,260.00 60 Days 5. Construction Administration $ 19,920.00 120 Days Please attach back-up documentation Cost & Time Change Summary: Cost Time Original Contract: $ 310,811.20 Days Previous Amendment(s): $ 39,345.00 Days Contract prior to this Amendment: $ 350,156.20 Days Net increase (decrease) from this Amendment: $ 49,393.10 Days Revised Contract: $ 399,549.30 Days Finance Approval: ____________________ Date: _____________ Finance ACCEPTED*: APPROVED: By: ___________________ Date: ____________ By:______________________Date: ____________ Consultant Owner *Consultant agrees to perform change(s) included in this Contract Amendment for the price and time indicated. The prices for changes included all costs associated with this Contract Amendment. No work is to be done until this Amendment is executed. No payment to the Consultant shall be made for work included in the Amendment until this Amendment is executed. Upon execution by all parties, the following changes identified for the Contract Value and/or Contract Time shown, are made part of the Contract. EXHIBIT A 12-21-2022 DocuSign Envelope ID: BAB92C0E-7B91-416F-AD8E-CAF149AB9CAA 1/10/2023 | 8:57 AM CST 1/11/2023 | 6:37 AM PST hdrinc.com Texas Registered Engineering Firm No. 754 4828 Loop Central Drive, Suite 800, Houston, TX 77081-2220 (713) 622-9264 December 6, 2022 City of Pearland Attention: Mrs. Jennifer Lee Senior Project Manager 2016 Old Alvin Rd Pearland, TX 77581 Re: Sleepy Hollow Street Reconstruction/Sleepy Hollow Waterline/Sleepy Hollow Sanitary Sewer Rehab City Project No: TR2002, WA2004, WW2005 HDR Job No. 10221676 Amendment #3 – Repackage Storm Sewer Design along Drainage Easement, Bid and Construction Administration Services Dear Mrs. Lee: HDR Engineering, Inc. (HDR) is pleased to submit this amendment to the existing contract with the City for the above referenced project. The approved contract was executed by City Council on February 24, 2020 and Notice to Proceed on March 23, 2020. This amendment is to repackage the contract documents, obtain additional geotechnical borings, design the replacement of a damaged storm sewer outfall, bid and construction administration phase services. A general description of the project, proposed scope of services, and a fee summary are included herein. General Overview HDR has previously completed the design of replacing the collapsed storm sewer located in a drainage easement between 2620 and 2618 Sleepy Hollow Drive. The City decided rebid this portion of the subdivisions drainage system due tothe pricing received by the current contractor for the proposed repairs. This proposal is to repackage the drainage easement design and include a complete bid set, additional geotechnical borings, bidding phase and construction administration services. A technical environmental memo for the outfall repair at Clear Creek has been provided to the City previously. DocuSign Envelope ID: BAB92C0E-7B91-416F-AD8E-CAF149AB9CAA Page 2 of 6 SCOPE OF SERVICES BASIC SERVICES A. Design Services for Repackaging Storm Sewer in Drainage Easement · Contact private utility companies, and other entities that may be involved to obtain updated information on their existing facilities and requirements that may impact this project. · Repackage plan drawings to project limits (cover, index, General Notes, survey control map). · Incorporate the drainage plan and profile sheets previously completed. · Repackage Storm Water Pollution Prevention Notes, Layout and Details to project limits. · HDR will be using City of Pearland front end documents and technical specifications and design standards/details. HDR will also incorporate Brazoria County Drainage District #4 standard outfall details. · Prepare quantity take-off and Opinions of Probable Construction Cost. · Perform a QA/QC of the plan drawings, specifications, and opinions of probable construction cost. · Provide a 90% set of draft plan drawings, specifications and opinions of probable cost to the City for review and comments. · Coordinate with utility companies to identify the location of existing utilities in the project and verify there are no conflicts or make adjustments accordingly. · Submit plans to utility companies for approval and signatures for repackaged project. · Provide two (2) sets of complete bidding documents to the City for repackaged project. DocuSign Envelope ID: BAB92C0E-7B91-416F-AD8E-CAF149AB9CAA Page 3 of 6 B. Bid Phase Services The City will enter into this phase after the acceptance of the Design Phase documents for Repackage. HDR shall: · Provide Notice to Bidders (NTB) to the Project Manager in an electronic form appropriate for the City’s e-bid system format. City is responsible for advertising and any associated cost with the advertising. · Reproduce and disseminate bid sets to the City [PM (1), Purchasing (1) and interested bidders]. · Keep record of plan holder’s list. · Chair pre-bid meeting and attend the Bid Opening. · Respond in writing to questions from bidders and prepare addenda as necessary. · Prepare Engineer’s Recommendation of Award Letter that includes the following required content:  Check for math errors and reconcile any mathematical discrepancies  Review for unbalance bid items  Certified Bid Tabulation including Engineer’s estimate  Review of contractor’s financial standing and references provided  Explanation of discrepancies between the Engineer’s estimate and bids if required  Recommendation to award contract to responsive qualified bidder  Attend City Council meeting and recommendation for award of Contract for Construction.  Produce and transmit to selected contractor five (5) sets of project manuals ready for execution with City’s Notice of Intent to Award (NOI) C. Construction Administration Services · Attend pre-construction meeting to provide information and answer questions. · Attend monthly progress meetings with Construction Manager, Contractor and City of Pearland as needed (estimated three (3) months construction duration). · Visit the site at intervals appropriate to the various stages of construction to observe the progress and quality of executed work and to determine in general if such work is proceeding in accordance with the Contract Documents. Detailed measurements and DocuSign Envelope ID: BAB92C0E-7B91-416F-AD8E-CAF149AB9CAA Page 4 of 6 investigations are not part of this task. Site representation is not included as part of Construction Administration. · HDR will not be responsible for the means, methods, techniques, sequences or procedures of construction selected by the Contractor(s) or the safety precautions and programs incident to the work of the Contractor(s). HDR's effort will be directed toward providing a greater degree of confidence for the City that the completed work of Contractor(s) will conform to the Contract Documents, but HDR will not be responsible for the failure of Contractor(s) to perform the work in accordance with the Contract Documents. During site visits and on the basis of on-site observations HDR will keep the City informed of the progress of the work, endeavor to guard the City against defects and deficiencies in such work and may recommend the City disapprove or reject work failing to conform to the Contract Documents. · Review/approve & comment on Contractor’s submittals, RFIs, Contractor Proposals, Request for Change Orders (RCO) including coordination with Construction Manager on Proposals & Change Orders, Review Pay Estimates using the City of Pearland’s web-based system. · Provide interpretive guidance for Contractor, Construction Manager in resolution of problems. · Conduct Substantial Completion Inspection with CM or PM to:  review progress of work for Substantial Completion walk through,  generate a punch list of items for correction  issue both Certificate of Substantial Completion (signed/sealed from Design Engineer) & Final Acceptance or 2nd walk through  Issue Final Completion & Acceptance letter to City recommending acceptance & release of final payment  Coordinate contractors, CM/CI to provide complete record of As-Builts Drawing  Within thirty (30) days after receipt of As-Builts from the contractor to the CM, the project engineer shall provide to the City one (1) set of full size reproducible record drawings, an electronic file copy (PDF format) and an AutoCAD file (.dwg) SPECIAL SERVICES D. Reimbursables • A budgetary amount will be allocated for reproduction including but not limited to: bid and construction sets, specifications and submittals. Reimbursable material charges will include the invoice and will be invoiced on the basis direct cost plus 10%. DocuSign Envelope ID: BAB92C0E-7B91-416F-AD8E-CAF149AB9CAA Page 5 of 6 • A budgetary amount for mileage will be set as part of this contract and will be billed at the prevailing IRS rates. E. Additional Geotechnical Borings HDR proposes a total of 2 soil borings along the drainage easement. The two boring locations, one at the outfall to Clear Creek (25 VF) and the other one at the upstream side (10 VF) near Sleepy Hollow roadway has a total depth of up to 30 VF. The geotechnical recommendations shall include open cut excavation and bedding and backfill for proposed storm sewer, structures, and slope protection and erosion control. Schedule It is estimated to take approximately six weeks from the Notice to Proceed to complete the above repackage bid set. Amendment #3 Summary Basic Services Design Services for Repackaging Storm Sewer in Drainage Easement (Lump Sum) $ 18,095.00 Bid Phase Services (Hourly Not to Exceed): $ 4,260.00 Construction Administration (Hourly Not to Exceed): $ 19,920.00 Total Basic Services $ 42,275.00 Special Services Reimbursables (Not to Exceed): $ 1,650.00 Additional Geotechnical Borings (Cost Plus 10%): $ 5,468.10 Total Special Services $ 7,118.10 Total Amendment #3 Fee with Additional Services $ 49,393.10 DocuSign Envelope ID: BAB92C0E-7B91-416F-AD8E-CAF149AB9CAA Page 6 of 6 The Total New Contract Fee: Original Fee: $ 310,811.20 Additional Amendment #1 Fee $ 14,455.00 Additional Amendment #2 Fee $ 24,890.00 Additional Amendment #3 Fee $ 49,393.10 New Total Contract Amount: $ 399,549.30 HDR appreciates the opportunity to submit this proposal and we look forward to continuing our work with the City of Pearland. Sincerely, HDR ENGINEERING, INC. Acceptance: City of Pearland, Texas By: ________________________________ David Weston Vice President/Area Manager Date: _______________________________ DocuSign Envelope ID: BAB92C0E-7B91-416F-AD8E-CAF149AB9CAA