R2022-204 2022-10-10RESOLUTION NO. R2022-204 A Resolution of the City Council of the City of Pearland, Texas, authorizing a construction management and construction inspection services contract with Cobb Fendley Associates, Inc., in the estimated amount of $264,565.30, for the Safe Routes to School Project. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain contract for construction management and construction inspection services associated with the Safe Routes to School Project, a copy of which is attached hereto as Exhibit “A” and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute, and the City Secretary to attest, a contract for construction management and construction inspection services associated with the Safe Routes to School Project. PASSED, APPROVED and ADOPTED this the 10th day of October, A.D., 2022. ________________________________ J. KEVIN COLE MAYOR ATTEST: ________________________________ FRANCES AGUILAR, TRMC, MMC CITY SECRETARY APPROVED AS TO FORM: ________________________________ DARRIN M. COKER CITY ATTORNEY DocuSign Envelope ID: 09D6CE43-B711-4E8A-99F5-6A28F8C675B1 DocuSign Envelope ID: B1868E7F-4352-4F09-BF7D-F0C453238F8A DocuSign Envelope ID: B1868E7F-4352-4F09-BF7D-F0C453238F8A DocuSign Envelope ID: B1868E7F-4352-4F09-BF7D-F0C453238F8A DocuSign Envelope ID: B1868E7F-4352-4F09-BF7D-F0C453238F8A DocuSign Envelope ID: B1868E7F-4352-4F09-BF7D-F0C453238F8A DocuSign Envelope ID: B1868E7F-4352-4F09-BF7D-F0C453238F8A10/11/2022 | 8:43 AM CDT DocuSign Envelope ID: B1868E7F-4352-4F09-BF7D-F0C453238F8A DocuSign Envelope ID: B1868E7F-4352-4F09-BF7D-F0C453238F8A Design 1 of 1 D29. Revised 2016 EXHIBIT A CONSTRUCTION MANAGEMENT SCOPE OF SERVICES FOR SAFE ROUTES TO SCHOOLS: CSJ 0912-31-318 DocuSign Envelope ID: B1868E7F-4352-4F09-BF7D-F0C453238F8A Design 2 of 10 D5. Revised 01/12 BASIC SERVICES: Construction Manager(s) shall render the following professional services to the OWNER in connection with the construction of the Project. 1. Pre-Construction (on specific projects, as requested by the City/Owner) 1.1. Provide constructability review of plans, specifications, contract documents and validity of Engineer of Record’s project duration. Identify construction issues, conflicts, deficiencies, review the adequacy and accuracy of the design and independent verification of quantities. 1.2. Attend Pre-Bid Meeting; provide feedback to City’s Project Manager as necessary, such as: tracking and recording questions for the Engineer’s written response, clarifying the Owner’s expectations for the project and the project execution. 1.3. Chair Pre-Construction Meeting 1.3.1. Schedule and conduct the pre-construction meeting; record and disseminate minutes from pre-construction meeting. 1.3.2. Utilize the City’s system: set communications protocol and contract administration procedures, establish progress meeting schedule and submittal schedule. 1.3.3. Provide agenda for meeting: Key milestone dates, pay application procedures, schedule, public notification issues and procedures, utility coordination issues, traffic control, permitting, property owner notification and coordination, temporary facilities, contractor’s use of City’s system, etc. DocuSign Envelope ID: B1868E7F-4352-4F09-BF7D-F0C453238F8A Design 3 of 10 D5. Revised 01/12 2. Construction Administration and Management Services 2.1. Act as the City’s on-site representative administering the contract for construction and providing overall project oversight, maintain record of decisions and changes made. 2.2. Meetings: Schedule and conduct construction progress meetings; record minutes from construction progress meetings and distribute via email to: City Project Manager, Design Engineer and contractor throughout the duration of the project. 2.2.1. Schedule meetings every two weeks, minimum, to review the following: work progress and schedule, outstanding issues, status of submittals and responses shop drawings unforeseen issues and changes to the work. 2.2.2. Coordinate additional meetings as necessary to discuss and resolve problems and provide guidance in a timely manner. 2.2.3. Coordinate/monitor the following: utility relocation activities for compliance, utility installation verification, reporting, record management and as-built drawings. 2.2.4. Attend all utility coordination, construction, and scheduling meetings. 2.2.5. Obtain copy of ROW permit and prints from Public Works in order to monitor progress of utility relocation per permit/plan. 2.3. Manage Construction 2.3.1. All final documentation is required in electronic/digital format, utilizing DropBox or other available system as is feasible. 2.3.2. As field problems arise, notify the Design Engineer and City Project Manager of proposed solutions to resolve problems. DocuSign Envelope ID: B1868E7F-4352-4F09-BF7D-F0C453238F8A Design 4 of 10 D5. Revised 01/12 2.3.3. Review and update as-built documents regularly with contractor. 2.3.4. Monitor and ensure adherence to approved project baseline schedule. Review contractor’s schedule monthly, ensure compliance with City’s intended schedule, and provide recommendations as needed to retain and regain schedule if needed. 2.3.5. Recommend alternate project sequencing/scheduling to keep project on schedule. 2.3.6. Prepare monthly summary report of construction activities with outstanding issues outlined for review. Monthly progress information associated with the project will be submitted to the Project Manager for review and approval. 2.3.7. Record weather conditions on jobsite daily. 2.4. Coordinate work of contractor with external agencies and utility companies. Coordinate contractor’s operations with regard to other City contracts and construction as well as with property owners for planned service outages, street closures, and access control issues to properties including notifications. 2.4.1. Verify construction conformance and compliance with TCEQ, NOI and NOT. 2.4.2. Verify construction conformance with permitted activities such as: City of Pearland permits, U.S. Army Corps of Engineers permits, TxDOT roadway permits, and any Railroad agreements. 2.5. Maintain records of all decisions, actions and activities with regard to construction operations electronically for future transmittal to the city.(i.e. Change Orders, RFIs and responses, Submittals and responses, Request for Proposals, correspondence, SWPPP inspections.) DocuSign Envelope ID: B1868E7F-4352-4F09-BF7D-F0C453238F8A Design 5 of 10 D5. Revised 01/12 3. Construction Inspection Services 3.1. Provide full-time on-site technical observation of Contractor’s activities to verify and ensure all work materials, structures, equipment and workmanship comply with the Contract Documents including Addenda, and Change Orders. Verify and ensure that Contractor maintains good construction practices and professional standards prevailing in the local City, County, and State of Texas. Maintain electronic file for all inspection reports. 3.1.1. Notify the City Project Manager if Contractor’s work is not in compliance with the Contract Documents or specifications. Notify the City Project Manager and Design Engineer of any failure of the Contractor to take measures to repair and bring work in compliance. 3.1.2. Issue Advisory Notices to Contractor for work that is not in compliance with approved construction documents. 3.1.3. Issue Non-Compliance Reports to Contractor if non- conforming work is not brought into compliance or if plan of action to bring work into compliance is not conducted in timely manner. 3.1.4. Inspect and observe the materials and equipment being incorporated into the work to assure that they are handled, stored and installed in accordance with the Contract Documents and specifications. Report to the City Project Manager regarding these activities. 3.2. Identify record and notify Design Engineer of any problems or failures to meet performance requirements in a timely manner to minimize delay in the progress of the project, make DocuSign Envelope ID: B1868E7F-4352-4F09-BF7D-F0C453238F8A Design 6 of 10 D5. Revised 01/12 recommendation(s) for appropriate solution to the City Project Manager and Design Engineer. 3.3. Prepare and maintain daily progress log or daily construction reports, photographs, records and track quantities installed that day. Retain all records and transmit daily report within 24 hours to City PM. 3.4. Ensure contractor reviews and approves daily reports and quantities. 3.5. Verify contractor has obtained necessary permits and is maintaining any Traffic Control, public notification and Storm Water Pollution Prevention Plans, facilities, equipment or arrangements in accordance with contract documents. 3.6. Attend and participate in progress meetings. 3.7. Create contacts for your record for: names, addresses, telephone numbers and email of all contractors, subcontractors, sub consultants and major suppliers of material and equipment; store electronically for record retention. 3.8. Immediately notify the City Project Manager and Design Engineer in the event of an on-site accident. Record and note conditions, activities and witnesses to the event. 3.9. Maintain Resolution Log and respond to citizen complaints electronically via DropBox or other share type system. 3.10. Consult with City Project Manager and Design Engineer in advance of scheduled major work operations, tests, inspections or start of important phases of project. 4. Pay Applications 4.1. Pay applications will be generated by the Construction Manager based on quantities approved in the daily reports.. Review and verify quantities provided by contractor for all work in compliance with contract documents. DocuSign Envelope ID: B1868E7F-4352-4F09-BF7D-F0C453238F8A Design 7 of 10 D5. Revised 01/12 4.1.1. Review work conducted daily on daily inspection reports and material installed measurements submitted by contractor; verify work conducted and bid item quantities; meet monthly to review pay estimate and quantities with contractor 4.1.2. Review progress pay application with Design Engineer for approval or revision prior to submittal to City. 4.1.3. Finalize pay application with signatures from Contractor, Engineer and Construction Manager certifying quantities and amounts. 4.1.4. Notify City Project Manager when all electronic signatures are completed for invoice processing. 4.1.5. Track and record requests for rain or other delays with potential to add to Contract Time in Daily Reports. 4.1.6. Provide an independent quantity forecast bid items to identify potential quantity over-runs as part of pay estimate review. 4.2. Upon completion of the work, prepare a final progress payment including a balancing change order zeroing out all unused quantities. Identify and add additional quantities and make any approved changes to the Contract Time. 4.2.1. Review and coordinate with Design Engineer to provide Engineer’s recommendation for Substantial Completion or Final Acceptance. (See Close-out Section) DocuSign Envelope ID: B1868E7F-4352-4F09-BF7D-F0C453238F8A Design 8 of 10 D5. Revised 01/12 5. Document Control 5.1. Utilize a file system: receive, route, track and log all Contractor communications, Submittals, Change Orders, RFIs, Pay Applications and Citizen Complaint/Resolution Log; communicate with Contractor the status of submittal reviews; review submittal and RFI log to ensure timely responses; notify City Project Manager, Contractor and Design Engineer of time critical issues. 5.1.1. Respond to RFIs when such response does not require the Engineer’s opinion or expertise or direction from City. 5.1.2. Assemble and maintain notes, comments, sketches and supportive data relative to the Project to facilitate the revision of drawings to conform to the final as-built conditions. Review Contractor’s record keeping periodically to ensure completeness, timeliness and progress. 6. Change Orders 6.1. Prepare and issue request for proposals in a timely manner. Review RFP and contractor proposal for additional work with City Project Manager and Design Engineer for approval. Ensure the status of RFP and Responses from Contractor, City and Design Engineer are logged and tracked. 6.2. Provide recommendation on technical matters as an advocate for the City. Evaluate Contractor’s response/proposal for merit, cost, time, accuracy and price practicality. Negotiate with Contractor on City’s behalf if required. 6.3. Prepare Change Order and documentation including signatures of Contractor, Engineer and Construction Manager for delivery to City. DocuSign Envelope ID: B1868E7F-4352-4F09-BF7D-F0C453238F8A Design 9 of 10 D5. Revised 01/12 7. Testing Laboratory and Results 7.1. Coordinate testing laboratory activities with Contractor’s activities. Review test reports for compliance with Contract Documents. Log, track and retain test reports. Review results with Contractor. Monitor any corrective action and re-testing for compliance. Maintain compliance with City’s specifications 7.1.1. Review lab test reports and log any failures. 7.1.2. Review Invoicing from Laboratory to daily activities. 8. Project Completion and Close out 8.1. A. Provide list of deliverables for substantial completion walk through/inspection. Schedule and conduct project walk through upon receipt of Contractor’s notification of substantial completion. Include City Project Manager, Design Engineer and others as directed. Prepare a list of non-conforming work based on visual inspections. Record and monitor contractor’s corrective efforts and schedule. Schedule final completion inspection for any remaining corrections. B. Coordinate and obtain Design Engineer’s signature and seal on Substantial Completion certificate and Final Completion and Acceptance certificate. 8.2. Review and compile any Operation and Maintenance documents required from the Contractor – forward to Engineer for review. Ensure Contractor’s closeout documents prepared and provided to the City. Review for completeness and accuracy, including; affidavits of final payment, final pay estimates, as built records, redlines and drawings. Once received, notify the Design Engineer and City Project Manager when completed. DocuSign Envelope ID: B1868E7F-4352-4F09-BF7D-F0C453238F8A Design 10 of 10 D5. Revised 01/12 8.2.1. Upon completion of close out items, provide recommendation for City’s Substantial Completion/Final Acceptance certificate. 8.2.2. Provide indexed project files,redline plans and asbuilt or record drawings to City. 8.3. Conduct Project Close-Out Meeting. 8.4. Prepare and recommend final payment applicatio n. (Prepare job record logs transmittals, and correspondence reports in an organized file for delivery to City.) 8.5. Consult with City on any potential Warranty items requiring repair or replacement. 9. Warranty Period 9.1. Schedule, arrange and coordinate a One Year Walk-through of the project to review status of the work 30 days prior to expiration of the One Year Maintenance period. 9.2. Provide staff to conduct and participate in the warranty inspections. 9.3. Prepare list of nonconforming work for presentation to the City Project Manager, Design Engineer and Contractor. 9.4. Oversee repairs for nonconforming work with Contractor. 9.5. Submit final report on completed warranty repairs. DocuSign Envelope ID: B1868E7F-4352-4F09-BF7D-F0C453238F8A 8/18/2022 $ 245.00 $ 137.00 Construction Contract Duration 26 months TOTALS Labor Cost Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19 Week 20 Week 21 Week 22 Week 23 Week 24 Week 25 Week 26 Week 27 Week 28 Week 29 Week 30 Week 31 Phase Construction Manager Regular Activities 155 37,975$ 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 Progress Meetings 60 14,700$ 0 4 0 4 0 4 0 4 0 4 0 4 0 4 0 4 0 4 0 4 0 4 0 4 0 4 0 4 0 4 0 Inspector 620 84,940$ 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 Contract Specialist 620 88,040$ 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 Total 225,655$ Total Equip/Misc Reimbursable Cost (See Below)3,586$ Total Costs 229,241$ Equipment and Misc Reimbursable Cost Items Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19 Week 20 Week 21 Week 22 Week 23 Week 24 Week 25 Week 26 Week 27 Week 28 Week 29 Week 30 Week 31 Mileage (visits at IRS rate )486$ 900$ 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 Lead Inspector Vehicle (includes mileage)3,100$ 3,100$ 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 Subtotal 3,586$ 3,586$ Notes: 3. Overtime will be charged at normal billing rates. Level of Effort ATTACHMENT B Construction Management and Inspection for City of Pearland, Safe Route to School CSJ 0912-31-318 NA Contract Specialist Project Engineer Inspector Construction Manager $ 142.00 2. This LOE assumes two progress meetings per month List of classifications and rates Units/Week Hours/Week 1. This LOE is based on a contract time of 249 calendar days to substantial completion and 279 days to final. DocuSign Envelope ID: B1868E7F-4352-4F09-BF7D-F0C453238F8A June 27, 2022 Cobb Fendley 13430 Northwest Freeway, Suite 1100 Houston, TX 77040 713.462.3242 Phone sbyington@cobbfendley.com Attention: Stephen Byington, P.E. Department Manager Reference: Construction Phase Services - Materials Testing Pearland Safe Rout to School City of Pearland, Texas GETI Proposal No. 22037 Geoscience Engineering & Testing, Inc. (GETI) is pleased to provide our proposed fee for material testing services in response to your request for the above referenced project. Project Information Project information was provided by City of Pearland Engineering and Capital Projects Department through E-Bid System and included the following: 1. Project Drawings provided by Cobb Fendley. The project will entail the Construction of 5- to 6-FT sidewalks with slotted curb along Mclean Rd from Village Creek Dr to Springfield Ave, Veterans Dr at Cowart Creek, Veterans at Springfield Ave, Veterans at Stonebridge Dr, Old Alvin Rd at McHard Rd, Pearland Pkwy from McHard Rd to Hidden Glen Ln, Knapp Rd from Glenda Street to Old Alvin Rd, Old Alvin Rd from Knapp Rd to just south of Knapp Rd, Glastonbury Dr from Robinson Dr to approximately 350’ west, Old Oaks Blvd, Fite Rd from east of Harkey Rd to Centennial Village Dr, Harkey Rd from Fite Rd to Josephine Dr, and Josephine Dr from Harkey Rd to Wagon Trial Rd. The work includes regarding swales with safety end treatments, riprap ditches, driveway reconstruction, installation of 20-LF of 7’x7’ storm sewer boxes and pavement markings. DocuSign Envelope ID: B1868E7F-4352-4F09-BF7D-F0C453238F8A 2 Scope of Work GETI is pleased to offer a program of acceptance testing and observation which will include the following items: A. Laboratory compaction and field density testing of utility backfill B. Concrete observations and testing to determine the compressive strength of concrete C. Reinforcement steel observations Fee Estimate Based on the plans and other documents provided our estimated fees for this project are approximately $32,113.00. This is a good faith estimate, and suggested budget only, since the actual cost will depend on the contractor’s schedule, which at the time of this proposal was not available, and efficiency, items over which we have no control. You will be billed only for the actual services performed. The GETI Fee Schedule of Personnel and Tests is also attached. We appreciate your consideration and this opportunity. We look forward to working with you on this project. If you have further questions or require additional information, please do not hesitate to call. Respectfully Submitted, GEOSCIENCE ENGINEERING & TESTING INC. TEXAS F-4802 James Taylor, CET Branch Manager Geoscience Engineering & Testing, Inc. Attachments Proposal Acceptance Project General Notes Terms & Conditions Fee Estimate DocuSign Envelope ID: B1868E7F-4352-4F09-BF7D-F0C453238F8A 3 PROPOSAL ACCEPTED BY: __________________________________ ________________________ Signature Date __________________________________ ________________________ Printed Name Company __________________________________ Title PROJECT GENERAL NOTES 1. Special tests and observations not contained herein will be quoted on a specific request basis. 2. Trip charges will be made by our technician to the site, including cancellations, with a minimum time of 4 hours. 3. All services on an hourly basis will be charged at the applicable hourly rate, portal to portal from our laboratory 4. Minimum technician time of 4 hours will be billed for any and all field observation trips, except sample pick up trips which will be billed at a minimum technician time of 2 hours. 5. Overtime rate of 1.5 times the regular published hourly rate will be billed charged for all work over 8 hours per day on Monday through Friday and for all hours worked on Saturday, Sunday and Holidays. 6. When GETI provides periodic services at the job site during construction. Client agrees that in accordance with generally accepted construction practices, the contractor will be solely and completely responsible for working conditions on the job site. Including safety of all persons and property during the performance of the work and compliance with OSHA regulations, and that these requirements will apply continuously and not be limited to normal working hours. DocuSign Envelope ID: B1868E7F-4352-4F09-BF7D-F0C453238F8A 4 GENERAL TERMS AND CONDITIONS Standard of Care: GETI will represent CLIENT in a professional manner, using proper skills and care normally associated with the type of project and geographical location of the project. The only warranty or guarantee made by GETI in connection with the services requested or performed hereunder is that we will use that level of skill ordinarily exercised under similar conditions by reputable members of our profession practicing in the same or similar locality. No other warranty, expressed or implied, is made or intended by our proposal for services or by furnishing oral or written reports. Sample Disposal Agreement: Unless otherwise requested, test specimens will be disposed of 4 weeks upon completion of testing. Upon written request, GETI will retain test specimens for a specified period of time, to be determined at the time of writing. Insurance: GETI maintains Comprehensive General Liability Insurance and Liability Insurance with bodily injury and property damage. Professional Liability Insurance is also provided for the protection of GETI. A Certificate of Insurance can be supplied evidencing such coverage. Termination: This agreement may be terminated by either party based on two days’ written notice. Upon termination, the GETI will be paid in full for all services performed and will provide copies of all reports to CLIENT. Underground Utilities: GETI is not responsible for locating or identifying underground utilities. Although GETI will call TEXAS ONE CALL in order to seek input from utility owners and take all reasonable care to avoid damage or injury to subterranean structures or utilities, the CLIENT agrees to hold GETI harmless for any damages to subterranean structures which are not called to our attention and correctly shown on the plans furnished. Right of Entry: The CLIENT further agrees to provide the right of entry of GETI to the site for the provision of service. While GETI will take all reasonable precautions to minimize any damage to the property, It Is understood by the CLIENT that in the normal course of work, some damage may occur and that the correction of such is not part of this agreement. Limitation of Liability: The CLIENT agrees to limit GETI’s liability to the owner, any and all construction contractors, sub- contractors, sub-consultants and other third parties arising from GETI’s professional acts, errors or omissions, on the project such that the total aggregate liability of GETI to all those named shall not exceed the limits of professional liability held by GETI ($1,000,000) as of the date of this contract. Payment Terms: Payment is due upon receipt of our invoice. If payment is not received within 30 days from the invoice date, client agrees to pay a finance charge on the principal amount of the past due account of one and one-half percent per month (nominally 19.56% effective rate per annum). If one and one-half percent per month exceeds the maximum allowed by law, the charge shall automatically be reduced to the maximum legally allowable. Reasonable attorney fees, personnel charges, or any costs incurred in collecting delinquent accounts will be charged to the client. All sums due are payable in Harris County, Texas. In the event client requests termination prior to completion, a termination charge in the amount equal to all charges incurred through the date services are stopped plus any shut down costs may, at the discretion of Geoscience Engineering & Testing, Inc. (GETI) be made. If GETI is required to stop operations because of changes in the scope of services as requested by the client or requirements of third parties, additional charges will be applicable. GETI reserves the right to withhold any letters and reports pending payment for services. Agreement: This agreement including these terms and conditions, represents the entire agreement between GETI and CLIENT and supersedes any previous agreements, negotiations, or representations, whether oral or written. This agreement DocuSign Envelope ID: B1868E7F-4352-4F09-BF7D-F0C453238F8A 10100 30 Hr.200.00 $6,000.00 10200 60 Hr.90.00 $5,400.00 10700 220 Hr.65.00 $14,300.00 10800 0 Hr.97.50 $0.00 15000 50 EA.72.50 $3,625.00 Sub Total Labor $29,325.00 Portland Cement Concrete 30100 24 Ea 17.00 $408.00 40100 1 Ea 200.00 $200.00 2112 Ea 350.00 $0.00 2117 Ea 13.50 $0.00 2119 Ea 78.00 $0.00 $608.00 Soils 90100 Ea 65.00 $0.00 90600 Ea 50.00 $0.00 92300 2 Ea 210.00 $420.00 92800 Ea 245.00 $0.00 94100 8 Ea 70.00 $560.00 94500 2 Ea 225.00 $450.00 95100 15 Trip 50.00 $750.00 $2,180.00 Total of Estimate $32,113.00 Sub Total Soils Liquid & Plastic Limits Nuclear Density Gauge OMD Standard Compaction, Treated Optimum Lime Content - PI Method Cement Sand Compressive Strength OMD Standard Compaction Percent Passing #200 Sieve Mix Design Review Sub Total Concrete Concrete Coring Minimum Charge Concrete Coring, addl. Thickness (6"-12") Preparation of Core, Cap & Test Compressive Str. (Cylinder) Vehicle Charge Pearland Safe Route To School GETI Proposal No. 22037 April 22, 2022 Principal, P.E. Project Manager City of Pearland Fee Schedule Construction Materials Engineering Services Labor Rates Technician, NICET II, ACI CI, HMA-1A, NDT II, Logger, TxDOT Soil SB-101 and Technician, OT DocuSign Envelope ID: B1868E7F-4352-4F09-BF7D-F0C453238F8A