R2022-181 2022-08-22DocuSign Envelope ID: 2BED3E07-4DC7-44A0-AA5C-D8B4Al2C4614 RESOLUTION NO. R2022-181 A Resolution of the City Council of the City of Pearland, Texas, amending a contract for construction materials testing services with GeoTech Engineering and Testing, in the additional amount of $12,475.00 (total amount of $58,886.67), for services associated with the Sleepy Hollow Street, Waterline and Sanitary Sewer Rehabilitation Project. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That the City hereby amends a contract for material testing services, with GeoTech Engineering and Testing, in the additional amount of $12,475.00. Section 2. The City Manager or his designee is hereby authorized to execute an amended contract for material testing services. PASSED, APPROVED and ADOPTED this the 22nd day of August, A.D., 2022. DocuSigned by: 9z g3F4F2 J. KEVIN4881YkB9-5COLE MAYOR ATTEST: DocuSigned by: 90'EC22"3tFFF�Y5... FRANCES AGUILAR, TRMC, MMC CITY SECRETARY APPROVED AS TO FORM: ,-DocuSigned by: L�E43CA008 &Bi-F486... DARRIN M. COKER CITY ATTORNEY CITY OF PEARLAND 01L PROJECTS DEPARTMENT 2016 Old Alvin Road 1li \R1 Pearland,Texas 77581 www.cityofpearland.com/projects y Professional Services Contract Amendment SLEEPY HOLLOW STREET RECONSTRUCTION,WATERLINE&SANITARY SEWER REIIABILATATION Date of Issuance: 26-Jul-22 Amendment No.: 2 TR2002/WA2004/ CoP Project No.: WW2005 Consultant: Geotech Engineering and Testing P.O. No.: 2021-00001382 Explanation: This amendment encompasses the following: Amendment for Sleepy Hollow Sanitary Sewer, Waterline,and Street Reconstruction Description of Work for Sanitary Sewer Cost Time 1 Technician (Sanitary Sewer) $ 233.75 0.Days 7 OMD,CSS,Standard(ASTM D698)(Sanitary Sewer) $ 324,00 0 Days 8 Transportation(Sanitary Sewer) $ 51.00 0 Days Total $ 608.75 Description of Work for Waterline 9 Technician (Waterline) $ (233.75) 0 Days 18 Transportation(Waterline) $ (51.00) 0 Days Total $ (284.75) Description of Work for Concrete 19 Technician (Concrete) $ 5,402.50 0 Days 20 Technician, OT(Concrete) $ 1,072.50 0 Days 21 Nuclear Gauge(Concrete) $ 456.00 0 Days 22 OMD, Soil, Standard (ASTM D698)(Concrete) $ 231.00 0 Days 23 LL(Method B)/PL(ASTM D4318) (Concrete) $ 71.00 0 Days 24 Pet Passing No.200 (ASTM D 1140)(Concrete) $ 55.00 0 Days 25 Transportation (Concrete) $ 1,110.00 0 Days 26 Comp. Strength Cone Cyl. (Concrete) $ 456.00 0 Days 28 Prep. Of Cores,Cap&Test(Concrete) $ (712.00) 0 Days 30 Percent Solid in Lime Slurry $ 49.00 0 Days 31 Sr. Engineer, P.E. $ 5,330.00 0 Days 32 Project Engineer $ (2,300.00) 0 Days 33 Engineering Asst. $ 930.00 0 Days Total $ 12,151.00 0 Days Please attach back-up documentation Design 1 of 2 D4.Revised 01/15 Cost& Time Change Summary Cost Time Original Contract: $ 49,210.00 0 Days Previous Change Order(s): $ (2,798.33) 0 Days Contract prior to this change order: $ 46,411.67 0 Days Net increase(decrease)from this change order $ 12,475.00 0 Days Revised Contract: $ 58,886.67_.. 0 Days Finance Approval: PQ2.&- ee,e9.P. Date: 08/24/2022 ACCEPTED*: APPROVED: , .fir ,..,.- By: ljita`i4e4,-;,, Date: - ,.a�_. By: Date: ..-2 q— 7 Consu,(t."--- Proj t Manager _ / „�.� � _.. By: Date: �� 2 gr )2— Owner •Contractor agrees to perform change(s)included in this Change Order for the price and time indicat , The prices for changes included all costs associated with this Change Order. No work is to be done until this change order is executed.No payment to the Contractor(or Cone Rant)shall be made for work-included in the change order until the Contractor's pay estimate is updated. Revise the project plans and specifications as referenced and insofar as the original project drawings and specifications are inconsistent,this Change Order governs Upon execution by all parties,the following changes identified for the Contract Value and/or Contract Time shown,are made part of the Contract. Design 2 of2 D4.Revised 01/15