RESOLUTION NO. R2022-181
A Resolution of the City Council of the City of Pearland, Texas, amending a
contract for construction materials testing services with GeoTech Engineering
and Testing, in the additional amount of $12,475.00 (total amount of
$58,886.67), for services associated with the Sleepy Hollow Street, Waterline
and Sanitary Sewer Rehabilitation Project.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS:
Section 1. That the City hereby amends a contract for material testing services, with
GeoTech Engineering and Testing, in the additional amount of $12,475.00.
Section 2. The City Manager or his designee is hereby authorized to execute an
amended contract for material testing services.
PASSED, APPROVED and ADOPTED this the 22nd day of August, A.D., 2022.
DocuSigned by:
9z
g3F4F2
J. KEVIN4881YkB9-5COLE
MAYOR
ATTEST:
DocuSigned by:
90'EC22"3tFFF�Y5...
FRANCES AGUILAR, TRMC, MMC
CITY SECRETARY
APPROVED AS TO FORM:
,-DocuSigned by:
L�E43CA008 &Bi-F486...
DARRIN M. COKER
CITY ATTORNEY
CITY OF PEARLAND
PROJECTS DEPARTMENT
2016 Old Alvin Road
Pearland, Texas 77581
www.cityofpearland.com/projects
Professional Services Contract Amendment
SLEEPY HOLLOW STREET RECONSTRUCTION, WATERLINE & SANITARY SEWER REIIABILATATION
Date of Issuance: 26 -Jul -22 Amendment No.:
2
TR2002/WA2004/
CoP Project No.: WW2005
Consultant: Geotech Engineering and Testing P.O. No.: 2021-00001382
Explanation:
This amendment encompasses the following:
Amendment for Sleepy Hollow Sanitary Sewer, Waterline, and Street Reconstruction
Description of Work for Sanitary Sewer
1 Technician (Sanitary Sewer)
7 OMD, CSS, Standard (ASTM D698) (Sanitary Sewer)
8 Transportation (Sanitary Sewer)
Total
Description of Work for Waterline
9 Technician (Waterline)
18 Transportation (Waterline)
Total
Description of Work for Concrete
19 Technician (Concrete)
20 Technician, OT (Concrete)
21 Nuclear Gauge (Concrete)
22 OMD, Soil, Standard (ASTM D698) (Concrete)
23 LL (Method B)/PL (ASTM D4318) (Concrete)
24 Pct Passing No. 200 (ASTM D 1140) (Concrete)
25 Transportation (Concrete)
26 Comp. Strength Conc Cyl. (Concrete)
28 Prep. Of Cores, Cap & Test (Concrete)
30 Percent Solid in Lime Slurry
31 Sr. Engineer, P.E.
32 Project Engineer
33 Engineering Asst.
Total
Please attach back-up documentation
Cost
$ 233.75
$ 324,00
$ 51.00
$ 608.75
(233.75)
(51.00)
(284.75)
5,402.50
1,072.50
456.00
231.00
71.00
55.00
$
$
1,110.00
456.00
(712.00)
49.00
5,330.00
(2,300.00)
930.00
12,151.00
Time
0. Days
0 Days
0 Days
0 Days
0 Days
0 Days
0 Days
0 Days
0 Days
0 Days
0 Days
0 Days
0 Days
0 Days
0 Days
0 Days
0 Days
0 Days
0 Days
Design
1 oft D4. Revised 01/15
Cost & Time Change Summary
Original Contract:
Previous Change Order(s):
Contract prior to this change order:
Net increase (decrease) from this change order
Revised Contract:
Finance Approval: Z7Cc/l.Cc. ez,d,
ACCEPTED*:
By: &kip',
Consujlant"
Cost
49,210.00
(2,798.33)
_...46,411.67
12,475.00
58,886.67
APPROVED:
Time
0 Days
_._.0 Days
0 Days
0 Days
0
Days
Date: 08/24/2022
By: i/A� /� Date:
By:
Owner
•Contractor agrees to perform change(s) included in this Change Order for the price and time indicatq(i, The prices for changes included all costs associated with
this Change Order.
No work is to be done until this change order is executed. No payment to the Contractor (or Con x4iltant) shall be made for work -included in the change order until the
Contractor's pay estimate is updated.
Revise the project plans and specifications as referenced and insofar as the original project drawings and specifications are inconsistent, this Change Order governs
Upon execution by all parties, the following changes identified for the Contract Value and/or Contract Time shown, are made part of the Contract.
7) -
Date:
Design
2 of2 D4. Revised 01/15