Loading...
HomeMy WebLinkAboutR2022-169 2022-08-22DocuSign Envelope ID: 2BED3E07-4DC7-44A0-AA5C-D8B4Al2C4614 RESOLUTION NO. R2022-169 A Resolution of the City Council of the City of Pearland, Texas, approving a Change Order No.2 with TB Concrete Construction, in the amount of $116,580.00, associated with the Shadow Creek Ranch Sidewalk Extension Project. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain change order associated with the Shadow Creek Ranch Sidewalk Extension Project, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a change order associated with the Shadow Creek Ranch Sidewalk Extension Project. PASSED, APPROVED and ADOPTED this the 22nd day of August, A.D., 2022. DocuSigned by: �t J. KEVIN COLE MAYOR ATTEST: by: ED9,ocuSigned &EC22 .21 FFF415 FRANCES AGUILAR, TRMC, MMC CITY SECRETARY APPROVED AS TO FORM: ,—DocuSigned by: +/ `—E93CAi?9SEE1 F4EG... DARRIN M. COKER CITY ATTORNEY DocuSign Envelope ID: F9584434-6D3D-4E14-9A9F-ECC9529FA776 CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive, Suite 300 Pearland, Texas 77581 wvvw.cityofpearland.com/projects CHANGE ORDER For Shadow Creek Ranch Sidewalk Extension Date of Issuance: 07/05/2022 Contractor: TB Concrete Construction Engineer: CP&Y Change Order No: 2 CoP Project No: TR2003 PO#: 2022-00001233 Explanation: This change order encompasses adding 1,400 LF of sidewalk from the Nature Trail to the Sports Complex. Description of Work 1. Mobilization 2. Traffic Control 3. Excavation — 400 CY 4. 6" Select Fill —165 SY 5. Compaction/Proof Roll Subgrade 6. Concrete Sidewalk (5" thick) —1,400 LF 7. Sodding — 380 SY 8. Wheelchair Ramps — 4 Total 9. Washout 10. SWPPP- Fence — 1,400 LF 11. SWPPP — Inlet Protection 12. Landscaping —15'x15' 13. Trim and Prume Existing Trees/Shrubs — 2 Cost $3,180.00 $5,000.00 $6,400.00 $6,600.00 $5,000.00 $58,000.00 $3,800.00 $14,000.00 $1,200.00 $4,900.00 $1,500.00 $5,000.00 $2,000.00 Cost & Time Change Summary: Original Contract: Previous Change Order(s): Contract prior to this change order: Net increase (decrease) from this change order: Revised Contract: � DocuSignnedby: 204.4.0.i.W7wr�j, .4.07L Finance Approval: O9 X61 p�z��c 2e... mance erector Cost $599,443.86 $12,500.00 $611,943.86 $116,580.00 $728,523.86 Date: 8/23/2022 I 12:48 PM CDT RECO ENDED: Date: 8/23/2022 By: Q,?,. -r C/44-. struction Manager Time 90 Days Time 250 Days 5 Days 255 Days 90 Days 345 Days Date: $/23/2ot2 Construction 1 of 2 D19. Revised 7/08 DocuSign Envelope ID: F9584434-6D3D-4E14-9A9F-ECC9529FA776 ACCEPTED*: By: aSamed Contractor DocuSigned by: API 1TOy,EI�(,a�csotA, Date: OS116/2022 By: �� Owner teasoac�o4eo... Date:8/23/2022 I 12:49 PM c *Contractor agrees to perform change(s) included in this Change Order for the price and time indicated. The prices for changes included all costs associated with this Change Order. No work is to be done until this change order is executed. No payment to the Contractor (or Consultant) shall be made for work included in the change order until the Contractor's pay estimate is updated. Revise the project plans and specifications as referenced and insofar as the original project drawings and specifications are inconsistent, this Change Order governs. Upon execution by all parties, the following changes identified for the contract value and/or contract time shown, are made part of the contract. Construction 2 of 2 D19. Revised 7/08 litMax l Microsoft CITY OF PEARLAND SCR Sidewalk 70 Proposed Sidewalk Proposed Crosswalk 140 Feet This product is for informational purposes and may not have been prepared for or be suitable for legal, engineering, or surveying purposes. It does not represent an on -the -ground survey and represents only the approximate relative location of property boundaries. MAP PREPARED: JULY 2022 CITY OF PEARLAND GIS DEPARTMENT 1 1 1 1 1 1