R2006-118 08-14-06RESOLUTION NO. R2006-118 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AWARDING A BID FOR CONSTRUCTION SERVICES ASSOCIATED WITH THE EXTENSION OF BAILEY DRIVE BETWEEN STATE HIGHWAY 35 AND VETERANS DRIVE. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That the City opened bids for construction services associated with the Bailey Drive Extension Project, and such bids have been reviewed and tabulated. Section 2. That the City Council hereby awards the bid to Hassell Construction Co., in the amount of $9,914,274.85. Section 3. The City Manager or his designee is hereby authorized to execute a contract for construction services associated with the Bailey Drive Extension Project. PASSED, APPROVED and ADOPTED this the 14th day of August, A.D., 2006. TOM REID MAYOR ATTEST: APPROVED AS TO FORM: 0,44- fl. DARRIN M. COKER CITY ATTORNEY Freese and Nichols, Inc. Engineers Environmental Scientists Architects • 2010 East Broadway Pearland, TX 77581-5502 281/485-2404 281/485-4322 fax www.freese.com July 11, 2006 FNI 05-315 Mr. Cecil Bowery Project Manager City of Pearland 3519 Liberty Drive Pearland, Texas 77581 Re: Bailey/Oiler Drive Extension Veterans Drive to SH 35 RFB 2006-052 Dear Cecil: 2666 On June 28, 2006, two (2) bids were opened for the referenced project. Bids were checked and tabulated. The low bidder is Hassell Construction Co., Inc. with a bid of $9,910,274.85. Enclosed are five (5) copies of bid tabulation sheet. Upon review of the low bidder's bid we noted an error in the price bid on Item B33, "Well Pointing". It was stipulated in the Bid Proposal that the minimum price bid for this item shall be $25. Hassell Construction Co., Inc. recorded a bid of $24. Freese and Nichols, Inc. spoke with Mr. Joe Rebecek with Hassell Construction Co., Inc. and informed him of this error. Mr. Rebecek stated that changing the price bid from $24 to $25 is acceptable. This error caused the bid to increase by $4,000, but it did not change the low bidder. Hassell Construction Co., Inc. has the experience in this type of work. A copy of their Statement of Qualifications is attached. They have completed similar projects for the City of Pearland in the past, and are TxDOT certified to bid up to $34,916,000. Their recent projects for the City of Pearland are Barry Rose Road, Cullen Blvd., and Kirby Drive Extension. These projects are either nearing or in closure phase at this time. However, all three recent projects have had issues concerning being a "responsive and responsible" contractor. These issues are mostly concerning staying on schedule, providing sufficient manpower, delay claims, and managing project adequately in the field as well as in the office. As we understand it these issues are being discussed with them by the City. Therefore, if the City and Hassell Construction Co. can resolve above issues, we recommend award of this contract to Hassell Construction Co., Inc., 12211 Duncan Road, Houston, Texas 77066, (281) 893-2570, in the amount of $9,914,274.85. However, if the issues can not be T:\PRL05315\Bowery5.1tr.doc Mr. Cecil Bowery July 11, 2006 resolved, the second bidder is W.W. Webber with a bid of $10,838,725.75. This company has experience in constructing these types of Projects. They completed McHard Road Overpass, Pearland Parkway for the City and are the Contractor on the Dixie Farm Road Widening Project. We would have no objections to recommending award of this contract to them. We are looking forward to the successful implementation of this project. Please call me if I can be of service to you. Sincerely, Mehran (Ron) Bavarian, P.E. Associate Pearland Office Manager Attachment: -, Freese 2nd Nichols Freese & Nichols, Inc. 2010 East Broadway Pearland, TX 77581-5502 BID TABULATION 9 M ofPeainandr , ? # } jt c-; 3;„r Project)BaIIeyOder Dnye 1:1dOnSI0ii (Veterans Dnve to S( 35) RFB 2006 D52 (( i qrt £ Q 'C } 3k Y1A {K ' ,}r"y'j'y�,�, 4 Y �,,�. C �+ T`3 B1d Date YJe 4,- . vJune 28 2006 `n.'a .}+ 4 S ,y: � � S ier � i � tE 3 �,.. $ro)ect;No ,PRL05315 „x„„. ,, , .'.._'.`.:.: `�.�, u.M `.�-s.� : Hassell Construction 12211 Duncan Rd. Houston, TX 77066 (281) 893-2570 W.W. Webber, LLC 14333 Chrisman Rd. Houston, TX 77039 (281) 987-8787 # 1 Description 1 Quantity 1 Unit Unit Cost 1 Total Cost Unit Cost 1 Total Cost ,- SEGTIOIVA . avm9 !, . r a 1 ` 1 'Mobilization for Entire Contract (Max. 4 % of Total Bid) . 1 1 jLS $370,000.001 $370,000.00 $394,000.001 $394,000.00 2 Traffic Control & Regulation during Construction 1 LS $13,500.00( $13,500.00 $100,000.001 $100,000.00 3 Project Identification Signs 2 EA $790.001 $1,580.00 $800.001 $1,600.00 4 Clearing and Grubbing for Entire Contract 60 AC $1,350.001 $81,000.00 $4,000.001 $240,000.00 5 Remove Existing Asphalt Pavement w/ Base (up to 12' thick) 250 SY $4.501 $1,125.00 $8.001 $2,000.00 6 Remove Existing Conc. Headwall on 7'x7' RCB 2 EA $3,900.001 $7,800.00 $8,000.001 $16,000.00 7 Remove Existing Pipe (All Sizes) 500 LF $19.001 $9,500.00 $12.001 $6,000.00 8 Roadway Excavation 3,000 CY $2.601 $7,800.00 $8.00! $24,000.00 9 Roadway Embankment, Compacted in Place (Max. LL=65, PI+35) 130,000 CY $6.60 $858,000.00 $6.38 $829,400.00 10 Manipulation of Lime Treated Subgrade (6') 6,400 SY $2.301 $14,720.00 $5.001 $32,000.00 11 Manipulation of Lime Treated Subgrade (8°) 20,000 SY $2.201 $44,000.00 $5.001 $100,000.00 12 Lime Material (6%) - 450 TN $111.00 f $49,950.00 $100.001 $45,000.00 13 6' Asphalt Stabilized Base 6,400 SY $32.001 $204,800.00 $25.651 $164,160.00 14 12' Asphalt Stabilized Base 650 SY $59.001 $38,350.00 $63.401 $41,210.00 15 3' Type 'D° HMAC Surface Coarse 7,000 SY $17.001 $119,000.00 $14.561 $101,920.00 16 10' Jointed, Reint. Concrete Pavement (Slip -form) 17,300 SY $38.001 $657,400.00 $39.141 $677,122.00 17 6' Concrete Curb 11,500 LF $1.401 $16,100.00 $3.501 $40,250.00 18 4° Concrete Sidewalks, including Wheelchair ramps per details in plans 38,400 SF $2.80 $107,520.00 $4.00 $153,600.00 19 6° Concrete Driveways 130 SY $34.001 $4,420.00 $60.001 $7,800.00 20 Type T501 Traffic Rail, incl. painting 115 LF $45.001 $5,175.00 $35.001 $4,025.00 21 Type PR 2 Pedestrian Rail, incl. conc. Footing and painting 1,000 LF $112.001 $112,000.00 $125.001 $125,000.00 22 Metal Beam Guard Fence with Timber Posts 850 LF $28.001 $23,800.00 $40.001 $34,000.00 23'Terminal Anchor Section 3IEA 1 $564.001 $1,692.00 $2,000.001 $6,000.00 124 (Metal Beam Guard Fence Transition 1 5IEA 1 $1,129.001 $5,645.00 $3,000.001 $15,000.00 25 116-ft. Type 1 Aluminum Gate at Detention Pond 1 11EA - 1 $500.001 $500.00 $2,000.001 $2,000.00 126 15-Strand Woven Wire Fence w/ Metal Posts per Details in Plans 1 16,000!LF I $6.701 $107,200.00 $4.80j $76,B00.00 27 2' Schedule 80 PVC Conduit for Future Street Lights, excl. bridge segment 5,600 LF $14.00 $78,400.00 $6.75 $37,800.00 128 !Install Fumished Electrical Conduit Pull Box 1 20IEA 1 $500.001 $10,000.00 $220.001 $4,400.00 129 !Brick Pavers j 1,2001SY I $62.001 $74,400.00 $60.001 $72,000.00 130'Roadway Area Hydro -Mulch Seeding 1 142,000ISY I $0.301 $42,600.00 $0.221 $31,240.00 131 14° Topsoil j 19,000jSY I $2.001 $38,000.00 $1.251 $23,750.00 132 'Block Sodding 1 19,000!SY I $3.001 $57,000.00 $2.76! $52,440.00 33 Site Restoration for Entire Contract incl. Clean up, Grading & Misc. Existing Ditch Regrading 1 LS $12,000.00 $12,000.00 $10,000.00 $10,000.00 1 34 !Single Guardrail Terminal 1 7!EA I $600.001 $4,200.00 $5,000.001 $35,000.00 SUBTOTAL SECTION "A" - Paving $3,179,177.00 $3,505,517.0D .?_a,F .o+. . 1 *.'sEQTIQW_ B =Teaina9etnc ...z.v 1 18° RCP Storm Sewer, Including excavation, bedding & backfill (Class III) 330 LF $52.00 $17,160.00 $45.00 $14,850.00 2 24° RCP Storm Sewer, including excavation, bedding & backfill (Class Ill) 1,700 LF $62.00 $105,400.00 $75.00 $127,500.00 3 30° RCP Storm Sewer, including excavation, bedding & backfill (Class III) 600 LF $81.00 $48,600.00 $95.00 $57,000.00 4 36° RCP Storm Sewer, including excavation, bedding & backfill (Class III) 525 LF $110.00 $57,750.00 $125.00 $65,625.00 5 42° RCP Storm Sewer, Including excavation, bedding & backfill (Class III) 1,000 LF $150.00 $150,000.00 $145.00 $145,000.00 6 48° RCP Storm Sewer, including excavation, bedding & backfill (Class III) 150 LF $170.00 $25,500.00 $160.00 $24,000.00 7 4'x4' RCB Storm Sewer, including excavation, bedding & backfill (ASTM C850) 180 LF $210.00 $37,800.00 $240.00 $43,200.00 6/28/2006 1 of 4 T:\Bldding Phase\BID TABS.XLS Freese end Nichols Client Cdy of Pearled Rr.oit v,$ariey/Cifet Drty Bid Dato Wednessday?3, Pro)ectfNO PRL'"05,3`':. Freese & Nichols, Inc. 2010 East Broadway Pearland, TX 77581-5502 BID TABULATION Description 1 Quantity 1 Unit Hassell Construction 12211 Duncan Rd. Houston TX 77066 (281) 893-2570 Unit Cost 8 9 10 5'x3' RCB Storm Sewer, including excavation, bedding & backfill (ASTM C850) 6'x4' RCB Stone Sewer, including excavation, bedding & backfill (ASTM C850) 7'x4' RCB Storm Sewer, including excavation, bedding & backfill (ASTM C850) 650 610 1,115 LF LF LF $245.00 $300.00 $400.00 Total Cost $159,250.00 $183,000.00 $446,000.00 W.W. Webber, LLC 14333 Chrisman Rd. Houston TX 77039 (281) 987-8787 Unit Cost $270.00 $330.00 $400.00 Total Cost $175,500.00 $201,300.00 $446,000.00 11 I8'x5' RCB Storm Sewer, including excavation, bedding & backfill (ASTM C850) 12 13 10'x7' RCB Storm Sewer, including excavation, bedding & backfill, and 2' inside fill (ASTM C850) Trench Safety 600 585 8,045 LF LF LF $500.00 $700.00 $0.23 $300,000.00 $409,500.00 $1,850.35 $490.00 $725.00 $1.00 $294,000.00 $424,125.00 $8,045.00 14 15 Pre -Cast Bends for 4'x4' RCB (0° - 45°) Pre -Cast Bends for 7'x4' RCB (0° - 35°) 2 4 EA EA $840.00 $1,620.00 $1,680.00 $6,480.00 $2,000.00 $4,500.00 $4,000.00 $18,000.00 16 Pre -Cast Bends for 7'x4' RCB (0° - 35°) w/ Manhole 4 EA $2,500.00 $10,000.00 $5,000.00 $20,000.00 17 Type 'A' Manhole, All Depths 4 EA $2,600.00 $10,400.00 $3,000.00 $12,000.00 18 Type °M' Manhole, All Depths 9 EA $2,900.00 $26,100.00 $4,500.00 $40,500.00 19 Junction Box, All Depths 2 EA $30,000.00 $60,000.00 $25,000.0D $50,000.00 20 Type'C° Inlet, All Depths 15 EA $1,600.00 $24,000.00 $2,800.00 $42,000.00 21 Stage I, Type °C° Inlet, All Depths 5 EA $1,100.00 $5,500.00 $2,400.00 $12,000.00 22 Stage I, Type'C' Inlet on 7'x4' RCB 1 EA $1,100.00 $1,100.00 $3,000.00 $3,000.00 23 Stage I, Type °C" Inlet w/ Type °AD' Grate, All Depths 1 EA $1,500.00 $1,500.00 $4,600.00 $4,600.00 24 Type °AD° Grate Inlet, All Depths 17 EA $1,800.00 $30,600.00 $3,200.00 $54,400.00 25 Type °B° Berm Inlet, All Depths 14 EA $1,800.00 $25,200.00 $3,600.00 $50,400.00 26 Type "E° Inlet, All Depths 1 EA $2,800.00 $2,800.00 $4,200.00 $4,200.00 27 Std. Culvert Headwall for 7'x4' RCB 1 EA $18,000.00 $18,000.00 $22,000.00 $22,000.00 128 'Std. Culvert Headwall for 2-8'x5' RCB 29 Std. Culvert Headwall for 3-10'x7' RCB 1JEA 2 EA $18,600.00 $17,500.00 $18,600.00 $35,000.00 $20,000.00 $25,000.00 $20,000.00 $50,000.00 30 'Articulated Blocks 1 31 1 18" - 6:1 Sloped End Treatment w/ Cross Bars 132 136° - 6:1 Sloped End Treatment w/ Cross Bars 133 'Well Pointing 134 'Channel Excavation 35 Channel Embankment, compacted in place 3,100ISY 4IEA 2IEA 4,000ILF 36,000ICY 500 CY $38.00 $1,500.00 $2,000.00 -$25 00 $7.00 $5.00 $117,800.00 $6,000.00 $4,000.00 $1A0000:oo $252,000.00 $2,500.00 $6.00 $1,600.00 $3,100.00 $25.00 $8.00 $5.00 $18,600.00 $6,400.00 $6,200.00 $100,000.00 $288,000.00 $2,500.00 36 Detention Pond Excavation 185,000 CY $4.00 $740,000.00 $8.00 $1,480,000.00 Concrete Flume in Detention Pond 1201CY $310.00 $37,200.00 $300.00 $36,000.00 Concrete Broad -Crested Weir at Detention Pond, incl. Toe Walls, 38 Beams, and 4' PVC Weep Holes on 15' Centers w/ 1 Cu. Ft. drain gravel w/ fabric 1,350 SY $43.00 $58,050.00 $60.00 $81.000.00 39 18° thick Rock Riprap w/ Geotextile Liner 200 SY $36.00 $7,200.00 $55.00 $11,000.00 40 Outfall Ditch and Det. Pond Hydro -Mulch Seeding 167,000 SY $0.16 $26,720.00 $0.22 $36,740.00 41 Cut, Remove & Replace Exist. 4° Force Main w/ 4' welded steel pipe (coated inside & out), incl. excavation, bedding, bends, adapters, and cement stabilized sand 175 LF $57.00 $9,975.00 $200.00 $35,000.00 42 Filter Fabric Fence - Install & Remove 18,000 LF $1.35 $24,300.00 $2.75 $49,500.00 43 Inlet Protection Barrier - Install & Remove 1,600 LF 144 lRock Filter Dam - Install & Remove 110ILF 145 (Construction Exit Type 1 - Install & Remove 2,000ISY 46 Extra Cement Stabilized Sand, compacted in place. As Authorized by Engineer 1,000 TN 147 'Type °M° Manhole Riser 71 EA 48 Conc. Headwall & Conc. Channel Transition w/ railing at STA. 14+90 per plans and details 1 LS SUBTOTAL SECTION "B" - Drainage $94.00 $150,400.00 $6.00 $9,600.00 $27.00 $15.00 $30.00 $2,970.00 $30,000.00 $30,000.00 $100.00 $25.00 $20.00 $11,000.00 $50,000.00 $20,000.00 $800.00 $17,000.00 $5,600.00 $17,000.00 $2,500.00 $25,000.00 $17,500.00 $25,000.00 $3,840,485.35 $4,717,285.00 6/28/2006 2 of 4 T:\Bidding Phase\BID TABS.XLS -, Freese and Nichols Freese & Nichols, Inc. 2010 East Broadway Pearland, TX 77581-5502 BID TABULATION Client',Cjtyof Pearland A Y of ks :r Profec(:1Barley/Oiler prove Extension (Veterans'Drtve to St{ 35) rR B 2006-05 s' ; x Bid Da *eL nesday June 8�200fi c A ( €s k EroJ at Noy PPL'05315 A Hassell Construction 12211 Duncan Rd. Houston, TX 77066 (281) 893-2570 W.W. Webber, LLC 14333 Chrisman Rd. Houston, TX 77039 (281) 987-8787 6 I Description I Quantity I Unit Unit Cost Total Cost Unit Cost Total Cost zx ; r . 6a ;,SECTION "C' ::Bridge F„'k P ., y.y., 1 Wide Flange Terminal Anchorage and related items per TxDOT Istandardforatotallength of 70 ft. 50 LF $145.00 $7,250.00 $650.00 $32,500.00 2 Drilled Shaft (18') 200 LF $200.00 $40,000.00 $70.00 $14,000.00 3 Drilled Shaft (36°) 1,615 LF $260.00 $419,900.00 $180.00 $290,700.00 4 Class°C° Concrete Abutment 75 LF $1,200.00 $90,000.00 $450.00 $33,750.00 5 Class"C" Concrete Bent 266 LF $800.00 $212,800.00 $500.00 $133,000.00 6 Reinf. Concrete Slab 30,000 SF $12.00 $360,000.00 $13.75 $412,500.00 7 Prestressed Concrete Beam (Type IV) 4,460 LF $160.00 $713,600.00 $125.00 $557,500.00 8 Retaining Wall (MSE)(Exp Aggr) 6,830 SF $32.00 $218,560.00 $40.00 $273,200.00 9 Concrete Surface Treatment (TxDOT Item 428) 3,600 SY $2.00 $7,200.00 $1.00 $3,600.00 L 10 Class °B' Concrete (Slope Paving) I 100 CY $200.00 $20,000.00 $300.00 $30,000.00 11 Concrete Riprap (Flume) 30 CY $275.00 $8,250.00 $600.00 $18,000.00 12 Concrete Riprap (Mowing Strip) 90 CY $200.00 $18,000.00 $450.00 $40,500.00 13 Type T501 Traffic Rail, incl. painting 895 LF $75.00 $67,125.00 $30.00 $26,850.00 14 Type C501 Traffic Rail, incl. 2° SCH 80 PVC embedded conduit and painting 905 LF $75.00 $67,875.00 $100.00 $90,500.00 15 Type PR 2 Pedestrian Rail 900 LF $65.00 $58,500.00 $110.00 $99,000.00 16 'Sealed Expansion Joint (4') I 220ILF I $75.00 $16,500.00 $70.00 $15,400.00 17 Chain Link Barrier Fence on Bridge Per Details in Plans, incl. overhang and installed 210 LF $37.00 $7,770.00 $53.00 $11,130.00 18 'Cement for Cement Treated Base (6') ' 10ITN I $120.00 $1,200.00 $115.00 $1,150.00 19 'Cement Treated Base (6") I 370ISY I $15.00 $5,550.00 $15.00 $5,550.00 20'Cement Treated Backfill behind Abutments I 70ICY I $50.00 $3,500.00 $40.00 $2,800.00 21'Asphalt Stabilized Base Bond Breaker (1') I 20ITN I $125.00 $2,500.00 $220.00 $4,400.00 SUBTOTAL SECTION °C" - Bridge $2,346,080.00 $2,096,030.00 :-;.,.,... <SECTtON"DF,Si riiri9t4PaveiriegifVlarkii &Signalizateon., `. . _... 1 'Small Aluminum Roadside Sign I 45'EA $280.00 $12,600.00 $391.00 $17,595.00 2 14' Broken White Striping I 1,300ILF I $1.10 $1,430.00 $0.47 $611.00 3 14° Solid Yellow Striping I 14,500ILF ' $1.10 $15,950.00 $0.47 $6,815.00 4 14' Solid White Striping I 4,6001LF I $1.10 $5,060.00 $0.47 $2,162.00 5 18' Solid White Striping I 850'LF I $2.20 $1,870.00 $0.94 $799.00 6 I12° Solid Yellow Striping I 1,150ILF I $7.00 $8,050.00 $2.75 $3,162.50 7 12° Solid White Striping 1,400 LF $7.00 $9,800.00 $2.75 $3,850.00 8 24° Solid White Stop Bar 525 LF $13.00 $6,825.00 $5.50 $2,887.50 9 'Arrow Pavement marking I 15IEA 1 $140.00 $2,100.00 $105.00 $1,575.00 10 Word Pavement Marking 15 EA $140.00 $2,100.00 $105.00 $1,575.00 11 Raised Refl. Pavement Markers (White TY-I-C or Yellow TY-II-A-A), as shown in Plans or As Directed by Engineer. 1,020 EA $6.00 $6,120.00 $3.50 $3,570.00 12 Pavement Surface Prep. (Blast Clean) (4°) 20,400 LF $0.10 $2,040.00 $0.10 $2,040.00 13 Pavement Surface Prep. (Blast Clean) (8°) 850 LF $0.20 $170.00 $0.20 $170.00 14 Pavement Surface Prep. (Blast Clean) (12') 2,550 LF $0.30 $765.00 $0.45 $1,147.50 15 Pavement Surface Prep. (Blast Clean) (24°) 525 LF $0.50 $262.50 $0.85 $446.25 16 Pavement Surface Prep. (Blast Clean) (Arrow) 15 EA $13.00 $195.00 $17.00 $255.00 17 Pavement Surface Prep. (Blast Clean) (Word) 15 EA $13.00 $195.00 $17.00 $255.00 18 Complete Signalization at Veterans Drive per plans and details and per TxDOT Standards and Specifications, Complete in place and Operational 1 LS $138,000.00 $138,000.00 $141,136.00 8141,136.00 19 Signal Modification at S.H. 35 per plans and details and per TxDOT Standards and Specifications, Complete in place and Operational 1 LS $85,000.00 $85,000.00 $79,842.00 $79,842.00 SUBTOTAL SECTION °D" - Signing, Pavement Marking & Signalization 5298,532.50 S269,893.75 6/2e/2006 3 of 4 T:18Idding Phase\BID TABS.XLS Freese and Nichols Freese & Nichols, Inc. 2010 East Broadway Pearland, TX 77581-5502 BID TABULATION ' tty of Peadarld Pto)ect Bale 7/OIIIerDhveXlen5lon(Vet ns�Driveto si.r3b)< FB 2006 052 B(d Dafe+ W9dnesday jutte 28 2066 ' v s ' ; n Projecti f r*6-05 315 ;.x �i a _ Y. *? A x<. ' �_ oh s f K .Hassell Construction 12211 Duncan Rd. Houston, TX 77066 (281) 893.2570 W.W. Webber, LLC 14333 Chrisman Rd. Houston, TX 77039 (281) 987-8787 # I Description I Quantity I Unit Unit Cost Total Cost Unit Cost Total Cost ', ; , .; SECTIDN...EMB Worst,;: < , . 1 'Extra Labor (unskilled) I IMan Hr $15.10 $25.00 $0.00 2 Extra Labor (skilled) Man Hr $17.90 $30.00 $0.00 3 Extra Excavation (machine) CY $4.50 $6.00 $0.00 4 Extra Concrete, all classes with form work, complete in place CY $200.00 $1,000.00 $0.00 5 Extra reinforcing steel, all sizes, complete in place LBS $0.50 $0.50 $0.00 6 Extra Cement Stabilized Sand, Compacted in Place TN $20.00 $25.00 $0.00 7 Flagman HR $32.50 $20.00 $0.00 8 Ductile Iron Fittings (M.J.) TN $2,500.00 $5,000.00 $0.00 SUBTOTAL SECTION "E" - Extra Work $250,000.00 $250,000.00 TOTAL AMOUNT BID $9,914,274.85 $10,838,725.75 VARIAN • ▪ 0 11 A . CEt�S� • ;�'® Z �Olp vi1®�`b�eu��aa 6/2B/2006 4 of 4 T:\Bidding Phase\BID TABS.XLS texas Department Transportation --DEWITT a-GRREER- STATE HIGHWAY--BLDG,• .125-E.4-TH-S-TRE€T-kAUSTIN TEXAS-78z9-i-2483-% P1-2+463-8585•— October 21, 2005 Hassell Construction Company, Inc. 12211 Duncan Road Houston, Texas 77066 Dear Contractor: Your prequalification statement as of June 30, 2005 is satisfactory and qualifies you to bid on all classes of Texas Department of Transportation work through June 30, 2006. Your bidding capacity has been set at $34,916,000.00. You may request and receive bidding proposals for projects on which the engineer's estimate does not exceed this amount, less any uncompleted work under contract. •If we may be of further assistance, please contact us at 512-416-2540. Sincerely, v TxDOT Vendor Code #: 897 Frank.Huerta, III Prequalification and Proposal Issuance Construction Division An Equal Opportunity Employer CONTRACTOR'S STATEMENT OF QUALIFICATIONS Date of Contractor's Statement () Individual () Joint Venture () Legal Name of Contractor (O'"Corporation () Partnership ( ) Other Address Telephone Texas Vendor Identification number Tax Identification number % ' -- l _) 4, 0 3 I certify that all information contained in this Contractor's Statement of Qualifications is true, correct, and complete. Name Avide:::-L Z. .44=j.se-2.4.- Title 4'�"s!<+�s;��lrf 00715-3 INFORMATION AND EXPERIENCE STATEMENT ORGANIZATIONAL BACKGROUND I. If the business is a PARTNERSHIP a. Date of organization ,/ b. State whether partnership is general or limited c. List ALL partners Name Status (general or Address Telephone limited) II. If the business is a CORPORATION a. Date of incorporation :e94:7 b. State of incorporation, c. Charter/permit number g8S 636C'O d. Principal place(s) of business a, e. Other state(s) in which corporation is authorized to do business f. Officers President ;j ,>.= /'' ,1; 4-65t,L Vice President(s) ,YicraA a/9Ga68i,.r..- Secretary 52M .� a `, f .;15 Treasurer .._;9,41,14.1 Ad. / .-7-A, 00715-4 g. List ALL shareholders owning 10 % or more of the stock of the corporation: Name • % of Stock Address Telephone Owned III. If the business is OTHER THAN PARTNERSHIP OR CORPORATION Describe the organization b. List ALL principals of the organization Name 4)f Address Telephone Title IV. How many years has the business been in business under its present name? a. Under what other or former names has the business operated? 41/4 b. Has the business ever defaulted, declared bankruptcy, or undergone reorganization procedures? If so, attach details: list of creditors, amounts owed each, amounts repaid, resolution of proceedings, etc. c. Has a predecessor of the business defaulted, declared bankruptcy, or undergone reorganization procedures? , If so, attach details, as above. d. Does the business presently have outstanding claims pending against it? If so, attach details, as above. e. Has the business been involved in litigation within the past five (5) years, or is it currently involved in litigation?If so, attach details, as 00715-5 above. f. Has an officer or principal of the business ever engaged in any of the activities or had claims against him or her as described in this item 1V? .; If so, attach details, as above. CONSTRUCTION EXPERIENCE V. How many years experience in construction work has the business had? a. As a general contractor : 9 b. As a subcontractor VI. What types of work does the business normally perform with its own forces? VII. Has the business ever failed to complete a construction contract, forfeited a bid bond/proposal guaranty, had liquidated damages withheld from its compensation due on a contract, or refused to enter into contract for work awarded to it? Aio If so, attach details (a) name of project; (b) contract amount; (c) type of work; (d) name and addresses of: (i) project engineer, (ii) contractor, and (iii) owner; (e) when; (f) where; and (g) why. VIII. Has any officer or partner of the business ever been an officer or principal of some other organization that failed to complete a construction contract, forfeited a bid bond/proposal guaranty, had liquidated damages withheld from its total compensation due on a contract, or refused to enter into contract for work awarded to it? /iv If so, attach details (a) name of individual; (b) his or her current position; (c) name of other organization; (d) position at other organization; (e) name of project; (f) when; (g) where; and (h) why. IX. Has any officer or principal of the business ever failed to complete a construction contract, forfeited a bid bond/proposal guaranty, had liquidated damages withheld from his or her total compensation due on a contract, or otherwise refused to enter into contract for work awarded to him or her in his or her own name? ti, If so, attach details (a) name of individual; (b) his or her current position; (c) type of work; (d) name and address; (e) when; (f) where; and (g) why. 00715-6 List all projects (beginning with the most current and not to exceed the last ten consecutive jobs) of construction cost greater than $200,000 that the business has completed within the last five (5) years in the Houston area and in Texas requalifying, only show work performed since last statement). You may attach copies of the final estimate for the jobs listed, in which event you need not list information called for by the chart that clearly a.ppears on the final estimate. Add additional sheets if needed. 00715-7 NAME OF PROJECT Amount Type of Work ,;f. Percentage subcontracted %U Amount subcontracted Je U 33 . 00 Scheduled completion date be-cEt-pti��. Date completed Location (city, county, state) Z.Ary - 7 6091-p '- ' y '7 Name and address of project engineer id ,S C-1314 /dococ- t1-10u5-r 15, 7-76r7 Name, address, and telephone of contractor (if subcontractor) Name, address, and telephonefjjof owner /.3 s 2s - 9oco % e9; '6;Z• 6 f /�Jee £Q,zi ,/ Zp • 00715-8 NAME OF PROJECT 9, Amount 3_;" . , ,:-? 7j? Type of Work 5c/80i Percentage subcontracted 7 4 Amount subcontracted 1 3.5" Scheduled completion date 4l%'C.',z,, coy'' Date completed 3/2 s'/c Location (city, county, state) L r ' - , 166'4,� o Name and address of project engineer le :•'6 li ocao 444,/ 770t 7 Name, address, and telephone of contractor (if subcontractor) Name, address, and telephone of owner 6703 -52.0 - Vcroo Ae.e4 4.t7, . (',J c, iatiew . isiiTAcb)gs7 GP 00715-9 NAME OF PROJECT t „CAI Amount 'J '7 • '%c Type of Work SG'& .i ti jsio,d ituoA. Percentage subcontracted Amount subcontracted 3..;"1-1 / -51. O Scheduled completion date &i , ,v/De5' Date completed . 4/2 do( Location (city, county, state) 164•ri e-,'z i3-S Name andaddress of project engineer le /I Name, address, and telephone of contractor (if subcontractor) ,v% Name, address, and telephone of owner 14 -.6 - 000 61Zot de- £`, tug L e- 00715-10 NAME OF PROJECT diV Amount 9.0 / ,737, co Type of Work as.).PaC;dec'zi4un_ 6/A(6� 77 5�L�.vi Percentage subcontracted 1`7 64, Amount subcontracted Scheduled completion date Od'_-oi, 64 a�t)s' Date completed Aire, ✓e-ni5 Location (city, county, state) /10a5r01� / , -i 5 • L�i4aS Name and address of project engineer 1"2 6 5 7 S'7 C4kvOcv/), ,/, I100 5 yz).cd 7 y 77s 7 Name, address, and telephone of contractor . (if subcontractor) Name, address, and telephone of owner r 1 G)G AS3 iio_ 00715-11 XI. List major construction projects the business has in process. Add additional sheets if needed. NAME OF PROJECT Amount '� C4 U, C •7 ) .:, Type of Work , ) &.4 Percentage completed Scheduled completion 406 Location (city, county, state) gtAiet,grAdi, 814, ,4.._ / KAS Name and address of project engineer 1_ ?'6 S 57 11ele)4. .- 7 i 77vs 7 Name, address, and telephone of contractor (if subcontractor) Name, address, and telephone of owner 1. ry SiJJ4'244.40 00715-12 NAME OF PROJECT Amount .�, ' °' . Type of Work .6).., ? 0 _,. ��" ��l ' Percentage completed 3� Scheduled completion MAY) 2Oo5 Location (city, county, state) Ali;S7-4,,j f sS - 6e4.5 Name and address of project engineer 7 Name, address, and telephone of contractor (if subcontractor) J/A Name, address, and telephone of owner d frAi 4A,eZA,1.0 00715-13 XII. List construction experience of the principal individuals of your organization (include not only officers and principals of the organizations, but also field superintendents who will be in charge of the work). Add additional sheets if needed. Name A - J if eep%C E-Z Present position or office tL -° Years with the organization Years of construction experience ;,:rc Detailed construction experience 6ref4 th',t 6 Name Present position or office G���C-1 �y .su 'r ins o, x Years with the organization Js L 4-t, Years of construction experience . Y0W 5 Detailed construction experience Z3.e° de .e - C- % rae -✓.��r 9�-iJ - 5c602,rier v V,J.,4.) •ate 00715-14 XIII. List all.subcontractors that are anticipated to perform any portion of the work valued at 20 0 of the amount bid or more. Add additional sheets if needed. Namej ,may Address Work to be done Percentage of contract Persons responsible for the work Name 11,04/ Address Work to be done Percentage of contract Persons responsible for the work - 00715-15 REFERENCES XIV. List all banks with whom the business has done business with during the past five years. List current bank first. Name of Name of bank Address contact officer Telephone ; ;�? ., • 2,,z : e -_his /4220 XV. Payment and performance and maintenance bonds a. Name and address of surety company le iv' ;-1-s %" 14-4 4 r e at7, .5-7 4 ) $ I pre- e- ) 3 Z'- 1. Company file number AI ) C .P' : 1 2. Authorized to do business in Texas? e:5 3. Authorized to issue payment and performance and maintenance bonds in Texas? 4. Maximum amount of bond authorized to issue ti,;' i, rL.Ce 5. Rating (as listed in Best's Key Guide) A 6. Financial size category (as listed in Best's Key Guide) 00715-16 b. Name and address of agency (company or partnership for which agent works) 1. Name and address of agent (person actually signing) 4`3,J) r7;4 (' ti7-rxe 2. Authorized to do business in Texas? 3. Agent's file number 4. Agent's local recording agent's license number gs 5. Does agent/agency have appointment from insurance company authorizing agent/agency to sign bonds? 00715-17