Loading...
R2022-151 2022-07-11RESOLUTION NO. R2022-151 A Resolution of the City Council of the City of Pearland, Texas, amending a design build contract for the Parks Equipment Recapitalization Irrigation Project (Phase II Construction Services), with Landscape Art, Inc., in the Guaranteed Maximum Price of $832,734.61. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That the City Council previously awarded a design build contract for the Parks Equipment Recapitaliz ation Irrigation Project, to Landscape Art, Inc., in the amount of $55,344.75 (Phase I Services) with a material and equipment mark -up percentage of 10%. Section 2. That the City Council hereby amends a design build contract for the Parks Equipment Recapitalization Irrigation Project (Phase II Construction Services), with Landscape Art, Inc., in the Guaranteed Maximum Price of $832,734.61. Section 3. The City Manager or his designee is hereby authorized to execute an amended design build contract for the Parks Equipment Recapitalization Irrigation Project. PASSED, APPROVED and ADOPTED this the 11th day of July A.D., 2022. ________________________________ J. KEVIN COLE MAYOR ATTEST: ________________________________ LESLIE CRITTENDEN CITY SECRETARY APPROVED AS TO FORM: ________________________________ DARRIN M. COKER CITY ATTORNEY DocuSign Envelope ID: 487FA7C9-ADBF-4C7F-94A5-3EEC3B24F525 DocuSign Envelope ID: El 8F9A1 E-60C6-4E44-9F52-C8C67C957D3F A CITY OF PEARLAND 6 ^u PROJECTS DEPARTMENT u INa 2016 Old Alvin .44 , ; 1 \ Pearland,Texas 77581 pearlandtx.gov/projects 16 i Design-Build Contract Amendment For Park Equipment Recapitalization (Irrigation) Date of Issuance: 7/11/2022 Amendment No.: 2 CoP Project No.: PK2101 & PK2201 Consultant: Landscape Art,Inc. P.O. No.: 2021-00001587 Explanation: This amendment encompasses the following: Amendment to implement Phase 2 of the existing Design-Build contract. Scope includes upgrades and repairs, as recommended by Landscape Art and approved by City staff,to (14) City parks for a guaranteed maximum price. Description of Work Cost Time 1 Hickory Slough Sports Complex Site Repairs $ 76,883.49 7 Days 2 Hickory Slough Sports Complex Control System Upgrades $ 44,649.00 7 Days 3 Independence Park Site Repairs $ 42,566.18 7 Days 4 Independence Park Control System Updgrades $ 15,554.00 7 Days 5 Veterans Sport Complex Site Repairs $ 66,414.38 7 Days 6 Veterans Sport Complex Control System Upgrades $ 8,990.00 7 Days 7 Shadow Creek Ranch Park(Phase 1) Site Repairs $ 43,583.34 7 Days 8 Shadow Creek Ranch Park(Phase 1) Control System Upgrades $ 30,913.00 7 Days 9 Shadow Creek Ranch Park(Phase 2) Site Repairs $ 21,144.50 7 Days 10 Shadow Creek Ranch Park(Phase 2) Control System Upgrades $ 15,768.00 7 Days 11 Southdown Park Site Repairs $ 72,454.47 7 Days 12 Southdown Park Control System Upgrades $ 15,030.00 7 Days 13 South Gate Park Site Repairs $ 18,734.61 7 Days 14 South Gate Park Control System Upgrades $ 7,515.00 7 Days 15 Cypress Village Park Site Repairs $ 11,883.31 7 Days 16 Cypress Village Park Control System Upgrades $ 7,515.00 7 Days 17 Recycle Center Site Repairs $ 50,100.88 7 Days 18 Recycle Center Control System Upgrades $ 7,515.00 7 Days 19 Delores Fenwick Nature Center Site Repairs $ 17,791.60 7 Days 20 Delores Fenwick Nature Center Control System Upgrades $ 7,515.00 7 Days 21 Zychlinski Park Site Repairs $ 13,101.49 7 Days 22 Zychlinski Park Control System Upgrades $ 7,515.00 7 Days 23 Creek Side Park Site Repairs $ 14,055.43 7 Days 24 Creek Side Park Control System Upgrades $ 7,515.00 7 Days 25 Hyde Park Site Repairs $ 17,205.80 7 Days 26 Hyde Park Control System Upgrades $ 7,515.00 7 Days 27 Pine Hollow Site Repairs $ 14,390.61 7 Days 28 Pine Hollow Control System Upgrades $ 7,515.00 7 Days Design 1 of 2 D4.Revised 01/15 DocuSign Envelope ID: El 8F9A1 E-60C6-4E44-9F52-C8C67C957D3F 29 Centennial Park Site Repairs $ 51,958.14 7 Days 30 Centennial Park Control System Upgrades $ 37,215.00 7 Days Please attach back-up documentation Cost & Time Change Summary Cost Time Original Contract: $ 55,344.75 0 Days Previous Amendment(s): $ 7,882.63 0 Days Contract prior to this amendment: $ 63,227.38 0 Days Net increase (decrease) from this amendment $ 760,507.23 210 Days Revised Contract: $ 823,734.61 210 Days DocuSigned by: Finance Approval: �7ac� Date: 7/15/2022 I 7:50 AM CDT •E6 kEE•i C22C2486... ACCEPTED*: APPROVED: , -DocuSigned by: AP�'7//'1 :6 2 Jul 1 2022 GctVSbin 7/15/2022 I 7:54 AM CDT '° Date: By: Date: 'ti• 3B8283B69CCQ460... Consultant Owner *Contractor agrees to perform change(s)included in this Change Order for the price and time indicated. The prices for changes included all costs associated with this Change Order. No work is to be done until this change order is executed.No payment to the Contractor(or Consultant)shall be made for work included in the change order until the Contractor's pay estimate is updated. Revise the project plans and specifications as referenced and insofar as the original project drawings and specifications are inconsistent,this Change Order governs.Upon execution by all parties,the following changes identified for the Contract Value and/or Contract Time shown,are made part of the Contract. Design 2 of 2 D4.Revised 01/15 Pearland Park Irrigation Repairs and Weather Trak Installation Location Site Repairs Control System Total Hickory Slough Sports Complex 76,883.49 44,649.00 121,532.49 Shadow Creek Ranch Sports Complex 43,583.34 30,913.00 74,496.34 Shadow Creek Ranch (New Area) 21,144.50 15,768.00 36,912.50 Independence Park 42,566.18 15,554.00 58,120.18 Veterans Sports Complex 66,414.38 8,990.00 75,404.38 South Down Park 72,454.47 15,030.00 87,484.47 Centennial Park 51,958.14 37,215.00 89,173.14 South Gate Park 18,734.61 7,515.00 26,249.61 Cypress Village Park 11,883.30 7,515.00 19,398.30 Recycle Center 50,100.88 7,515.00 57,615.88 Deloris Fenwick Nature Center 17,791.60 7,515.00 25,306.60 Zychlinski Park 13,101.49 7,515.00 20,616.49 Creek Side Park 14,055.43 7,515.00 21,570.43 Hyde Park 17,205.80 7,515.00 24,720.80 Pine Hollow 14,390.61 7,515.00 21,905.61 Totals 532,268.23 228,239.00 760,507.23 Notes: 1. Recycle Center is a very difficult install that is close to being a completely new irrigation system. It would involve boring and overall is very labor intensive. We are not recommending proceeding with this installation. 2.The Site Repair pricing listed above is a guaranteed maximum price. Irrigation Repair Pricing Hickory Slough Sports Complex Unit Total Total Ext. Description Size Qty Price Price IRRIGATION TOTALS(from below) 76,883.49 HEADS Raise/Straighten Heads ea 794 29.08 23,090.51 Replace Nozzle ea 46 10.31 474.38 Replace 1804 Spray Head ea 9 32.18 289.58 Replace 1812 Spray Head ea 0 - 0.00 Replace Rotor Head ea 13 50.39 655.12 Replace Bubbler Head ea 0 - 0.00 Replace Bubbler on Flex Pipe ea 53 20.28 1,074.91 Drip Repair ea 0 - 0.00 VALVES Repair Valve/Replace Solenoid ea 0 - 0.00 Replace Drip Kit 1" ea 0 - 0.00 Replace Valve 1" ea 1 426.25 426.25 Replace Valve 1 1/2" ea 0 - 0.00 Replace Valve 2" ea 0 - 0.00 1 inch Quick Couplers 44DRC ea 0 - 0.00 Replace Flow Sensor ea 0 - 0.00 Replace Master Valve ea 0 - 0.00 Replace Rain Sensor ea 0 - 0.00 1" Ball Valve ea 0 - 0.00 1 1/2"Ball valve ea 0 - 0.00 2"Ball Valve ea 0 - 0.00 Clean Valve Boxes/Add Gravel ea 0 - 0.00 Remove and Reset Valve Boxes with Gravel and Bricks ea 149 162.25 24,175.25 Replace Decoder ea 0 - 0.00 ID Tags ea 0 - 0.00 PIPING and BACKFLOW Repair Lateral Leak ea 16 488.13 7,810.00 Repair Mainline ea 0 - 0.00 Repair Backflow ea 0 - 0.00 Replace 1"PBV ea 0 - 0.00 Replace 1 1/2"PBV ea 0 - 0.00 Replace 2"PBV ea 0 - 0.00 Replace 1"RPZ ea 0 - 0.00 Replace 1 1/2"RPZ ea 0 - 0.00 Replace 2"RPZ ea 0 - 0.00 Hotbox InsulatedLL035045035 ea 0 - 0.00 Strongbox SBBC-30ALI Enclosure W/pad ea 0 - 0.00 Strongbox SBBC-45ALI Enclosure ea 0 - 0.00 Strongbox SBBC-45SS Enclosure ea 0 - 0.00 Backflow Certification ea 0 - 0.00 MISCELLANEOUS COSTS & REPAIRS Equipment Is 1 4,983.77 4,983.77 Materials Is 1 3,849.19 3,849.19 Labor Is 1 10,054.54 10,054.54 PEARLAND IRRIGATION RECAPITALIZATION HICKORY SLOUGH SPORTS COMPLEX WEATHERTRAK Total Description Totals Unit Price Extended Price WeatherTrak OptiFlow XR 1 6,826.00 6,826.00 WeatherTrak Central Internet Management(CIM)- Manufacturer 1 - - providing 3 years of service at no cost. WeatherTRAK Flow3- Master Valve and Flow Meter 1 2,284.00 2,284.00 Rain Sensor 1 249.00 249.00 Flow Meter Decoder 1 529.00 529.00 Master Valve Decoder 1 257.00 257.00 H2O Decoders 149 214.00 31,886.00 MISC. Wiring and Grounding Rod 1 2,618.00 2,618.00 TOTAL 44,649.00 NOTES: Please note the master valve and flow meter may require trenching back to controller that is unknown at this time. Pricing will be included in the park specific repair proposals. Irrigation Repair Pricing Shadow Creek Ranch Unit Total Total Ext. Description Size Qty Price Price IRRIGATION TOTALS(from below) 43,583.34 HEADS Raise/Straighten Heads ea 3 29.08 87.24 Replace Nozzle ea 0 - 0.00 Replace 1804 Spray Head ea 0 - 0.00 Replace 1812 Spray Head ea 0 - 0.00 Replace Rotor Head ea 2 50.39 100.79 Replace Bubbler Head ea 0 - 0.00 Replace Bubbler on Flex Pipe ea 0 - 0.00 Drip Repair ea 0 - 0.00 VALVES Repair Valve/Replace Solenoid ea 0 - 0.00 Replace Drip Kit 1" ea 0 - 0.00 Replace Valve 1" ea 1 577.50 577.50 Replace Valve 1 1/2" ea 0 - 0.00 Replace Valve 2" ea 1 962.50 962.50 1 inch Quick Couplers 44DRC ea 0 - 0.00 Replace Flow Sensor ea 0 - 0.00 Replace Master Valve ea 0 - 0.00 Replace Rain Sensor ea 0 - 0.00 1" Ball Valve ea 0 - 0.00 1 1/2"Ball valve ea 0 - 0.00 2"Ball Valve ea 0 - 0.00 Clean Valve Boxes/Add Gravel ea 65 120.31 7,820.31 Remove and Reset Valve Boxes with Gravel and Bricks ea 0 - 0.00 Replace Decoder ea 2 467.50 935.00 ID Tags ea 0 - 0.00 PIPING and BACKFLOW Repair Lateral Leak ea 0 - 0.00 Repair Mainline ea 0 - 0.00 Repair Backflow ea 0 - 0.00 Replace 1"PBV ea 0 - 0.00 Replace 1 1/2"PBV ea 0 - 0.00 Replace 2"PBV ea 0 - 0.00 Replace 1"RPZ ea 0 - 0.00 Replace 1 1/2"RPZ ea 0 - 0.00 Replace 2"RPZ ea 0 - 0.00 Hotbox InsulatedLL035045035 ea 0 - 0.00 Strongbox SBBC-30ALI Enclosure W/pad ea 0 - 0.00 Strongbox SBBC-45ALI Enclosure ea 0 - 0.00 Strongbox SBBC-45SS Enclosure ea 0 - 0.00 Backflow Certification ea 0 - 0.00 MISCELLANEOUS COSTS & REPAIRS Equipment Is 1 6,895.83 6,895.83 Materials Is 1 4,531.55 4,531.55 Labor Is 1 21,672.62 21,672.62 PEARLAND IRRIGATION RECAPITALIZATION SHADOW CREEK RANCH SPORTS COMPLEX WEATHERTRAK Total Description Totals Unit Price Extended Price WeatherTrak ET Pro3 96 Station 1 4,860.00 4,860.00 WeatherTrak Central Internet Management(CIM)- Manufacturer 1 - - providing 3 years of service at no cost. WeatherTRAK Flow3- Master Valve and Flow Meter 1 2,284.00 2,284.00 Rain Sensor 1 249.00 249.00 Flow Meter Decoder 1 529.00 529.00 Master Valve Decoder 1 257.00 257.00 H2O Decoders 94 214.00 20,116.00 MISC. Wiring and Grounding Rod 1 2,618.00 2,618.00 TOTAL 30,913.00 NOTES: Please note the master valve and flow meter may require trenching back to controller that is unknown at this time. Pricing will be included in the park specific repair proposals. Irrigation Repair Pricing Shadow Creek Ranch (New Area) Unit Total Total Ext. Description Size Qty Price Price IRRIGATION TOTALS(from below) 21,144.50 HEADS Raise/Straighten Heads ea 1 26.44 26.44 Replace Nozzle ea 0 - 0.00 Replace 1804 Spray Head ea 0 - 0.00 Replace 1812 Spray Head ea 0 - 0.00 Separate mixed zones ea 132 45.81 6,047.25 Replace Bubbler Head ea 0 - 0.00 Replace Bubbler on Flex Pipe ea 0 - 0.00 Drip Repair ea 0 - 0.00 VALVES Repair Valve/Replace Solenoid ea 0 - 0.00 Replace Drip Kit 1" ea 0 - 0.00 Replace Valve 1" ea 0 - 0.00 Replace Valve 1 1/2" ea 0 - 0.00 Replace Valve 2" ea 0 - 0.00 1 inch Quick Couplers 44DRC ea 0 - 0.00 Replace Flow Sensor ea 0 - 0.00 Replace Master Valve ea 0 - 0.00 Replace Rain Sensor ea 0 - 0.00 1" Ball Valve ea 0 - 0.00 1 1/2"Ball valve ea 0 - 0.00 2"Ball Valve ea 0 - 0.00 Clean Valve Boxes/Add Gravel ea 0 - 0.00 Remove and Reset Valve Boxes with Gravel and Bricks ea 10 147.50 1,475.00 Replace Decoder ea 0 - 0.00 ID Tags ea 0 - 0.00 PIPING and BACKFLOW Repair Lateral Leak ea 1 70.81 70.81 Repair Mainline ea 0 - 0.00 Repair Backflow ea 0 - 0.00 Replace 1"PBV ea 0 - 0.00 Replace 1 1/2"PBV ea 0 - 0.00 Replace 2"PBV ea 0 - 0.00 Replace 1"RPZ ea 0 - 0.00 Replace 1 1/2"RPZ ea 0 - 0.00 Replace 2"RPZ ea 0 - 0.00 Hotbox InsulatedLL035045035 ea 0 - 0.00 Strongbox SBBC-30ALI Enclosure W/pad ea 0 - 0.00 Strongbox SBBC-45ALI Enclosure ea 0 - 0.00 Strongbox SBBC-45SS Enclosure ea 0 - 0.00 Backflow Certification ea 0 - 0.00 MISCELLANEOUS COSTS & REPAIRS Equipment Is 1 706.25 706.25 Materials Is 1 2,387.50 2,387.50 Labor Is 1 10,431.25 10,431.25 PEARLAND IRRIGATION RECAPITALIZATION SHADOW CREEK RANCH SPORTS COMPLEX- NEW SECTION WEATHERTRAK Total Description Totals Unit Price Extended Price WeatherTrak ET Pro3 48 Station 1 3,839.00 3,839.00 WeatherTrak Central Internet Management(CIM)- Manufacturer 1 - - providing 3 years of service at no cost. WeatherTRAK Flow3- Master Valve and Flow Meter 1 2,284.00 2,284.00 Rain Sensor 1 249.00 249.00 Flow Meter Decoder 1 529.00 529.00 Master Valve Decoder 1 257.00 257.00 H2O Decoders 28 214.00 5,992.00 MISC. Wiring and Grounding Rod 1 2,618.00 2,618.00 TOTAL 15,768.00 NOTES: Please note the master valve and flow meter may require trenching back to controller that is unknown at this time. Pricing will be included in the park specific repair proposals. Irrigation Repair Pricing Independence Park Unit Total Total Ext. Description Size Qty Price Price IRRIGATION TOTALS(from below) 42,566.18 HEADS Raise/Straighten Heads ea 34 29.08 988.76 Raise/Straighten Heads(bubblers) ea 96 29.08 2,791.80 Replace Nozzle ea 0 - 0.00 Replace 1804 Spray Head ea 0 - 0.00 Replace 1812 Spray Head ea 0 - 0.00 Replace Rotor Head ea 3 50.39 151.18 Replace Bubbler Head ea 1 35.06 35.06 Replace Bubbler on Flex Pipe ea 0 - 0.00 Drip Repair ea 0 - 0.00 VALVES Repair Valve/Replace Solenoid ea 0 - 0.00 Replace Drip Kit 1" ea 0 - 0.00 Replace Valve 1" ea 0 - 0.00 Replace Valve 1 1/2" ea 0 - 0.00 Replace Valve 2" ea 0 - 0.00 1 inch Quick Couplers 44DRC ea 0 - 0.00 Replace Flow Sensor ea 0 - 0.00 Replace Master Valve ea 0 - 0.00 Replace Rain Sensor ea 0 - 0.00 1" Ball Valve ea 0 - 0.00 1 1/2"Ball valve ea 0 - 0.00 2"Ball Valve ea 0 - 0.00 Clean Valve Boxes/Add Gravel ea 27 240.63 6,496.88 Remove and Reset Valve Boxes with Gravel and Bricks ea 0 - 0.00 Replace Decoder ea 0 - 0.00 ID Tags ea 0 - 0.00 PIPING and BACKFLOW Repair Lateral Leak ea 2 1,615.63 3,231.25 Repair Mainline ea 0 - 0.00 Repair Backflow ea 0 - 0.00 Replace 1"PBV ea 0 - 0.00 Replace 1 1/2"PBV ea 0 - 0.00 Replace 2"PBV ea 0 - 0.00 Replace 1"RPZ ea 0 - 0.00 Replace 1 1/2"RPZ ea 0 - 0.00 Replace 2"RPZ ea 0 - 0.00 Hotbox InsulatedLL035045035 ea 0 - 0.00 Strongbox SBBC-30ALI Enclosure W/pad ea 0 - 0.00 Strongbox SBBC-45ALI Enclosure ea 0 - 0.00 Strongbox SBBC-45SS Enclosure ea 0 - 0.00 Backflow Certification ea 0 - 0.00 MISCELLANEOUS COSTS & REPAIRS Equipment Is 1 4,558.75 4,558.75 Materials Is 1 3,935.83 3,935.83 Labor Is 1 20,376.67 20,376.67 PEARLAND IRRIGATION RECAPITALIZATION INDEPENCENCE PARK WEATHERTRAK Total Description Totals Unit Price Extended Price WeatherTrak ET Pro3 48 Station 1 3,839.00 3,839.00 WeatherTrak Central Internet Management(CIM)- Manufacturer 1 - - providing 3 years of service at no cost. WeatherTRAK Flow3- Master Valve and Flow Meter 1 2,284.00 2,284.00 Rain Sensor 1 249.00 249.00 Flow Meter Decoder 1 529.00 529.00 Master Valve Decoder 1 257.00 257.00 H2O Decoders 27 214.00 5,778.00 MISC. Wiring and Grounding Rod 1 2,618.00 2,618.00 TOTAL 15,554.00 NOTES: Please note the master valve and flow meter may require trenching back to controller that is unknown at this time. Pricing will be included in the park specific repair proposals. Irrigation Repair Pricing Veterans Sports Complex Unit Total Total Ext. Description Size Qty Price Price IRRIGATION TOTALS(from below) 66,414.38 HEADS Raise/Straighten Heads ea 51 29.08 1,483.08 Replace Nozzle ea 12 10.31 123.72 Replace 1804 Spray Head ea 8 32.18 257.44 Replace 1812 Spray Head ea 8 42.49 339.92 Replace Rotor Head(Falcon 6504)Controller 2 ea 54 113.44 6,125.76 Replace Rotor Head(Falcon 6504)Controller 3 ea 88 113.44 9,982.72 Replace Bubbler Head ea 0 - 0.00 Drip Repair ea 0 - 0.00 VALVES Repair Valve/Replace Solenoid ea 0 - 0.00 Replace Drip Kit 1" ea 0 - 0.00 Replace Valve 1" ea 0 - 0.00 Replace Valve 1 1/2" ea 0 - 0.00 Replace Rotor Head ea 0 - 0.00 Replace Valve 2" ea 3 735.63 2,206.89 1 inch Quick Couplers 44DRC ea 0 - 0.00 Replace Flow Sensor ea 0 - 0.00 Replace Master Valve ea 0 - 0.00 Replace Rain Sensor ea 0 - 0.00 1" Ball Valve ea 0 - 0.00 1 1/2"Ball valve ea 0 - 0.00 2"Ball Valve ea 0 - 0.00 Clean Valve Boxes/Add Gravel ea 0 - 0.00 Remove and Reset Valve Boxes with Gravel and Bricks ea 25 481.25 12,031.25 Remove and Reset Valve Boxes with Gravel and Bricks- ea 16 481.25 7,700.00 Controller 2 Replace Decoder ea 0 - 0.00 ID Tags ea 0 - 0.00 PIPING and BACKFLOW Repair Lateral Leak ea 1 456.02 456.02 Repair BIG Leak ea 3 760.86 2,282.58 Repair Backflow ea 0 - 0.00 Replace 1"PBV ea 0 - 0.00 Replace 1 1/2"PBV ea 0 - 0.00 Replace 2"PBV ea 0 - 0.00 Replace 1"RPZ ea 0 - 0.00 Replace 1 1/2"RPZ ea 0 - 0.00 Replace 2"RPZ ea 0 - 0.00 Hotbox InsulatedLL035045035 ea 0 - 0.00 Strongbox SBBC-30ALI Enclosure W/pad ea 0 - 0.00 Strongbox SBBC-45ALI Enclosure ea 0 - 0.00 Strongbox SBBC-45SS Enclosure ea 0 - 0.00 Backflow Certification ea 0 - 0.00 MISCELLANEOUS COSTS&REPAIRS Equipment ea 1 5,267.65 5,267.65 Materials ea 1 3,755.88 3,755.88 Labor ea 1 14,401.47 14,401.47 PEARLAND IRRIGATION RECAPITALIZATION VETERANS SPORTS COMPLEX WEATHERTRAK Total Description Totals Unit Price Extended Price WeatherTrak ET Pro3 48 Station 1 3,839.00 3,839.00 WeatherTrak Central Internet Management(CIM)- Manufacturer 1 - - providing 3 years of service at no cost. WeatherTRAK Flow3- Master Valve and Flow Meter 1 2,284.00 2,284.00 Rain Sensor 1 249.00 249.00 MISC. Wiring and Grounding Rod 1 2,618.00 2,618.00 TOTAL 8,990.00 NOTES: Please note the master valve and flow meter may require trenching back to controller that is unknown at this time. Pricing will be included in the park specific repair proposals. Irrigation Repair Pricing South Down Park Unit Total Total Ext. Description Size Qty Price Price IRRIGATION TOTALS(from below) 72,454.47 HEADS Raise/Straighten Heads ea 300 24.96 7,486.88 Replace Nozzle ea 20 10.31 206.25 Replace 1804 Spray Head ea 3 32.18 96.53 Replace 1812 Spray Head ea 0 - 0.00 Replace Rotor Head ea 10 50.39 503.94 Replace Bubbler Head ea 0 - 0.00 Replace Bubbler on Flex Pipe ea 0 - 0.00 Drip Repair ea 0 - 0.00 VALVES Repair Valve/Replace Solenoid ea 0 - 0.00 Replace Drip Kit 1" ea 0 - 0.00 Replace Valve 1" ea 0 - 0.00 Replace Valve 1 1/2" ea 0 - 0.00 Replace Valve 2" ea 0 - 0.00 1 inch Quick Couplers 44DRC ea 0 - 0.00 Replace Flow Sensor ea 0 - 0.00 Replace Master Valve ea 0 - 0.00 Replace Rain Sensor ea 0 - 0.00 1" Ball Valve ea 0 - 0.00 1 1/2"Ball valve ea 0 - 0.00 2"Ball Valve ea 0 - 0.00 Clean Valve Boxes/Add Gravel ea 0 - 0.00 Remove and Reset Valve Boxes with Gravel and Bricks-Cor ea 30 481.25 14,437.50 Remove and Reset Valve Boxes with Gravel and Bricks-Cor ea 30 481.25 14,437.50 Remove and Reset Valve Boxes with Gravel and Bricks ea 0 - 0.00 Replace Decoder ea 0 - 0.00 ID Tags ea 0 - 0.00 PIPING and BACKFLOW Repair Lateral Leak ea 9 607.27 5,465.42 Repair Mainline(Quick Coupler) ea 1 609.61 609.61 Repair Backflow ea 0 - 0.00 Replace 1"PBV ea 0 - 0.00 Replace 1 1/2"PBV ea 0 - 0.00 Replace 2"PBV ea 0 - 0.00 Replace 1"RPZ ea 0 - 0.00 Replace 1 1/2"RPZ ea 0 - 0.00 Replace 2"RPZ ea 0 - 0.00 Hotbox InsulatedLL035045035 ea 0 - 0.00 Strongbox SBBC-30ALI Enclosure W/pad ea 0 - 0.00 Strongbox SBBC-45ALI Enclosure ea 0 - 0.00 Strongbox SBBC-45SS Enclosure ea 0 - 0.00 Backflow Certification ea 0 - 0.00 MISCELLANEOUS COSTS&REPAIRS Equipment Is 1 5,738.65 5,738.65 Materials Is 1 2,058.27 2,058.27 Labor Is 1 21,413.94 21,413.94 PEARLAND IRRIGATION RECAPITALIZATION SOUTH DOWN PARK WEATHERTRAK Total Description Totals Unit Price Extended Price WeatherTrak LC+Controller 2 2,364.00 4,728.00 WeatherTrak Central Internet Management(CIM)- Manufacturer 2 - - providing 3 years of service at no cost. WeatherTRAK Flow3- Master Valve and Flow Meter 2 2,284.00 4,568.00 Rain Sensor 2 249.00 498.00 MISC. Wiring and Grounding Rod 2 2,618.00 5,236.00 TOTAL 15,030.00 NOTES: Please note the master valve and flow meter may require trenching back to controller that is unknown at this time. Pricing will be included in the park specific repair proposals. Irrigation Repairs Pricing Centennial Park Unit Total Total Ext. Description Size Qty Price Price IRRIGATION TOTALS(from below) 51,958.14 HEADS Raise/Straighten Heads ea 126 29.08 3,664.24 Replace Nozzle ea 0 - 0.00 Replace 1804 Spray Head ea 0 - 0.00 Replace 1812 Spray Head ea 0 - 0.00 Replace Rotor Head ea 0 - 0.00 Replace Bubbler Head ea 0 - 0.00 Replace Bubbler on Flex Pipe ea 4 20.28 81.13 Drip Repair ea 2 625.63 1,251.25 VALVES Repair Valve/Replace Solenoid ea 0 - 0.00 Replace Drip Kit 1" ea 0 - 0.00 Replace Valve 1" ea 1 426.25 426.25 Replace Valve 1 1/2" ea 0 - 0.00 Replace Valve 2" ea 1 735.63 735.63 1 inch Quick Couplers 44DRC ea 0 - 0.00 Replace Flow Sensor ea 0 - 0.00 Replace Master Valve ea 0 - 0.00 Replace Rain Sensor ea 0 - 0.00 1" Ball Valve ea 0 - 0.00 1 1/2"Ball valve ea 0 - 0.00 2"Ball Valve ea 0 - 0.00 Clean Valve Boxes/Add Gravel Controller 1 ea 21 233.75 4,908.75 Clean Valve Boxes/Add Gravel Controller 2 ea 9 233.75 2,103.75 Clean Valve Boxes/Add Gravel Controller 3 ea 10 233.75 2,337.50 Remove and Reset Valve Boxes with Gravel and Bricks ea 0 - 0.00 Replace and Reset Valve Boxes with Gravel and Bricks- ea 5 481.25 2,406.25 Controller 1 Replace and Reset Valve Boxes with Gravel and Bricks- ea 2 481.25 962.50 Controller 2 Replace Decoder ea 0 - 0.00 ID Tags ea 0 - 0.00 PIPING and BACKFLOW Repair Lateral Leak ea 15 380.39 5,705.91 Repair Mainline ea 0 - 0.00 Repair Backflow ea 0 - 0.00 Replace 1"PBV ea 0 - 0.00 Replace 1 1/2"PBV ea 0 - 0.00 Replace 2"PBV ea 0 - 0.00 Replace 1"RPZ ea 0 - 0.00 Replace 1 1/2"RPZ ea 0 - 0.00 Replace 2"RPZ ea 0 - 0.00 Hotbox InsulatedLL035045035 ea 0 - 0.00 Strongbox SBBC-30ALI Enclosure W/pad ea 0 - 0.00 Strongbox SBBC-45ALI Enclosure ea 0 - 0.00 Strongbox SBBC-45SS Enclosure ea 0 - 0.00 Backflow Certification ea 0 - 0.00 MISCELLANEOUS COSTS&REPAIRS Equipment Is 1 6,097.97 6,097.97 Materials Is 1 4,199.32 4,199.32 Labor Is 1 17,077.71 17,077.71 PEARLAND IRRIGATION RECAPITALIZATION CENTENNIAL PARK WEATHERTRAK Total Description Totals Unit Price Extended Price WeatherTrak OptiFlow XR 3 6,826.00 20,478.00 WeatherTrak Central Internet Management(CIM)- Manufacturer 3 - - providing 3 years of service at no cost. WeatherTRAK Flow3- Master Valve and Flow Meter 1 2,284.00 2,284.00 Rain Sensor 1 249.00 249.00 Flow Meter Decoder 1 529.00 529.00 Master Valve Decoder 1 257.00 257.00 H2O Decoders 26 214.00 5,564.00 MISC. Wiring and Grounding Rod 3 2,618.00 7,854.00 TOTAL 37,215.00 NOTES: Please note the master valve and flow meter may require trenching back to controller that is unknown at this time. Pricing will be included in the park specific repair proposals. Irrigation Repair Pricing South Gate Park Unit Total Total Ext. Description Size Qty Price Price IRRIGATION TOTALS(from below) 18,734.61 HEADS Raise/Straighten Heads ea 0 - 0.00 Replace Nozzle ea 0 - 0.00 Replace 1804 Spray Head ea 43 29.25 1,257.75 Replace 1812 Spray Head ea 0 - 0.00 Replace Rotor Head ea 51 45.81 2,336.44 Replace Bubbler Head ea 0 - 0.00 Replace Bubbler on Flex Pipe ea 0 - 0.00 Drip Repair ea 0 - 0.00 VALVES Repair Valve/Replace Solenoid ea 0 0.00 Replace Drip Kit 1" ea 0 - 0.00 Replace Valve 1" ea 0 - 0.00 Replace Valve 1 1/2" ea 10 562.50 5,625.00 Replace Valve 2" ea 0 - 0.00 1 inch Quick Couplers 44DRC ea 1 628.80 628.80 Replace Flow Sensor ea 0 - 0.00 Replace Master Valve ea 0 - 0.00 Replace Rain Sensor ea 0 - 0.00 1" Ball Valve ea 0 - 0.00 1 1/2"Ball valve ea 0 - 0.00 2"Ball Valve ea 1 555.38 555.38 Clean Valve Boxes/Add Gravel ea 0 - 0.00 Remove and Reset Valve Boxes with Gravel and Bricks ea 10 243.75 2,437.50 Replace Decoder ea 0 - 0.00 ID Tags ea 10 31.25 312.50 PIPING and BACKFLOW Repair Lateral Leak ea 1 443.75 443.75 Repair Mainline ea 0 - 0.00 Repair Backflow ea 0 - 0.00 Replace 1"PBV ea 0 937.81 0.00 Replace 1 1/2"PBV ea 0 1,411.63 0.00 Replace 2"PBV ea 0 1,771.88 0.00 Replace 1"RPZ ea 0 1,069.50 0.00 Replace 1 1/2"RPZ ea 0 1,530.41 0.00 Replace 2"RPZ ea 0 1,804.50 0.00 Hotbox InsulatedLL035045035 ea 0 4,832.25 0.00 Strongbox SBBC-30ALI Enclosure W/pad ea 0 2,206.05 0.00 Strongbox SBBC-45ALI Enclosure ea 0 2,581.25 0.00 Strongbox SBBC-45SS Enclosure ea 0 3,331.25 0.00 Backflow Certification ea 0 293.75 0.00 MISCELLANEOUS COSTS & REPAIRS Equipment Is 1 562.50 562.50 Materials Is 1 462.50 462.50 Labor Is 1 4,112.50 4,112.50 PEARLAND PARKS EQUIPMENT RECAPITALIZATION IRRIGATION South Gate Park WEATHERTRAK Total Description Totals Unit Price Extended Price WeatherTrak LC+Controller 1 2,364.00 2,364.00 WeatherTrak Central Internet Management(CIM)- Manufacturer 1 - - providing 3 years of service at no cost. WeatherTRAK Flow3- Master Valve and Flow Meter 1 2,284.00 2,284.00 Rain Sensor 1 249.00 249.00 MISC. Wiring and Grounding Rod 1 2,618.00 2,618.00 TOTAL 7,515.00 NOTES: Please note the master valve and flow meter may require trenching back to controller that is unknown at this time. Pricing will be included in the park specific repair proposals. Irrigation Repair Pricing Cypress Village Park Unit Total Total Ext. Description Size Qty Price Price IRRIGATION TOTALS(from below) 11,883.30 HEADS Raise/Straighten Heads ea 0 - 0.00 Replace Nozzle ea 0 - 0.00 Replace 1804 Spray Head ea 42 29.25 1,228.50 Replace 1812 Spray Head ea 0 - 0.00 Replace Rotor Head ea 25 45.81 1,145.31 Replace Bubbler Head ea 0 - 0.00 Replace Bubbler on Flex Pipe ea 0 - 0.00 Drip Repair ea 0 - 0.00 VALVES Repair Valve/Replace Solenoid ea 0 - 0.00 Replace Drip Kit 1" ea 0 - 0.00 Replace Valve 1" ea 7 387.50 2,712.50 Replace Valve 1 1/2" ea 0 - 0.00 Replace Valve 2" ea 0 - 0.00 3/4"inch Quick Couplers 44DRC ea 1 628.80 628.80 Replace Flow Sensor ea 0 - 0.00 Replace Master Valve ea 0 - 0.00 Replace Rain Sensor ea 0 - 0.00 1" Ball Valve ea 0 - 0.00 1 1/2"Ball valve ea 0 - 0.00 2"Ball Valve ea 1 555.38 555.38 Clean Valve Boxes/Add Gravel ea 0 - 0.00 Remove and Reset Valve Boxes with Gravel and Bricks ea 7 312.50 2,187.50 Replace Decoder ea 0 - 0.00 ID Tags ea 7 31.25 218.75 PIPING and BACKFLOW Repair Lateral Leak ea 0 - 0.00 Repair Mainline ea 0 - 0.00 Repair Backflow ea 0 - 0.00 Replace 1"PBV ea 1 525.31 525.31 Replace 1 1/2"PBV ea 0 - 0.00 Replace 2"PBV ea 0 - 0.00 Replace 1"RPZ ea 0 - 0.00 Replace 1 1/2"RPZ ea 0 - 0.00 Replace 2"RPZ ea 0 - 0.00 Hotbox InsulatedLL035045035 ea 0 - 0.00 Strongbox SBBC-30ALI Enclosure W/pad ea 0 - 0.00 Strongbox SBBC-45ALI Enclosure ea 0 - 0.00 Strongbox SBBC-45SS Enclosure ea 0 - 0.00 Backflow Certification ea 1 293.75 293.75 MISCELLANEOUS COSTS & REPAIRS Equipment Is 1 205.25 205.25 Materials Is 1 187.50 187.50 Labor Is 1 1,994.75 1,994.75 PEARLAND PARKS EQUIPMENT RECAPITALIZATION IRRIGATION Cypress Village Park WEATHERTRAK Total Description Totals Unit Price Extended Price WeatherTrak LC+Controller 1 2,364.00 2,364.00 WeatherTrak Central Internet Management(CIM)- Manufacturer 1 - - providing 3 years of service at no cost. WeatherTRAK Flow3- Master Valve and Flow Meter 1 2,284.00 2,284.00 Rain Sensor 1 249.00 249.00 MISC. Wiring and Grounding Rod 1 2,618.00 2,618.00 TOTAL 7,515.00 Irrigation Repair Pricing Recycle Center Unit Total Total Ext. Description Size Qty Price Price IRRIGATION TOTALS(from below) 50,100.88 HEADS Raise/Straighten Heads ea 0 - 0.00 Replace Nozzle ea 0 - 0.00 Replace 1804 Spray Head ea 144 29.25 4,212.00 Replace 1812 Spray Head ea 18 38.63 695.25 Replace Rotor Head ea 20 45.81 916.25 Replace Bubbler Head ea 0 - 0.00 Replace Bubbler on Flex Pipe ea 0 - 0.00 Drip Repair ea 0 - 0.00 VALVES Repair Valve/Replace Solenoid ea 0 - 0.00 Replace Drip Kit 1" ea 0 - 0.00 Replace Valve 1" ea 0 - 0.00 Replace Valve 1 1/2" ea 14 562.50 7,875.00 Replace Valve 2" ea 0 - 0.00 3/4"inch Quick Couplers 44DRC ea 0 - 0.00 Replace Flow Sensor ea 0 - 0.00 Replace Master Valve ea 0 - 0.00 Replace Rain Sensor ea 0 - 0.00 1" Ball Valve ea 0 - 0.00 1 1/2"Ball valve ea 0 - 0.00 2"Ball Valve ea 3 555.38 1,666.13 Clean Valve Boxes/Add Gravel ea 0 - 0.00 Remove and Reset Valve Boxes with Gravel and Bricks ea 14 243.75 3,412.50 Replace Decoder ea 0 - 0.00 ID Tags ea 14 31.25 437.50 PIPING and BACKFLOW Repair Lateral Leak New Piping ea 1900 8.44 16,031.25 Repair Mainline ea 140 23.88 3,342.50 New Main Line ea 1100 6.38 7,012.50 Repair Backflow ea 0 - 0.00 Replace 1"PBV ea 0 - 0.00 Replace 1 1/2"PBV ea 0 - 0.00 Replace 2"PBV ea 0 - 0.00 Replace 1"RPZ ea 0 - 0.00 Replace 1 1/2"RPZ ea 0 - 0.00 Replace 2"RPZ ea 0 - 0.00 Hotbox InsulatedLL035045035 ea 0 - 0.00 Strongbox SBBC-30ALI Enclosure W/pad ea 0 - 0.00 Strongbox SBBC-45ALI Enclosure ea 0 - 0.00 Strongbox SBBC-45SS Enclosure ea 0 - 0.00 Backflow Certification ea 0 - 0.00 MISCELLANEOUS COSTS & REPAIRS Equipment Is 1 624.20 624.20 Material Is 1 1,124.80 1,124.80 Labor Is 1 2,751.00 2,751.00 PEARLAND PARKS EQUIPMENT RECAPITALIZATION IRRIGATION Recycle Center WEATHERTRAK Total Description QTY Unit Price Extended Price WeatherTrak LC+Controller 1 2,364.00 2,364.00 WeatherTrak Central Internet Management(CIM)- Manufacturer 1 - - providing 3 years of service at no cost. WeatherTRAK Flow3- Master Valve and 1 2,284.00 2,284.00 Rain Sensor 1 249.00 249.00 MISC. Wiring and Grounding Rod 1 2,618.00 2,618.00 TOTAL 7,515.00 Irrigation Repair Pricing Deloris Fenwick Nature Center Unit Total Total Ext. Description Size Qty Price Price IRRIGATION TOTALS(from below) 17,791.60 HEADS Raise/Straighten Heads ea 0 - 0.00 Replace Nozzle ea 0 - 0.00 Replace 1804 Spray Head ea 3 29.25 87.75 Replace 1812 Spray Head ea 0 - 0.00 Replace Rotor Head ea 0 - 0.00 Replace Bubbler Head ea 44 31.88 1,402.50 Replace Bubbler on Flex Pipe ea 0 - 0.00 Drip Repair ea 0 - 0.00 VALVES Repair Valve/Replace Solenoid ea 0 - 0.00 Replace Drip Kit 1" ea 0 - 0.00 Replace Valve 1" ea 1 387.50 387.50 Replace Valve 1 1/2" ea 0 - 0.00 Replace Valve 2" ea 0 - 0.00 3/4 inch Quick Couplers 44DRC ea 2 628.80 1,257.60 Replace Flow Sensor ea 0 - 0.00 Replace Master Valve ea 0 - 0.00 Replace Rain Sensor ea 0 - 0.00 1" Ball Valve ea 0 - 0.00 1 1/2"Ball valve ea 0 - 0.00 2"Ball Valve ea 0 - 0.00 Clean Valve Boxes/Add Gravel ea 0 - 0.00 Remove and Reset Valve Boxes with Gravel and Bricks ea 13 312.50 4,062.50 Replace Decoder ea 0 - 0.00 ID Tags ea 13 31.25 406.25 PIPING and BACKFLOW Repair Lateral Leak ea 7 443.75 3,106.25 Repair Mainline ea 0 - 0.00 Repair Backflow ea 0 - 0.00 Replace 1"PBV ea 0 - 0.00 Replace 1 1/2"PBV ea 0 - 0.00 Replace 2"PBV ea 0 - 0.00 Replace 1"RPZ ea 0 - 0.00 Replace 1 1/2"RPZ ea 0 - 0.00 Replace 2"RPZ ea 0 - 0.00 Hotbox InsulatedLL035045035 ea 0 - 0.00 Strongbox SBBC-30ALI Enclosure W/pad ea 0 - 0.00 Strongbox SBBC-45ALI Enclosure ea 0 - 0.00 Strongbox SBBC-45SS Enclosure ea 0 - 0.00 Backflow Certification ea 1 293.75 293.75 MISCELLANEOUS COSTS&REPAIRS Equipment Is 1 370.00 370.00 Materials Is 1 880.60 880.60 Labor Is 1 5,536.90 5,536.90 PEARLAND PARKS EQUIPMENT RECAPITALIZATION IRRIGATION Deloris Fenwick Nature Center WEATHERTRAK Total Description Totals Unit Price Extended Price WeatherTrak LC+Controller 1 2,364.00 2,364.00 WeatherTrak Central Internet Management(CIM)- Manufacturer 1 - - providing 3 years of service at no cost. WeatherTRAK Flow3- Master Valve and Flow Meter 1 2,284.00 2,284.00 Rain Sensor 1 249.00 249.00 MISC. Wiring and Grounding Rod 1 2,618.00 2,618.00 TOTAL 7,515.00 Irrigation Repair Pricing Zychlinski Park Unit Total Total Ext. Description Size Qty Price Price IRRIGATION TOTALS(from below) 13,101.49 HEADS Raise/Straighten Heads ea 0 - 0.00 Replace Nozzle ea 0 - 0.00 Replace 1804 Spray Head ea 0 - 0.00 Replace 1812 Spray Head ea 0 - 0.00 Replace Rotor Head ea 69 45.81 3,161.06 Replace Bubbler Head ea 0 - 0.00 Replace Bubbler on Flex Pipe ea 0 - 0.00 Drip Repair ea 0 - 0.00 VALVES Repair Valve/Replace Solenoid ea 0 - 0.00 Replace Drip Kit 1" ea 0 - 0.00 Replace Valve 1" ea 0 - 0.00 Replace Valve 1 1/2" ea 7 562.50 3,937.50 Replace Valve 2" ea 0 - 0.00 1 inch Quick Couplers 44DRC ea 1 628.80 628.80 Replace Flow Sensor ea 0 - 0.00 Replace Master Valve ea 0 - 0.00 Replace Rain Sensor ea 0 - 0.00 1" Ball Valve ea 0 - 0.00 1 1/2"Ball valve ea 0 - 0.00 2"Ball Valve ea 1 555.38 555.38 Clean Valve Boxes/Add Gravel ea 0 - 0.00 Remove and Reset Valve Boxes with Gravel and Bricks ea 7 243.75 1,706.25 Replace Decoder ea 0 - 0.00 ID Tags ea 7 31.25 218.75 PIPING and BACKFLOW Repair Lateral Leak ea 0 - 0.00 Repair Mainline ea 0 - 0.00 Repair Backflow ea 0 - 0.00 Replace 1"PBV ea 0 - 0.00 Replace 1 1/2"PBV ea 0 - 0.00 Replace 2"PBV ea 0 - 0.00 Replace 1"RPZ ea 0 - 0.00 Replace 1 1/2"RPZ ea 0 - 0.00 Replace 2"RPZ ea 0 - 0.00 Hotbox InsulatedLL035045035 ea 0 - 0.00 Strongbox SBBC-30ALI Enclosure W/pad ea 0 - 0.00 Strongbox SBBC-45ALI Enclosure ea 0 - 0.00 Strongbox SBBC-45SS Enclosure ea 0 - 0.00 Backflow Certification ea 0 - 0.00 MISCELLANEOUS COSTS & REPAIRS Equipment Is 1 124.00 124.00 Materials Is 1 157.25 157.25 Labor Is 1 2,612.50 2,612.50 PEARLAND PARKS EQUIPMENT RECAPITALIZATION IRRIGATION Zychlinski Park WEATHERTRAK Total Description Totals Unit Price Extended Price WeatherTrak LC+Controller 1 2,364.00 2,364.00 WeatherTrak Central Internet Management(CIM)- Manufacturer 1 - - providing 3 years of service at no cost. WeatherTRAK Flow3- Master Valve and Flow Meter 1 2,284.00 2,284.00 Rain Sensor 1 249.00 249.00 MISC. Wiring and Grounding Rod 1 2,618.00 2,618.00 TOTAL 7,515.00 Irrigation Repair Pricing Creek Side Park Unit Total Total Ext. Description Size Qty Price Price IRRIGATION TOTALS(from below) 14,055.43 HEADS Raise/Straighten Heads ea 0 - 0.00 Replace Nozzle ea 0 - 0.00 Replace 1804 Spray Head ea 0 - 0.00 Replace 1812 Spray Head ea 0 - 0.00 Replace Rotor Head ea 80 45.81 3,665.00 Replace Bubbler Head ea 0 - 0.00 Replace Bubbler on Flex Pipe ea 0 - 0.00 Drip Repair ea 0 - 0.00 VALVES Repair Valve/Replace Solenoid ea 0 - 0.00 Replace Drip Kit 1" ea 0 - 0.00 Replace Valve 1" ea 0 - 0.00 Replace Valve 1 1/2" ea 8 562.50 4,500.00 Replace Valve 2" ea 0 - 0.00 1 inch Quick Couplers 44DRC ea 1 628.80 628.80 Replace Flow Sensor ea 0 - 0.00 Replace Master Valve ea 0 - 0.00 Replace Rain Sensor ea 0 - 0.00 1" Ball Valve ea 0 - 0.00 1 1/2"Ball valve ea 0 - 0.00 2"Ball Valve ea 1 555.38 555.38 Clean Valve Boxes/Add Gravel ea 0 - 0.00 Remove and Reset Valve Boxes with Gravel and Bricks ea 8 243.75 1,950.00 Replace Decoder ea 0 - 0.00 ID Tags ea 8 31.25 250.00 PIPING and BACKFLOW Repair Lateral Leak ea 1 443.75 443.75 Repair Mainline ea 0 - 0.00 Repair Backflow ea 0 - 0.00 Replace 1"PBV ea 0 937.81 0.00 Replace 1 1/2"PBV ea 0 1,411.63 0.00 Replace 2"PBV ea 0 1,771.88 0.00 Replace 1"RPZ ea 0 1,069.50 0.00 Replace 1 1/2"RPZ ea 0 1,530.41 0.00 Replace 2"RPZ ea 0 1,804.50 0.00 Hotbox InsulatedLL035045035 ea 0 4,832.25 0.00 Strongbox SBBC-30ALI Enclosure W/pad ea 0 2,206.05 0.00 Strongbox SBBC-45ALI Enclosure ea 0 2,581.25 0.00 Strongbox SBBC-45SS Enclosure ea 0 3,331.25 0.00 Backflow Certification ea 0 293.75 0.00 MISCELLANEOUS COSTS & REPAIRS Equipment Is 1 165.70 165.70 Materials Is 1 191.50 191.50 Labor Is 1 1,705.30 1,705.30 PEARLAND PARKS EQUIPMENT RECAPITALIZATION IRRIGATION Creek Side Park WEATHERTRAK Total Description Totals Unit Price Extended Price WeatherTrak LC+Controller 1 2,364.00 2,364.00 WeatherTrak Central Internet Management(CIM)- Manufacturer 1 - - providing 3 years of service at no cost. WeatherTRAK Flow3- Master Valve and Flow Meter 1 2,284.00 2,284.00 Rain Sensor 1 249.00 249.00 MISC. Wiring and Grounding Rod 1 2,618.00 2,618.00 TOTAL 7,515.00 Irrigation Repair Pricing Hyde Park Unit Total Total Ext. Description Size Qty Price Price IRRIGATION TOTALS(from below) 17,205.80 HEADS Raise/Straighten Heads ea 0 - 0.00 Replace Nozzle ea 0 - 0.00 Replace 1804 Spray Head ea 0 - 0.00 Replace 1812 Spray Head ea 0 - 0.00 Replace Rotor Head ea 63 45.81 2,886.19 Replace Bubbler Head ea 0 - 0.00 Replace Bubbler on Flex Pipe ea 0 - 0.00 Drip Repair ea 0 - 0.00 VALVES Repair Valve/Replace Solenoid ea 0 - 0.00 Replace Drip Kit 1" ea 0 - 0.00 Replace Valve 1" ea 0 - 0.00 Replace Valve 1 1/2" ea 6 562.50 3,375.00 Replace Valve 2" ea 0 - 0.00 1 inch Quick Couplers 44DRC ea 1 628.80 628.80 Replace Flow Sensor ea 0 - 0.00 Replace Master Valve ea 0 - 0.00 Replace Rain Sensor ea 0 - 0.00 1" Ball Valve ea 0 - 0.00 1 1/2"Ball valve ea 0 - 0.00 2"Ball Valve ea 1 555.38 555.38 Clean Valve Boxes/Add Gravel ea 0 - 0.00 Remove and Reset Valve Boxes with Gravel and Bricks ea 6 243.75 1,462.50 Replace Decoder ea 0 - 0.00 ID Tags ea 6 31.25 187.50 PIPING and BACKFLOW Repair Lateral Leak ea 3 718.75 2,156.25 Repair Mainline ea 1 554.19 554.19 Repair Backflow ea 0 - 0.00 Replace 1"PBV ea 0 - 0.00 Replace 1 1/2"PBV ea 0 - 0.00 Replace 2"PBV ea 0 - 0.00 Replace 1"RPZ ea 0 - 0.00 Replace 1 1/2"RPZ ea 0 - 0.00 Replace 2"RPZ ea 0 - 0.00 Hotbox InsulatedLL035045035 ea 0 - 0.00 Strongbox SBBC-30ALI Enclosure W/pad ea 0 - 0.00 Strongbox SBBC-45ALI Enclosure ea 0 - 0.00 Strongbox SBBC-45SS Enclosure ea 0 - 0.00 Backflow Certification ea 0 - 0.00 MISCELLANEOUS COSTS & REPAIRS Equipment Is 1 602.40 602.40 Materials Is 1 1,474.60 1,474.60 Labor Is 1 3,323.00 3,323.00 PEARLAND PARKS EQUIPMENT RECAPITALIZATION IRRIGATION Hyde Park WEATHERTRAK Total Description QTY Unit Price Extended Price WeatherTrak LC+Controller 1 2,364.00 2,364.00 WeatherTrak Central Internet Management(CIM)- Manufacturer 1 - - providing 3 years of service at no cost. WeatherTRAK Flow3- Master Valve and Flow Meter 1 2,284.00 2,284.00 Rain Sensor 1 249.00 249.00 MISC. Wiring and Grounding Rod 1 2,618.00 2,618.00 TOTAL 7,515.00 Irrigation Repair Pricing Pine Hollow Unit Total Total Ext. Description Size Qty Price Price IRRIGATION TOTALS(from below) 14,390.61 HEADS Raise/Straighten Heads ea 0 - 0.00 Replace Nozzle ea 0 - 0.00 Replace 1804 Spray Head ea 21 29.25 614.25 Replace 1812 Spray Head ea 0 - 0.00 Replace Rotor Head ea 37 45.81 1,695.06 Replace Bubbler Head ea 0 - 0.00 Replace Bubbler on Flex Pipe ea 0 - 0.00 Drip Repair ea 0 - 0.00 VALVES Repair Valve/Replace Solenoid ea 0 - 0.00 Replace Drip Kit 1" ea 0 - 0.00 Replace Valve 1" ea 0 - 0.00 Replace Valve 1 1/2" ea 0 - 0.00 Replace Valve 2" ea 0 - 0.00 3/4 inch Quick Couplers 44DRC ea 1 628.80 628.80 Replace Flow Sensor ea 0 - 0.00 Replace Master Valve ea 0 - 0.00 Replace Rain Sensor ea 0 - 0.00 1" Ball Valve ea 0 - 0.00 1 1/2"Ball valve ea 0 - 0.00 2"Ball Valve ea 0 - 0.00 J-Box for wire conectors ea 2 193.75 387.50 Clean Valve Boxes/Add Gravel ea 0 - 0.00 Remove and Reset Valve Boxes with Gravel and Bricks ea 7 312.50 2,187.50 Replace Decoder ea 0 - 0.00 ID Tags ea 7 31.25 218.75 PIPING and BACKFLOW Repair Lateral Leak ea 1 443.75 443.75 Repair Mainline ea 0 - 0.00 Repair Backflow ea 0 - 0.00 Replace 1"PBV ea 0 - 0.00 Replace 1 1/2"PBV ea 0 - 0.00 Replace 2"PBV ea 0 - 0.00 Replace 1"RPZ ea 0 - 0.00 Replace 1 1/2"RPZ ea 0 - 0.00 Replace 2"RPZ ea 0 - 0.00 Hotbox InsulatedLL035045035 ea 0 - 0.00 Strongbox SBBC-30ALI Enclosure W/pad ea 0 - 0.00 Strongbox SBBC-45ALI Enclosure ea 0 - 0.00 Strongbox SBBC-45SS Enclosure ea 0 - 0.00 Backflow Certification ea 1 293.75 293.75 MISCELLANEOUS COSTS & REPAIRS Equipment Is 1 437.50 437.50 Materials Is 1 642.45 642.45 Labor Is 1 6,841.30 6,841.30 PEARLAND PARKS EQUIPMENT RECAPITALIZATION IRRIGATION Pine Hollow WEATHERTRAK Total Description Totals Unit Price Extended Price WeatherTrak LC+Controller 1 2,364.00 2,364.00 WeatherTrak Central Internet Management(CIM)- Manufacturer 1 - - providing 3 years of service at no cost. WeatherTRAK Flow3- Master Valve and Flow Meter 1 2,284.00 2,284.00 Rain Sensor 1 249.00 249.00 MISC. Wiring and Grounding Rod 1 2,618.00 2,618.00 TOTAL 7,515.00