R2022-151 2022-07-11RESOLUTION NO. R2022-151
A Resolution of the City Council of the City of Pearland, Texas, amending a
design build contract for the Parks Equipment Recapitalization Irrigation
Project (Phase II Construction Services), with Landscape Art, Inc., in the
Guaranteed Maximum Price of $832,734.61.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS:
Section 1. That the City Council previously awarded a design build contract for the
Parks Equipment Recapitaliz ation Irrigation Project, to Landscape Art, Inc., in the amount of
$55,344.75 (Phase I Services) with a material and equipment mark -up percentage of 10%.
Section 2. That the City Council hereby amends a design build contract for the Parks
Equipment Recapitalization Irrigation Project (Phase II Construction Services), with Landscape Art,
Inc., in the Guaranteed Maximum Price of $832,734.61.
Section 3. The City Manager or his designee is hereby authorized to execute an
amended design build contract for the Parks Equipment Recapitalization Irrigation Project.
PASSED, APPROVED and ADOPTED this the 11th day of July A.D., 2022.
________________________________
J. KEVIN COLE
MAYOR
ATTEST:
________________________________
LESLIE CRITTENDEN
CITY SECRETARY
APPROVED AS TO FORM:
________________________________
DARRIN M. COKER
CITY ATTORNEY
DocuSign Envelope ID: 487FA7C9-ADBF-4C7F-94A5-3EEC3B24F525
DocuSign Envelope ID: El 8F9A1 E-60C6-4E44-9F52-C8C67C957D3F
A CITY OF PEARLAND
6 ^u PROJECTS DEPARTMENT
u INa 2016 Old Alvin
.44
, ; 1 \ Pearland,Texas 77581
pearlandtx.gov/projects
16 i
Design-Build Contract Amendment
For Park Equipment Recapitalization (Irrigation)
Date of Issuance: 7/11/2022 Amendment No.: 2
CoP Project No.: PK2101 & PK2201
Consultant: Landscape Art,Inc. P.O. No.: 2021-00001587
Explanation:
This amendment encompasses the following: Amendment to implement Phase 2 of the existing
Design-Build contract. Scope includes upgrades and repairs, as recommended by Landscape Art and approved by City
staff,to (14) City parks for a guaranteed maximum price.
Description of Work Cost Time
1 Hickory Slough Sports Complex Site Repairs $ 76,883.49 7 Days
2 Hickory Slough Sports Complex Control System Upgrades $ 44,649.00 7 Days
3 Independence Park Site Repairs $ 42,566.18 7 Days
4 Independence Park Control System Updgrades $ 15,554.00 7 Days
5 Veterans Sport Complex Site Repairs $ 66,414.38 7 Days
6 Veterans Sport Complex Control System Upgrades $ 8,990.00 7 Days
7 Shadow Creek Ranch Park(Phase 1) Site Repairs $ 43,583.34 7 Days
8 Shadow Creek Ranch Park(Phase 1) Control System Upgrades $ 30,913.00 7 Days
9 Shadow Creek Ranch Park(Phase 2) Site Repairs $ 21,144.50 7 Days
10 Shadow Creek Ranch Park(Phase 2) Control System Upgrades $ 15,768.00 7 Days
11 Southdown Park Site Repairs $ 72,454.47 7 Days
12 Southdown Park Control System Upgrades $ 15,030.00 7 Days
13 South Gate Park Site Repairs $ 18,734.61 7 Days
14 South Gate Park Control System Upgrades $ 7,515.00 7 Days
15 Cypress Village Park Site Repairs $ 11,883.31 7 Days
16 Cypress Village Park Control System Upgrades $ 7,515.00 7 Days
17 Recycle Center Site Repairs $ 50,100.88 7 Days
18 Recycle Center Control System Upgrades $ 7,515.00 7 Days
19 Delores Fenwick Nature Center Site Repairs $ 17,791.60 7 Days
20 Delores Fenwick Nature Center Control System Upgrades $ 7,515.00 7 Days
21 Zychlinski Park Site Repairs $ 13,101.49 7 Days
22 Zychlinski Park Control System Upgrades $ 7,515.00 7 Days
23 Creek Side Park Site Repairs $ 14,055.43 7 Days
24 Creek Side Park Control System Upgrades $ 7,515.00 7 Days
25 Hyde Park Site Repairs $ 17,205.80 7 Days
26 Hyde Park Control System Upgrades $ 7,515.00 7 Days
27 Pine Hollow Site Repairs $ 14,390.61 7 Days
28 Pine Hollow Control System Upgrades $ 7,515.00 7 Days
Design 1 of 2 D4.Revised 01/15
DocuSign Envelope ID: El 8F9A1 E-60C6-4E44-9F52-C8C67C957D3F
29 Centennial Park Site Repairs $ 51,958.14 7 Days
30 Centennial Park Control System Upgrades $ 37,215.00 7 Days
Please attach back-up documentation
Cost & Time Change Summary Cost Time
Original Contract: $ 55,344.75 0 Days
Previous Amendment(s): $ 7,882.63 0 Days
Contract prior to this amendment: $ 63,227.38 0 Days
Net increase (decrease) from this amendment $ 760,507.23 210 Days
Revised Contract: $ 823,734.61 210 Days
DocuSigned by:
Finance Approval: �7ac� Date: 7/15/2022 I 7:50 AM CDT
•E6 kEE•i C22C2486...
ACCEPTED*: APPROVED:
, -DocuSigned by:
AP�'7//'1 :6 2 Jul 1 2022 GctVSbin 7/15/2022 I 7:54 AM CDT
'° Date: By: Date:
'ti• 3B8283B69CCQ460...
Consultant Owner
*Contractor agrees to perform change(s)included in this Change Order for the price and time indicated. The prices for changes included all costs associated with
this Change Order.
No work is to be done until this change order is executed.No payment to the Contractor(or Consultant)shall be made for work included in the change order until
the Contractor's pay estimate is updated.
Revise the project plans and specifications as referenced and insofar as the original project drawings and specifications are inconsistent,this Change Order
governs.Upon execution by all parties,the following changes identified for the Contract Value and/or Contract Time shown,are made part of the
Contract.
Design 2 of 2 D4.Revised 01/15
Pearland Park Irrigation Repairs and Weather Trak Installation
Location Site Repairs Control System Total
Hickory Slough Sports Complex 76,883.49 44,649.00 121,532.49
Shadow Creek Ranch Sports Complex 43,583.34 30,913.00 74,496.34
Shadow Creek Ranch (New Area) 21,144.50 15,768.00 36,912.50
Independence Park 42,566.18 15,554.00 58,120.18
Veterans Sports Complex 66,414.38 8,990.00 75,404.38
South Down Park 72,454.47 15,030.00 87,484.47
Centennial Park 51,958.14 37,215.00 89,173.14
South Gate Park 18,734.61 7,515.00 26,249.61
Cypress Village Park 11,883.30 7,515.00 19,398.30
Recycle Center 50,100.88 7,515.00 57,615.88
Deloris Fenwick Nature Center 17,791.60 7,515.00 25,306.60
Zychlinski Park 13,101.49 7,515.00 20,616.49
Creek Side Park 14,055.43 7,515.00 21,570.43
Hyde Park 17,205.80 7,515.00 24,720.80
Pine Hollow 14,390.61 7,515.00 21,905.61
Totals 532,268.23 228,239.00 760,507.23
Notes:
1. Recycle Center is a very difficult install that is close to being a completely new irrigation system. It
would involve boring and overall is very labor intensive. We are not recommending proceeding with this
installation.
2.The Site Repair pricing listed above is a guaranteed maximum price.
Irrigation Repair Pricing
Hickory Slough Sports Complex
Unit Total Total Ext.
Description Size Qty Price Price
IRRIGATION TOTALS(from below) 76,883.49
HEADS
Raise/Straighten Heads ea 794 29.08 23,090.51
Replace Nozzle ea 46 10.31 474.38
Replace 1804 Spray Head ea 9 32.18 289.58
Replace 1812 Spray Head ea 0 - 0.00
Replace Rotor Head ea 13 50.39 655.12
Replace Bubbler Head ea 0 - 0.00
Replace Bubbler on Flex Pipe ea 53 20.28 1,074.91
Drip Repair ea 0 - 0.00
VALVES
Repair Valve/Replace Solenoid ea 0 - 0.00
Replace Drip Kit 1" ea 0 - 0.00
Replace Valve 1" ea 1 426.25 426.25
Replace Valve 1 1/2" ea 0 - 0.00
Replace Valve 2" ea 0 - 0.00
1 inch Quick Couplers 44DRC ea 0 - 0.00
Replace Flow Sensor ea 0 - 0.00
Replace Master Valve ea 0 - 0.00
Replace Rain Sensor ea 0 - 0.00
1" Ball Valve ea 0 - 0.00
1 1/2"Ball valve ea 0 - 0.00
2"Ball Valve ea 0 - 0.00
Clean Valve Boxes/Add Gravel ea 0 - 0.00
Remove and Reset Valve Boxes with Gravel and Bricks ea 149 162.25 24,175.25
Replace Decoder ea 0 - 0.00
ID Tags ea 0 - 0.00
PIPING and BACKFLOW
Repair Lateral Leak ea 16 488.13 7,810.00
Repair Mainline ea 0 - 0.00
Repair Backflow ea 0 - 0.00
Replace 1"PBV ea 0 - 0.00
Replace 1 1/2"PBV ea 0 - 0.00
Replace 2"PBV ea 0 - 0.00
Replace 1"RPZ ea 0 - 0.00
Replace 1 1/2"RPZ ea 0 - 0.00
Replace 2"RPZ ea 0 - 0.00
Hotbox InsulatedLL035045035 ea 0 - 0.00
Strongbox SBBC-30ALI Enclosure W/pad ea 0 - 0.00
Strongbox SBBC-45ALI Enclosure ea 0 - 0.00
Strongbox SBBC-45SS Enclosure ea 0 - 0.00
Backflow Certification ea 0 - 0.00
MISCELLANEOUS COSTS & REPAIRS
Equipment Is 1 4,983.77 4,983.77
Materials Is 1 3,849.19 3,849.19
Labor Is 1 10,054.54 10,054.54
PEARLAND IRRIGATION RECAPITALIZATION
HICKORY SLOUGH SPORTS COMPLEX
WEATHERTRAK
Total
Description Totals Unit Price Extended
Price
WeatherTrak OptiFlow XR 1 6,826.00 6,826.00
WeatherTrak Central Internet
Management(CIM)- Manufacturer 1 - -
providing 3 years of service at no cost.
WeatherTRAK Flow3- Master Valve and
Flow Meter 1 2,284.00 2,284.00
Rain Sensor 1 249.00 249.00
Flow Meter Decoder 1 529.00 529.00
Master Valve Decoder 1 257.00 257.00
H2O Decoders 149 214.00 31,886.00
MISC. Wiring and Grounding Rod 1 2,618.00 2,618.00
TOTAL 44,649.00
NOTES:
Please note the master valve and flow meter may require trenching back to
controller that is unknown at this time. Pricing will be included in the park
specific repair proposals.
Irrigation Repair Pricing
Shadow Creek Ranch
Unit Total Total Ext.
Description Size Qty Price Price
IRRIGATION TOTALS(from below) 43,583.34
HEADS
Raise/Straighten Heads ea 3 29.08 87.24
Replace Nozzle ea 0 - 0.00
Replace 1804 Spray Head ea 0 - 0.00
Replace 1812 Spray Head ea 0 - 0.00
Replace Rotor Head ea 2 50.39 100.79
Replace Bubbler Head ea 0 - 0.00
Replace Bubbler on Flex Pipe ea 0 - 0.00
Drip Repair ea 0 - 0.00
VALVES
Repair Valve/Replace Solenoid ea 0 - 0.00
Replace Drip Kit 1" ea 0 - 0.00
Replace Valve 1" ea 1 577.50 577.50
Replace Valve 1 1/2" ea 0 - 0.00
Replace Valve 2" ea 1 962.50 962.50
1 inch Quick Couplers 44DRC ea 0 - 0.00
Replace Flow Sensor ea 0 - 0.00
Replace Master Valve ea 0 - 0.00
Replace Rain Sensor ea 0 - 0.00
1" Ball Valve ea 0 - 0.00
1 1/2"Ball valve ea 0 - 0.00
2"Ball Valve ea 0 - 0.00
Clean Valve Boxes/Add Gravel ea 65 120.31 7,820.31
Remove and Reset Valve Boxes with Gravel and Bricks ea 0 - 0.00
Replace Decoder ea 2 467.50 935.00
ID Tags ea 0 - 0.00
PIPING and BACKFLOW
Repair Lateral Leak ea 0 - 0.00
Repair Mainline ea 0 - 0.00
Repair Backflow ea 0 - 0.00
Replace 1"PBV ea 0 - 0.00
Replace 1 1/2"PBV ea 0 - 0.00
Replace 2"PBV ea 0 - 0.00
Replace 1"RPZ ea 0 - 0.00
Replace 1 1/2"RPZ ea 0 - 0.00
Replace 2"RPZ ea 0 - 0.00
Hotbox InsulatedLL035045035 ea 0 - 0.00
Strongbox SBBC-30ALI Enclosure W/pad ea 0 - 0.00
Strongbox SBBC-45ALI Enclosure ea 0 - 0.00
Strongbox SBBC-45SS Enclosure ea 0 - 0.00
Backflow Certification ea 0 - 0.00
MISCELLANEOUS COSTS & REPAIRS
Equipment Is 1 6,895.83 6,895.83
Materials Is 1 4,531.55 4,531.55
Labor Is 1 21,672.62 21,672.62
PEARLAND IRRIGATION RECAPITALIZATION
SHADOW CREEK RANCH SPORTS COMPLEX
WEATHERTRAK
Total
Description Totals Unit Price Extended
Price
WeatherTrak ET Pro3 96 Station 1 4,860.00 4,860.00
WeatherTrak Central Internet
Management(CIM)- Manufacturer 1 - -
providing 3 years of service at no cost.
WeatherTRAK Flow3- Master Valve and
Flow Meter 1 2,284.00 2,284.00
Rain Sensor 1 249.00 249.00
Flow Meter Decoder 1 529.00 529.00
Master Valve Decoder 1 257.00 257.00
H2O Decoders 94 214.00 20,116.00
MISC. Wiring and Grounding Rod 1 2,618.00 2,618.00
TOTAL 30,913.00
NOTES:
Please note the master valve and flow meter may require trenching back to
controller that is unknown at this time. Pricing will be included in the park
specific repair proposals.
Irrigation Repair Pricing
Shadow Creek Ranch (New Area)
Unit Total Total Ext.
Description Size Qty Price Price
IRRIGATION TOTALS(from below) 21,144.50
HEADS
Raise/Straighten Heads ea 1 26.44 26.44
Replace Nozzle ea 0 - 0.00
Replace 1804 Spray Head ea 0 - 0.00
Replace 1812 Spray Head ea 0 - 0.00
Separate mixed zones ea 132 45.81 6,047.25
Replace Bubbler Head ea 0 - 0.00
Replace Bubbler on Flex Pipe ea 0 - 0.00
Drip Repair ea 0 - 0.00
VALVES
Repair Valve/Replace Solenoid ea 0 - 0.00
Replace Drip Kit 1" ea 0 - 0.00
Replace Valve 1" ea 0 - 0.00
Replace Valve 1 1/2" ea 0 - 0.00
Replace Valve 2" ea 0 - 0.00
1 inch Quick Couplers 44DRC ea 0 - 0.00
Replace Flow Sensor ea 0 - 0.00
Replace Master Valve ea 0 - 0.00
Replace Rain Sensor ea 0 - 0.00
1" Ball Valve ea 0 - 0.00
1 1/2"Ball valve ea 0 - 0.00
2"Ball Valve ea 0 - 0.00
Clean Valve Boxes/Add Gravel ea 0 - 0.00
Remove and Reset Valve Boxes with Gravel and Bricks ea 10 147.50 1,475.00
Replace Decoder ea 0 - 0.00
ID Tags ea 0 - 0.00
PIPING and BACKFLOW
Repair Lateral Leak ea 1 70.81 70.81
Repair Mainline ea 0 - 0.00
Repair Backflow ea 0 - 0.00
Replace 1"PBV ea 0 - 0.00
Replace 1 1/2"PBV ea 0 - 0.00
Replace 2"PBV ea 0 - 0.00
Replace 1"RPZ ea 0 - 0.00
Replace 1 1/2"RPZ ea 0 - 0.00
Replace 2"RPZ ea 0 - 0.00
Hotbox InsulatedLL035045035 ea 0 - 0.00
Strongbox SBBC-30ALI Enclosure W/pad ea 0 - 0.00
Strongbox SBBC-45ALI Enclosure ea 0 - 0.00
Strongbox SBBC-45SS Enclosure ea 0 - 0.00
Backflow Certification ea 0 - 0.00
MISCELLANEOUS COSTS & REPAIRS
Equipment Is 1 706.25 706.25
Materials Is 1 2,387.50 2,387.50
Labor Is 1 10,431.25 10,431.25
PEARLAND IRRIGATION RECAPITALIZATION
SHADOW CREEK RANCH SPORTS COMPLEX- NEW SECTION
WEATHERTRAK
Total
Description Totals Unit Price Extended
Price
WeatherTrak ET Pro3 48 Station 1 3,839.00 3,839.00
WeatherTrak Central Internet
Management(CIM)- Manufacturer 1 - -
providing 3 years of service at no cost.
WeatherTRAK Flow3- Master Valve and
Flow Meter 1 2,284.00 2,284.00
Rain Sensor 1 249.00 249.00
Flow Meter Decoder 1 529.00 529.00
Master Valve Decoder 1 257.00 257.00
H2O Decoders 28 214.00 5,992.00
MISC. Wiring and Grounding Rod 1 2,618.00 2,618.00
TOTAL 15,768.00
NOTES:
Please note the master valve and flow meter may require trenching back to
controller that is unknown at this time. Pricing will be included in the park
specific repair proposals.
Irrigation Repair Pricing
Independence Park
Unit Total Total Ext.
Description Size Qty Price Price
IRRIGATION TOTALS(from below) 42,566.18
HEADS
Raise/Straighten Heads ea 34 29.08 988.76
Raise/Straighten Heads(bubblers) ea 96 29.08 2,791.80
Replace Nozzle ea 0 - 0.00
Replace 1804 Spray Head ea 0 - 0.00
Replace 1812 Spray Head ea 0 - 0.00
Replace Rotor Head ea 3 50.39 151.18
Replace Bubbler Head ea 1 35.06 35.06
Replace Bubbler on Flex Pipe ea 0 - 0.00
Drip Repair ea 0 - 0.00
VALVES
Repair Valve/Replace Solenoid ea 0 - 0.00
Replace Drip Kit 1" ea 0 - 0.00
Replace Valve 1" ea 0 - 0.00
Replace Valve 1 1/2" ea 0 - 0.00
Replace Valve 2" ea 0 - 0.00
1 inch Quick Couplers 44DRC ea 0 - 0.00
Replace Flow Sensor ea 0 - 0.00
Replace Master Valve ea 0 - 0.00
Replace Rain Sensor ea 0 - 0.00
1" Ball Valve ea 0 - 0.00
1 1/2"Ball valve ea 0 - 0.00
2"Ball Valve ea 0 - 0.00
Clean Valve Boxes/Add Gravel ea 27 240.63 6,496.88
Remove and Reset Valve Boxes with Gravel and Bricks ea 0 - 0.00
Replace Decoder ea 0 - 0.00
ID Tags ea 0 - 0.00
PIPING and BACKFLOW
Repair Lateral Leak ea 2 1,615.63 3,231.25
Repair Mainline ea 0 - 0.00
Repair Backflow ea 0 - 0.00
Replace 1"PBV ea 0 - 0.00
Replace 1 1/2"PBV ea 0 - 0.00
Replace 2"PBV ea 0 - 0.00
Replace 1"RPZ ea 0 - 0.00
Replace 1 1/2"RPZ ea 0 - 0.00
Replace 2"RPZ ea 0 - 0.00
Hotbox InsulatedLL035045035 ea 0 - 0.00
Strongbox SBBC-30ALI Enclosure W/pad ea 0 - 0.00
Strongbox SBBC-45ALI Enclosure ea 0 - 0.00
Strongbox SBBC-45SS Enclosure ea 0 - 0.00
Backflow Certification ea 0 - 0.00
MISCELLANEOUS COSTS & REPAIRS
Equipment Is 1 4,558.75 4,558.75
Materials Is 1 3,935.83 3,935.83
Labor Is 1 20,376.67 20,376.67
PEARLAND IRRIGATION RECAPITALIZATION
INDEPENCENCE PARK
WEATHERTRAK
Total
Description Totals Unit Price Extended
Price
WeatherTrak ET Pro3 48 Station 1 3,839.00 3,839.00
WeatherTrak Central Internet
Management(CIM)- Manufacturer 1 - -
providing 3 years of service at no cost.
WeatherTRAK Flow3- Master Valve and
Flow Meter 1 2,284.00 2,284.00
Rain Sensor 1 249.00 249.00
Flow Meter Decoder 1 529.00 529.00
Master Valve Decoder 1 257.00 257.00
H2O Decoders 27 214.00 5,778.00
MISC. Wiring and Grounding Rod 1 2,618.00 2,618.00
TOTAL 15,554.00
NOTES:
Please note the master valve and flow meter may require trenching back to
controller that is unknown at this time. Pricing will be included in the park
specific repair proposals.
Irrigation Repair Pricing
Veterans Sports Complex
Unit Total Total Ext.
Description Size Qty Price Price
IRRIGATION TOTALS(from below) 66,414.38
HEADS
Raise/Straighten Heads ea 51 29.08 1,483.08
Replace Nozzle ea 12 10.31 123.72
Replace 1804 Spray Head ea 8 32.18 257.44
Replace 1812 Spray Head ea 8 42.49 339.92
Replace Rotor Head(Falcon 6504)Controller 2 ea 54 113.44 6,125.76
Replace Rotor Head(Falcon 6504)Controller 3 ea 88 113.44 9,982.72
Replace Bubbler Head ea 0 - 0.00
Drip Repair ea 0 - 0.00
VALVES
Repair Valve/Replace Solenoid ea 0 - 0.00
Replace Drip Kit 1" ea 0 - 0.00
Replace Valve 1" ea 0 - 0.00
Replace Valve 1 1/2" ea 0 - 0.00
Replace Rotor Head ea 0 - 0.00
Replace Valve 2" ea 3 735.63 2,206.89
1 inch Quick Couplers 44DRC ea 0 - 0.00
Replace Flow Sensor ea 0 - 0.00
Replace Master Valve ea 0 - 0.00
Replace Rain Sensor ea 0 - 0.00
1" Ball Valve ea 0 - 0.00
1 1/2"Ball valve ea 0 - 0.00
2"Ball Valve ea 0 - 0.00
Clean Valve Boxes/Add Gravel ea 0 - 0.00
Remove and Reset Valve Boxes with Gravel and Bricks ea 25 481.25 12,031.25
Remove and Reset Valve Boxes with Gravel and Bricks- ea 16 481.25 7,700.00
Controller 2
Replace Decoder ea 0 - 0.00
ID Tags ea 0 - 0.00
PIPING and BACKFLOW
Repair Lateral Leak ea 1 456.02 456.02
Repair BIG Leak ea 3 760.86 2,282.58
Repair Backflow ea 0 - 0.00
Replace 1"PBV ea 0 - 0.00
Replace 1 1/2"PBV ea 0 - 0.00
Replace 2"PBV ea 0 - 0.00
Replace 1"RPZ ea 0 - 0.00
Replace 1 1/2"RPZ ea 0 - 0.00
Replace 2"RPZ ea 0 - 0.00
Hotbox InsulatedLL035045035 ea 0 - 0.00
Strongbox SBBC-30ALI Enclosure W/pad ea 0 - 0.00
Strongbox SBBC-45ALI Enclosure ea 0 - 0.00
Strongbox SBBC-45SS Enclosure ea 0 - 0.00
Backflow Certification ea 0 - 0.00
MISCELLANEOUS COSTS&REPAIRS
Equipment ea 1 5,267.65 5,267.65
Materials ea 1 3,755.88 3,755.88
Labor ea 1 14,401.47 14,401.47
PEARLAND IRRIGATION RECAPITALIZATION
VETERANS SPORTS COMPLEX
WEATHERTRAK
Total
Description Totals Unit Price Extended
Price
WeatherTrak ET Pro3 48 Station 1 3,839.00 3,839.00
WeatherTrak Central Internet
Management(CIM)- Manufacturer 1 - -
providing 3 years of service at no cost.
WeatherTRAK Flow3- Master Valve and
Flow Meter 1 2,284.00 2,284.00
Rain Sensor 1 249.00 249.00
MISC. Wiring and Grounding Rod 1 2,618.00 2,618.00
TOTAL 8,990.00
NOTES:
Please note the master valve and flow meter may require trenching back to
controller that is unknown at this time. Pricing will be included in the park
specific repair proposals.
Irrigation Repair Pricing
South Down Park
Unit Total Total Ext.
Description Size Qty Price Price
IRRIGATION TOTALS(from below) 72,454.47
HEADS
Raise/Straighten Heads ea 300 24.96 7,486.88
Replace Nozzle ea 20 10.31 206.25
Replace 1804 Spray Head ea 3 32.18 96.53
Replace 1812 Spray Head ea 0 - 0.00
Replace Rotor Head ea 10 50.39 503.94
Replace Bubbler Head ea 0 - 0.00
Replace Bubbler on Flex Pipe ea 0 - 0.00
Drip Repair ea 0 - 0.00
VALVES
Repair Valve/Replace Solenoid ea 0 - 0.00
Replace Drip Kit 1" ea 0 - 0.00
Replace Valve 1" ea 0 - 0.00
Replace Valve 1 1/2" ea 0 - 0.00
Replace Valve 2" ea 0 - 0.00
1 inch Quick Couplers 44DRC ea 0 - 0.00
Replace Flow Sensor ea 0 - 0.00
Replace Master Valve ea 0 - 0.00
Replace Rain Sensor ea 0 - 0.00
1" Ball Valve ea 0 - 0.00
1 1/2"Ball valve ea 0 - 0.00
2"Ball Valve ea 0 - 0.00
Clean Valve Boxes/Add Gravel ea 0 - 0.00
Remove and Reset Valve Boxes with Gravel and Bricks-Cor ea 30 481.25 14,437.50
Remove and Reset Valve Boxes with Gravel and Bricks-Cor ea 30 481.25 14,437.50
Remove and Reset Valve Boxes with Gravel and Bricks ea 0 - 0.00
Replace Decoder ea 0 - 0.00
ID Tags ea 0 - 0.00
PIPING and BACKFLOW
Repair Lateral Leak ea 9 607.27 5,465.42
Repair Mainline(Quick Coupler) ea 1 609.61 609.61
Repair Backflow ea 0 - 0.00
Replace 1"PBV ea 0 - 0.00
Replace 1 1/2"PBV ea 0 - 0.00
Replace 2"PBV ea 0 - 0.00
Replace 1"RPZ ea 0 - 0.00
Replace 1 1/2"RPZ ea 0 - 0.00
Replace 2"RPZ ea 0 - 0.00
Hotbox InsulatedLL035045035 ea 0 - 0.00
Strongbox SBBC-30ALI Enclosure W/pad ea 0 - 0.00
Strongbox SBBC-45ALI Enclosure ea 0 - 0.00
Strongbox SBBC-45SS Enclosure ea 0 - 0.00
Backflow Certification ea 0 - 0.00
MISCELLANEOUS COSTS&REPAIRS
Equipment Is 1 5,738.65 5,738.65
Materials Is 1 2,058.27 2,058.27
Labor Is 1 21,413.94 21,413.94
PEARLAND IRRIGATION RECAPITALIZATION
SOUTH DOWN PARK
WEATHERTRAK
Total
Description Totals Unit Price Extended
Price
WeatherTrak LC+Controller 2 2,364.00 4,728.00
WeatherTrak Central Internet
Management(CIM)- Manufacturer 2 - -
providing 3 years of service at no cost.
WeatherTRAK Flow3- Master Valve and
Flow Meter 2 2,284.00 4,568.00
Rain Sensor 2 249.00 498.00
MISC. Wiring and Grounding Rod 2 2,618.00 5,236.00
TOTAL 15,030.00
NOTES:
Please note the master valve and flow meter may require trenching back to
controller that is unknown at this time. Pricing will be included in the park
specific repair proposals.
Irrigation Repairs Pricing
Centennial Park
Unit Total Total Ext.
Description Size Qty Price Price
IRRIGATION TOTALS(from below) 51,958.14
HEADS
Raise/Straighten Heads ea 126 29.08 3,664.24
Replace Nozzle ea 0 - 0.00
Replace 1804 Spray Head ea 0 - 0.00
Replace 1812 Spray Head ea 0 - 0.00
Replace Rotor Head ea 0 - 0.00
Replace Bubbler Head ea 0 - 0.00
Replace Bubbler on Flex Pipe ea 4 20.28 81.13
Drip Repair ea 2 625.63 1,251.25
VALVES
Repair Valve/Replace Solenoid ea 0 - 0.00
Replace Drip Kit 1" ea 0 - 0.00
Replace Valve 1" ea 1 426.25 426.25
Replace Valve 1 1/2" ea 0 - 0.00
Replace Valve 2" ea 1 735.63 735.63
1 inch Quick Couplers 44DRC ea 0 - 0.00
Replace Flow Sensor ea 0 - 0.00
Replace Master Valve ea 0 - 0.00
Replace Rain Sensor ea 0 - 0.00
1" Ball Valve ea 0 - 0.00
1 1/2"Ball valve ea 0 - 0.00
2"Ball Valve ea 0 - 0.00
Clean Valve Boxes/Add Gravel Controller 1 ea 21 233.75 4,908.75
Clean Valve Boxes/Add Gravel Controller 2 ea 9 233.75 2,103.75
Clean Valve Boxes/Add Gravel Controller 3 ea 10 233.75 2,337.50
Remove and Reset Valve Boxes with Gravel and Bricks ea 0 - 0.00
Replace and Reset Valve Boxes with Gravel and Bricks- ea 5 481.25 2,406.25
Controller 1
Replace and Reset Valve Boxes with Gravel and Bricks- ea 2 481.25 962.50
Controller 2
Replace Decoder ea 0 - 0.00
ID Tags ea 0 - 0.00
PIPING and BACKFLOW
Repair Lateral Leak ea 15 380.39 5,705.91
Repair Mainline ea 0 - 0.00
Repair Backflow ea 0 - 0.00
Replace 1"PBV ea 0 - 0.00
Replace 1 1/2"PBV ea 0 - 0.00
Replace 2"PBV ea 0 - 0.00
Replace 1"RPZ ea 0 - 0.00
Replace 1 1/2"RPZ ea 0 - 0.00
Replace 2"RPZ ea 0 - 0.00
Hotbox InsulatedLL035045035 ea 0 - 0.00
Strongbox SBBC-30ALI Enclosure W/pad ea 0 - 0.00
Strongbox SBBC-45ALI Enclosure ea 0 - 0.00
Strongbox SBBC-45SS Enclosure ea 0 - 0.00
Backflow Certification ea 0 - 0.00
MISCELLANEOUS COSTS&REPAIRS
Equipment Is 1 6,097.97 6,097.97
Materials Is 1 4,199.32 4,199.32
Labor Is 1 17,077.71 17,077.71
PEARLAND IRRIGATION RECAPITALIZATION
CENTENNIAL PARK
WEATHERTRAK
Total
Description Totals Unit Price Extended
Price
WeatherTrak OptiFlow XR 3 6,826.00 20,478.00
WeatherTrak Central Internet
Management(CIM)- Manufacturer 3 - -
providing 3 years of service at no cost.
WeatherTRAK Flow3- Master Valve and
Flow Meter 1 2,284.00 2,284.00
Rain Sensor 1 249.00 249.00
Flow Meter Decoder 1 529.00 529.00
Master Valve Decoder 1 257.00 257.00
H2O Decoders 26 214.00 5,564.00
MISC. Wiring and Grounding Rod 3 2,618.00 7,854.00
TOTAL 37,215.00
NOTES:
Please note the master valve and flow meter may require trenching back to
controller that is unknown at this time. Pricing will be included in the park
specific repair proposals.
Irrigation Repair Pricing
South Gate Park
Unit Total Total Ext.
Description Size Qty Price Price
IRRIGATION TOTALS(from below) 18,734.61
HEADS
Raise/Straighten Heads ea 0 - 0.00
Replace Nozzle ea 0 - 0.00
Replace 1804 Spray Head ea 43 29.25 1,257.75
Replace 1812 Spray Head ea 0 - 0.00
Replace Rotor Head ea 51 45.81 2,336.44
Replace Bubbler Head ea 0 - 0.00
Replace Bubbler on Flex Pipe ea 0 - 0.00
Drip Repair ea 0 - 0.00
VALVES
Repair Valve/Replace Solenoid ea 0 0.00
Replace Drip Kit 1" ea 0 - 0.00
Replace Valve 1" ea 0 - 0.00
Replace Valve 1 1/2" ea 10 562.50 5,625.00
Replace Valve 2" ea 0 - 0.00
1 inch Quick Couplers 44DRC ea 1 628.80 628.80
Replace Flow Sensor ea 0 - 0.00
Replace Master Valve ea 0 - 0.00
Replace Rain Sensor ea 0 - 0.00
1" Ball Valve ea 0 - 0.00
1 1/2"Ball valve ea 0 - 0.00
2"Ball Valve ea 1 555.38 555.38
Clean Valve Boxes/Add Gravel ea 0 - 0.00
Remove and Reset Valve Boxes with Gravel and Bricks ea 10 243.75 2,437.50
Replace Decoder ea 0 - 0.00
ID Tags ea 10 31.25 312.50
PIPING and BACKFLOW
Repair Lateral Leak ea 1 443.75 443.75
Repair Mainline ea 0 - 0.00
Repair Backflow ea 0 - 0.00
Replace 1"PBV ea 0 937.81 0.00
Replace 1 1/2"PBV ea 0 1,411.63 0.00
Replace 2"PBV ea 0 1,771.88 0.00
Replace 1"RPZ ea 0 1,069.50 0.00
Replace 1 1/2"RPZ ea 0 1,530.41 0.00
Replace 2"RPZ ea 0 1,804.50 0.00
Hotbox InsulatedLL035045035 ea 0 4,832.25 0.00
Strongbox SBBC-30ALI Enclosure W/pad ea 0 2,206.05 0.00
Strongbox SBBC-45ALI Enclosure ea 0 2,581.25 0.00
Strongbox SBBC-45SS Enclosure ea 0 3,331.25 0.00
Backflow Certification ea 0 293.75 0.00
MISCELLANEOUS COSTS & REPAIRS
Equipment Is 1 562.50 562.50
Materials Is 1 462.50 462.50
Labor Is 1 4,112.50 4,112.50
PEARLAND PARKS EQUIPMENT RECAPITALIZATION IRRIGATION
South Gate Park
WEATHERTRAK
Total
Description Totals Unit Price Extended
Price
WeatherTrak LC+Controller 1 2,364.00 2,364.00
WeatherTrak Central Internet
Management(CIM)- Manufacturer 1 - -
providing 3 years of service at no cost.
WeatherTRAK Flow3- Master Valve and
Flow Meter 1 2,284.00 2,284.00
Rain Sensor 1 249.00 249.00
MISC. Wiring and Grounding Rod 1 2,618.00 2,618.00
TOTAL 7,515.00
NOTES:
Please note the master valve and flow meter may require trenching back to
controller that is unknown at this time. Pricing will be included in the park specific
repair proposals.
Irrigation Repair Pricing
Cypress Village Park
Unit Total Total Ext.
Description Size Qty Price Price
IRRIGATION TOTALS(from below) 11,883.30
HEADS
Raise/Straighten Heads ea 0 - 0.00
Replace Nozzle ea 0 - 0.00
Replace 1804 Spray Head ea 42 29.25 1,228.50
Replace 1812 Spray Head ea 0 - 0.00
Replace Rotor Head ea 25 45.81 1,145.31
Replace Bubbler Head ea 0 - 0.00
Replace Bubbler on Flex Pipe ea 0 - 0.00
Drip Repair ea 0 - 0.00
VALVES
Repair Valve/Replace Solenoid ea 0 - 0.00
Replace Drip Kit 1" ea 0 - 0.00
Replace Valve 1" ea 7 387.50 2,712.50
Replace Valve 1 1/2" ea 0 - 0.00
Replace Valve 2" ea 0 - 0.00
3/4"inch Quick Couplers 44DRC ea 1 628.80 628.80
Replace Flow Sensor ea 0 - 0.00
Replace Master Valve ea 0 - 0.00
Replace Rain Sensor ea 0 - 0.00
1" Ball Valve ea 0 - 0.00
1 1/2"Ball valve ea 0 - 0.00
2"Ball Valve ea 1 555.38 555.38
Clean Valve Boxes/Add Gravel ea 0 - 0.00
Remove and Reset Valve Boxes with Gravel and Bricks ea 7 312.50 2,187.50
Replace Decoder ea 0 - 0.00
ID Tags ea 7 31.25 218.75
PIPING and BACKFLOW
Repair Lateral Leak ea 0 - 0.00
Repair Mainline ea 0 - 0.00
Repair Backflow ea 0 - 0.00
Replace 1"PBV ea 1 525.31 525.31
Replace 1 1/2"PBV ea 0 - 0.00
Replace 2"PBV ea 0 - 0.00
Replace 1"RPZ ea 0 - 0.00
Replace 1 1/2"RPZ ea 0 - 0.00
Replace 2"RPZ ea 0 - 0.00
Hotbox InsulatedLL035045035 ea 0 - 0.00
Strongbox SBBC-30ALI Enclosure W/pad ea 0 - 0.00
Strongbox SBBC-45ALI Enclosure ea 0 - 0.00
Strongbox SBBC-45SS Enclosure ea 0 - 0.00
Backflow Certification ea 1 293.75 293.75
MISCELLANEOUS COSTS & REPAIRS
Equipment Is 1 205.25 205.25
Materials Is 1 187.50 187.50
Labor Is 1 1,994.75 1,994.75
PEARLAND PARKS EQUIPMENT RECAPITALIZATION IRRIGATION
Cypress Village Park
WEATHERTRAK
Total
Description Totals Unit Price Extended
Price
WeatherTrak LC+Controller 1 2,364.00 2,364.00
WeatherTrak Central Internet
Management(CIM)- Manufacturer 1 - -
providing 3 years of service at no cost.
WeatherTRAK Flow3- Master Valve and
Flow Meter 1 2,284.00 2,284.00
Rain Sensor 1 249.00 249.00
MISC. Wiring and Grounding Rod 1 2,618.00 2,618.00
TOTAL 7,515.00
Irrigation Repair Pricing
Recycle Center
Unit Total Total Ext.
Description Size Qty Price Price
IRRIGATION TOTALS(from below) 50,100.88
HEADS
Raise/Straighten Heads ea 0 - 0.00
Replace Nozzle ea 0 - 0.00
Replace 1804 Spray Head ea 144 29.25 4,212.00
Replace 1812 Spray Head ea 18 38.63 695.25
Replace Rotor Head ea 20 45.81 916.25
Replace Bubbler Head ea 0 - 0.00
Replace Bubbler on Flex Pipe ea 0 - 0.00
Drip Repair ea 0 - 0.00
VALVES
Repair Valve/Replace Solenoid ea 0 - 0.00
Replace Drip Kit 1" ea 0 - 0.00
Replace Valve 1" ea 0 - 0.00
Replace Valve 1 1/2" ea 14 562.50 7,875.00
Replace Valve 2" ea 0 - 0.00
3/4"inch Quick Couplers 44DRC ea 0 - 0.00
Replace Flow Sensor ea 0 - 0.00
Replace Master Valve ea 0 - 0.00
Replace Rain Sensor ea 0 - 0.00
1" Ball Valve ea 0 - 0.00
1 1/2"Ball valve ea 0 - 0.00
2"Ball Valve ea 3 555.38 1,666.13
Clean Valve Boxes/Add Gravel ea 0 - 0.00
Remove and Reset Valve Boxes with Gravel and Bricks ea 14 243.75 3,412.50
Replace Decoder ea 0 - 0.00
ID Tags ea 14 31.25 437.50
PIPING and BACKFLOW
Repair Lateral Leak New Piping ea 1900 8.44 16,031.25
Repair Mainline ea 140 23.88 3,342.50
New Main Line ea 1100 6.38 7,012.50
Repair Backflow ea 0 - 0.00
Replace 1"PBV ea 0 - 0.00
Replace 1 1/2"PBV ea 0 - 0.00
Replace 2"PBV ea 0 - 0.00
Replace 1"RPZ ea 0 - 0.00
Replace 1 1/2"RPZ ea 0 - 0.00
Replace 2"RPZ ea 0 - 0.00
Hotbox InsulatedLL035045035 ea 0 - 0.00
Strongbox SBBC-30ALI Enclosure W/pad ea 0 - 0.00
Strongbox SBBC-45ALI Enclosure ea 0 - 0.00
Strongbox SBBC-45SS Enclosure ea 0 - 0.00
Backflow Certification ea 0 - 0.00
MISCELLANEOUS COSTS & REPAIRS
Equipment Is 1 624.20 624.20
Material Is 1 1,124.80 1,124.80
Labor Is 1 2,751.00 2,751.00
PEARLAND PARKS EQUIPMENT RECAPITALIZATION IRRIGATION
Recycle Center
WEATHERTRAK
Total
Description QTY Unit Price Extended
Price
WeatherTrak LC+Controller 1 2,364.00 2,364.00
WeatherTrak Central Internet
Management(CIM)- Manufacturer 1 - -
providing 3 years of service at no cost.
WeatherTRAK Flow3- Master Valve and 1 2,284.00 2,284.00
Rain Sensor 1 249.00 249.00
MISC. Wiring and Grounding Rod 1 2,618.00 2,618.00
TOTAL 7,515.00
Irrigation Repair Pricing
Deloris Fenwick Nature Center
Unit Total Total Ext.
Description Size Qty Price Price
IRRIGATION TOTALS(from below) 17,791.60
HEADS
Raise/Straighten Heads ea 0 - 0.00
Replace Nozzle ea 0 - 0.00
Replace 1804 Spray Head ea 3 29.25 87.75
Replace 1812 Spray Head ea 0 - 0.00
Replace Rotor Head ea 0 - 0.00
Replace Bubbler Head ea 44 31.88 1,402.50
Replace Bubbler on Flex Pipe ea 0 - 0.00
Drip Repair ea 0 - 0.00
VALVES
Repair Valve/Replace Solenoid ea 0 - 0.00
Replace Drip Kit 1" ea 0 - 0.00
Replace Valve 1" ea 1 387.50 387.50
Replace Valve 1 1/2" ea 0 - 0.00
Replace Valve 2" ea 0 - 0.00
3/4 inch Quick Couplers 44DRC ea 2 628.80 1,257.60
Replace Flow Sensor ea 0 - 0.00
Replace Master Valve ea 0 - 0.00
Replace Rain Sensor ea 0 - 0.00
1" Ball Valve ea 0 - 0.00
1 1/2"Ball valve ea 0 - 0.00
2"Ball Valve ea 0 - 0.00
Clean Valve Boxes/Add Gravel ea 0 - 0.00
Remove and Reset Valve Boxes with Gravel and Bricks ea 13 312.50 4,062.50
Replace Decoder ea 0 - 0.00
ID Tags ea 13 31.25 406.25
PIPING and BACKFLOW
Repair Lateral Leak ea 7 443.75 3,106.25
Repair Mainline ea 0 - 0.00
Repair Backflow ea 0 - 0.00
Replace 1"PBV ea 0 - 0.00
Replace 1 1/2"PBV ea 0 - 0.00
Replace 2"PBV ea 0 - 0.00
Replace 1"RPZ ea 0 - 0.00
Replace 1 1/2"RPZ ea 0 - 0.00
Replace 2"RPZ ea 0 - 0.00
Hotbox InsulatedLL035045035 ea 0 - 0.00
Strongbox SBBC-30ALI Enclosure W/pad ea 0 - 0.00
Strongbox SBBC-45ALI Enclosure ea 0 - 0.00
Strongbox SBBC-45SS Enclosure ea 0 - 0.00
Backflow Certification ea 1 293.75 293.75
MISCELLANEOUS COSTS&REPAIRS
Equipment Is 1 370.00 370.00
Materials Is 1 880.60 880.60
Labor Is 1 5,536.90 5,536.90
PEARLAND PARKS EQUIPMENT RECAPITALIZATION IRRIGATION
Deloris Fenwick Nature Center
WEATHERTRAK
Total
Description Totals Unit Price Extended
Price
WeatherTrak LC+Controller 1 2,364.00 2,364.00
WeatherTrak Central Internet
Management(CIM)- Manufacturer 1 - -
providing 3 years of service at no cost.
WeatherTRAK Flow3- Master Valve and
Flow Meter 1 2,284.00 2,284.00
Rain Sensor 1 249.00 249.00
MISC. Wiring and Grounding Rod 1 2,618.00 2,618.00
TOTAL 7,515.00
Irrigation Repair Pricing
Zychlinski Park
Unit Total Total Ext.
Description Size Qty Price Price
IRRIGATION TOTALS(from below) 13,101.49
HEADS
Raise/Straighten Heads ea 0 - 0.00
Replace Nozzle ea 0 - 0.00
Replace 1804 Spray Head ea 0 - 0.00
Replace 1812 Spray Head ea 0 - 0.00
Replace Rotor Head ea 69 45.81 3,161.06
Replace Bubbler Head ea 0 - 0.00
Replace Bubbler on Flex Pipe ea 0 - 0.00
Drip Repair ea 0 - 0.00
VALVES
Repair Valve/Replace Solenoid ea 0 - 0.00
Replace Drip Kit 1" ea 0 - 0.00
Replace Valve 1" ea 0 - 0.00
Replace Valve 1 1/2" ea 7 562.50 3,937.50
Replace Valve 2" ea 0 - 0.00
1 inch Quick Couplers 44DRC ea 1 628.80 628.80
Replace Flow Sensor ea 0 - 0.00
Replace Master Valve ea 0 - 0.00
Replace Rain Sensor ea 0 - 0.00
1" Ball Valve ea 0 - 0.00
1 1/2"Ball valve ea 0 - 0.00
2"Ball Valve ea 1 555.38 555.38
Clean Valve Boxes/Add Gravel ea 0 - 0.00
Remove and Reset Valve Boxes with Gravel and Bricks ea 7 243.75 1,706.25
Replace Decoder ea 0 - 0.00
ID Tags ea 7 31.25 218.75
PIPING and BACKFLOW
Repair Lateral Leak ea 0 - 0.00
Repair Mainline ea 0 - 0.00
Repair Backflow ea 0 - 0.00
Replace 1"PBV ea 0 - 0.00
Replace 1 1/2"PBV ea 0 - 0.00
Replace 2"PBV ea 0 - 0.00
Replace 1"RPZ ea 0 - 0.00
Replace 1 1/2"RPZ ea 0 - 0.00
Replace 2"RPZ ea 0 - 0.00
Hotbox InsulatedLL035045035 ea 0 - 0.00
Strongbox SBBC-30ALI Enclosure W/pad ea 0 - 0.00
Strongbox SBBC-45ALI Enclosure ea 0 - 0.00
Strongbox SBBC-45SS Enclosure ea 0 - 0.00
Backflow Certification ea 0 - 0.00
MISCELLANEOUS COSTS & REPAIRS
Equipment Is 1 124.00 124.00
Materials Is 1 157.25 157.25
Labor Is 1 2,612.50 2,612.50
PEARLAND PARKS EQUIPMENT RECAPITALIZATION IRRIGATION
Zychlinski Park
WEATHERTRAK
Total
Description Totals Unit Price Extended
Price
WeatherTrak LC+Controller 1 2,364.00 2,364.00
WeatherTrak Central Internet
Management(CIM)- Manufacturer 1 - -
providing 3 years of service at no cost.
WeatherTRAK Flow3- Master Valve and
Flow Meter 1 2,284.00 2,284.00
Rain Sensor 1 249.00 249.00
MISC. Wiring and Grounding Rod 1 2,618.00 2,618.00
TOTAL 7,515.00
Irrigation Repair Pricing
Creek Side Park
Unit Total Total Ext.
Description Size Qty Price Price
IRRIGATION TOTALS(from below) 14,055.43
HEADS
Raise/Straighten Heads ea 0 - 0.00
Replace Nozzle ea 0 - 0.00
Replace 1804 Spray Head ea 0 - 0.00
Replace 1812 Spray Head ea 0 - 0.00
Replace Rotor Head ea 80 45.81 3,665.00
Replace Bubbler Head ea 0 - 0.00
Replace Bubbler on Flex Pipe ea 0 - 0.00
Drip Repair ea 0 - 0.00
VALVES
Repair Valve/Replace Solenoid ea 0 - 0.00
Replace Drip Kit 1" ea 0 - 0.00
Replace Valve 1" ea 0 - 0.00
Replace Valve 1 1/2" ea 8 562.50 4,500.00
Replace Valve 2" ea 0 - 0.00
1 inch Quick Couplers 44DRC ea 1 628.80 628.80
Replace Flow Sensor ea 0 - 0.00
Replace Master Valve ea 0 - 0.00
Replace Rain Sensor ea 0 - 0.00
1" Ball Valve ea 0 - 0.00
1 1/2"Ball valve ea 0 - 0.00
2"Ball Valve ea 1 555.38 555.38
Clean Valve Boxes/Add Gravel ea 0 - 0.00
Remove and Reset Valve Boxes with Gravel and Bricks ea 8 243.75 1,950.00
Replace Decoder ea 0 - 0.00
ID Tags ea 8 31.25 250.00
PIPING and BACKFLOW
Repair Lateral Leak ea 1 443.75 443.75
Repair Mainline ea 0 - 0.00
Repair Backflow ea 0 - 0.00
Replace 1"PBV ea 0 937.81 0.00
Replace 1 1/2"PBV ea 0 1,411.63 0.00
Replace 2"PBV ea 0 1,771.88 0.00
Replace 1"RPZ ea 0 1,069.50 0.00
Replace 1 1/2"RPZ ea 0 1,530.41 0.00
Replace 2"RPZ ea 0 1,804.50 0.00
Hotbox InsulatedLL035045035 ea 0 4,832.25 0.00
Strongbox SBBC-30ALI Enclosure W/pad ea 0 2,206.05 0.00
Strongbox SBBC-45ALI Enclosure ea 0 2,581.25 0.00
Strongbox SBBC-45SS Enclosure ea 0 3,331.25 0.00
Backflow Certification ea 0 293.75 0.00
MISCELLANEOUS COSTS & REPAIRS
Equipment Is 1 165.70 165.70
Materials Is 1 191.50 191.50
Labor Is 1 1,705.30 1,705.30
PEARLAND PARKS EQUIPMENT RECAPITALIZATION IRRIGATION
Creek Side Park
WEATHERTRAK
Total
Description Totals Unit Price Extended
Price
WeatherTrak LC+Controller 1 2,364.00 2,364.00
WeatherTrak Central Internet
Management(CIM)- Manufacturer 1 - -
providing 3 years of service at no cost.
WeatherTRAK Flow3- Master Valve and
Flow Meter 1 2,284.00 2,284.00
Rain Sensor 1 249.00 249.00
MISC. Wiring and Grounding Rod 1 2,618.00 2,618.00
TOTAL 7,515.00
Irrigation Repair Pricing
Hyde Park
Unit Total Total Ext.
Description Size Qty Price Price
IRRIGATION TOTALS(from below) 17,205.80
HEADS
Raise/Straighten Heads ea 0 - 0.00
Replace Nozzle ea 0 - 0.00
Replace 1804 Spray Head ea 0 - 0.00
Replace 1812 Spray Head ea 0 - 0.00
Replace Rotor Head ea 63 45.81 2,886.19
Replace Bubbler Head ea 0 - 0.00
Replace Bubbler on Flex Pipe ea 0 - 0.00
Drip Repair ea 0 - 0.00
VALVES
Repair Valve/Replace Solenoid ea 0 - 0.00
Replace Drip Kit 1" ea 0 - 0.00
Replace Valve 1" ea 0 - 0.00
Replace Valve 1 1/2" ea 6 562.50 3,375.00
Replace Valve 2" ea 0 - 0.00
1 inch Quick Couplers 44DRC ea 1 628.80 628.80
Replace Flow Sensor ea 0 - 0.00
Replace Master Valve ea 0 - 0.00
Replace Rain Sensor ea 0 - 0.00
1" Ball Valve ea 0 - 0.00
1 1/2"Ball valve ea 0 - 0.00
2"Ball Valve ea 1 555.38 555.38
Clean Valve Boxes/Add Gravel ea 0 - 0.00
Remove and Reset Valve Boxes with Gravel and Bricks ea 6 243.75 1,462.50
Replace Decoder ea 0 - 0.00
ID Tags ea 6 31.25 187.50
PIPING and BACKFLOW
Repair Lateral Leak ea 3 718.75 2,156.25
Repair Mainline ea 1 554.19 554.19
Repair Backflow ea 0 - 0.00
Replace 1"PBV ea 0 - 0.00
Replace 1 1/2"PBV ea 0 - 0.00
Replace 2"PBV ea 0 - 0.00
Replace 1"RPZ ea 0 - 0.00
Replace 1 1/2"RPZ ea 0 - 0.00
Replace 2"RPZ ea 0 - 0.00
Hotbox InsulatedLL035045035 ea 0 - 0.00
Strongbox SBBC-30ALI Enclosure W/pad ea 0 - 0.00
Strongbox SBBC-45ALI Enclosure ea 0 - 0.00
Strongbox SBBC-45SS Enclosure ea 0 - 0.00
Backflow Certification ea 0 - 0.00
MISCELLANEOUS COSTS & REPAIRS
Equipment Is 1 602.40 602.40
Materials Is 1 1,474.60 1,474.60
Labor Is 1 3,323.00 3,323.00
PEARLAND PARKS EQUIPMENT RECAPITALIZATION IRRIGATION
Hyde Park
WEATHERTRAK
Total
Description QTY Unit Price Extended
Price
WeatherTrak LC+Controller 1 2,364.00 2,364.00
WeatherTrak Central Internet
Management(CIM)- Manufacturer 1 - -
providing 3 years of service at no cost.
WeatherTRAK Flow3- Master Valve and
Flow Meter 1 2,284.00 2,284.00
Rain Sensor 1 249.00 249.00
MISC. Wiring and Grounding Rod 1 2,618.00 2,618.00
TOTAL 7,515.00
Irrigation Repair Pricing
Pine Hollow
Unit Total Total Ext.
Description Size Qty Price Price
IRRIGATION TOTALS(from below) 14,390.61
HEADS
Raise/Straighten Heads ea 0 - 0.00
Replace Nozzle ea 0 - 0.00
Replace 1804 Spray Head ea 21 29.25 614.25
Replace 1812 Spray Head ea 0 - 0.00
Replace Rotor Head ea 37 45.81 1,695.06
Replace Bubbler Head ea 0 - 0.00
Replace Bubbler on Flex Pipe ea 0 - 0.00
Drip Repair ea 0 - 0.00
VALVES
Repair Valve/Replace Solenoid ea 0 - 0.00
Replace Drip Kit 1" ea 0 - 0.00
Replace Valve 1" ea 0 - 0.00
Replace Valve 1 1/2" ea 0 - 0.00
Replace Valve 2" ea 0 - 0.00
3/4 inch Quick Couplers 44DRC ea 1 628.80 628.80
Replace Flow Sensor ea 0 - 0.00
Replace Master Valve ea 0 - 0.00
Replace Rain Sensor ea 0 - 0.00
1" Ball Valve ea 0 - 0.00
1 1/2"Ball valve ea 0 - 0.00
2"Ball Valve ea 0 - 0.00
J-Box for wire conectors ea 2 193.75 387.50
Clean Valve Boxes/Add Gravel ea 0 - 0.00
Remove and Reset Valve Boxes with Gravel and Bricks ea 7 312.50 2,187.50
Replace Decoder ea 0 - 0.00
ID Tags ea 7 31.25 218.75
PIPING and BACKFLOW
Repair Lateral Leak ea 1 443.75 443.75
Repair Mainline ea 0 - 0.00
Repair Backflow ea 0 - 0.00
Replace 1"PBV ea 0 - 0.00
Replace 1 1/2"PBV ea 0 - 0.00
Replace 2"PBV ea 0 - 0.00
Replace 1"RPZ ea 0 - 0.00
Replace 1 1/2"RPZ ea 0 - 0.00
Replace 2"RPZ ea 0 - 0.00
Hotbox InsulatedLL035045035 ea 0 - 0.00
Strongbox SBBC-30ALI Enclosure W/pad ea 0 - 0.00
Strongbox SBBC-45ALI Enclosure ea 0 - 0.00
Strongbox SBBC-45SS Enclosure ea 0 - 0.00
Backflow Certification ea 1 293.75 293.75
MISCELLANEOUS COSTS & REPAIRS
Equipment Is 1 437.50 437.50
Materials Is 1 642.45 642.45
Labor Is 1 6,841.30 6,841.30
PEARLAND PARKS EQUIPMENT RECAPITALIZATION IRRIGATION
Pine Hollow
WEATHERTRAK
Total
Description Totals Unit Price Extended
Price
WeatherTrak LC+Controller 1 2,364.00 2,364.00
WeatherTrak Central Internet
Management(CIM)- Manufacturer 1 - -
providing 3 years of service at no cost.
WeatherTRAK Flow3- Master Valve and
Flow Meter 1 2,284.00 2,284.00
Rain Sensor 1 249.00 249.00
MISC. Wiring and Grounding Rod 1 2,618.00 2,618.00
TOTAL 7,515.00