R2022-066 2022-03-28DocuSign Envelope ID: 99075401-9410-4064-975A-FE8B25C4C3D3 RESOLUTION NO. R2022-66 A Resolution of the City Council of the City of Pearland, Texas, approving Change Order No. 8 with PLW Waterworks, in the amount of $1,078,000.00, associated with the Surface Water Plant Project. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain change order associated with the Surface Water Plant Project, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest the change order associated with the Surface Water Plant Project. PASSED, APPROVED and ADOPTED this the 28th day of March, A.D., 2022. rDocuSigned by: ATTEST: DocuSigned by: 7E 10GOB64e;4hTTrA LESLIE CRIENDEN CITY SECRETARY APPROVED AS TO FORM: ,-DocuSigned by: • `E e*e9S&B4F4BG... DARRIN M. COKER CITY ATTORNEY J. KEVIN C 64&8�9Q 4F2 -Af-1€OLS MAYOR di Ly51*,hi Exhibit A CHANGE ORDER Surface Water Plant CITY OF PEARLAND PROJECTS DEPARTMENT 1016 Old Alvin Rood Pearland, Texas 77581 www.cityorpea rlaad.co rni p rojccut Date or Issuance: 3/9/2022 Change Order No.: 8 Contractor: PLW Waterworks CoP Project No.: WA 1605 Designer: CDM Smith P.O. No.: 2019-00001305 Explanation: This change order encompasses the following: Change prdcr 148 will be to add additional scope identified as WCD 1-3 Additional items that were added to the Work by the City after the GMP was accepted include the changes identified below and the City's memo dated 3/10/2022, Description of Work Cost Time 1 WCD # I "Modification to the solids handling system to collect wash -water and belt press filtrate for return to the GCWA canal rather than pumping to Reflection Bay Water Reclamation Facility. Additional changes made to provided City's standard COVID preparations." S 224,000.00 0 Days 2 WCD # 2" Modification to the membrane and piping to accept the Toray membranes in place of the basis of design, Pall System, Additional structural requirements to comply with Critical Facility designation of the 2018 [-codes for TM windstorm."' S 734.000,0E 0 Days 3 WCD # 3 "Modifications to the IT equipment and network switches to conform to the changes in SCADA system after requirements from T-Fix to VT SCADA and to replace the rack mounted UPS units with a single 40kVa stand alone to protect the redundant City -wide Data center located at the plant_" Please attach hack -up documentation I20.ob0.ao Days Cast & Time Chance Summar Cost Time Original Contract: 5 1,092,320.0E 240 Days Previous ChangeOrder(s): S134,905,361,00 1191 bays Contract prior to this change order: $ 135,997,681.00 143 I Days Net increase (decrease) from this change order b 1,078,000.00 0 Days Revised Contract: S 137,075,681.00 1431 Days Finance Approval:: RECOMMENDED: Domen,cD,Cen o°m By: Date_ By: o.,mzzw,an.zseasoo Date: 04/14/2022 Ali ,.-,".:::re°, Construction Manager Leadir ute: 04-18-22 RECOMMENDED: 4/13/2022 Lynea Gallagher Z;,"°5 ACCEPTED*: f�f1l� 3ycmil,alopezCthr 1, 2622 ixil tsnuate: 11-Mar-2022 APPROVED: By: Cordrnctor Emilio Loper Pacettk, Presicler i Owner Date: 04/18/2022 'Contractor agrees to perform chanPeisy Included in 'ads Change Order ror the puce and time indicated. The prices for changes included all costs assceraicd with chili Change Order. NO work is ro be dome umrl this r=hungr order is executed. Nu payment lu the Comractor (or Consnitani) shall be made roc work included in the. chrrngcordcr until the Cwthactor's pay estrnwle is updated. Revise the project pins and speciheaUcisas referenced and insofar as die original projectdrawings and speciretaiunsarc inculisistcaL this Chsutg Orrice guv(Tne. Win gin Mpg 3ummar,•The Prarul,1LA,341tor1•Yr1L Oa Mai meb ahV rlrapr34! d+14114 trYANdi. MINIM MPo Clung. 6i41s1on HP EL 5uhj4endor mango -In Cott emag Issued co to sub/Vendor cc Eaen0ed mole Remark !l 2f 31 41. 5 6 1) Bj PirwC010;,Addar for addlriunal duct hank[, ylstar analiger and flew meter, 5.57E pumps El &c mdit jPumptredit Is separate Below under Hahn Equipment Padagej to reduce the .pump rrarn{3) io 2) and rhenCInte from 4611P 10 20 HP. Add suppry of 20' MnG Flow Meter Tor RWP3 IMP 20.011. Originally this. MAG meter was Suppose to the iupplled by CliddlTOr Safdllr4 ik M' Litt Stotlnn PuMl[{[,gh32.0 r+4ry LEI en l21 owl doWnfI2I46 from ao ha to 26hp. Per W14 aU1, oexater7n¢ Building Slab design change. MedaanIsaF changes to Oswaterkg Bldg. Pipe IIM-ber& SSk.i Pipe[NM-1&1S. ExcludIn Mersin S&V CMaA under BP15A3A 5.01 SIIPAIp byEWA-Aedi]Ional Pepe& Finn dgc 5545.o4 raspetre parwcop0j BP 30A3 WM.. PrHTastment=•; .Nn CudFan -ct Mehahrane•ihlarlme& efilalne Dodds.& kin Yard Flee• For WCO n71: Mem S63 . Add s torm for oraatering Bullding Including Fleaamat. ilerm HBB - Credlt to muddy Sanhary Sewer Building Padage- Add comp upgrade for plumbing, HenrIcal and llphtlniE touchlesn dnon hardware 16.67 •sui 1.A.04- HshH Eq] men; 26D2-5usIanhe ISO]. -F rgulan &15.677I•Eahan 2O03 •WM1 20.04-PLW 02.05-PLW 2a.]]4-Tllniro, lilt 733.279.00 [5a,sH1.mI U,iJ67A] 31.HI]J55 $B SO 53,620.21 $37.12.46 BP 1E.61A71,BFC031103 HP 71.OL Hahn Ega 1pnnntCa1,33 6P 23A2 5usianIe ['OPUS B. WIIOS Ferguson CO need to !Ewe and Cahene0X02arsued an 6l%2H/22..IFIN & n process Nal -•ulre Nal . ulre ArdYhdareTJtlled WM:0 c heltgee van PLW Sint-puit•rrn 4cotrart nsihrerird praposal BP 211.06FIInrno, 1C-CO Yp11 61III wai]Ing foe tflf Lidm pruposnl irem Mien, Kupi budtpsi of #22k L 13%21-Eoeeuled QBfl]j21• EMe[uled O6/30,21 & {rB{15f21 - EUlsu[ed In Proms NA NA Not yt.t ttnuad 2124,2022 t,,r?, •. 51 21L'.LoLL .r • 1Kid. N41]] Cr In Fracas,. Nand rouor rhsnges and .E.maR will issue. CO Qnn exert! tar UV flints Pascrmle Tatar 5heteosl for Web 401 qs oTO212 : Add c0]0us uurk-u5 of 4.135% :1.464 11i61137Curt Scmnuly- IlrelM.111lag Tao M re1rIJFl.e■dW 1r.ai.aa4�f13l71 roe 1) YJ 31 }I di 71 dl 04. .oe.r. rr. AJFuMl[n9In9uII PIW11tl1µfe4i1g.trarWC9102 1314116.A. ;LAI& 31.01 EP.1.I 31:•1.4 wah 050 u,lrylh 0 l003141a na h.hpca t iB.J.M rill's, 6) Oue to TV rage reVremrrd perYg4197.urA Impu[L lor.% Ene110r90019 a 143PP40e 10 Prlint[131herVa131GN aril di. HSPSd'lduer[ Caner Ind Oplrala/6.150 WE.I. utind Maul 1.10. jW5,- IN•arwnnrni!WV. Cps.' impart Rkrbkal madAcelk...w3.nmo6Plr MFS IMahrare'Jlranan 309.2 dednalanga. Yard ixernirme tHodrr R iiiodn•Vadde AnNus-ISI fah coo tnplrtrrd PLW Glut far xlfperlaml.wk E..wur146.11lky nrmNe vMll'VMS mrar+hllr4Carfaldrdon for MFS pia parI Vnd°raid.. Import milady ern reNsld aodtdd MPS Inik .,uh alp. W.kki.Ircf.hm. P., 11,11951rrop0m.to Pmokl• Nc .'J.%IVA 044pi MFEPakafc ...I1.143r,. ..4rF ilia MdRMiar flumbh.6 rhenau Per Yh7.72. ArawnmlYMe amines Me to1171 requrennnls No Gast nigyizePre• Nealmr it S7unure Casslrtal rrpgpkal,ar la xuarnmaIme MFS ! erckrinefla :xi Spla,I d . rh.i . l No cost Rnrrior Ind Li. mentrantik Minim. Wiling padkta1k .to aoo..Amdfale 101.Iaffaid rugairn.0 sad Manblsu fJir.W1n irNm 04.E. I.....a.rr.:wrl01 .I NI ram04a and e'tlae9r06 x.rf ID aoocnmoda1c1E7 Wad load desn [ninJes. ❑W 10 T01 rnlur.mm..,ga de.rf Pl la r.lr.0 hhdrilinn 9f Wrmtnfnrilnapf PA xkmteuna Flkrakn Sr -as eolipl e,NaylsrcxbttlnwLh dr. Ta auanunoina 6aka. ch.,. for tdimbr.I. Mratpn.r3tr., dm. M74. 9dele ell Me Imps f.om WCDPJ32nd sake f WI [real ef 5717El5.Birld rid f21 ttl' Jt4.',.6.1. r..r 3511 Iv .otoriponplo 121 aplrrnaor as per dl'eakln 46}i. 44494. 2fiI .FIm[a Canmrlll m 37b1-W3. JR d1-NI-Pdnlr dQ JFS.fLW SAhW VI- 1db}-LmrrB. BPSSALB•Caian Br35.01A-FFfpdmn UAl-M20 fatal Chsr, i, Grnr 1.15r5i3417 $4 i1.1.711 Lia7.211.97 3%,9.2692 101,199.71 16,131.181 Poem d4rN1911 RerNiremnl 6tulp. eh .r 141.07917 Si. - $I10.1C9Ap MAIS.93 • - h.1 On la Mtn Urn W.4%9130 54 21.11.7.2.1 -. L327}62.14 - 171.J91.75 2.1011.131 CMJdl aawJ in ea .rhfwnd.r BP36Di-F011i.OL(L 10*• COr'lad4 Fix PemIrs le !4k11'Jt lrr. COMA Nets 1'LW need to.sena revised praposalper r ar. ccrete.. M,L.na Ardura an'shidrem.'le 1, WYE minrs per cameo.. ko.Jon25..1.rip0,1.. SO.4,99f 1lsuad Oaf92 far Has J15 m3udid. CM? al Ondlnd.rproySd u. 13.4patmItkPeior 0ddld FcnPa pr 41U1m111 RbfraewJ Oaie 7f15103i11, atidil2t NA 9)23,7074,,.. 111. moo ..,...in,cost neWP3ted am, made'-rarges 3113142133tt P2130022 Ci1N@9�720f2t CW03 ea,ce.J igrui; 7,.; _. f.e,,.,, `,,.x3 on4177;727 Mm1ri. - -. - "-,. _'droHmlprh rt. - , - Chen rtW meg lc •n33,44 u•:ar+al,nu N tII,r allS' " I :r_.... 313.G0i.29 . 267;51170 PiII.1nlal ur.r1 Coos ONCE. I4-7 a,ai ,Ipiadj23 7d6,0 ? add C1/474B rAs.l -Pal .1.1. 111.57.727 11511. V41 17.7P1.777 WCO 1101 Csn7 Surnm.il - by Ptah! I @n H41 hn111Y nwi todogn Or dill*Wa M1u1 an 9Sf 17t22 No Charge Oeosicn BP Ft Sub/Vendor nave inloL CMAR hvUed CO h}strb{Vendw COEgrOated Bak il¢Inorks 1} Croat far p} 12 KVA UPS and UPS bypesa,wikh and odd 4FKVA Ue4,ert Uhl UPS.. battery rahlreet system and rnalntenance bypass ralslnet 1601 -All-Prlm,a 59.8113.132 Yap BP 16.01•All, Ir.. •Prima COMM, 1{ 1O22. 117/7413:177 ..'w _ 2} filet. kP+neli.{Snilth Chnngat requirebs Prime Controls per WCU1103. Firma a and prauldc credit for O1d} Cisco CataIlrrt switchrr to be prcnidcd bll Pr11rn. City wIII rob -tide and aleady phased lei proposed 1E-3300 acid requested to add [2f addltrarnl I£-3100 1681-NI-Prime 7fifl117.P5 V.c RP L5 fl1-All, Inr.- Prlrnn LY711f)3 3] B] Srope rheneesBeyerWCDA03- Changes to meet updsles Innen...4Hk topology from Her to PLR 11.011420 9,17I 31 Yb,APLEAS- H2O-LOBOS BUdkelief MS1 rk P4alofA She W$k PLW in prams to pet rraponse for submitted RFI fu Installation details 02124,022 In Process elnt y9S, Pluplen budtekohr mlmher _ RP subnitta¢ for niquostmn INL#RHFOtl dlshdet frOIII 12 KVAto40KW UPS F3MEro-F56 EWA fnslallallon of 121VA UPS whldt is rJ edin 30 KVA UPS. Waikin Lsq get detal.from PAR far {tpmgasla. FIc., 20,05FIIntco-FS6 19.37.64 Add CMAR Mark-up of -0.11.Sid r 5550.767