R2005-0026 01-31-05 RESOLUTION NO. R2005-26 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, APPROVING CHANGE ORDER NO. 1 ASSOCIATED WITH THE PEARLAND PARKWAY WATERLINE PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That Change Order No. 1 associated with the Pearland Parkway Waterline Project, a copy of which is attached hereto as Exhibit"A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest Change Order No. 1 associated with the Pearland Parkway Waterline Project. PASSED,APPROVED and ADOPTED this the 31st day of January A.D., 2005. TOM REID MAYOR ATTEST: UNG, RFIN , MC Y S RETARY APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY 03/03/2005 11:28 2813713079 CROSS CONTRACTING PAGE 02/06 RESOLUTION NO.R200S-26 CHANGE ORDER NO. 01 AMM MIIMM.= PEARL-AND PARKWAY &t BROADWAY (FM 51 $) PROPOSED 1 6-INCH WATERLINE QwNER: SID No.: 1320o4-067 CONTRACTOR: CROSS CONTRACTING SERVICES. LTD. ENGINEER: OTHON, INC. CONSULTING aN4oNEERs YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENTS. 61„," DESCRIPTION: 3� ` 1 . ADJUSTMENT OF CONTRACT AMOUNT BASED ON ACTUAL QUANTITIES USED. tttvvv D REASON FOR CHANGg ORDER: \N "0 TO CLOSE-OUT THE CONSTRUCTION CONTRACT, AND ADJUST TOTAL CONTRACT AMOUNT FOR SEVERAL. ITEMS THAT ,WERE ADDED IN THE FIELD. ATTACHMENTS: 1. WORK CHANGE DIRECTIVE I o. 1 FROM CITY OP PEARLAND DATED OCTOBER 13, 2004. 2, COST' PROPOSAL FROM CROSS CONTRACTING SERVICE, LTD. DATE MAY 26,, 2004 FOR UNIT PRICE ON REPLACING SIDEWALK. 3. CALCULATION OF CHANGE IN CONTRACT PRICE FROM OTHON DATED JANUARY 19, 2005, CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: ORIGINAL CONTRACT PRICE! ORIGINAL CONTRACT TIMES: $487,003.00 SUBSTANTIAL COMPLETION: ISO CALENDAR DAYS READY FOR FINAL. PAYMENT: 1 80 CALENDAR DAYS NET CHANGES FROM PREVIOUS CHANGE ORDER(S): NET CHANGES FROM PREVIOUS CHANGE ORDER(S): l $0.00 (NONE) 0 CALENDAR DAYS CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: CONTRACT TIMES PRIOR TO THE CHANGE ORDER: $457,903.00 SUBSTANTIAL COMPLETION; 150 CALENDAR DAYS READY FOR FINAL PAYMENT: 180 CALENDAR DAYS {..ate.._ NET INCREASE OF THIS GE ORDER: NET INCREASE (OR DECREASE) OF THIS CHANGE ORDER; S47,605 50 0 CALENDAR DAYS CONTRACT PRICE WITH ALL APPROVED CONTRACT TIMES WITH ALL APPROVED CHANGE ORDERS; CHANGE ORDERS: SUBSTANTIAL COMPLETION: 150 CALENDAR DAYS $535,707.50 READY FOR FINAL PAYMENT: ISO CALENDAR DAYS CHANGE ORDER NO. 1 1 of 2 Bid No.: 82004.057 01/19/2005 03/03/2005 11:28 2813713079 CROSS CONTRACTING PAGE 03/06 r RECOMMENDED: 01346 A,� DATE: HY: O HON, INC. (A'UTHbRIZED SIGNATI-IRE) APPROVED: By, DATE: CITY OF PEARLAND 8711 LB ssen (AUTHORIZED SIGNATURE) ACCEPTED: @Y: _ bAT>w: 10 CR CONTRACTING SERVICES, LTD, TWORIzED SIGNATURE) • CHANGE ORDER NO. 1 2 of 2 Bid No.: B2004.057 01/19/2005 03/03/2005 11:28 2813713079 CROSS CONTRACTING PAGE 04/06 Work Change Directive No. I City Project No:B2004.057 Project Nato: Pearlend Parkway&Broadway(FM 518)Proposed 16" Waterline You are hereby directed to make the following changes in the Work, as described below and specified or shown 071 attachments, if applicable: (a) Brief description of the changes in the Work: i. Remove and replace existing sidewalk at $5.00 per square foot. (b) Justification fir change: i Per city inspector Charlie Stubbs and response to RET'5 Proposed Contract Adjustments: (a) Overrun of bid item##26 The contract tine is proposed to remain unchanged. Signature by the City indicates notice to proceed to the Contractor for the described work and outlines the proposed method of adjustment in Contract Price and Contract Time, Ct Si r. Title u -� Date Print • Signature by the Contractor indicates the Contractor's agreement with,the above proposed. —MET ILO on car Signature Title D t Print Name 03/03/2005 11:28 2813713073 CROSS CONTRACTING PAGE 05I05 GRoms CONTRACTING SERVICES, LTD a 4141 KATY HOGK.I..ET Rb. .�( ilr; KATY, TX 77493 _. r rO PH 281-371-3050 OT INC. Px 281-371-3079 OCT 0 4 204 May 26, 2004 Richard Davis Othon Inc. 11111 Wilcrest Green, Suite 128 Houston, Texas 77042 Reference: Pearland Parkway & Broadway (FM 518) Proposed 16" Waterline Job No. 408 Dear Mr, Davis: In response to RFI 0 5, Cross Contracting Services Ltd. was informed by the project inspector that the removal and replacement of the sidewalk at the south end of Pearland Parkway would be paid for by over running bid item number 26 of the Agreement between Owner and Contractor. As discussed previously, we propose the following for the above referenced project: Remove and Replace Existing Sidewalk @ $5.00 per square foot. if you have any questions or require additional information, please contact me. Sincerely, V71/1444 //( Kent McAllister Project Manager Peggy Betzer, City of Pearland File 11Spencerlcross docslProposalslPearland Sidewalk Proposal 9-30-O4.,doc b;i/4J.3/1 JUb 11:2U 2b1:3 f L3 f`-I UHIJ5S JUN I HAU 11Nea FALL tgbf 7b s, Change Order No. 1 Attachment 3 PEARLAND PARKWAY & BROADWAY (FM 518) PROPOSED 16-INCH WATERLINE Bit)NO.B2004-057 CHANGE ORDER NO. 1: [ITEM BID ACTUAL QUANT BID CONTRACT NO. ITEM DESCRIPTION UNIT UANT, QUANT. ADJUST. PRICE ADJUST. 5 Trench Safety System,All DELI! LF 6670 6651 -19 $ 1.00 $ (19,00) 7 Remove Existing 10-inch Asbestos Cement Waterline LF J 1618 475 -I 143 $ 6.50 $ (7,429.50)1 16"Waterline,Open Cut,All Depths, Complete in 8 Place i,.F 6611 6510 -101 $ 35,00 $ (3,535.00)1 1 16" Steel Waterline, Aerial Crossing at Tributary of 10 Mary's Creek,Complete in Place LF 105 108 3 $ 275,00 $ 825.00 16" Waterline,Augered with Casing;Ail Depths, 13 Complete in Place — LF 303 308 5 $ 130.00 $ 650,00 14 16" Waterline, Augered;All Depths,Complete in Place LF 113 388 275 $ 60.00 $ 16,500,00 16 2" Waterline,Open Cut,All Depths,Complete in Place LF — 201 10 -10 $ 10,00 $ (100.00) 17 2" Waterline,Augered, All Depths,Complete in Place LI: 60 0 -60 $ 20.00 $ (I.200.00 16"x 16"Tapping Sleeve w/Gate Valve w/Box, • 19 Complete in Place EA 1 2 - 1 $ 15,000,00 S 15,000,00 20 Remove and Salvage Existing Fire Hydrant EA 2 0 .- -2 $ 200.00 5 (400,00) 21 __Fire Hydrant Assembly,All Depths,Complete in Place EA 14 11 - -3 $ 1,300.00 i $ (3,900.00) 6-inch Fire Hydrant Branch, Open-cut, All Depths, _2 Complete in Place EA 84. 65 -19 $ 23.00 $ (437.00) Connection of Proposed 16-inch Lo Existing 8-inch at Rivermist Subdivision including Removal of Existing 2- 24 inch Blow-off Valve,Complete in Place LS I 21 $ 500.UU $ 500.00 26 Remove and Replace Sidewalk Si 50 6320 6270 S 5 00 S. 1,3,50A0 TOTAL CONTRACT CHANCE .. „., _ $ 47,804.50 , .ate Ur''11 , , ,- CHANGE ORDER NO. 1 1/19/2005 Page I of 1 '