Loading...
R2007-114 2007-07-23 FAILED FAILED 7/23/07 RESOLUTION NO. R2007-114 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AUTHORIZING THE CITY MANAGER OR HIS DESIGNEE TO NEGOTIATE A GMP COST PLUS DESIGN/BUILD CONTRACT WITH GILBANE BUILDING COMPANY FOR CONSTRUCTION OF A PUBLIC SAFETY BUILDING. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: • Section 1. That the City Manager or his designee is hereby authorized to negotiate a GMP Cost Plus design/build contract with Gilbane Building Company for construction of.a Public Safety Building . PASSED,APPROVED and ADOPTED this the day of A.D., 2007. TOM REID MAYOR ATTEST: YOUNG LORFING, TRMC CITY SECRETARY APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY .PEA /A 'i p • , T E X r7t,; S r. its June 13,2007 Mr:Dave Palmer Hale-Mills Construction, Ltd. 4130 Bellaire Boulevard, Suite 210 Houston, Texas 77025 Re: City of Pearland Design/Build Selection for the Public Safety Building Dear Mr. Palmer: This letter is to provide you with an update on the City of Pearland's selection of a Design/Build Firm for the City's Public Safety Building. After a series of workshops the Council has decided to move forward with a motion that was passed at the May 14, 2007 City Council Meeting. The motion stated that the City will "proceed with Design Build as the delivery process for the Public Safety Building and require the two candidates to submit a Guaranteed Maximum Price proposal."The intent of this motion was clarified at the June 11,2007 meeting and staff is preparing to move forward with the process. With that direction, both firms that were short listed for Phase 2 of the Request for Qualifications are being asked to re-submit their Phase 2 submittal,based on the original published selection criteria. Addendum#13 is forthcoming and will clarify the original published criteria, clarify the proposed contract, and rescind previous addenda that changed the original published selection criteria. We appreciate your patience throughout this process and encourage you to remain a candidate for this project as we bring the selection process to its conclusion. Sincerely, rent Epperson Cc: Bill Eisen Projects Director Mike Hodge Darrin Coker S iPper. 01\5 3519 LIBERTY DRIVE•PEARLAND,TEXAS 77581-5416• 281-652-1600•www ci.pearland.tx.us tot Printed on Recycled Paper ADDENDUM NO. THIRTEEN Date: 19 June 2007 Project: City of Pearland Public Safety Building Design Criteria Project No.: 215-06052.00 From: PGAL 5555 San Felipe, Suite 1000 Houston, Texas 77056 To: Prospective Offerors This Addendum forms a part of the Request For Qualifications Document and will be incorporated into this document as of the date above. Questions concerning this addendum should be addressed to the City's Consulting Architect. PART 1 — Modifications to Previous Addenda I Item No. 1: Modify Addendum No, 8,Answer No. 5, Sentence No. 4 as follows: " The City will require a GMP prior to execution of a contract for Design-Build Services." AND, Sentence No. 6 as follows: "The City will ask for a GMP, to include all work contained by the project that will form the basis for the agreement between the Design builder and the City. This GMP will be refined as design progresses to ultimately produce a final project cost." Item No. 2: Modify Addendum No. 9,Item No. 1 as follows: "Item No. 1: Additional Direction for Step Two Submittal: Delete the following: " Should the Design Build Firm wish to present alternative approaches to the RFQ such as Stipulated Sum or Cost plus fee, they should be clearly defined as such and clearly separated at the end of the Step Two Response. The City will entertain merits of the various options for the AIA A141 contract during the interview process. Design Build firms will not be penalized for not completely answering the Step Two Response. " Item No. 3: Modify Addendum No. 10,Item No. 1 as follows: "Item No. 1: 1. Question: Based on Addenda 9, is the data required in Exhibits B, C & D optional? Is the selection criteria changing? Can you please provide those changes prior to our submittal on the 21st of March? Answer: Addenda 9 has been changed and the Exhibits are not optional. The selection criteria will be based on the RFQ as originally issued. The revised responses for Step Two will be evaluated based on the originally published criteria. The City will schedule a second interview as a component of the Step Two submittal. The City will contact Offerors to schedule interviews. 2. Question: Addenda 9 eludes to alternative delivery methods such as stipulated sum or cost plus. a. Are you still planning to use the AIA 141 as the contract? b. How will the selection criteria be used in evaluating alternative responses when the original RFQ process allowed for GMP responses only? (This is not an apples to apples comparison). If not, how can we know what to propose on? Answer: Alternative deliveries to the GMP process will not be considered. Prospective Offerors shall submit based on Cost Plus GMP contract. The City is still anticipating using the AIA A141 contract. Item No. 4: Modify Addendum No. 11,Item No. 1 as follows: "Item No. 1: 1. Question: Are we to assume that we should omit the second part to Section F1.1 which asks "Submit how approved changes to the contract would be marked up including all fees and overhead and other costs"? Answer: The second part to Section F1.1 should be completely answered as part of the Step Two Submittal." Item No. 5: Modify Volume 1, Request For Qualifications; Section IX—Submitting Step Two Additional Information: Replace the first paragraph, with: "Sealed responses shall be addressed and delivered to the City of Pearland City Secretaries Office, City of.Pearland City Hall, on or before 2:00 PM on Monday July 9th, 2007, at 3519 Liberty Drive Pearland, Texas 77581 (281) 652-1706. Submittals not date stamped by the City of Pearland City Secretaries Office by the time listed above will not be opened." END OF ADDENDUM NO. THIRTEEN , Y y^ ' dt '�' Eki3'} '�i' jY} d4+- .4tF -t l' *' y�i� . r . DESIGN CRITERIA •k • MILLS CONSTRUCT/ON.LTO. Exhibit A Qualifications and Clarifications 1. Exclude concealed conditions y 2. Exclude permanent utility fees 3. Exclude any off site work 4. Exclude all assessments and impact fees 5. Exclude cost plus•GMP contract structure. Proposal is based on stipulated sum. 6. All cost figures included in this proposal are for information only. 7. We reserve the right to negotiate a contract acceptable to both Owner and Design/Builder. 8. Our proposal is based on tax-exempt project. 9. Exclude certified payroll. _. • fi 31 4r. 1t: kh i y Step Two— Resubmitted per Addendum 13 -July 9, 2007- '�i