Loading...
R2006-014 01-23-06 RESOLUTION NO. R2006-14 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, APPROVING CHANGE ORDER NO. 4 ASSOCIATED WITH THE KIRBY DRIVE EXTENSION PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That Change Order NO.4 associated with the Kirby Drive Extension Project, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest Change Order No. 4 associated with the Kirby Drive Extension Project. PASSED, APPROVED and ADOPTED this the 23rd day of January A.D., 2006. ~~~ TOMREID MAYOR ATTEST: APPROVED AS TO FORM: 0~ aA-- DARRIN M. COKER CITY ATTORNEY Exhibit "A" Resolution 2006-14 City of Pearl and Projects Department CHANGE ORDER For Kirby Drive Extension PEARLAND, TEXAS Change Order No: CoP Project No: 4 Date of Issuance: December 19. 2005 Contractor: Hassell Construction PM6804 Engineer: Dannenbaum Engineering Explanation: This change order encompasses the following: Installation of four additional 8" water laterals as requested by LNR. Three of the four will be TS& V installations because the water line was already complete in those areas. The fourth will be installed using a tee. This cost will be shared between the city and LNR as agreed in the Development Agreement. Contract Amount: Original Contract Price: Previous Change Order(s): Contract price prior to this change order: Net increase (decrease) from this change order: Contract price with all change orders to date (including this change order): $ 7.568.945.50 $ (11.694.75) $ 7.557.250.75 $ 42.420.39 &~c,-7;~" "'), ~r"....1 .J ,/ ".,,' r:><'" r': ..., t! ('oj '-'\.~, 'j --" !A ""'. .....p , . ,S) ',,'\ ' j"~~~? "'i-~X\{\D ~..~~:~\ r';;;,~ 3p..~\ c.-u ':=3 t~l ~i.~::C.,';',';.'/;);;\'/'; ,.;:;~~) tt~ ;f""" ,0;::4/1/1;1. ".~:...} '..i>' ~ I~ ~"'c'l ~. (." ".,,'i .,-";c.:" ", f:" ":J \~ <',,' tA;f fl ~>'"",, .. I \~(~~._>~~ ':,'_ V . <,,' ~~/ \~:-j /~-"-', - - (~\':> ~"<<2(1,,,""l,, . III 'eN'" '1 ~\~;:;?" '" ~J&b~" Please attach back-up documentation ,ri -',',; $ 7.599.671.14 Contract Time: Authorized contract time change: four (4) days ACCEPTED: By: ~.e.- --rA ~y Contractor / Date: 1:2-/ l..-yps APPROVED: I1Ji- Owner Bill E i s en ( Date January 23, 2006 12211 DUNCAN RO~t\D IIOlJSTON, TEXA.S 77066 PH. 281~893-2570 fAX 281-580-9170 eSl~1976 ~ HASSELll December 6, 2005 City of Pearland 3519 Liberty Drive Pearland, Texas 77581 Attn: Jennifer Phan, Project Manager Re: Kirby Drive Extension Project PM6804 HCCI Job 0525 Dear Ms. Phan, At the request of the City of Pearl and, Hassell Construction is submitting a change order for the installation of8" Laterals at four locations designated by the City of Pearl and. Three of the locations are Tapping Sleeve and Valves and the fourth location will be installed by cutting the existing 20" water line and installing a 20"x8" Tee. Due to the current volatility of the market and the excessive over-run of the quantity, current supplier prices will have to be utilized. A cost breakdown is provided on the attached spreadsheet. The cost is follows: Total Cost for Installation of 8" Laterals $42,420.39 The aforementioned change order will have some impact on the production schedule. We currently began our roadway stabilization as of 11/17/05 and will proceed with paving operation thereafter. We request an additional four days to be added to the contract. The timing of your consideration of this change order will determine how much the overall schedule is impacted. We appreciate the opportunity to provide our services. If you have any questions, please do not hesitate to call. Sincerely, r1 1A~ Ter;::Jlls, Project Manager HASSELL CONSTRUCTION CO., INC. c: \hassell Co nstmcti on IPearland\K irby\8wlcob FfASSELL CO'\iSTRLCTIOI\ }(iF~f3Y DR - 3" LA TE;~c.L_ C.O. j':j:..:;tf (.525 :~'jS-~j,L'_ 490' OF 5" L ~\.1~_'~ r,"- c..<P~'/ ,. ,~= ~=~~~~I\j _ . - _~--~ ~L ~~=~==':-;~i ~~~-----------"---J-: . S~;'~'~: peORC,qs-",_r, l ,;;O! t= --F=t----l C:\':::C)-'~J"~ -,-----.-. ---- ~-r.;:s '//C?'..',.~J - _._~--_._--- -"-,- '. v' _.~ _-----1-__.j S"~;_CG :.___-----:.9~~' 5-1.2.:3(,3 sc'~!(',i ,--;10_...,') S,-ic>~' .'~Ci SC},:;~ r 4C c:c. S=:'s-G ~,' ~r'~1 40 I~U~ '1 ,- ')c;n ,-.nl .:)0, UL--t--------~_r-----.-.:::..- ,L~'_'_''-''J I o HRS I i ==:j SUBTOTi\L $3,80000 $570.00 $209000 I 15% compensation 55% ins & taxes LABOR TOTAL EQUIPMENT QTY HRL Y WAGE HRS WORKED TOTAL -_. - -~-- ---_._---~ ----- 3/4 TON PICK-UP 1 $5.83 40.00 $233.20 KOMATSU 250 LOADER 1 $30.44 4000 $1,21760 KOMATSU 200 BACKHOE 1 $48.24 4000 $1,92960 SUBTOTAL $3,380.40 $50706 I 15% compensation EQUIPMENT TOTAL MATERIAL UNIT PRICE QUANTITY TOTA! - CEMENT STABILIZED SAND TON $1490 180.00 $2,68200 CONCRETE CY $7000 400 $280 00 8" C-900 PVC WATERLINE LF $9.75 490.00 $477750 8" GATE VALVE W/BOX EA $485.00 1.00 $485.00 2" B OV WI BOX EA $220.00 4.00 $880 00 20X8 TS&V (SUB-CONTRACTOR) EA $4,97500 300 $1492500 20X8 TEE l-A $1,60000 100 $1.60000 20" SLEEVE EA $30000 200 $600.00 20" MEGA L.UG GAS KIT KIT E~_ $41500 400 $1,66000 SUBTOTAL $27,88950 $4,18343 1 15% compensation MATERIAL TOTAL TOTAL ------'1 ERJ(::-.U'EflJJ~.9E WATERLINE 490 LF OF 8" PVC WL INCL FITTINGS ,::'/2,2CC :; $646S $3,887461 $32,072931 $42,420 39) c_~ lYfickie ';ervice Cornoanv Ine, ~ '" P.O. bOX SSS4.:.\ Houston, 'IX 772)~;-S 71 2-7454 n3 i-6536FA\: BilL TO Hassell Construction Co Lie 12211 Duncan Rd Houston, Texas 77066 PO NO, -r----n ;~RMS JOB ADDRESS 1 -- I ~5;-5~2;---------~_~~~_-- ----~~t-;-O~~;~- Kirby Dr, Pearl and DESCRIPTION QTY RATE 20 X 8 Tapping sleeve & valve, furnish, install & tap Sales Tax We appreciate your business. ALL INVOICES DUE AND PAYABLE AT HOUSTON, TEXAS Total D..\TE '; -\ ,,--- l.._,... _' 4,975.00 8.25% ~ -. ' ," . ,,' , Hl~! (J ~ ce j i\j\,'() i C ':= }t J ~ 8:, ~:, ORDERED BY Terry AMOUNT 14,925,00 0.00 $14,925.00