R2022-009 2022-01-10RESOLUTION NO. R2022-9 A Resolution of the City Council of the City of Pearland, Texas, amending Task No. 5 (Task 5A) with Ardurra Group LLC, in the estimated amount of $975,460.00, for Owner’s Representative construction phase services associated with the Surface Water Plant Project. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 2. That certain amended Task Order No. 5 (Task 5A), a copy of which is attached hereto as Exhibit “A” and made a part hereof for all purposes, is hereby authorized and approved. Section 2.That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest an amended Task Order No. 5. PASSED, APPROVED and ADOPTED this the 10th day of January, A.D., 2022. _________________________________ J. KEVIN COLE MAYOR ATTEST: ________________________________ CRYSTAL ROAN, TRMC, CMC CITY SECRETARY APPROVED AS TO FORM: ________________________________ DARRIN M. COKER CITY ATTORNEY DocuSign Envelope ID: 53457356-37C3-4014-B09A-A79526731266 35,841.00$ 0 Days 427,935.00$ 180 Days 198,780.00$ 180 Days 10,000.00$ 0 Days 302,904.00$ 180 Days Days Days Days Days Days By: By: Construction Phase Services Project Management Services On-Call Modeling and Support Services Construction Management and Inspection for BOP Finance Approval: 3,125,014.00$ 975,460.00$ 4,100,474.00$ 3.5 Consultant Project Manager Date Owner *Consultant agrees to perform change(s) included in the Contract Amendment for the price and time indicated. The prices for changes included all costs associated with this Contract Amendment. No work is to be done until this Amendment is executed. No payment to the Consultant shall be made for work included in the Amendment until this Amendment is executed. Upon execution by all parties, the following changes identifies for the contract value and/or contract time shown, are made part of the Design 1 of 1 D4. Revised 7/08 Date ACCEPTED*:APPROVED: By:Date Date Net increase (decrease) from this Amendment:180 Revised Contract:1369 Previous Amendment(s):0.00$ 0 Contract prior to this Amendment:1189 2.1 Please attach back-up documentation. Cost & Time Change Summary Cost Time Original Contract:3,125,014.00$ 1189 2.2 3.1 Explanation: This change order encompasses the following: Continued and Additional Required Regulatory Components (HNE) , Customary Construction Phase Services (HNE) , and Customary Construction Phase Services (HNE) Description of Work Cost 1.1 TWDB DWSRF Funding Application Assistance Consultant:Ardurra Group CoP Project No.:WA1605-Task 5 P.O. No.:2021-00000266 CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive, Suite 300 Pearland, TX 77581 pearlandtx.gov/projects Professional Services Contract Amendment Surface Water Plant-Task 5 Date of Issuance:12/21/2021 Amendment No.:1 12/22/2021 EXHIBIT A Page 28 of 29 DocuSign Envelope ID: 722D9CC4-37BF-4ADB-AA33-8663EF86B3D4 2/10/2022 | 8:53 AM CST 2/10/2022 | 9:39 AM CST 2/10/2022 | 8:09 AM PST Exhibit A Task Order N o. 5A AP1AA Detailed Scope of Services December 13,2021 Scope of Services For Owner's Representative Services For 10 MGD Surface Water Treatment Plant Through Construction Completion-Task Order#5A The Engineer will execute tasks necessary to perform Owner's Representative duties and responsibilities for planning, development, construction oversight, and start-up assistance activities related to the proposed surface water treatment plant (SWTP)for the City of Pearland as defined in this Task Order Amendment. The tasks associated with these engineering services are an extension of services described in Task Order#5 resulting from projected CMAR schedule extension due to multiple mitigating factors: 1. Continued and Additional Required Regulatory Components 1.1. TWDB DWSRF Funding Application Assistance 1.1.1. Through 1.1.4—No Extension of Services 1.1.5.Conduct mussel survey pre and post construction in compliance with Texas Parks and Wildlife to satisfy TWDB environmental requirements. 1.2. Review and track regulatory requirements &oversight coordination—No Extension of Services 2. Construction Phase Services—The following services are to be extended. 2.1. Construction Progress meetings 2.1.1. Monthly Construction Progress Meetings Participate in and facilitate with CMAR,the monthly and semimonthly progress meetings with the Owner, Design Consultants, CMAR and Contractors for the duration of the construction phase. Prepare meeting summary for distribution. The following is assumed: Monthly progress meetings(onsite)—6 Semimonthly progress meetings (by video)—6 Weekly progress meeting with Owner, CMAR and Contractors as needed. A-1 ARDURRA httpsaiardurra.sharepomt.com/shared documents pi pearland/42516-00 swtp/ardnna 01 project management/02 contract/task order 5a/task order 5a 12-15-2021.docx Task Order No. 5A Detailed Scope of Services 2.1.2. Specialty Coordination &Joint Meetings/Workshops Coordinate, lead and conduct project workshops between the various Design Consultants, Owner, CMAR and Contractors as needed throughout the course of the project and prepare agendas, materials, exhibits or coordinate production of same as necessary to execute required tasks. Prepare meeting agenda and summary to be reviewed by Design Consultants and CMAR prior to distribution. 2.1.2.1. Process control, instrumentation, and SCADA system architecture coordination workshop 2.1.2.2. Electrical power distribution and backup power coordination meeting 2.1.2.3. Plant security coordination meeting 2.1.2.4. Architectural coordination meeting 2.1.2.5. Coordination meetings as needed with GCWA, BDD#4, etc. (led by the Engineer). Engineer will prepare and distribute meeting agenda and meeting summary. 2.1.2.6. Coordination meetings with CMAR and Design Consultants. Engineer will facilitate coordination between CMAR/ Contractors and Design Consultant, and track changes and their respective impacts on cost and schedule. Constructability and VE review/recommendation by CMAR—Coordinate the dissemination of CMAR requests and recommendation related to cost, schedule and constructability for each package or the impact on multiple design packages. Other requests such as materials and/or equipment substitutions; corrective actions, etc. 2.1.2.7. Undefined meetings and conference calls, assuming one per week. 2.1.3. Submittal Review Coordination 2.1.3.1. Shop Drawing Review Coordination and Consolidation of Review comments by multiple EOR's 2.1.3.2. RFI Review Coordination and Consolidation of Review comments by multiple EOR's 2.1.3.3. Materials Substitution, VE Coordination & Support 2.1.4. Substantial Completion and Final Inspections, and Coordination of FOR Inspections and Punch Lists 2.1.5. Surface Water Plant Startup and Commissioning A-2 ARDURRA httpsaiardurra.sharepomt.com/shared documents pi pearland/42516-00 swtp/ardnna 01 project management/02 contract/task order 5a/task order 5a 12-15-2021.docx Task Order No. 5A , ' '� Detailed Scope of Services 2.1.5.1. Review& coordinate startup plan with Owner& CMAR. Conduct a pre-startup coordination meeting with Owner and CMAR team to review proposed startup and acceptance testing phases, review responsibility matrix, water quality sampling, monitoring, and analytical requirements, and testing schedule and duration, etc. 2.1.5.2. Equipment startup coordination and oversight 2.1.5.3. Process systems startup coordination and oversight 2.1.5.4. Systems startup coordination and oversight 2.1.5.5. Plant wide startup &commissioning coordination and oversight. Coordinate with Owner and CMAR to conduct start-up and acceptance testing to demonstrate treatment performance meets regulatory standards and city internal treatment goals. Samples will be collected per the sampling and monitoring plan developed in Task Order 4. 2.1.5.6. Finished Water Analysis. Coordinate with Owner and CMAR to collect finished water samples after any post-treatment for the constituents listed in the TCEQ Surface Water Plant Use Checklist Step 2 document. This will include finished water samples at the Surface Water Treatment Plant, Kirby Water Plant after blending, and Shadow Creek Ranch Water Plant after blending. Prepare the sample report and submit to TCEQ for review and approval. 2.1.5.7. Treatment Process Regulatory Testing Membrane Direct Integrity Testing (DIT). Prepare and submit DIT parameters for the full-scale membrane units to the TCEQ for review and approval. Full-scale Plate Settler Demonstration Testing. Conduct 30-day full- scale demonstrate testing to demonstrate plate settler treatment performance at designed surface overflow rate (SOR). Coordinate with Owner and CMAR to collect field samples, monitor and report parameters as required by TCEQ. Prepare demonstration report and submit to TCEQ for review and approval. 2.1.5.8. Miscellaneous regulatory coordination and assist Owner with preparing administrative and technical documents to TCEQ.This would include listing of operators who will be operating the surface water treatment plant and their current licenses,training records for the use of all chemicals, plant start-up certification, certificate of construction completion, chlorine dioxide verification form, A-3 ARDURRA httpsaiardurra.sharepomt.com/shared documents pi pearland/42516-00 swtp/ardnna 01 project management/02 contract/task order 5a/task order 5a 12-15-2021.docx Task Order No. 5A P, ' '�� A� Detailed Scope of Services disinfection CT study report, corrosion study report, updated monitoring plan etc. 2.2. Project Management Services 2.2.1.Owner's Representative's quarterly Update Meetings with the City 2.2.2. Undefined/Ad-Hoc/Special Meetings—Identify need for any special meetings, coordinate team member attendance so the appropriate staff are at the meeting, facilitate the meeting, and track action items and responsible party and follow-up to confirm action items have been completed. 2.2.3. Public Outreach assistance/support—support City and program as needed. Provide project status reports, project schedule, and other supporting documents for City to use and post on the city website. 2.2.4. Master Schedule—review CMAR master schedule for compliance with project goals; recommend corrective active in cases where schedule slippage is starting to occur. 2.2.5. Budget Tracking, Analysis and Management—track and update master program costs based on actual contract values and estimated costs to complete the work through startup. 2.2.6. Maintain Collaborative Tools/ Document Control 2.2.6.1. Update and maintain a Project Management and Quality Control Plan for the surface water program inclusive of the three (3) main design packages and the CMAR; 2.2.6.2. Maintain the Project SharePoint site for electronic document system/repository as outlined in the project PMP. 2.2.7.Generate monthly status reports and preparation of invoices to be submitted together for review and approval. 3. Additional and Special Services-The following services are to be extended as indicated below. 3.1. On Call Modeling and Support Services- No Extension of Services. 3.2. Future Forebay Feasibility Study- No Extension of Services. 3.3 Operations and Maintenance Manual - No Extension of Services. 3.4. 12 Month Contractor Warranty Support-No Extension of Services. 3.5. Construction Management-The following services are to be extended. 3.5.1. Pre-Construction A-4 ARDURRA httpsaiardurra.sharepomt.com/shared documents pi pearland/42516-00 swtp/ardnna 01 project management/02 contract/task order 5a/task order 5a 12-15-2021.docx Task Order No. 5A Detailed Scope of Services 3.5.1.1. Schedule and conduct the pre-construction meeting; record and disseminate summary from pre-construction meeting. 3.5.1.2. Utilize the City's Project Management information system (Manage It): set communications protocol and contract administration procedures, establish progress meeting schedule and submittal schedule. 3.5.1.3. Provide agenda for meeting: Key milestone dates, pay application procedures, schedule, public notification issues and procedures, utility coordination issues,traffic control, permitting, property owner notification and coordination,temporary facilities, contractor's use of City's Manage It system, etc. 3.5.2. Construction Administration and Management Services 3.5.2.1. Act as the City's on-site representative administering the contract for construction and providing overall project oversight, maintain record of decisions and changes made. 3.5.2.2. Meetings: Schedule and conduct construction progress meetings; record summary from construction progress meetings and distribute via Pro- Trak to: City Project Manager, Design Engineer, and CMAR/Contractors throughout the duration of the project. 3.5.2.2.1. Schedule bi-monthly progress meetings as well as weekly coordination meetings to review the following: work progress and schedule, outstanding issues, status of submittals and responses, shop drawings, unforeseen issues and changes to the work. 3.5.2.2.2. Coordinate additional meetings as necessary to discuss and resolve problems and provide guidance in a timely manner. 3.5.2.2.3. Coordinate/monitor the following: utility relocation activities for compliance, utility installation verification, reporting, record management and as-built drawings. 3.5.2.2.4. Attend all utility coordination, construction, and scheduling meetings. 3.5.2.3. Manage Construction 3.5.2.3.1. All final documentation is required in electronic/digital format, utilizing Manage It as is feasible. 3.5.2.3.2. As field problems arise, notify the Design Engineer and City Project Manager of proposed solutions to resolve problems. A-5 ARDURRA httpsaiardurra.sharepomt.com/shared documents pi pearland/42516-00 swtp/ardnna 01 project management/02 contract/task order 5a/task order 5a 12-15-2021.docx Task Order No. 5A Detailed Scope of Services 3.5.2.3.3. Review and update as-built documents regularly with contractor. 3.5.2.3.4. Monitor and ensure adherence to approved project baseline schedule. Review contractor's schedule monthly, ensure compliance with City's intended schedule, and provide recommendations as needed to retain and regain schedule if needed. 3.5.2.3.5. Recommend alternate project sequencing/scheduling to keep project on schedule. 3.5.2.3.6. Prepare monthly summary report of construction activities with outstanding issues outlined for review. Monthly progress information associated with the project will be submitted to the Project Manager for review and approval. 3.5.2.3.7. Record weather conditions on jobsite daily. 3.5.2.3.8. Monitor, on an on-going basis, cost impacts (both increase and decrease) and track with schedule of values. Identify any potential cost impacts related to project delays and/or potential change orders and notify Owner as appropriate. 3.5.2.4. Coordinate work of Contractor with external agencies and utility companies. Coordinate Contractor's operations with regard to other City contracts and construction as well as with property owners for planned service outages, street closures, and access control issues to properties including notifications. 3.5.2.4.1. Verify construction conformance and compliance with TCEQ, NOI and NOT. 3.5.2.4.2. Verify construction conformance with permitted activities such as: City of Pearland permits, BDD4. GCWA and Brazoria County permits,TxDOT roadway permits, and any Railroad agreements. 3.5.2.5. Maintain records of all decisions, actions, and activities with regard to construction operations via the City's Manage It system (i.e. Daily Reports, Change Orders, RFIs and responses, Submittals and responses, Request for Proposals, correspondence, SWPPP inspections.) 3.5.3. Construction Inspection Services 3.5.3.1. Provide full-time on-site technical observation of Contractor's activities to verify and ensure all work materials, structures, equipment, and workmanship comply with the Contract Documents including Addenda A-6 ARDURRA httpsaiardurra.sharepomt.com/shared documents pi pearland/42516-00 swtp/ardnna 01 project management/02 contract/task order 5a/task order 5a 12-15-2021.docx Task Order No. 5A Detailed Scope of Services and Change Orders. Verify and ensure that Contractor maintains good construction practices and professional standards prevailing in the local City, County, and State of Texas. Utilize City's Pro-Trak system for all inspection reports. 3.5.3.1.1. Notify the City Project Manager if Contractor's work is not in compliance with the Contract Documents or specifications. Notify the City Project Manager and Design Engineer of any failure of the Contractor to take measures to repair and bring work in compliance. 3.5.3.1.2. Issue Advisory Notices to Contractor for work that is not in compliance with approved construction documents. 3.5.3.1.3. Issue Non-Compliance Reports to Contractor if non- conforming work is not brought into compliance or if plan of action to bring work into compliance is not conducted in timely manner. 3.5.3.1.4. Inspect and observe the materials and equipment being incorporated into the work, including AIS compliance according to furnished submittal data,to assure that they are handled, stored, and installed in accordance with the Contract Documents and specifications. Report to the City Project Manager regarding these activities. 3.5.3.1.5. Inspect and observe electrical and instrumentation installation utilizing personnel specifically trained in those disciplines in accordance with the level of effort shown in Exhibit B. 3.5.3.1.6. Identify, record, and notify Design Engineer of any problems or failures to meet performance requirements in a timely manner to minimize delay in the progress of the project, make recommendation(s) for appropriate solution to the City Project Manager and Design Engineer. 3.5.3.1.7. Prepare and maintain daily progress log or daily construction reports, photographs, records, and track quantities installed that day utilizing the City's Manage It system. 3.5.3.1.8. Ensure Contractor reviews and approves daily reports and quantities. 3.5.3.1.9. Verify Contractor has obtained necessary permits and is maintaining any Traffic Control, public notification and A-7 ARDURRA httpsaiardurra.sharepomt.com/shared documents pi pearland/42516-00 swtp/ardnna 01 project management/02 contract/task order 5a/task order 5a 12-15-2021.docx Task Order No. 5A , ' '� Detailed Scope of Services Storm Water Pollution Prevention Plans,facilities, equipment, or arrangements in accordance with contract documents. 3.5.3.1.10. Attend and participate in progress meetings. 3.5.3.1.11. Create contacts for your record for: names, addresses, telephone numbers and email of all contractors, subcontractors, sub consultants and major suppliers of material and equipment; store in City's Pro-Trak system. 3.5.3.1.12. Immediately notify the City Project Manager and Design Engineer in the event of an on-site accident. Record and note conditions, activities, and witnesses to the event. 3.5.3.1.13. Maintain Resolution Log and respond to citizen complaints in Pro-Trak system. 3.5.3.1.14. Consult with City Project Manager and Design Engineer in advance of scheduled major work operations,tests, inspections or start of important phases of project. 3.5.4. Pay Applications 3.5.4.1. Pay applications will be generated by the City's Manage It system based on quantities approved in the daily reports. Review,verify and enter quantities provided by contractor for all work in compliance with contract documents. 3.5.4.1.1. Review work conducted daily on daily inspection reports and material installed measurements submitted by contractor;verify work conducted and bid item quantities via Pro-Trak; meet monthly to review pay estimate and quantities with contractor 3.5.4.1.2. Review progress pay application with Design Engineer for approval or revision prior to submittal to City. Collect certified payroll for compliance with Davis Bacon requirements and upload to Manage It for City review. 3.5.4.1.3. Finalize pay application with signatures from Contractor, Engineer and Construction Manager certifying quantities and amounts via Manage It. 3.5.4.1.4. Notify City Project Manager when all electronic signatures are completed in the Manage It system for invoice processing. A-8 ARDURRA httpsaiardurra.sharepomt.com/shared documents pi pearland/42516-00 swtp/ardnna 01 project management/02 contract/task order 5a/task order 5a 12-15-2021.docx Task Order No. 5A Detailed Scope of Services 3.5.4.1.5. Track and record requests for rain or other delays with potential to add to Contract Time in Daily Reports in Manage It via Daily Reports. 3.5.4.2. Provide an independent quantity forecast bid items to identify potential quantity over-runs as part of pay estimate review. Upon completion of the work, prepare a final progress payment including a balancing change order zeroing out all unused quantities utilizing Manage It. Identify and add additional quantities and make any approved changes to the Contract Time. 3.5.4.2.1. Review and coordinate with Design Engineer to provide Engineer's recommendation for Substantial Completion or Final Acceptance. (See Close-out Section) 3.5.5. Document Control 3.5.5.1. Utilize the City's Pro-Trak system to: receive, route, track and log all Contractor communications, Submittals, Change Orders, RFIs, Pay Applications and Citizen Complaint/Resolution Log; communicate with Contractor the status of submittal reviews; review submittal and RFI log in Pro-Trak to ensure timely responses; notify City Project Manager, Contractor and Design Engineer of time critical issues. 3.5.5.1.1. Respond to RFIs when such response does not require the Engineer's opinion or expertise or direction from City. 3.5.5.1.2. Assemble and maintain notes, comments, sketches and supportive data relative to the Project to facilitate the revision of drawings to conform to the final as-built conditions. Review Contractor's record keeping periodically to ensure completeness,timeliness and progress. 3.5.5.1.3. As may be required by TWDB, maintain project files within City's Project Management information system (Manage It), in accordance with TWDB requirements. 3.5.6. Change Orders 3.5.6.1. Prepare and issue request for proposals in a timely manner via Pro-Trak. Review RFP and contractor proposal for additional work with City Project Manager and Design Engineer for approval. Ensure the status of RFP and Responses from Contractor, City and Design Engineer are uploaded/logged and tracked in the Manage It system. A-9 ARDURRA httpsaiardurra.sharepomt.com/shared documents pi pearland/42516-00 swtp/ardnna 01 project management/02 contract/task order 5a/task order 5a 12-15-2021.docx Task Order No. 5A , ' '� Detailed Scope of Services 3.5.6.2. Provide recommendation on technical matters as an advocate for the City. Evaluate Contractor's response/proposal for merit, cost,time, accuracy and price practicality. Negotiate with Contractor on City's behalf if required. 3.5.6.3. Prepare Change Order and documentation including signatures of Contractor, Engineer and Construction Manager for City review in Manage It. 3.5.7. Testing Laboratory and Results 3.5.7.1. Coordinate testing laboratory activities with Contractor's activities. Review test reports for compliance with Contract Documents. Log, track and retain test reports in Manage It. Review results with Contractor. Monitor any corrective action and re-testing for compliance. Maintain compliance with City's specifications 3.5.7.2. Review lab test reports and log any failures. 3.5.7.3. Review Invoicing from Laboratory to daily activities. 3.5.8. Project Completion and Close out 3.5.8.1. Provide list of deliverables for Substantial Completion walk through/inspection. Schedule and conduct project walk through upon receipt of Contractor's notification of substantial completion. Include City Project Manager, Design Engineer and others as directed. Prepare a list of non-conforming work based on visual inspections via Manage It. Record and monitor contractor's corrective efforts and schedule. Schedule final completion inspection for any remaining corrections. B. Coordinate and obtain Design Engineer's signature and seal on Substantial Completion certificate and Final Completion and Acceptance certificate via Manage It. 3.5.8.2. Review and compile any Operation and Maintenance documents required from the Contractor—forward to Engineer for review. Ensure Contractor's closeout documents are uploaded to Manage It. Review for completeness and accuracy, including; affidavits of final payment, final pay estimates, as built records, redlines and drawings. Once received, notify the Design Engineer and City Project Manager when completed, upload to Manage It. 3.5.8.2.1. Upon completion of close out items, provide recommendation for City's Substantial Completion/Final Acceptance certificate. A-10 ARDURRA httpsaiardurra.sharepomt.com/shared documents pi pearland/42516-00 swtp/ardnna 01 project management/02 contract/task order 5a/task order 5a 12-15-2021.docx Task Order No. 5A ' ' FM Detailed Scope of Services 3.5.8.2.2. Provide indexed project files, redline plans and as-built or record drawings to City via Manage It. 3.5.8.3. Conduct Project Close-Out Meeting. 3.5.8.4. Prepare and recommend final payment application. (Prepare job record logs transmittals, and correspondence reports in an organized file for delivery to City.) 3.5.8.5. Consult with City on any potential Warranty items requiring repair or replacement. 3.5.9. Clarifications and Exclusions 3.5.9.1. Davis-Bacon wage compliance and certification are to be provide by the Owner and is not part of this scope. f'` A-11 ARDURRA https://ardurra.sharepomt.com/shared documentsiprojects/00000 pearland/42516-00 swtp/ardnna 01 project management/02 contract/task order 5a/task order 5a 12-13-2021.docx Task Order No. 5A a"� Detailed Scope of Services TABLE A-1 TO AGREEMENT BETWEEN ENGINEER AND OWNER FOR PROFESSIONAL SERVICES FOR CITY OF PEARLAND OWNER'S REPRESENTATIVE SERVICES 10 MGD SURFACE WATER TREATMENT PLANT SUMMARY OF SERVICES AND FEES TASK TASK DESCRIPTION AMOUNT 1 Continued and Additional Required Regulatory Components(HNE) 1.1 TWDB DWSRF Funding Application Assistance $35,841.00 1.2 Regulatory Coordination and Oversight $0.00 Subtotal—Task 1 $35,841.00 2 Customary Construction Phase Services(HNE) 2.1 Construction Phase Services $427,935.00 2.2 Project Management Services $198,780.00 Subtotal—Task 2 $626,715.00 3 Additional and Special Services(HNE) 3.1 On-Call Modeling and Support Services $10,000.00 3.2 Forebay Feasibility Analysis (3 alternatives) $0.00 3.3 O&M Manual $0.00 3.4 12 Month Warranty Period Support $0.00 3.5 Construction Management and Inspection for BOP $302,904.00 Subtotal—Task 3 $312,904.00 Total $975,460.00 HNE—Hourly Not to Exceed Sub Consultants Mark-up—5% A-12 ARDURRA https: ardurra.sharepomt.com/shared documentsiprojects/00000 pearland/42S1Fr00 swtp/ardnna01 project management 02 contract/task order Sa/task order Sa 12-13-2021.docx Task Order No. 5A '. , A Detailed Scope of Services TABLE A-2 TO AGREEMENT BETWEEN ENGINEER AND OWNER FOR PROFESSIONAL SERVICES FOR CITY OF PEARLAND OWNERS REPRESENTATIVE SERVICES 10 MGD SURFACE WATER TREATMENT PLANT HOURLY LABOR RATES ILABO%CATEGORY Hearty Rate Principal/Sr. Project Manager $270 Sr.Tech Specialist (QA/QC) $270 Engineer 7/8 $230 Engineer 5/6 $180 Engineer 3/4 $160 Engineer 1/2 $140 Senior Modeler $155 Modeler $135 Senior Designer $155 Designer/Drafter $135 Construction Manager $160 Resident Representative $110 GIS Technician $120 Sr. Administrative $135 Administrative/Accounting $110 An$8.50 technology charge is applied to each hour billed. A-13 ARDURRA httpsaiardurra.sharepoint.com/shared documents pi pearland/42516-00 swtp/ardnna 01 project management/02 contract/task order 5a/task order 5a 12-15-2021.docx Task Order No. 5A Owner's Representative Services For 10 MGD Surface Water Treatment Plant Hourly Labor Rate $ 270 $ 270 $140 $160 $110 $135 $110 Sub -task Hours Sub -task Cost Sub -task ODCs RKI Sub - consultants Mark-up (5%) Total Cost Discipline/Expertise Program Hr. Director Cost Sr. Tech Hr. Specialist Cost Engineer Hr. 1/2 Cost Construction Hr. Manager Cost Resident Rep Hr. esenta[ive Cost Sr. Administrative Modeler / Admini Accouning/GIs trative / Continued and Additional Required Regulatory Components 1.1 TWDB DWSRF Funding Application Assistance 1.1,1 Continuous Coordination with TWDB as necessary $0 $0 $0 $0 So $0 $0 D $0 $D $D 1.1.2 TWDB Close-out Coordination and Activities $0 $0 $0 $0 $o $0 $0 D $0 $0 $D 1.1.3 Monthly Outlay Reimbursement Request Support $0 50 $0 $0 $0 $0 $0 0 $0 $0 $0 1.1.9 Meetings with Twos $0 $0 $0 $0 $0 $0 $0 0 $0 $0 $0 1.1.5 Parks & Wildlife Environmental Approval per TWDB $0 16 $9,320 $0 $0 $0 $0 $0 16 $4,320 $136 $29,890 $1,495 $35,841 1.1 TWDB DWSRF Funding Application Assistance -Subtotal 0 $0 16 $9,320 0 $0 0 $0 0 $0 0 $0 0 50 16 $4,320 $136 $29,890 $1,495 $35,841 1 2 Review and Track Regulatory Requirements & Oversight Coordination $0 $0 $0 $0 $0 $0 $0 D $0 $0 $0 Continued and Additional Required Regulatory Components -Subtotal 0 $0 16 $4,320 0 $0 0 $0 0 $0 0 $0 0 $0 16 $4,320 $136 $29,890 $1,495 $35,841 2 Customary Construction Phase Services 2.1 Construction Phase Services 2.1.1 Monthly Construction Progress Meetings 36 $9,720 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 36 $9,720 306 0 $10,026 2.1.1.1 Monthly Progress Meetings (6) 24 $6,480 $0 $0 $0 $0 $0 $0 24 $6,480 $204 $6,684 2.1.1.2 Semi- Monthly Progress Video Meetings (6) 12 $3,240 $0 $0 $0 $0 $0 $0 12 $3,240 $102 $3,342 2.1.2 Specialty Coordination &Jolnt Meetings/Workshops 674 $181,980 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 674 $181,980 5729 0 $187,709 2.1.2.1 Process Control, Inst. & SCADA System $0 $0 $0 $0 $0 $0 $0 0 $0 $0 $0 2.1,2,2 Electrical Power Distribution Coordination $0 S0 $0 $0 $0 $0 $0 0 $0 $0 $D 2.1.23 Plant Security (CCTV, Card Reader etc.) Coordination $0 50 $0 $o $o $0 $0 0 $o $0 $D 2.1.2.9 Architectural Coordination $0 S0 $0 $0 $0 $0 $0 0 $o $0 $0 2.1.2.5 Coordination Meetings with 6CWA & 8DD#4 etc., $0 $0 $0 $0 $0 $0 $0 0 $0 $0 $0 2.1.2.6 Coordination Meetings with CMAR 574 $154,980 $0 $0 $0 $0 $0 $0 504 $154,980 $9,879 $159,859 2.1.2.7 Undefined Meetings & Conference Calls 100 $27,000 $0 $0 $0 $0 $0 $0 100 527,000 $850 $27,850 2.1.3 Submittal Review Coordination 400 $108,000 0 $0 800 $112,000 0 $0 0 50 0 $0 0 50 1200 $220,000 10200 0 $230,200 2.1.3.1 Shop Drawing Review Coordination and Consolidation of 100 $27,000 $0 200 528,000 $0 $0 $0 $0 300 $55,000 $2,550 $57,550 Review comments by multiple EOR's 2.1.3.2 RFI Review Coordination and Consolidation of Review comments by multiple EOR's 100 $27,000 $0 300 $42,000 $0 $0 $0 $0 400 $69,000 $3,400 $72,400 2.1.3.3 Materials Substitution, VE Coordination & Support 200 $54,000 $0 300 $42,000 $0 $0 $0 $0 500 $96,000 $4,250 $100,250 2.1.4 Substantial Completion & Final Inspection 0 $0 0 $D 0 $0 0 $0 0 $0 0 $0 0 $D 0 $0 0 $0 2.1.5 Plots Stutrup&Commisioning 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 0 $0 2.1.5.1-8 Review & Coordinate Startup Plan with Owner &CMAR $0 $0 $0 $0 $0 0 $0 $0 0 $0 00 $0 2.1 Construction Phase Services - Subtotal 1110 $299,700 0 $0 800 $112,000 0 $0 0 $0 0 $0 0 $0 191D $411,700 $16,235 $0 $0 $427,935 2.2 Project Management Services 2.2.1 Owner's Rep quarterly Update Meetings with City 6 51,620 $0 6 $840 $0 $0 40 $5,400 $0 52 $7,860 $442 $8,302 2.2.2 Undefined Meetings/Conference Calls (Stakeholder Meetings) 200 $54,000 $0 200 $28,000 $0 $0 20 $2,700 $0 420 $84,700 $3,570 $88,270 2.2.3 Public Outreach Assistance&Support $0 $0 0 $0 $0 $0 $0 $0 0 $0 $0 $0 2.2.4 Review and Update Overall Project Schedule Monthly 12 $3,240 $0 12 $1,680 $0 $0 $0 $0 24 $4,920 $204 $5,124 2.2.5 SWP Funding Budget Tracking, Analysis and Management 40 $10,800 $0 40 $5,600 $0 $0 20 $2,700 $0 100 $19,100 $850 $19,950 2.2.6 Maintain collaborative tools / document control 12 $3,240 $0 12 $1,680 $0 $0 80 $10,800 $0 104 $15,720 $48,842 $64,562 2.2.7 Project Invoicing & Monthly Status Reports 16 $4,320 $0 16 $2,240 $0 $0 40 $5,400 $0 72 $11,960 $612 $12,572 2.2 Project Management Services - Sub Totals 286 $77,220 0 $0 286 $40,040 0 $0 0 $0 200 $27,000 0 $0 772 $144,260 $54,520 $0 $0 $198,780 2 Customary Construction Phase Services -Subtotal 1396 $376,920 0 $0 1086 $152,040 0 $0 0 50 200 $27,000 0 50 2682 $555,960 $70,755 $0 $0 $626,715 3 Additional a d Special Services 3.1 On -call Modeling and Support Services o $0.00 $0.00 $0.00 $O.00 $O.00 $O.00 $0.00 D $o $10,000 $0.00 $10,000.OS 3.2 ForeBay Feasabilsy Analysis (3 alternatives) 0 $0 $0 $0 $0 0 $0 $0 0 $0 0 $0 $0 $0 3.3 O&M Manual 0 $0 50 $0 $0 0 $0 $0 0 $0 D $0 50 $0 3.4 12 Month Warranty Period Support 0 $0 $0 $0 $0 0 $0 $0 0 $0 D $0 $0 $0 3.5 Construction Management & Inspection 3.5.1-3.5.8 Plant 364 $98,280 $0 $0 867 $138,720 0 $0 $0 0 $0 1,231 $237,000 $10,464 $247,464 3.5.1-3.5.8 Pipeline (Ardurral Augmentation) 0 $0 $0 $0 $0 480 $52,800 $0 0 $0 980 $52,800 $2,640 $55,440 3.5 Construction Management & Inspection 364 $98,280 0 $0 0 $0 867 $138,720 480 $52,800 0 $0 0 $0 1711 $289,800 $10,464 $2,640 $302,904 3 Additional a d5pecial $ervites- Subtotal 364 $98,280 - SO - $0 867 $138,720 480 $52,800 - $0 - $0 $1,711 $289,800 $20,464 $0 $2,690 $312,904 Total 1760 $475,200.00 16 94,320.00 1086 $152,040.00 867 $138,720.00 480 $52,800.00 200 $27,000.00 0 $0.00 4409 $850,080 $91,355 $29,890 $4,135 $975,459 Note: 1. Sub consultants mark-up is 5%, Page 1 of