Loading...
R2021-183 2021-09-13RESOLUTION NO. R2021-183 A Resolution of the City Council of the City of PearlCI" d, Texas, amending a contractwith Gauge Engineering, in the additional amount of $29,492.50 (total contract amount of $316,855.50) for design services associated with the Safe Routes to School Project. BE IT RESbLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND3 TEXAS: Section 1. That certain amended contract by and between the City of Pearland and Gauge Enineering, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest an amended contract with Gauge Engineering, for design services associated with the Safe Routes to School Project. PASSED, APPROVED and ADOPTED this the 13th day of September, A.D., 2021. CRYSTAL ROAN, l CITY SECRETARY MC, CMC APPROVED AS TO FORM: CITY ATTORNEY Date of Issuance: Consultant: Explanation: EXHIBIT A CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive, Suite 300 Pearland, TX 77581 pearlandtx.gov/projects Professional Services Contract Amendment 03/16/2021 Gauge Engineering Safe Routes to School Amendment No.: CoP Project No.: P.O. No.: 2 TR1602 2019-00001484 This change order encompasses the following: Contract Amendment #2 is for the re -design and additional scope required by TxDOT. The scope now includes surveying, regrading ditches, cross sections (at 50-ft. intervals), and conducting a drainage analysis. The design was approaching 90%when this scope change was initiated. Description of Work Cost Time 1 Revise the quantity from 1 to .89650245807 on Item No. 2 2 $(9,200.00) Additional Services ? Revise the quantity from 1 to .3714644877435576 on Item No. 5 5 $(2,000.00) Reimbursable Expenses 3 Revise the quantity from 1 to .6737027546445 on Item No. 6 $(15,280.50) Pedestrian Bridge Design 4 Add Item No. 7 Contract Amendment #2 $ 50,323.00 Please attach back-up documentation. Cost &Time Change Summary Cost Original Contract: $ 240,533.00 Previous Amendment(s): $ 46,830.00 Contract prior to this Amendment: $ 287,363.00 Net increase (decrease) from this Amendment: $ 23,842.50 Revised Contract: $ 311,205.50 Finance Approval � �'�-�-- ACCEPTED*: By: Date Consultant 0 Days 0 Days 0 Days 0 Days Time 0 Days 0 Days 0 Days 0 Days 0 Days Date 05/04/2021 APPROVVED: 03/16/2021 gy. c'��=— Date Project Manager By:-����1-- == Date Owner 03/19/2021 05/04/2021 *Consultant agrees to perform changes) included in the Contract Amendment for the price and time indicated. The prices for changes included all costs associated with this Contract Amendment. No work is to be done until this Amendment is executed. No payment to the Consultant shall be made for work included in the Amendment until this Amendment is executed. Upon execution by all parties, the following changes identifies for the contract value and/or contract time shown, are made part of the Design 1 of 1 D4. Revised 7/08 Date of Issuance: Consultant: Explanation: CITY OF PEARLAND PROJECTS DEPARTMENT Professional Services Contract Amendment Safe Routes to School 06/21 /2021 Gauge Engineering Amendment No.: CoP Project No.: P.O. No.: 3519 Liberty Drive, Suite 300 Pearland, TX 77581 pearlandtx.gov/projects 3 TR1602 2019-00001484 This change order encompasses the following: Contract Amendment #3 in the amount of $5,650.00 is for the Scour Analysis for the pedestrian bridge that was required by TxDOT. This task was added after the pedestrian bridge that was previously removed from the project was added back in at the Alvin crossing. Description of Work Cost Time � Add Item No. 8 Scour Analysis for the pedestrian bridge required by TxDOT Please attach back-up documentation. Cost &Time Change Summary Original Contract: Previous Amendment(s): Contract prior to this Amendment: Net increase (decrease) from this Amendment: Revised Contract: Finance Approval: CT� �f P ACCEPTED*: By: � Date Consultant 08/16/2021 By: APPROVED: Project Manager Owner $ 5,650.00 Cost $ 240,533.00 $ 703672.50 $ 311,205,50 $ 5,650.00 $ 316,855,50 0 Days Time 0 Days 0 Days 0 Days 0 Days 0 Days Date 09/16/2021 Date 08/16/2021 Date 09/14/2021 `Consultant agrees to perform changes) included in the Contract Amendment for the price and time indicated. The prices for changes included all costs associated with this Contract Amendment. No work is to be done until this Amendment is executed. No payment to the Consultant shall be made for work included in the Amendment until this Amendment is executed. Upon execution by all parties, the following changes identifies for the contract value and/or contract time shown, are made part of the Design 1 of 1 D4. Revised 7/OS