R2021-176 2021-09-27 RESOLUTION NO. R2021-176 A Resolution of the City Council of the City of Pearland, Texas, amending a contract with Enprotec/Hibbs&Todd, Inc.,for design services associated with the Bailey Water Plant Project, in the additional amount of$119,315.00 (total contract amount of$694,125.00). BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain amended contract for engineering design services associated with the Bailey Water Plant Project, a copy of which is attached hereto as Exhibit"A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest an amended contract for engineering design services associated with the Bailey Water Plant Project. PASSED, APPROVED and ADOPTED this the 27rd day of September, A.D., 2021. EVIN COLS AYO R dITEST: 1,,,A, . C YS AL ROAN, TRMC, CMC o "���'�11"� A/, �,Q�p,R LA/��'',. CITY SECRETARY °� j"% rO. i E►— " cl APPROVED AS TO FORM: sk ...., 0% ....! , :U _a „,""""",,,,, `DARRIN M. COKER CITY ATTORNEY of nEgR CITY OF PEARLAND i � PROJECTS DEPARTMENT • 3519 Liberty Drive, Suite 300 Pearland,TX 77581 pearlandtx.gov/projects Fsr Is' " Professional Services Contract Amendment Bailey Water Plant Improvements Date of Issuance: 07/19/2021 Amendment No.: 3 Consultant: Enprotec/Hibbs&Todd CoP Project No.: WA1901-Enprotec P.O. No.: 2019-00000747 Explanation: This change order encompasses the following: Due to the extensive landscaping in front of the Natatorium and Recreation Center, staff pursued alternate construction methods to minimize impact and restoration costs associated with conventional open-cut method. However,the nature of gravity sanitary lines requires the pipe be sloped continuously to keep waste moving through the system,which could only be guaranteed in a costly jack-and-bore installation. Cost analysis performed throughout design showed an imbalance in value to pursue the gravity main installation due to the necessary depth and grade requirements of the line. By modifying the design to incorporate a shallower force main and a new lift station to serve the backwash pond, the motor control lab building on site, and future Fire Station 7,the construction cost was reduced by$1.3 million The addition of the Magnolia flows to Bailey results in necessary pump and electrical upgrades at the Magnolia site to account for the modified treatment configuration. The Bailey and Magnolia sites need the appropriate connectivity capabilities for integration with the future SCADA program and controls to communicate with these facilities. eHT has drafted a proposed amendment to account for the design changes needed on this project, in the amount of$119,315.00, bringing their revised contract amount to$694,125.00. Review of the proposal by Engineering and Projects staff has determined that the proposal is complete and reasonable and will provide the effort needed to complete this project through design, bid, construction and post construction phases. No additional funds are requested for bid or construction phases in this proposal Description of Work Cost Time Revise the quantity from 1.465099544255217 to $ 119,315.00 0 Days 2.0374910050371791 on Item No. 1 1 Basic Services Please attach back-up documentation. Cost&Time Change Summary Cost Time Original Contract: $372,460.00 0 Days Previous Amendment(s): $202,350.00 0 Days Contract prior to this Amendment: $574,810.00 0 Days Net increase(decrease)from this Amendment: $ 119,315.00 0 Days Revised Contract: $694,125.00 0 Days Finance Approval: '� Date 09/28/2021 ACCEPTED*: APPROVED: By: u0� -' - Date 09/09/2021 By: WTI)n��t Lfl '' Date 09/07/2021 Consultant Project Manager By: — Date 09/28/2021 Owner 'Consultant agrees to perform change(s)included in the Contract Amendment for the price and time indicated. The prices for changes included all costs associated with this Contract Amendment. No work is to be done until this Amendment is executed. No payment to the Consultant shall be made for work included in the Amendment until this Amendment is executed. Upon execution by all parties,the following changes identifies for the contract value and/or contract time shown,are made part of the Design 1 of 1 D4.Revised 7/08 Bailey WTP Improvements,Well Line,and Sanitary Sewer Line City of Pearland Prepared by:JSH Date: 5/27/2021 Budget Hours Construction/ Project Sr. Project Project GPS Senior Commissioning Engineerir Principal Manager Manager Survey Crew Engineer Manager CAD 1 CAD 2 Technicis Rates $200 $170 $145 $170 $135 $135 $100 $90 $135 ENGINEERING TASKS 1 Preliminary Design 1.1 Revise Sanitary Sewer Line Adjacent to Natatorium 16 32 _ 24 1.2 Backwash Detention Pond at Bailey WTP Site 8 40 - 8 1.3 Magnolia Pump Station Building(Including Electrical/SCADAj 10 54 32 1.4 Upgrade Existing Bailey WTP Site SCADA Infrastructure 2 16 1.5 Emergency Generators for Bailey WTP and Magnolia Well Sites 2 24 _ 1.6 Security System for Bailey WTP and Magnolia Well Sites 8 2 Final Design 2.1 Prepare Final Drawings 16 80 _ 40 2.2 Prepare Final Specifications 80 2.3 60%,90%& 100%Review 8 32 16 2.4 QA/QC _ 16 -- 8 40 _ 16 2.5 TCEQ Review and Coordination 16 40 3 Bidding _ 3.1 Biddin Document Development 3.2 Pre-Bid Meeting _ _ 3.3 Addenda and Questions _ 3.4 Evaluation and Recommendation 4 _Construction Phase Services 4.1 Pre-Construction Conference _ 4.2 Construction Administration _ 4.3 Review Submittals and RFIs . 4.4 Construction Status Meetings and Inspections 5 Post Construction Phase Services _ _ 5.1 Site lnpsection . 5.2 Develop Record Drawings 6 Additional Services Total Hours' 16 86 446 0 0 0 I 136 J 0 0 9/1 6/2U21 To: Mayor and City Council members 144 Update on the progress of a major water quality project to return the o Magnolia and Bailey wells to service.A forthcoming design contract Memo amendment requiring Council action is detailed.The design modifications will r X significantly reduce the construction costs. e=r. toh -Trent To: Clay Pearson, City Manager From: Morgan R Early, Project Manager CC: Trent Epperson, Deputy City Manager Robert D. Upton, P.E., Director of E sneering & Public Works Skipper Jones, Assistant Direct of Capital Projects Eric Hammond, Assistant Dir for of Public Works Date: September 16, 2021 Re: Bailey Water Plant Improvements & Bailey Sewer Line (Veterans to Bailey WTP) Purpose This memo provides information about the progress on the Bailey Water Plant Improvements& Bailey Sewer Line (Veterans to Bailey WTP) projects' status and the forthcoming proposed design contract amendment for Enprotec / Hibbs & Todd (eHT). This amendment is scheduled for presentation to Council on the September 27, 2021 meeting agenda. Background Both the Bailey water well and the Magnolia water well have elevated levels of manganese and iron that cause taste, odor, and appearance issues. These items are secondary contaminants that fall under the secondary regulations list that do not affect the safety of the water and so are considered nuisance constituents due to the color, taste, and odor they impart. This project will address these secondary contaminants at both plants by installing an additional treatment process for the plants. Both water wells are necessary per our Water Master Plan and Water Model to meet regulatory capacities as the City builds-out. The project is part of our overall water quality improvement efforts and will significantly reduce or eliminate the water quality issues allowing the plants to return to service. Council awarded a design contract to eHT in January 2019. Phase 1 of this project installed a new 1 MG prestressed concrete Ground Storage Tank (GST) to replace the existing welded steel tank. Construction of Phase 1 was awarded to DN Tanks in July 2019, and the Phase 1 was completed in June 2020. The design consultant provided a draft Basis of Design Report for the treatment process while Phase 1 construction was in progress. That report recommended a common treatment system for both plants located at the Bailey plant prompting the addition of a transmission line from the Magnolia as well as a sanitary sewer line that would carry the wastewater generated by the selected treatment process. As the design progressed, an analysis of the planned gravity sanitary sewer line versus a lift station and force main was performed due to the required depth of the gravity line being over 29' deep due to the starting depth to clear the ditch next to the water plant. Open cutting a line of this depth will have significant impacts on the Recreation Center & Natatorium (RCN), requiring removal/replacement of the landscaping, signage, driveways, and a portion of the parking lot. Alternatively, to install a gravity line at this depth with trenchless methods is extremely expensive. The analysis showed a local lift station that will serve the water plant, future Fire Station #7, and the surrounding area owned by Pearland Independent School District (PISD) will eliminate those disruptions and reduce project costs by approximately $1.0M. Phase 2 now includes: A treatment system (Aerelater) to remove the iron and manganese, installation of a waterline to transport water from the Magnolia Water Plant to the Bailey Treatment Plant, installation of a new local Lift Station and Force Main to discharge backwash from the treatment system to the gravity sanitary sewer line at Veterans and Bailey, SCADA integration, and removal of the existing steel GST. pcoming Contract Amendment Two prior amendments for eHT added the water transmission line from the Magnolia plant to the Bailey plant, and the gravity sanitary sewer line. The current amendment is for the design of the Lift Station and Force Main to replace the gravity line, electrical and pumping upgrades at the Magnolia site determined to be necessary to send the water to the Bailey plant, and additional SCADA programming and controls to communicate with these combined facilities. eHT has drafted a proposed amendment to account for the design changes needed in the amount of $119,315.00. Review of the proposal by Engineering and Projects Staff has determined that the proposal is complete and reasonable and will provide the effort needed to complete this project through design, bid, construction, and post construction phases. No additional funds are requested for bid or construction phases in this proposal. Current Status The 90% submission was received in March 2021 and reviewed with staff from Engineering and Public Works in April 2021. Coordination with CenterPoint Energy is ongoing to provide natural gas for the new generator. BNSF has reviewed and approved the waterline crossing perpendicular to their existing infrastructure and an agreement to allow the installation has been executed for this work. This agreement provides the City's contractor with the pipeline license needed to work in the Railroad easement. Next Steps There is approximately one month remaining to finalizing the design for review by the Technical Review Committee (TRC) prior to issuing a bid-level plan set with the bid advertisement. Upon approval of the amendment, eHT will implement these final details and submit the 100% plans, specifications, and construction estimate. Advertisement for proposals is scheduled for November, with a mandatory pre-bid conference and site visit following. The project will utilize the Competitive Sealed Proposal (Local Gov't Code Chapter 2269), subchapter (B) procurement process. Once the project has been bid and awarded the construction is expected to begin in January 2022. The construction phase is anticipated at 18 (eighteen) months to substantial completion. Budget Info WA1901 — Bailey Water Plant Funding Sources Series To Date Future Total Budget General Revenue- Cash - Certificates of Obligation - Certificates of Obligation - W/S Revenue Bonds 2018E 620,000 620,000 W/S Revenue Bonds 2019E 4,240,000 4,240,000 W/S Revenue Bonds TBS 2022 7,980,000 7,980,000 Impact Fee- Debt - Other Funding Sources - Total Funding Sources 12,840,000 - 12,840,000 Expenditures To Date Future Total PER - and - Design 539,376 119,315 658,691 Construction (Tank) 1,596,570 1,596,570 Construction (Pretreatment) 9,576,000 9,576,000 Construction Materials Testing 16,493 60,000 76,493 FF&E - Total Expenditures 2,152,439 9,755,315 11,907,754 Project Contingency 6% 800,000 Project Balance 132,247 WW2007— Bailey Sewer Line Funding Sources Series To Date Future Total Budget General Revenue- Cash - Certificates of Obligation - Certificates of Obligation - System Revenue-Cash 30,000 30,000 W/S Revenue Bonds 2021B 600,000 600,000 W/S Revenue Bonds - Impact Fee- Debt - Other Funding Sources - Total Funding Sources 630,000 - 630,000 Expenditures To Date Future Total PER ---- Land - Design 49,500 49,500 Construction 490,000 490,000 Construction Management/Inspection - Construction Materials Testing - FF&E - Total Expenditures 49,500 490,000 539,500 Project Contingency 14% 90,500 Project Balance - Schedule Info Base Line Current Design Start December-18 January-19 Bid Start April-21 November-21 Construction Start January-22 Construction Completion June-23 Recommendation taff will recommend to Council at the September 27th meeting to award the design contract amendment to Enprotec/ Hibbs & Todd in the amount of$119,315.00. Previous Memos 11/08/18, 08/08/19, 11/07/19, 01/30/20, 04/02/20, 08/06/20, 01/14/21, 05/06/21 Map T t _ i IIr .. r f A ii 1.14 4. . T ''rs.:Tet.4 i, 111":,- 1 J t ti tt J F• , , � S 4, ,4444,E ",•Y *1 tR. tY -t• ..', x ' , 1. ;�5•tea , .F j.. t I- i'Wi .1N11 '� err04 _ ,' i•4 1 'I • I. .rr .art-M�+�Y+.,=Yam' '. e.7 n;« _'1 .)" -J �i r c " y � 3 '% � �� .s ` , 4 _ , ri *�,y Jyy` - laJr�i to .�a� "r -St r • e " � F , a " '''.. . r 1t tit 4 �a fS r '� r « , iR i. RT Jks " 1 t (rr;�n:c 1sr, isr•, ' • t' t n e `i - t t i +a-,�•�" _ '� � Proposed Lift �?ation ` �- - ...rti7 ' opused n - -- -_ —..' s"__ .1 Force , - rr—.'J Mail CITY OF PEARLAND _.._ Baile• y Rater Plant L "" �weer Rant --Proposee water Lr'e ._......r•".*•.�..* '"•� - a (t,,,.wasa,,,ua c/a.wa+ `.AM I. e:.- ,....impm ed se.\cr LL,c Now _« ,._.«.. '* VlI0 9`1.k..+ -�� ! " _. • �...-'H 'ice ... __W[_■ ..�..`7... �.._+a