Loading...
R2021-138 2021-07-12RESOLUTION NO. R2021-138 A Resolution of the City Council of the City of Pearland, Texas, awarding a service contract for street and sidewalk maintenance, to Greenscapes Six, LLC, in the estimated amount of $746,080.00, for the period of July 13, 2021 through July 12, 2022. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That the City opened bids for street and sidewalk maintenance services, and such bids have been reviewed and tabulated. Section 2. That the City Council hereby awards the contract to Greenscapes Six, LLC, in the amounts reflected in Exhibit "A" attached hereto. Section 3. The City Manager or his designee is hereby authorized to execute a contract for street and sidewalk maintenance services. PASSED, APPROVED and ADOPTED this the 12th day of July, A.D., 2021. ,'-Z EVIN COLE MAYOR ATTEST: CRYSTAL ROAN, TRMC, CMC CITY SECRETARY APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY City of Pearland 3519 Liberty Drive Pearland, TX 77581 General Services Contract This Contract (Contract) is made between the City of Pearland, Texas (City), and Contractor. The City and Contractor agree to the terms and conditions of this Contract, which consists of the following parts: I. Summary of Contract Terms II. Signatures III. Standard Contractual Provisions IV. Special Terms and Conditions V. Additional Contract Attachments I. Summary of Contract Terms. Contractor: Description of Services: Contract Type: Effective Date: Termination Date: Renewal: Greenscapes Six 7020 FM 3180 Baytown, TX 77523 Contractor will provide streets and sidewalk maintenance services, for the City of Pearland, as needed, per the specifications of Bid #0521-46, R2021-138. Unit Price Contract, Estimated Amount of $746,080.00 -1rne-2n1- July 13, 2021 July 12, 2022 Two renewal options available, upon mutual agreement of both parties II. Signatures. By signing below, the parties agree to the terms of this Contract: CITY OF PEARLAND: Purchasing Officer 7.13.2021 Date *Signed by: Date: 7//3/7 / �( City Manager Assistant City Manager Director Superintendent/Manager *Contract Signature Authority: Title: ON! pf! t,vro /I_reik>2-- Date: (�j 04 % 2a ? Superintendent/Manager -$5,999 or less Director - $6,000 to $30,000 City Manager/Assistant City Managers - $30,001 to $50,000 City Council Resolution - $50,000+ Page 1 of 4 III. Standard Contractual Provisions. A. Definitions. Contract means this Standard Services Contract. Services means the services for which the City solicited bids or received proposals as described in Exhibit A, attached hereto. B. Services and Payment. Contractor will furnish Services to the City in accordance with the terms and conditions specified in this Contract. Contractor will bill the City for the Services provided at intervals of at least 30 days, except for the final billing. The City shall pay Contractor for the Services in accordance with the terms of this Contract, but all payments to be made by the City to Contractor, including the time of payment and the payment of interest on overdue amounts, are subject to the applicable provisions of Chapter 2251 of the Government Code. C. Termination Provisions. (1) City Termination for Convenience. Under this paragraph, the City may terminate this Contract during its term at any time for the City's own convenience where the Contractor is not in default by giving written notice to Contractor. If the City terminates this Contract under this paragraph, the City will pay the Contractor for all services rendered in accordance with this Contract to the date of termination. (2) Termination for Default. Either party to this Contract may terminate this Contract as provided in this paragraph if the other party fails to comply with its terms. The party alleging the default will give the other party notice of the default in writing citing the terms of the Contract that have been breached and what action the defaulting party must take to cure the default. If the party in default fails to cure the default as specified in the notice, the party giving the notice of default may terminate this Contract by written notice to the other party, specifying the date of termination. Termination of this Contract under this paragraph does not affect the right of either party to seek remedies for breach of the Contract as allowed by law, including any damages or costs suffered by either party. (3) Multi -Year Contracts and Funding. If this Contract extends beyond the City's fiscal year in which it becomes effective or provides for the City to make any payment during any of the City's fiscal years following the City's fiscal year in which this Contract becomes effective and the City fails to appropriate funds to make any required Contract payment for that successive fiscal year and there are no funds from the City's sale of debt instruments to make the required payment, then this Contract automatically terminates at the beginning of the first day of the City's successive fiscal year of the Contract for which the City has not appropriated funds or otherwise provided for funds to make a required payment under the Contract. D. Liability and Indemnity. Any provision of any attached contract document that limits the Contractor's liability to the City or releases the Contractor from liability to the City for actual or compensatory damages, loss, or costs arising from the performance of this Contract or that provides for contractual indemnity by one party to the other party to this Contract is not applicable or effective under this Contract. Except where an Additional Contract Document provided by the City provides otherwise, each party to this Contract is responsible for defending against and liable for paying any claim, suit, or judgment for damages, loss, or costs arising from that party's negligent acts or omissions in the performance of this Contract in accordance with applicable law. This provision does not affect the right of either party to this Contract who is sued by a third party for acts or omissions arising from this Contract to bring in the other party to this Contract as a third -party defendant as allowed by law. E. Assignment. The Contractor shall not assign this Contract without the prior written consent of the City. F. Law Governing and Venue. This Contract is governed by the law of the State of Texas and a lawsuit may only be prosecuted on this Contract in a court of competent jurisdiction located in or having jurisdiction in Brazoria County, Texas. G. Entire Contract. This Contract represents the entire Contract between the City and the Contractor and supersedes all prior negotiations, representations, or contracts, either written or oral. This Contract may be amended only by written instrument signed by both parties. H. Independent Contractor. Contractor shall perform the work under this Contract as an independent contractor and not as an employee of the City. The City has no right to supervise, direct, or control the Contractor or Contractor's officers or employees in the means, methods, or details of the work to be performed by Contractor under this Contract. The City and Contractor agree that the work performed under this Contract is not inherently dangerous, that Contractor will perform the work in a workmanlike manner, and that Contractor will take proper care and precautions to insure the safety of Contractor's officers and employees. I. Dispute Resolution Procedures. The Contractor and City desire an expeditious means to resolve any disputes that may arise between them regarding this Contract. If either party disputes any matter relating to this Contract, the parties agree to try in good faith, before bringing any legal action, to settle the dispute by submitting the matter to mediation before a third party who will be selected by agreement of the parties. The parties will each pay one- half of the mediator's fees. J. Attornev's Fees. Should either party to this Contract bring suit against the other party for breach of contract or for any other cause relating to this Contract, neither party will seek or be entitled to an award of attorney's fees or other costs relating to the suit. K. Severability. If a court finds or rules that any part of this Contract is invalid or unlawful, the remainder of the Contract continues to be binding on the parties. IV. Special Terms or Conditions. None. V. Additional Contract Documents. The following specified documents attached to this Contract are part of this Contract. Any provision contained in the Contractor's Additional Contract Documents that conflicts with this Contract shall have no legal effect. A. Contractor's Additional Contract Documents: 1. The contractor's response to Bid #0521-46 shall be construed as additional contract documents. 2. Executed Contractor Insurance Requirements & Agreement (required insurance certificate[s] shall be in possession of City at actual commencement of work). B. City's Additional Contract Documents: 1. Scope of Services as listed on the attached. EXHIBIT A CONTRACTOR'S SCOPE OF SERVICES Scope of services shall consist of the contractor providing streets and sidewalk maintenance services for the City of Pearland, as needed, per the specifications of Bid #0521-46. Pricing is as follows per contractor's response to the same, as listed below: Bid # 0521-46 Title Annual Sidewalk and Street Maintenance Contract Greenscapes Six. LLC LINE ITEMS Line Description UOM QTY Unit 1 CONCRETE SIDEWALK AND STREET REPAIRS 1 1 1.1 Saw Cut Concrete (Full Depth) Linear Foot 140 $25.00 1.2 Sidewalk Removal and Replacement - 4-Inch thickness, 4-Foot Width Linear Foot 28000 $17.25 1.3 Sidewalk Removal and Replacement - 4-Inch Thickness, 5-Foot Width Linear Foot 350 $23.00 1.4 Sidewalk Removal and Replacement - 4-Inch Thickness, 6-Foot Width Linear Foot 350 $24.00 1.5 New Sidewalk Placement - 4-inch thickness, 4-foot width Linear Foot 4200 $17.35 1.6 New Sidewalk Placement - 4-inch thickness, 5-foot width Linear Foot 350 $23.00 1.7 New Sidewalk Placement - 4-inch thickness, 6-foot width Linear Foot 350 $24.00 1.8 New Sidewalk Placement - 4-inch thickness, 10-foot width Linear Foot 350 $40.00 1.9 Driveway Removal Placement - 6-inch thickness, varying width Sq Yard 200 $63.00 1.10 Street Removal Replacement - 8-inch thickness, varying width Sq Yard 200 $120.00 1.11 Wheel Chair Ramp Replacement: 4-inch thickness EA 28 $800.00 1.12 Manhole Adjusting/Repair EA 28 $400.00 1.13 Tree Root Barrier Linear Foot 1400 $8.00 1.14 Curb Removal and Replacement Linear Foot 280 $23.00 1.15 Valve Boxes, Meter Boxes, and Electrical Boxes Adjusting/Repair EA 14 $500.00 1.16 Inlet Adjusting/Repair EA 14 $400.00 1.17 Extra 5,000 PSI Reinforced Concrete, Where Required. Complete in place. Cubic Yard 14 $330.00 1.18 Payment For Bonds and Insurance EA 1 $5,000.00 1.19 Replacement and Installation of SOD (St. Augustine or Bermuda) Sq Yard 100 $6.00 1.20 Reinforced Filter Fabric Fence, Complete In Place, the sum of Linear Foot 100 $1.50 1.21 Mobilization (not to exceed 3% of total bid) EA 5 $1,500.00 1.22 Altemative High Early/Class K Modified Mix Concrete Option Cubic Yard 50 $130.00 1.23 Traffic Control and Regulation, Including Flagman, Signs, Barrels, Barricades, Relocating and Replacing Existing Signs, Complete in Place, the sum of EA 10 $1,500.00 Bid # 0521-46 Title Annual Sidewalk and Street Maintenance Contract LINE ITEMS Exhibit A Greenscapes Six, LLC Line Description UOM QTY Unit Extended 1 CONCRETE SIDEWALK AND STREET REPAIRS 1 1 $746,080.00 1.1 Saw Cut Concrete (Full Depth) Linear Foot 140 $25.00 1.2 Sidewalk Removal and Replacement - 4-Inch thickness, 4-Foot Width Linear Foot 28000 $17.25 1.3 Sidewalk Removal and Replacement - 4-Inch Thickness, 5-Foot Width Linear Foot 350 $23.00 1.4 Sidewalk Removal and Replacement - 4-Inch Thickness, 6-Foot Width Linear Foot 350 $24.00 1.5 New Sidewalk Placement - 4-inch thickness, 4-foot width Linear Foot 4200 $17.35 1.6 New Sidewalk Placement - 4-inch thickness, 5-foot width Linear Foot 350 $23.00 1.7 New Sidewalk Placement - 4-inch thickness, 6-foot width Linear Foot 350 $24.00 1.8 New Sidewalk Placement - 4-inch thickness, 10-foot width Linear Foot 350 $40.00 1.9 Driveway Removal Placement - 6-inch thickness, varying width Sq Yard 200 $63.00 1.10 Street Removal Replacement - 8-inch thickness, varying width Sq Yard 200 $120.00 1.11 Wheel Chair Ramp Replacement: 4-inch thickness EA 28 $800.00 1.12 Manhole Adjusting/Repair EA 28 $400.00 1.13 Tree Root Barrier Linear Foot 1400 $8.00 1.14 Curb Removal and Replacement Linear Foot 280 $23.00 1.15 Valve Boxes, Meter Boxes, and Electrical Boxes Adjusting/Repair EA 14 $500.00 1.16 Inlet Adjusting/Repair EA 14 $400.00 1.17 place. 5,000 PSI Reinforced Concrete, Where Required. Complete in Cubic rd 14 $330.00 1.18 Payment For Bonds and Insurance EA 1 $5,000.00 1.19 Replacement and Installation of SOD (St. Augustine or Bermuda) Sq Yard 100 $6.00 1.20 Reinforced Filter Fabric Fence, Complete In Place, the sum of Linear Foot 100 $1.50 1.21 Mobilization (not to exceed 3% of total bid) EA 5 $1,500.00 1.22 Alternative High Early/Class K Modified Mix ConcreteOption Cubic Yard 50 $130.00 1.23 Traffic Control and Regulation, Including Flagman, Signs, Barrels, Barricades, Relocating and Replacing Existing Signs, Complete in Place, EA 10 $1,500.00 Total $746,080.00