Loading...
R2021-067 2021-04-12RESOLUTION NO. R2021-67 A Resolution of the City Council of the City of Pearland, Texas, renewing a unit supply bid for rough cut, open ditch and bridge grounds maintenance services with Lawnscapes Unlimited, in the estimated amount of $231,475.00, for the period of April 17, 2021 through April 16, 2022. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That competitive bids were previously obtained for rough cut, open ditch and bridge grounds maintenance services. Section 2. That the City Council hereby renews a contract with Lawnscapes Unlimited, in the estimated amount of $231,475.00. Section 3. The City Manager or his designee is hereby authorized to execute a contract for rough cut, open ditch and bridge grounds maintenance services. PASSED, APPROVED and ADOPTED this the 12th day of April, A.D., 2021. ir EVIN COLE AYOR ATT CRYSTAL ROAN, TRMC, CMC CITY SECRETARY APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY City of Pearland 3519 Liberty Drive Pearland, TX 77581 General Services Contract This Contract (Contract) is made between the City of Pearland, Texas (City), and Contractor. The City and Contractor agree to the terms and conditions of this Contract, which consists of the following parts: I. Summary of Contract Terms II. Signatures III. Standard Contractual Provisions IV. Special Terms and Conditions V. Additional Contract Attachments I. Summary of Contract Terms. Contractor: Lawnscapes Unlimited P.O. Box 553 Rosharon, TX 77583 Description of Services: Contractor will provide rough cut, open ditch and bridge grounds maintenance for the City of Pearland, as needed, per the specifications of Bid #1119-09, R2021-67. Contract Type: Unit Price Contract, Estimated Amount of $231,475.00. Effective Date: April 18, 2021 Termination Date: April 17, 2022 Renewal: No renewal option available II. Signatures. By signing below, the parties agree to the terms of this Contract: CITY OF PEARLAND: 4.27.2021 Purchasing Officer *Srg ed by: ate: ZSq NTRACTOR: rL /IIZ+iL awnscapes Unl mited Date Title: owner j Lo2� y City Mnager Assistant City Manager Director Superintendent/Manager *Contract Signature Authority: Date: 4.20.21 Superintendent/Manager -$5,999 or less Director - $6,000 to $30,000 City Manager/Assistant City Managers - $30,001 to $50,000 City Council Resolution - $50,000+ Page 1 of 4 III. Standard Contractual Provisions. A. Definitions. Contract means this Standard Services Contract. Services means the services for which the City solicited bids or received proposals as described in Exhibit A, attached hereto. B. Services and Payment. Contractor will furnish Services to the City in accordance with the terms and conditions specified in this Contract. Contractor will bill the City for the Services provided at intervals of at least 30 days, except for the final billing. The City shall pay Contractor for the Services in accordance with the terms of this Contract, but all payments to be made by the City to Contractor, including the time of payment and the payment of interest on overdue amounts, are subject to the applicable provisions of Chapter 2251 of the Government Code. C. Termination Provisions. (1) City Termination for Convenience. Under this paragraph, the City may terminate this Contract during its term at any time for the City's own convenience where the Contractor is not in default by giving written notice to Contractor. If the City terminates this Contract under this paragraph, the City will pay the Contractor for all services rendered in accordance with this Contract to the date of termination. (2) Termination for Default. Either party to this Contract may terminate this Contract as provided in this paragraph if the other party fails to comply with its terms. The party alleging the default will give the other party notice of the default in writing citing the terms of the Contract that have been breached and what action the defaulting party must take to cure the default. If the party in default fails to cure the default as specified in the notice, the party giving the notice of default may terminate this Contract by written notice to the other party, specifying the date of termination. Termination of this Contract under this paragraph does not affect the right of either party to seek remedies for breach of the Contract as allowed by law, including any damages or costs suffered by either party. (3) Multi -Year Contracts and Funding. If this Contract extends beyond the City's fiscal year in which it becomes effective or provides for the City to make any payment during any of the City's fiscal years following the City's fiscal year in which this Contract becomes effective and the City fails to appropriate funds to make any required Contract payment for that successive fiscal year and there are no funds from the City's sale of debt instruments to make the required payment, then this Contract automatically terminates at the beginning of the first day of the City's successive fiscal year of the Contract for which the City has not appropriated funds or otherwise provided for funds to make a required payment under the Contract. D. Liability and Indemnity. Any provision of any attached contract document that limits the Contractor's liability to the City or releases the Contractor from liability to the City for actual or compensatory damages, loss, or costs arising from the performance of this Contract or that provides for contractual indemnity by one party to the other party to this Contract is not applicable or effective under this Contract. Except where an Additional Contract Document provided by the City provides otherwise, each party to this Contract is responsible for defending against and liable for paying any claim, suit, or judgment for damages, loss, or costs arising from that party's negligent acts or omissions in the performance of this Contract in accordance with applicable law. This provision does not affect the right of either party to this Contract who is sued by a third party for acts or omissions arising from this Contract to bring in the other party to this Contract as a third -party defendant as allowed by law. E. Assignment. The Contractor shall not assign this Contract without the prior written consent of the City. F. Law Governing and Venue. This Contract is governed by the law of the State of Texas and a lawsuit may only be prosecuted on this Contract in a court of competent jurisdiction located in or having jurisdiction in Brazoria County, Texas. G. Entire Contract. This Contract represents the entire Contract between the City and the Contractor and supersedes all prior negotiations, representations, or contracts, either written or oral. This Contract may be amended only by written instrument signed by both parties. H. Independent Contractor. Contractor shall perform the work under this Contract as an independent contractor and not as an employee of the City. The City has no right to supervise, direct, or control the Contractor or Contractor's officers or employees in the means, methods, or details of the work to be performed by Contractor under this Contract. The City and Contractor agree that the work performed under this Contract is not inherently dangerous, that Contractor will perform the work in a workmanlike manner, and that Contractor will take proper care and precautions to insure the safety of Contractor's officers and employees. I. Dispute Resolution Procedures. The Contractor and City desire an expeditious means to resolve any disputes that may arise between them regarding this Contract. If either party disputes any matter relating to this Contract, the parties agree to try in good faith, before bringing any legal action, to settle the dispute by submitting the matter to mediation before a third party who will be selected by agreement of the parties. The parties will each pay one- half of the mediator's fees. J. Attorney's Fees. Should either party to this Contract bring suit against the other party for breach of contract or for any other cause relating to this Contract, neither party will seek or be entitled to an award of attorney's fees or other costs relating to the suit. K. Severability. If a court finds or rules that any part of this Contract is invalid or unlawful, the remainder of the Contract continues to be binding on the parties. IV. Special Terms or Conditions. None. V. Additional Contract Documents. The following specified documents attached to this Contract are part of this Contract. Any provision contained in the Contractor's Additional Contract Documents that conflicts with this Contract shall have no legal effect. A. Contractor's Additional Contract Documents: 1. The contractor's response to Bid #1119-09 shall be construed as additional contract documents. 2. Executed Contractor Insurance Requirements & Agreement (required insurance certificate[s] shall be in possession of City at actual commencement of work). B. City's Additional Contract Documents: 1. Scope of Services as listed on the attached. EXHIBIT A CONTRACTOR'S SCOPE OF SERVICES Scope of services shall consist of the contractor providing rough cut, open ditch and bridge grounds maintenance services for the City of Pearland, as needed, per the specifications of Bid #1119-09, R2021-67. Pricing is as follows per contractor's response to the same, as listed below: Attachment A — Bid #1119-09 Line Items, combined Rough Cut Contract Property List and Maintenance Schedule Attachment A Line Items Lawnscapes Unlimited Line Description UOM QTY Unit 1 Properties 1 1.1 IH-1A Mayor's Alley: Portion of Mayor's alley near apartments Mon 12 $103.74 1.2 IH-1 Old Alvin Road: Bridge Crossing: Bridge crossing at walking trail bridge near Swenson Mon 12 $54.72 1.3 IH-2 Main @ 3rd Street: West shoulder of road from 3rd street to Mary's Creek Mon 12 $60.80 1.4 IH-3 Industrial West: West of Main Street including Alexander easement Mon 12 $190.00 1.5 IH-4 Industrial East: East of Main Street Mon 12 $280.06 1.6 IH-5 Dixie Farm Lot: Pearland Parkway connection Mon 12 $137.94 1.7 IH-6 Friendswood Hastings Lot: Intersection of Friendswood Hastings and Dixie Farm Road Mon 12 $269.80 1.8 IH-7 Hastings Friendswood: Side of City property Mon 12 $64.60 1.9 IH-9 John Lizer Road: Pearland Parkway east to Mary's Creek Mon 12 $118.94 1.10 IH-11 Library Lot: Lot behind library and fence line Mon 12 $44.08 1.11 IH-12 Library Pond: : Library pond Mon 12 $71.44 1.12 IH-15 East Mary's Creek Retention pond: Estimated at 1 pass behind the houses Mon 12 $58.90 1.13 IH-16 McGinnis Road: Dixie Farm to drainage ditch Mon 12 $99.56 1.14 IH-19 Green Tee Ditch: Moore north to Bogey Way Mon 12 $387.22 1.15 IH-20 Country Club Ditch: Antrim north to creek Mon 12 $418.38 1.16 IH-21 Barry Rose Road: Lot on east side of Barry Rose Mon 12 $88.54 1.17 IH-23 Pearland Parkway Pond East: Pond on east side of Pearland Parkway near Clear Creek Mon 12 $456.00 1.18 IH-24 Pearland Parkway Pond West: Pond on west side of Pearland Parkway near Clear Creek Mon 12 $190.00 1.19 IH-25 Twin Creek Ditch and Pond to the east (Glastonbury): Twin creek ditch and pond to the east - Glastonbury Ditch (Ditch runs parallel to Hickory Knoll) Mon 12 $264.86 1.20 IH-26 Bishopton Lot: Ditch in front of City lot on Bishopton Mon 12 $33.44 1.21 IH-27 Knapp Road: Intersection of Knapp and Old Alvin Road Mon 12 $74.48 1.22 IH-28 Old Alvin Rd: Intersection of future Halik and Old Alvin Road Mon 12 $32.80 1.23 IH-29 Houston Alley: Between Houston and SH35 / Jasmine and Plum Mon 12 $38.00 1.24 IH-30 Orange and Washington Lot: Corner lot at Orange and Washington Mon 12 $102.98 1.25 IH-31 Orange: From Railroad Tracks to Washington Mon 12 $34.20 1.26 IH-32 North Pearland Alley: Jasmine North to Orange Mon 12 $61.18 1.27 IH-33 North San Antonio Alley: Jasmine to Plum Mon 12 $59.28 1.28 IH-34 North Washington Alley: Jasmine to Orange Mon 12 $59.66 1.29 IH-35 North Washington Fence Line: Jasmine North to Plum Mon 12 $52.44 1.30 IH-36 McHard Overpass Ponds: Ponds along McHard Phase 1 Mon 12 $228.00 1.31 IH-37 Mykawa : East shoulder: Katy Street to Creek and Median at Bridge Mon 12 $216.22 1.32 IH-38 Woody Road: Cunningham to Cherry Mon 12 $67.64 1.33 IH-39 Hatfield Road: Intersection of Jasper and Hatfield Mon 12 $15.00 1.34 IH-40 1626 Hatfield: Future Expansion of McHard Mon 12 $176.70 1.35 IH-41 O'Day Road: Along City property south of Rice Mon 12 $37.24 Page 2 of 6 1.36 IH-42 Garden Road Water Tower Field: Field behind Garden Road Water Tower Mon 12 $152.76 1.37 IH-43 Max Road: Along Hickory Slough Sports Plex Mon 12 $130.72 1.38 IH-44 Reid Road: FM1128 Extension Mon 12 $58.14 1.39 IH-46 Lee Road: Lee Road Connection Mon 12 $47.50 1.40 IH-47 Hill House Road: FM518 to Cemetery Westside Behind Wood Fence Mon 12 $68.40 1.41 IH-48 MUD 5 Pond: Intersection of McHard and Cullen Mon 12 $700.00 1.42 IH-49 Water Lights Road: Water lights Road Mon 12 $1.00 1.43 IH-50 Kirby Ditch & Kirby Pond 1: Kirby ditch from Kirby East to pond Mon 12 $1.00 1.44 IH-51 Kirby Pond: Pond on West side of Kirby, north of creek Mon 12 $1.00 1.45 IH-52 Shadow Creek Parkway Lot: To be Future Fire Station Mon 12 $147.44 1.46 IH-55 Fite Road : Navarro to Dead End Mon 12 $85.12 1.47 IH-57 Bailey Road: 1800' West of FM1128 to Veterans (South Side) Mon 12 $1.00 1.48 IH-59 Veterans Road: Magnolia to Bailey Mon 12 $191.90 1.49 IH-60 Magnolia Ponds (2): Ponds on Magnolia shoulders Mon 12 $213.94 1.50 IH-61 Lee Lane Extension: Continuation of Lee Road From Dead End to Fence line Mon 12 $52.58 1.51 IH-62 McLean Road: Cabot Cove to Bailey (Ditch crossing at School) Mon 12 $57.38 1.52 IH-64 Harkey Road: Fite to Figland on East Shoulder Only Mon 12 $58.90 1.53 IH-66 Fite Road: Hatfield to McLean Mon 12 $184.30 1.54 IH-68 Fire Admin Fields: Fields behind Old Police Dept. Mon 12 $281.20 1.55 IH-69 Walnut Road: Along Walnut Estates Subdivision Mon 12 $135.66 1.56 IH-70 Veterans Road: Walnut to Magnolia Mon 12 $94.62 1.57 IH-71 McLean Road: Jolie to Cabot Cove Mon 12 $91.58 1.58 IH-72 McLean Road: Silsbee to Apple Springs Mon 12 $75.62 1.59 IH-73 Hatfield Road: Broadway to Fite Mon 12 $150.86 1.60 IH-73A Hatfield Trunk Line: Hatfield Road from Mary's Creek to Barricade on Magnolia Mon 12 $80.94 1.61 IH-74 Broadway: Johnston to Ray Mon 12 $39.52 1.62 IH-75 South Pearland Alley: Walnut north to FM 518 Mon 12 $66.50 1.63 IH-76 South San Antonio Alley: Walnut north to FM 518 Mon 12 $72.20 1.64 IH-77 South Washington Alley: Walnut to Pear Mon 12 $15.00 1.65 IH-78 South Texas Alley: Walnut to Pear Mon 12 $64.60 1.66 IH-79 South Sacramento Alley: Walnut to Just north of Pear Mon 12 $64.60 1.67 IH-80A Hastings Cannon Lot: East property line between Land and Trailer Park Mon 12 $187.72 1.68 IH-81 Fite @ FM 1128: Intersection of Fite and FM 1128 with Sidewalk Mon 12 $50.92 1.69 IH-82 Southeast Corner Magnolia @ McLean: Corner of Magnolia & McLean between Road and Sidewalk Mon 12 $104.50 1.70 IH-83 Southwest Corner Magnolia @ McLean: Corner of Magnolia & McLean at Majestic Church Mon 12 $104.50 1.71 IH-84 Barry Rose @ Pearland Parkway: Between Creekside Subdivision Fence and Sidewalk Mon 12 $71.44 1.72 IH-85 Pearland Parkway Loop: Lot near Pearland Parkway's "Round -a -Bout" Mon 12 $69.16 1.73 IH-86 Bailey Road: Wellbore to Veterans Mon 12 $25.00 Page 3 of 6 :,4 IH-87 Fite Road: Hatfield to Cullen Mon 12 $396.72 1.75 IH-88 Garden Road: Broadway to Brookside Mon 12 $396.72 j 1.76 IH-89 Harkey Road: Sharondale Street to Terrell Drive Mon 12 $56.24 1.77 IH-90 McLean Road: Near intersection of Magnolia Mon 12 $88.54 1.78 IH-91 O'Day Road: Broadway to Olin Drive Mon 12 $247.38 1.79 IH-92 Old Alvin Road: Near intersection of McHard Mon 12 $83.22 1.80 IH-93 Veterans Road: Magnolia to Walnut Mon 12 $133.00 1.81 IH-94 Mykawa at McHard: Bridge deck at intersection of Mykawa and McHard Mon 12 $188.10 1.82 IH-95 Mykawa at Orange: East shoulder of Mykawa at Orange Mon 12 $73.72 1.83 IH-96 Hatfield Road: Hatfield Road between Rockland and Colmesneil Drive Mon 12 $90.06 1.84 IH - 97 Longwood @ Mary's Creek Bridge: Bridge deck Mon 12 $70.00 1.85 IH - 98 Wood Creek Drive @ Marys Creek: Bridge deck Mon 12 $70.00 1.86 IH - 99 Longherridge @ Mary's Creek Bridge: Bridge deck Mon 12 $70.00 1.87 IH - 100 Country Club Drive @ Clear Creek Bridge: Bridge deck Mon 12 $70.00 1.88 IH - 101 Providence Village Drive @ Mary's Creek: Bridge deck Mon 12 $70.00 1.89 IH - 102 John Lizer @ Mary's Creek: Bridge deck Mon 12 $70.00 1.90 IH - 103 Robinson Drive @ Hickory Slough Bridge: Bridge deck Mon 12 $70.00 1.91 IH - 104 Old Alvin Road @ Hickory Slough Bridge: Bridge deck Mon 12 $70.00 1.92 IH - 105 Old Alvin Road @ Town Ditch Bridge: Bridge deck Mon 12 $70.00 1.93 IH - 106 Old Alvin Road @ Mary's Creek: Bridge deck Mon 12 $70.00 1.94 IH - 107 Mykawa Road @ Clear Creek Bridge: Bridge deck Mon 12 $70.00 1.95 IH - 108 Hwy 35 @ Mary's Creek Bridge: Bridge deck Mon 12 $70.00 1.96 IH - 109 Hwy 35 @ Cowart's Creek: Bridge deck Mon 12 $70.00 1.97 IH - 110 Hwy 35 @ Hastings Field Bridge: Bridge deck Mon 12 $70.00 1.98 IH - 111 Hwy 35 @ CR 128 Bridge: Bridge deck Mon 12 $70.00 1.99 IH - 112 Veterans Drive @ Mary's Creek Bridge: Bridge deck Mon 12 $70.00 1.100 IH - 113 Hwy 35 @ Hickory Slough: Bridge deck Mon 12 $70.00 1.101 IH - 114 Hwy 35 @ Town Ditch: Bridge deck Mon 12 $70.00 1.102 IH - 115 Hwy 35 at No Name Road (Prancer): Bridge deck Mon 12 $70.00 1.103 IH - 116 Rockland Drive @ Corrigan Ditch: Bridge deck Mon 12 $70.00 1.104 IH - 117 Hatfield Road @ Corrigan Bypass Ditch: Bridge deck Mon 12 $70.00 1.105 IH - 118 Harkey Road @ Mary's Creek Bridge: Bridge deck Mon 12 $70.00 1.106 IH - 119 Manvel Road @ Mary's Creek Bridge: Bridge deck Mon 12 $70.00 1.107 IH - 120 Max Road @ Hickory Slough bridge: Bridge deck Mon 12 $70.00 1.108 IH - 121 Roy @ Hickory Slough: Bridge deck Mon 12 $70.00 1.109 IH - 122 Garden @ Hickory Slough: Bridge deck Mon 12 $70.00 1.110 IH - 123 O'Day @ Hickory Slough: Bridge deck Mon 12 $70.00 1.111 IH - 124 Hatfield Road @ Hickory Slough: Bridge deck Mon 12 $70.00 1.112 IH - 125 Miller Ranch @ Hickory Slough: Bridge deck Mon 12 $70.00 1.113 IH - 126 Country Place Parkway @ Southdown Ditch: Bridge deck Mon 12 $70.00 1.114 IH - 127 Kingsley @ Clear Creek: Bridge deck Mon 12 $70.00 1.115 IH - 128 Hwy 35 @ Clear Creek Bridge: Bridge deck Mon 12 $70.00 1.116 IH - 129 Kingsley @ American Canal: Bridge deck Mon 12 $70.00 1.117 IH - 130 Kingsley @ Mustang Bayou: Bridge deck Mon 12 $70.00 1.118 IH - 131 Forest Park Ln @ Town Ditch: Bridge deck Mon 12 $70.00 1.119 IH - 132 Shauntel @ Mary's Creek: Bridge deck Mon 12 $70.00 1.120 IH - 133 Max Rd: Roadside ditch Mon 12 $15.00 Page 4 of 6 P T21 IH - 134 Roy Rd : Roadside ditch Mon 12 $122.00 1.122 IH - 135 Garden Rd: Roadside ditch Mon 12 $30.00 1.123 IH - 136 O'Day Rd: Roadside ditch Mon 12 $18.00 1.124 IH - 137 Liberty Dr: Roadside ditch Mon 12 $62.00 1.125 IH - 138 Old Alvin: Roadside ditch Mon 12 $160.00 1.126 IH - 139 Orange St : Roadside ditch Mon 12 $15.00 1.127 IH - 140 Mykawa Rd: Roadside ditch Mon 12 $220.00 1.128 IH - 141 Hatfield Rd: Roadside ditch Mon 12 $39.00 1.129 IH - 142 Hughes Ranch Rd: Roadside ditch Mon 12 $71.00 1.130 IH - 143 Smith Ranch Rd: Roadside ditch Mon 12 $15.00 1.131 IH - 144 Walnut St: Roadside ditch Mon 12 $15.00 1.132 IH - 146 Main St: Roadside ditch Mon 12 $350.00 1.133 IH - 148 Cullen Pkwy: Roadside ditch Mon 12 $15.00 1.134 IH - 149 Fite Rd: Roadside ditch Mon 12 $36.00 1.135 IH - 150 Woody Rd: Roadside ditch Mon 12 $65.00 1.136 IH - 151 Harkey Rd: Roadside ditch Mon 12 $200.00 1.137 IH - 152 Manvel Rd: Roadside ditch Mon 12 $110.00 1.138 IH - 153 Veterans Dr: Roadside ditch Mon 12 $120.00 1.139 IH - 154 Hughes Ranch Rd: Roadside ditch Mon 12 $20.00 1.140 IH - 155 Hooper Rd: Roadside ditch Mon 12 $50.00 1.141 IH - 156 Riley Rd: Roadside ditch Mon 12 $45.00 1.142 IH - 157 Broadway St: Roadside ditch Mon 12 $110.00 1.143 IH - 158 Kingsley Clear Creek North: Roadside ditch Mon 12 $19.00 1.144 IH - 159 Brookside Rd: Roadside ditch Mon 12 $15.00 1.145 IH - 160 CR 48: Roadside ditch Mon 12 $338.00 1.146 IH - 161 Wells Road @ Massey Ranch Road Bridge: Roadside ditch / bridge deck Mon 12 $70.00 1.147 IH - 162 Cherry Pie - Broadway @ Cherry: Roadside ditch / greenspace median Mon 12 $20.00 1.148 IH - 163 Mykawa @ Cherry: Roadside Mon 12 $25.00 1.149 IH - 164 Fire Station on 2234: Vacant undeveloped City property Mon 12 $120.00 1.150 IH - 165 Future Fire station on Old Alvin: Vacant undeveloped City property Mon 12 $50.00 1.151 IH - 166 Future Retention site on Old Alvin @ Walnut: Vacant undeveloped City property Mon 12 $110.00 1.152 IH - 167 Glastonbury 50' buffer: Rear easement 50' buffer Mon 12 $50.00 1.153 IH - 433 Haddock Property (Est.): Vacant undeveloped City Property (future surface water site) Mon 12 $700.00 1.154 IH - 434 Fite Road @ Harkey (EST.): intersection of Fite at Harkey (SE corner) Mon 12 $15.00 1.155 IH - 435 Southeast waterwell pond (EST): retention pond Mon 12 $100.00 1.156 IH - 436 Magnolia Road at RR Crossing (EST.): Undeveloped property at near 4181 Magnolia Mon 12 $50.00 1.157 IH - 437 SOHO treatment plant road (EST): roadside ditch Mon 12 $75.00 1.158 IH - 438 Veterans at Bailey (EST): roadside ditch - southeast corner of Veterans at Bailey to city limit sign Mon 12 $35.00 1.159 IH - 439 N. Galveston alley: Alley south of duplex at intersection of Park and Plum Mon 12 $30.00 1.160 IH - 440 Old Alvin Road: Roadside ditch across from Cross Point Church Mon 12 $36.00 1.161 IH - 441 Bailey at Harkey: Roadside Ditch at intersection Mon 12 $40.00 Page 5 of 6 1.162 IH - 442 Hickory Knoll: vacant property Mon 12 $30.00 2 Extra Services 1 2.1 Price per square foot to Hydro Axe Sq Ft 1 $0.10 2.2 Price per acre to mow vacant property Acre 1 $50.00 2.3 Price per acre to slope mow Acre 1 $100.00 2.4 Price per acre for right-of-way mowing. Acre 1 $100.00 2.5 Price per square foot for Restoration of ROW (removing all tree branches from encroaching within ROW) Sq Ft 1 $0.15 Page 6 of 6