R2021-060 2021-03-22RESOLUTION NO. R2021-60
A Resolution of the City Council of the City of Pearland, Texas, authorizing
a contract with E Contractors and ratifying emergency expenditures, in the
amount of $151,968.00, for emergency repairs to City facilities during the
February 2021 Texas Severe Winter Storm.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS:
Section 1. As authorized by Local Government Code 252.022(a), emergency repairs
to City facilities were required during the February 2021 Texas Severe Winter Storm.
Section 2. That the City Council hereby authorizes a contract with E Contractors and
ratifies the emergency expenditures, in the amount of $151.968.00.
PASSED, APPROVED and ADOPTED this the 22nd day of March, A.D., 2021.
EVIN COLE
MAYOR
ATTEST:
TAL RO N, TRMC, CMC
CITY SECRETARY
APPROVED AS TO FORM:
DARRIN M. COKER
CITY ATTORNEY
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421D6F61E8
City of Pearland
3519 Liberty Drive
Pearland, TX 77581
General Services Contract
This Contract (Contract) is made between the City of Pearland, Texas (City),
and Contractor. The City and Contractor agree to the terms and conditions of this Contract, which
consists of the following parts:
I. Summary of Contract Terms
II. Signatures
III. Standard Contractual Provisions
IV. Special Terms and Conditions
V. Additional Contract Attachments
I. Summary of Contract Terms.
Contractor:
Description of Services:
Contract Amount:
Effective Date:
Termination Date:
Renewal:
E Contractors USA
16554 Creek Bend Dr, Suite 200
Sugar Land, TX 77478
Contractor will provide emergency construction services caused by
Winter Storm Uri for the City of Pearland to City facilities, per the
specifications of attached quotes dated March 2, 2021 for Shadow
Creek Sport Complex, Hickory Slough Sport Complex, Knapp
Senior Center, Animal Shelter, Natatorium and Fire Station #2;
resolution # R2021-60.
$151,968
March 22, 2021
May 15, 2021
No renewal options.
II. Signatures. By signing below, the parties agree to the terms of this Contract:
CITY OF PEARLAND:
Purchasing Officer
4.28.2021
Date
*Signed by/ Uate: 24 4/r 1 lb z I
City anager
Assistant City Manager
Director
Superintendent/Manager
*Contract Signature Authority:
CONTRACTOR:
YQuu E
sratst���uii Abj i
Idle: 4/27/2021
Date:
Managing Member
Superintendent/Manager -$5,999 or less
Director - $6,000 to $30,000
City Manager/Assistant City Managers - $30,001 to $50,000
City Council Resolution - $50,000+
Page 1 of 4
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421 D6F61 E8
III. Standard Contractual Provisions.
A. Definitions.
Contract means this Standard Services Contract.
Services means the services for which the City solicited bids or received proposals as
described in Exhibit A, attached hereto.
B. Services and Payment. Contractor will furnish Services to the City in accordance with the
terms and conditions specified in this Contract. Contractor will bill the City for the Services
provided at intervals of at least 30 days, except for the final billing. The City shall pay
Contractor for the Services in accordance with the terms of this Contract, but all payments to
be made by the City to Contractor, including the time of payment and the payment of interest
on overdue amounts, are subject to the applicable provisions of Chapter 2251 of the
Government Code.
C. Termination Provisions.
(1) City Termination for Convenience. Under this paragraph, the City may terminate
this Contract during its term at any time for the City's own convenience where the
Contractor is not in default by giving written notice to Contractor. If the City terminates
this Contract under this paragraph, the City will pay the Contractor for all services
rendered in accordance with this Contract to the date of termination.
(2) Termination for Default. Either party to this Contract may terminate this Contract
as provided in this paragraph if the other party fails to comply with its terms. The
party alleging the default will give the other party notice of the default in writing citing
the terms of the Contract that have been breached and what action the defaulting
party must take to cure the default. If the party in default fails to cure the default as
specified in the notice, the party giving the notice of default may terminate this
Contract by written notice to the other party, specifying the date of termination.
Termination of this Contract under this paragraph does not affect the right of either
party to seek remedies for breach of the Contract as allowed by law, including any
damages or costs suffered by either party.
(3) Multi -Year Contracts and Funding. If this Contract extends beyond the City's fiscal
year in which it becomes effective or provides for the City to make any payment during
any of the City's fiscal years following the City's fiscal year in which this Contract
becomes effective and the City fails to appropriate funds to make any required
Contract payment for that successive fiscal year and there are no funds from the City's
sale of debt instruments to make the required payment, then this Contract
automatically terminates at the beginning of the first day of the City's successive fiscal
year of the Contract for which the City has not appropriated funds or otherwise
provided for funds to make a required payment under the Contract.
D. Liability and Indemnity. Any provision of any attached contract document that limits the
Contractor's liability to the City or releases the Contractor from liability to the City for actual
or compensatory damages, loss, or costs arising from the performance of this Contract or
that provides for contractual indemnity by one party to the other party to this Contract is not
applicable or effective under this Contract. Except where an Additional Contract Document
provided by the City provides otherwise, each party to this Contract is responsible for
defending against and liable for paying any claim, suit, or judgment for damages, loss, or
costs arising from that party's negligent acts or omissions in the performance of this Contract
in accordance with applicable law. This provision does not affect the right of either party to
Page 2 of 4
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421 D6F61 E8
this Contract who is sued by a third party for acts or omissions arising from this Contract to
bring in the other party to this Contract as a third -party defendant as allowed by law.
E. Assignment. The Contractor shall not assign this Contract without the prior written
consent of the City.
F. Law Governing and Venue. This Contract is governed by the law of the State of Texas
and a lawsuit may only be prosecuted on this Contract in a court of competent jurisdiction
located in or having jurisdiction in Brazoria County, Texas.
G. Entire Contract. This Contract represents the entire Contract between the City and the
Contractor and supersedes all prior negotiations, representations, or contracts, either written
or oral. This Contract may be amended only by written instrument signed by both parties.
H. Independent Contractor. Contractor shall perform the work under this Contract as an
independent contractor and not as an employee of the City. The City has no right to
supervise, direct, or control the Contractor or Contractor's officers or employees in the
means, methods, or details of the work to be performed by Contractor under this Contract.
The City and Contractor agree that the work performed under this Contract is not inherently
dangerous, that Contractor will perform the work in a workmanlike manner, and that
Contractor will take proper care and precautions to insure the safety of Contractor's officers
and employees.
I. Dispute Resolution Procedures. The Contractor and City desire an expeditious means to
resolve any disputes that may arise between them regarding this Contract. If either party
disputes any matter relating to this Contract, the parties agree to try in good faith, before
bringing any legal action, to settle the dispute by submitting the matter to mediation before a
third party who will be selected by agreement of the parties. The parties will each pay one-
half of the mediator's fees.
J. Attorney's Fees. Should either party to this Contract bring suit against the other party for
breach of contract or for any other cause relating to this Contract, neither party will seek or
be entitled to an award of attorney's fees or other costs relating to the suit.
K. Severability. If a court finds or rules that any part of this Contract is invalid or unlawful, the
remainder of the Contract continues to be binding on the parties.
IV. Special Terms or Conditions. Federal Requirements and Certification Regarding Lobbying (see
attached Exhibit B and C).
V. Additional Contract Documents. The following specified documents attached to this Contract
are part of this Contract. Any provision contained in the Contractor's Additional Contract Documents
that conflicts with this Contract shall have no legal effect.
A. Contractor's Additional Contract Documents:
1. The contractor's quotes for emergency work (attached) shall be construed as
additional contract documents.
2. Executed Contractor Insurance Requirements & Agreement (required insurance
certificate[s] shall be in possession of City at actual commencement of work).
B. City's Additional Contract Documents:
1. Scope of Services as listed on the attached
2. Federal Requirements — Exhibit B
3. Certification Regarding Lobbying — Exhibit C
Page 3 of 4
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421D6F61E8
EXHIBIT A
CONTRACTOR'S SCOPE OF SERVICES
Scope of services shall be as reflected on quotes to provide emergency construction services caused
by Winter Storm Uri for the City of Pearland to City facilities: Shadow Creek Sport Complex, Hickory
Slough Sport Complex, Knapp Senior Center, Animal Shelter, Natatorium and Fire Station #2
(attached). Pricing is as follows per contractor's response to the same:
$9,150 Shadow Creek Sports Complex
$17,541 Hickory Slough Sports Complex 24648
$46,015 Knapp Senior Center
$12,037 Animal Shelter
$2,225 Natatorium
$65,000 Fire Station #2
Page 4 of 4
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421D6F61E8
Exhibit B
FEDERAL REQUIREMENTS
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421D6F61E8
FEDERAL REQUIREMENTS
TABLE OF CONTENTS
Section No.
Title
FR-F01
Access to Records
FR-F02
Breach of Contract
FR-F03
Byrd Anti -Lobbying Amendment
FR-F04
Clean Air Act and the Federal Water Pollution Control Act
FR-F05
Compliance with Federal Law, Regulations, and Executive Orders
FR-F06
Contract Work hours and Safety Standards Act
FR-F07
Copeland "Anti -Kickback" Act (Construction Only)
FR-F08
Davis -Bacon Act (Construction Only)
FR-F09
Debarment and Suspension
FR-F10
DHS Seal, Logo and Flags
FR-F11
Equal Employment Opportunity (Construction Only)
FR-F12
No Obligation by Federal Government
FR-F13
Procurement of Recovered Materials
FR-F14
Program Fraud and False or Fraudulent Statements or Related Acts
FR F15
Right to Inventions Made Under Contract or Agreement (Not for Public
Assistance Contracts)
FR-F16
Termination for Cause and Convenience
END OF TABLE OF CONTENTS
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421D6F61E8
FEDERAL REQUIREMENTS: FR-F01
ACCESS TO RECORDS
Access to Records. The following access to records requirements apply to this contract:
(1) The Contractor agrees to provide the City, the FEMA Administrator, the
Comptroller General of the United States, or any of their authorized
representatives access to any books, documents, papers, and records of the
Contractor which are directly pertinent to this contract for the purposes of making
audits, examinations, excerpts, and transcriptions.
(2) The Contractor agrees to permit any of the foregoing parties to reproduce by any
means whatsoever or to copy excerpts and transcriptions as reasonably needed.
(3)
The Contractor agrees to provide the FEMA Administrator or authorized
representatives access to construction or other work sites pertaining to the work
being completed under the contract.
Reference: DHS Standard Terms and Conditions, v 3.0, ¶ XXVI (2013)
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421 D6F61 E8
FEDERAL REQUIREMENTS: FR-F02
BREACH OF CONTRACT
Any violation or breach of terms of this Contract on the part of the Contractor or its
subcontractors may result in the suspension or termination of this Contract or such other
action that may be necessary to enforce the rights of the parties of this agreement.
City will provide Contractor written notice that describes the nature of the breach and
corrective actions the Contractor must undertake in order to avoid termination of the
Contract. City reserves the right to withhold payments to Contractor until such time the
Contractor corrects the breach or the City elects to terminate the Contract. The City's
notice will identify a specific date by which the Contractor must correct the breach. City
may proceed with termination of the Contract if the Contractor fails to correct the breach
by deadline indicated in the City's notice.
The duties and obligations imposed by the Contract documents and the rights and
remedies available thereunder are in addition to, and not a limitation of, any duties,
obligations, rights and remedies otherwise imposed or available by law.
Reference: 2 CFR § 200 Appendix II(A)
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421D6F61E8
FEDERAL REQUIREMENTS: FR-F03
BYRD ANTI -LOBBYING AMENDMENT
Contractors who apply or bid for an award of $100,000 or more shall file the required
certification. Each tier certifies to the tier above that it will not and has not used Federal
appropriated funds to pay any person or organization for influencing or attempting to
influence an officer or employee of any agency, a member of Congress, officer or
employee of Congress, or an employee of a member of Congress in connection with
obtaining any Federal contract, grant, or any other award covered by 31 U.S.C. § 1352.
Each tier shall also disclose any lobbying with non -Federal funds that takes place in
connection with obtaining any Federal award. Such disclosures are forwarded from tier
to tier up to the recipient.
Reference: 31 U.S.C. § 1352 (as amended)
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421 D6F61 E8
FEDERAL REQUIREMENTS: FR-F04
CLEAN AIR ACT AND THE FEDERAL WATER POLLUTION CONTROL ACT
(1) The Contractor agrees to comply with all applicable standards, orders or
regulations issued pursuant to the Clean Air Act, as amended, 42 U.S.C. §7401 et
seq.
(2) The Contractor agrees to report each violation to the City and understands and
agrees that the City will, in turn, report each violation as required to assure
notification to the Federal Emergency Management Agency, and the appropriate
Environmental Protection Agency Regional Office.
(3)
The Contractor agrees to include these requirements in each subcontract
exceeding $150,000 financed in whole or in part with Federal assistance provided
by FEMA.
Reference: 2 CFR § 200, Appendix ll¶ (G)
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421D6F61E8
FEDERAL REQUIREMENTS: FR-F05
COMPLIANCE WITH FEDERAL LAW, REGULATIONS, AND EXECUTIVE ORDERS
This is an acknowledgement that FEMA financial assistance will be used to fund the
contract only. The Contractor will comply will all applicable federal law, regulations,
executive orders, FEMA policies, procedures, and directives.
Reference: FEMA requirement
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421 D6F61 E8
FEDERAL REQUIREMENTS: FR-F06
CONTRACT WORK HOURS AND SAFETY STANDARDS ACT
(1) Overtime requirements. No Contractor or subcontractor contracting for any part of
the contract work which may require or involve the employment of laborers or
mechanics shall require or permit any such laborer or mechanic in any workweek
in which he or she is employed on such work to work in excess of forty hours in
such workweek unless such laborer or mechanic receives compensation at a rate
not less than one and one-half times the basic rate of pay for all hours worked in
excess of forty hours in such workweek.
(2) Violation; liability for unpaid wages; liquidated damages. In the event of any
violation of the clause set forth in paragraph (1) of this section the Contractor and
any subcontractor responsible therefor shall be liable for the unpaid wages. In
addition, such Contractor and subcontractor shall be liable to the United States (in
the case of work done under contract for the District of Columbia or a territory, to
such District or to such territory), for liquidated damages. Such liquidated damages
shall be computed with respect to each individual laborer or mechanic, including
watchmen and guards, employed in violation of the clause set forth in paragraph
(1) of this section, in the sum of $10 for each calendar day on which such individual
was required or permitted to work in excess of the standard workweek of forty
hours without payment of the overtime wages required by the clause set forth in
paragraph (1) of this section.
(3)
Withholding for unpaid wages and liquidated damages. The City shall upon its own
action or upon written request of an authorized representative of the Department
of Labor withhold or cause to be withheld, from any moneys payable on account
of work performed by the Contractor or subcontractor under any such contract or
any other Federal contract with the same prime Contractor, or any other federally -
assisted contract subject to the Contract Work Hours and Safety Standards Act,
which is held by the same prime Contractor, such sums as may be determined to
be necessary to satisfy any liabilities of such Contractor or subcontractor for unpaid
wages and liquidated damages as provided in the clause set forth in paragraph (2)
of this section.
(4) Subcontracts. The Contractor or subcontractor shall insert in any subcontracts the
clauses set forth in paragraph (1) through (4) of this section and also a clause
requiring the subcontractors to include these clauses in any lower tier
subcontracts. The prime Contractor shall be responsible for compliance by any
subcontractor or lower tier subcontractor with the clauses set forth in paragraphs
(1) through (4) of this section.
Reference: 29 CFR § 5.5(b)
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421 D6F61 E8
FEDERAL REQUIREMENTS: FR-F07
COPELAND "ANTI -KICKBACK" ACT
FOR CONSTRUCTION CONTRACTS
(1) The CONTRACTOR shall comply with 18 U.S.C. § 874, 40 U.S.C. § 3145, and
the requirements of 29 C.F.R. pt. 3 as may be applicable, which are incorporated
by reference into this contract.
(2) Subcontracts. The CONTRACTOR or subcontractor shall insert in any
subcontracts the clause above and such other clauses as the federal government
may by appropriate instructions require, and also a clause requiring the
subcontractors to include these clauses in any lower tier subcontracts. The prime
CONTRACTOR shall be responsible for the compliance by any subcontractor or
lower tier subcontractor with all of these contract clauses.
(3)
Breach. A breach of the contract clauses above may be grounds for termination
of the contract, and for debarment as a CONTRACTOR and subcontractor as
provided in 29 C.F.R. § 5.12."
Reference: 29 CFR pt. 3
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421D6F61E8
FEDERAL REQUIREMENTS: FR-F08
DAVIS - BACON REQUIREMENTS
FOR CONSTRUCTION ONLY
The CONTRACTOR agrees to comply with the requirements of the Secretary of Labor in
accordance with the Davis -Bacon Act as amended, the provisions of Contract Work Hours
and Safety Standards Act (40 U.S.C. 327 et seq.) and all other applicable Federal, state and
local laws and regulations pertaining to labor standards insofar as those acts apply to the
performance of this Agreement. The CONTRACTOR agrees to comply with the Copeland
Anti -Kick Back Act (18 U.S.C. 874 et seq.) and it's implementing regulations of the U.S.
Department of Labor at 29 CFR Part 3. The CONTRACTOR shall maintain documentation
that demonstrates compliance with hour and wage requirements of this part. Such
documentation shall be made available to the Subrecipient for review upon request.
The CONTRACTOR agrees that, except with respect to the rehabilitation or construction of
residential property containing less than eight (8) units, all contractors engaged under
contracts in excess of $2,000.00 for construction, renovation or repair work financed in whole
or in part with assistance provided under this contract, shall comply with Federal
requirements adopted by the Subrecipient in 2 CFR Part 200, Appendix II, ¶ D, pertaining to
such contracts and with the applicable requirements of the regulations of the Department of
Labor, under 29 CFR Parts 1, 3, 5 and 7 governing the payment of wages and ratio of
apprentices and trainees to journey workers; provided that, if wage rates higher than those
required under the regulations are imposed by state or local law, nothing hereunder is
intended to relieve the CONTRACTOR of its obligation, if any, to require payment of the
higher wage. The CONTRACTOR shall cause or require to be inserted in full, in all such
contracts subject to such regulations, provisions meeting the requirements of this paragraph.
Reference: 29 CFR
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421 D6F61 E8
FEDERAL REQUIREMENTS: FR-F09
DEBARMENT AND SUSPENSION
(1) This contract is a covered transaction for purposes of 2 C.F.R. pt. 180 and 2 C.F.R.
pt. 3000. As such the Contractor is required to verify that none of the Contractor,
its principals (defined at 2 C.F.R. § 180.995), or its affiliates (defined at 2 C.F.R. §
180.905) are excluded (defined at 2 C.F.R. § 180.940) or disqualified (defined at
2 C.F.R. § 180.935).
(2) The Contractor must comply with 2 C.F.R. pt. 180, subpart C and 2 C.F.R. pt. 3000,
subpart C and must include a requirement to comply with these regulations in any
lower tier covered transaction it enters into.
(3)
This certification is a material representation of fact relied upon by (insert name of
subrecipient). If it is later determined that the Contractor did not comply with 2
C.F.R. pt. 180, subpart C and 2 C.F.R. pt. 3000, subpart C, in addition to remedies
available to (name of state agency serving as recipient and name of subrecipient),
the Federal Government may pursue available remedies, including but not limited
to suspension and/or debarment.
(4) The bidder or proposer agrees to comply with the requirements of 2 C.F.R. pt. 180,
subpart C and 2 C.F.R. pt. 3000, subpart C while this offer is valid and throughout
the period of any contract that may arise from this offer. The bidder or proposer
further agrees to include a provision requiring such compliance in its lower tier
covered transactions.
Reference: 2 CFR part 180, 2 CFR part 3000
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421 D6F61 E8
FEDERAL REQUIREMENTS: FR-F10
DHS SEAL, LOGO AND FLAGS
The Contractor shall not use the DHS seal(s), logos, crests, or reproductions of flags or
likenesses of DHS agency officials without specific FEMA pre- approval.
Reference: DHS Standard Terms and Conditions, v.3.0 ¶ XXV (2013)
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421D6F61E8
FEDERAL REQUIREMENTS: FR-F11
EQUAL EMPLOYMENT OPPORTUNITY
CONSTRUCTION CONTRACTS ONLY
Per federal regulations in 41 CFR Part 60-1.4(C)(b), during the performance of this
contract, the CONTRACTOR:
(1) will not discriminate against any employee or applicant for employment because of race,
color, religion, sex, or national origin. The CONTRACTOR will take affirmative action to
ensure that applicants are employed, and that employees are treated during employment
without regard to their race, color, religion, sex, or national origin.
Such action shall include, but not be limited to the following: Employment, upgrading,
demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of
pay or other forms of compensation; and selection for training, including apprenticeship. The
CONTRACTOR agrees to post in conspicuous places, available to employees and
applicants for employment, notices to be provided setting forth the provisions of this
nondiscrimination clause.
(2) The CONTRACTOR will, in all solicitations or advertisements for employees placed by or
on behalf of the contractor, state that all qualified applicants will receive considerations for
employment without regard to race, color, religion, sex, or national origin.
(3) The CONTRACTOR will send to each labor union or representative of workers with which
he has a collective bargaining agreement or other contract or understanding, a notice to be
provided advising the said labor union or workers' representatives of the contractor's
commitments under this section, and shall post copies of the notice in conspicuous places
available to employees and applicants for employment.
(4) The CONTRACTOR will comply with all provisions of Executive Order 11246 of
September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of
Labor.
(5) The CONTRACTOR will furnish all information and reports required by Executive Order
11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of
Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the
administering agency and the Secretary of Labor for purposes of investigation to ascertain
compliance with such rules, regulations, and orders.
(6) In the event of the CONTRACTOR's noncompliance with the nondiscrimination clauses
of this contract or with any of the said rules, regulations, or orders, this contract may be
canceled, terminated, or suspended in whole or in part and the CONTRACTOR may be
declared ineligible for further Government contracts or federally assisted construction
contracts in accordance with procedures authorized in Executive Order 11246 of September
24, 1965, and such other sanctions as may be imposed and remedies invoked as provided in
Executive Order 11246 of September 24, 1965, or by rule, regulation, or order of the
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421D6F61E8
Secretary of Labor, or as otherwise provided by law.
(7) The CONTRACTOR will include the option of the sentence immediately preceding
paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract or
purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor
issued pursuant to section 204 of Executive Order 11246 of September 24, 1965, so that
such provisions will be binding upon each subcontractor 01' vendor. The CONTRACTOR will
take such action with respect to any subcontract or purchase order as the administering
agency may direct as a means of enforcing such provisions, including sanctions for
noncompliance: Provided, however, That in the event a CONTRACTOR becomes involved
in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction
by the administering agency the CONTRACTOR may request the United States to enter into
such litigation to protect the interests of the United States."
Reference: 41 CFR Part 60
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421D6F61E8
FEDERAL REQUIREMENTS: FR-F12
NO OBLIGATION BY FEDERAL GOVERNMENT
The Federal Government is not a party to this contract and is not subject to any obligations
or liabilities to the non -Federal entity, Contractor, or any other party pertaining to any
matter resulting from the contract.
Reference: FEMA requirement
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421D6F61E8
FEDERAL REQUIREMENTS: FR-F13
PROCUREMENT OF RECOVERED MATERIALS
(1) In the performance of this contract, the Contractor shall make maximum use of
products containing recovered materials that are EPA- designated items unless
the product cannot be acquired
(i) Competitively within a timeframe providing for compliance with the
contract performance schedule;
(ii) Meeting contract performance requirements; or
(iii) At a reasonable price.
(2) Information about this requirement, along with the list of EPA -designate items, is
available at EPA's Comprehensive Procurement Guidelines web site,
https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program.
Reference: 2 CFR § 200.322 and 40 CFR part 247
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421 D6F61 E8
FEDERAL REQUIREMENTS: FR-F14
PROGRAM FRAUD AND FALSE OR FRAUDULENT STATEMENTS RE RELATED
ACTS
The Contractor acknowledges that 31 U.S.C. Chap. 38 (Administrative Remedies for
False Claims and Statements) applies to the Contractor's actions pertaining to this
contract.
Reference: 31 U.S.C. Chap. 38
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421 D6F61 E8
FEDERAL REQUIREMENTS: FR-F15
RIGHT TO INVENTIONS MADE UNDER CONTRACT OR AGREEMENT
Stafford Act Disaster Grants. This requirement does not apply to the Public Assistance,
Hazard Mitigation Grant Program, Fire Management Assistance Grant Program, Crisis
Counseling Assistance and Training Grant Program, Disaster Case Management Grant
Program, and Federal Assistance to Individuals and Households - Other Needs Assistance
Grant Program, as FEMA awards under these programs do not meet the definition of
"funding agreement."
If a FEMA award meets the definition of "funding agreement" under 37 C.F.R. § 401.2(a) and
the non -Federal entity wishes to enter into a contract with a small business firm or nonprofit
organization regarding the substitution of patties, assignment or performance of
experimental, developmental, or research work under that "funding agreement," the non -
Federal entity must comply with the requirements of 37 C.F. R. Part 401 (Rights to
Inventions Made by Nonprofit Organizations and Small Business Firms Under Government
Grants, Contracts and Cooperative Agreements), and any implementing regulations issued
by FEMA. See 2 C.F.R. Part 200, Appendix II, § F.
The regulation at 37 C.F.R. § 401.2(a) currently defines "funding agreement" as any
contract, grant, or cooperative agreement entered into between any Federal agency, other
than the Tennessee Valley Authority, and any contractor for the performance of
experimental, developmental, or research work funded in whole or in part by the Federal
government. This term also includes any assignment, substitution of pm ties, or subcontract
of any type entered into for the performance of experimental, developmental, or research
work under a funding agreement as defined in the first sentence of this paragraph.
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421D6F61E8
FEDERAL REQUIREMENTS: FR-F16
TERMINATION FOR CAUSE AND CONVENIENCE
Termination for Cause:
(a)
(1) The Government may, subject to paragraphs (c) and (d) below, by written notice of
default to the Contractor, terminate this contract in whole or in part if the Contractor fails
to -
(i) Deliver the supplies or to perform the services within the time specified in this contract
or any extension;
(ii) Make progress, so as to endanger performance of this contract (but see subparagraph
(a)(2) below); or
(iii) Perform any of the other provisions of this contract (but see subparagraph (a)(2)
below).
(2) The Government's right to terminate this contract under subdivisions (1)(ii) and (1)(iii)
above, may be exercised if the Contractor does not cure such failure within 10 days (or
more if authorized in writing by the Contracting Officer) after receipt of the notice from the
Contracting Officer specifying the failure.
(b) If the Government terminates this contract in whole or in part, it may acquire, under
the terms and in the manner the Contracting Officer considers appropriate, supplies or
services similar to those terminated, and the Contractor will be liable to the Government
for any excess costs for those supplies or services. However, the Contractor shall
continue the work not terminated.
(c) Except for defaults of subcontractors at any tier, the Contractor shall not be liable for
any excess costs if the failure to perform the contract arises from causes beyond the
control and without the fault or negligence of the Contractor. Examples of such causes
include (1) acts of God or of the public enemy, (2) acts of the Government in either its
sovereign or contractual capacity, (3) fires, (4) floods, (5) epidemics, (6) quarantine
restrictions (7) strikes, (8) freight embargoes, and (9) unusually severe weather. In each
instance the failure to perform must be beyond the control and without the fault or
negligence of the Contractor.
(d) If the failure to perform is caused by the default of a subcontractor at any tier, and if
the cause of the default is beyond the control of both the Contractor and subcontractor,
and without the fault or negligence of either, the Contractor shall not be liable for any
excess costs for failure to perform, unless the subcontracted supplies or services were
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421 D6F61 E8
obtainable from other sources in sufficient time for the Contractor to meet the required
delivery schedule.
(e) If this contract is terminated for default, the Government may require the Contractor
to transfer title and deliver to the Government, as directed by the Contracting Officer, any
(1) completed supplies, and (2) partially completed supplies and materials, parts, tools,
dies, jigs, fixtures, plans, drawings, information, and contract rights (collectively referred
to as manufacturing materials in this clause) that the Contractor has specifically produced
or acquired for the terminated portion of this contract. Upon direction of the Contracting
Officer, the Contractor shall also protect and preserve property in its possession in which
the Government has an interest.
(f) The Government shall pay contract price for completed supplies delivered and
accepted. The Contractor and Contracting Officer shall agree on the amount of payment
for manufacturing materials delivered and accepted and for the protection and
preservation of the property. Failure to agree will be a dispute under the Disputes clause.
The Government may withhold from these amounts any sum the Contracting Officer
determines to be necessary to protect the Government against loss because of
outstanding liens or claims of former lien holders.
(g) If, after termination, it is determined that the Contractor was not in default, or that the
default was excusable, the rights and obligations of the parties shall be the same as if the
termination had been issued for the convenience of the Government.
(h) The rights and remedies of the Government in this clause are in addition to any other
rights and remedies provided by law or under this contract.
Termination for Convenience:
(a) The Government may terminate performance of work under this contract in whole or,
from time to time, in part if the Contracting Officer determines that a termination is in the
Government's interest. The Contracting Officer shall terminate by delivering to the
Contractor a Notice of Termination specifying the extent of termination and the effective
date.
(b) After receipt of a Notice of Termination, and except as directed by the Contracting
Officer, the Contractor shall immediately proceed with the following obligations,
regardless of any delay in determining or adjusting any amounts due under this clause:
(1) Stop work as specified in the notice.
(2) Place no further subcontracts or orders (referred to as subcontracts in this clause) for
materials, services, or facilities, except as necessary to complete the continued portion
of the contract.
(3) Terminate all subcontracts to the extent they relate to the work terminated.
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421D6F61E8
(4) Assign to the Government, as directed by the Contracting Officer, all right, title, and
interest of the Contractor under the subcontracts terminated, in which case the
Government shall have the right to settle or to pay any termination settlement proposal
arising out of those terminations.
(5) With approval or ratification to the extent required by the Contracting Officer, settle all
outstanding liabilities and termination settlement proposals arising from the termination
of subcontracts; the approval or ratification will be final for purposes of this clause.
(6) As directed by the Contracting Officer, transfer title and deliver to the Government (i)
the fabricated or unfabricated parts, work in process, completed work, supplies, and other
material produced or acquired for the work terminated, and (ii) the completed or partially
completed plans, drawings, information, and other property that, if the contract had been
completed, would be required to be furnished to the Government.
(7) Complete performance of the work not terminated.
(8) Take any action that may be necessary, or that the Contracting Officer may direct, for
the protection and preservation of the property related to this contract that is in the
possession of the Contractor and in which the Government has or may acquire an
interest.
(9) Use its best efforts to sell, as directed or authorized by the Contracting Officer, any
property of the types referred to in subparagraph (b)(6) of this clause; provided, however,
that the Contractor (i) is not required to extend credit to any purchaser and (ii) may acquire
the property under the conditions prescribed by, and at prices approved by, the
Contracting Officer. The proceeds of any transfer or disposition will be applied to reduce
any payments to be made by the Government under this contract, credited to the price or
cost of the work, or paid in any other manner directed by the Contracting Officer.
(c) The Contractor shall submit complete termination inventory schedules no later than
120 days from the effective date of termination, unless extended in writing by the
Contracting Officer upon written request of the Contractor within this 120-day period.
(d) After expiration of the plant clearance period as defined in subpart 49.001 of the
Federal Acquisition Regulation, the Contractor may submit to the Contracting Officer a
list, certified as to quantity and quality, of termination inventory not previously disposed
of, excluding items authorized for disposition by the Contracting Officer. The Contractor
may request the Government to remove those items or enter into an agreement for their
storage. Within 15 days, the Government will accept title to those items and remove them
or enter into a storage agreement. The Contracting Officer may verify the list upon
removal of the items, or if stored, within 45 days from submission of the list, and shall
correct the list, as necessary, before final settlement.
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421D6F61E8
(e) After termination, the Contractor shall submit a final termination settlement proposal
to the Contracting Officer in the form and with the certification prescribed by the
Contracting Officer. The Contractor shall submit the proposal promptly, but no later than
1 year from the effective date of termination, unless extended in writing by the Contracting
Officer upon written request of the Contractor within this 1-year period. However, if the
Contracting Officer determines that the facts justify it, a termination settlement proposal
may be received and acted on after 1 year or any extension. If the Contractor fails to
submit the proposal within the time allowed, the Contracting Officer may determine, on
the basis of information available, the amount, if any, due the Contractor because of the
termination and shall pay the amount determined.
(f) Subject to paragraph (e) of this clause, the Contractor and the Contracting Officer may
agree upon the whole or any part of the amount to be paid or remaining to be paid
because of the termination. The amount may include a reasonable allowance for profit on
work done. However, the agreed amount, whether under this paragraph (f) or paragraph
(g) of this clause, exclusive of costs shown in subparagraph (g)(3) of this clause, may not
exceed the total contract price as reduced by (1) the amount of payments previously made
and (2) the contract price of work not terminated. The contract shall be modified, and the
Contractor paid the agreed amount. Paragraph (g) of this clause shall not limit, restrict, or
affect the amount that may be agreed upon to be paid under this paragraph.
(g) If the Contractor and the Contracting Officer fail to agree on the whole amount to be
paid because of the termination of work, the Contracting Officer shall pay the Contractor
the amounts determined by the Contracting Officer as follows, but without duplication of
any amounts agreed on under paragraph (f) of this clause:
(1) The contract price for completed supplies or services accepted by the Government (or
sold or acquired under subparagraph (b)(9) of this clause) not previously paid for,
adjusted for any saving of freight and other charges.
(2) The total of -
(i) The costs incurred in the performance of the work terminated, including initial costs
and preparatory expense allocable thereto, but excluding any costs attributable to
supplies or services paid or to be paid under subparagraph (g)(1) of this clause;
(ii) The cost of settling and paying termination settlement proposals under terminated
subcontracts that are properly chargeable to the terminated portion of the contract if not
included in subdivision (g)(2)(i) of this clause; and
(iii) A sum, as profit on subdivision (g)(2)(i) of this clause, determined by the Contracting
Officer under 49.202 of the Federal Acquisition Regulation, in effect on the date of this
contract, to be fair and reasonable; however, if it appears that the Contractor would have
sustained a loss on the entire contract had it been completed, the Contracting Officer
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421D6F61E8
shall allow no profit under this subdivision (iii) and shall reduce the settlement to reflect
the indicated rate of loss.
(3) The reasonable costs of settlement of the work terminated, including -
(i) Accounting, legal, clerical, and other expenses reasonably necessary for the
preparation of termination settlement proposals and supporting data;
(ii) The termination and settlement of subcontracts (excluding the amounts of such
settlements); and
(iii) Storage, transportation, and other costs incurred, reasonably necessary for the
preservation, protection, or disposition of the termination inventory.
(h) Except for normal spoilage, and except to the extent that the Government expressly
assumed the risk of Toss, the Contracting Officer shall exclude from the amounts payable
to the Contractor under paragraph (g) of this clause, the fair value as determined by the
Contracting Officer, for the loss of the Government property.
(i) The cost principles and procedures of part 31 of the Federal Acquisition Regulation, in
effect on the date of this contract, shall govern all costs claimed, agreed to, or determined
under this clause.
(j) The Contractor shall have the right of appeal, under the Disputes clause, from any
determination made by the Contracting Officer under paragraph (e), (g), or (I) of this
clause, except that if the Contractor failed to submit the termination settlement proposal
or request for equitable adjustment within the time provided in paragraph (e) or (I),
respectively, and failed to request a time extension, there is no right of appeal.
(k) In arriving at the amount due the Contractor under this clause, there shall be deducted
(1) All unliquidated advance or other payments to the Contractor under the terminated
portion of this contract;
(2) Any claim which the Government has against the Contractor under this contract; and
(3) The agreed price for, or the proceeds of sale of, materials, supplies, or other things
acquired by the Contractor or sold under the provisions of this clause and not recovered
by or credited to the Government.
(I) If the termination is partial, the Contractor may file a proposal with the Contracting
Officer for an equitable adjustment of the price(s) of the continued portion of the contract.
The Contracting Officer shall make any equitable adjustment agreed upon. Any proposal
by the Contractor for an equitable adjustment under this clause shall be requested within
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421 D6F61 E8
90 days from the effective date of termination unless extended in writing by the
Contracting Officer.
(m)
(1) The Government may, under the terms and conditions it prescribes, make partial
payments and payments against costs incurred by the Contractor for the terminated
portion of the contract, if the Contracting Officer believes the total of these payments will
not exceed the amount to which the Contractor will be entitled.
(2) If the total payments exceed the amount finally determined to be due, the Contractor
shall repay the excess to the Government upon demand, together with interest computed
at the rate established by the Secretary of the Treasury under 50 U.S.C. App. 1215(b)(2).
Interest shall be computed for the period from the date the excess payment is received
by the Contractor to the date the excess is repaid. Interest shall not be charged on any
excess payment due to a reduction in the Contractor's termination settlement proposal
because of retention or other disposition of termination inventory until 10 days after the
date of the retention or disposition, or a later date determined by the Contracting Officer
because of the circumstances.
(n) Unless otherwise provided in this contract or by statute, the Contractor shall maintain
all records and documents relating to the terminated portion of this contract for 3 years
after final settlement. This includes all books and other evidence bearing on the
Contractor's costs and expenses under this contract. The Contractor shall make these
records and documents available to the Government, at the Contractor's office, at all
reasonable times, without any direct charge. If approved by the Contracting Officer,
photographs, microphotographs, or other authentic reproductions may be maintained
instead of original records and documents.
Reference: 48 CFR 52.249; 2 CFR § 200 Appendix II(B)
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421D6F61E8
CERTIFICATION REGARDING LOBBYING
Exhibit C
(3)
CERTIFICATION FOR CONTRACTS, GRANTS, LOANS,
AND COOPERATIVE AGREEMENTS
The undersigned certifies, to the best of his or her knowledge and belief, that
(1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the
undersigned, to any person for influencing or attempting to influence an officer or
employee of an agency, a Member of Congress, an officer or employee of Congress, or
an employee of a Member of Congress in connection with the awarding of any Federal
contract, the making of any Federal grant, the making of any Federal loan, the entering
into of any cooperative agreement, and the extension, continuation, renewal,
amendment, or modification of any Federal contract, grant, loan, or cooperative
agreement.
(2) If any funds other than Federal appropriated funds have been paid or will be paid to any
person for influencing or attempting to influence an officer or employee of any agency,
a Member of Congress, an officer or employee of Congress, or an employee of a
Member of Congress in connection with this Federal contract, grant, loan, or cooperative
agreement, the undersigned shall complete and submit Standard Form- LLL,
"Disclosure Form to Report Lobbying," in accordance with its instructions..
The undersigned shall require that the language of this certification be included in the
award documents for all subawards at all tiers (including subcontracts, subgrants, and
contracts under grants, loans, and cooperative agreements) and that all subrecipients
shall certify and disclose accordingly.
This certification is a material representation of fact upon which reliance was placed when
this transaction was made or entered into. Submission of this certification is a prerequisite
for making or entering into this transaction imposed by 31, U.S.C. § 1352 (as amended by
the Lobbying Disclosure Act of 1995). Any person who fails to file the required certification
shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for
each such failure.
The Contractor, , certifies or affirms the truthfulness and
accuracy of each statement of its certification and disclosure, if any. In addition, the
Contractor understands and agrees that the provisions of 31 U.S.C. § 3801 et seq., apply
to this certification and disclosure, if any.
Signature of Contractor's Authorized Official
Name and Title of Contractor's Authorized Official
Date
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421D6F61E8
0 EXCELLENCE IN GENERAL CONTRACTING
March 2, 2021
Melissa Sullinger
Risk Manager City of Pearland
3519 Liberty Dr.,
Pearland, TX 77581
E CONTRACTORS
RE: Pearland Emergency Work Shadow Creek Sport Complex
Dear Mrs. Sullinger,
E Contractors is pleased to provide the following cost to date pricing for the above reference
project.
Scope of Work
Plumbing scope
• Repair 2-3/4" copper leaks in wall.
• Repair 2- 1/2" copper 90'elbow fitting leaks in wall at mop sinks.
• Repair 5- 3/4" copper leaks in attic
• Reinsulate approximately 60 feet of water pipe.
• replace mixing valves under sinks (7).
• Chicago faucet stems replaced on all faucets (7).
Drywall & Ceiling Repair Scope
• Mobilize all equipment, crew, and materials to jobsite.
• Demo existing CMU to allow access for plumbers.
• Re -install CMU to existing conditions.
Time of Construction
• Total Construction Timeframe: 3 Weeks
o Pre -Construction Phase 0 week
o Material Lead Time 1 weeks
o Construction Phase 2 Weeks
o Post Construction Phase 0 week
16554 Creek Bend Drive, Suite 200. Sugar Land, Texas 77478
T: 713-493-2500 I F: 713-493-2501
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421D6F61E8
0 EXCELLENCE IN GENERAL CONTRACTING
E CONTRACTORS
Pricing for scope of work is as follows of the total project:
Cost to date
Permit Cost including
$ 9,150.00.
$ 0.00.
Total $ 9,150.00
E Contractors is available for review of this estimate at your convenience. Please feel free to
contact me at 281-908-5790 or by email at emckinzie@econtractors.com.
Sincerely,
Weil
Ed McKinzie
Project Manager
Attachments:
RS Means Estimate
Detailed drawing
16554 Creek Bend Drive, Suite 200. Sugar Land, Texas 77478
T: 713-493-2500 I F: 713-493-2501
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421D6F61E8
16 EXCELLENCE IN GENERAL CONTRACTING
March 2, 2021
Melissa Sullinger
Risk Manager City of Pearland
3519 Liberty Dr.,
Pearland, TX 77581
E CONTRACTORS
RE: Pearland Emergency Work Hickory Slough Sport Complex
Dear Mrs. Sullinger,
E Contractors is pleased to provide the following cost to date pricing for the above reference
project.
Scope of Work
Plumbing scope
• Repair (14) copper water links in attic
• Repair copper line feeding 3 compartment sink.
• Replace metering assembly on (2) drinking fountains and (1) lay.
• Capped (2) leaking wall hydrants.
• Repair 6" irrigation leak underground at front entrance
• Patch and repair concrete.
• Provide backhoe for excavating of trench to locate damaged pipe.
• Repaint walls at front entrance to match existing.
• Repaired an additional Leak (1) in CMU wall
• Replace and additional 2 metering assembly on lav faucets.
• Replace 2 stem on hose bibs.
• Replace approximately 10 LF of pipe insulation.
Drywall & Ceiling Repair Scope
• Mobilize all equipment, crew, and materials to jobsite.
• Demo existing CMU to allow access for plumbers.
• Re -install CMU to existing conditions.
• Due to waterlines breaking at different time had to remobilize to project (3) different
times.
16554 Creek Bend Drive, Suite 200. Sugar Land, Texas 77478
T: 713-493-2500 I F: 713-493-2501
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421 D6F61 E8
0 EXCELLENCE IN GENERAL CONTRACTING
Time of Construction
E CONTRACTORS
• Total Construction Timeframe: 3 Weeks
o Pre -Construction Phase 0 week
o Material Lead Time 1 weeks
o Construction Phase 2 Weeks
o Post Construction Phase 0 week
Pricing for scope of work is as follows of the total project:
Cost to date
Permit Cost including
$ 17,541.00.
$ 0.00.
Total $ 17,541.00
E Contractors is available for review of this estimate at your convenience. Please feel free to
contact me at 281-908-5790 or by email at emckinzieecontractors.com.
Sincerely,
Ced�ciLc�ire
Ed McKinzie
Project Manager
Attachments:
RS Means Estimate
Detailed drawing
16554 Creek Bend Drive, Suite 200. Sugar Land, Texas 77478
T: 713-493-2500 I F: 713-493-2501
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421D6F61E8
0 EXCELLENCE IN GENERAL CONTRACTING
March 2, 2021
Melissa Sullinger
Risk Manager City of Pearland
3519 Liberty Dr.,
Pearland, TX 77581
E CONTRACTORS
RE: Pearland Emergency Work Knapp Senior Center
Dear Mrs. Sullinger,
E Contractors is pleased to provide the following cost to date pricing for the above reference
project.
Scope of Work
Plumbing scope
• Repair 3/" copper line above ceiling at two locations.
• Repair water line under sink inn restroom
• Replace (1) faucet.
Drywall & Ceiling Repair Scope
• Mobilize all equipment, crew, and materials to jobsite.
• Demo water damaged drywall and insulation
• Furnish and set dehumidifiers and blowers for 4 days.
• Install insulation and drywall where previously removed.
• Tape, float, and paint all affected areas.
• Provide and install 4 cases of ceiling tile.
Flooring Scope
• Demo of existing floor at main entrance lobby past the treadmills at corner
• Install new VCT flooring match as close as possible and replace 4.5" rubber base.
• Prepped existing slab for new VCT.
16554 Creek Bend Drive, Suite 200. Sugar Land, Texas 77478
T: 713-493-2500 I F: 713-493-2501
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421D6F61E8
0 EXCELLENCE IN GENERAL CONTRACTING
Electrical Scope
E CONTRACTORS
• Remove (5) 2'x 4' lay in fixtures.
• Install (5) new LED 2'x 4' light fixtures.
• Remove and replace (2) occupancy switch sensor.
Fire Alarms Scope
• Replace one smoke and one strobe in each of the two restrooms (Men's and
women's)
• Re -Run circuit cable and tie in back at the FACP or NAC/SLC circuit
• Program in the new smoke detectors on the existing FACP
• Test system and note any other issues on the system.
• At the time we did our walk thru, there was a comm failure message on the
panel. We will need the phone lines fixed prior to coming out. We will also
need the monitoring center's number for testing.
Final Clean Scope
• Final all work areas
• Apply (4) costs of wax to new VCT.
Time of Construction
• Total Construction Timeframe: 4 Weeks
o Pre -Construction Phase 0 week
o Material Lead Time 1 weeks
o Construction Phase 3 Weeks
o Post Construction Phase 0 week
Pricing for scope of work is as follows of the total project:
Cost to date
Permit Cost including
$ 46,015.00.
$ 0.00.
Total $ 46,015.00
16554 Creek Bend Drive, Suite 200. Sugar Land, Texas 77478
T: 713-493-2500 I F: 713-493-2501
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421D6F61E8
0 EXCELLENCE IN GENERAL CONTRACTING
E CONTRACTORS
E Contractors is available for review of this estimate at your convenience. Please feel free to
contact me at 281-908-5790 or by email at emckinzieecontractors.com.
Sincerely,
cec l �i jre
Ed McKinzie
Project Manager
16554 Creek Bend Drive, Suite 200. Sugar Land, Texas 77478
T: 713-493-2500 I F: 713-493-2501
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421D6F61E8
0 EXCELLENCE IN GENERAL CONTRACTING
March 2, 2021
Melissa Sullinger
Risk Manager City of Pearland
3519 Liberty Dr.,
Pearland, TX 77581
E CONTRACTORS
RE: Pearland Emergency Work Animal Shelter
Dear Mrs. Sullinger,
E Contractors is pleased to provide the following cost to date pricing for the above reference
project.
Scope of Work
Plumbing scope
• Repair'/" PVC piping at front entrance above ceiling.
• Repair copper line'/" at back of building.
• Remove and replace (1) backflow device.
• Remove and replace (1) faucet.
Drywall & Ceiling Repair Scope
• Remove ceiling tile and insulation.
• Replace ceiling tile at front entrance.
• Replace insulation above ceiling at front entrance.
• Replace corner column due to water damage.
• Repaint walls at front entrance to match existing.
Flooring Scope
• Demo of existing floor in front of reception desk and remove base.
• Install new LVT flooring match as close as possible and replace 4" rubber base.
Electrical Scope
• Remove (2) 2'x 4' lay in fixtures.
• Install (2) new LED 2'x 4' light fixtures.
16554 Creek Bend Drive, Suite 200. Sugar Land, Texas 77478
T: 713-493-2500 I F: 713-493-2501
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421D6F61E8
0 EXCELLENCE IN GENERAL CONTRACTING
Time of Construction
E CONTRACTORS
• Total Construction Timeframe:
o Pre -Construction Phase
o Material Lead Time
o Construction Phase
o Post Construction Phase
3 Weeks
0 week
1 weeks
2 Weeks
0 week
Pricing for scope of work is as follows of the total project:
Cost to date
Permit Cost including
$ 12037.00.
$ 0.00.
Total $ 12,037.00
E Contractors is available for review of this estimate at your convenience. Please feel free to
contact me at 281-908-5790 or by email at emckinzieecontractors.com.
Sincerely,
Ed McKinzie
Project Manager
Attachments:
RS Means Estimate
Detailed drawing
16554 Creek Bend Drive, Suite 200. Sugar Land, Texas 77478
T: 713-493-2500 I F: 713-493-2501
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421 D6F61 E8
0 EXCELLENCE IN GENERAL CONTRACTING
March 2, 2021
Melissa Sullinger
Risk Manager City of Pearland
3519 Liberty Dr.,
Pearland, TX 77581
E CONTRACTORS
RE: Pearland Emergency Work Natatorium
Dear Mrs. Sullinger,
E Contractors is pleased to provide a cost to date proposal, for the above reference project.
Scope of Work
Plumbing scope
• Repair copper Tine 3/4" feeding eye wash.
Drywall & Ceiling Repair Scope
• Mobilize all equipment, crew, and materials to jobsite.
• Demo existing upper cabinets in kitchen area
• Provide 1 case of ceiling tile for kitchen area.
• Paint existing CMU wall where cabinets were removed.
• Remove and replace damaged ceiling tile in natatorium area (2 Cases).
Time of Construction
• Total Construction Timeframe: 3 Days
o Pre -Construction Phase 0 week
o Material Lead Time 0 weeks
o Construction Phase 3 Days
o Post Construction Phase 0 week
16554 Creek Bend Drive, Suite 200. Sugar Land, Texas 77478
T: 713-493-2500 I F: 713-493-2501
DocuSign Envelope ID: 004D3E19-0906-4CF5-87DD-A5421 D6F61 E8
0 EXCELLENCE IN GENERAL CONTRACTING
E CONTRACTORS
Pricing for scope of work is as follows of the total project:
Cost to date
Permit Cost including
$ 2,225.00.
$ 0.00.
Total $ 2,225.00
E Contractors is available for review of this estimate at your convenience. Please feel free to
contact me at 281-908-5790 or by email at emckinzie(c�econtractors.com.
Sincerely,
weal J12c 5-e
Ed McKinzie
Project Manager
16554 Creek Bend Drive, Suite 200. Sugar Land, Texas 77478
T: 713-493-2500 I F: 713-493-2501
0
EXCELLENCE IN GENERAL CONTRACTING
April 27, 2021
Melissa Sullinger
Risk Manager City of Pearland
3519 Liberty Dr.,
Pearland, TX 77581
E CONTRACTORS
RE: Pearland Emergency Work Fire Station 2
Dear Mrs. Sullinger,
Rev #1
E Contractors is pleased to provide the following cost to date pricing for the above reference
project.
Scope of Work
Plumbing scope
• Repair 'A" waterline at (1) outside faucets.
Drywall & Ceiling Repair Scope
• Remove and reinstall block and brick work after outside faucets have been repaired.
• Repaint back side of CMU wall after CMU block has been patched in due to plumbing
repairs.
Fire Alarm Scope
• Replace fire alarm panel and run new circuits.
• Run test on fire alarms throughout fire station.
• Check smoke detectors in duct work, & throughout fire station.
• Get Fire Marshall to sign off on new system (inspection)
16554 Creek Bend Drive, Suite 200. Sugar Land, Texas 77478
T: 713-493-2500 I F: 713-493-2501
0
EXCELLENCE IN GENERAL CONTRACTING
E CONTRACTORS
Electrical Scope
• Repair or replace under counter lights in kitchen.
• Replace building surge protector in electrical room.
• Check all circuits at every receptacle.
• Run circuit test from AC equipment to panel to determine adequate power to AC
equipment.
• Run circuit test to all kitchen equipment (dishwasher, Stove, refrigerator, Coffee maker.
& microwave).
• Noted that the transfer switch was damaged but suggest that Pearland take care of this
issue when making repairs to the existing emergency generator. We just ran test on that
equipment.
Overhead Doors Scope
• Per the Captain at the Fire Station list of items to be repaired
a. Set up to run test and to find out what the issues might be with overhead doors.
b. Blown circuit boards might need to be replace. (Was not the issue)
c. Add price to replace all operators for overhead doors CO 3 wait for approval.
(PENDING)
HVAC Scope
• Had Climatex come out to work on BAS controls for HVAC.
MISC Sub Work Scope
• Had C& K come out to run test on Anzil system.
• Had to get someone out to run test on dishwasher.
• Sub to come out to test on Stove.
• Sub to come out to run test on ice machine and made repairs.
• Sub to come out and check out refrigerator and made some repairs.
Time of Construction
• Total Construction Timeframe: 8 Weeks
o Pre -Construction Phase 0 week
o Material Lead Time 3 weeks
o Construction Phase 4 Weeks
o Post Construction Phase 1 week
16554 Creek Bend Drive, Suite 200. Sugar Land, Texas 77478
T: 713-493-2500 I F: 713-493-2501
EXCELLENCE IN GENERAL CONTRACTING
0
E CONTRACTORS
Pricing for scope of work is as follows of the total project:
RS Means Estimate
Houston CCI .869
Buy -Board Coefficient
Sub Total
Bond
Total (rounded)
$ 103,886.92
$ (13,609.19)
$ (25,277.77)
$ 64,999.97
$ 0.00
$ 65,000.00
E Contractors is available for review of this estimate at your convenience. Please feel free to
contact me at 281-908-5790 or by email at emckinzie(c�econtractors.com.
Sincerely,
6ed 7� e
Ed McKinzie
Project Manager
Attachments:
Letter from Jack Johnson
16554 Creek Bend Drive, Suite 200. Sugar Land, Texas 77478
T: 713-493-2500 I F: 713-493-2501
COP FIRE STATION 2 REPAIRS REV 1
6050 FITE RD
PEARLAND TEXAS
Data Release : Year 2021 Quarter 1
Unit Cost Estimate
Quantity
LineNumber
Description
Unit
Ext. Mat.
O&P
Ext.
Labor O&P
Ext.
Equip. O&P
Ext.
Total O&P
Notes
0.5
013113200160
Field personnel, general purpose
laborer, average
Week
$ -
$ 1,412.50
$ -
$ 1,412.50
labor for sawcutting
and cleaning up each
time, final clean of
blocks to reset
NJAC
1.5
013113200200
Field personnel, project manager,
average
Week
$ -
$ 6,000.00
$ -
$ 6,000.00
3
013113200260
Field personnel, superintendent,
average
Week
$ -
$ 11,175.00
$ -
$ 11,175.00
3
015433400030
Rent aerial lift, scissor type, to 30'
high, 1200 Ib. capacity, electric, Incl.
Hourly Oper. Cost.
Week
$ -
$ -
$ 2,830.74
$ 2,830.74
1
015433400040
Rent aerial lift, scissor type, over 30'
high, 1500 Ib. capacity, electric, Incl.
Hourly Oper. Cost.
Week
$ -
$ -
$ 1,180.30
$ 1,180.30
12
015436501300
Mobilization or demobilization, delivery
charge for equipment, hauled on 3-ton
capacity towed trailer
Ea.
$ -
$ 3,120.00
$ 1,224.00
$ 4,344.00
MOB FOR 6
CONTRACTORS FOR
EMERGENCY WORK
120
019313161030
Electrical facilities maintenance,
distribution systems and equipment,
reset breaker or replace fuse
Ea.
$ -
$ 4,680.00
$ -
$ 4,680.00
WORK CHECKING
OUT BREAKERS IN
ELECTRICAL PANEL
AND RESETTING 2
TIMES EACH
8
019313163080
Electrical facilities maintenance,
motors and generators, megger test
motor windings
Ea.
$ -
$ 1,176.00
$ -
$ 1,176.00
2
024119190800
Selective demolition, rubbish handling,
dumpster, 30 C.Y., 7 ton capacity,
weekly rental, includes one dump per
week, cost to be added to demolition
cost
Week
$ 1,600.00
$ -
$ -
$ 1,600.00
40
024119192045
Selective demolition, rubbish handling,
0'-100' haul, load, haul, dump and
return, wheeled, cost to be added to
demolition cost
C.Y.
$ -
$ 1,820.00
$ -
$ 1,820.00
40
024119192085
Selective demolition, rubbish handling,
haul and return, add per each extra
100' haul, wheeled, cost to be added to
demolition cost
C.Y.
$ -
$ 840.00
$ -
$ 840.00
192
040120400050
Sawing masonry, brick or block, by
hand, per inch depth
L.F.
$ 9.60
$ 867.84
$ 192.00
$ 1,069.44
SAW CUTTING OF
WALLS TO GET TO
PLUBING LEAKS
NJAC
24
040120500720
Toothing masonry, blockwork, hard
mortar
V.L.F.
$ -
$ 271.20
$ -
$ 271.20
24
040505100360
Selective demolition, masonry,
concrete block walls, unreinforced, 12"
thick
S.F.
$ -
$ 28.56
$ -
$ 28.56
200
099123722100
Paints & coatings, walls & ceilings,
interior, masonry or concrete block,
latex paint, smooth finish, brushwork
S.F.
$ 34.00
$ 118.00
$ -
$ 152.00
100
099123724000
Paints & coatings, walls & ceilings,
interior, masonry or concrete block,
block filler, 1 coat, brushwork
S.F.
$ 15.00
$ 138.00
$ -
$ 153.00
1
220505109420
Water heater, 250 thru 756 GPH,
selective demolition
Ea.
$ -
$ 940.00
$ -
$ 940.00
DEMO EXISTING
WATER HEATER
1
220523205650
Valves, bronze, relief, pressure &
temperature, self -closing, threaded, 1",
ASME
Ea.
$ 470.00
$ 35.00
$ -
$ 505.00
20
220719107100
Insulation, pipe covering (price copper
tube one size less than I.P.S.),
fiberglass with all service jacket, 1-1/2"
wall, 3/4" iron pipe size
L.F.
$ 56.20
$ 126.00
$ -
$ 182.20
25
220719107140
Insulation, pipe covering (price copper
tube one size less than I.P.S.),
fiberglass with all service jacket, 1-1/2"
wall, 2" iron pipe size
L.F.
$ 95.75
$ 182.50
$ -
$ 278.25
PIPE INSULATION
FOR NEW WATER
PIPE AT HEATER
20
221113232180
Pipe, copper, tubing, solder, 3/4"
diameter, type L, includes coupling &
clevis hanger assembly 10' OC
L.F.
$ 67.00
$ 220.00
$ -
$ 287.00
20
221113232200
Pipe, copper, tubing, solder, 1"
diameter, type L, includes coupling &
clevis hanger assembly 10' OC
L.F.
$ 78.00
$ 246.00
$ -
$ 324.00
DRAIN PIPE FOR
RELIEF VALVE TO
DRAIN
20
221113232260
Pipe, copper, tubing, solder, 2"
diameter, type L, includes coupling &
clevis hanger assembly 10' OC
L.F.
$ 253.00
$ 398.00
$ -
$ 651.00
NEW COPPER FOR
WATER HEATER
4
221113250120
Elbow, 90 Deg., copper, wrought,
copper x copper, 3/4"
Ea.
$ 17.12
$ 176.00
$ -
$ 193.12
4
221113250130
Elbow, 90 Deg., copper, wrought,
copper x copper, 1"
Ea.
$ 42.00
$ 208.00
$ -
$ 250.00
6
221113250160
Elbow, 90 Deg., copper, wrought,
copper x copper, 2"
Ea.
$ 264.00
$ 456.00
$ -
$ 720.00
2
221113250700
Coupling, copper, wrought, copper x
copper, 3/4"
Ea.
$ 8.48
$ 80.00
$ -
$ 88.48
FITTINGS FOR
LEAKING WATER
LINE IN WALL TO
HOSE BIB
2
221113250940
Union, copper, cast, copper x copper,
2"
Ea.
$ 554.00
$ 167.00
$ -
$ 721.00
UNIONS FOR WATER
HEATER
1
230505109000
HVAC, selective demolition, minimum
labor/equipment charge
Job
$ -
$ 785.00
$ -
$ 785.00
REMOVE OLD
ANSUL SYSTEM
1
230593500140
Pipe testing, nondestructive hydraulic
pressure test, isolate, 1 hour hold, 1"
to 4" pipe, 0-250 LF
Ea.
$ -
$ 635.00
$ -
$ 635.00
HYDRO TEST FOR
ANSUL SYSTEM
1
233813107952
Hood fire protection system, gas stove,
commercial kitchen equipment
Ea.
$ 2,600.00
$ 500.00
$ -
$ 3,100.00
11
260505257510
Computer regulator transformer, single
phase, 240 V, 0.5 kVAR, electrical
demolition, remove
Ea.
$ -
$ 1,012.00
$ -
$ 1,012.00
DEMO CONTROL
TRANSFORMER IN
OVERHEAD DOOR
CABINET MINERS
13
260505257550
Computer regulator transformer, single
phase, plug-in unit, 120 V, 1 kVAR,
electrical demolition, remove
Ea.
$ -
$ 598.00
$ -
$ 598.00
1
260505257830
Transient voltage suppressor
transformer, single phase, 115 or 220
V, 14.4 kVA, electrical demolition,
remove
Ea.
$ -
$ 77.00
$ -
$ 77.00
200KA / 14.4KVA =
13.88
16
260505505000
Ballast, fluorescent fixture, electrical
demolition, remove
Ea.
$ -
$ 520.00
$ -
$ 520.00
16
260505506010
Fluorescent lamp, electrical demolition,
remove
Ea.
$ -
$ 62.56
$ -
$ 62.56
2
260923100160
Lighting devices, daylighting sensor,
manual control, ceiling mounted
Ea.
$ 300.00
$ 224.00
$ -
$ 524.00
6
260923100400
Lighting devices, remote power pack
Ea.
$ 246.00
$ 471.00
$ -
$ 717.00
REPLACE MINI
POWER PACKS FOR
LIGHTING
10
262213300200
Transformer, isolation, single phase
120/240 V primary 120/240 V
secondary, 0.50 kVA
Ea.
$ 4,750.00
$ 1,960.00
$ -
$ 6,710.00
NEW CONTROL
TRANSFORMERS
FOR OVERHEAD
DOOR MOTOR
CONTROL. MINERS
13
262213300200
Transformer, isolation, single phase
120/240 V primary 120/240 V
secondary, 0.50 kVA
Ea.
$ 6,175.00
$ 2,548.00
$ -
$ 8,723.00
change out
transformers in
ventilation equipment
tejas elec
1
262726104200
Low voltage switching, transformer, low
voltage switching, 115 V to 25 V
Ea.
$ 139.00
$ 65.00
$ -
$ 204.00
TRANSFORMER TO
REPLACE ONE FOR
EXHAUST FAN
CIRCUIT C&K
36
262813103850
Fustat, 120 V, 0.3 to 14 amp
Ea.
$ 345.60
$ 563.40
$ -
$ 909.00
1
262913101600
Contactors, magnetic with auxiliary
contact, 18 amp, size 0, NEMA 1
Ea.
$ 252.00
$ 196.00
$ -
$ 448.00
CONTACTOR FOR
EXHAUST FAN THAT
WAS FRIED C&K
MECHANICAL ELECT
3
263526400160
Transient voltage suppressor
transformer, single phase, 240 V, 7.2
kVA
Ea.
$ 12,375.00
$ 588.00
$ -
$ 12,963.00
2
265113506900
Fluorescent fixture, interior, mirror
light, acrylic enclosure, R.S., 2-40 W,
incl lamps, mounting hardware and
connections
Ea.
$ 256.00
$ 196.00
$ -
$ 452.00
REPLACE EXISTING
UNDER COUNTER
FIXTURES 2 ROOMS
16
265113507540
Ballast, replacement, interior lighting
fixtures, fluorescent, w/ reducer, two 40
W, 2 to 5 lbs, to 15' high
Ea.
$ 1,208.00
$ 1,336.00
$ -
$ 2,544.00
8
265113507690
Emergency ballast, material only,
interior, factory installed in fixture
Ea.
$ 1,328.00
$ -
$ -
$ 1,328.00
16
266123550525
LED lamp, 12 W LED, A19 lamp,
dimmable, equal to 75 W
Ea.
$ 121.60
$ 89.60
$ -
$ 211.20
REPLACE FIXTURE
LAMPS TEJAS
2
271501191900
Fire alarm cable, FEP teflon, 150 V, to
200 Deq.C, #18, 2 pair
C.L.F.
$ 588.00
$ 240.00
$ -
$ 828.00
1
275119104800
House phone, amplifier or power
supply, excl rough -in wires, cables &
conduits
Ea.
$ 920.00
$ 148.00
$ -
$ 1,068.00
POWER SUPPLY
FOR CONTROL
SYSTEM, EXISTING
GOT FRIED
1
280505101270
Fire alarm control panel, 12 to 16 zone,
electrical demolition, remove
Ea.
$ -
$ 585.00
$ -
$ 585.00
1
280505101290
Fire alarm annunciation panel, 12 to 16
zone, electrical demolition, remove
Ea.
$ -
$ 261.00
$ -
$ 261.00
1
284620504160
Detection system, fire alarm control
panel, addressable without voice, up to
200 points, excluding wires & conduits
Ea.
$ 2,150.00
$ 1,375.00
$ -
$ 3,525.00
1
284620504200
Detection system, fire alarm control
panel, battery & rack, excluding wires
& conduits
Ea.
$ 510.00
$ 196.00
$ -
$ 706.00
1
284620504400
Detection system, fire alarm control
panel, battery & rack, automatic
charger, excluding wires & conduits
Ea.
$ 580.00
$ 98.00
$ -
$ 678.00
1
284620505425
Detection system, duct smoke and
heat detector 2 wire
Ea.
$ 170.00
$ 98.00
$ -
$ 268.00
FIRE SMOKE
DETECTOR FOR
HOOD
1
284620508000
Detection system, remote annunciator,
12 zone lamp, excluding wires &
conduits
Ea.
$ 475.00
$ 600.00
$ -
$ 1,075.00
10
ELEC-
CONTROL CONTACTOR
ELECTRICIAN TRACING OUT
PROBLEMS WITH SYSTEM
Hr.
$ -
$ 978.50
$ -
$ 978.50
CONTROL
CONTRACTOR
ELECTRICIAN 14
HRS CLIMATEC AND
2 HRS C&K MECH
ELECTRICIANS
10
ELECTRICAN
EMERGENCY SERVICE CALL TO
FIND OUT WHAT WAS WRONG
MINERS
Hr.
$ -
$ 978.50
$ -
$ 978.50
FIND OUT WHAT
HAD HAPPENED TO
DOOR OPERATION
24
ELECTRICIAN
Electrician to verify damage to
electrical system
Hr.
$ -
$ 2,348.40
$ -
$ 2,348.40
9
SASH CHAINS
NEW SASH CHAIN PULLS
Ea.
$ 972.00
$ 1,125.00
$ -
$ 2,097.00
INSTALL NEW CHAIN
ON 9 DOOR
OPERATORS
21.41
Technician
FIRE ALARM INSTALLER AND
PROGRAMMER
Hr.
$ -
$ 2,094.97
$ -
$ 2,094.97
FIRE ALARM
PROGRAMMER
R S Means Estimate
Houston CCI .869
BuyBoard Coeffient .72
Sub Total
Bond
$ 103,886.92
$ (13,609.19)
$ (25,277.77)
$ 64,999.97
Grand Total $ 64,999.97
EXECUTION OF OFFER
The undersigned Proposer has carefully examined all instructions, requirements, specifications, terms and conditions
of this RFP and the Agreement and certifies:
1. It is a reputable company regularly engaged in providing goods and/or services necessary to meet the
requirements, specifications, terms and conditions of the RFP and the Agreement.
2. It has the necessary experience, knowledge, abilities, skills, and resources to satisfactorily perform the
requirements, specifications, terms and conditions of the RFP and the Agreement. Further, if awarded,
the Proposer agrees to perform the requirements, specifications, terms and conditions of the RFP and
the Agreement.
3. All statements, information, and representations prepared and submitted in response to this RFP are
current, complete, true, and accurate. Proposer acknowledges that HCDE will rely on such statements,
information, and representations in selecting the successful Proposer(s).
4. It is not currently barred or suspended from doing business with the Federal government, any of the
members represented, or any of their respective agencies.
5. It shall be bound by all statements, representations, warranties, and guarantees made in its proposal.
6. Submission of a proposal indicates the Proposer's acceptance of the evaluation technique and the
Proposer's recognition that some subjective judgments may be made by HCDE and its membership as
part of the evaluation.
7. That all of the requirements of this RFP and the Agreement have been read and understood. In addition,
compliance with all requirements, terms and conditions will be assumed by HCDE if not otherwise
noted in the proposal.
8. The individual signing below has authority to enter into this on behalf of Proposer.
9. Proposer acknowledges that the Agreement may be canceled if any conflict of interest or appearance of
a conflict of interest is discovered by HCDE.
10. This Agreement is subject to purchase orders duly authorized and executed by HCDE.
CORPORATE NAME:
E Contractors USA LLC
AUTHORIZED SIGNATURE:
PRINT NAME:
ii
TITLE:
Managing Member
DATE:
December 06, 2019
ADDRESS:
16554 Creek Bend Dr. Ste 200
CITY, STATE, ZIP CODE:
Sugar Land TX, 77478
PHONE:
713-493-2500
FAX: 1 713-493-2501
EMAIL ADDRESS:
rfp ;_, econtractors.com
WEBSITE URL
www.econtractors.com
This Section to be Completed by HCDE
Contract Number: 20/017MR-08 Term of contract: 02/26/2020 to 02/25/2021
Vendor shall honor all CPC Administrative Fees for any sales resulting from this Contract whether Vendor is awarded
a renewal or not.
Approved by Harris Count
Jesus J. Amezcu., PhD.,
Assistant Superi tendent:usin;. Services
ucat pn`
HCDE
I Complete before awarding or
enterine into contract
Harris County Department of Education
Choice Partners
CCCHOICE
PARTNERS
The R; hr Resourc: s Right Now
DETERMINATION OF COST OR PRICE ANALYSIS (REASONABLENESS)
Purpose: Federal regulations require documentation of cost analysis or price analysis for every procurement action at or above
$150,000 (see 2 C F R. § 200 323). The Determination of Cost or Price Reasonableness form is used to document the analysis
shoving that the offered price is fair and reasonable. The form is kept as part of the procurement file to demonstrate that the
procurement process was conducted in an open and fa r manner and that the D.stnct received the most advantageous price
Instructions
1. Complete a separate Determination of Cost or Price Reasonableness form for each vendor being recommended for contract
award. Comp ete all applicable sections accord ng to the instructions given An incomplete Determination of Cost or Price
Reasonableness form cannot be approved
2 Provide a detailed discussion of your price analysis or cost analysis. A Determination of Cost or Price Reasonableness form that
lacks sufficient detail cannot be approved
3 Sign in blue ink and date the form
4 Maintain a copy on the grant file subject to retention schedules
5. Submit completed form to the Director pr or to contract award
An improperly completed and/or unsigned form will be returned
Prepared by:M chae Robles___
Date: 01/29 2020
Email: mrobles@hcde-texas.org
Phone Number: 713-316-4254
Department: Choice Partners
Subject: Determination of Cost or Price Reasonableness
Good or service to be acquired: J0C Construction iD10
[Procurement Type, e.g., RFP, RFC)] #: 20/017MR JOC_
Independent Estimate Produced before Receiving Bids or Proposals: Yes (attach support ng docuTent(si i
Vendor: See Awarded Vendors
Amount: 200 Million
(Attach written quotation or other information that documents the estimate of cost or price reasonableness)
(As necessary include unit costs, rates, schedules, price estimates, and budgets, etc.)
1
*HCDE
cri CHOICE
PARTNERS
The Right n"e. cu es. Tcht iV w
I, Procurement Type
This expenditure of $150,000 or more is being made under one or more of the following (check those that apply and
attach supporting documentation):
For items A and B, please complete Section !! (Price Analysis)
A. 'Request for Proposals (or Competitive Sealed Proposals) for goods or services including construction services
B. 7 Competitive Bidding for goods or services including construction services
For items C - F, please complete Sections !!! (Cost Analysis) and IV (Profit)
C. i Competitive Bidding, Competitive Sealed Proposal. or Request for Proposals (where the solicitation is publically
posted) where only one (1) bid/proposal is rece ved
D. 0 Profess ona services (as defined under TEC 44.031(f) and/or Ch 2254 of the Tex. Gov't Code) where no pnce
competit on exists poor to select on
E. O Price adjustment to Purchase Order No _ or Contract No. (and already
procured under item A - )
F. ❑ Extension of an existing contract past its in tial term Contract extension s allowed under procurement method or
contract, if al owed by Board policy
Note: When using federal funds, Construction Manager -at -Risk or other Cost -Plus contracts are prohibited.
II. Price Analysis: If the expenditure is being made under items A or B in Section /(Procurement Type) above complete this
section. You are not required to complete Sections Ill or IV
Price offered is considered fair and reasonable for the following reason(s), and if applicable, is supported by attached
documentation and/or a detailed discussion of the price analysis (select at least one applicable situation):
O Comparison of previous district purchase order and contract prices with current proposed price for the same or similar
items. Both the validity of the comparison and the reasonableness of the previous price(s) have been established Attach
the referenced purchase orderslcontracts. amounts. issuance dates, and how they are similar to the current purchase.
/ Comparison with Vendor's published price lists, market prices, pricing indexes, and discount or rebate arrangements.
Attach published price list or other published pricing information used (a vendor's quotation or correspondence does not
qualify as a published price list).
O Comparison of proposed price with independent estimates, which were determined to be allowable under 2 C F.R. Part
200, Subpart E—Cost Principles. Attach estimates used.
O Comparison of proposed price with prices obtained through market research for the same or similar tems. Attach
documentation of research conducted.
O The order is priced in accordance with existing INSERT DISTRICT Purchase Order No. _ and/or
INSERT DISTRICT Contract No. which was competitively established.
O Other reason (specify and attach supporting documentation if applicable):
2
C CHOICE
PARTNERS
7."%7( cSOH..... ..
III. Cost Analysis: Complete this Section and attach a deta.ied breakdown of the vendor's proposed costs if you selected C-F
in Section 1 (Procurement Type), complete this Section and attach a detaibled breakdown of the vendor's proposed costs (e.g
labor materials profit reimbursable expenses).
After analyzing and verifying vendor's cost information, it is determined that each of the cost items listed by the
vendor is allocable, reasonable, necessary, and therefore, allowable in accordance with 2 C.F.R. Part 200, Subpart
E—Cost Principles for the following reason(s) (select at least one applicable situation and attach supporting
documentation and/or a detailed discussion of the cost analysis):
Compar son of costs proposed with actual costs previously incurred by the same vendor for the same or similar work.
- Comparison of costs proposed with actual costs of previous same or similar work performed by other vendors.
Comparison of costs proposed with previous cost estimates from the vendor or other vendors for the same or similar
items or work
Comparison of costs proposed with the District's independent estimate. which was determined to be allowab e under 2
C F.R Part 200 Subpart E—Cost Principles. Attach independent estimate.
- Compar son of costs proposed with the methods proposed by vendor with the requirements of the solicitation, i.e., do
the costs reflect the technical approach proposed and the work required?
❑ Verification that the costs proposed conforms to the appropriate set of cost principles.
❑ Verification of the accuracy of the cost and pricing Information submitted and evaluating the application of audited or pre -
negotiated (e.g by the Federal Goverment) indirect cost (e.g , overhead rates, labor and fringe benefit rates, or other
factors.
7 Verifcation of the accuracy of cost and pricing information proposed and evaluation of the effect of vendor's current
practices on future costs
Verification of the accuracy of the cost and pricing information submitted and evaluation of vendor's projected cost trends
Other reason (specify and attach supporting documentation if applicable:
IV. Profit: If you selected C - F in Section 1 (Procurement Type), complete this Section.
Negotiated profit amount {attach supporting documentation):
Profit negotiated is considered fair and reasonable for the following reasons, and is supported by attached
documentation andlor a detailed discussion of the cost or price analysis (you must complete each item below and
explain reasoning; attach additional pages and/or supporting documents if necessary):
Consideration of the complexity of the work to be performed
Consideration of the risk borne by the contractor
Consideration of the contractors investment
3
HCDE
•
C
CHOICE
PARTNERS
O Consideration of the amount of subcontracting.
• Consideration of the quality of contractor's record of past performance.
L' Consideration of industry profit rates in the surround ng geographical area for s milar work.
CERTIFICATION:
1 certify that the information provided above is Prue and correct to the best of my knowledge and belief I further certify that l have
determined that the costs or prices proposed are necessary, fair, and reasonable
_Michael Robles
FuIUName of Indi
APPROVED:
Jeff Dru
Level One: F
Signature
r of Cho ce Partners
Bill Monroe
Level Two: Full Name of Director of Purchas.ng
to
Signature
Date
Dr. Jesus Amezcua
Level Three: Ful Name of Assistant Superintendent for Business Services
Signature
4
Date
20/017MR JOC Construction IDIQ 1/29/2020
1
Coefficient for unit price book - RSMeans online
Supplier QTY UOM Price Extended Supplier Notes
Nash Industries, Inc. 1 EA $0.80 $0.80
a & i custom manufacturing Ilc 1 EA $0.80 $0.80 Bid .80 of Unit P
Tucker Construction (Jon Tucker 1 EA $0.82 $0.82
JC Stonewall Constructors, LP 1 EA $0.82 $0.82
JR Thomas Group, Inc. 1 EA $0.84 $0.84
Mart, Inc. 1 EA $0.85 $0.85
DivisionOne Construction LLC 1 EA $0.86 $0.86
Millennium Project Solutions, In 1 EA $0.86 $0.86
D & G Quality Roofing Inc. 1 EA $0.86 $0.86
SETEX Facilities & Maintenance, 1 EA $0.86 $0.86
Construction Masters of Housto 1 EA $0.88 $0.88
E Contractors LLC 1 EA $0.89 $0.89
Texas General Contractors, Inc. 1 EA $0.89 $0.89 Upon Award of t
Point Alliance Solutions 1 EA $0.90 $0.90
Honesty Construction Group (Fir 1 EA $0.90 $0.90
WestCo Ventures 1 EA $0.90 $0.90
Basic IDIQ 1 EA $0.90 $0.90
ERC Environmental & Construct 1 EA $0.90 $0.90
Tommy Klein Construction, Inc. 1 EA $0.92 $0.92
Texas Metal Roundup 1 EA $0.92 $0.92
BaseLine Paving & Construction 1 EA $0.92 $0.92
Prime Maintenance & Construct 1 EA $0.92 $0.92
Hallmark Mitigation & Construc.1 EA $0.92 $0.92
Horizon International Group, LL+ 1 EA $0.93 $0.93
CMST, LLC (Construction Manag 1 EA $0.94 $0.94
ML Deer Construction 1 EA $0.95 $0.95
CORE construction services of T. 1 EA $0.97 $0.97
F.H. Paschen, S.N.Nielsen & Ass( 1 EA $0.97 $0.97
Regiment Commercial Construc 1 EA $0.97 $0.97
Wylie Construction Services 1 EA $0.98 $0.98 .98 coefficient i
Vaughn Construction (J.T. Vaugt 1 EA $0.98 $0.98
TSG Industries (The Sithe Group 1 EA $0.98 $0.98
Belfor Property Restoration (BE 1 EA $1.00 $1.00
SW Elevators LLC 1 EA $1.00 $1.00
Cavalry Construction 1 EA $1.00 $1.00 Coefficient can t
FMG Construction Developmen 1 EA $1.02 $1.02
KR Allen Construction, LLC 1 EA $1.15 $1.15
Mooring Recovery Services 1 EA $1.18 $1.18
Chamberlin Roofing and Water 1 EA $1.43 $1.43
1 Reynolds & Co., Inc. 1 EA $65.00 $65.00
Coefficient for RSMeans online - after hours and overtime hours
Supplier QTY UOM Price Extended Supplier Notes
Nash Industries, Inc. 1 EA $0.84 $0.84
Tucker Construction (Jon Tucker 1 EA $0.86 $0.86
JC Stonewall Constructors, LP 1 EA $0.87 $0.87
JR Thomas Group, Inc. 1 EA $0.87 $0.87
E Contractors LLC 1 EA $0.89 $0.89
20/017MR Addendum 1 - Page 1
Texas General Contractors, Inc. 1 EA $0.89 $0.89
Honesty Construction Group (Mt 1 EA $0.90 $0.90 Overtime fees v
SETEX Facilities & Maintenance, 1 EA $0.90 $0.90
ERC Environmental & Construct 1 EA $0.90 $0.90
DivisionOne Construction LLC 1 EA $0.91 $0.91
Construction Masters of Housto 1 EA $0.92 $0.92
Tommy Klein Construction, Inc. 1 EA $0.94 $0.94
Point Alliance Solutions 1 EA $0.95 $0.95
WestCo Ventures 1 EA $0.95 $0.95
a & i custom manufacturing Ilc 1 EA $0.95 $0.95 Bid .95 of Unit P
Prime Maintenance & Construct 1 EA $0.96 $0.96
ML Deer Construction 1 EA $0.97 $0.97
Millennium Project Solutions, In 1 EA $0.97 $0.97
CMST, LLC (Construction Manag 1 EA $0.97 $0.97
Wylie Construction Services 1 EA $0.98 $0.98 .98 coefficient it
BaseLine Paving & Construction 1 EA $0.98 $0.98
Horizon International Group, at 1 EA $0.98 $0.98
Hallmark Mitigation & Construc 1 EA $0.99 $0.99
CORE construction services of T 1 EA $0.99 $0.99
SW Elevators LLC 1 EA $1.00 $1.00
Basic IDIQ 1 EA $1.00 $1.00
Texas Metal Roundup 1 EA $1.00 $1.00
F.H. Paschen, S.N.Nielsen & Ass( 1 EA $1.06 $1.06
FMG Construction Developmen' 1 EA $1.07 $1.07
TSG Industries (The Sithe Group 1 EA $1.08 $1.08
D & G Quality Roofing Inc. 1 EA $1.10 $1.10
Regiment Commercial Construc 1 EA $1.12 $1.12
KR Allen Construction, LLC 1 EA $1.15 $1.15
Vaughn Construction (J.T. Vaugt 1 EA $1.21 $1.21
Mart, Inc. 1 EA $1.26 $1.26
Mooring Recovery Services 1 EA $1.28 $1.28
Cavalry Construction 1 EA $1.50 $1.50 Coefficient is 1.0
Belfor Property Restoration (BE 1 EA $1.50 $1.50
Chamberlin Roofing and Watery 1 EA $1.50 $1.50
J Reynolds & Co., Inc. 1 EA $97.50 $97.50
Coefficient for National Construction Estimator book by Craftsman
Supplier QTY UOM Price Extended Supplier Notes
Horizon International Group, ail EA No Bid
Nash Industries, Inc. 1 EA No Bid
Tommy Klein Construction, Inc. 1 EA No Bid
Honesty Construction Group (H( 1 EA No Bid
Wylie Construction Services 1 EA No Bid
Basic IDIQ 1 EA No Bid
ERC Environmental & Construct 1 EA $0.90 $0.90
Point Alliance Solutions 1 EA $1.15 $1.15
WestCo Ventures 1 EA $1.15 $1.15
Construction Masters of Housto 1 EA $1.15 $1.15 RS Means is the
TSG Industries (The Sithe Group 1 EA $1.17 $1.17
KR Allen Construction, LLC 1 EA $1.17 $1.17
JC Stonewall Constructors, LP 1 EA $1.19 $1.19
20/017MR Addendum 1 Page 2
DivisionOne Construction LLC 1 EA $1.20 $1.20
Regiment Commercial Construc 1 EA $1.20 $1.20
Tucker Construction (Jon Tucker 1 EA $1.20 $1.20
Texas Metal Roundup 1 EA $1.20 $1.20
CMST, LLC (Construction Manag 1 EA $1.20 $1.20
ML Deer Construction 1 EA $1.20 $1.20
Cavalry Construction 1 EA $1.20 $1.20
FMG Construction Developmen' 1 EA $1.20 $1.20
Hallmark Mitigation & Construc 1 EA $1.20 $1.20
Texas General Contractors, Inc. 1 EA $1.20 $1.20
Mooring Recovery Services 1 EA $1.20 $1.20
JR Thomas Group, Inc. 1 EA $1.20 $1.20
Mart, Inc. 1 EA $1.24 $1.24
SETEX Facilities & Maintenance, 1 EA $1.24 $1.24
F.H. Paschen, S.N.Nielsen & Ass( 1 EA $1.24 $1.24
Chamberlin Roofing and Waterr 1 EA $1.25 $1.25
a & i custom manufacturing Ilc 1 EA $1.25 $1.25
BaseLine Paving & Construction 1 EA $1.25 $1.25
J Reynolds & Co., Inc. 1 EA $1.25 $1.25
SW Elevators LLC 1 EA $1.25 $1.25
D & G Quality Roofing Inc. 1 EA $1.25 $1.25
Prime Maintenance & Construct 1 EA $1.30 $1.30
Belfor Property Restoration (BEI 1 EA $1.35 $1.35
Millennium Project Solutions, In 1 EA $1.35 $1.35
Vaughn Construction (J.T. VaugF 1 EA $1.35 $1.35
Coefficient for overtime hours for the National Construction Estimator book by
Supplier QTY UOM Price Extended Supplier Notes
Basic IDIQ 1 EA No Bid
Horizon International Group, LU 1 EA No Bid
Nash Industries, Inc. 1 EA No Bid
Honesty Construction Group (Ht 1 EA No Bid
Wylie Construction Services 1 EA No Bid
Tommy Klein Construction, Inc. 1 EA No Bid
D & G Quality Roofing Inc. 1 EA $0.35 $0.35
ERC Environmental & Construct 1 EA $0.90 $0.90
Point Alliance Solutions 1 EA $1.20 $1.20
JC Stonewall Constructors, LP 1 EA $1.24 $1.24
ML Deer Construction 1 EA $1.25 $1.25
Construction Masters of Housto 1 EA $1.25 $1.25
WestCo Ventures 1 EA $1.25 $1.25
Chamberlin Roofing and Watery 1 EA $1.28 $1.28
Tucker Construction (Jon Tucker 1 EA $1.30 $1.30
Hallmark Mitigation & Construc 1 EA $1.30 $1.30
Texas Metal Roundup 1 EA $1.30 $1.30
CMST, LLC (Construction Manag 1 EA $1.30 $1.30
Texas General Contractors, Inc. 1 EA $1.30 $1.30
Mooring Recovery Services 1 EA $1.30 $1.30
KR Allen Construction, LLC 1 EA $1.30 $1.30
DivisionOne Construction LLC 1 EA $1.30 $1.30
JR Thomas Group, Inc. 1 EA $1.30 $1.30
20/017MR Addendum 1 - Page 3
Regiment Commercial Construc 1 EA $1.30 $1.30
FMG Construction Developmerr 1 EA $1.30 $1.30
a & i custom manufacturing Ilc 1 EA $1.30 $1.30
SW Elevators LLC 1 EA $1.30 $1.30
TSG Industries (The Sithe Group 1 EA $1.33 $1.33
F.H. Paschen, S.N.Nielsen & Assr 1 EA $1.34 $1.34
SETEX Facilities & Maintenance, 1 EA $1.34 $1.34
Baseline Paving & Construction 1 EA $1.35 $1.35
Mart, Inc. 1 EA $1.35 $1.35
Cavalry Construction 1 EA $1.35 $1.35
J Reynolds & Co., Inc. 1 EA $1.35 $1.35
Prime Maintenance & Construct 1 EA $1.40 $1.40
Millennium Project Solutions, In 1 EA $1.45 $1.45
Belfor Property Restoration (BEI 1 EA $1.50 $1.50
Vaughn Construction (J.T. Vaugr 1 EA $1.60 $1.60
Usual and customary mark up for any non -pre -priced items that may come up. This is
Supplier QTY UOM Price Extended Supplier Notes
Wylie Construction Services 1 EA No Bid
TSG Industries (The Sithe Group 1 EA $0.15 $0.15
CORE construction services of Ti 1 EA $0.17 $0.17
Texas Metal Roundup 1 EA $0.18 $0.18
Prime Maintenance & Construct 1 EA $0.20 $0.20
Tommy Klein Construction, Inc. 1 EA $0.20 $0.20
Nash Industries, Inc. 1 EA $1.10 $1.10
E Contractors LLC 1 EA $1.10 $1.10
Horizon International Group, LLB 1 EA $1.15 $1.15
ERC Environmental & Construct 1 EA $1.15 $1.15 15% Mark up on
FMG Construction Developmen 1 EA $10.00 $10.00
Regiment Commercial Construc 1 EA $12.00 $12.00
JR Thomas Group, Inc. 1 EA $12.00 $12.00
Honesty Construction Group (Hc 1 EA $14.00 $14.00 Can be adjusted
DivisionOne Construction LLC 1 EA $15.00 $15.00
Millennium Project Solutions, In 1 EA $15.00 $15.00
Basic IDIQ 1 EA $15.00 $15.00
ML Deer Construction 1 EA $15.00 $15.00
JC Stonewall Constructors, LP 1 EA $15.00 $15.00
Hallmark Mitigation & Construc 1 EA $15.00 $15.00
Mart, Inc. 1 EA $15.00 $15.00
Construction Masters of Housto 1 EA $15.00 $15.00 The UOM showr
WestCo Ventures 1 EA $15.00 $15.00
Texas General Contractors, Inc. 1 EA $16.00 $16.00
F.H. Paschen, S.N.Nielsen & Assr 1 EA $16.00 $16.00
SETEX Facilities & Maintenance, 1 EA $18.00 $18.00
Tucker Construction (Jon Tucker 1 EA $18.00 $18.00 This is a percent
Point Alliance Solutions 1 EA $19.00 $19.00
SW Elevators LLC 1 EA $20.00 $20.00
J Reynolds & Co., Inc. 1 EA $20.00 $20.00
a & i custom manufacturing Ilc 1 EA $20.00 $20.00
D & G Quality Roofing Inc. 1 EA $20.00 $20.00
Cavalry Construction 1 EA $20.00 $20.00
20/017MR Addendum 1 - Page 4
Vaughn Construction (J.T. VaugF 1 EA $20.00 $20.00
Mooring Recovery Services 1 EA $20.00 $20.00
Chamberlin Roofing and Watery 1 EA $20.00 $20.00
Baseline Paving & Construction 1 EA $20.00 $20.00 This would be a
KR Allen Construction, LLC 1 EA $20.00 $20.00
Be!for Property Restoration (BE. 1 EA $21.00 $21.00
CMST, LLC (Construction Manag 1 EA $33.00 $33.00 to clarify, the pe
20/017MR Addendum 1 - Page 5
20/017MR JOC - Evaluation Criteria
Total Weighted
Value
Miracle
Method
Surface
Refinishing
Wylie
Construction
Services
Tommy Klein
Construction,
Inc.
CORE
construction
services of
Texas, Inc.
Nash
Industries,
Inc.
E Contractors
LLC
Horizon
International
Group, LLC
Texas
Metal
Roundup
TSG Industries
(The Sithe
Group, LLC.)
Averages
(1) Price
Vendor's proposed coefficient(s)
40
N R
22.00
28.00
23.00
40.00
31.00
27.00
28.00
22.00
(2) Vendor's experience and reputation
References for local governmental entities and with a purchasing
cooperative program
Local government agencies within the past 5 years
Other projects completed within the past 10 years
15
5.33
12.33
11.67
8.33
8.33
9.00
5.00
11.00
(3) Quality of Vendor's products/services and extent to which the
products/services meet HCDE/CP and CP members' needs,
including: JOC Project Management, JOC Infrastructure Solutions,
Quality of Vendors Products/Service, Demonstracted ability to
perform job order contracting services, Vendor's proposed
personnel
25
14.67
18.33
22.67
21.00
18.67
18.67
14.00
14.00
(4) Impact on the ability of HCDE members to comply with laws
and rules relating to HUB/MWBE/SBE/PDBE/DBE
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(5) Vendor's safety record, including current OSHA safety report
5
2.33
2.33
4.33
2.33
2.67
4.33
2.33
2.67
(6) Whether Vendor's financial capability is appropriate to the size
and scope of the project and the total long-term cost to HCDE/CP
and CP members to acquire the products/services
5
3.33
4.33
5.00
4.33
4.33
4.33
2.00
3.33
services related to telecommunications and information services,
building construction and maintenance, or instructional materials,
whether the Vendor or the Vendor's ultimate parent company or
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(8) Vendor's past relationship with HCDE/CP and/or CP members,
including Vendor's job order contracting relationship with
HCDE/CP and/or CP members
5
0.00
4.67
4.33
4.33
4.33
4.33
0.00
1.33
(9) Marketing Plan
5
0.67
3.67
4.33
1.67
4.33
4.67
3.67
1.33
Total
100
48.33
73.67
75.33
82.00
73.67
72.33
55.00
55.67
Evaluation committee for this RFP:
Mary Causey
Stephen Kendrick
Monique Joseph
Invitations sent to
Contracts are in accordance
It is recommended
Contract
899
that the
-01
-02
-03
-04
-05
-06
prospective bidders
with TEC 44.031
following awards
Vendor
& 2269
of annual contracts:
Ilc
& Construction, Inc.
Restoration (BELFOR USA Group, Inc.)
of Houston, Inc
services of Texas, Inc.
Invitations sent
Contracts are in
It is recommended
Contract
to
accordance with
that the following
-07
-08
-09
-10
-11
-12
899
TEC 44.031
awards of annual
Vendor
prospective bidders
contracts:
LLC
& Construction Services
Group, LLC
LP
Inc.
20/017MR
20/017MR
20/017MR
20/017MR
20/017MR
20/017MR
a & i custom manufacturing
BaseLine Paving
Basic IDIQ
Belfor Property
Construction Masters
CORE construction
20/017MR
20/017MR
20/017MR
20/017MR
20/017MR
20/017MR
DivisionOne Construction
E Contractors LLC
ERC Environmental
Horizon International
JC Stonewall Constructors,
JR Thomas Group,
Non -Responsive
Non -Awarded
Award Threshold of 70
Total Responses
9
11
21
41
20/017MR JOC - Evaluation Criteria
ERC
Environmental &
Construction
Services, Inc.
Prime
Maintenance &
Construction
FMG
Construction
Development
Honesty
Construction
Group (HCG
Management LLC)
JR Thomas
Group, Inc.
Regiment
Commercial
Construction
Basic IDIQ
JC Stonewall
Constructors, LP
Construction
Masters of
Houston, Inc
WestCo
Ventures
Averages
(1) Price
Vendor's proposed coefficient(s)
30.00
28.00
N R
30.00
34.00
23.00
30.00
38.00
32.00
30.00
(2) Vendor's experience and reputation
References for local govemmental entities and with a purchasing
cooperative program
Local government agencies within the past 5 years
Other projects completed within the past 10 years
13.33
11.67
7.33
8.33
10.33
12.33
12.33
14.33
11.67
(3) Quality of Vendor's products/services and extent to which the
products/services meet HCDE/CP and CP members' needs,
including: JOC Project Management, JOC Infrastructure Solutions,
Quality of Vendors Products/Service, Demonstracted ability to
perform job order contracting services, Vendor's proposed
personnel
20.00
20.00
17.67
17.67
22.67
21.00
20.67
20.67
19.33
(4) Impact on the ability of HCDE members to comply with laws
and rules relating to HUB/MWBE/SBE/PDBE/DBE
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(5) Vendor's safety record, including current OSHA safety report
2.67
4.67
2.67
2.00
2.33
5.00
2.33
3.00
2.33
(6) Whether Vendor's financial capability is appropriate to the size
and scope of the project and the total long-term cost to HCDE/CP
and CP members to acquire the products/services
4.00
4.33
2.33
4.33
3.33
4.33
4.00
4.00
3.67
services related to telecommunications and information services,
building construction and maintenance, or instructional materials,
whether the Vendor or the Vendor's ultimate parent company or
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(8) Vendor's past relationship with HCDE/CP and/or CP members,
including Vendor's job order contracting relationship with
HCDE/CP and/or CP members
5.00
2.00
2.00
4.33
3.00
4.67
4.00
5.00
5.00
(9) Marketing Plan
4.00
3.33
3.33
5.00
4.00
5.00
5.00
4.33
4.67
Total
79.00
74.00
65.33
75.67
68.67
82.33
86.33
83.33
76.67
Evaluation committee for this RFP:
Mary Causey
Stephen Kendrick
Monique Joseph
Invitations sent to
Contracts are in accordance
It is recommended that
Contract
with TEC
the following awards
-13
-14
-15
-16
-17
-18
899
44.031
of annual contracts:
Vendor
prospective bidders
Inc.
Construction
LLC
Inc.
Contract
-19 Tommy Klein Construction
-20 Vaughn Construction
-21 WestCo Ventures
Vendor
20/017MR
20/017MR
20/017MR
20/017MR
20/017MR
20/017MR
Mart, Inc.
Millennium Project Solutions,
Nash Industries, Inc.
Prime Maintenance &
SETEX Facilities & Maintenance,
Texas General Contractors,
20/017MR
20/017MR
20/017MR
Non -Responsive
Non -Awarded
Award Threshold of 70
Total Responses
9
11
21
41
20/017MR JOC - Evaluation Criteria
DivisionOne
Construction
LLC
ML Deer
Construction
Hallmark
Mitigation &
Construction
Millennium
Project
Solutions, Inc.
Mart, Inc.
Texas General
Contractors,
Inc.
F.H. Paschen,
S.N.Nielsen &
Associates LLC
Tucker Construction
(Jon Tucker
Construction, LTD)
SETEX
Facilities &
Maintenance,
LLC
Point
Alliance
Solutions
Averages
(1) Price
Vendors proposed coefficient(s)
34.00
25.00
28.00
34.00
35.00
31.00
23.00
N R
34.00
30.00
(2) Vendor's experience and reputation
References for local governmental entities and with a purchasing
cooperative program
Local government agencies within the past 5 years
Other projects completed within the past 10 years
10.00
5.00
4.33
12.33
9.00
13.33
8.00
11.00
7.33
(3) Quality of Vendor's products/services and extent to which the
products/services meet HCDE/CP and CP members' needs,
including: JOC Project Management, JOC Infrastructure Solutions,
Quality of Vendor's Products/Service, Demonstracted ability to
perform job order contracting services, Vendor's proposed
personnel
21.67
17.33
12.33
21.00
20.00
20.00
21.33
20.33
11.67
(4) Impact on the ability of HCDE members to comply with laws
and rules relating to HUB/MWBE/SBE/PDBE/DBE
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(5) Vendor's safety record, including current OSHA safety report
5.00
5.00
2.33
2.67
2.33
2.33
2.33
2.67
2.00
(6) Whether Vendors financial capability is appropriate to the size
and scope of the project and the total long-term cost to HCDE/CP
and CP members to acquire the products/services
5.00
4.00
3.33
4.33
4.00
4.00
4.67
4.00
2.33
services related to telecommunications and information services,
building construction and maintenance, or instructional materials,
whether the Vendor or the Vendor's ultimate parent company or
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(8) Vendor's past relationship with HCDE/CP and/or CP members,
including Vendor's job order contracting relationship with
HCDE/CP and/or CP members
3.33
0.00
0.00
5.00
3.67
2.67
0.00
5.00
1.67
(9) Marketing Plan
3.33
1.33
3.33
4.67
4.67
3.67
2.33
1.00
3.00
Total
82.33
57.67
53.67
84.00
_ 78.67
77.00
61.67
78.00
58.00
Evaluation committee for this RFP:
Mary Causey
Stephen Kendrick
Monique Joseph
Non -Responsive
Non -Awarded
Award Threshold of 70
Total Responses
9
11
21
41
20/017MR JOC - Evaluation Criteria
D & G
Quality
Roofing
Inc.
a & i custom
manufacturing IIc
BaseLine Paving
& Construction,
Inc.
SW
Elevators
LLC
KR Allen
Construction,
LLC
Mooring
Recovery
Services
Cavalry
Construction
Vaughn
Construction (J.T.
Vaughn
Construction, LLC)
Chamberlin Roofing
and Waterproofing
(Chamberlin
Houston, LLC)
Belfor Property
Restoration
(BELFOR USA
Group, Inc.)
Averages
(1) Price
Vendor's proposed coefficient(s)
N R
39.67
28.00
N R
N R
N R
20.00
22.00
N R
20.00
(2) Vendor's experience and reputation
References for local governmental entities and with a purchasing
cooperative program
Local government agencies within the past 5 years
Other projects completed within the past 10 years
6.00
12.67
8.00
11.33
12.00
(3) Quality of Vendor's products/services and extent to which the
products/services meet HCDE/CP and CP members' needs,
including: JOC Project Management, JOC Infrastructure Solutions,
Quality of Vendors Products/Service, Demonstracted ability to
perform job order contracting services, Vendor's proposed
personnel
15.00
20.33
16.00
23.00
22.33
(4) Impact on the ability of HCDE members to comply with laws
and rules relating to HUB/MWBE/SBE/PDBE/DBE
0.0°
0.00
0.00
0.00
0.00
(5) Vendor's safety record, including current OSHA safety report
2.33
2.67
5.00
2.33
5.00
(6) Whether Vendor's financial capability is appropriate to the size
and scope of the project and the total long-term cost to HCDE/CP
and CP members to acquire the products/services
3.33
3.33
4.67
4.67
5.00
services related to telecommunications and information services,
building construction and maintenance, or instructional materials,
whether the Vendor or the Vendor's ultimate parent company or
0.00
0.00
0.00
0.00
0.00
(8) Vendor's past relationship with HCDE/CP and/or CP members,
including Vendor's job order contracting relationship with
HCDE/CP and/or CP members
2.00
5.00
1.67
5.00
1.00
(9) Marketing Plan
3.67
3.67
4.00
4.00
4.67
Total
72.00
75.67
59.33
72.33
70.00
Evaluation committee for this RFP:
Mary Causey
Stephen Kendrick
Monique Joseph
Non -Responsive
Non -Awarded
Award Threshold of 70
Total Responses
9
11
21
41
20/017MR JOC - Evaluation Criteria
CMST, LLC
(Construction
Managers of
Southeast Texas,
LLC)
J Reynolds
& Co., Inc.
Averages
(1) Price
Vendor's proposed coefficient(s)
26.00
N R
(2) Vendor's experience and reputation
References for local govemmental entities and with a purchasing
cooperative program
Local government agencies within the past 5 years
Other projects completed within the past 10 years
9.67
(3) Quality of Vendor's products/services and extent to which the
products/services meet HCDE/CP and CP members' needs,
including: JOC Project Management, JOC Infrastructure Solutions,
Quality of Vendor's Products/Service, Demonstracted ability to
perform job order contracting services, Vendor's proposed
personnel
16.67
(4) Impact on the ability of HCDE members to comply with laws
and rules relating to HUB/MWBE/SBE/PDBE/DBE
o.00
(5) Vendor's safety record, including current OSHA safety report
2.33
(6) Whether Vendor's financial capability is appropriate to the size
and scope of the project and the total long-term cost to HCDE/CP
and CP members to acquire the products/services
2.67
services related to telecommunications and information services,
building construction and maintenance, or instructional materials,
whether the Vendor or the Vendor's ultimate parent company or
0.00
(8) Vendor's past relationship with HCDE/CP and/or CP members,
including Vendor's job order contracting relationship with
HCDE/CP and/or CP members
3.67
(9) Marketing Plan
4.33
Total
65.33
Evaluation committee for this RFP:
Mary Causey
Stephen Kendrick
Monique Joseph
Non -Responsive
Non -Awarded
Award Threshold of 70
Total Responses
9
11
21
41
0
EXCELLENCE IN GENERAL CONTRACTING
March 2, 2021
Melissa Sullinger
Risk Manager City of Pearland
3519 Liberty Dr.,
Pearland, TX 77581
E CONTRACTORS
RE: Pearland Emergency Work Shadow Creek Sport Complex
Dear Mrs. Sullinger,
E Contractors is pleased to provide the following cost to date pricing for the above reference
project.
Scope of Work
Plumbing scope
• Repair 2-3/4" copper leaks in wall.
• Repair 2- 1/2" copper 90'elbow fitting leaks in wall at mop sinks.
• Repair 5- 3/4" copper leaks in attic
• Reinsulate approximately 60 feet of water pipe.
• replace mixing valves under sinks (7).
• Chicago faucet stems replaced on all faucets (7).
Drywall & Ceiling Repair Scope
• Mobilize all equipment, crew, and materials to jobsite.
• Demo existing CMU to allow access for plumbers.
• Re -install CMU to existing conditions.
Time of Construction
• Total Construction Timeframe: 3 Weeks
o Pre -Construction Phase 0 week
o Material Lead Time 1 weeks
o Construction Phase 2 Weeks
o Post Construction Phase 0 week
16554 Creek Bend Drive, Suite 200. Sugar Land, Texas 77478
T: 713-493-2500 1 F: 713-493-2501
EXCELLENCE IN GENERAL CONTRACTING
0
E CONTRACTORS
Pricing for scope of work is as follows of the total project:
Cost to date
Permit Cost including
$ 9,150.00.
$ 0.00.
Total $ 9,150.00
E Contractors is available for review of this estimate at your convenience. Please feel free to
contact me at 281-908-5790 or by email at emckinzie(a,,econtractors.com.
Sincerely,
Ed McKinzie
Project Manager
Attachments:
RS Means Estimate
Detailed drawing
16554 Creek Bend Drive, Suite 200. Sugar Land, Texas 77478
T: 713-493-2500 I F: 713-493-2501
0
EXCELLENCE IN GENERAL CONTRACTING
March 2, 2021
Melissa Sullinger
Risk Manager City of Pearland
3519 Liberty Dr.,
Pearland, TX 77581
E CONTRACTORS
RE: Pearland Emergency Work Hickory Slough Sport Complex
Dear Mrs. Sullinger,
E Contractors is pleased to provide the following cost to date pricing for the above reference
project.
Scope of Work
Plumbing scope
• Repair (14) copper water links in attic
• Repair copper line feeding 3 compartment sink.
• Replace metering assembly on (2) drinking fountains and (1) lay.
• Capped (2) leaking wall hydrants.
• Repair 6" irrigation leak underground at front entrance
• Patch and repair concrete.
• Provide backhoe for excavating of trench to locate damaged pipe.
• Repaint walls at front entrance to match existing.
• Repaired an additional Leak (1) in CMU wall
• Replace and additional 2 metering assembly on lav faucets.
• Replace 2 stem on hose bibs.
• Replace approximately 10 LF of pipe insulation.
Drywall & Ceiling Repair Scope
• Mobilize all equipment, crew, and materials to jobsite.
• Demo existing CMU to allow access for plumbers.
• Re -install CMU to existing conditions.
• Due to waterlines breaking at different time had to remobilize to project (3) different
times.
16554 Creek Bend Drive, Suite 200. Sugar Land, Texas 77478
T: 713-493-2500 I F: 713-493-2501
0
EXCELLENCE IN GENERAL CONTRACTING
Time of Construction
E CONTRACTORS
• Total Construction Timeframe: 3 Weeks
o Pre -Construction Phase 0 week
o Material Lead Time 1 weeks
o Construction Phase 2 Weeks
o Post Construction Phase 0 week
Pricing for scope of work is as follows of the total project:
Cost to date
Permit Cost including
$ 17,541.00.
$ 0.00.
Total $ 17,541.00
E Contractors is available for review of this estimate at your convenience. Please feel free to
contact me at 281-908-5790 or by email at emckinzieecontractors.com.
Sincerely,
We/
tve
Ed McKinzie
Project Manager
Attachments:
RS Means Estimate
Detailed drawing
16554 Creek Bend Drive, Suite 200. Sugar Land, Texas 77478
T: 713-493-2500 ( F: 713-493-2501
0
EXCELLENCE IN GENERAL CONTRACTING
March 2, 2021
Melissa Sullinger
Risk Manager City of Pearland
3519 Liberty Dr.,
Pearland, TX 77581
E CONTRACTORS
RE: Pearland Emergency Work Knapp Senior Center
Dear Mrs. Sullinger,
E Contractors is pleased to provide the following cost to date pricing for the above reference
project.
Scope of Work
Plumbing scope
• Repair %" copper line above ceiling at two locations.
• Repair water line under sink inn restroom
• Replace (1) faucet.
Drywall & Ceiling Repair Scope
• Mobilize all equipment, crew, and materials to jobsite.
• Demo water damaged drywall and insulation
• Furnish and set dehumidifiers and blowers for 4 days.
• Install insulation and drywall where previously removed.
• Tape, float, and paint all affected areas.
• Provide and install 4 cases of ceiling tile.
Flooring Scope
• Demo of existing floor at main entrance lobby past the treadmills at corner
• Install new VCT flooring match as close as possible and replace 4.5" rubber base.
• Prepped existing slab for new VCT.
16554 Creek Bend Drive, Suite 200. Sugar Land, Texas 77478
T: 713-493-2500 I F: 713-493-2501
0
EXCELLENCE IN GENERAL CONTRACTING
Electrical Scope
E CONTRACTORS
• Remove (5) 2'x 4' lay in fixtures.
• Install (5) new LED 2'x 4' light fixtures.
• Remove and replace (2) occupancy switch sensor.
Fire Alarms Scope
• Replace one smoke and one strobe in each of the two restrooms (Men's and
women's)
• Re -Run circuit cable and tie in back at the FACP or NAC/SLC circuit
• Program in the new smoke detectors on the existing FACP
• Test system and note any other issues on the system.
• At the time we did our walk thru, there was a comm failure message on the
panel. We will need the phone lines fixed prior to coming out. We will also
need the monitoring center's number for testing.
Final Clean Scope
• Final all work areas
• Apply (4) costs of wax to new VCT.
Time of Construction
• Total Construction Timeframe: 4 Weeks
o Pre -Construction Phase 0 week
o Material Lead Time 1 weeks
o Construction Phase 3 Weeks
o Post Construction Phase 0 week
Pricing for scope of work is as follows of the total project:
Cost to date
Permit Cost including
$ 46,015.00.
$ 0.00.
Total $ 46,015.00
16554 Creek Bend Drive, Suite 200. Sugar Land, Texas 77478
T: 713-493-2500 I F: 713-493-2501
EXCELLENCE IN GENERAL CONTRACTING
16
E CONTRACTORS
E Contractors is available for review of this estimate at your convenience. Please feel free to
contact me at 281-908-5790 or by email at emckinzieecontractors.com.
Sincerely,
Ed McKinzie
Project Manager
16554 Creek Bend Drive, Suite 200. Sugar Land, Texas 77478
T: 713-493-2500 I F: 713-493-2501
0
EXCELLENCE IN GENERAL CONTRACTING
March 2, 2021
Melissa Sullinger
Risk Manager City of Pearland
3519 Liberty Dr.,
Pearland, TX 77581
E CONTRACTORS
RE: Pearland Emergency Work Animal Shelter
Dear Mrs. Sullinger,
E Contractors is pleased to provide the following cost to date pricing for the above reference
project.
Scope of Work
Plumbing scope
• Repair 3/4" PVC piping at front entrance above ceiling.
• Repair copper line 3/4" at back of building.
• Remove and replace (1) backflow device.
• Remove and replace (1) faucet.
Drywall & Ceiling Repair Scope
• Remove ceiling tile and insulation.
• Replace ceiling tile at front entrance.
• Replace insulation above ceiling at front entrance.
• Replace corner column due to water damage.
• Repaint walls at front entrance to match existing.
Flooring Scope
• Demo of existing floor in front of reception desk and remove base.
• Install new LVT flooring match as close as possible and replace 4" rubber base.
Electrical Scope
• Remove (2) 2'x 4' lay in fixtures.
• Install (2) new LED 2'x 4' light fixtures.
16554 Creek Bend Drive, Suite 200. Sugar Land, Texas 77478
T: 713-493-2500 I F: 713-493-2501
0
EXCELLENCE IN GENERAL CONTRACTING
Time of Construction
E CONTRACTORS
• Total Construction Timeframe: 3 Weeks
o Pre -Construction Phase 0 week
o Material Lead Time 1 weeks
o Construction Phase 2 Weeks
o Post Construction Phase 0 week
Pricing for scope of work is as follows of the total project:
Cost to date
Permit Cost including
$ 12037.00.
$ 0.00.
Total $ 12,037.00
E Contractors is available for review of this estimate at your convenience. Please feel free to
contact me at 281-908-5790 or by email at emckinzie@econtractors.com.
Sincerely,
Ed McKinzie
Project Manager
Attachments:
RS Means Estimate
Detailed drawing
16554 Creek Bend Drive, Suite 200. Sugar Land, Texas 77478
T: 713-493-2500 I F: 713-493-2501
0
EXCELLENCE IN GENERAL CONTRACTING
March 2, 2021
Melissa Sullinger
Risk Manager City of Pearland
3519 Liberty Dr.,
Pearland, TX 77581
E CONTRACTORS
RE: Pearland Emergency Work Natatorium
Dear Mrs. Sullinger,
E Contractors is pleased to provide a cost to date proposal, for the above reference project.
Scope of Work
Plumbing scope
• Repair copper line 3/4" feeding eye wash.
Drywall & Ceiling Repair Scope
• Mobilize all equipment, crew, and materials to jobsite.
• Demo existing upper cabinets in kitchen area
• Provide 1 case of ceiling tile for kitchen area.
• Paint existing CMU wall where cabinets were removed.
• Remove and replace damaged ceiling tile in natatorium area (2 Cases).
Time of Construction
• Total Construction Timeframe: 3 Days
o Pre -Construction Phase 0 week
o Material Lead Time 0 weeks
o Construction Phase 3 Days
o Post Construction Phase 0 week
16554 Creek Bend Drive, Suite 200. Sugar Land, Texas 77478
T: 713-493-2500 I F: 713-493-2501
EXCELLENCE IN GENERAL CONTRACTING
0
E CONTRACTORS
Pricing for scope of work is as follows of the total project:
Cost to date
Permit Cost including
$ 2,225.00.
$ 0.00.
Total $ 2,225.00
E Contractors is available for review of this estimate at your convenience. Please feel free to
contact me at 281-908-5790 or by email at emckinzie@econtractors.com.
Sincerely,
17/
t %<< izlrf
Ed McKinzie
Project Manager
16554 Creek Bend Drive, Suite 200. Sugar Land, Texas 77478
T: 713-493-2500 I F: 713-493-2501