Loading...
R2006-015 01-23-06 RESOLUTION NO. R2006-15 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, APPROVING CHANGE ORDER NO.3 ASSOCIATED WITH THE DIXIE FARM ROAD SANITARY SEWER PROJECT. T RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXA Section 1. That Change Order No. 3 associated with the Dixie Farm f tary Sewer Project, a copy of which is attached hereto as Exhibit "A" and made c ~of for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to eXE the City Secretary to attest Change Order NO.3 associated with the Dixie Farm I itary Sewer Project. PASSED, APPROVED and ADOPTED this the 23rd day of Janaury ,2006. ~~ <- TOM REID MAYOR EST: >ROVED AS TO FORM: . /U) Lane Sanitary Sewer Line Req'd Unit price (per quantity Unit contract) Total . line, open cut 1200 If $ 44.00 $ 52,800.00 . line, bored & cased 100 If $ 201.00 $ 20,100.00 3 ea $ 4,260.00 $ 12,780.00 n of existing lift station 1 Is $ 12,000.00 $ 12,000.00 lp 2 ea $ 750.00 $ 1,500.00 air 1 Is $ 10,000.00 $ 10,000.00 ~ grubbing 1 ac $ 6,275.00 $ 6,275,00 $ 115,455,00 15%contingency $ 17,318.25 Estimated Total $ 132,773.25 alics are estimated (item not included in contract) ~ :;s n )9 EXHIBIT II ,. Resolution 2006-1 ~ January 17, 2006 (Incorrectectly Listed as Change Order #3 CITY OF PEARLAND DIXIE FARM ROAD SANITARY SEWER IMPROVEMENTS BID RFB 2005-018 FNI 03-292 CHANGE ORDER NO.4 lyer, Inc, \ 18 Reid Lake Drive Juston, Texas 77064 le following change order for materials and labor has been approved: ITEM \ UNIT II QUANTITY II UNIT \~ NO. ITEM DESCRIPTION PRICE 1 Clear & Grub (1,100' x 40') AC 1 $8,00000 $8,OC 2 12" PVC, SDR 26 (ASTM 0-3034) san, swr, including excavation, bedding, & backfill (10'-12') Depth LF 195 $50,00 $9,7 (12'-14') Depth LF 215 $56.00 $12,C (14'-16') Depth LF 430 $7400 $31,1 (16'-18') Depth LF 195 $78.00 $15,: 2 12" PVC, SDR 26 (ASTM 0-3034) San, Swr. in Uncased Bore Hole (All Depths) LF 40 $14500 r 3 Std. 4' Diam. Pre-Cast Conc, Sanitary Sewer Manhole EA 4 $4,600.00 $18, 4 Extra Depth Pre-Cast Conc. Sanitary Sewer Manhole, 4' Diam, VF 27 $200 80 I $5,' 5 Trench Safety (All Depths) LF 1,035 $1.00 I $1,1 6 Tie-in Prop. 12" San. Swr, to Exist MH at Dixie Farm Rd. EA 1 $2,200.00 $2, 7 Tie-in Prop, 12" San, Swr. to Exist MH at Lift Station and Plug Line EA 1 $2,200.00 $2 8 Site Restoration including grading and hydromulching LS 1 $4,00000 $4 1 I I I t TOTAL CHANGE ORDER NO.4 ~ Contract Time is extended by 30 calendar days for this Change Order. \.