R2005-0168 10-31-05 RESOLUTION NO. R2005-168 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, APPROVING CHANGE ORDER NO.1 ASSOCIATED WITH THE MAGNOLIA SEWER PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That change order No. 1 associated with the construction of the Magnolia Sewer Project, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest Change Order NO.1 associated with the Magnolia Sewer Project. PASSED, APPROVED and ADOPTED this the 31st day of October c- '(2 ->~'.,~ TOM REID MAYOR A.D., 2005. ATTEST: ~~ Y S RETARY APPROVED AS TO FORM: ~ 4..-~ 1-(. &J-- DARRIN M. COKER CITY ATTORNEY Exhibit "A" Resolution 2005-168 CHANGE ORDER FOR Utility Relocations Along Magnlia Rd From Magnolia Estates Blvd. to Main (SH 35) 30" Sanitary Sewer PEARLAND,TEXAS Date of Issuance: Owner: Contractor: Engineer: 1-Nov-05 City of Pearland Reddico Construction Co. S&B Infrasturcture Change Order No.: Owner's Project No.: Contractor's Project No.: Engineer's Project No.: 1 B2004 - 019 SummarY of Chanoe Order: Org. Con. Revised Description Contract Change Item OTY Con. OTY Amount Time Bid Item 2 300 1063.5 Add 763.5 HRs of "Flagman" at $34.80 a HR. The total change in the contact amount for this item is = $26,569.80 N/A Section 01555 requires the use of flagmen where construction equipment enters, crosses, or encroaches on active vehicular traffic lanes and protected sidewalks and crosswalks. The traffic control did not allow the contractor to utilize an existing lane of traffic for ingress/egress of Justification construction equipment and material hauling trucks for his open cut activities. Due to the contractual requirements, the actual traffic loading, and the extended durations of the peak hours, due to a major route for several area schools, it was agreed that additional flagmen would be needed on site to protect the traveling Public. Add 358.66 LF of "Trench Safety System" at $1.00 a Bid Item 4 2816 3174.66 LF. The total change in the contact amount for this item is = $358.66 N/A On the drawings the open cut shown is as following: 2,917 LF of 30", 299 LF of 6", 63 LF of 8" for a total Justification of 3,219 LF. The 30" bores were extended 50.34 LF, the service lead bores were extended 73 LF and 21 LF was added of 24" pipe leaving a total of 3,174.66 of Open Cut Pipe. Delete 943 LF of "Control of Ground Water for Open Bid Item 5 3885 2942 Cut Excavations" at $1.00 a LF. The total change in the contract amount for this item is = -$943.00 N/A Justification Ground water control was only necessary on 2,942 LF of pipe. Delete 3261 LF of "Filter Fabric Fence, Complete in Bid Item 6 3336 75 Place" at $1. 15 a LF. The total change in the contract amount for this item is = -$3.750.15 N/A Justification Only 75 LF of Filter Fabric Fence was needed to control erosion and debris. Delete 707 LF of "Reinforced Filter Fabric Barrier, Bid Item 7 887 180 Complete in Place" at $1.50 a LF. The total change in the contract amount for this item is = -$1.060.50 N/A Justification Only 180 LF of Reinforced Filter Fabric Barrier was needed to control erosion and debris. CO-1B[1] Page 1 of 10 CHANGE ORDER FOR Utility Relocations Along Magnlia Rd From Magnolia Estates Blvd. to Main (SH 35) 30" Sanitary Sewer PEARLAND,TEXAS Date of Issuance: Owner: Contractor: Engineer: 1-Nov-05 City of Pearland Reddico Construction Co. S&B Infrasturcture Change Order No.: Owner's Project No.: Contractor's Project No.: Engineer's Project No.: 1 B2004 - 019 S ummarv 0 anae r er: Org. Con. Revised Description Contract Change Item QTY Con. QTY Amount Time Add 12 LF of "6-lnch Sanitary Sewer Lead, Open Bid Item 8 237 249 Cut" at $32.00 a LF. The total change in the contact amount for this item is = $384.00 N/A On the drawings there is 299 LF of Open Cut 6" Service leads. Since MH #17 was moved 10' West Justification and the three long side connections had the bores extended by 60 LF to protect existing utilities the total amount of 6" open cut service lead installed was 249 LF. Add 60 LF of "6-lnch Sanitary Sewer Lead in 12-lnch Bid Item 9 114 174 Augered Steel Sleeve" at $139.00 a LF. The total change in the contract amount for this item is = $8,340.00 N/A On the drawings there is 214 LF of Augered 6" Justification Service leads in 12" Steel Casing. The three long side service lead bores were extended by 60 LF to protect existing utilities. Delete 40 LF of "8-lnch Sanitary Sewer Lead, Open Bid Item 1 0 78 38 Cut" at $32.20 a LF. The total change in the contact amount for this item is = -$1.28800 N/A The drawings call for 63 LF of 8" service connection Justification of open cut. The bore was extended by 25 LF to protect existng utilities. Add 25 LF of "8-lnch Sanitary Sewer Lead in 16-lnch Bid Item 11 65 90 Augered Steel Sleeve" at $125.30 a LF. The total change in the contract amount for this item is = $3,132.50 N/A The drawings call for 65 LF of 8" service connection Justification of auger. The bore was extended by 25 LF to protect existng utilities. Add 4 EA of "6-lnch or 8-lnch Plug" at $65.00 a EA. Bid Item 13 8 12 The total change in the contact amount for this item is = $260.00 N/A There was a plug placed in each of the service Justification connection stub outs and in each service stack for a total of 12. Delete 67.34 LF of "30-lnch Sanitary Sewer, Open Bid Item 14 945 877.66 Cut, 20-22 Feet Deep" at $106.20 a LF. The total change in the contact amount for this item is = -$7,151.51 N/A fCh Od CO-1B[1] Page 2 of 10 CHANGE ORDER FOR Utility Relocations Along Magnlia Rd From Magnolia Estates Blvd. to Main (SH 35) 30" Sanitary Sewer PEARLAND, TEXAS Date of Issuance: Owner: Contractor: Engineer: 1-Nov-05 City of Pear/and Reddico Construction Co. S&B Infrasturcture Change Order No.: Owner's Project No.: Contractor's Project No.: Engineer's Project No.: 1 B2004 - 019 S ummarv 0 anae r er: Org. Con. Revised Description Contract Change Item QTY Con. QTY Amount Time The drawings show 2,384 LF of 30" open cut not in steel casing. Two bores were extended to protect Justification the road and existing utilities for 40.34 LF. The remaining difference in as-built quantities is from elevation variances. Add 11 LF of "30-lnch Sanitary Sewer, Open Cut, 22 Bid Item 15 961 972 24 Feet Deep" at $111.60 a LF. The total change in the contact amount for this item is = $1,227.60 N/A The drawings show 2,384 LF of 30" open cut not in steel casing. Two bores were extended to protect Justification the road and existing utilities for 50.34 LF. The remaining difference in as-built quantities is from elevation variances. Add 35 LF of "30-lnch Sanitary Sewer in 42-lnch Bid Item 18 205 240 Augered Steel Sleeve Under SH 35" at $526.00 a LF. The total change in the contact amount for this item is = $18,410.00 N/A The bore was extended under SH 35 by 35 LF to Justification protect the existing TxDOT Traffic Signal electrical boxes on the North East corner of the intersection of SH 35 and Magnolia/John Uzer Road. Add 15.34 LF of "30-lnch Sanitary Sewer in 42-lnch Bid Item 20 124 139.34 Augered Steel Sleeve Under Magnolia Street" at $586.60 a LF. The total change in the contact amount for this item is = $8,998.44 N/A In RFI #5 the Contractor expressed concern for the stability of the Magnolia Road due to change in soil Justification conditions. The Contractor extended the bore to protect the road and existing utilities and the City agreed to split the cost of the extension. Delete 1 EA of "8-Foot Sanitary Sewer Manhole (4- Bid Item 21 1 o Foot Diameter){Corrosion Resistant)" at $2,840.00 a EA. The total change in the contact amount for this item is = -$2.84000 N/A fCh Od CO-1B[1] Page 3 of 10 CHANGE ORDER FOR Utility Relocations Along Magnlia Rd From Magnolia Estates Blvd. to Main (SH 35) 30" Sanitary Sewer PEARLAND,TEXAS Date of Issuance: Owner: Contractor: Engineer: 1-Nov-05 City of Pearland Reddico Construction Co. S&B Infrasturcture Change Order No.: Owner's Project No.: Contractor's Project No.: Engineer's Project No.: 1 B2004 - 019 SummarY of Chanae Order: Org. Con. Revised Description Contract Change Item OTY Con. OTY Amount Time Instead of placing a 4' diameter manhole (MH #16A) next to an existing Lift Station (Weatherford) at Sta. Justification 43+24 that was to be abandoned and converted to a MH in this contract, the City requested that MH #16A not be installed and the 8" service lead be connected directly into the converted LS. Add 1 EA of "8-Foot Sanitary Sewer Manhole (5-Foot Bid Item 22 12 13 Diameter)(Corrosion Resistant)" at $5,025.00 a EA. The total change in the contact amount for this item is = $5,025.00 N/A Originally MH #19 (8' Diameter) at Sta. 53+25 was to have a stub out South along SH 35. This MH was to be a 8' diameter MH to take the flow from the North Justification and South of SH 35. After the start of construction Manhole #19 was changed to a 5' diameter manhole after KKI stated that no North or South stub outs were needed. Delete 1 EA of "8-Foot Sanitary Sewer Manhole (8- Bid Item 23 1 o Foot Diameter)(Corrosion Resistant)" at $10,225.00 a EA. The total change in the contact amount for this item is = -$10.225.00 N/A Originally MH #19 (8' Diameter) at Sta. 53+25 was to have a stub out South along SH 35. This MH was to be a 8' diameter MH to take the flow from the North Justification and South of SH 35. After the start of construction Manhole #19 was changed to a 5' diameter manhole after KKI stated that no North or South stub outs were needed. Delete 10.75 VF of "Extra Depth for Sanitary Sewer Bid Item 24 200 189.25 Manhole (Corrosion Resistant)" at $215.00 a VF. The total change in the contact amount for this item is = -$2,311.25 N/A Justification The removal of one MH reduced the need for a quantity of extra depth vertical footage. Delete 37.43 VF of "6-lnch Drop Connections at Bid Item 25 95 57.57 Manhole" at $35.00 a VF. The total change in the contact amount for this item is = -$1.3"10.05 N/A It is not mandatory by TCEQ regulations to install Justification drop connections for service leads at MHs. The City requested that no further drop connections be installed on service connections. CO-1B[1 ] Page 4 of 10 CHANGE ORDER FOR Utility Relocations Along Magnlia Rd From Magnolia Estates Blvd. to Main (SH 35) 30" Sanitary Sewer PEARLAND, TEXAS Date of Issuance: Owner: Contractor: Engineer: 1-Nov-05 City of Pearland Reddico Construction Co. S&B Infrasturcture Change Order No.: Owner's Project No.: Contractor's Project No.: Engineer's Project No.: 1 B2004 - 019 S fCh Od ummarv 0 anae r er: Org. Con. Revised Description Contract Change Item QTY Con. QTY Amount Time Add 0.55 VF of "8-lnch Drop Connections at Bid Item 26 32 32.55 Manhole" at $37.00 a VF. The total change in the contact amount for this item is = $20.35 N/A This number is based on as-built field measured Justification quantities and differentiates from the bid quantity due to slight grade differences. Delete 1 EA of "30-lnch Plug" at $1,750.00 a EA. Bid Item 27 1 o The total change in the contact amount for this item is = -$1.75000 N/A Justification The 30" stub out south from MH 319 was removed and therefore no plug was needed. Bid Item 31 400 o Delete 400 SY of "Sodding" at $4.00 a SY. The total change in the contact amount for this item is = -$1.60000 N/A There were no locations indicated on the drawings Justification for the placement of sod and no sod was needed in this job. Delete 1,468 SY of "Hydromulch" at $0.35 a SY. Bid Item 32 15644 14176 The total change in the contact amount for this item is = -$51380 N/A The John Lizer Project started before the final clean up for this project was complete. Since the two jobs Justification overlapped East of SH 35 the City decided there was no reason to hydromulch the same area twice. This area will be hydromulched after the completion of John Lizer. Delete 100 SY of "Extra Sodding" at $4.00 a SY. Bid Item 33 100 o The total change in the contact amount for this item is = -$400.00 N/A There were no locations indicated on the drawings Justification for the placement of sod and no sod was needed in this job. Delete 5 TON of "Extra Cement Stabilized Sand" at Item 34 5 0$15.00 a TON. The total change in the contact amount for this item is = -$75.00 N/A Justification No extra cement stabilized sand was required for this job. CO-1B[1] Page 5 of 10 CHANGE ORDER FOR Utility Relocations Along Magnlia Rd From Magnolia Estates Blvd. to Main (SH 35) 30" Sanitary Sewer PEARLAND, TEXAS Date of Issuance: Owner: Contractor: Engineer: 1-Nov-05 City of Pearland Reddico Construction Co. S&B Infrasturcture Change Order No.: Owner's Project No.: Contractor's Project No.: Engineer's Project No.: 1 B2004 - 019 SummarY of Chance Order: Org. Con. Revised Description Contract Change Item OTY Con. OTY Amount Time Add 402.1 CY of "Machine Excavation to Obtain a Item 35 100 502.1 Stable Trench Bottom or Manhole Bottom" at $4.00 a CY. The total change in the contact amount for this item is = $1,608.68 N/A Section 01564 requires the Contractor to control groundwater by both dewatering and depressurization of water-bearing soil layers to maintain trench excavations and foundation beds in dry and stable conditions. The Contractor was unable to utilize the prescribed methods to stabilize Justification the foundation by dewatering and depressurization due to the cohesive soils encountered in the trench zone. The Contractor provided control of groundwater in the trench with sump pumps. Extra Bid Items in the Contract, for use in wet and unstable trench conditions, were utilized to ensure proper installation of the Work, in accordance with the details. Add 402.1 CY of "Crushed Rock to Obtain a Stable Item 36 100 502.1 Trench Bottom or Manhole Bottom" at $35.00 a CY. The total change in the contact amount for this item is = $14,073.50 N/A Section 01564 requires the Contractor to control groundwater by both dewatering and depressurization of water-bearing soil layers to maintain trench excavations and foundation beds in dry and stable conditions. The Contractor was unable to utilize the prescribed methods to stabilize Justification the foundation by dewatering and depressurization due to the cohesive soils encountered in the trench zone. The Contractor provided control of groundwater in the trench with sump pumps. Extra Bid Items in the Contract, for use in wet and unstable trench conditions, were utilized to ensure proper installation of the Work, in accordance with the details. Delete 100 LF of "Wet Sand Construction for 6-lnch Item 37 100 o Sanitary Sewer, Open Cut, All Depths" at $10.00 a LF. The total change in the contact amount for this item is = -$1.00000 N/A Justification No wet sand construction was required for 6-inch service leads. CO-1B[1] Page 6 of 10 CHANGE ORDER FOR Utility Relocations Along Magnlia Rd From Magnolia Estates Blvd. to Main (SH 35) 30" Sanitary Sewer PEARLAND,TEXAS Date of Issuance: Owner: Contractor: Engineer: 1-Nov-05 City of Pearland Reddico Construction Co. S&B Infrasturcture Change Order No.: Owner's Project No.: Contractor's Project No.: Engineer's Project No.: 1 B2004 - 019 SummarY of Chanae Order: Org. Con. Revised Description Contract Change Item QTY Con. QTY Amount Time Delete 100 LF of "Wet Sand Construction for 8-lnch Item 38 100 o Sanitary Sewer, Open Cut, All Depths" at $12.00 a LF. The total change in the contact amount for this item is = -$1,20000 N/A Justification No wet sand construction was required for 8-inch service leads. Add 2,607 LF of "Wet Sand Construction for 30-lnch Item 39 100 2707 Sanitary Sewer, Open Cut, All Depths" at $21.50 a LF. The total change in the contact amount for this item is = $56,050.50 N/A Section 01564 requires the Contractor to control groundwater by both dewatering and depressurization of water-bearing soil layers to maintain trench excavations and foundation beds in dry and stable conditions. The Contractor was unable to utilize the prescribed methods to stabilize Justification the foundation by dewatering and depressurization due to the cohesive soils encountered in the trench zone. The Contractor provided control of groundwater in the trench with sump pumps. Extra Bid Items in the Contract, for use in wet and unstable trench conditions, were utilized to ensure proper installation of the Work, in accordance with the details. Add 1 LS amount of $ 2,818.20 for the price increase assciated with the increase wall thickness for the CO Item 40 N/A 1 casing pipe under the Railroad Crossing ($23.10 for 122 LF). The total change in the contract amount for this item is = $2,818.20 0 Prior to bid the casing wall thickness for the bore under the Rail Road tracks was specified as 0.5". The Rail Road Permit issued after bid, required the wall thickness to be 0.563". This line item covers the additional cost associated with the increased wall thickness required. Add 1 LS amount of $ 6,430.14 for material cost CO Item 41 N/A 1 increases due to delay in contract start. The total change in the contract amount for this item is = $6,430.14 0 CO-1B[1] Page 7 of 10 CHANGE ORDER FOR Utility Relocations Along Magnlia Rd From Magnolia Estates Blvd. to Main (SH 35) 30" Sanitary Sewer PEARLAND, TEXAS Date of Issuance: Owner: Contractor: Engineer: 1-Nov-05 City of Pearland Reddico Construction Co. S&8lnfrasturcture Change Order No.: Owner's Project No.: Contractor's Project No.: Engineer's Project No.: 1 82004 - 019 S fCh Od ummarv 0 anae r er: Org. Con. Revised Description Contract Change Item OTY Con. OTY Amount Time Due to the delay in the contract start from the bid date the Contractor incurred price increases in the cost of the pipe. This line item covers the additional cost of the material due to the price escalation. Add 1 LS amount of $500.00 for additional site clearing associated with the extension of the 24" CO Item 42 N/A 1 Stub of 29 LF away from the MH #19. The total contract change in the contract amount for this item is = $500.00 0 The Contract called for a 24" stub out East along John Lizer Road from Manhole #19. The City requested an extension of the stub out to enable the next Contractor to install the 24" sewer without disturbing the existing MH #19. Add 1 LS amount of $200.00 for additional traffic CO Item 43 N/A 1 control associated with the extension of the 24" Stub of 29 LF away from the MH #19. The total contract change in the contract amount for this item is = $200.00 0 The Contract called for a 24" stub out East along John Lizer Road from Manhole #19. The City requested an extension of the stub out to enable the next Contractor to install the 24" sewer without disturbing the existing MH #19. Add 21 LF of 24" Pipe for an extension of the stub CO Item 44 N/A 21 out from MH #19 at $165.00 per LF. The total change in the contract amount for this item is = $3,465.00 0 The Contract called for a 24" stub out East along John Lizer Road from Manhole #19. The City requested an extension of the stub out to enable the next Contractor to install the 24" sewer without disturbing the existing MH #19. CO Item 45 N/A 1 Add 1 EA of 24" Plug at $1,585.00 EA. The total change in the contract amount for this item is = $1,585.00 0 CO-18[1] Page 8 of 10 CHANGE ORDER FOR Utility Relocations Along Magnlia Rd From Magnolia Estates Blvd. to Main (SH 35) 30" Sanitary Sewer PEARLAND, TEXAS Date of Issuance: Owner: Contractor: Engineer: 1-Nov-05 City of Pearland Reddico Construction Co. S&8lnfrasturcture Change Order No.: Owner's Project No.: Contractor's Project No.: Engineer's Project No.: 1 82004 - 019 Summarv of hanoe Order: Org. Con. Revised Description Contract Change Item QTY Con. QTY Amount Time The Contract called for a 24" stub out East along John Lizer Road from Manhole #19. The City requested an extension of the stub out to enable the next Contractor to install the 24" sewer without disturbing the existing MH #19. Add 48 LF of remove and dispose of 18" RCP pipe at CO Item 46 N/A 48 $18.00 per LF. The total change in the contract amount for this item is = $864.00 0 48 LF of 18" RCP pipe was discovered East of the intersection of SH 35 and Magnolia Road that was not shown on the drawings. The Contractor removed and disposed of the Pipe. Add 90 LF of Dry Auger for the 8" bore under CO Item 47 N/A 90 Magnolia Road at $65.00 per LF of cost increase to original LF price. The total change in the contract amount for this item is = $5,850.00 0 The Contractor originally bid the 8" Pipe in 16" Steel Casing across Magnolia Road from MH #16 at Sta. 44+ 15 to be wet augered. Due to unforeseen soil conditions, a wet auger failed three times and the Contractor was forced to dry auger and up the casing size to 20". The increases in the Contractor's cost are reflected in this line item. Deduct 104 LF of steel cased service lead auger at CO Item 48 N/A 104 $41.80 per LF. The total change in the contract amount for this item is = -$4.347.20 0 During Construction, the steel casing was removed from the service lead bores unless it was required due to soil conditions on the 6" service leads. With the removal of the steel casing, there is a credit per LF for the two service leads that did not require casing (Sta. 40+80 and Sta. 48+15). C CO-18[1] Page 9 of 10 CHANGE ORDER FOR Utility Relocations Along Magnlia Rd From Magnolia Estates Blvd. to Main (SH 35) 30" Sanitary Sewer PEARLAND,TEXAS Date of Issuance: Owner: Contractor: Engineer: 1-Nov-05 City of Pearland Reddico Construction Co. S&B Infrasturcture Change Order No.: Owner's Project No.: Contractor's Project No.: Engineer's Project No.: 1 B2004 - 019 Description Contract Change Amount Time Contract Amount: Original Contract Price: Previous Change Order(s): Contract price prior to this change order $933,509.50 150 Days $0.00 0 $933,509.50 150 Days $124,405.92 0 $1,057,915.42 150 Days Net increase (decrease) from this change order Contract price with all change orders to date (including this change order): Contract Time: No change in contract time is authorized by this change order. ACCEPTED: APPROVED: By'; ~/ r~ Contractor By gfl:- OwnerBill Eisen, City Manager r; Date: II, \ . 0 \ Date: )//rJ,IO$ , I D~e: November 1. 2005 CO-1B[1] Page 10 of 10 Darrin Coker To: Christina Abbott/COP@ci.pearland.tx.us 11/01/2005 08:05 AM cc: Young Lorfing/COP@ci.pearland.tx.us Subject: change order Can you please get the new Magnolia Change Orders(with the approved amount)to Young for execution. I think the new ones that he has reflect the higher amount.Thanks! Darrin M. Coker City Attorney-City of Pearland 3519 Liberty Drive Pearland,TX 77581 Telephone: 281-652-1664 Fax: 281-652-1679 CONFIDENTIALITY STATEMENT This message and all attachments are confidential and may be protected by the attorney-client and other privileges.Any review, use, dissemination,forwarding, printing, copying, disclosure or distibution by persons other than the intended recipients is prohibited and may be unlawful. If you believe this message has been sent to you in error, please notify the sender by replying to this transmission, or by calling the City of Pearland at(281) 652-1664. Unless expressly stated in this e-mail, nothing in this message should be construed as a digital or electronic signature.Thank you for you cooperation. C g 1E NOV 1•. 2005 CITY OF PEARLAND ( PROJECTS DEPARTMENT 1\--9 _ APPROVED - .0 Z r ti i 1